Nirav Gevariya I Undergraduate Architect Portfolio 2017-2020

Page 1

ARCHITECTURE

PORTFOLIO A COMPILATION OF SELECTED WORKS 2017-2020


“ A project is a temporary endeavour involving a connected sequence of activities and a range of resources, which is designed to achieve specific and unique outcome and which operates within time, cost of quality constraints and which is oftenused to introduce change. “



C U R R I C U LU M V I TA E Hello , I am a 21 year old and 4th year undergraduate architecture student. I seek to learn and understand design methods and technologies that would help me create spaces that are sensitive towards the users as well as the environment. A nature lover and strong beliver in sustainable design approach which can have a positive on the environment for a better future ahead.

NIRAV GEVARIYA gevarianirav@gmail.com

D.O.B - 16/09/1999

EDUCATION

ARCHITECTURAL DOCUMENTATIONS

+91-7600806882

R.S.M Poonawala Sarvajanik Experimental School

( SSC - 2015 )

Shree Bhagvati Vidyalaya

( HSC - 2017 )

D.C Patel School of Architecture

( 4th year - 2020 )

Khamir art and Craft centre , Bhuj Sonar ki Galli , Jodhpur Village Gaamtal of Karamsad

WORKSHOPS

Clay modeling workshop at APIED Deployable Structure workshop at APIED Bamboo workshop at APIED

SOFTWARE SKILLS

Autodesk Autocad Graphisoft Archicad SketchUp Lumion V-Ray Adobe Photoshop Adobe Indesign MS Office MS Word

HOBBIES

Photography Travelling Reading Horse Riding

LANGUAGES

Surat , Gujarat - 395006

Hindi Gujarati English


01

VOXEL STUDENT HOUSING

02

ENVIRONMENTAL INSTITUTE

03

THE OCEAN 120 HOURS COMPETITION

04

WORKING DRAWINGS

05

CANTEEN RENOVATION

06

ARCHITECTURAL DOCUMENTATIONS

07

BAMBOO INSTALLATION - MACHAAN

08

INTERPRETING NATURE - BASIC DESIGN

09

PHOTOGRAPHY

CONTENTS


EVERY YEAR THOUSANDS OF STUDENTS POUR INTO THE CITY OF VALLABH VIDYANAGAR KNOWN AS THE EDUCATION HUB OF WEST GUJARAT TO ACHIEVE THEIR GOAL OF EDUCATION. THIS INCREASE IN NO. OF STUDENTS LEADS TO AN AMALGAMATION OF CULTURAL AND LINGUISTIC BEHAVIORS. A HOSTEL BECOMES A HOME FOR A STUDENT FOR THE YEARS THEY PURSUE HIS EDUCATION. COMPLEX AS EDUCATION CAN GET, HOME ALWAYS BRINGS BACK THE EASE TO LIFE. THE QUALITY OF A STUDENT’S ACADEMIC EXCELLENCE STARTS FROM WHERE THEY BEGIN AND END THEIR DAY.


01

7th Semester June 2020 - November 2020

Voxel Student & Faculty Housing


ME IN FOR ANDA E HIS ED-

CAN GET,

TO LIFE. MATION

C EXCELSIONAL

GIN AND DEFINES

TH ITS X

RDINATE

RMATION COOR-

NSIONAL OSITION, DEFINES

GREATEST ARTISTS OF THE 20TH CENTURY. MONDRIAN WAS INSPIRED BY CUBISM, A MOVEMENT LED BY PABLO PICASSO AND GEORGES BRAQUE THAT EXPLORED THE USE OF MULTIPLE PERSPECTIVES. MONDRIAN BEGAN EXPERIMENTPIXEL VOXEL MATRIX ING PIXEL WITH ABSTRACTED FORMS AROUND THE VOXEL MATRIX

PRO

TIME HE MOVED TO PARIS IN 1912. TTERN WHAT IS VOXEL ?

WITH ITS X

ORDINATE 906 PIET A VOXEL IS A UNIT OF GRAPHIC INFORMATION THAT DEFINES A POINT IN THREE-DIMENSIONAL SPACE. SINCE A PIXEL E COORND THE-

(PICTURE ELEMENT) DEFINES A POINT IN TWO DIMENSIONAL SPACE WITH ITS X AND Y COORDINATES , A THIRD Z COORDINATE IS NEEDED. IN 3-D SPACE, EACH OF THE COORDINATES IS DEFINED IN TERMS OF ITS POSITION, COLOR, AND OSITION, PIXEL VOXEL MATRIX OF THE DENSITY.

Y.

PR

MOVEATTERN

EORGES 906 PIET

MULTIPLE ND THE-

ERIMENTOF THE

ND RY. THE

H

A MOVE-

GEORGES

MULTIPLE

ERIMENT-

UND THE

SOC

SO

DES

PIETER CORNELIS MONDRIAAN AFTER 1906 PIET MONDRIAN WAS A DUTCH PAINTER AND THEORETICIAN WHO IS REGARDED AS ONE OF THE GREATEST ARTISTS OF THE 20TH CENTURY. MONDRIAN WAS INSPIRED BY CUBISM, A MOVEMENT LED BY PABLO PICASSO AND GEORGES BRAQUE THAT EXPLORED THE USE OF MULTIPLE PERSPECTIVES. MONDRIAN BEGAN EXPERIMENTING WITH ABSTRACTED FORMS AROUND THE TIME HE MOVED TO PARIS IN 1912.

D


AND

VOXEL

MATRIX

PROPER L

ION

NAL

INES

ITS X

NATE

OOR-

ON,

PIXEL

VOXEL

MATRIX

P

ERN PIET

THE-

HEALT

THE

OVE-

SUBDIVISION OF SQUARE DESIGN PROCESS

GES

TIPLE

ENTTHE

SOCIAL

SUBDIVISION OF CUBE DESIGN PROCESS

DESIGNE GENERATIVE DESIGN PROCESS


[2]

[2]

[2]

[1]

[1]

[1]

[1]

[2]

[3]

[4]

[5]

[5]

[4]

[3]

[3]

[4]

[5]

[5]

[4]

[3]

[1] SLEEPING, LIVING & WORKING AREA - 3 X 2 M [2] BALCONY - 2 X 1.6 M [3] TOILET - 2.1 X 1.2 M [4] PASSAGE - 1 X 2.2 M [5] WARDROBE & SMALL PANTRY - 0.6 X 2.2 M

[1] SLEEPING LIVING & WORKING [2] BALCONY [3] TOILET [4] PASSAGE [5] WARDRO SMALL PA

UNIT A-A PLAN

UNIT A-B PLAN

UNIT AA

UNIT AB

[1]

[1]

[2]

[2]

[2A]

[1]

[1]

[3]

[4]

[5]

[5]

[4]

[2]

[3]

[3]

[4]

[5]

[5]

[4]

[3]

[1] SLEEPING LIVING & WORKING [2] BALCONY [2A] BALCONY [3] TOILET [4] PASSAGE [5] WARDRO SMALL PA

[1] SLEEPING, LIVING & WORKING AREA - 3 X 2 M [2] BALCONY - 2 X 1.6 M [3] TOILET - 2.1 X 1.2 M [4] PASSAGE - 1 X 2.2 M [5] WARDROBE & SMALL PANTRY - 0.6 X 2.2 M

UNIT B-B PLAN

UNIT B-C PLAN

UNIT BB

UNIT BC

[2 ] [2]

[1]

[2B]

[1] [1]

[1]

[3]

[4]

[5]

[5]

[4]

[3] [1] SLEEPING, LIVING & WORKING AREA - 3 X 2 M [2] BALCONY - 3.3 X 2 M

[3]

[4]

[5]

[5]

[4]

[3]

[1] SLEEPING LIVING & WORKING [2] BALCONY [2B] OPEN SP [3] TOILET [4] PASSAGE [5] WARDRO SMALL PA

[3] TOILET - 2.1 X 1.2 M [4] PASSAGE - 1 X 2.2 M [5] WARDROBE & SMALL PANTRY - 0.6 X 2.2 M

UNIT C-C PLAN

UNIT CC

UNIT CE

[1]

UNIT C-E PLAN

[1] [2B]

[2]

[3]

[4]

[5]

[5]

[4]

[3]

[1]

[1]

[3]

[4]

[2]

[5]

[4]

[3]

[1] SLEEPING LIVING & WORKING [2] BALCONY [2B] OPEN SP [3] TOILET [4] PASSAGE [5] WARDRO SMALL PA

UNIT D-D PLAN

UNIT A-E PLAN

UNIT DD

UNIT AE

[2]

[3]

[2]

[2]

[1]

[1]

[1]

[4]

[5]

[5]

[4]

[2A]

[3]

[3]

[1]

[4]

[5]

[5]

[4]

[3]

[1] SLEEPING LIVING & WORKING [2] BALCONY [2A] BALCONY [3] TOILET [4] PASSAGE [5] WARDRO SMALL PA

[1] SLEEPING, LIVING & WORKING AREA - 3 X 2 M [2] OPEN SPACE - 3.3 X 2 M [3] TOILET - 2.1 X 1.2 M [4] PASSAGE - 1 X 2.2 M [5] WARDROBE & SMALL PANTRY - 0.6 X 2.2 M

UNIT A-C PLAN

UNIT E-E PLAN

UNIT EE

[5]

[1] SLEEPING, LIVING & WORKING AREA - 3 X 2 M [2] CORRIDOR - 3.3 X 2 M [3] TOILET - 2.1 X 1.2 M [4] PASSAGE - 1 X 2.2 M [5] WARDROBE & SMALL PANTRY - 0.6 X 2.2 M

UNIT AC


UP

UP

2 X 1.2 M LIFT

2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

2 X 1.5 M SERVICE ROOM

FLOOR PLAN 1FLOOR PLAN 1

FLOOR PLAN 2FLOOR PLAN 2

UP

UP

2 X 1.2 M LIFT

2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

2 X 1.5 M SERVICE ROOM

FLOOR PLAN 3FLOOR PLAN 3

FLOOR PLAN 4FLOOR PLAN 4

UP

UP 2 X 1.2 M LIFT

2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

2 X 1.5 M SERVICE ROOM

FLOOR PLAN 5FLOOR PLAN 5

FLOOR PLAN 6FLOOR PLAN 6

UP

UP 2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

FLOOR PLAN 7FLOOR PLAN 7

2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

FLOOR PLAN 8FLOOR PLAN 8


[1]

[4]

[5]

[2]

[3]

[1] [2] [3] [4] [5]

LIVING ROOM WASH AREA C.TOILET KITCHEN BEDROOM

- 3.3 X 2.9 M - 1.3 X 2 M - 1.6 X 2 M - 2.7 X 2.9 M - 3.3 X 3 M

1 BHK FLOOR PLAN

1 BHK FACULTY HOUSING UNIT

[1]

[7] [5] [7]

[6]

[2] [4]

[6]

[1] [2] [3] [4] [5] [6]

[3]

L W C K D B

[6] B [7] T [7] T

2 BHK FLOOR PLAN

2 BHK FACULTY HOUSING UNIT

[3] [10]

[8] [1] [11] [8]

[10] [4]

[2]

[9]

[10]

[7]

[12]

[5]

[1] [2] [3] [4] [5] [6]

[6]

LIVING ROOM - 4.0 X 6.0 M DRAWING ROOM - 4.0 X 2.8 M C.TOILET - 1.4 X 2 M PASSAGE - 1.8 X 8 M DINNING - 3.0 X 6.0 M KITCHEN - 5.0 X 3.0. M

[7] STORAGE

- 1.0 X 2.0 M

[8] BEDROOM - 2.8 X 3.8 M [9] CHILD BEDROOM - 3.0 X 3.0 M

[13]

[10] TOILET

- 1.8 X 2.2 M

[11] BALCONY

- 2.4 X 2.4 M

[12] BALCONY

- 1.6 X 2.2 M

[13] WASHING AREA

- 1.8 X 2.0 M

3 BHK FLOOR PLAN

3 BHK FACULTY HOUSING UNIT

[3]

[3]

[5]

[4]

[1]

[2]

[2]

[1]

[3]

[2]

[1 [2 [3 [4 [5

[1] FOYER - 1.2 X 2.0 M [2] TOILET - 1.3 X 2.0 M [3] BEDROOM - 3.0 X 3.5 M

GUEST ROOM FLOOR PLAN

GUEST HOUSE UNIT

[1]

SUITE ROOM FLOOR PLAN

SUITE ROOM UNIT


2 X 1.5 M SERVICE ROOM UP

2 X 1.2 M LIFT

FACULTY HOUSING 1 BHK UNIT FLOOR PLAN 1

2 X 1.5 M SERVICE ROOM UP

2 X 1.2 M LIFT

FACULTY HOUSING 2 BHK UNIT FLOOR PLAN 2

2 X 1.5 M SERVICE ROOM UP

2 X 1.2 M LIFT

FACULTY HOUSING 2 BHK UNIT FLOOR PLAN 3

2 X 1.5 M SERVICE ROOM UP

2 X 1.2 M LIFT

FACULTY HOUSING 4 BHK UNIT FLOOR PLAN 4

2 X 1.5 M SERVICE ROOM UP

2 X 1.2 M LIFT

GUEST & SUITE ROOM UNIT FLOOR PLAN 5


1. 5.

3.

FACULTY BLOCK

ROOF SHADECOVERED WITH CREEPER

2.

STUDENT BLOCK

7.

STUDENT BLOCK

4.

8.

6.

9.

GIRLS BLOCK

OP SITE LAYOUT

CENTRAL COURTYARD

BOYS BLOCK

ROOF SHADE COVERED WITH CREEPERS

5.


1. BOYS HOSTEL UNIT 2. GIRLS HOSTEL UNIT 3. HOSTEL CENTERAL SPACE 4. OPEN AMPHITHEATRE 5. HOSTEL OPEN TERRACE WALKWAY 6. FACULTY HOUSING BLOCK 7. PARKING 8. COLLEGE VOLLEYBALL COURT 9. APIED COLLEGE

STUDENT HOUSING CLUSTER PLAN

FACULTY BLOCK

ROOF SHADECOVERED WITH CREEPER

STUDENT BLOCK

STUDENT BLOCK


1.6 X 1.5 M STORAGE +LVL - 1 M

1.6 X 1.5 M STORAGE +LVL - 1 M

UP

UP

2 X 1.2 M LIFT

2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

3.1X 2.9 M ENTRANCE FOYER +LVL - 1 M

3.1X 2.9 M ENTRANCE FOYER +LVL - 1 M

UP

UP

1.5X 1.5 M LANDING +LVL - 1 M

2 X 1.5 M SERVICE ROOM

3X 1.9 M INFORMATION DESK +LVL - 1 M

3X 1.9 M INFORMATION DESK +LVL - 1 M

UP

UP

UP 1.5 WIDE RAMP

UP

1.5X 1.5 M LANDING +LVL - .6 M

GYM - GROUND FLOOR PLAN

1.5 WIDE RAMP

1.5 WIDE RAMP

1.5X 1.5 M LANDING +LVL - .6 M

1.5X 1.5 M LANDING +LVL - 1 M

AREA - 450 SQ.M.

STUDENT HOUSING GYM LAYOUT

1.5 WIDE RAMP

1.5X 1.5 M LANDING +LVL - .6 M

INDOOR SPORT GROUND FLOOR PLAN

AREA - 500 SQ.M.

STUDENT HOUSING INDOOR SPORTS LAYOUT

CENTRAL AMPHITHEATRE


UP

1.5X 1.5 M LANDING +LVL - .6 M

1.5 WIDE RAMP

A

UP

1.5 WIDE RAMP

3X 1.9 M INFORMATION DESK +LVL - 1 M

GIRLS BLOCK UP

3.1X 2.9 M ENTRANCE FOYER +LVL - 1 M

CENTRAL COURTYARD 1.5X 1.5 M LANDING +LVL - 1 M

BOYS BLOCK

ROOF SHADE COVERED WITH CREEPERS

2 X 1.5 M SERVICE ROOM

L

2 X 1.2 M LIFT

P

F

UP

1.6 X 1.5 M STORAGE +LVL - 1 M

1.6 X 1.5 M STORAGE +LVL - 1 M

S

UP 2 X 1.2 M LIFT

2 X 1.5 M SERVICE ROOM

3.1X 2.9 M ENTRANCE FOYER +LVL - 1 M

UP

1.5X 1.5 M LANDING +LVL - 1 M

1.5 WIDE RAMP 3X 1.9 M INFORMATION DESK +LVL - 1 M

1.5X 1.5 M LANDING +LVL - .6 M

E - LIBRARY , READING ROOM & COMMON WORKING AREA GROUND FLOOR PLAN

AREA - 500 SQ.M.

STUDENT HOUSING E - LIBRARY LAYOUT

STATIONARY - GROUND FLOOR PLAN

1.5 WIDE RAMP

UP

UP

AREA - 450 SQ.M.

STUDENT HOUSING OTHER AMENITIES LAYOUT

CENTRAL AMPHITHEATRE


CENTRAL AMPHITHEATRE COMMON AREA VIEW FOR STUDENTS SITTING AND LEASIURE SPACE

OPEN AMPHITHEATRE VIEW

CAMPUSAMPHITHEATRE CORRIDOR CENTRAL


ROOF TERRACE VIEW

APIED HOUSING BIRD EYE VIEW



02

5th Semester June 2019 - October 2019

Environmental Institute


THE AIM OF THE PROJECT WAS TO DESIGN AN INSTITUTE FOR ENVIRONMENTAL STUDIES, TO PROMOTE ENVIRONMENTAL AND SUSTAINABLE DEVELOPMENT, PROVIDE STUDY AND RESEARCH FACILITIES FOR STUDENTS, PEOPLE AND PROFESSIONALS IN FIELDS OF ENVIRONMENT. THE INSTITUTE WILL FACILITATE COURSES FOR STUDENTS , PRACTICE AND RESEARCH FACILITIES PROFESSIONALS, WORKSHOPS AND LECTURES FOR PEOPLE, IN ORDER TO GENERATE AWARENESS TOWARDS PRESERVATION OF NATURE AND ENVIRONMENT. ALL THE ACTIVITIES AND FUNCTIONS ARE SEGREGATED IN FIVE ZONES. FRONT PART IS A PUBLIC ZONE WHERE THE ADMIN AND EXHIBITION AREA ARE LOCATED, AT THE CENTRE THERE GATHERING SPACE, ON THE HIGHEST SIDE OF SITE THERE ARE CLASSROOMS AND RESEARCH LABS ON THE OPPOSITE SIDE.

TOP VIEW


13. 11.

12.

13.

14.

6.

11.Classroom 12.Library 13.Single Occupancy 14.Open air sitting

FIRST FLOOR PLAN

8.

9.

10.

7.

6.

1. 4. 3. 5.

2.

GROUND FLOOR PLAN

1.Parking 2.Main Entrance 3.Admin Area 4. Laboratery 5. Canteen 6. Open Ground 7. Auditorium 8. Exhibition Area 9. Workshop 10. Accomodation


SECTION AA’

FINAL MODEL VIEW 1

FINAL MODEL VIEW 2

FINAL MODEL VIEW 3


SECTION BB’

OPEN AMPHITHEATRE VIEW

INSTITUTE CAMPUS VIEW


AUDIOTORIUM ROOF TOP

ISOMETRIC DIAGRAM

AMPHITHEATRE FROM BRIDGE


INSTITUTE ENTRANCE

UNDER THE BRIDGE


PLANET EARTH’S 3/4TH OF COVERAGE HUNTING HAD A HUGE IMPACT ON THE ECOSYSTEM UNTIL THE HUMANS ARRIVED. PLASTIC POLLUTION IS ONLY ONE OF THE MANY PROBLEMS NOT ENTIRELY SOLVED BY HUMANKIND AND ITS EFFECTS ARE ON ONE’S NOT EVEN USING IT. BEDDING OF AN OCEAN IS NOW LITTERS OF PLASTIC, UNSEEN DEEP WITHIN. THE INABILITY TO BIODEGRADE BRINGS PLASTIC POLLUTION DOWN TO FDEMEANING AQUATIC LIFE BY BRINGING WRAPPED AROUND POLYTHENE BAGS AND FISHING NETS. THE STRUCTURE FRANSCENDS YOU FROM LAND TO UNDERWATER, TAKING A SHAPE RESAMBLING THAT OF A PLASTIC BOTTLE. IT TAKES ON AN EXPERIENCE QUALITATIVE. THE WALK BE TWEEN WATER AROUND PLASTIC INSTALLATION AND SHED TREES REFLECT THE EXCRUCIATING PHYSICALITY OF AQUATIC LIFE AROUND THE WASTE. THE PLASTIC TOMADO IMPACTS NATURE IN ALL FORMS. THE GLASS ELEMENT OF STRUCTURE INCLUDES TRANSPARENCY AND UTTER ONENESS WITH SURROUNDING SUGGESTS ISSUE PERSISTING INSIDE AND EDUCATES VISITORS OF THE PERILS. SPACE WILL BE INFLUENTIAL FOR PEOPLE, SUPPORTIVE OF THE WATER BODY, AND SURREAL EXPERIENCE OF ITS OWN.


03

Design Competition October 2020

The Ocean 120 Hours



VIEW POINT A

VIEW POINT B

UNDER WATER VIEWS



04

6th Semester October 2019 - February 2020

Residential House Working Drawing


D

1

A'

3

2

H

4

E'

TOP CABIN

5

7

6

14480 3220 C/C

C1

W4 G-06

2135

590

181300

1099

3453 C/C

1190

1125

2321 C/C

300

2852 C/C

5475

300

01

17

1337

3515 C/C

1403

15 16

POOJA ROOM 2.0 M X 3.3 M +0.30 M LVL

UP

HOME THEATRE 4.70 M X 5.50 M +0.30 M LVL

C1

2359

1180

W4 G-04

3240 C/C

2970

5065

B'

N

INFORMAL LIVING AREA 4.9 M X 4.9 M +0.30 M LVL

LIVING AREA 3.5 M X 5.2 M +0.30 M LVL

2990

300

D

C1

2862 G-02

4926

W4 G-03

2970

2940

G C

W1 G-01

1977

C1

D1 G-01

988

C1

1229

1900

N

988 C/C

683

C1

796

3240 C/C

STORAGE 2.9 M X 3.1 M +0.30 M LVL

W4

C1

C1

2228

4981

+0.0 M LVL 1377

1033

300

1967

3220 C/C

A

W2 G-01

8309 4228

516

C1

300 D2 G-02

3795

+0.15 M LVL

300

4893

C1

615

579

983 C/C

993 997

1486

997

683

983 C/C

300

B

300

A

N

13557

C1

4906

D4 G-02

300

4932

C1

1152

1325

300 98

C1

C1

988 C/C

C

5527

G'

B

2568 C/C

D3 G-01

2268

1320

2568 C/C

DINNING AREA 2.9 M X 3.5 M +0.30 M LVL

230

C

E

4217

13557

B

F'

1089

990

792

2080

D

C1

C1

C1

393

C'

W4 G-01

1800

256

1087

5848

14

02

1050

M LVL

30079

12

4711

1968

3646

1377

3515 C/C

972 300

E

11+2.25

13

03

1245

10

05 04

D4 G-01

KITCHEN 2.9 M X 6.0 M +.030 M LVL

09

08

06

5522

1175

+1.20 M LVL 07

W4 G-05

C1

C1

W3 G-01

3285

V1 G-01

1175

866

C1

1245 2985

TOILET 1.4 M X 2.0 M

F

F

300

1180

3715 C/C

300

F

300 304

1470 C/C

BALCONY 2.9 M X 8.3 M +0.30 M LVL

ENTRANCE

543

1400

1470 C/C

951

300

1191

3715 C/C

1900

300

3000

1441

3453 C/C

2321 C/C

433 300

2852 C/C

17336

D'

1

2

A

3

H'

4

E 6

5

7

GROUND FLOOR PLAN D6 G-01

D

1

2

A'

3

H

4

E'

TOP CABIN

5

7

6

17331 3220 300

2050

300

1138

3453

1180

1097

300

2321

2500

300

2852

2695

300

2531

300

300

1010

5532 27

28

22

30

20

31 32 33

19

F

3215

26

29

21

4177

25

23

1298

3215

24

3515 C/C

F

4187

1185

4450

W3 S-01

3515 C/C

F

2040

3715

300

300

D5 G-01

1470

F'

34

DOWN 1050

CABIN +6.6 M LVL

E

300

6325

300

E

1483

2378

2268

11590

10011

230

2568 C/C

9023

2263

910

2777

11590

300

D

C

N

D

300 242

C'

2568 C/C

D4 S-06

2831

G'

3240 C/C

B

678 300

3729

983 C/C

983

988

300

300 683

N

988 C/C

989

300

8599 1182

300

983 C/C

N

C

678

988 C/C

B

B' G

3220

C

A

3686

3686

6818

2945

3240 C/C

B

13900

D

D

D

A

D

D 300

2920

300

3220

882

300

3729

1470

300

3715

2473

300

2695

3453

300

2321

2531

300

2852

17331

1

D'

2

3

A

4

H'

TERRACE FLOOR PLAN D6 G-01

5

E 6

7

D


D

1

2

A'

3

H

4

E'

5

7

6

17331

3220

1470 106300 106 300

1138

C1

1092

3453

1180

1097

300

1125

2321

1180

1620

2852

1180

390

300

W4 F-08

C1

300

34

1528

2393

3515 C/C

3215 698

D3 F-04

1158

DRESSING 1.0 M X 1.7 M 310

TOILET 2.0 M X 2.4 M

D4 F-04

590

V1 F-03 C1

W4

B'

1180

C1

C1

978

988

W4 F-11

V1

G C 988 C/C

5538

725

W4 F-10

C1

A

NAM

3051

4931 1273 1185

3749

3240 C/C

BALCONY 2.7 M X 4.0 M 500

3928

3147 300 295

D3 F-05

W4 F-09

C1

C1

W2

W3

BEDROOM 4.1 M X 5.5 M

3108

W1

NAM

D1

B

D2

983 C/C

497

BEDROOM 4.1 M X 5.5 M W4 F-12

NAM

D

2620

BALCONY 2.7 M X 4.0 M

DR RE

C

30044 300 44

1617

240

1000

E 2568 C/C

957

221

2393

TH N

923

900

C1

V1 F-02

1528

3692

D3 F-06

1180

3240 C/C

C1

3768

C1

983

983 C/C

TOILET 2.0 M X 2.4 M

DRESSING 1.0 M X 1.7 M

11590

910

D3 F-03

1019

2283 78 300

1245

678

988 C/C

2639

HALL 3.4 M X 3.4 M

300

B

D4 F-03

C1

242 800

D3 F-07

C1

C

F'

1010

1000

TOILET 2.3 M X 3.1 M

AL ME

2623

346 300

1088

1437

N

590

300

D3 F-02

BEDROOM 3.7 M X 5.5 M

32

18

C1

400 2568 C/C 11590

29

33

UP

1000

1245

5542

30

19

1010 3217

D4 F-05

G'

F

28

1825

972

20

W4 F-07

C1

31

2985

D

27

1348

3285

21

V1 F-04

B

26

O.T.S

22

GYM 4.4 M X 4.6 M

C1

C'

25

23

W4 F-13 1377

3515 C/C

24

E

1087

3457 W3 F-01

1826

W2 F-02

1016

866

4460

1015

C1

F

2831

900

F

3715

3980

300

300 304

D3

A

D4

D5

D6 300

1029

590

1296

300

887

3220

1574

1470

1377

1374

1164

3715

1377

585

300

2342

3453

2831

2321

2852

NO

17331

01

KE

D'

1

2

A

3

H'

4

5

E 6

7

5

6

7

3495

3

4

118

79

°

2

1

88

FIRST FLOOR PLAN

22

87

17046 C/C 3220 C/C

1470 C/C

3715 C/C

3453 C/C

2321 C/C

S W

2852 C/C 5931

9593

C1

TIT

F

9379

300 C1 450 150

C1

C1

150 450

150 450

300

1501

F

2701

450 150

PR

NA

NO RO

AL ME

3515 C/C

3515 C/C

D.

2701

2701

2568

C1

2701

E

2568

TH NO

C1

DR RE

E

C1

C1

2568 C/C

5269

5269

11295 C/C

1475

11295 C/C

2568

C1 C1

D

C1

3240 C/C

C1

2701 2701

2506

3240 C/C

D

1067

2568 C/C

1475

2701 C1

C

C 988 C/C

3684

C1

2484

988 C/C

C1

C1

C1

B 979 C/C

3684

C1

A

2484

979 C/C

B C1

A

1501

2701 1501

3220 C/C

1470 C/C

3715 C/C

3453 C/C

2321 C/C

2852 C/C

17031 C/C

0

52

65

38

2

3

4

FOUNDATION LAYOUT

5

6

7 4°

1

10

14


D

LVL +7500 MM PARAPET

LVL +7500 MM PARAPET

23 22 21 20 19

F TOP CABIN

C

LVL +6600 MM SLAB TOP

LVL +6600 MM SLAB TOP

B G

TOP CABIN

BEDROOM

PASSAGE

W4

LVL +5500 MM LINTEL LEVEL

W4

W4

W4

W4

D3

D3

D'

D3

LVL +4350 MM BALCONY RAILING LVL +3450 MM SLAB TOP

NOTES:

LVL +3450 MM SLAB TOP LVL +2400 MM LINTEL LEVEL

D1

D2

W2

D1

W1

ALL DIMENSIONS ARE MENTIONED.

NOTES:

W4

DINNING

LVL +300 MM PLINTH LEVEL LVL +0.0 GROUND LEVEL

THE DRAWING IS MAD NOT MEASURING. ALL DIM MENTION DRAWING NOT SHOWI REVISION ABOVE ARE THE DRA NOT MEA

LVL +300 MM PLIMTH LEVEL LVL +0.0 GROUND LEVEL

DRAWING REVISION LVL -1500 MM FOUNDATION

LVL -1500 MM FOUNDATION

SECTION AA' LVL +9750 MM TOP CABIN LEVEL

KEYPLAN

SECTION GG’GG' SECTION

LVL +9750 MM TOP CABIN LEVEL LVL +7500 MM PARAPET

TOP CABIN

LVL +6600 MM SLAB TOP

LVL +7500 MM PARAPET

LVL +7500 MM PARAPET

LVL +6600 MM SLAB TOP

LVL +3450 MM SLAB TOP

BEDROOM

LVL +5550 MM LINTEL LEVEL

W4

D4

D4

BEDROOM

LVL +4350 MM

W4

W4

D3

D3

BEDROOM

LVL +4350 MM SILL LEVEL

BALCONY RAILING LVL +2400 MM LINTEL LEVEL

TOILET

D4 TOILET

LVL +6600 MM SLAB TOP

BEDROOM

NOTES:

HOME-THEATRE

LIVING ROOM

LVL +3450 MM SLAB TOP

ALL DIMEN MENTIONED

LVL +3450 MM SLAB TOP

LVL +1080 MM BALCONY RAILING LVL +2400 MM LINTEL LEVEL

TOILET

STORE

LVL +300 MM PLINTH LEVEL LVL +0.0 GROUND LEVEL

W4

DINNING

11

D4

D4

THE DRAW NOT MEASU

D2

INFORMAL LIVING ROOM

DRAWING N REVISION A

W4

D3

10 09 08 07

W3

06 05 04

LVL +300 MM PLIMTH LEVEL LVL -1500 MM LVL +0.0 FOUNDATION GROUND LEVEL

LVL -1500 MM FOUNDATION

LVL +300 MM PLINTH LEVEL LVL +0.0 GROUND LEVEL

03 02 01

STUDIO VI Working drawin

SECTION EE'

LVL -1500 MM FOUNDATION

SECTION SECTION bb' BB’hh' SECTION LVL +7500 MM PARAPET

TITLE

:

SECTIO KE

NAME

:

STUDI NIRAV GE Worki

: 17 SA 1 PROJECT D. C. PATEL SCHOOL OF AR

TITLE

NAME GYM

ROLL NO

TOP CABIN

V1

LVL +6050 MM VENTILATION TOP LEVEL

LVL +4350 MM BALCONY RAILING

RESIDEN

ROLL NO

LVL +9750 MM TOP CABIN SLAB

LVL +6600 MM SLAB TOP

LVL +5450 MM VENTILATION BOTTON LEVEL

:

PROJECT

BALCONY

V1

TOILET

LVL +7500 MM PARAPET

PASSAGE

W3

D3

D. C. PATEL

D3

D3

TOILET

LVL +6600 MM SLAB TOP

34

GYM

BEDROOM

LVL +3450 MM SLAB TOP

29 28

W2

W4

LVL +2400 MM LINTEL LEVEL

W4

27 26

D2

W2

W4

ENTRANCE HALL

W1

D1

25

STORAGE

D4

NO

24 23

W4

22 21 20

AL ME

19

LVL +1200 MM SILL LEVEL

18

LVL +3450 MM SLAB TOP

17

TOILET

KITCHEN

W3

LVL +0.0

D4

W4

GROUND LEVEL

TH NO

HOME-THEATRE 12

W4

11

DR RE

10 09 08 07 06 05 04 03

LVL -1500 MM FOUNDATION

02 01

LVL +300 MM PLINTH LEVEL LVL +0.0 GROUND LEVEL

STUDIO Working

SECTION cc'

PROJECT

LVL -1500 MM FOUNDATION

SECTION FF’ ff' SECTION

:

TITLE

:

NAME

:

ROLL NO

:

D. C. PATEL SC LVL +9750 MM TOP CABIN LEVEL

LVL +7500 MM PARAPET

LVL +6600 MM SLAB TOP

LVL +5550 MM LINTEL LEVEL

BALCONY

TOILET

GYM W4

D4

W4

D3

LVL +4350 MM SILL LEVEL

LVL +3450 MM SLAB TOP

KITCHEN

LVL +2400 MM LINTEL LEVEL

STORAGE W4

W4 CUTOUT

LVL +1200 MM SILL LEVEL

LVL +300 MM PLINTH LEVEL LVL +0.0 GROUND LEVEL

ST Wo LVL -1500 MM FOUNDATION

PRO

SECTION DD’ SECTION dd'

TITL

NAM

ROL

D. C


450

150

SECOND LANDING LVL + 9080 CABINET TOP LVL +8930

CABINET PARAPET WALL LVL + 6610

1010

B

B

CABINET FINISH FLOOR LVL + 5930

D

34

FIRST FLOOR TOP LVL + 5780 78

23

29

22

30

1000

20

32

19

33

18

26

1000

256 25

24

1000

27

26

28

23

29

22

30

21

31

22

20

32

21

19

33

25

KEYPLAN 24

THIRD 31 B 21 LANDING LVL + 4060

256

256

27

28

23

78

DETAIL D

20

34

24

25

26

27

34

28

23

29

22

30

21

31

20

32

19

33

170

27

256

170

26

28

256

25

1175

82 24

256

29

170

1000

1082 1170

1000

FOURTH LANDING LVL + 5092 1078 256 256

34

DOWN

A

19

1082

A'

1000

UP

1175

27

28

29

22

30

170

26

23

256

25

SECOND LANDING LVL + 220231 21 32

FIRST FLOOR 19

33

78

1082

05

1000

1175 18

A'

29

30

21

31

33

METAL ANCHOR Ø 7 MM DETAIL B

32

NOTES:

METAL TUBE ALL DIMENSIONS ARE IN MM UNLESS MENTIONED. Ø 40 MM

METAL TUBE Ø 40 MM 33

34

THE DRAWING IS MADE FOR READING AND NOT MEASURING.

34

METAL FRAME

SOLDIER Ø 40 MM

A'

UP

31 32

28

22

19

STEEL PIPE Ø 40 MM

GROOVE 10 MM X 10 MM

29 30

SECTION AA' 27

20

GRANITE 12 MM

28

170

1175

23

33

UP

26

STAIRCASE SECTION

32

19

25

24

17

31

27

DETAIL A 1000

256

256

01

21

256

256

30

20

A

170

16

26

20

DOWN

256

29

25

22

1082

14

02

B'

24 23

21

19

34

15

23

SOLDIER Ø 40 MM

78 GROOVE 10 MM X 10 MM 01

TOP FLOOR CABIN

27 03 28

26

STEEL PIPE Ø 40 MM

1000

GROUND LVL + 0.0 1170

1000 170

256

1078

GRANITE 12 MM

02

13

256

03

11

LVL + 05 150 04

25

10

12

22

256

09

06

82 24

256

08

KEYPLAN

04

B

256

256 1000

TOP FLOOR CABIN

B'

06

1000

07

256

1000

A'

FIRST LANDING LVL + 1170

B

THE DRAWING IS MADE09 FOR READING AND NOT MEASURING. 08 DRAWING NOT SHOWING THE LATEST REVISION 07 ABOVE ARE TO BE CANCELLED.

34

DOWN

A

A

11 ALL DIMENSIONS ARE IN MM UNLESS MENTIONED. 10

170

256

256

12

NOTES:

256

20

B' B

A'

17

256 256 GROUND FLOOR TOP LVL + 2890 1000 24

DOWN

1010

A

18

FIRST FLOOR FINISH FLOOR LVL +3040

TUBE Ø 25 MM

DOWN

A

DRAWING NOT SHOWING THE LATEST REVISION ABOVE ARE TO BE CANCELLED.

A'

SOLDIER Ø 40 MM TUBE Ø 40 MM

WELD

WELD

ANCHOR Fe Ø 12 MM

METAL PLATE

78

15

02

16

01

17

A

UP

A UP

29

PROJECT

22

22

30

30

21

21

31 DETAIL A

31

20

20

32

19

19

33

18

18

34

DETAIL D

UP

SCALE 1 : 5

:

24

RESIDENTAIL, KARAMSAD

TITLE

:

STAIRCASE DETAIL

32

NAME

:

NIRAV GEVARIYA

33

ROLL NO

:

17 SA 137

34

D. C. PATEL SCHOOL OF ARCHITECTURE A.P.I.E.D.

METAL ANCHOR Ø 7 MM DETAIL B

A'

METAL TUBE Ø 40 MM

SCALE:

10 MM PLASTER DETAIL C B' FIRST FLOOR FIRST FLOOR B

256

26

27

1000

28

23

23

29

22

22

30

21

21

31

20

20

32

19

19

33

33

34

34

29

30 31

DOWN

32

DOWN

STUDIO VI Working drawing

METAL PLATE

B' B

256 1000

25

A

SOLDIER Ø 40 MM TUBE Ø 40 MM

WELD

ANCHOR Fe Ø 12 MM

GROUND FLOOR

256 2824

TUBE Ø 25 MM WELD

B'

27

17

A

METAL FRAME

26

1:20

DRWG NO:

METAL TUBE Ø 40 MM

A'

256

25

LAYOUTS 256 STAIRCASE 256 256 78

78

PROJECT

:

RESIDENTAIL, KARAMSAD

TITLE

:

STAIRCASE DETAIL

DETAIL D

SCALE 1 : 5

NAME

:

NIRAV GEVARIYA

ROLL NO

:

17 SA 137

D. C. PATEL SCHOOL OF ARCHITECTURE A.P.I.E.D.

SCALE: 1:20

DRWG NO:

TOP FLOOR TOPCABIN FLOOR CABIN B'

B'

17

A'

170

29 GROOVE 1023 MM X 10 MM

256

1000

STUDIO SOLDIER VI Ø 40 MM Working drawing

28

1082

256

27

STEEL PIPE Ø 40 MM

1170

1170

1000

GRANITE 12 MM 27 2824 25 26

26

1082

1078

170

170

A'

256 1078256

78

256

03

256

14

256

10 MM PLASTER 13

170

05

23

25

78

170

82

SCALE 1 : 5

B

B'

TUBE MM 256 Ø 25 256 SOLDIER Ø 40 MM TUBE Ø 40 MM82 1000 24

12 METAL PLATE

DETAIL C

1000

11

256

10

256

09

256

08

WELD

256

256 256

WELD 07

06

04

A

1000

1175

1000

1000

METAL FRAME 1082

B

TOP FLOOR CABIN

METAL TUBE Ø 40 MM

METAL TUBE Ø 40 MM

ANCHOR Fe Ø 12 MM

DETAILS

B

256

B

DETAIL D

256

256

256

DETAIL C

DETAIL B

1000

GROUND FLOOR FIRST FLOOR

1175

B'

B' B

10 MM PLASTER

METAL ANCHOR Ø 7 MM

1175

DETAIL A


4690

3987

2820

3000

LVL +9750 MM

2250

TOP CABIN LEVEL

LVL +7500 MM

900

1000

PARAPET

LVL +6600 MM 1050

SLAB TOP

LVL +5550 MM

W4

3245

1200

LINTEL LEVEL

W4

LVL +4350 MM

900

SILL LEVEL

LVL +3450 MM

1050

SLAB TOP

LVL +2400 MM

1200

W2

D2

W1

3540

LINTEL LEVEL

W4 D1

LVL +1200 MM 900

SILL LEVEL LVL +300 MM

300

PLIMTH LEVEL LVL +0.0 GROUND LEVEL

17553

FRONT ELEVATION

FRONT ELEVATION

3723

2810

4223

833

LVL +9750 MM TOP CABIN LEVEL

2250

TOP CABIN

LVL +9750 MM TOP CABIN LEVEL

LVL +7500 MM

TOP CABIN

900

1000

PARAPET

LVL +6600 MM SLAB TOP

1050

LVL +7500 MM PARAPET

LVL +5550 MM LINTEL LEVEL LVL +6600 MM

1200

W4

3150

V1

SLAB TOP

W4

D3

LVL +5550 MM LINTEL LEVEL LVL +4350 MM

SILL LEVEL

7600

900

V1 W4

LVL +3450 MM

W4

D3

1050

SLAB TOP LVL +4350 MM SILL LEVEL

LVL +2400 MM

LVL +3450 MM

LINTEL LEVEL

W4

3150

1200

SLAB TOP W4

LVL +2400 MM LINTEL LEVEL

LVL +1200 MM SILL LEVEL W4

300

1200

W4

LVL +0.0 LVL +1200 MM GROUND LEVEL SILL LEVEL

12840

LEFT SIDE ELEVATION

LVL +0.0 GROUND LEVEL

LEFT SIDE ELEVATION

LEFT SIDE ELEVATION LVL +9750 MM TOP CABIN LEVEL

3048

3048

3415

2495

2495

LVL +9750 MM

LVL +7500 MM PARAPET

2250

TOP CABIN LEVEL

LVL +7500 MM LVL +6600 MM

SLAB TOP LVL +5550 MM

LVL +6600 MM

RADIUS 500

900

PARAPET

LINTEL LEVEL

1050

SLAB TOP LVL +5550 MM

W4

W4

RADIUS 500

W2

LVL +4350 MM SILL LEVEL

1200

LINTEL LEVEL

W4

W4

W2

LVL +4350 MM

LVL +3450 MM

7650

LVL +3450 MM SLAB TOP

W3

900

SLAB TOP

W3

LVL +2400 MM LINTEL LEVEL

1050

SILL LEVEL

V1

LVL +2400 MM

W4

LINTEL LEVEL

W4

LVL +1200 MM SILL LEVEL

1200

V1 W4

W4

LVL +0.0 GROUND LEVEL

LVL +0.0 GROUND LEVEL

1200

LVL +1200 MM SILL LEVEL

REAR ELEVATION ELEVATION REARREAR ELEVATION


B'

46

SECTION BB'

W3

A

KEYPLAN

THE DRAWING IS MADE FOR READING AND NOT MEASURING. DRAWING NOT SHOWING THE LATEST REVISION ABOVE ARE TO BE CANCELLED.

W3 6mm TH. CLEAR GLASS

24

650

AS PER SELECTION CRYSTAL GRAY STONE

31 32 33

MICROWAVE

2106

3000

NOTES:

2313

TOASTER

KEYPLAN

W3

BLACK MARBLE TOP

0.23

29 30

KOTAH STONE SINGLE SIDE POLISHED

SHOWER (JAQUAR)

SINK

ALL DIMENSIONS ARE IN MM UNLESS MENTIONED.

0.23

DEATIL - 2

THE DRAWING IS MADE FOR READING AND NOT MEASURING. DRAWING NOT SHOWING THE LATEST REVISION ABOVE ARE TO BE CANCELLED.

655

820

W3

W3

KITCHEN LAYOUT

0.80 0.90

DETAIL A

6mm TH. CLEAR GLASS ALUMINUM SECTION SLIDING SHUTTER

FIN. FLOOR LVL. 53

75

2.10

2.9 M X 6.0 M dim & furni

2.10

DRAWING NOT SHOW REVISION ABOVE AR

GLASS 6MM TH.

RESIDENCEKITCHEN BOTTOL HEIGHT

KOTAH STONE SINGLE SIDE POLISHED

FLOOR. LvL.

12 x 12mm GROOVE IN PLASTER

SECTION A-A

DETAIL C

LOWER CABINET LAYOUT 0.80

UPPER CABINET LAYOUT A' B

R

DETAIL B 5

100 DIA CAST IRON SOIL WASTE DISPOSAL DOWN TAKE PIPE LINE WITH PROPER AIR VENT 100 DIA CAST IRON WASTE DISPOSAL DOWN TAKE PIPE LINE WITH PROPER AIR VENT

R

: KITCHEN DETAIL 150 DIA CAST IRON RAINTITLE WATER DISPOSAL DOWN TAKE PIPE LINE WITH PROPER AIR VENT : KITCHEN DETAIL

C

NAME : NIRAV GEVARIYA UPVC PRESSURED COLD WATER SUPPLY DOWN TAKE PIPEDEATIL LINE FROM-TERRACE 21:20 LVL. ROLL NO : 17 SA 137 SCALE: DRWG NO: NAME : NIRAV GEVARIYA UPVC PRESSURED HOT WATER SUPPLY D. DOWN TAKE PIPE FROM TERRACE LVL. WITH C. PATEL SCHOOL OF LINE ARCHITECTURE 18 1:20 A.P.I.E.D. B' ROLL NO : BB' PROPER INSULATION 17 SECTION SA 137

1

SCALE:

0.60

3

100 DIA CAST IRON WATER DISPOSAL PIPE LINE , BURRIED UNDER GROUND AS PER GIVEN , SHOWER SLOPE 1:80 V (JAQUAR)

A.P.I.E.D.

G-2

150 DIA STONE WARE OR PVC WASTE WATER DISPOSAL DRAINAGE PIPE LINE , LINE BURRIED UNDER GROUND , AS PER GIVEN DETAIL , HAVING SLOP 1:100 150 DIA STONE WARE OR PVC SOIL WASTE DISPOSAL DRAINAGE PIPE LINE , LINE BURRIED UNDER GROUND , AS PER GIVEN DETAIL , HAVING SLOP 1:100

CEMENT MORTAR

SHOWER (JAQUAR)

A

B 600

5

DETAIL F

FLUSH COCK

0.23

38mm PIPE OUTSIDE

PLASTER 12MM TH. (JAQUAR)

C

KOTAH STONE SINGLE SIDE POLISHED

D

0.80

779 900

D2 TOILET FOLDED ELEVATION

ELEVATION B'

SECTION BB'

KOTAH STONE SINGLE SIDE POLISHED

MASONRY SECTION - AA WALL

1.20LINTEL ARCHITRAVE

AA'

KITCHEN PLATFORM GAS AREA DETAIL

WOODEN PANEL

SECTION A-A

DETAIL E

DETAIL C 0.60

A

1

5

0.60

1.20

D4

BATH AREA

1.40

UPVC PRESSURED HOT WATER SUPPLY DOWN TAKE PIPE LIN PROPER INSULATION

1

100 DIA CAST IRON SOIL WASTE PIPE LINE , BURRIED UNDER

3

100 DIA CAST IRON WATER DISPOSAL PIPE LINE , BURRIED UN SLOPE 1:80

PROJECT

DETAILKITCH E

R

TITLE

HOT WATER PIPE LINE ROLL

:

D

NO

:

17 SA

D. C. PATEL SCHOOL OF A TRANS

WOODEN FRAME STRUCTURE

SLOPE

A B

NANI TRAP

5

D

C

PLASTER 12MM TH. MASONRY WALL

DETAIL E

WINDOW DETAILS

TRANSPAREN

W3

LINTEL 4" HIGH

0.60

PLASTER 12MM TH.

WOODEN FRAME STRUCTURE

DET

TRANSPARENT GLASS 6MM TH. DETAIL F

WOODEN FRAME STRUCTURE A'

PLASTER 12MM TH.

LIN RESIDE

NIRAV

1 5

:

150 DIA STONE WARE OR PVC SOIL WASTE NAME : DISPOSAL DRAINA UNDER GROUND , AS PER GIVEN DETAIL , HAVING SLOP 1:100

DETAIL E MASONRY WALL

DETAIL C 1.20

1.60

D

PLAN

DETAIL F

A

TRANSPARENT GLASS 6MM TH.

M STUDIO VI T Working draw

COLD WATER PIPE LINE

SLOPE SHOWER (JAQUAR)

1.20

DETAIL D

UPVC PRESSURED COLD WATER SUPPLY DOWN TAKE PIPE LI

5

WOODEN PANEL

DETAIL B C DETAIL

150 DIA CAST IRON RAIN WATER DISPOSAL DOWN TAKE PIPE

C

150 DIA STONE WARE OR PVC WASTE WATER DISPOSAL DRA UNDER GROUND , AS PER GIVEN DETAIL , HAVING SLOP 1:100

DETAIL D3F

A'

100 DIA CAST IRON WASTE DISPOSAL DOWN TAKE PIPE LINE

R

WASH BASIN COUNTER IN GRANITE

D2 TRANSPARENT GLASS 6MM TH.

100 DIA CAST IRON SOIL WASTE DISPOSAL DOWN TAKE PIPE

5

0.60

0.60

A

TRANSPARENT GLASS1 6MM TH.

DETAIL A

JAMB

R

1

WATER CLOSET (JAQUAR)

DETAIL B

0.80

S

B

5

0.23

0.23 WOODEN PANEL

D3

53

FLOOR. LvL.

JAMB

1.40

FIN. FLOOR LVL.

TRANSPARENT GLASS 6MM TH. 75

PLASTER 12MM

MASONRY WALL

0.60

MASONRY WALL

COMMERCIAL BOTTOL HEIGHT

RESIDENCE BOTTOL HEIGHT

PLAN

TAP (JAQUAR)

0.23

HAND SHOWER (JAQUAR)

WATER 13mm(Aprox.) GAS PIPE CLOSET

50

D1 TOILET LAYOUT

SECTION AA'

1

650

SLOPE

NANI TRAP

0.90

DETAIL B

750 WOODEN FRAME700 STRUCTURE 50

WASH BASIN (JAQUAR)

2.10

1

SLOPE

W3

D4

BLACK GRANITE TOP

46

2.10

D4

COLD WATER PIPE LINE

MIRROR

WASH BASIN COUNTER IN GRANITE

5

TRANSPARENT G

HOT WATER PIPE LINE

5

BATH AREA

DRWG NO:

C. PATEL OF ARCHITECTURE 100 DIA CAST IRON SOILD. WASTE PIPESCHOOL LINE , BURRIED UNDER GROUND AS 19 PER GIVEN , SLOPE 1:60

1

0.23

DETAIL E

1.40

1

5

WATER CLOSET (JAQUAR)

LINTEL 4" H

PROJECT

TITLE

TRANSPARENT GLASS 6MM TH.

5

RESIDENTAIL, KARAMSAD RESIDENTAIL, KARAMSAD :

:

609 (Aprox.)

1

A B

PROJECT

MASONRY

KOTAH STONE SINGLE SIDE POLISHED

STUDIO VI VI WorkingSTUDIO drawing Working drawing

D

SECTION AA'

AS PER SELECTION BLACK GRANITE PLATFORM

AS PER SELECTION CRYSTAL GRAY STONE

KITCHEN PLATFORM GAS AREA DETAIL

KITCHEN DETAILS DETAIL B

DETAIL A

THE DRAWING IS MA NOT MEASURING.

2.10

KITCHEN 2.9 M X 6.0 M dim & furni TRANSPARENT

STORAGE 2.9 M X 3.1 M

SECTION - AA

ALL DIMENSIONS AR MENTIONED.

COMMERCIAL BOTTOL HEIGHT

847

779 900

W3

D3

10 x 10mm GROOVE

1.40 NOTES:

BLACK GRANITE

DETAIL - 1

D4

GE .1 M

N PANEL

W3

38mm PIPE OUTSIDE 13mm(Aprox.) GAS PIPE

50

KOTAH STONE SINGLE SIDE POLISHED

N

W3

0.60

B

900

46 600

D2

50

CEMENT MORTAR

40 50 25

1

650

A

1.40

BLACK GRANITE TOP

732

CEMENT MORTAR

0.60

0.80

750 700

609 (Aprox.)

D4 BLACK GRANITE TOP

SECTION AA'

900

WATER CLOSET (JAQUAR)

A'

40 50 25

HAND SHOWER (JAQUAR)

660

3506 TAP (JAQUAR)

847

ASH BASIN AQUAR)

820

46

FLUSH COCK

732

MIRROR

N

0.60

INET LAYOUT

STOVE

TEA MAKER

28

650

2086

12 x 12mm GROOVE IN PLASTER

V G-2

27

20

AS PER SELECTION BLACK GRANITE PLATFORM

REFGIRETOR

KITCHEN 2.9 M X 6.0 M dim & furni

26

22

DOWN

ALUMINUM SECTION SLIDING SHUTTER

STORAGE 2.9 M X 3.1 M

25

23

21

19

34

D4

W3

UPPER CABINET LA

ALL DIMENSIONS ARE IN MM UNLESS MENTIONED.

BLACK GRANITE

DETAIL - 1

CHEN M X 6.0 M & furni

NOTES:

10 x 10mm GROOVE

W3


05

Canteen Renovation 3rd Semester June 2018 - October 2018


6. 1. A

2.

4. A’

5.

2.

3.

3.

1.Old Canteen 2.Waiting Area 3.PTFE Pavallion 4. Steel Structure 5. Sitting Space 6. Services

FIRST FLOOR PLAN

6. 1.

2.

4.

A

A’ 5.

2.

3.

3.

GROUND FLOOR PLAN

KEY PLAN


STEEL PLATE (ANGLE BRACE)

ANGLE BRACE SANDWICH PANEL

STEEL FRAME

ROOF DETAIL

ROUTEL

NODE

SPIEDER FITTING FIN

ROUTEL STEEL BOX SECTION BASE FRAME FOR GLASS FLOORING

SILLICON SEALANT

STEEL BOX SECTION

RCC ANCHOR BOLT / J-BOLT

ISOMETRIC VIEW

SINGLE HINGE MAST BASE PLATE

UNIT PLAN


TOUGHNED GLASS ( 20 MM TO 24 MM ) GLASS

SILICON SEALANT

SANDWICH GLASS RUBBER BOOT

CLEAR SILICONE SEALANT

JOINARY ALUMINUM FRAME STRUCTURE SPACE MEMBER

STEEL C-SECTION

STEEL PLATE BOLTED TO JOINT 2 SECTION

STEEL SECTION

STAIRCASE STEP DETAIL


ELEVATION OF MODULE

MODULE SECTION

MODULE PLAN

SECTIO


2 CABLE CLAMPED TOGETHER

PTFE TEFLON

THICKNESS OF CABLES (6MM TO 26 MM DIAMETER) METAL WIRE CLIPS OR CABLE CLAMPS PTFE TEFLON

CABLE BASE PLATE

CABLE CONCRETE FOUNDATION

J-BOLTS

CABLE ANGLE PLATE J - BOLTS ( TO FIX THE COLUMN WITH FOUNDATION

ON AA’

BASE PLATE PTFE COATED FABRIC FABRIC ROCKET WITH CABLE



06

4th Semester June 2018 - October 2019

Architectural Documentations


SECTION AA’

GROUND FLOOR PLAN

LEFT SIDE ELEVATIONIT

SECOND FLOOR PLAN


SECTION BB’

THIRD FLOOR PLAN

FRONT SIDE ELEVATION

ROOF PLAN


B

B

B’

B’ GROUND FLOOR PLAN

FIRST FLOOR PLAN

B

B’ SECOND FLOOR PLAN

TOP VIEW


SECTION BB’

FRONT ELEVATION



07

College Festival October 2019 - February 2020

Bamboo Installation ( Machaan )


CONCEPTUAL PROCESS

EXCAVATION FOR FOUNDATION



08

Interpretaing Nature 4th Semester - Basic Design November 2018 - April 2019

THE EXERCISE STARTED BY SELECTING A “DRY TREE BRANCH”. THE NEXT TASK WAS TO CONNECT THE NODES, WITH OTHER NODES AND BRANCH ENDS WITH DIERENT COLOURED THREADS. IN THE NEXT STAGE, TO UNDERSTAND THE VOLUME, NEGATIVES AND POSITIVES AND SPATIAL ORGANIZATION OF BRANCH, A MODAL WAS MADE WITH JUTE SHEET, THROUGH SURFACE DEVELOPMENT, USING THE TRIANGULATION METHOD. NEXT STAGE INCLUDES REPLACEMENTS OF FEW SURFACES BY TRANSPARENT OR TRANSLUCENT MATERIALS AND REMOVAL OF ONE OF THE SURFACES, TO CREATE AN OPENING. NEXTLY HORIZONTAL PLAINS WERE ADDED AT CERTAIN PLACES TO CREATE LEVELS. HUMAN FIGURES WERE PLACED ON VARIOUS LEVELS TO UNDERSTAND TYPOLOGY OF SPACES AND VOLUMES GENERATED.

SUITE ROOM UNIT

SUITE ROOM UNIT

SUITE ROOM UNIT TRIANGULATION METHOD


CREATE A FORM

SKETCHES


09

Photography



THANK YOU FOR YOUR TIME AND CONSIDERATION !

NIRAV GEVARIYA

E - mail : gevarianirav@gmail.com Phone : 7600806882


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.