Ningxiao cao MLA 2016 Worksample

Page 1





QIN LAKE YU MOUNTAIN

SHANGHU LAKE

KUNCHENG LAKE

QIN LAKE

KUNCHENG LAKE

SHANGHU LAKE

QIN LAKE

EXISITING BUS ROUTE

PRIORITY ZONE FOR REMEDIATION

INFILTRATION SWALE SYSTEM

STREET END POCKET PARKS

PLANTED REMEDIATION BASIN

PROPOED OPEN SPACE

A

MAJOR STATION: For locations with ample ROW. Extended canopy with windscreens and seating. Full platform pavement treatment.

B

STANDARD STATION: For locations with sufficient ROW for dedicated platform. Modular shelters with platform pavement treatment.

C

MINIMUM STATION: For locations with narrow sidewalks. Platform edge strip with signage.

EXISTING PRIMARY ROAD

C B PROPOSED PRIMARY ROAD

Case Study: dlandstudio

A



DESIGN DETAILS



SITE VIEW

SITE VIEW





















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.