Niruoning's portfolio 2016

Page 1

RUONING NI

RUONING NI Mail: neeruoning@163.com Tel: +86 13921434640


2011.09

2010.09 EDUCATION

Nanjing University

Nanjing University

School of Social and Behavioral Sciences.

School of Architecture and Urbanization Planning.

Sociology

INTERNSHIP

Ruoning Ni 倪若宁

2015.06 2015.09

University of British Columbia

Architecture

Landscape Architecture School of Architecture and Landscape Architecture

Atelier cnS, Guangzhou I 2014.07 - 2014.08 Project “Lianfa Huamei Culture Creative Park” -Designed the indoor space of Building C. -Deepened the landscape design of Building C.

Project “Juchuan Hotel” -Designed the detail of the facade and awning in node level -Refined the construction member of facade

ruoningni@163.com TEL +86 13071160025

SKILLS

Present

Softwares

English

AutoCAD

SkechUp

Rhino

InDesign

Illustrator Photoshop

Hand Modelling

IELTS Overall:

7.5

Reading: Listening: Writing: Speaking:

9 7.5 6.5 6.5

SPACE

SYSTEM

BUILD

LANDSCAPE

EXTENSION GALLERY

CITY COMPLEX

DIGITAL FABRICATION

RAILWAY REFORMATION

URBAN DESIGN


v

G

A

L

L

E

R

Y

EXTENSION OF PEARL BUCK'S HOUSE

S I T E : NANJING UNIVERSITY,HANKOU LU-----------NANJING, JIANGSU, CHINA T Y P E : MENMORIAL MUSEUM A / P : ACADEMIC I/G: INDIVISUAL D A T E : 2ND YEAR, 2013/09-2013/10 T U T O R: PROF. LIN ZHOU -----------zhoulin@nju.edu.com


BACKGROUND

RISI NG V IEW

FORM DEVELOPING

7m

Campus of Nanjing University

PEARL’S BUCK A PAPER

FORMER HOUSE SIDE GATE

WANTTED A PLACE FOR

MAJOR SCENE VIEW

EXHIBITION

SITE FORMER HO

PEARL ’

USE

S HOU SE

B

SELLING

WRITTING

L UI

NG DI

EA

OR -N ST

TH

SLICE IT

FOLD, RISE

T SI

E

REPRESENTATIVE WORK

<THE GOOD EARTH>

EATING FOLD AGAIN

MAIN ENTRANCE OF THE CAMPUS

COINCIDENTALLY ECHO OF THE CONCEPT

PLUS MORE

RISE FROM THE EARTH


MATERIALS

MATERIALS OF HISTORICAL BUILDINGS IN CAMPUS

WATERPROOF RUBBER STRIP HOLLOW GLASS WITH INTERLAYER ISOLATION STRIP SUPPORT STRUCTURE-STEEL PIPE WATERPROOF COATING THE EMBEDDED COMPONET REINFORCED CONCRETE

CEMENT BOARD 10 FEBER CEMENT BOARD 30*30*30*1.5 Ω-TYPED KEEL ADJUSTING BRACKET 40 AIR LAYER ACHOR 60 INSULATION LAYER REINFORCED CONCRETE

10 FEBER CEMENT BOARD 30*30*1.5 Ω-TYPED KEEL 30*30 T-TYPYED KEEL ADJUSTING BRACKET 60 ISULATION LAYER WATERPROOF LAYER REINFORCED CONCRETE

10 FIBER CEMENT BOARD 30*30*30 T-SHAPED KEEL ADJUSTING BRACKET WATERPROOF COATING PLASTIC EXTRUDED BOARD WATERPROOF COATING MORTAR LEVELING LAYER REINFORCED CONCRETE CEILING COMPONETS 20*50 MAJOR KEEL 50*20 SECONDARY KEEL

4.770 4.460 4.120

1020

0.670 -0.005

1200

±0.000

+

TRADITIONAL MATERIALS

COLOR-GREY

MADE OF CLAY

THE GOOD EARTH- MODERN MATERIAL WITH THE FEATURE OF EARTH----CEMENT

FACE BRICK

CEMENT BOARD

CONSTRUCTION

-3.600

-0.140


PLAN-FACADE

EXIBITION HALL

CAFE BAR

E X T E N S I O N OF PEARL.S.BUCK’S HOUSE PROJECTION ROOM

GAZE

PLAN-UNDERGROUND

INTO

THE

PAST

S I T E : NANJING UNIVERSITY,HANKOU ROAD -----------NANJING, JIANGSU, CHINA T Y P E : MENMORIAL MUSEMUM A / P : ACADEMIC I / G: INDIVISUAL D A T E : 2013/09-2013/10 T U T O R: PROF. LIN ZHOU SHOP

FACADE-SOUTH

PLAN-GROUND FLOOR


C I T Y

v

C O M P L E X

SPACE BETWEEN BUILDINGS A W A L K I N G S--Y S T E M S T I Y T P E

: WEST MUFUJIANGSU, ROAD, COMMERCIAL NANJING, CENTER CHINA

2014/3XIAONING - 2014/6HUA T U T O R: PROF. A / P : ACADEMIC I / G: INDIVISUAL D A T E : WUTANG PLAZA -----------

C I T Y -

C O M P L E X

SPACE BETWEEN BUILDINGS A WALKING SYSTEM

S I T E : WEST MUFU ROAD,WUTANG SQUARE -----------NANJING, JIANGSU CHINA T Y P E : COMMERCIAL BUILDING A / P : ACADEMIC I/G: INDIVISUAL D A T E : 3RD YEAR, 2014/03-2014/06 T U T O R: PROF.XIAONING HUA -----------huaxiaoning@nju.edu.com


SHOPPING MALL

30000㎡

PERFORMANCE CENTRE 10000㎡

6500㎡

URBAN PLAZA

HILLS

HIGHRISE HOUSING

CITY EXPRESSWAY

ATERIAL ROAD TO DOWNTOWN


CONCEPT GENERATION TRANSPORT

INTENSIVE

RANDOMLY

BALANCE

CONNECTION WITH UPDOWN AREA IN THE WEST

RK PA

IN

Space for optional activities

Phychologically secure element for

G

LAOHU HILL

SHOPPING MALL Active

Passive

Active

Passive

Active

Passive RESIDENTIAL AREA

STUDY OF MOVING MODE DIVIDE THEM

PERFORVATED PLATE

PERFORMANCE CENTRE

CIRCULATION NODE AS GATHERING SPACE

BLOCKS DIVIDED BY STREAM OF PEOPLE

To enclose a space with fewest straight borders.

Easy to be connected by one path.

Strong hint of directions

WHY TRIANGLE? OPEN SPACE

SECOND FLOOR AS PUBLIC PLATFORM

Double it

Divide the space

Insect the volume.

METRO ENTRANCE

WEST

WALKING SYSTEM

MUFU

ROAD

PEDESTRIAN


SECTION - THEATRE

PERFORMANCE CENTRE

FACADE STEEL STRUCTURE

THEATRE

68째

27째

CINEMA

5째 8째

PLATFORM

SHOPS

CINEMA

STEEL STRUCTURE


PLPLAZA LANDSCAPE DESIGN 4 LAYERS-DIRECTIVITY 4 METRO ENTRANCE

The plaza is an extension of the walking system. It is divided into four layers. Each layer is designed for certain activities and leads to different part of the complex building.

3 2 1

LAYER 4 GREEN SPACE FOR LEISURE ACTIVITIES

PLANE-GROUND

N

LAYER 3 MAIN ENTRANCE TO THE SECOND FLOOR PLATFORM

LAYER 2-MAIN ENTRANCE TO THE SHOPPING CENTER

LAYER 1-CONNECTION BETWEEN EAST AND WEST


v

U R B A N P A SAPCE

D E S I G N

R K I N G BETWEEN LAYERS

S I T E : CHANGJIANG ROAD, GULOU AREA -----------NANJING, JIANGSU CHINA T Y P E : URBAN DESIGN A / P : ACADEMIC D A T E : 3RD YEAR, 2014/03 - 2014/06 T U T O R: PROF.XIAONING HUA -----------huaxiaoning@nju.edu.com GRUOP WORK (4 PERSONS) Data Collection, Model Making, Basic AutoCAD Drawings All drawings in this portfolio are rendered by myself.


Of

300 300 115

45

ce

100

Bu il

92

50

120

fi

73

NOW:

STREET SPACE TAKEN BY ILLEGAL PARKING

109

POTENTIAL

WEILAI

2 7 5

2 7 5

0

STREET A

2 1 3

1912

48

8 8

STREET B

d

Re s

id

en ti al

101

STREET F

Ar

31

TOTAL DATA

37 28

86

60

24

SITE

TE SI

130 130

71

5 4 8 3 7 5

1 4 7

1 4 7

1 7

1 7

1 2 0

1 2 0

4 9 3

1 4 4 0

9 4 7

DATE:2014-11-16 DATA COLLECTION:

SUNDAY TIME:8PM-12PM THE WHOLE TEAM

SPACE:

UNDERGROUND PARKING GROUND PARKING

DEMAND:

OCCUPIED SPACE ILLEGAL PARKING(ALONG THE STREET)

POTENTIAL:

PARKING NEEDS

RS

60

5 4

2 1 3

7 5

TAI-P

286

ea

2 8 6

8 3

STREET E

- 4 8

4 1 6

STREET D

110

4 0

1 3 0

STREET C

Ol

60

DEMAND

FENG-H

79

PROBLEM FINDING

SPACE

di ng

120 117 107

SPOT

BA

40

DEMAND IN TOTAL

&

2326

TS

RE ST AU RA N

26

DOWNTOWN

SPACE IN TOTAL

1308

GAP

1018

N/10000 VIECLE AMOUNT IN NANJING 300

33

Cu

lt ur e

35

Fa c

il it y

Cu

lt

250

ur e

12 .

200

Fa c

il it

35%

y

2011 2012 2013 2014

24/100

STATISTIC OF REGIONAL PARKING SPACE DEMAND

EXISTING SPACE

X

= 1792

150 100 0

1018

5

(12.35%) 5 YEARS LATER

YEAR

BUILDING TYPES

PRIVATE

WHY FOCUS ON PARKING? The site of the project is surrounded by numerous old residential areas. These areas usually have no underground parking facility. Also, various bars and resturants are located in the other side of the street ,which produce huge demand for parking space.

15/150

56% RESIDENTIAL

500m RADIUS

19% COMMERCIAL 16% OFFICE 9%

DAILY NIGHTS WEEKEND NIGHTS DAILY DAYTIME

CULTURE FELEXIBLE


SOLUTION PROPOSAL

More than parking problem solving

SPACE & FUNCTION DISTRIBUTION

PARKING SPACE CALCULATION 1792

x

=

24694m

2

outdoor parking 32487 x 50% x 30% underground parking

AN UNIT OF CITY

18=6*3

32487 x 33%

E GR

EN

E AC SP

+ DW

VIEWING THE CITY DOWN- SPACE BETWEEN BUILDINGS

N LI EL

OFFICES G

UP-SPACE BEWEEN LAYERS

IN RK A P

G

TRANSPORTING PARKING E AC

PURE FUNCTIONAL BEHAVIOR

E

UR

ANOTHER WAY OF PARKING

IS LE

SP

WALKING THROUGH LEISURE SPACE

Relax & Socila Activities

O SH

PS

LINE THE LAYERS

PUBLIC SPACE COMMERCIAL

ELEVATED ROADS-Quick access to car parks & flats

SHOPS

RELEASE REBUILD

Ground space, raise transport space to floor 4 and above. Social interactions in high-rise residential buildings.

I

AD TR

O TI

L NA

ET RE T S

AC SP

E

MASTER PLAN


SECTION-PLAN

SECTION A-A

SECTION B-B

SECTION C-C

PLAN-FLOOR 3

PLAN-FLOOR 4


v

CONSTRUCTION COMPONENTS

X 170

X 19

CONSTRUCT BY PARTS

RECIPROCAL STRUCTURE

COMBINE

DIGITAL

COST

FABRICATION

2mm PLYWOOD X 10

2mm GALVANIZED STEEL PIPE X 20m

PROCESSING FEES

TRANSPORT

TOTAL

800 ¥

300 ¥

500 ¥

100 ¥

1700 ¥

PROBLEM SOLVING UNSTABLE JOINT

ALTITUDE DIFFERENCE

LACK OF LOCATING TOOLS

S I T E : NANJING UNIVERSITY GULOU CAMPUS -----------NANJING, JIANGSU CHINA T Y P E : INSTALLATION A / P : ACADEMIC I/G: INDIVISUAL D A T E : 4RD YEAR, 2015/05-2015/06 T U T O R: PROF.ZIYU TONG -----------tongziyu@nju.edu.com


ALGORITHM

FORCE

FORMING

A

B

START

A

C

B

INPUT

C

FORCE

D = 48 H = 100 W = 10

FORCE TRANSMISSION

L H

D

W

RECIPRICAL STRUCTURE

CURVE FITTING

DATA GENERATION A

INPUT A CURVE TRUE FALSE

FALSE TEST INTERSECTION

B(n)

A

ANGEL BETWEEN FIRST PIEACE AND THE GROUND

8 5 4 ...

MINIMUN LENGTH

x

x RALATIONSHIP BETWEEN FORM AND NUBERS

List(x)=max-(max-min)*y/Sn(y)

FALSE GENERATE CURVES

TEST

MAX LENGTH

y

sin, y=t*sin(x)

FIT CURVE

LEGTHS BASED FROM A SERIES OF DATA

y

62°

FALSE LOOP

REACH THE GROUND LINE

TURE

CHANGE DIRECTION

COPY 0

210

DENSITY 把模型投影成平面

划分格子,随机删除

BORDER 75 162 76 163 164 168 169 170 172

END

20

22

21

23

77

71

70

72

74

167

OUTPUT

73

166

LAYOUT

165

OR

ALTER ALGORITHM

A = 62° A(n)= 1500 1373 ...

MAX3

1-DIMENSIONAL

MIN2

D E V E L O P M E N T S

MAX2

3-DIMENSIONAL

MIN1

2-DIMENSIONAL

MAX1

E X P E R I M E N T S

LIST

投影回模型,删除对应的构件


CONSTRUCTION COMPONENTS

X 170

X 19

CONSTRUCT BY PARTS COMBINE

COST

2mm PLYWOOD X 10

2mm GALVANIZED STEEL PIPE X 20m

PROCESSING FEES

TRANSPORT

TOTAL

800 ¥

300 ¥

500 ¥

100 ¥

1700 ¥

PROBLEM SOLVING ALTITUDE DIFFERENCE

UNSTABLE JOINT

Lack of lateral force

Not thick enough

Solution

LACK OF LOCATING TOOLS

Solution 1

Slop beside wall

Scaffold

Solution 2

Motise Extra fixing components


v

S H U T T L E S C A P E RAILWAY

REFORMATION

S I T E : SOUTH FALSE CREEK FLATS -----------VANCOUVER, CANADA T Y P E : LANDSCAPE A / P : ACADEMIC I/G: INDIVISUAL D A T E : 2015/11-2015/12 T U T O R: ELIZABETH UMBANHOWER


Moving System & Outdoor Gallery To make use of the linear and transporting features of railways in false creek flat, this design proposes a moving system with several unique parks along it. By redesigning abandoned railways into walking, biking and exibiting space together with outdoor galleries, the whole area is transformed into a kinetic whole.

CONCEPT

3 Prototypes

OPEN TO THE CITY Indu

stria l

MAKE USE OF THE WATER

PROTOTYPE OF SPACE

EXISTING TOPOGRAPY & PLANTS

aven ure Shrubs Tree

Main accesses to roads

FEATURES OF RAILWAY SPACE in Flase Creek Flats

Exisiting water

The way that rails join and spread

Soil that can be reused

FLOWING WALLS

OPENINGS

MOUNDS & GREENS

LO C AT I O N

WATERWAY

LINEAR

SITE STATUS

TRANSPORT

CURRENT SITE FUTURE DEVELOPMENTS

W A T E R STORM WATER

CLEAN WATER

FLEXIBLE SPACE STRATEGY E LOS ENC

BUSINESSES WATER TREATMENT

WALKING

BIKING

-- A ES -

G RIA C AR

ART

VACANT SPACE

AC

- PL

G ERIN ATH

CARRIAGES

E YST ES

SERVICE MANUFACTURE FOOD

D --

RG E FO

M

BL OVA

M

N ED OPE

LAC

--- P

R E FO

EXI

G

N BITI


A

PLANTS - REMEDIATION

A B

A

Vetiver Grass

Shrub Willows

Cardaminopsis halleri

C

SECTIO

N A-A

B

B

SECTIO

N B -B

B

C

A

C

C

PLAN 1:500 AREA: 32000 m2

SECTIO

N C- C



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.