Leading Architecture & Design August/September 2021

Page 18

Bl ue print

Bending The first phase of luxury apartment development Ellipse Waterfall, by dhk Architects, is complete.

the rules Phot og r aphy Tris tan McL are n

18 Leading Architecture + Design AUGUST/SEPTEMBER 2021

T

he first phase of highrise luxury apartment development, Ellipse Waterfall, is complete. Construction of the first two towers, 10-storey Newton and 11-storey Kepler, began in November 2019 and was completed in June 2021. This moves the development onto the second phase in which the flagship 16-storey Cassini tower, including The Luna Club, will be built. The Galileo tower will be built in the third and final phase.

Once complete, the sizable 45 000m2 precinct will include 600 brandnew apartments and other amenities such as leisure and lap pools, verdant gardens, and The Luna Club. Designed by distinguished multidisciplinary design studio dhk Architects, the elegant form of the Ellipse Waterfall towers developed by Attacq and Tricolt will deliver a highly recognisable landmark in the heart of Waterfall City.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.