![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
ENGINEERING & TRAFFIC SYSTEM STATS & FAST FACTS
control support for special events and other in-street projects being done by other city teams, as well as operation and enforcement of public parking. Additionally, as part of its role in planning projects, Engineering provides support and leadership in applying for relevant grants, low-interest loans, and zero-interest loans for projects to minimize costs to our citizens.
• Number of Projects with Engineering Oversight: 10
• Amount of grant funding secured for projects (2022): $2.86M
• Total Value of Projects Awarded (2022):
TRAFFIC LIGHTS MANAGED:
• Number of Special Event Road Closures (2022): 99
INSPECTIONS PERFORMED:
ROAD CLOSURES PERFORMED FOR INFRASTRUCTURE DIVISIONS: