Norman capistrano senior architect cv portfolio

Page 1


Palm International Hotel and Tower Dubai,UAE

Summary of Works: Part of my job in the tender design of this hotel is to prepare the plans for construction drawings. In order to manage this, i need to review and coordinate the plans with the design engineers for their design inputs regarding the given rooms for MEP . I have coordinated the plans(Front of House , back of House, Guest Rooms and Hotel Facilities ) to the hotel operator and see if there are additional requirements based on the day to day operational basis. I have also coordinated the lift design to the vertical design consultant and see how many lifts are required and its specification. Basically cad is the only tools to create this design of plans.

Norman Capistrano

Design Portfolio 2014

Senior Architect


Summary of Works: The tender design of the elevation and sections are also part of my responsibilities. I have look into each individual height of each floor use whether it is for hotel or for mechanical services. For the elevation, i have designed it to reflect the material finishes of the building itself and their respective heights.

Norman Capistrano

Design Portfolio 2014

Senior Architect


Dubai Creek Harbor Dubai,UAE

DUBAI CREEK HARBOUR

2.1 PHASE 1A PODIUM MASTER PLANS

CONCEPT DESIGN REPORT

DELINEATION MASTERPLAN

PHASE 1A - RESIDENTIAL TOWERS

PODIUM MASTER PLAN +4.5M Boulevard parking at 2.4m.

North Podium

South Podium

2.4m

1.1 PROJECT LOCATION N

10

11 9 6

5

1

2

7

4

KEY

1 - Dubai Creek Harbour, Phase 1A 2 - Dubai Creek Harbour, Phase 1B 3 - Dubai Creek Harbour, Phase 2 4 - Ras Al Khor Bird Sanctuary 5 - Dubai Creek 6 - Festival City 7 - Business Bay 8 - Al Khail Road 9 - Emirates Road 10 - Umm Hurair Road 11 - Sheikh Zayed Road 12 - Al Ain Road 13 - Dubai Camel Race Course

4

8 3

12 13

DUBAI CREEK HARBOUR

Summary of Works: PHASE 1A - RESIDENTIAL TOWERS

My responsibility on the Dubai Creek Harbour is to prepare the masterplan for design development and coordinate the latest plans of the hotel and the roads from the internal designers and external consultants. I have managed to deliver the piling locations for the whole site. I have coordinated the tower locations to be correct by overlaying them on the podium plans. I am the lead on the podium plans preparing all the floors. Also, I am coordinating the plans to MEP and structures for design requirements and issues.

14

DUBAI CREEK HARBOUR PHASE 1A - RESIDENTIAL TOWERS

AUGUST 2013

PODIUM MASTER PLAN +10.5M PODIUM MASTER PLAN +7.5M Boulevard parking at 5.6m.

North Podium

South Podium North Podium

South Podium

5.6m

16 AUGUST 2013

Norman Capistrano

15

17

DUBAI CREEK HARBOUR PHASE 1A - RESIDENTIAL TOWERS

Design Portfolio 2014

Senior Architect


Dubai Creek Harbor Dubai,UAE

PODIUM PLAN B2 +4.5M

PODIUM PLAN GF +10.5M

PODIUM PLAN +16.5M

GENERAL NOTES:

DUBAI CREEK HARBOUR

DUBAI CREEK HARBOUR

PHASE 1A

AUGUST 2013

GENERAL NOTES:

PHASE 1A

21 AUGUST 2013

PODIUM PLAN +13.5M PODIUM PLAN B1 +7.5M

23

PODIUM PLAN AT TERRACE +21.5M

RESIDENCES PODIUM LEVEL +4.50 GENERAL NOTES:

5120544-PN-A-SK-1001

GENERAL NOTES:

RESIDENCES PODIUM LEVEL +10.50

A

5120544-PN-A-SK-1003

PHASE 1A

PHASE 1A

DUBAI CREEK HARBOUR PHASE 1A - RESIDENTIAL TOWERS

24

DUBAI CREEK HARBOUR

26

PHASE 1A - RESIDENTIAL TOWERS RESIDENCES PODIUM LEVEL +7.50

5120544-PN-A-SK-1002

Norman Capistrano

A

DUBAI CREEK HARBOUR

DUBAI CREEK HARBOUR

22

A

DUBAI CREEK HARBOUR PHASE 1A - RESIDENTIAL TOWERS

RESIDENCES PODIUM LEVEL +13.50

A

Design Portfolio 2014

5120544-PN-A-SK-1004

A

Senior Architect


Iris Bay

Dubai,UAE

Summary of Works: My role on the Iris Bay project is to prepare the preliminary design concept until the tendering stage. I have prepare the plans, elevations, sections and details as part of the submission requirements by the client. I have also considered the green strategies by coordinating it to the LEED engineers who help me to elevate the design to be more competitive in terms of sustainability initiatives.

Norman Capistrano

Design Portfolio 2014

Senior Architect









Overall Site Plan

Equestrian Club Project

Jeddah Kingdom of Saudi Arabia

F

E

C B

A

D

H G

Points of Attraction

Pedestrian Network Analysis

Poimts of Attraction

A. B. C. D D. E. F. G. H.

Dancing Water Fountain Aquarium Central Walk P Promenade d Children`s Play Areas Family Park and Open Spaces Weekend Bazaar and Temporary Stand Alone Kiosks Ferris Wheel

PEDESTRIAN NETWORK

POTENTIAL CONNECTION

PEDESTRIAN NETWORK

POTENTIAL CONNECTION

POINTS OF ATTRACTION CYCLING LANE

PEDESTRIAN PATH

CYCLING AND PEDESTRIAN

LANDSCAPE

PEDESTRIAN WALK

PEDESTRIAN REST AREAS

Summary of Works: I have designed the preliminary option for the Equestrian Club. Part of the masterplanning process is to prepare the site circulation like the pedestrian and vehicular access. Also to identify the nodes that are being connected is also important. The theme of the masterplan is to have a retail destination for all kinds of people especially for families. I have managed to identify the constraint of separation of bachelors to the families. Strict cultural lifestyle of the Arabic people should be look into. I have thought putting up tourist attractions facilities like the ferris wheel, dancing fountain, and a central walk . WATER FEATURE

Norman Capistrano

Design Portfolio 2014

CHILDREN PLAY AREA

WATER FOUNTAIN

AQUARIUM

Senior Architect


DEVELOPING THE CONCEPT - Preferred Option

Prince Sultan Cultural Center ILLUSTRATIVE PLAN

Jeddah, Kingdom of Saudi Arabia

PSCC ‐ Draft Development Area Program for comment and input from E&Y ‐ 10.04.2013

Residential Villas

Service Sport

Education

Components Private Land Areas Residential Villa Cluster 1 Villa Cluster 2 Villa Cluster 3

Residential Villas

Hospitality

Education Retail Health

Exhibition

University Culture

Commercial Public Park

Retail

Mixed Use Residential

FAR

110 140 165

45,026 79,670 86,839

0.60 0.60 0.60

16,396 13,524 17,150 26,526 9,932 7,470 17,956

135 125 120 105 140 130 105

98,377 81,146 102,902 159,157 59,592 44,820 107,735

2.70 2.70 2.70 2.70 2.70 2.70 2.70

45.00% 45.00% 45.00%

10,851 3,150 2,316

135 85 125

65,108 18,900 13,897

2.70 2.70 2.70

8.30%

48%

95000.00

60

95,000

0.48

11.75% 0.25% 8.30% 0.93% 0.61% 1.66%

60.00% 60.00% 60.00% 60.00% 60.00%

3,649 120,000 13,384 8,780 23,926

160 80 135 130 105

3,649 200,040 13,384 8,780 23,926

0.60 1.00 0.60 0.60 0.60

40.00% 40.00% 40.00%

15,022 9,755 9,460

130 125 115

45,065 29,266 28,379

1.20 1.20 1.20

12.46%

159

200,000

0.67

0.92%

152

10,000

0.45

16,000 12,000 24,000

150 100 160

32,000 12,000 40,080

0.64 0.60 1.00

60.00% 60.00% 60.00%

1,500 1,500 720

130 105 160

1,800 1,875 900

0.72 0.75 0.75

10%

2,560

150

2,560

0.10

140

18,280

1.24

22,513 39,835 43,419

Cluster Apartments Cluster Apartments 1 Cluster Apartments 2 Cluster Apartments 3 Cluster Apartments 4 Cluster Apartments 5 Cluster Apartments 6 Cluster Apartment 7

10.05% 1.51% 1.25% 1.58% 2.45% 0.92% 0.69% 1.66%

45.00% 45.00% 45.00% 45.00% 45.00% 45.00% 45.00%

Hospitality Upscale Hotel Smart Hotel Boutique Hotel

1.51% 1.00% 0.29% 0.21%

Exhibition Retail Community Retail Retail Mall Showroom 1 Showroom 2 Showroom 3 Office/Commercial Office/Commercial 1 Office/Commercial 2 Office/Commercial 3

3.55% 1.56% 1.01% 0.98%

Public Areas Healthcare Culture Education International School French School University

4.57% 2.08% 0.83% 1.66%

32.00% 60.00% 60.00%

Big Mosque 1 Big Mosque 2 Small Mosque 1

0.26% 0.10% 0.10% 0.05%

Sports

1.06%

Service/Utilities Public Space

0.61% 30.32% 3.95% 14.26% 9.82% 0.93% 1.36%

Mosque

Prince Sultan Cultural City - 6th March 2013 Park 1

Park 2 Park 3

SECTION B Total

Maximum Building Height in Meters GFA

30.00% 30.00% 30.00%

Lake Right of Way

2

Total Building Building coverage on footprints on super Super plot plot m2

14.64% 3.12% 5.51% 6.01%

Hospitality Mosque

Plot Coverage of total land area (%)

Summary of Works: I have prepared the rendering of the final options for the Prince Sultan and Cultural Center based on the proposed landuse. Also , i have tabulated the final areas for the masterplan showing the GFA, individual site area, FAR, heights and etc. I have produced also a site section to give an information of the building scale in compare to the site. The proposed development is theme as a sustainable city because of its strategies of green initiatives. The tools that i have used are cad, photoshop and microsoft excel.

1,730,153

B

Norman Capistrano

Design Portfolio 2014

Senior Architect


Norman Capistrano

Senior Architect Dubai United Arab Emirates 00971 50 4277340 normancap@gmail.com Linkedin : http://ae.linkedin.com/in/normancapistrano