ADAPTIVHOUS Taylor Herman & Alex Baker ARCH 5120 Professor Michelle Laboy Spring 2020
CONTENTS SITE
BUILDING DESIGN
03
04 14
0’
Lateral support Stairs / elevator core Lateral support
co re
to co re
INTEGRATION
RENDERS & MODELS Circulation paths Entrances/exit
11
Egress Path
6’
Enclosed exit
Double height spaces
Se
95 ’ on 3
cti
11
Se
16 5’ on 2
cti
19 95 ’ cti on
Se Floor
10
7
6
8
7
8
11
Height
150 ft
125 ft
125 ft
150 ft
150 ft
150 ft
175 ft
Area
2550 sq ft
2720 sq ft
2720 sq ft
2550 sq ft
2720 sq ft
2720 sq ft
2550 sq ft
16
5’
1
co re
to co
Site
Chapter One
Site Neighborhood Connection
3
Building
Chapter Two
Elevations North Elevation
4
Building
Chapter Two
Elevations South Elevation
5
Building
Chapter Two
Elevations West Elevation
6
Building
Chapter Two
Elevations East Elevation
7
Building
Chapter Two
Section Long || View North
8
Building
Chapter Two
Section Short || View West
9
Building
Chapter Two
Floor Plans 1st, 5th, 8th Floors
5th Floor 1st Floor
8th Floor
10
Renders & Models
Chapter Three
Render Street Side || Looking Northeast
11
Renders & Models
Chapter Three
Render
Looking Northwest
12
Renders & Models
Chapter Three
Render Parkside || Looking East
13
Renders & Models
Chapter Three
Render Streetscape || Looking West
14
Renders & Models
Chapter Three
Render Streetscape || Looking West
15
Renders & Models
Chapter Three
Render Interior View || Parkside
16
Renders & Models
Chapter Three
Model 1/32 Scale
17
Renders & Models
Chapter Three
Model
Section || 1/8 Scale
18
Integrations
Chapter Four
Birdseye Axo Structural Stability & Emergency Egress
14
0’
co re
to co re
11
6’
Se
co re
to co re
95 ’ on 3
cti
Se
16 5’ on 2
cti
Lateral support Stairs / elevator core Lateral support
95 ’ cti on
Se
1
16
5’
’
46
Circulation paths Entrances/exit
Floor
10
7
6
8
7
8
11
Height
150 ft
125 ft
125 ft
150 ft
150 ft
150 ft
175 ft
Area
2550 sq ft
2720 sq ft
2720 sq ft
2550 sq ft
2720 sq ft
2720 sq ft
2550 sq ft
’
90
6’
63’
13
15’
Egress Path
52’
12’
82’
52’ 18’
18’
Enclosed exit Section 3
Double height spaces
Section 2 Floor 5
Section 1
Circulation paths
19
Integrations
Chapter Four
Peel-Away Construction and Materials
Soil
Bioswell
Exterior and Interior Concrete finish
Grass
Roof parapet Permiable Tile roof Rigid Insulation Roof slope layer Beam/floor modual
Water collection
East & West facades
Rigid Insulation
Glass subtle blue reflectant
Weather proofing sealant/caulking Control cracking/ Expansion joints Concrete + Rebar
Window glazing Window frame
Window cladding
Window cladding
Structural Memebers
North & South Facade system
Virtical Organization
1”
1” 1”
9”
9” 1”
1’
1.25”
1”
1’ 1.75’
Low Light
Medium light
Roof permeable tiles Rigid Insulation Weatherproof membrane Beam/floor Modular
9” 14”
Horizontal Organization
2”
2.5” 3’
1.5’ 2.5” 1.8’
1.8’
2”
High light
20
Integrations
Chapter Four
Section Perspective Building and Scenario Planning
Scenario 1 Emergency Response Intended for quick and frequent set up of emergancy haousing services, this building can be set up to provide personal rooms for families through the use of custom modular office furniture design.
Scenario 2 Self reliant In this emergency we see societal needs that will off more security inside thee building, and thus will offer more to those who will stay inside more. To accompany this we see shops and stores on the first few floors that offer a more social center to the building. While more private needs may be served up higher in the building where there are apartments.
Natural Light Fresh Air HVAC Supply HVAC Return
21