MATERIAL LEGEND WOOD, FINISHED
2
REVISION
1
WINDOW TYPE
101
ROOM NUMBER
CMU
BRICK
CONCRETE
PARTITION TYPE
2
WOOD, ROUGH
U1
DOOR TYPE
ABBREVIATIONS
ATS AUTO AVE
AIR CONDITIONING ANCHOR BOLT ABOVE ACOUSTICAL ACCESS ACCESS FLOOR ACOUSTICAL PLASTER ACOUSTIC CEILING TILE AREA DRAIN ADDENDUM ADJACENT ADJUSTABLE ARCHITECT/ENGINEER ABOVE FINISHED FLOOR AGGREGATE ALUMINUM ALTERNATE ANCHOR, ANCHORAGE ANNEALED ANODIZED ACCESS PANEL APPROXIMATE ARCHITECT (URAL) ASPHALT ASSEMBLY AMERICAN SOCIETY for TESTING MATERIALS ABOVE TOP OF SLAB AUTOMATIC AVENUE
BC BD BEL BET BIT,BITUM BKR BLDG BLK BLKG BM BOC BOT BPL BRG BRK BS BSMT BTU BUR BW
BRICK COURSE BOARD BELOW BETWEEN BITUMINOUS BACKER ROD BUILDING BLOCK BLOCKING BENCH MARK BOTTOM OF CURB BOTTOM BEARING PLATE BEARING BRICK BOTH SIDES BASEMENT BRITISH THERMAL UNIT BUILT-UP ROOFING BOTH WAYS
A/C AB ABV AC ACC ACFL ACPL ACT AD ADD ADJ ADJT A/E AFF AGG AL ALT ANC ANLD ANOD AP APPROX ARCH ASPH ASSEM ASTM
SHIM
1
BUILDING SECTION BATT INSULATION
A100
EARTH
1
WALL OR DETAIL SECTION
A100
RUBBLE STONE 1 ELEVATION A100
BLUSTONE SLATE SOAP STONE FLAGGING
1
ENLARGED DETAIL
A100
PLAN OR SECTION
POROUS FILL (GRAVEL, STONE)
PLYWOOD
NORTH RIGID INSULATION
NEW (PROPOSED) ELEVATION
EXISTING ELEVATION
MARBLE, GRANITE
STEEL
1 2
4
GYPSUM WALLBOARD
INTERIOR ELEVATION MARK
3
CERAMIC OR QUARRY TILE
10
COLUMN LINE ALUMINUM
C CAB CB CEM CF CFLG CFM CG CH CI CIPC CIR CIRC CJT CL CLG CLL CLN CLR CMPL CMU CO COL COMB COMP CONC CONN CONST CONT CONTR COORD CORR CPR CPT CPTT CSK CS CSMT
CT CTR CUH CW CY
CERAMIC TILE COUNTER CABINET UNIT HEATER COLD WATER CUBIC YARD
D DA DEM DEP DH DIA DIAG DIFF DIM DR DN DTL DWG
DRAIN DOUBLE-ACTING DEMOLISH, DEMOLITION DEPRESSED DOUBLE HUNG DIAMETER DIAGONAL DIFFUSER DIMENSION DUPLEX RECEPTACLE DOWN DETAIL DRAWING
E EA EF EL ELAS ELEC ELEV EMER ENC EP EQ EQPT EST EWC EWEF EXIST EXH EXIST EXP EXP JT EXPN BLT EXT
EAST EACH EACH FACE ELEVATION ELASTOMERIC ELECTRIC (AL) ELEVATOR EMERGENCY ENCLOSE (URE) ELECTRICAL PANELBOARD EQUAL EQUIPMENT ESTIMATE ELECTRIC WATER COOLER EACH WAY EACH FACE EXISTING EXHAUST EXISTING EXPANSION, EXPOSED EXPANSION JOINT EXPANSION BOLT EXTERIOR
F FA FAS FAWP FB FBD FD FDN FE FEC COURSE FF CABINET CATCH BASIN, CORNER BEAD FGL FH CEMENT FHC CUBIC FOOT (FEET) FHS COUNTERFLASHING FIN CUBIC FEET PER MINUTE FIXT CORNER GUARD FJT CEILING HEIGHT FL CAST IRON FLG CAST IN PLACE CONCRETE FLUR CIRCLE FLX CIRCUMFERENCE FNR CONTROL JOINT CENTER LINE FOC CEILING FOF CONTRACT LIMIT LINE FOM CLEAN FOS CLEAR (ANCE) FP CEMENT PLASTER (PORTLAND) FPL CONCRETE MASONRY UNIT FPM CLEANOUT FR COLUMN FRC COMBINATION FRCB COMPRESS (ED,ION,IBLE) CONCRETE FRT CONNECTION FSP CONSTRUCTION FSR CONTINUOUS or CONTINUE FT CONTRACT (OR) FTG COORDINATE FTR CORRIDOR FUR COPPER FUT CARPET CARPET TILE GA COUNTER SINK(SUNK) GB CAST STONE GC CASEMENT
FAHRENHEIT FIRE ALARM FASTEN (ER) FLUID APPLIED WATERPROOFING FACE BRICK FIBERBOARD FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISHED FLOOR FIBERGLASS FIRE HYDRANT FIRE HOSE CABINET FIRE HOSE STATION FINISH (ED) FIXTURE FLUSH JOINT FLOOR (ING) FLASHING FLUORESCENT FLEXIBLE FEMININE NAPKIN RECEPTACLE FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FIREPROOF FLOOR PLATE FEET PER MINUTE FRAME (D) (ING) FIRE-RESISTANT COATING FIBER REINFORCED CEMENTITIOUS BOARD FIRE-RETARDANT FIRE STAND PIPELINE FLEXIBLE SHEET ROOFING FOOT, FEET FOOTING FINNED TUBE RADIATION FURRED (ING) FUTURE GAGE, GAUGE GRAB BAR GENERAL CONTRACT (OR)
GD GKT GL GLB GLCOM GLF GLV GRL GRN GSS GST GT GWB
GRADE, GRADING GASKET (ED) GLASS, GLAZING GLASS BLOCK GLAZING COMPOUND GLASS FIBER GALVANIZED GRILLE GRANITE GALVANIZED STEEL SHEET GLAZED STRUCTURAL TILE GROUT GYPSUM WALL BOARD
HARDN HB HBD HC HD HDW HJT HM HOR HP HR HT HTG HVAC HW HWD
HARDENED HOSE BIBB HARDBOARD HOLLOW CORE HEAVY DUTY HARDWARE HEAD JOINT HOLLOW METAL HORIZONTAL HIGH POINT HOUR HEIGHT HEATING HEATING/VENTILATING/ AIR CONDITIONING HOT WATER, HEADWALL HARDWOOD
ID INCL INSUL INT INV IPS
INSIDE DIAMETER INCLUDE (D) (ING) INSULATE (D) (ION) INTERIOR INVERT IRON PIPE SIZE
J JB JF JT
JOIST JUNCTION BOX JOINT FILLER JOINT
K KD KIT KV KVA KW
KIPS (1000 LBS) KNOCK-DOWN KITCHEN KILOVOLT KILOVOLT-AMPERE KILOWATT
L LAB LAV LBL LH LL LMS LOC LP LSW LT LTL LVR LWC
LENGTH LABORATORY LAVATORY LABEL LEFT HAND LIVE LOAD LIMESTONE LOCATION LIGHTPROOF, LOW POINT LIGHT SWITCH LIGHT LINTEL LOUVER LIGHTWEIGHT CONCRETE
M MAR MAS MAX MB MBR MDL MECH MED MEMB MFD MFR MH MIN MIR MISC MLDG MO MRD MT MTFR MTL MTL ST MULL
METER (S) MARBLE MASONRY MAXIMUM MACHINE BOLT MEMBER MODULAR MECHANIC (AL) MEDIUM MEMBRANE METAL FLOOR DECK MANUFACTURE (R) MANHOLE MINIMUM MIRROR MISCELLANEOUS MOLDING, MOULDING MASONRY OPENING METAL ROOF DECK MOUNT (ED) (ING) METAL FURRING METAL METAL STUD MULLION
Hose Image N NAT NIC N0,# NOM NRC NTS
NORTH NATURAL NOT IN CONTRACT NUMBER NOMINAL NOISE REDUCTION COEFFICIENT NOT TO SCALE
OA OC OD OFF OH OPNG OPP
OVERALL ON CENTER (S) OUTSIDE DIAMETER OFFICE OVERHEAD OPENING OPPOSITE
PAR PBD PCC PCF PCP PED PER PRKG PL PLAM PLAS PLF PLYWD PNL PNT PRF PSF PSI PTD PTH PTN PVC PVMT PVT
PARALLEL PARTICLE BOARD PRECAST CONCRETE POUNDS PER CUBIC FOOT PRECAST CONCRETE PLANK PEDESTAL PERIMETER PARKING PLATE PLASTIC LAMINATE PLASTER POUNDS PER LINEAL FOOT PLYWOOD PANEL PAINT (ED) IN FIELD PREFORMED POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH PAPER TOWEL DISPENSER PAPER TOWEL HOLDER PARTITION POLY VINYL CHLORIDE PAVEMENT PAVER TILE
QT
QUARRY TILE
"R" R RAD RB RBT RC RCB RCP RD REC RECP REF REG REINF REM REQD RES REV RFG RFL RGD RH RLG RM RO RTN RWC R/W
THERMAL RESISTANCE RADIUS, RISER RADIATOR RUBBER BASE-STRAIGHT RABBET, REBATE REINFORCED CONCRETE RUBBER COVE BASE REINFORCED CONCRETE PIPE ROOF DRAIN RECESSED RECEPTACLE REFERENCE REGISTER REINFORCE (D) (ING) REMOVED REQUIRED RESILIENT REVISION (S), REVISED ROOFING REFLECT (ED) (IVE) RIGID RIGHT HAND RAILING ROOM ROUGH OPENING RETURN RAIN WATER CONDUCTOR RIGHT OF WAY
S SC SCHED SCRN SD SECT SF SFGL SHT SHTHG SIM SKYLT SLR SLV SM SNT SP
SOUTH SOILD CORE SCHEDULE SCREEN STORM DRAIN SECTION SQUARE FOOT (FEET) SAFETY GLASS SHEET SHEATHING SIMILAR SKYLIGHT SEALER SLEEVE SHEET METAL SEALANT SOUND PROOF
SPEC SQ SST STD STL STR SURF SUSP SYM SYN SYS
SPECIFICATION SQUARE STAINLESS STEEL STANDARD STEEL STRUCTURAL SURFACE SUSPENDED SYMMETRY (ICAL) SYNTHETIC SYSTEM
TREAD TAPERED TOP AND BOTTOM TEST BORING TERRA COTTA TERNE COATED STAINLESS STEEL TDC TRAFFIC DECK COATING TEL TELEPHONE TEMP TEMPORARY, TEMPERED T&G TONGUE AND GROOVE THK THICK (NESS) THRESH THRESHOLD THRU THROUGH TO TOP OF TOC TOP OF CONCRETE, CURB TOES TOP OF EXISTING SLAB TOF TOP OF FOOTING TOL TOLERANCE TOP TOP OF PLANK TOR TOP OF ROOFING TOS TOP OF STEEL/ TOP OF SLAB TOW TOP OF WALL TPH TOILET PAPER HOLDER TTD TOILET TISSUE DISPENSER TYP TYPICAL T TAP T&B TB TC TCS
UC UNEX UNF UON
UNDERCUT UNEXCAVATED UNFINISHED UNLESS OTHERWISE NOTED
VAC VAR VB
VACUUM VARNISH VAPOR BARRIER, VINYL BASE-STRAIGHT VINYL COATED VINYL COVE BASE VINYL COMPOSITION TILE VERTICAL VESTIBULE VERTICAL GRAIN VERIFY IN FIELD VINYL V-JOINT (ED) VENEER VAPOR RETARDER VERMICULITE VINYL TILE VINYL WALL FABRIC
VC VCB VCT VERT VEST VG VIF VIN VJT VNR VR VRM VT VWF W W/ WB WC WD WGL WH WIN WM W/O WP WPT WR
WEST WITH WOOD BASE WATER CLOSET WOOD WIRED GLASS WALL HUNG WINDOW (S) WIRE MESH WITHOUT WATERPROOF (ING), WEATHERPROOF WORKING POINT WATER REPELLANT
W/R WSCT WST WWF
WATER RESISTANT WAINSCOTT WEATHERSTRIPPING WELDED WIRE FABRIC
XTR
EXISTING TO REMAIN
No.
Description
Date
204 Beech Ave Toronto, ON M4E 3H8, Canada DRAWING LIST
Jack Washington Beech House Cover Sheet Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A101 Scale
8/21/2014 9:31:28 PM
SYMBOL LEGEND
No.
Description
Date
DN DN
-
Jack Washington
Site 1/4" = 1'-0"
Beech House Site Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A102 Scale
1/4" = 1'-0"
8/21/2014 9:31:29 PM
1
A105 1 North
32' - 9 1/8"
11' - 6 1/4" 2
2 15
125
UP 10' - 0 1/8"
Stairs
6' - 10 5/8"
2
Bath 3
10' - 9 11/16"
4
4' - 6 3/4"
Kitchen 4
Living Room
10' - 5 9/16"
2 45
4
103
1
A106
2
122
3
39
No.
2
Dining Room 1
112
Description
Date
10' - 9 7/16"
92
UP UP
53 20' - 5 3/4"
2
53
13' - 2 7/16"
8' - 10 3/4"
2A105 -
1
1st Floor 1/4" = 1'-0"
Jack Washington Beech House First Floor Plan Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A103 Scale
1/4" = 1'-0"
8/21/2014 9:31:29 PM
A106
2
8' - 8 7/16"
39
14 8' - 8 11/16"
5
5' - 8 5/8"
Ele.
4' - 1 3/4"
13 7' - 5"
3' - 3 5/16"
31' - 2 1/8"
15' - 0 9/16" 53
2
1' - 7 3/4"
53
125 3' - 9 3/8"
7 UP
11 8
4' - 10 3/8"
3' - 0"
4
89 9' - 1 1/4"
13 5' - 8 5/8"
3
6
4 20' - 6 5/8"
8
CST.
3 5' - 11 5/8" 10
Bed.1 Bath.2 5' - 3 3/8"
6
4
7
12
6' - 4"
1' - 3 5/8"
8' - 11 15/16"
13' - 0 15/16"
12 13' - 1 11/16"
5
3' - 0"
20' - 5 7/8"
Master 9' - 4"
Bed.2
146
139
4' - 1 3/4"
9
146
53
4' - 0 13/16"
Ele.
4
10' - 0 27/32"
11
Ensuite 10
79
No.
Description
Date
4
53 126 26' - 11"
5
53 3
126 18
10
53
16' - 3 3/4"
53
2 15' - 1"
second floor 1/4" = 1'-0" -
Jack Washington
-
Beech House Second Floor Plan Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A104 Scale
1/4" = 1'-0"
8/21/2014 9:31:30 PM
1
3' - 10 1/2"
Aluminum Copper Finish
Broom finish concrete
6' - 8"
Soda Lime Glass
Broom finish concrete
Aluminum 6061
Aluminum 6061
1
North 1/4" = 1'-0"
Broom finish concrete
Broom finish concrete
Description
Date
11' - 11"
12' - 11"
No.
Aluminum 6061
Aluminum 6061
Aluminum Copper Finish
Soda Lime Glass
Quercus Rubra Soda Lime Glass
Jack Washington
South 1/4" = 1'-0"
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A105 Scale
1/4" = 1'-0"
8/21/2014 9:31:30 PM
2
Beech House South & North Elevations
Aluminum Copper Finish Aluminum Copper Finish Soda Lime Glass
Aluminum Copper Finish 12' - 11"
Soda Lime Glass Soda Lime Glass
Soda Lime Glass
Quercus Rubra
Quercus Rubra
Aluminum Copper Finish
Aluminum Copper Finish
4' - 4"
1' - 0"
1' - 1 3/4"
Aluminum 6061
Aluminum 6061 Soda Lime Glass
Aluminum 6061
?
Description
Date
1' - 0"
No.
East Elevation 1/4" = 1'-0"
4
West 1/4" = 1'-0"
Jack Washington Beech House East & West Elevations Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A106 Scale
1/4" = 1'-0"
8/21/2014 9:31:31 PM
1
Room Schedule Level Name
Door Schedule Area Mark
1
1st Floor
2
1st Floor
3 4
1st Floor 1st Floor
5 13 6
1st Floor 1st Floor second floor 7 second floor 8 second floor 9 second floor 10 second floor 11 second floor 12 second floor Grand total: 13
Dining Room Kitchen Bath Living Room Ele. Stairs Bed.1
Count
Width
Height
125 SF 2 Not Enclosed 46 SF 287 SF 32 SF 213 SF 135 SF
Bath.2
68 SF
Bed.2
127 SF
Ele.
28 SF
Ensuite
67 SF
Master
216 SF
CST.
11 SF 1356 SF
1
3' - 0"
8' - 0"
5
1
3' - 0"
6' - 8"
6
1
3' - 0"
6' - 8"
8
1
3' - 0"
6' - 8"
10
1
3' - 0"
6' - 8"
11
1
3' - 0"
6' - 8"
12
1
4' - 0"
7' - 0"
13
1
4' - 0"
7' - 0"
14
1
3' - 0"
6' - 8"
15
1
3' - 0"
6' - 8"
Mark
Family and Type Single-Glas s 1: door entrance Single-Flus h: 36" x 80" Single-Flus h: 36" x 80" Single-Flus h: 36" x 80" Single-Flus h: 36" x 80" Single-Flus h: 36" x 80" Sliding-Clos et: 48" x 84" Sliding-Clos et: 48" x 84" Single-Flus h: 36" x 80" Single-Glas s 1: 36" x 80"
Count
Window Schedule Height Width
2
1
11' - 9"
10 12 13 25
1 1 1 1
7' - 0" 4' - 4" 6' - 6" 6' - 6"
37
1
6' - 6"
38
1
2' - 0"
39
1
2' - 0"
40
1
2' - 0"
41
1
11' - 9"
43
1
2' - 0"
44
1
2' - 0"
45 46 49 51 53 54 55 56
1 1 1 1 1 1 1 1
2' - 0" 2' - 0" 7' - 0" 8' - 9" 8' - 9" 4' - 4" 15' - 4" 2' - 0"
57
1
2' - 0"
58
1
2' - 0"
59
1
2' - 0"
60
1
2' - 0"
62
1
6' - 6"
64
1
6' - 6"
Level
entrence door 1st Floor 1st Floor 1st Floor second floor 10' - 0" second floor 3' - 11 3/4" second floor 3' - 11 3/4" second floor 3' - 11 3/4" second floor 8' - 2 1/8" second floor 3' - 11 3/4" second floor 3' - 11 3/4" second floor 3' - 11 3/4" 1st Floor 3' - 11 3/4" 1st Floor 10' - 1" 1st Floor 9' - 7" 1st Floor 17' - 10" 1st Floor 2' - 11" 1st Floor 3' - 3 1/8" 1st Floor 2' - 8 3/4" second floor 2' - 8 3/4" second floor 2' - 8 3/4" second floor 3' - 11 3/4" second floor 3' - 11 3/4" second floor 9' - 0 11/16" second floor 9' - 1" second floor
Wall Schedule Type Mark Type
8' - 2 1/8"
10' - 0 1/8" 2' - 11" 4' - 11" 8' - 2 11/16"
1 2 3 4 5 6 7
foundation1 exterior wall 2 exterior wall 3 Interior 1 exterior wall 4 exterior wall 7 exterior wall 6
No.
Description
Date
Jack Washington Beech House Rooms & Door & Windows & Walls SCH. Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A107 Scale
8/21/2014 9:31:31 PM
Number
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A108 Scale
8/21/2014 9:31:33 PM
Beech House Energy & Cost Usage
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A109 Scale
8/21/2014 9:31:36 PM
Beech House Energy & Cost Difference
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A110 Scale
8/21/2014 9:31:36 PM
Beech House Changes of Cost & Energy
1 A112
2nd Floor 10' - 6"
2 A112
1st Floor 0' - 0"
Description
Date
Section 4 1/4" = 1'-0"
Jack Washington Beech House Section Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A111 Scale
1/4" = 1'-0"
8/21/2014 9:31:37 PM
1
No.
Generic wood EPDM roof membrane Plywood, sheathing grade
Level 2 21' - 6"
Flashing NAILER Metal Finish
Wight Gypsum Wall Board
NAILER
Quercus Rubra Air Generic wood
No.
Wight Gypsum Wall Board Millwork
Description
Date
1st Floor 0' - 0"
Cast-in-place concrete
Wight Gypsum Wall Board
Quercus Rubra
Air
Generic wood
Millwork
2nd Floor 10' - 6"
Generic wood
Wood Planks Finish
Jack Washington Roof Section 1" = 1'-0"
2
Beech House Section Detail
Foundation Wall Section 1" = 1'-0"
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A112 Scale
1" = 1'-0"
8/21/2014 9:31:37 PM
1
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A113 Scale
8/21/2014 9:31:38 PM
Beech House Dining Room View
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A114 Scale
8/21/2014 9:31:39 PM
Beech House South East View
No.
Description
Date
Jack Washington
Project number Date Drawn by Checked by
1 July 30, 2014 Nassim Haouam MT
A115 Scale
8/21/2014 9:31:39 PM
Beech House South West View