QIN LAKE YU MOUNTAIN
SHANGHU LAKE
KUNCHENG LAKE
QIN LAKE
KUNCHENG LAKE
SHANGHU LAKE
QIN LAKE
EXISITING BUS ROUTE
PRIORITY ZONE FOR REMEDIATION
INFILTRATION SWALE SYSTEM
STREET END POCKET PARKS
PLANTED REMEDIATION BASIN
PROPOED OPEN SPACE
A
MAJOR STATION: For locations with ample ROW. Extended canopy with windscreens and seating. Full platform pavement treatment.
B
STANDARD STATION: For locations with sufficient ROW for dedicated platform. Modular shelters with platform pavement treatment.
C
MINIMUM STATION: For locations with narrow sidewalks. Platform edge strip with signage.
EXISTING PRIMARY ROAD
C B PROPOSED PRIMARY ROAD
Case Study: dlandstudio
A
DESIGN DETAILS
SITE VIEW
SITE VIEW