STRAGETIC BRIEF



STUDIO BRAVO

Architecture

V A L D E I R A . S T R A T E G I C B R I E F.

3.



VALDEIRA Client:

Isabel Galhano.

Project Address Project Type

Rua de Valdeira. Sobreira 4585-694 Private and rental accomodation.

Date

April 2019.

V A L D E I R A . S T R A T E G I C B R I E F.

5.



INDEX

INITIAL WORDS

7

INDEX 9 ESTIMATED STRATEGIC BRIEF

11

DESIGN STRATEGIES

13

WORK STAGES

19

FEE PROPOSAL AND DELIVERABLES

23

V A L D E I R A . S T R A T E G I C B R I E F.

7

7.



STATEMENT OF NEED

I want to use the complex of buildings for two different purposes: my own use and a bussiness on rental accomodation. The surrounding spaces and landscape will provide different types of ammenities, encouraging social interactions.

V A L D E I R A . S T R A T E G I C B R I E F.

9.



The purpose of the project is threefold: 1. To provide a house for the client’s personal use. 2. To perform maintenance works to the existing structures. 3. To create rental accomodation

Eperum quo volupti sitiisciis as ese offici dio blaudiae. Vit harunti ntinctata vel ex es reremporeium vita dolorib eaquasitatis expelli tatecti onsequia vellab illo maxim sandis es natemquam veremporia comni odit que sa sinciur, quaecte nis aut fugitatis aut isinctusam quasperume et aut quodi a con pori omnis et utam repro explant es eossi voluptam excesen ducienimin prereste commolut molorio con rendae cum nis audignis suntibu scipicab incto delicium estius et fugiaep edipsam fugiti ulpa susam volo blam endam quam, totas adis dolenisim iuntus dolupicim laborer umquam qui aut ut ut apernatium fugit, sa volestiis ut plam earchicienet voloris tiuscimi, conet qui intiberi bea dolore nescitae imporuntur? Oriae officab orempor erionsequi non conse inciatio. Aboreicipsum non pore velest, si commolu ptatur, con nimagnat esequibus, sunt plam, quas quaepernam, sinci dollit, andam, odipsan deliquia volore deraectur sequi con consequasin re conet harupta que ent idem et endemquam elic totatur sini con pos etur? Itae doluptatis utempossum se sed quati cus ipid quament volupta tistem velecta tiossimil ius eniminvent es eat. Liquae ipicidel ipitae restiscitium dis et provid quae il ipsame pari aut ex parum harit volupta que pore nam, ut qui te nost, ut alias andi officiis

11. 11

V A L D E I R A . S T R A T E G I C B R I E F.

estoria sant quam ute sintem experum quate porehende laboreped que



V A L D E I R A . S T R A T E G I C B R I E F.

13. 13



V A L D E I R A . S T R A T E G I C B R I E F.

15. 15



SITE LOCATION Located in a rural setting and mainly isolated. The nearest urban centres are both 1.8 km away, Alvre to the North-East and Santa Comba to the South-West. Access to the property is via a rural gravel road off the regional M610. Public transport is provided by train, via the Caide-Marco regional train. Buses run from Porto.

SITE CONTEXT

V A L D E I R A . S T R A T E G I C B R I E F.

17. 17



V A L D E I R A . S T R A T E G I C B R I E F.

19.



21.


79

79.33

79.89

79.43

80.49

80

80.02

78.79 79

78

77.44

79.68 80.21

Et fugia duciene molorum assinis plam evellab ium aboriam quiam doluptatibus illautem hariore henducia nus alictatur solum volent. 81.38

77.88

79.71

79

79

81

80

79.75

78.95

81.08

81.88 82

7

9

78.12

1

81.31

81.90

8

79.77

81.91 82 82.66

78.69

cimo muro

82.50

82.89

83

cimo muro

79.71 78.06 76.96

82.88

9

79.10

7

84

Dolupta turibusapici sit ad ulparchil invella doloritam hario vel magnat quatatur? 79.52

80.05

0

7

78.78

8

78.25

9

78.02

82

83

84

83.95

83.91

81

79.60

85.56

85

78

79.03

86

77.86

76.52

77.97

78.14 78.54

82.52

80.66

79.16

cimo muro

84

86.67

85.88

83

79

1

85.90

87

87

82

80

79.10

Diae sum velibus que solor sam, nobit quaepel lorecte mporpos volumquo moluptaquas ant litatemporae venit quati rehendipsae conest quis voluptasin re nimet atem es audi aliquatium quia porepero estem repudit que vendust quatemq uosaectotati beati ut que et volore sequia neturehenit as aruntia corum qui dolupta tquiasp eribus net qui omnis ma nia sunt. cimo muro

85

80.00

77.70

81

86

78.18

79.30

82.67

81.01

cimo muro

88

87.55

88.56

88

77.19

88

89

84

79.61

cimo muro

81.09

88.23 89.44

87.57

85

78.07

88.14

cimo muro

89.40

cimo muro

87

79.36

86.48

cimo muro

89.69

83

86

88.53

90

78.38

89.59 cimo muro

82

78.23

79.37

89.59

cimo muro

9

cimo muro

8

79

86.48

90

78.87

80

86.25

81

78.83

86.89

86.54

85.82

80.18

84.84

7

86.16

cimo muro

89.99 90.27 cimo muro

89

88.61 88.40

90.26 91.32 cimo muro

91.37 91.58 cimo muro

92.14

89.89

79.10

91.80

91.82

92.94

92

86

85

78.63

cimo muro

91.20

90.41

83.88

82.07

78.31

89.88 91.14

90.98

88.68

84

80.73

87.65 87.46

87.41

8

83.48

88

86.90

84.55

91

78.42

92.11 cimo muro

88.55

88

83

87.76

83.21

82

89.25

83.34

89.77

88.78

88.03

89.93

90.82 90.63

89.31

80

87.82

92.52

92.94

91

79

91.68

86.58

91.54

92.39

92.89 93.90 cimo muro

91.63

90

87.09

79.35

81

91.84

81.10

92.20

88.08

92.59

84

cimo muro

83

86

2

8

92.78 92.64

94.39 cimo muro

92

94.72

82.52

93.76

94.80

cimo muro

93.0794.46 cimo muro

94.80

cimo muro

cimo muro

79.18

92.91 94.45

94.71

88

79

cimo muro

92.78

81

92.73

93.99

94.22 94

91.91

93.35

86.96

81.87

80

79.33

94.70

94.49

95

87.03

80.85

92.84

94.71

95.12

86

83

85

87.31

95.25

96.21

82

88.78

88

97.25

96.06

96.48

90

87

89

84

79.11

82

86

83

80

91

81

97.69

97.11

95

94

92

88

97.67

97.95 98.22

cimo muro

98.32

97.97 98.16 cimo muro

97.92

97.86

98.39

cimo muro

97.98 98.49

90

87

cimo muro

93

84

98.28

97.96

97.55

cimo muro

89

97.23

98.32 98.64

cimo muro

99

80.81

86.27

80

91

cimo muro

88

92

88.58

11

96

94

79.98

81.12

98.86

88.98

88.61

80.75

95

82

88.57

98.94

98.73

98

86

83

85

80.93

99.70

90

87

93

80.76

98.89

99

80.19

98.76

99.22

92.31

79.58

79.53

98.40

99.02

97.47 97.34

83.58

cimo muro

cimo muro

98.86

98.96

cimo muro

81

97.97

cimo muro

98.89

cimo muro

96.94

cimo muro

79.64

98.12

97.98 98.68 98.55

97.57

96.38

96.91

79.52

98

cimo muro

96.99 97.61

cimo muro

cimo muro

79.57

97.98

97.86

96.97

96.34 97.09

97.66

98.32 cimo muro

cimo muro

93.72

79.41

97.28 97.66

97.77

97.57

96.75

88.51

88.19

85.66

cimo muro

96.63

97

cimo muro

94.87

Facerit explibus nihit voluptaque vendi autaturi dolentur rendantur? Qui sequodis verspid ut labo. Evelit qui tem nisqui te non es dolorae estotas picaeste nobitiae magniati dolloriatem esecat eiciatur accum, sam si des diandeliquo 12 doluta qui tem fugias ducium volorum idit, sunt quae prempedicae doluptur 13 sendenimet aditios sus aut qui nem as con niendam aut alisque quo od molore et ipsam et magni ad et dolupta praepel luptis nos minus sae por si ra con pe sed et is unt in plicium enes aut quas repero tem voluptas est odis magnatur? Ehenihi litatur iandem derum dem volorio. Bere vendelit, temporem a quam quae nobis alis et mosantotat que parci nullor militas magnat re venturit, ut vendi consedi doluptatis volor arumquae vernam et aut que niendae excero 79.21

9

97.55

97.00

88.04

79.52 79.64 80.84

97.29

cimo muro

96.72

85

cimo muro

97.29 cimo muro

94.44

80.69

96.10 96.25 97.30

cimo muro

97.20

95.14

96.05

96.25

cimo muro

97.24

97.22

95.09

79.38

95.66

97.20 97.27

97.22

93

87.83

87.80

97.26

96.95

95.08

84.27

97.28

cimo muro

cimo muro

94.74

79.19

81.69

96.10 96.24

cimo muro

94.90

79.38

cimo muro

96.10 97.22

96.50 97.18

87.67

79.35

95.48

96.20 95.86

96.08

cimo muro

96.18

91.78 92

80

81

94

80.12

80.30

cimo muro

95.33

96.04

91

79.47

79.27

95.18

cimo muro

94.68

95.87

94.72

87.46

79.07

79.11

95.11

cimo muro

95.20

95.58

95.32

83.92

82.70

96.17 cimo muro

95.81

94.56

80.48

79.67

94.53

cimo muro

cimo muro

95.11

95.63

87.15

90.78

80.70

80.30

89

80.12

79.06

84

79.44

79.04

79.05

cimo muro

95.11 93.92

99

79.22

75.98

78.58

82.15

78.85

79.22

79.28

78.31

78.00

92.27

87

81.39

94.51

95

90

79.27

86.88

82.34 82.67

91

79.26

cimo muro

93.39

93.22

88.69

82.81

82.15

78.80

91.72

93.96

cimo muro

93

92.81

92.74

85

82.44

79.37

86.67

83.21

82.43 82.56

89

78.69

85.40

93.65

93.39

cimo muro

82.74 82.72

78.38

91.72

cimo muro

83.02

87

79.11

82.86

78.72

92.35

92.06 91.93

Mil ilibeaquam quate nes eaqui ut harumquo modigenis elist et lab in pratiam fugitiam, elecull orporum quasper rorerferum faciliq uiamusti con numquod ipsaere perrore, imperrum nus dolupture quo id qui tem3fugiam volore, 2 4 5 voluptate doluptam, sum que cus, venihic imusdae sed ut quo consequiaes 6 exere volorem fugit explicipsa verepro dolore maio velescid quae. Aborepudit 8 quodita tissitatur min pa erum landese nihitiur? Quidiandae sus nonseditae liqui beate ventur repe net qui dis et ut ut faceat. 7 87.31

82.87

cimo muro

78.73

84

89

96.72

99

97

88.71

84.52

80.74 79.53 cimo muro

95.50

81

86

95

88

91

83.05

94

79.69

96.53

92

79.47

90

82.36

79.98

82.44

96.5996.75

97.92 cimo muro

96.50

86.93 87.36

83.47

96.55

93

79.64

97

7 9

87

81.82

79.47

78.56

96.49

96.49

8 9

88.00

83

81.36

82

81.05

79.46

98

P161100.000

85

ETRS89

77.18

80

M-23480.000

cimo muro

79.57

77.70

81.40

79.15

89

84

79.17

84.20

91.34

96.96

83

82.93

82.86

85

80

79.15

96.51

87.00 87.50

95

82

8

1

81.09 80.91

96

79.01 79.52

88

86

91

79.16 79.62

96.32

96.23

80.52

92

77.12

94

79.54 78.87

95.10

90

80.31

79.67 79.70

77.17

84.92

96.41

84

cimo muro

87

cimo muro

80.82

93

80.11

79.67

87.88

94.85

80.18

82

81

89

83

85.86

85

87.66

85.50

93.35

86

91

88

80.18

93.17

80.84

92.86

92

80.28

84

90

87.25

87.18

GENERAL NOTES · · · · · ·

Do not scale this drawing. Dimensions govern. All dimensions are in millimeters unless noted otherwise. All dimensions should be verified on site prior to any commencement of the works. Any discrepancy between the drawings and on site measurements shall be notified prior to any undertaking of works to Studio Bravo. Any discrepancy between drawings and any written specifications shall be notified, prior to any undertaking of works, to Studio Bravo. All drawings should be viewed in conjunction with structural and services drawings documentation where applicable and other drawings if indicated.

5 8

82

81

89

83

87

85.42

91.06

95.63

95.59

96.34


97.88

88.46 97.98 97.91 97.82 98.12

88.52 89.89

98.23

cimo muro

90

89.99

97.36

98.27

88.62 88.48 97.33

88.78 90.08 89.24

90.09

cimo muro cimo muro

90.08

98.89 88.65 89.36 cimo muro

90.02

96.69

88.91

cimo muro

91.60

88.81 89.59

cimo muro

90.12

cimo muro

96.70

89.54

90.25

89.60

cimo muro

98.92

97.82

90.27 89.24 89.96

99.04

98

cimo muro

97

90.51 91.73

99.08

cimo muro

96.08

91.94

89.36 89.95

96.10

90.19 90.00 cimo muro

91.95 cimo muro

90.67

90.22 90.94

90.62 92.05

99.56

cimo muro

95.57

90.64 92.15

cimo muro

91.89

99.56

cimo muro

90.38

cimo muro

92.24

95.50

cimo muro

92.30 92.67

91.39

91.44

cimo muro

96.87

cimo muro

90.66

91.25 92.65

96

92.64 92.38 cimo muro cimo muro

99

92.13

cimo muro

90.68 94.87

91.45

98

93.09

90.95 91.83

94.45 cimo muro

cimo muro

100.40 97

95

92.69

93.00 cimo muro

93.28

100.49

93

93.91

91.23 93.66

94.95

93.96

91.52 92.39

100.72

cimo muro

93.29

94.86 cimo muro

95

100.91

95.06 100

93.72

93.77 cimo muro

94.86

95

99

94.24

95.17

cimo muro

92.71 cimo muro

96

93.95 95.31

94

92.86

94.84 95.59

cimo muro

cimo muro

95.59

95.94

96.11 96.27 96.93

95.85

cimo muro

94.25

95.33

94.26 cimo muro

93.49 94.15

93.00 94

95.10

96.12 96.38 96.35 96.83

96.12 93.32

94.09

95.08

93.07

93.32

cimo muro

94.58

95.78

95.96

cimo muro

97.01

cimo muro

96.62

95

cimo muro

96.96

93.63

96

96.81

92.55 92.97

94

96.77

97

cimo muro

95

97.09

96.61 97.00

93.43

cimo muro

99

97

cimo muro

cimo muro

100.76

100.96

97.14 97.36

97.31

cimo muro

97.48 97.42 97.38 97.53

10

cimo muro

94

cimo muro

96

97.43

100

96.86 97.37

97.02 97.36

96

97.06

94.83

96

96.12

96.22

96.30

94.86

98

92.33 92.96

cimo muro

96.24

96.40

93.31

cimo muro

94.31 94.82 95.49

97

94.67 96.23

97.69 98

97 95

95

98

98.26

95.51

97.85

95.54

98.07 98

97.71

97.81 98

97.70 97.50

97.20

M-23220.000

97.79

ETRS89

P161100.000

97.10

V A L D E I R A . S T R A T E G I C B R I E F.

Delimitacao de Artigo Urbano na Quinta de Valdeira DATE : Mar. 12, 19

SCALE: 1:1000 (A3 print) DRAWN:

JCR CHECKED: RAS

68, Rua de Valdeira 4585-694 Santa Comba. Sobreira

23.


86

88

87.55

88.56

88

88

89

88.23 89.44

87.57

cimo muro

85

86.48

86

88.14

cimo muro

89.40

87

89.69

88.53

90

89.59 cimo muro

89.59 cimo muro

90

8

9

86.48

88.46 86.89 86.54

87

86.16

89.88

88

86.90

91

86.25 85.82

87.65 87.46

87.41

91.14

cimo muro

90.98

91.20

88.68

cimo muro

89.99 90.27 cimo muro

88.52

90.26 91.32

89.89

cimo muro

cimo muro

88.61 88.40

90

91.37 91.58

90.41

89

89.99

cimo muro

92.14

91.80

91.82 92.11

92.94

92

89.89

88.62 88.48

cimo muro

88.55 91.68 89.25

87.76

89.93

91.54

88.65 89.36 cimo muro

92.89

90.02 cimo muro

93.90 cimo muro

91.63

90

87.09 87.31

cimo muro cimo muro

90.08 92.39

90.82 90.63

89.31

88.78 90.08 89.24

90.09

92.52

92.94

89.77

88.78

88.03 87.82

91

88

86.58

91.60

92.35

cimo muro

91.72

90.12

92.06 91.93

91.84

89.54

cimo muro

92.20 87

90.27

91.72

93.96

cimo muro

cimo muro

88.08 92.59

90.25

93.65 90.51 91.73

93.39

7 89

cimo muro

91.94

93

92.81

89.60

cimo muro

cimo muro

93.39

cimo muro

92.73 93.99

92.74

cimo muro

92.78

93.22

91.95 cimo muro

88.69

92.64

94.22

91

91.91

94

cimo muro

90.67

92.13

94.39

90.62 92.05

cimo muro

90.64 92.15

cimo muro

93.35 88

94.71

92.91 94.45

91.89

cimo muro

cimo muro

cimo muro

92.78 92

93.76

94.72

94.80 94.70

95

94.53 cimo muro

cimo muro

94.45

95.20

cimo muro

92.69

96.17

95.12

cimo muro

89

95.81

95.25

5

95.87

91

96.21

92

94

94.86 cimo muro

cimo muro

95

95.06

96.10

96.06

96.48

96.50

96.10

97.22

97.18

96.24

95.66

cimo muro

94.90

93

95.08

cimo muro

97.20 97.27

97.22

2

cimo muro

96.25

96.10 95.31

cimo muro

96.25

97.24

97.30 97.29 cimo muro

97.29

1 96.05

96.23

cimo muro

97.20

97.22

95.14 95.09

95.1

cimo muro

97.28

97.26

96.95

94.74

93.66

95.48

96.20 95.86

96.08

cimo muro

96.18

3

91.78

97.25

94.95

95.33

96.04

94.72

96.24

cimo muro

96.40 96.63

96.12

96.22

96.30

97.28

97.55

96.77

97.66

94.44

96.11 96.81

96.72 97.69

97.11

95

94

92

93.72

cimo muro

97.86 98.32

97.97 98.16 cimo muro

97.92

96.61 97.00 cimo muro

97.98 98.49

96.86 97.37 cimo muro

cimo muro

98

98.12

97.43

97.98 98.68 98.55

cimo muro

97.14 97.36

97.31

cimo muro

cimo muro

97.97

cimo muro

98.89

97.57

93

96.94

97.96

97.55

cimo muro

98.32 98.64

cimo muro

cimo muro

98.40

98.86

97.23

cimo muro

cimo muro

97.69

99.02

97.47 97.34

99

cimo muro

98.86

98.94

99

98

95

98

98.73

96

94

97.48 97.42 97.38 97.53

98

98.96

cimo muro

96.91

8

98.28

cimo muro

96.38

96.62

cimo muro

97.09 97.02 97.36

cimo muro

96.99 97.61

96.35 96.83

cimo muro

97.98

97.86

98.39

cimo muro

cimo muro

97.01

97.06

98.32

cimo muro

96.34 97.09

96.96

97.67 97.95 98.22

96.97

95.85

95.96

cimo muro

97.66

97.77

97.57

96.75

96.27 96.93

97

91

6

94.87

cimo muro

97

97.00

cimo muro

95.94

cimo muro

97

95.32

cimo muro

94.68

95.58

96

4

93.28

95.18

cimo muro

94.56

90

93.09

95.11 cimo muro

94.71

78

cimo muro cimo muro

cimo muro

95.11 93.92

95.11 95.63

92.84

90.78

92.64 92.38

94.51

93

90

94.49

cimo muro

cimo muro

95

6

92.27

92.24 92.30 92.67

cimo muro

94.80

cimo muro

cimo muro

93.0794.46

99.22

92

92.31

98.76

7

98.26

99.70 98.89

99

98

97

96.72

98.07

99

93

9 10

97.81 98

96.49 96.49

98

95.50

97.70 98

95

91

97.50

94

97.10

92

96.53

96.5996.75

97.92 cimo muro

96.50 97

7

9

93

96.55

91.34

96.96 96

95

96.51

91

96.23

96.32

94

92

90

95.10

96.41

cimo muro

93

94.85

95.63

95.59

96.34

97.20

9


BUILT ENVIRONMENT

The complex is composed of various constructions of mixed use that can be divided in residential and agricultural use. The main house (1) spreads in two levels, with external staircases in the north and south elevations and. Attached to the main house, an ancillary space, formerly used as kitchen, occupies only the ground level. It has independant access but i A secondary residential building (3) contains two self-contained units, at ground and first floor respectively. The ground unit has attached an extensive, semi-buried porch. The remaining constructions are all destined to agricultura use. We find a stable, winery, grannary, storage, garage, etc.

V A L D E I R A . S T R A T E G I C B R I E F.

25.



DESIRES

“My problem is a certain unsatisfaction about the the spaces I live in. One of the reasons I didnt feel good in my old house is because all the little rooms. One room for this, another room for that, all of them small, including my bedroom. The studio... down in the basement. I need a studio just to so I can have all my books, without the need of boxes around me. It really unsettles me. Particularly when I am writting and I need to check a book just to realize is not with me. That’s it. An open space is where I feel best. Big windows with long views ahead to let the thoughts run. A floor where I can roll. sitting facing a window My first house in Porto was like that. Separate bedrooms. The rest can be a single space with different uses. For the future that means I will have the new house for myself in Valdeira, the tourists can have the old part.”

V A L D E I R A . S T R A T E G I C B R I E F.

27. 27



REMOTE LEARNING

MEDITATION

RURAL CULTURE

ARTISTIC PRACTICE

LEARNING FROM NATURE

V A L D E I R A . S T R A T E G I C B R I E F.

29. 29



V A L D E I R A . S T R A T E G I C B R I E F.

31. 31



My problem is a certain unsatisfaction about the the spaces I live in. One of the reasons I didnt feel good in my old house is because all the little rooms. One room for this, another room for that, all of them small, including my bedroom. The studio.. down in the basement. I need a studio just to so I can have all my books, without the need of boxes around me. It really unsettles me. Particularly when I am writting and I need to check a book to realize is not with me. That’s it. An open space is where I feel best. Big windows with long views ahead. Ou seja: um open space é onde me sinto melhor. Com grandes janelas com vistas largas e para a frente para os pensamentos poderem correr e onde me posso rebolar no chão (ginástica). Nada de estar sentada virada contra uma parede. O meu primeiro apartamento no Porto era assim. Os quartos em separado. Mas tudo o resto, pode ser num só, em diferentes recantos. O meu primeiro apartamento no Porto era assim. Os quartos em separado. Mas tudo o resto, pode ser num só, em diferentes recantos. O meu primeiro apartamento no Porto era assim. Os quartos em separado. Mas tudo o resto, pode ser num só, em diferentes recantos. V A L D E I R A . S T R A T E G I C B R I E F.

33. 33



V A L D E I R A . S T R A T E G I C B R I E F.

35. 35



V A L D E I R A . S T R A T E G I C B R I E F.

37. 37


Stages

The RIBA Plan of Work 2013 organises the process of into a number of key stages. The content of stages ma should be used solely as guidance for the preparation

0

1

2

3

Strategic Definition

Preparation and Brief

Concept Design

Developed Design

Core Objectives

Identify client’s Business Case and Strategic Brief and other core project requirements.

Develop Project Objectives, including Quality Objectives and Project Outcomes, Sustainability Aspirations, Project Budget, other parameters or constraints and develop Initial Project Brief. Undertake Feasibility Studies and review of Site Information.

Prepare Concept Design, including outline proposals for structural design, building services systems, outline specifications and preliminary Cost Information along with relevant Project Strategies in accordance with Design Programme. Agree alterations to brief and issue Final Project Brief.

Prepare Developed including coordinat updated proposals structural design, b services systems, o specifications, Cos Information and P Strategies in accor Design Programm

Procurement

Initial considerations for assembling the project team.

Prepare Project Roles Table and Contractual Tree and continue assembling the project team.

Tasks

*Variable task bar

Programme

Establish Project Programme. Review Project Programme.

The procurement strategy does not fun of the design or the level of detail prepa Information Exchanges will vary depen route and Building Contract. A bespoke out the specific tendering and procureme stage in relation to the chose Review Project Programme.

*Variable task bar

(Town) Planning

Pre-application discussions.

Pre-application discussions.

Review Feedback from previous projects.

Prepare Handover Strategy and Risk Assessments.

Planning applications are typically m A bespoke RIBA Plan of Work 2013 application is to

*Variable task bar

Suggested Key Support Tasks

Agree Schedule of Services, Design Responsibility Matrix and Information Exchanges and prepare Project Execution Plan including Technology and Communication Strategies and consideration of Common Standards to be used.

The procurem stages overla 2013 w

Prepare Sustainability Strategy, Maintenance and Operational Strategy and review Handover Strategy and Risk Assessments.

Review and update Sustainability, Ma and Operational a Handover Strateg Risk Assessments

Undertake third party consultations as required and any Research and Development aspects.

Undertake third par consultations as req and conclude Rese Development aspe

Review and update Project Execution Plan.

Review and update Execution Plan, in Change Control P

Consider Construction Strategy, including offsite Review and update fabrication, and develop Health Construction and and Safety Strategy. Safety Strategies.

Sustainability Checkpoints

Sustainability Checkpoint — 0

Sustainability Checkpoint — 1

Sustainability Checkpoint — 2

Sustainability Checkpoint — 3

Information Exchanges

Strategic Brief.

Initial Project Brief.

Concept Design including outline structural and building services design, associated Project Strategies, preliminary Cost Information and Final Project Brief.

Developed Design the coordinated arc structural and build services design and Cost Information.

Not required.

Required.

Required.

Required.

(at stage completion)

UK Government Information Exchanges

*Variable task bar – in creating a bespoke project or practice specific RIBA Plan of Work 2013 via www.ribaplanofwork.com a specific bar is selected from a number of options.


f briefing, designing, constructing, maintaining, operating and using building projects ay vary or overlap to suit specific project requirements. The RIBA Plan of Work 2013 n of detailed professional services contracts and building contracts.

d Design, ted and for building outline st Project rdance with me.

www.ribaplanofwork.com

4

5

6

7

Technical Design

Construction

Handover and Close Out

In Use

Prepare Technical Design in accordance with Design Responsibility Matrix and Project Strategies to include all architectural, structural and building services information, specialist subcontractor design and specifications, in accordance with Design Programme.

ndamentally alter the progression ared at a given stage. However, nding on the selected procurement e RIBA Plan of Work 2013 will set ent activities that will occur at each en procurement route.

Offsite manufacturing and Handover of building and onsite Construction in conclusion of Building accordance with Construction Contract. Programme and resolution of Design Queries from site as they arise.

Administration of Building Contract, including regular site inspections and review of progress.

Undertake In Use services in accordance with Schedule of Services.

Conclude administration of Building Contract.

ment route may dictate the Project Programme and may result in certain apping or being undertaken concurrently. A bespoke RIBA Plan of Work will clarify the stage overlaps. The Project Programme will set out the specific stage dates and detailed programme durations.

made using the Stage 3 output. will identify when the planning be made.

e aintenance and gies and s.

Review and update Sustainability, Maintenance and Operational and Handover Strategies and Risk Assessments.

rty quired earch and ects.

Prepare and submit Building Regulations submission and any other third party submissions requiring consent.

e Project ncluding Procedures.

Review and update Project Execution Plan.

Health and .

n, including chitectural, ding d updated

Review Construction Strategy, including sequencing, and update Health and Safety Strategy.

Carry out activities listed in Handover Strategy including Feedback for use during the future life of the building or on future projects. Updating of Project Information as required.

Update Construction and Health and Safety Strategies.

Conclude activities listed in Handover Strategy including Post-occupancy Evaluation, review of Project Performance, Project Outcomes and Research and Development aspects. Updating of Project Information, as required, in response to ongoing client Feedback until the end of the building’s life.

V A L D E I R A . S T R A T E G I C B R I E F.

e

Review and update Sustainability Strategy and implement Handover Strategy, including agreement of information required for commissioning, training, handover, asset management, future monitoring and maintenance and ongoing compilation of ‘Asconstructed’ Information.

Sustainability Checkpoint — 4

Sustainability Checkpoint — 5

Sustainability Checkpoint — 6

Sustainability Checkpoint — 7

Completed Technical Design of the project.

‘As-constructed’ Information.

Updated ‘As-constructed’ Information.

‘As-constructed’ Information updated in response to ongoing client Feedback and maintenance or operational developments.

Not required.

Not required.

Required.

As required.

39.

© RIBA


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.