RUONING NI
RUONING NI Mail: neeruoning@163.com Tel: +86 13921434640
2011.09
2010.09 EDUCATION
Nanjing University
Nanjing University
School of Social and Behavioral Sciences.
School of Architecture and Urbanization Planning.
Sociology
INTERNSHIP
Ruoning Ni 倪若宁
2015.06 2015.09
University of British Columbia
Architecture
Landscape Architecture School of Architecture and Landscape Architecture
Atelier cnS, Guangzhou I 2014.07 - 2014.08 Project “Lianfa Huamei Culture Creative Park” -Designed the indoor space of Building C. -Deepened the landscape design of Building C.
Project “Juchuan Hotel” -Designed the detail of the facade and awning in node level -Refined the construction member of facade
ruoningni@163.com TEL +86 13071160025
SKILLS
Present
Softwares
English
AutoCAD
SkechUp
Rhino
InDesign
Illustrator Photoshop
Hand Modelling
IELTS Overall:
7.5
Reading: Listening: Writing: Speaking:
9 7.5 6.5 6.5
SPACE
SYSTEM
BUILD
LANDSCAPE
EXTENSION GALLERY
CITY COMPLEX
DIGITAL FABRICATION
RAILWAY REFORMATION
URBAN DESIGN
v
G
A
L
L
E
R
Y
EXTENSION OF PEARL BUCK'S HOUSE
S I T E : NANJING UNIVERSITY,HANKOU LU-----------NANJING, JIANGSU, CHINA T Y P E : MENMORIAL MUSEUM A / P : ACADEMIC I/G: INDIVISUAL D A T E : 2ND YEAR, 2013/09-2013/10 T U T O R: PROF. LIN ZHOU -----------zhoulin@nju.edu.com
BACKGROUND
RISI NG V IEW
FORM DEVELOPING
7m
Campus of Nanjing University
PEARL’S BUCK A PAPER
FORMER HOUSE SIDE GATE
WANTTED A PLACE FOR
MAJOR SCENE VIEW
EXHIBITION
SITE FORMER HO
PEARL ’
USE
S HOU SE
B
SELLING
WRITTING
L UI
NG DI
EA
OR -N ST
TH
SLICE IT
FOLD, RISE
T SI
E
REPRESENTATIVE WORK
<THE GOOD EARTH>
EATING FOLD AGAIN
MAIN ENTRANCE OF THE CAMPUS
COINCIDENTALLY ECHO OF THE CONCEPT
PLUS MORE
RISE FROM THE EARTH
MATERIALS
MATERIALS OF HISTORICAL BUILDINGS IN CAMPUS
WATERPROOF RUBBER STRIP HOLLOW GLASS WITH INTERLAYER ISOLATION STRIP SUPPORT STRUCTURE-STEEL PIPE WATERPROOF COATING THE EMBEDDED COMPONET REINFORCED CONCRETE
CEMENT BOARD 10 FEBER CEMENT BOARD 30*30*30*1.5 Ω-TYPED KEEL ADJUSTING BRACKET 40 AIR LAYER ACHOR 60 INSULATION LAYER REINFORCED CONCRETE
10 FEBER CEMENT BOARD 30*30*1.5 Ω-TYPED KEEL 30*30 T-TYPYED KEEL ADJUSTING BRACKET 60 ISULATION LAYER WATERPROOF LAYER REINFORCED CONCRETE
10 FIBER CEMENT BOARD 30*30*30 T-SHAPED KEEL ADJUSTING BRACKET WATERPROOF COATING PLASTIC EXTRUDED BOARD WATERPROOF COATING MORTAR LEVELING LAYER REINFORCED CONCRETE CEILING COMPONETS 20*50 MAJOR KEEL 50*20 SECONDARY KEEL
4.770 4.460 4.120
1020
0.670 -0.005
1200
±0.000
+
TRADITIONAL MATERIALS
COLOR-GREY
MADE OF CLAY
THE GOOD EARTH- MODERN MATERIAL WITH THE FEATURE OF EARTH----CEMENT
FACE BRICK
CEMENT BOARD
CONSTRUCTION
-3.600
-0.140
PLAN-FACADE
EXIBITION HALL
CAFE BAR
E X T E N S I O N OF PEARL.S.BUCKâ&#x20AC;&#x2122;S HOUSE PROJECTION ROOM
GAZE
PLAN-UNDERGROUND
INTO
THE
PAST
S I T E : NANJING UNIVERSITY,HANKOU ROAD -----------NANJING, JIANGSU, CHINA T Y P E : MENMORIAL MUSEMUM A / P : ACADEMIC I / G: INDIVISUAL D A T E : 2013/09-2013/10 T U T O R: PROF. LIN ZHOU SHOP
FACADE-SOUTH
PLAN-GROUND FLOOR
C I T Y
v
C O M P L E X
SPACE BETWEEN BUILDINGS A W A L K I N G S--Y S T E M S T I Y T P E
: WEST MUFUJIANGSU, ROAD, COMMERCIAL NANJING, CENTER CHINA
2014/3XIAONING - 2014/6HUA T U T O R: PROF. A / P : ACADEMIC I / G: INDIVISUAL D A T E : WUTANG PLAZA -----------
C I T Y -
C O M P L E X
SPACE BETWEEN BUILDINGS A WALKING SYSTEM
S I T E : WEST MUFU ROAD,WUTANG SQUARE -----------NANJING, JIANGSU CHINA T Y P E : COMMERCIAL BUILDING A / P : ACADEMIC I/G: INDIVISUAL D A T E : 3RD YEAR, 2014/03-2014/06 T U T O R: PROF.XIAONING HUA -----------huaxiaoning@nju.edu.com
SHOPPING MALL
30000㎡
PERFORMANCE CENTRE 10000㎡
6500㎡
URBAN PLAZA
HILLS
HIGHRISE HOUSING
CITY EXPRESSWAY
ATERIAL ROAD TO DOWNTOWN
CONCEPT GENERATION TRANSPORT
INTENSIVE
RANDOMLY
BALANCE
CONNECTION WITH UPDOWN AREA IN THE WEST
RK PA
IN
Space for optional activities
Phychologically secure element for
G
LAOHU HILL
SHOPPING MALL Active
Passive
Active
Passive
Active
Passive RESIDENTIAL AREA
STUDY OF MOVING MODE DIVIDE THEM
PERFORVATED PLATE
PERFORMANCE CENTRE
CIRCULATION NODE AS GATHERING SPACE
BLOCKS DIVIDED BY STREAM OF PEOPLE
To enclose a space with fewest straight borders.
Easy to be connected by one path.
Strong hint of directions
WHY TRIANGLE? OPEN SPACE
SECOND FLOOR AS PUBLIC PLATFORM
Double it
Divide the space
Insect the volume.
METRO ENTRANCE
WEST
WALKING SYSTEM
MUFU
ROAD
PEDESTRIAN
SECTION - THEATRE
PERFORMANCE CENTRE
FACADE STEEL STRUCTURE
THEATRE
68째
27째
CINEMA
5째 8째
PLATFORM
SHOPS
CINEMA
STEEL STRUCTURE
PLPLAZA LANDSCAPE DESIGN 4 LAYERS-DIRECTIVITY 4 METRO ENTRANCE
The plaza is an extension of the walking system. It is divided into four layers. Each layer is designed for certain activities and leads to different part of the complex building.
3 2 1
LAYER 4 GREEN SPACE FOR LEISURE ACTIVITIES
PLANE-GROUND
N
LAYER 3 MAIN ENTRANCE TO THE SECOND FLOOR PLATFORM
LAYER 2-MAIN ENTRANCE TO THE SHOPPING CENTER
LAYER 1-CONNECTION BETWEEN EAST AND WEST
v
U R B A N P A SAPCE
D E S I G N
R K I N G BETWEEN LAYERS
S I T E : CHANGJIANG ROAD, GULOU AREA -----------NANJING, JIANGSU CHINA T Y P E : URBAN DESIGN A / P : ACADEMIC D A T E : 3RD YEAR, 2014/03 - 2014/06 T U T O R: PROF.XIAONING HUA -----------huaxiaoning@nju.edu.com GRUOP WORK (4 PERSONS) Data Collection, Model Making, Basic AutoCAD Drawings All drawings in this portfolio are rendered by myself.
Of
300 300 115
45
ce
100
Bu il
92
50
120
fi
73
NOW:
STREET SPACE TAKEN BY ILLEGAL PARKING
109
POTENTIAL
WEILAI
2 7 5
2 7 5
0
STREET A
—
2 1 3
1912
48
8 8
STREET B
—
d
Re s
id
en ti al
101
STREET F
Ar
…
31
TOTAL DATA
37 28
86
60
24
SITE
TE SI
130 130
71
5 4 8 3 7 5
—
1 4 7
1 4 7
—
1 7
1 7
1 2 0
…
1 2 0
…
4 9 3
…
1 4 4 0
9 4 7
DATE:2014-11-16 DATA COLLECTION:
SUNDAY TIME:8PM-12PM THE WHOLE TEAM
SPACE:
UNDERGROUND PARKING GROUND PARKING
DEMAND:
OCCUPIED SPACE ILLEGAL PARKING(ALONG THE STREET)
POTENTIAL:
PARKING NEEDS
RS
60
5 4
2 1 3
7 5
—
TAI-P
286
ea
2 8 6
8 3
—
STREET E
- 4 8
4 1 6
—
STREET D
110
4 0
1 3 0
STREET C
Ol
60
DEMAND
FENG-H
79
PROBLEM FINDING
SPACE
di ng
120 117 107
SPOT
BA
40
DEMAND IN TOTAL
&
2326
TS
RE ST AU RA N
26
DOWNTOWN
SPACE IN TOTAL
1308
GAP
1018
N/10000 VIECLE AMOUNT IN NANJING 300
33
Cu
lt ur e
35
Fa c
il it y
Cu
lt
250
ur e
12 .
200
Fa c
il it
35%
y
2011 2012 2013 2014
24/100
STATISTIC OF REGIONAL PARKING SPACE DEMAND
EXISTING SPACE
X
= 1792
150 100 0
1018
5
(12.35%) 5 YEARS LATER
YEAR
BUILDING TYPES
PRIVATE
WHY FOCUS ON PARKING? The site of the project is surrounded by numerous old residential areas. These areas usually have no underground parking facility. Also, various bars and resturants are located in the other side of the street ,which produce huge demand for parking space.
15/150
56% RESIDENTIAL
500m RADIUS
19% COMMERCIAL 16% OFFICE 9%
DAILY NIGHTS WEEKEND NIGHTS DAILY DAYTIME
CULTURE FELEXIBLE
SOLUTION PROPOSAL
More than parking problem solving
SPACE & FUNCTION DISTRIBUTION
PARKING SPACE CALCULATION 1792
x
=
24694m
2
outdoor parking 32487 x 50% x 30% underground parking
AN UNIT OF CITY
18=6*3
32487 x 33%
E GR
EN
E AC SP
+ DW
VIEWING THE CITY DOWN- SPACE BETWEEN BUILDINGS
N LI EL
OFFICES G
UP-SPACE BEWEEN LAYERS
IN RK A P
G
TRANSPORTING PARKING E AC
PURE FUNCTIONAL BEHAVIOR
E
UR
ANOTHER WAY OF PARKING
IS LE
SP
WALKING THROUGH LEISURE SPACE
Relax & Socila Activities
O SH
PS
LINE THE LAYERS
PUBLIC SPACE COMMERCIAL
ELEVATED ROADS-Quick access to car parks & flats
SHOPS
RELEASE REBUILD
Ground space, raise transport space to floor 4 and above. Social interactions in high-rise residential buildings.
I
AD TR
O TI
L NA
ET RE T S
AC SP
E
MASTER PLAN
SECTION-PLAN
SECTION A-A
SECTION B-B
SECTION C-C
PLAN-FLOOR 3
PLAN-FLOOR 4
v
CONSTRUCTION COMPONENTS
X 170
X 19
CONSTRUCT BY PARTS
RECIPROCAL STRUCTURE
COMBINE
DIGITAL
COST
FABRICATION
2mm PLYWOOD X 10
2mm GALVANIZED STEEL PIPE X 20m
PROCESSING FEES
TRANSPORT
TOTAL
800 ¥
300 ¥
500 ¥
100 ¥
1700 ¥
PROBLEM SOLVING UNSTABLE JOINT
ALTITUDE DIFFERENCE
LACK OF LOCATING TOOLS
S I T E : NANJING UNIVERSITY GULOU CAMPUS -----------NANJING, JIANGSU CHINA T Y P E : INSTALLATION A / P : ACADEMIC I/G: INDIVISUAL D A T E : 4RD YEAR, 2015/05-2015/06 T U T O R: PROF.ZIYU TONG -----------tongziyu@nju.edu.com
ALGORITHM
FORCE
FORMING
A
B
START
A
C
B
INPUT
C
FORCE
D = 48 H = 100 W = 10
FORCE TRANSMISSION
L H
D
W
RECIPRICAL STRUCTURE
CURVE FITTING
DATA GENERATION A
INPUT A CURVE TRUE FALSE
FALSE TEST INTERSECTION
B(n)
A
ANGEL BETWEEN FIRST PIEACE AND THE GROUND
8 5 4 ...
MINIMUN LENGTH
x
x RALATIONSHIP BETWEEN FORM AND NUBERS
List(x)=max-(max-min)*y/Sn(y)
FALSE GENERATE CURVES
TEST
MAX LENGTH
y
sin, y=t*sin(x)
FIT CURVE
LEGTHS BASED FROM A SERIES OF DATA
y
62°
FALSE LOOP
REACH THE GROUND LINE
TURE
CHANGE DIRECTION
COPY 0
210
DENSITY 把模型投影成平面
划分格子,随机删除
BORDER 75 162 76 163 164 168 169 170 172
END
20
22
21
23
77
71
70
72
74
167
OUTPUT
73
166
LAYOUT
165
OR
ALTER ALGORITHM
A = 62° A(n)= 1500 1373 ...
MAX3
1-DIMENSIONAL
MIN2
D E V E L O P M E N T S
MAX2
3-DIMENSIONAL
MIN1
2-DIMENSIONAL
MAX1
E X P E R I M E N T S
LIST
投影回模型,删除对应的构件
CONSTRUCTION COMPONENTS
X 170
X 19
CONSTRUCT BY PARTS COMBINE
COST
2mm PLYWOOD X 10
2mm GALVANIZED STEEL PIPE X 20m
PROCESSING FEES
TRANSPORT
TOTAL
800 ¥
300 ¥
500 ¥
100 ¥
1700 ¥
PROBLEM SOLVING ALTITUDE DIFFERENCE
UNSTABLE JOINT
Lack of lateral force
Not thick enough
Solution
LACK OF LOCATING TOOLS
Solution 1
Slop beside wall
Scaffold
Solution 2
Motise Extra fixing components
v
S H U T T L E S C A P E RAILWAY
REFORMATION
S I T E : SOUTH FALSE CREEK FLATS -----------VANCOUVER, CANADA T Y P E : LANDSCAPE A / P : ACADEMIC I/G: INDIVISUAL D A T E : 2015/11-2015/12 T U T O R: ELIZABETH UMBANHOWER
Moving System & Outdoor Gallery To make use of the linear and transporting features of railways in false creek flat, this design proposes a moving system with several unique parks along it. By redesigning abandoned railways into walking, biking and exibiting space together with outdoor galleries, the whole area is transformed into a kinetic whole.
CONCEPT
3 Prototypes
OPEN TO THE CITY Indu
stria l
MAKE USE OF THE WATER
PROTOTYPE OF SPACE
EXISTING TOPOGRAPY & PLANTS
aven ure Shrubs Tree
Main accesses to roads
FEATURES OF RAILWAY SPACE in Flase Creek Flats
Exisiting water
The way that rails join and spread
Soil that can be reused
FLOWING WALLS
OPENINGS
MOUNDS & GREENS
LO C AT I O N
WATERWAY
LINEAR
SITE STATUS
TRANSPORT
CURRENT SITE FUTURE DEVELOPMENTS
W A T E R STORM WATER
CLEAN WATER
FLEXIBLE SPACE STRATEGY E LOS ENC
BUSINESSES WATER TREATMENT
WALKING
BIKING
-- A ES -
G RIA C AR
ART
VACANT SPACE
AC
- PL
G ERIN ATH
CARRIAGES
E YST ES
SERVICE MANUFACTURE FOOD
D --
RG E FO
M
BL OVA
M
N ED OPE
LAC
--- P
R E FO
EXI
G
N BITI
A
PLANTS - REMEDIATION
A B
A
Vetiver Grass
Shrub Willows
Cardaminopsis halleri
C
SECTIO
N A-A
B
B
SECTIO
N B -B
B
C
A
C
C
PLAN 1:500 AREA: 32000 m2
SECTIO
N C- C