Projects sheets Niek Meijer 2015 02 20

Page 1

Project sheets

/ Niek Meijer


Niek Meijer PROJECTS

YEAR

STATUS

PLACE

TYPE

BK-straat

2014

built

Raalte

Residential

250

Markeweg

2013

feasibility

Raalte

Residential

350

Amsterdam Marina

2012

study

Amsterdam

Hybrid building

Venebrugge

2012

built

Raalte

Innovation

160

Brugstraat

2011

built

Raalte

Residential

100

Architectural body

2010

study

Antwerp

Recreation

200.000

Hybrid Building

2010

study

Antwerp

Town hall

8.000

UVA-Amsterdam

2009

study

Amsterdam

Education

20.000

PROJECTS

YEAR

STATUS

PLACE

TYPE

Lot 750

2014

under construction

Hong Kong

Residential

Smart City

2014

under construction

Ningbo

Office

90.000

Hankow road

2014

under construction

Hong Kong

Office

4.600

Kimberley street

2013

under construction

Hong Kong

facade

4.500

Lantau Hostel

2013

competition

Hong Kong

Hostel

1.500

Macau

2013

under construction

Macau

Hybrid building

Sai Kung Hotel

2012

competition

Hong Kong

Hotel

Perkins road

2012

under construction

Hong Kong

Residential

8.000

PROJECTS

YEAR

STATUS

PLACE

TYPE

SQM

AM2

2007

feasibility

Amsterdam

Office

60.000

SBN

2007

competition

Lelystad

Office

12.000

Rijswijk

2007

feasibility

Rijswijk

Master plan

PROJECTS

YEAR

STATUS

PLACE

TYPE

SHELL NTC

2006

Built

Amsterdam

Laboratory

N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

SQM

20.000

SQM 400

140.000 27.000

900.000

SQM 80.000

I

T: 0031 611422661


Niek Meijer BK- STRAAT

Type: Status: Date: Place: Area: Client:

Residential Built 2014 Raalte, the Netherlands 200m2 Mr. L. Meijer

The aim of the project was a renovation of the existing building, located in the middle of the town, and an extension of the same. In order to provide a good spatial relation between the existing part and the new one, the internal layout has been completely changed. During the design process, one of the key element has been the relation with the city, apertures were studied in order to exploit the benefits of the strategic location in terms of view and lights, with a particular attention to the privacy of the more private spaces of the house.

Front facade - under construction

Rear facade - under construction N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer BRUGSTRAAT

Type: Status: Date: Place: Area: Client:

Residential Built 2014 Raalte, the Netherlands 200m2 Mr. L. Meijer

This project on the Brugstraat concerns the renovation with an extension of an existing house. The composition in the main facade is based on rectangular shapes which try to keep a visual harmony between the windows, the doors and the facade itself. In order to match the new design, the entire interior layout has been changed. The house had to be completed following the contemporary energy efficient standards.

Rear garden with view on the new extension

Completely renovated and redesigned internal space N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer VENEBRUGGE

Type: Status: Date: Place: Area: Client:

Residential Built 2012 Raalte, the Netherlands 160m2 Bouwbedrijf Gebr. Meijer

The Dutch Government has the goal to build only energy neutral houses starting from the 2020. The construction process for a typical house has not been innovated and improved much in the last years, reason why the construction requirements are difficult to achieve. To meet this request of the Government, these houses will be built following a new process of construction and using sustainable materials.

Exterior view on a passive house

Wand - Sierpleistersysteem: - Isolatie: - Cellenbeton:

Section cut show the innovating ideas N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

Rc= 9,5 m2K/W 15mm 160mm 280mm

New type of build up with high end materials I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer AMSTERDAM MARINA

Type: Status: Date: Place: Area: Client:

Hybrid building Study 2012 Amsterdam, the Netherlands 20.000m2 Municipality of Amsterdam

The “Amsterdam Marina” is my graduation project. The ‘Hybrid Buildings’ is a urban scale study and project studio focused on the analysis between architecture and urban environment. My attempt tried to show the strength and the opportunities of this area, located in Amsterdam North. The aim of this project is to create a physical and social relation between the consolidated city and this site, at that moment non well identified. This urban planning considers also the surrounding buildings and the people already living there.

The relation between public and private

Public space within the new Amsterdam marina N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer VENEBRUGGE 29

Type: Status: Date: Place: Area: Client:

Residential On the boards 2012 Raalte, the Netherlands 160m2 Bouwbedrijf Gebr. Meijer

This corner villa, in the town of Raalte, was designed for a private client, who asked for a sustainable building. The most unique point is the view on the surrounding landscape. The main design feature is the orientation towards this view. This corner house meets the latest requirements of engineering and sustainability. The walls are not built following the traditional way, but using materials that have a much better thermal resistance.

Venebrugge corner house exterior view

Venebrugge corner house exterior view N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer ARCHITECTURAL BODY Type: Status: Date: Place: Area: Client:

Recreation Study 2010 Antwerp, Belgium 200.000m2 Municipality of Antwerp

The long stripe next to the Schelde, in the city of Antwerp, can be described as an empty urban wasteland with aged industrial artifacts scattered around. The fragmentation in terms of use and the difference in character of the site make the feeling of contrapositive bigger. The proposal for a new urban recreation area in Antwerp tries to find solutions in terms of new functions and respect of the history.

Public spaces

RIVER

CITY

RIVER

ANTwERP SECTION 01

CITY

INTEgRATION wITH THE CITY & THE IMPORTANT POINTS. INTEgRATION THE SITE wITH THE CITY.

USE THE STREETS Of THE CITY AND ExTEND THE LINES.

Public

1

Commercial

2

Residential

3

HOw TO USE THE THREE LINES.

THESE ExTENDED LINES wILL CREATE POINTS.

The points will generate the ‘public line’.

Connect the ‘public line’ with the ground.

Pull up the places witch have relation with the city.

New entrances will be created.

The tectonic moves are; cutting & bending.

A rule will make sure that the commercial line ‘ always be attached to ‘public line’.

Use the ‘commercial line’ for perpendicular surfaces.

Change the surfaces into components.

Change the surfaces into components. (top view)

Delete component for a better livable environment.

Some component can be made smaller other can move a little bit.

Some sections of the skyline can be used to make define areas .

This can create a site with is hard to explain for visitors. Behind all corners can be a different atmosphere.

RIVER

Make sure the ‘commercial line’ is still visible, by using multiple functions in the same volume.

The end result will hold different volumes, nice space (squares) and a visible ‘commercial line’.

CITY

HOw THE DIffERENT LINES ARE CREATED.

The ‘residential line’ is the opposite of the ‘public line’.

The skyline of Antwerp will be used for the ‘residential line’.

MSC 02 / Design studio ‘ ARCHITECTURAL BODY’ / Niek Meijer / final presentation / June ‘10 / TU Delft

Scheme/diagram N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer HYGHBRID BUILDING

Type: Status: Date: Place: Area: Client:

Town hall Study 2010 Antwerp, Belgium 8.000m2 District of Deurne

The main challenge for the design of the town hall of Deurne was related to his background: status, history, and social involvement. The new project considers the relationship with the surrounding: the Church and the cloister by adding a new type: the market Hall. During my research I tried to focus my attention on a good translation of the “market hall� type. After studies I decided to design the building as a detached element and to give to the ground floor the character of public function.

Section cut of the new market hall

Diagram of the spacial relations N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer UVA - AMSTERDAM Type: Status: Date: Place: Area: Client:

Education Study 2009 Amsterdam, the Netherlands 20.000m2 UVA

The design studio “Hybrid buildings� was focused on the design for a new University in Amsterdam. This University is equipped with a large auditorium, classrooms, hotel, student houses and a restaurant. The huge scale of the building is well integrated in the site area, characterized by a mixed use which includes residential, commerce and industrial buildings. In order to ensure private and pleasant spaces the garden is located in the middle of the structure, far from the traffic and the city noises.

Longitudinal section cut

Inner courtyard

Facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer MARKEWEG

Type: Status: Date: Place: Area: Client:

Residential Feasibility study 2013 Raalte, the Netherlands 350m2 Confidential

The “ Markeweg “ is a feasibility study focused on the design of a new villa in an existing plot of 1,800 sqm. The client asked for an independent house located next to his own one. The goal was to ensure the privacy of both, giving to the general composition a visual harmony.

Horizontal section cut

Relation between the excising and the new development N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer SMART CITY

Type: Status: Date: Place: Area: Client:

Office Built 2014 Ningbo, China 90.000m2 GAO

The Smart City development will be a new, mixed-use hub located in the High Tech zone in Ningbo. The concept behind the scheme is to generate activity throughout the day and into the evening. A combination of office, retail, and F&B accommodation organised in an urban layout has been carefully designed to be human in scale and so offer a welcoming and lively environment for users. The scheme is divided into two zones. The river front zone proposes two options; either commercial units or luxury villas, both of which have been developed to a high level of architectural detail to express the opportunities each can provide.

Plan: top view

Smart city by night N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer PRINCE JEWELLERY

Type: Status: Date: Place: Area: Client:

Office Built 2014 TST, Hong Kong 4.600m2 Prince jewellery

Located on a high profile corner in the retail hub of Tsim Sha Tsui, this flagship store and retail tower is designed for a mixed brand jewellery and watch retailer. Taking inspiration from the idea of the heirloom and watch mechanisms, the facade reveals layers of highly crafted screen in a classic framework of natural stone. With the podium providing the Client’s flagship store, the tower provides space for tenanted retail, commercial and F+B units.

Interior lobby space

Front facade including a big led screen

Front facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer MACAU

Type: Status: Date: Place: Area: Client:

Residential Built 2014 Macau, China 140.000m2 Asian Standard

pdp[east] were appointed to design a luxury residential development located near the famous Cotai Strip in Macau. The scheme contains close to 1400 apartments in a series of highdensity towers that have been designed to maximise views to the strip as well as sunlight and daylight to all apartments. The development is bold and confident however its controlled style brings a level of sophistication and refinement to the rapidly developing Macau residential skyline.

Plan: 2nd floor

Front facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer VENEBRUGGE

Type: Status: Date: Place: Area: Client:

Residential Built 2012 Raalte, the Netherlands 160m2 Bouwbedrijf Gebr. Meijer

The Dutch Government has the goal to build only energy neutral houses starting from the 2020. The construction process for a typical house has not been innovated and improved much in the last years, reason why the construction requirements are difficult to achieve. To meet this request of the Government, these houses will be built following a new process of construction and using sustainable materials.

Outside spaces WD-28

50

DO NOT SCALE FROM THIS DRAWING. Construction Package References:

25

PVF2 coated aluminium profile handrail [WIN]

120

GENERAL NOTES. All dimensions to be checked on site prior to commencement o and/or preparation of any shop drawings. Sizes of and dimensions to any structural elements are indicativ See structural engineers drawings for actual sizes / dimensions Sizes of and dimensions to any service elements are indicative See service engineers drawings for actual sizes and dimensions This drawing to be read in conjunction with all relevant Architec specifications and other Consultants' information.

25

BD-01

tempered glass balustrade [WIN-] thk according to schedule

5

inside

Finishes key

outside

paver: PAV1 recycled concrete paver

BD-04 145x30mm composite timber decking GMS adjustable bearer supports GMS bearer joist

AW 10

floor & wall tile: T1 purestone grigio natural finish floor tile T2 purestone grigio hammered (R11) finish flo T3 inax luminos exterior facade tile T4 venus ferroker matte finish wall tile T5 seastone white textured finish wall tile T6 mineral d rame natural finish wall & floor ti T7 90% thermal emmitance ceramic tile T8 purestone grigio linea finish wall tile T9 dark grey smooth finish tile

fritting (back painting) [WIN]

water proof non-shrink cement grout [WIN.] aluminium door tray by [WIN]

structural silicone [WIN]

GMS angle secure to rc upstand [WIN] PVF2 coated aluminium flashing to fall [WIN]

15

ST2 natural stone threshold

M1 2mm thk. metal profile [FIT]

align

150

38

align

15 19

WPC1

30

ET1 timber [FIT]

fall

4100

metal: M1 metallic charcoal grey PVF2 coated alumi M2 aluminium with timber print M3 white PVF2 coated aluminium

M1

76

above SSL at GF

swimming pool tile: GT1 glass mosaic tile in long strips

117

textured paint: TP1 white textured paint TP2 grey textured paint

125

30 20

stone: ST1 katanar limestone antique finish ST2 berlin grey marble waterjet finish ST3 silestone countertop ST4 savala limestone honed finish

GB 11

50

150

200

glass: GL1 charcoal grey backpainted glass GL2 clear tempered glass GL3 acid etched tempered glass GL4 mirror glass

425

3950 above SSL at GF

264

proprietary drain by others tiles to fall waterproofing

fall M3 200

50

Note: If not specified in drawing all work for [MC] main contractor

150

3525 above SSL at GF

P1

TP1

65

waterproofing flashing [WIN]

painted plaster board ceiling board fixed to GMS suspended ceiling system [FIT].

aluminium profile cover[WIN]

inside

Interior layout N: N. Meijer

recessed light fitting (spec TBC) - RSE to advise

50x50 GMS RHS hanger welded to plate & bolted to rc to RSE specification

recessed single curtain track [FIT]

1

25

50

0째

above SSL at GF

45.0

15 35 25

3600

200

150

180

130

275

Legend: [MC] main contractor [WIN] window subcontractor [FIT] fit out contractor [LAN] landscape contractor

75

50

Contractor key

T9

25

fall

425

350

drain to fall to nearest duct @ min. fall

paint: P1 white painted plaster P2 white painted wood P3 light grey matte finish paint wood: WPC1 brown wood composite decking WPC2 brown wood composite cladding W1 exterior oak hardwood cladding W2 interior oak hardwood nosing ET1 interior oak flooring ET2 interior oak wall cladding TV1 interior oak veneer

225

300

65

AW 01

Exterior details - balcony SCALE 1:5

outside WD-01

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

[

PT3 PT2 PT1 -

]

issue for tender addendum issue for pre-tender issue for pre-tender issue for window quotation

revision

description

project no.

drawing no.

2 0 1 1

d

3003 (L10)002 drawing

P

Exterior details

scale

Main Bdrm Balcony

initials date

wire mesh waterproofing 25mm painted plaster drip formed in plaster corner plaster bead aluminium sill profile secured to window frame[WIN] counter flashing [WIN] glass balustrade fixing according [WIN]

Detail balcony I

- waterproofing on external walls up to 1000mm above SSL @ GF - waterproofing shall be applied for a coverag miniumum 300mm along edge of window fram all around WIN

I

T: 0031 611422661

project

Lot 750 South Lantau Road, Hong Kong

client

Swire Properties Ltd.

unit 807 yu yuet lai building, 43-55 wyndham street, central hong kon www.pdpeast.com t + 852 2899 2909


Niek Meijer LANTAU HOSTEL Type: Status: Date: Place: Area: Client:

Hotel Competition (2nd) 2013 Lantau, Hong Kong 1.500m2 Swire

We were asked to prepare two schemes for this stage of the project. One was to be based on an existing scheme that has government approval, the other to explore an alternative approach from first principles. In developing the two schemes there are certain ideas that both designs share, and others that are unique to each. In common to both schemes is an approach to the design of the outdoor spaces and the way they interact with the built form to create a network of exterior space. This provides a variety of experience in the organisation of position, scale, and orientation of the different spaces.

Model

Open courtyard layout N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer SAI KUNG HOTEL

Type: Status: Date: Place: Area: Client:

Hotel competition (2nd) 2012 Saikung, Hong Kong 27.000m2 Confidential

pdp[east] were engaged to develop designs for a resort hotel in the Sai Kung area of Hong Kong. The first of a kind in Hong Kong, the development would have a full set of five star facilities including retail, restaurants and a wedding chapel and banqueting facilities. The designs prepared divide the development into a number of small scale buildings each linked by an integrated landscape design. The scheme is designed to integrate into the urban fabric of Sai Kung and also open out to the ocean where the wedding chapel forms the centrepiece of the landscape design.

Birds eye view

Hotel room view N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer PERKINS ROAD

Type: Status: Date: Place: Area: Client:

Residential On the board 2012 Hong Kong 8.000m2 CSI, Grosvernor, ASI

Based in Hong Kong central, the Perkins road project is one of the most luxurious project on the globe. Designed for only the richest people mainly from mainland China, the Perkins road tower facilitate full floor apartments, duplexes, garden houses and a 3 floor penthouse.

Facade

Illustration: interior

Illustration: front facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer AM2

Type: Status: Date: Place: Area: Client:

Office Feasibility 2007 Amsterdam, the Netherlands 60.000m2 Confidential

Illustration: AM2 tower N: N. Meijer

I

A 180 meter tall high-rise office building Dutch Top, that we designed a few years ago for AM . The building was proposed on the “E” location next to the Sloterdijk station in Teleport, Amsterdam. We never say that a project is dead, unless there is something built in it’s place, so we list this project as dormant

illustration: AM2 tower A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer SBN

Type: Status: Date: Place: Area: Client:

Office Competition 2007 Lelystad, the Netherlands 12.000m2 Fortis

“Station Balkon Noord “ in Lelystad is Rietveld architects designed building for an office. The building contains a parking garage, lobbies, voids , green landscaping and office spaces.

Plan: 1st floor

Illustration: front facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer RIJSWIJK

Type: Status: Date: Place: Area: Client:

Master plan Feasibility study 2007 Rijswijk, the Netherlands 900.000m2 Municipality of Rijswijk

The design for the Masterplan incorporated the idea that people should live on squares rather then on streets. The next idea that followed was that every square could have it’s own architecture, or in other words its own architect. As part of the development of the six Hoog Steenvoorde apartment towers, the City of Rijswijk asked to the developer Modulus and to Rietveld Architects to look beyond the immediate site, and create a context scheme for the whole area, and a vision for the coming 30 years.

Plan: top view

Illustration: Aerial view N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


Niek Meijer SHELL - NTC

Type: Status: Date: Place: Area: Client:

Laboratory Built 2006 Amsterdam, the Netherlands 80.000m2 Shell

During my first internship I worked as a planner for one of the biggest contractors of the Netherlands. I worked on one the largest projects, in Amsterdam. The project included the construction and installations of a laboratory for the Shell. I have gained much knowledge here as planner, in terms of safety, organization, structures, planning and the relationship between the construction site and the design.

Illustration: Front facade from the IJ-river

Illustration: front facade N: N. Meijer

I

A: Pokfulam rd. - Hong Kong

I

www.niekmeijer.nl

I

E: niekmeijer@me.com

I

T: 0031 611422661


N: N. Meijer A: Pokfulam rd. - Hong Kong W: www.niekmeijer.nl E: niekmeijer@me.com T: +31 611422661

Project sheets

/ Niek Meijer


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.