POST-PANDEMICOFFICE & SEAFOOD RESTAURANT NIK MUHAMMAD AIDIEL BIN CHE MEGAT 17195235/3 M.ARCH SEM 1 2020/2021
SPACE & FACILITIES02 RIGID AREA04 IMAGINARY BOUNDARY 03 LACK OF GREENERIES 01 01 SITE ISSUES
02 OPPORTUNITY FACILITIES & RETAILS01 GREEN02 GREEN SPACE03 OPEN SPACE04helps in attracting people to the site -the integration with RKK (green connector) Lush green space provided on the ground floor -provided open space as main plaza, place of assembly 04 01 03 02
03 DESIGN INTENTION 02 BIOPHILIC DESIGN01TECTONICS ARCHITECTURE 02HUMAN + NATURE HOW LANDSCAPE HELPS IN EDUCATION AND POST-PANDEMIC OFFICE CONFIGURATION KEYWORD: LANSCAPE & WORK-LIFE BALANCE 03LANDSCAPE AND WORKING HABITAT 01 ORIGINAL OF SEKSYEN 13
SITE PROJECT 02 SEGREGATION LEVELLING03SITE AREA 01 04 CONCEPT DIAGRAM
01
04 CONCEPT DIAGRAM + = BUILDING MASSING
LANDSCAPE02 HANGING GARDEN 03
= TYPICAL BUILDING01 HANGING GARDEN 02 04 CONCEPT DIAGRAM
MASSING BLOCK04 STAGE 01 STAGE 02 STAGE 03 STAGE 04 MASSING BLOCK01 MASSING BLOCK02 MASSING BLOCK03 05 BUILDING MASSING
06 DRAWINGS
OFFICE TOWER
Office tower is facing Jalan Kemajuan along with other office buildings and showrooms as a continuation of the style and typology.
OPPORTUNITY: FOOD ALLEY UNIQUE SEAFOOD RESTAURANT
Restaurant is facing Jalan 13/2 along with other cafes, restaurant and terraces of retails in PJ Midtown compound as I see an opportunity for the road to become a food alley. During lunch hour, the area is considered dense due to people come to eat at hawker stalls along the road.
Car park = 79 Motor park = 32
One-way circulation is proposed for the seafood restaurant to educate visitors by practicing minimal contact and physical distancing during the pandemic. Visitors will use the exit to The Central Garden and benefit the beauty and comfort of the garden
A B A B
A B A B
Car park = 3 PWD Carpark= 13 Motor park = 140
Spacious pre-event hall and lobby are introduced to cater for post-pandemic strategy. Visitors are at comfort with the physical distance and the large space makes the space look less crowded.
A
B
A B
Automated sanitization is placed at entrance before visitors lead to their respective spaces. Large corridor is filled with planter boxes to make the space look soft and create an imaginary wayfinding and circulation to cater for pandemic situation.
A B B A
A B A B
A B A B
SECTION A A SCALE 1:750 HI ! THE FOOD IS DELICIOUS ! WELCOME !
GARDEN
-PERSPECTIVES INTERMEDIATE
GARDEN
-PERSPECTIVES INTERMEDIATE
BASEMENT & LOWER GROUND PODIUM RETAIL INTERMEDIATE GARDEN LOW ZONE OFFICE HANGING GARDEN HIGH ZONE OFFICE BREAKOUT SPACE: STEPPED GARDEN ROOFTOP LIBRARY SKY DINING MICRO OFFICLE HOTDESK RENTAL MUTIPURPOSE HALL CO-LA WING OFFICE WING INTERMEDIATE GARDEN -BUILDING PROGRAMMES
No. of parking per basement Car park = 229 Motor park = 32 DEVELOPMENT GFA / CALCULATION (sqft) CAR PARK REQUIRED Carpark + 20% Visitors + 2% Ladies Parking 730 OKU Parking (2%) 13 Motor Parking 380 Restaurant & Office (344961.8 sqft)
TYPE 1A
HOTDESK RENTAL
TYPE 2A
HOTDESK RENTAL
MICRO OFFICLES
BREAKOUT SPACE
15 PERSPECTIVES
TYPE 3A
TYPE 3A PRIVATE LIBRARY
GARDEN
DINING
SKY
HANGING
GARDEN
POOL
SWIMMING
HANGING
VIEW FROM HANGING GARDEN
-PERSPECTIVE
VIEW FROM HANGING GARDEN
-PERSPECTIVE
VIEW FROM HANGING GARDEN
-PERSPECTIVE
ELEVATION FROM WISMA CELCOM SCALE 1:750 TYPE 1B HI ! IT’S ME AGAIN ☺ WAHH ! I LOVE THIS GARDEN <3
2B MEETING
ELEVATION FROM WISMA CELCOM SCALE 1:750 TYPE
PODS HANGING GARDEN !!
3B
ELEVATION FROM JALAN KEMAJUAN SCALE 1:750 TYPE
INTERMEDIATE GARDEN SKY DINING
PV PANEL CALCULATION Formula = E = nx Ax r x Hx PR Where, E = Energy (kWh) n = Number of solar panels A = Area of solar panels (m2) r = Solar panel yield / efficiency (%) H = Annual average solar radiation on tilted panels PR = Performance ratio (default value = 0.75) E = 105 x 1.65 x 15 x 1500 x 0.75 = 2923 kWh Calculation for Solar PV energy and Financial Gain Average annual energy in output of Solar PV generator : 2923 kWh/year Cost of energy : RM 0.36/kWh Total annual amount of electricity generated : RM 384,082.2 / year 07 GREEN BUILDING STRATEGIES
07 GREEN BUILDING STRATEGIES BUILDING ORIENTATION 01 LONG SIDE IS FACING NORTHEAST, GETTING ADEQUATE DAYLIGHTING DURING DAY DAYLIGHTING02 CEILING HEIGHT WINDOW INCREASES THE DEPTH OF LIGHT ENTER THE SPACE NATURAL VENTILATION 03 SHARE SPACES ARE OPEN AND NATURALLY VENTILATED TO HELP CIRCULATES BETTER AIR QUALITY FAÇADE/ SUNSHADING 04 DOUBLE SKIN FAÇADE HELPS TO REDUCE THE LIGHT PENETRATION DURING DAYTIME USE OF LOW E GLASS WITH REFLECTIVE FILM HELPS TO REDUCE THE HEAT GAIN BECAUSE OF IT RELATIVELY LOW IN SHADING COEFFICIENT VALUE MATERIAL SELECTION 06 LANDSCAPE DESIGN 05 LUSH GREEN AREAS IN BETWEEN SPACES HELP TO REDUCE BUILDING TEMPERATURE AND HEAT GAIN AND HELP TO FILTER AIR WHITE PAINTED WALL WITH NO VOC HELPS TO IMPPROVE AIR QUALITY BUILDING ENVELOPE 07
08 OTTV AND BEI CALCULATION
08 OTTV AND BEI CALCULATION
09 POST-PANDEMIC STRATEGIES PHYSICAL DISTANCING 01 3 METERS WIDE CORRIDOR IS APPLIED FOR A COMFORT DISTANCE OF TWO PEOPLE AT ONE TIME AUTOMATED SANITATION AREA 02 01 02 CROSS VENTILATED SPACE AND CORRIDOR 03 AVOID CONTAMINATED AIR CIRCULATE IN A CONFINED SPACE INTERGRATING LANDSCAPE04 03 BIOPHILIC DESIGN STRATEGIES IS USED TO REPLACE WALLS 04 FLEXIBLE OPEN PLAN 05 TENANTS ARE FLEXIBLE TO ARRANGE THEIR OWN OFFICE 05 MAIN WALL SECTION SCALE 1:100
SEPARATE LIFT08 07NATURAL VENTILATED STAIRCASE HELP TO REDUCE THE PHYSICAL CONTACT AND SEGREGATES THE USER BY THE PROGRAMMES 09 POST-PANDEMIC STRATEGIES SANITATION ZONE09 SANITATION ZONE AT EVERY FLOOR IN CO LA WING SEPARATE DROP-OFF10 OFFICE TOWER AND RESTAURANT HAVE ITS OWN DROP OFF ZONE , TO REDUCE THE DENSIFICATION OF HUMANS TO AVOID CONFINED SPACE
10 LANDSCAPE STRATEGIES 01 BUFFER & ORNAMENT 03 ORNAMENT & FRAGRANCE 02ORNAMENT, SHADY, FLOWERING & FRAGRANCE 04ORNAMENT & FRAGRANCE HANGING GARDEN CENTRAL GARDEN INTERMEDIATE GARDEN ENTRANCE PLAZA
ornamental trees and hedges are planted belting the site and upon entrance, act as buffer to the main road and barrier towards noise and air pollution from the vehicles.
10 ENTRANCE PLAZA 01 TERMINALIA MANTALY ACALYPHA SIAMENSIS 02 03 SYZYGIUM MYRTIFOLIUM SYZYGIUM ZEYLANICUM 04 05 TABEBUIA PALLIDA BUFFER & ORNAMENT Medium
green
10 THE CENTRAL GARDEN ORNAMENT, SHADY, FLOWERING & FRAGRANCE 01 BUCIDA MOLINETI CINNAMOMUM INERS 02 03 CORDYLINE FRUSTICOSA CRINUM ASIATICUM 04 05 DURANTA REPENS FILICIUM DECIPIENS 06 07 PLUMERIA OBTUSA Act as first
node in the area, Central Garden is lushed with medium to high trees with large canopy to give shade and comfort for the visitors. Fragrance and flowering hedges and plants are planted to bring colours and scents that benefit both parties, office and restaurants.
ornamental trees are planted on this level to provide shady areas as this place will be utilizes by visitors and officers. Thus, right scale of trees helps to give comfort to human eyes and emotions.
10 LANDSCAPE STRATEGIES 01 CALATHEA LUTEA CANANGA FRUTICOSA 02 03 CHEILOCOSTUS SPECIOSUS ORNAMENT & FRAGRANCE PLUMERIA RUBRA 04 10 INTERMEDIATE GARDEN Medium
10 THE HANGING GARDEN ORNAMENT & FRAGRANCE 01 CALATHEA LUTEA CANANGA FRUTICOSA 02 03 CHEILOCOSTUS SPECIOSUS PLUMERIA RUBRA 04 Main garden to be utilized by visitors and office users. Medium high trees such as Bucida helps to give shade for the comfortness of the user due to its large canopy size.
STRUCTURE AND FAÇADE OVERVIEW OF STRUCTURE
DIAMOND BEAM
DESIGNED TO EXPRESS THE BEAUTY OF ARCHITECTURE
HIDDEN STEEL STRUCTURE
‘FALSE CEILING’ DIAMOND BEAM IS CONSTRUCTED BELOW THE STEEL STRUCTURE TO IMITATE THE OVERALL DESIGN
11
STRUCTURE AND FACADE 8.4 m 8.4 m
STRUCTURAL GRID
8.4m x 8.4m MOST CONVINIENT
STRUCTURAL GRID
VERTICAL FAÇADE IS INTRODUCED TO GIVE SLIM EFFECT TO THE BUILDING. 500mm X 300mm POWDER COATED ALUMINIUM IS USED AS AN ENVELOPE AND SIGNATURE TO THE BUILDING
STEEL STRUCTURE
RHS STEEL STRUCTURE WITH SUPPORTING TRUSSES IS USE TO SUPPORT HANGING GARDEN ON LEVEL 15. THE DEPTH OF STRUCTURE IS ABOUT 4 METER TO PROVIDE STRONG SUPPORT FOR THE HANGING GARDEN
BUBBLE DECK SLAB
REDUCE THE USAGE OF CONCRETE UP TO 35%. THUS HELPS TO REDUCE CARBON RELEASE POLLUTION DURING CONSTRUCTION STAGE
11
FACADE
300mm x 500mm POWDER COATED ALUMINIUM TO ENGR’S DETAIL
POWDER COATED RHS STRUCTURE TO ENGR’S DETAIL
PLANTER BOX
1500mm DEPTH FOR MEDIUM SIZE TREE
SUSPENDED CEILING
DRYWALL SUSPENSION SYSTEM WITH HANGER WIRE AND ‘C’ CHANNEL AT THE END EDGE OF CEILING
BUBBLE DECK SLAB
REDUCE THE USAGE OF CONCRETE UP TO 35%. THUS HELPS TO REDUCE CARBON RELEASE POLLUTION DURING CONSTRUCTION STAGE
RETAINING WALL
400mm THK RETAIINING ALONG THE BASEMENT WITH WATERPROOFING
12 BUILDING SERVICES LIFT CORE02 01FIRE STAIRCASE 03M&E
12 BUILDING SERVICES DCW TANK WR & SPRINKLER TANK ELECTRICAL TELCO BREAK TANK AT LEVEL 16 SEPARATE TANK FOR RESTAURANTWATER TANKS LOCATED AT LOWER GROUND 1 FOR OFFICE TOWER WATER TANKS AT ROOF LEVEL
RUNNING DISTANCE (BASEMENT)
FIRE
FIRE FIGHTING LOBBY
LOCATION OF FIRE HYDRANT ON GROUND FIRE TRUCK ACCESSWAY AND ACCESS ROAD (ISLAND SITE)
13 BOMBA COMPLIANCE
SHUTTER COMPARTMENT (exceed 20000 sqft)
PASSENGER
LOBBY
FIRE FIGHTING ACCESS LOBBY: • STRECHER LIFT (FIREMEN’S LIFT) • FIREFIGHTING STAIRCASE • RISER • HOSE REEL
SECTION A-A SCALE: NTS ESCAPE ROUTE ASSEMBLY POINT 13 BOMBA COMPLIANCE • RUNNING DISTANCE ON TYPICAL FLOOR LAYOUT • DEAD END LIMIT < 15m • 45m MAX. DISTANCE FROM RISER • 45m MAX. DISTANCE OF FURTHERMOST POINT TO FIRE ACCESS LOBBY
(OFFICE) GROUND FLOOR - ATRIUM
14 PERSPECTIVES
(OFFICE)
14 PERSPECTIVES
LEVEL 2 - BRIDGE
(OFFICE)
3 – VIEW OF STEP SOCIAL SPACES
14 PERSPECTIVES
LEVEL
PERSPECTIVES (OFFICE)
FROM OFFICE UNIT
14
VIEW
(OFFICE)
14 PERSPECTIVES
BREAKOUT SPACE
CENTRAL GARDEN
14 PERSPECTIVES THE
THE CENTRAL GARDEN
14 PERSPECTIVES
THE CENTRAL GARDEN
14 PERSPECTIVES
(RESTAURANT)
DOUBLE VOLUMED LOBBY
14 PERSPECTIVES
LOFTY
(RESTAURANT)
DINING AREA
14 PERSPECTIVES
INDOOR
(RESTAURANT)
14 PERSPECTIVES
CENTRAL CORRIDOR
(RESTAURANT)
DINING
14 PERSPECTIVES
OUTDOOR
AREA
VIEW FROM SEKSYEN 12
14 PERSPECTIVES
VIEW FROM JALAN 13/2
14 PERSPECTIVES
14 PERSPECTIVES BIRD’S EYE VIEW 1
BIRD’S EYE VIEW
14 PERSPECTIVES
2
14 PERSPECTIVES BIRD’S EYE VIEW 3
VIEW FROM REGEN HOSPITAL
14 PERSPECTIVES
14 PERSPECTIVES BIRD’S EYE VIEW 4
VIEW FOCUSED ON STRUCTURE
14 PERSPECTIVES
14 PERSPECTIVES FACADE
ELEVATION FROM JALAN KEMAJUAN SCALE 1:500
ELEVATION FROM JALAN 13/2 SCALE 1:500
ELEVATION FROM WISMA CELCOM SCALE 1:500
SECTION A A SCALE 1:500
SECTIONAL PERSPECTIVE NTS
Programmes
Unit Room Size
RESTAURANT
Total Area (sqm)
Lobby 1 102.5 - 102.5
Indoor Dining 1 394 - 394
Outdoor Dining 1 86 - 86
Sushi Café 1 327.5 - 327.5
Kitchen & Storage 1 214 - 214
Banquet Hall 1 1 398 - 398
Banquet Hall 2 1 793 - 793
Office 1 12 - 12
Total NFA - - 2327
Core & Services (+Refuse Chamber) - 538 538 GFA 2865
GROUNDFLOOR
Floors OFFICE
Services / M&E / Refuse Chamber - 270 - 270
Control Room 1 28 - 28
Management Office 1 48.5 1 48.5
F&B Retail - 629 - 629
Atrium 1 819 - 819
NFA 1496.5
Service Facilities (Toilet) 1 48 48
Office Lobby & Core 2 123 246
Podium Lobby &Core 1 63 63
GFA 1853.5
PODIUM(LEVEL1-LEVEL3)
Retail - 1527 3 1527
Medicare Centre 1 128.4 1 128.4
Multipurpose Hall 1 364 1 364
Library 1 514.3 2 514.3
Pocket Space - 183.9 3 183.9
Pocket Garden - 199 3 199
NFA 2916.6
Service Facilities (Surau) 3 82 246
Office Lobby & Core 2 123 246
Podium Lobby &Core 1 63 63 GFA 3471.6
Programmes Unit Room Size Floors Total Area (sqm)
LEVEL4-5
Meeting Pod 13 15 1 195
Intermediate Garden - 1500 1 1500 NFA 1695
Office Lobby & Core 2 123 246
Podium Lobby &Core 1 63 63
GFA 2004
LEVEL6-32
WINGA(OfficeZone)
Office Type A 33 100 26 3300
Office Type B 15 143 25 2145
Office Type C1 9 200 9 1800
Office Type C2 15 243 15 3645
Meeting Pod A 5 33 26 165 Meeting Pod B 24 34.2 7 820.8
Breakout Space A 8 111 8 888 Breakout Space B 16 53 16 848
NFA 13611.8
Office Lobby & Core 1 123 123
WINGB(ColaborativeZone)
Hotdesk Rental & Micro Officles 9 600 9 5400
Breakout Space 3 127.1 3 381.3
NFA 5781.3
Office Lobby & Core 1 123 123
Facilities (Toilet) 1 45.8 45.8
GFA 19684.9
FACILITIESLEVEL(LEVEL15-17)
Sky Dining 1 810.3 - 810.3
Swimming Pool 1 317.5 - 317.5
Sky Garden - 1041.2 - 1041.2
NFA 2169
Total NFA 29997.2
Total GFA 32048
EFFICIENCY
WITH AVERAGE OF 74% FLOOR EFFICIENCY FOR OFFICE
15 DEVELOPMENT DATA
78%
• ADDEDMISSINGCOLUMNSON FLOORPLANS(LVL6-33) • UPDATESTRUCTUREANDFAÇADE SLIDES • ADDEDBASEMENTANDROOFLEVEL DRAWINGS • UPDATEBOMBACOMPLIANCESLIDES • ADDEDNEWSLIDESFOR ELEVATIONSANDSECTIONSWITH RIGHTSCALE • ADDEDANDAMMENDED PERSPECTIVES(EXTERIOR) • ADDEDNEWWALLSECTION DRAWING • ADDEDDESCRIPTIONSON LANDSCAPESTRATEGIES AMMENDMENTS:
THANKYOU NIK MUHAMMAD AIDIEL BIN CHE MEGAT 17195235/3 M.ARCH SEM 1 2020/2021