Resource Recovery Facility process

Page 1

Boosting recycling in north London As part of the project to transform Edmonton EcoPark, NLWA is building flagship recycling facilities to help boosting recycling rates. The Resource Recovery Facility will recycle up to 135,000 tonnes of recycling every year. BULKY RESIDUAL

Bulky waste collections

Fly tipped waste

Residual waste

Street sweeping

NLWA recycles 75,430 mattresses each year

Large recyclable materials are extracted

Mattresses

NLWA recycles 45,600 tonnes of food and garden waste each year using Anaerobic Digestion and In-Vessel Composting Plants.

Textiles

Electricals

Garden waste

Food waste

NLWA recycles 2,300 tonnes of electrical items each year

Sent for onward reuse and recycling

Leftover materials are shredded for further sorting

Smaller recyclable materials are separated from the shredded material

Paint

fine metal

Leftover waste that can’t be recycled

Resource Recovery Facility

Sent to the Energy Recovery Facility which generates power and heat for local homes


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.