CKW Transition and close down plan
1.0 1.1 1.2 1.3 1.4 1.5 2 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.2 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 3.0 3.1 3.1.1 3.1.2 3.2
Project Governance Set up governance arrangements, project plan, risk recording/monitoring Establish monthly project steering group High level project plan and governance sign off at Cluster board implemenation of detailed project plan (regular monitoring) Establish monthly reporting into Cluster Governance Committee Quality (Laura Elliot) Quality legacy documents Programme of refreshing documents throughout transition period Preparation of v.1 handover document to North of England by end september Handover document to last CKW Cluster Board
4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.2 4.2.1 4.2.2
24-Jun
17-Jun
10-Jun
03-Jun
June '13 27-May
20-May
13-May
06-May
29-Apr
22-Apr
May '13 15-Apr
08-Apr
25-Mar
18-Mar
11-Mar
04-Mar
25-Feb
01-Apr
Apr '13
Mar '13 18-Feb
11-Feb
04-Feb
28-Jan
Feb '13 21-Jan
14-Jan
07-Jan
31-Dec
24-Dec
Jan '13 17-Dec
10-Dec
03-Dec
Dec '12 26-Nov
19-Nov
12-Nov
05-Nov
29-Oct
22-Oct
Nov '12 15-Oct
08-Oct
01-Oct
24-Sep
17-Sep
10-Sep
Oct '12
Y Y
LE SC LE
Handover to CCGs Series of face to face meetings with CCGs
SC
Identify running arrangements for next 6 months
LE
Handover to Commissioning Board
LE
Identify primary care quality information to be transferred to commissioning board
LE
Handover document to first meeting of CCG Boards Workforce (Susan Moloney)
LE
Staff communications and engagement
Establish staff reference group for PCT staff Local HR/OD shared service footprint to change to reflect PCT cluster
Various future arrangements for functions
CCG management structures produced for consultation and process for 'slot in and/or pool 3.2.1 arrangements 3.3 Staff transfer arrangements 3.3.1 produce and consult on people transition policy 3.3.2 Commence interim alignment of staff by function followed by 1:1 discussions with LMgr to confirm 3.3.3 Continue process of staff alignment CCGs discussed and agreed with PCT Cluster implementation of People Transition Plan for staff and 3.3.4 infrastructure support Roll out schemes for staff as required in line with people transition policy and send to SHA for 3.3.5 approval 3.3.6 Validate staff lists and alignment 3.3.7 Prepare staff transfer letters 3.3.8 Give notice to contracted services 3.3.9 Assess and compare staff benefits and payroll arrangements 3.3.10 Complete and distribute transfer letter to staff 3.3.11 Prepare basic information and share with new hosts 3.3.12 Prepare basic information and share with TUs 3.3.13 Finalise any schemes/processes for staff in line with people Transition policy 3.3.14 Prepare and deliver letter requesting formal measures from hosts 3.3.15 Due diligence questionnaire complete 3.3.16 Prepare full staff list and transfer date and share with TUs 3.3.17 Receive formal measures from new hosts 3.3.18 Formal notification of transfer 3.3.19 Transfer of all staff complete 3.3.20 Thank you letter from Chief Executive 3.3.21 Liaise with receiver organisations to ensure 'soft landing of staff'; induction, welcome letters 3.3.22 work with staff groups and receiver organisations on staff issues eg. Taking of annual leave 3.4 Non clinical contracts relating to workforce 3.4.1 work through any issues in particular: payroll and OH with contracting 3.4.2 Transfer of staff records (ESR) including CRB checks, OH checks, working permits 4.0
JS JS JS JS JS
Status
Description
actions complete
Task Ref.
R e v
Lead
WorkstreamSteps and Milestones
03-Sep
Sep '12
Last updated: 19th September 2012
SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM SM
Communications and engagement (Jeanette Miller/jayne Beecham) internal communications Disseminate information via Cluster Connect and intranet (ongoing) Arrangements for transfer of engagement databases including seeking any permissions Liaise with IM&T and finance on comms' equipment including graphics package Staff awards/thank you events - autumn 2012 External Keep websites up to date with links to new organisations (inc.microsites for CCGs) Transfer C&E archives to CSU
JB JM JM JB JB JB/JM Z:\Corporate Services\Meetings\Cluster Board\2012\Sept 12\CKWCB-12-193d CKW transition and close down project plan DRAFTv 6 19th Sept (2)