Ponte Vedra/Palm Valley Traffic Study
PONTE VEDRA, FL APRIL 13, 2017 980 North Jefferson Street Jacksonville, FL 32209 904-306-7500 TDD 904-306-7502 www.northfloridatpo.com
DRAFT
Ponte Vedra/Palm Valley Traffic Study
Summary This study’s purpose is to identify improvements to enhance traffic flow and safety in the vicinity of SR A1A from Mickler Road to Duval County Line, Mickler Road, Palm Valley Road, and Roscoe Boulevard/Solana Road. The following intersections were examined to assess traffic benefits, right-of-way impacts and costs. SR A1A • Mickler Road • Crossroad Lakes Drive/Oceans Edge Drive • Plantation Drive • Sawgrass Drive/Fairfield Boulevard • Palm Valley Road/Old CR 210 • ATP Tour Boulevard • PGA Tour Boulevard/Country Club Boulevard • Sawgrass Village Drive/L’Atrium Circle • Thousand Oaks Boulevard/Ocean Place • Corona Road/Summerfield Drive • Library Boulevard • Solana Road • Dolphin Boulevard • Marlin Avenue Roscoe Road • Solana Road at North Roscoe Boulevard Palm Valley • Roscoe Boulevard • Canal Boulevard/Possum Trot Road • Landrum Lane • Mickler Road Current and future traffic concerns in the Ponte Vedra area prompted this traffic study. Continued traffic growth is anticipated within this study area over the design period for the project, 2040. Alternatives to improve the intersections anticipated to have the worst congestion in the future were evaluated. Improvements are proposed at the following intersections: • • • • • •
SR A1A at Mickler Road SR A1A at PGA Tour Boulevard SR A1A at Sawgrass Village/L’Atrium Drive SR A1A at Solana Road SR A1A at Dolphin Boulevard Palm Valley Road at Mickler Road i
Ponte Vedra/Palm Valley Traffic Study
Improvements to meet the long-term needs within the corridor include: • • • • •
Widening SR A1A from two to four lanes from Mickler Road to ATP Tour Boulevard Widening SR A1A from four to six lanes from ATP Tour Boulevard to Marlin Avenue Widening Mickler Road and the east-west segment of Palm Valley Road from two to four lanes Constructing a new ramp from Palm Valley Road to Roscoe Boulevard in advance of the Intracoastal Waterway Bridge Constructing new sidewalk and bicycle lanes along Palm Valley Road
The total construction costs of these standalone intersection improvements are estimated to be $3.4 million. The total construction costs of the widening improvements are anticipated to be $32.6 million.
ii
Ponte Vedra/Palm Valley Traffic Study
TABLE OF CONTENTS INTRODUCTION .......................................................................................................................................1 PURPOSE ........................................................................................................................................................ 1 BACKGROUND ................................................................................................................................................. 2 STUDY AREA ................................................................................................................................................... 3 EXISTING CONDITIONS ............................................................................................................................5 FIELD OBSERVATIONS ....................................................................................................................................... 5 2.1.1 SR A1A .................................................................................................................................................. 5 2.1.2 Roscoe Boulevard ............................................................................................................................... 12 2.1.3 Palm Valley Road ............................................................................................................................... 13 TRAFFIC DATA COLLECTION ............................................................................................................................. 15 2.2.1 Truck Average Volume ....................................................................................................................... 15 2.2.2 Crash Analysis .................................................................................................................................... 16 EXISTING TRAFFIC VOLUMES AND LOS .............................................................................................................. 19 2.3.1 Volumes and LOS................................................................................................................................ 19 2.3.2 Cut-Through Volumes ........................................................................................................................ 19 INTERSECTION VOLUMES AND LOS ................................................................................................................... 21 METHODOLOGY .................................................................................................................................... 24 ADOPTED TRAVEL DEMAND FORECASTING MODEL.............................................................................................. 24 ALTERNATIVES ANALYZED................................................................................................................................ 24 3.2.1 Base Year............................................................................................................................................ 24 3.2.2 No Build .............................................................................................................................................. 24 3.2.3 Build Alternative................................................................................................................................. 24 DESIGN TRAFFIC VOLUMES .............................................................................................................................. 25 3.3.1 Annual Average Daily Traffic Volumes ............................................................................................... 25 NO BUILD ALTERNATIVE ........................................................................................................................ 26 INTERSECTION PEAK HOUR VOLUMES ............................................................................................................... 26 INTERSECTION LOS ........................................................................................................................................ 28 2040 INTERSECTION IMPROVEMENTS .................................................................................................... 31 INTERSECTION IMPROVEMENTS ........................................................................................................................ 31 5.1.1 SR A1A Improvements ........................................................................................................................ 31 5.1.2 Palm Valley Road Improvements ....................................................................................................... 38 INTERSECTION LOS ........................................................................................................................................ 41 2040 BUILD ALTERNATIVE .............................................................................................................................. 43 INTERSECTION LOS ........................................................................................................................................ 53 COST ESTIMATE ..................................................................................................................................... 55 CONCLUSION......................................................................................................................................... 56
iii
Ponte Vedra/Palm Valley Traffic Study
LIST OF APPENDICES Appendix A: 72 hour Volume Counts ...................................................................................................................... 58 Appendix B: Turning Movement Counts ...............................................................................................................185 Appendix C: Crash Locations..................................................................................................................................300 Appendix D: Timing Plans ......................................................................................................................................306 Appendix E: Synchro ..............................................................................................................................................318 Appendix F: Arterial Analysis .................................................................................................................................483 Appendix G: Cost Estimate ....................................................................................................................................485
iv
Ponte Vedra/Palm Valley Traffic Study
LIST OF TABLES Table 1. Average Truck Volume Summary ............................................................................................................... 15 Table 2. Crash Severity Summary ............................................................................................................................ 16 Table 3. Crash Types ................................................................................................................................................ 17 Table 4. Crash Conditions Summary ........................................................................................................................ 18 Table 5. Existing Level of Service and Intersection Delay ........................................................................................ 22 Table 6. 2040 No Build Level of Service and Delays ................................................................................................ 29 Table 7. 2040 Intersection Improvements Level of Service and Delays .................................................................. 42 Table 8. 2040 Build Alternative Level of Service and Delays ................................................................................... 54 Table 9. Intersection improvements........................................................................................................................ 55 Table 10. Long Term Improvements ........................................................................................................................ 55
v
Ponte Vedra/Palm Valley Traffic Study
LIST OF FIGURES Figure 1. Study Area................................................................................................................................................... 4 Figure 2. Existing Intersection volumes ................................................................................................................... 20 Figure 3. 2040 No Build Peak Hour Volumes ........................................................................................................... 27 Figure 4. Mickler Road Improvements .................................................................................................................... 33 Figure 5. PGA Tour Boulevard Improvements ......................................................................................................... 34 Figure 6. Sawgrass Village Drive Improvements...................................................................................................... 35 Figure 7. Solana Road Improvements ...................................................................................................................... 36 Figure 8. Dolphin Boulevard Improvements ............................................................................................................ 37 Figure 9. Palm Valley Road at Mickler Road Improvements ................................................................................... 39 Figure 10. Palm Valley Road at Roscoe Boulevard Improvements .......................................................................... 40 Figure 11. 2040 Build Alternative Improvements.................................................................................................... 44 Figure 12. 2040 Build Alternative Peak Hour Volumes............................................................................................ 45 Figure 13. Mickler Road Build Alternative Improvements ...................................................................................... 46 Figure 14. PGA Tour Boulevard Build Alternative Improvements ........................................................................... 47 Figure 15. Sawgrass Village Drive Build Alternative Improvements ........................................................................ 48 Figure 16. Solana Road Build Alternative Improvements ........................................................................................ 49 Figure 17. Dolphin Boulevard Build Alternative Improvements .............................................................................. 50 Figure 18. Palm Valley Road at Mickler Road Build Alternative Improvements ..................................................... 51 Figure 19. Palm Valley Road at Roscoe Boulevard Build Alternative Improvements .............................................. 52
vi
Ponte Vedra/Palm Valley Traffic Study
Introduction Purpose This study’s purpose is to identify improvements to enhance traffic flow and safety in the vicinity of SR A1A from Mickler Road to the Duval County Line, Mickler Road, Palm Valley Road, and Roscoe Boulevard/Solana Road. The following intersections were examined to assess traffic benefits, right-of-way impacts and costs. SR A1A • Mickler Road • Crossroad Lakes Drive/Oceans Edge Drive • Plantation Drive • Sawgrass Drive/Fairfield Boulevard • Palm Valley Road/ Old CR 210 • ATP Tour Boulevard • PGA Tour Boulevard/Country Club Boulevard • Sawgrass Village Drive/L’Atrium Circle • Thousand Oaks Boulevard/Ocean Place • Corona Road/ Summerfield Drive • Library Boulevard • Solana Road • Dolphin Boulevard • Marlin Avenue Roscoe Road • Solana Road at North Roscoe Boulevard Palm Valley • Roscoe Boulevard • Canal Boulevard/Possum Trot Road • Landrum Lane • Mickler Road
1
Ponte Vedra/Palm Valley Traffic Study
Background Current and future traffic concerns in the Ponte Vedra area prompted this traffic study. Continued traffic growth is anticipated within this study area over the design period for the project, 2040. Alternatives to improve the intersections anticipated to have the worst congestion in the future were evaluated. Long-term improvements consider the impacts of widening SR A1A, Mickler Road and the east-west portion of Palm Valley Road. This project analyzed existing roadways with improvements that will result in increased connectivity and will support planned development within the study area. Several intersection alternatives considered were eliminated from further consideration because of fatal flaws that included capacity and cost considerations. The North Ponte Vedra Beach Traffic Study was conducted as the first phase of this study in 2016. The study included the North Ponte Vedra Beach and South Jacksonville Beach areas and along SR A1A from Ponte Vedra Lakes Boulevard to SR 202/J. Butler Boulevard (JTB). The following intersections were examined to assess traffic benefits, right-of-way impacts and costs. • • • • • •
SR 202/JTB eastbound off-ramp at Marsh Landing Boulevard Marsh Landing Parkway at South Beach Parkway SR 202/JTB westbound on-ramp (Sanctuary Parkway) at South Beach Parkway Ponte Vedra Lakes Boulevard at Marsh Cove Drive Marsh Landing Parkway at SR A1A Ponte Vedra Lakes Boulevard at SR A1A
Two alternatives were analyzed for the design year of 2040. The first alternative implements Transportation System Management (TSM) strategies. Typical TSM improvements evaluated included short-term intersection improvements, signal modification and removing bottlenecks. The second alternative considers the impacts of extending South Beach Parkway to Ponte Vedra Lakes Boulevard via Vista Grande Drive. With the second alternative, the impacts of the shift in traffic were considered at each intersection. The following summarize the recommendations of this study. SR 202/JTB eastbound off-ramp at Marsh Landing Boulevard • Remain as existing Marsh Landing Parkway at South Beach Parkway • Add southbound left-turn lane • Add exclusive westbound channelized right-turn lane • Extend eastbound left-turn bays • Convert eastbound left-turn lane to additional receiving lane • Add bike lanes along Marsh Landing Parkway and along South Beach Parkway Sanctuary Parkway at South Beach Parkway • Add additional receiving lane on Sanctuary Parkway • Add multiuse path on north side of Sanctuary Parkway 2
Ponte Vedra/Palm Valley Traffic Study
•
Add bike lane along South Beach Parkway
Ponte Vedra Lakes Boulevard at Marsh Cove Drive • Add a community park with walkway that can be used by emergency vehicles on the north side of the intersection • Add a parking lot to accommodate up to 20 vehicles • Add two bus bays on the north and south sides of Ponte Vedra Lakes Boulevard, adjacent to the park to accommodate school buses Marsh Landing Parkway at A1A • Add bike lanes along A1A • Add eastbound right-turn overlap phase • Right-in right-out channelized island at Professional Drive • Convert Avenue C median opening to directional median • Extend JTB exit lane to Ponte Vedra Lakes Drive Ponte Vedra Lakes Boulevard at A1A • Construct a Florida T-Intersection • Add additional northbound left-turn lane • Add receiving lane on west leg to terminate at Professional Drive • Add bike lanes along A1A • Add eastbound right-turn overlap phase • Maintain three southbound through lanes from Marsh Landing Parkway to Marlin Avenue
The anticipated cost for implementation of the recommended project alternatives at the study intersections is $4.0 million. Based on the results of the North Ponte Vedra Beach Traffic Study, the limits were extended south to Mickler Road. Palm Valley Road and Solana Road were also evaluated.
Study Area The project is located within Ponte Vedra Beach and Palm Valley. The study area includes SR A1A from Marlin Avenue to Mickler Road, Palm Valley Road, Mickler Road, and Roscoe Boulevard/Solana Road. This study area is located in northeast St. Johns County. A location map is provided in Figure 1.
3
SR A1A at Ponte Vedra Lakes Blvd
SR A1A at Solana Rd
I
SR A1A at Marsh Landing Pkwy SR A1A at Marlin Ave
0
0.375 0.75 Miles
1.5
SR A1A at Dolphin Blvd SR A1A at Library Blvd
Solana Rd at North Roscoe Blvd
SR A1A at Thousand Oaks Dr SR A1A at PGA Tour Blvd SR A1A at Palm Valley Rd
SR A1A at Corona Rd SR A1A at Sawgrass Village Dr
SR A1A at ATP Tour Blvd
SR A1A at Sawgrass Dr
Palm Valley Rd at Canal Blvd
SR A1A at Plantation Dr Palm Valley Rd at Landrum Ln
SR A1A at Crossroad Lakes Dr SR A1A at Mickler Rd
Palm Valley Rd at Mickler Rd
Palm Valley Rd at Roscoe Blvd
Ponte Vedra Palm Valley ComprehensiveTraffic Study
Study Intersections Figure 1 Page 4
Ponte Vedra/Palm Valley Traffic Study
Existing Conditions Field Observations Field reviews were performed within the study area at the following intersections during the AM and PM peak periods. The times of observation were from 7 AM to 9 AM and 4 PM to 6 PM. The AM and PM peak hours were 7:45 AM to 8:45 AM and 4:45 PM to 5:45 PM, respectively. • • • • • • • • • • • • • • • • • • •
SR A1A at Mickler Road SR A1A at Crossroad Lakes Drive/Oceans Edge Drive SR A1A at Plantation Drive SR A1A at Sawgrass Drive/Fairfield Boulevard SR A1A at Palm Valley Road/Old CR 210 SR A1A at ATP Tour Boulevard SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Sawgrass Village Drive/L’Atrium Circle SR A1A at Thousand Oaks Boulevard/ Ocean Place SR A1A at Corona Road/Summerfield Drive SR A1A at Library Boulevard SR A1A at Solana Road SR A1A at Dolphin Boulevard SR A1A at Marlin Avenue Solana Road at North Roscoe Boulevard Palm Valley Road at Roscoe Boulevard Palm Valley Road at Canal Boulevard/Possum Trot Road Palm Valley Road at Landrum Lane Palm Valley Road at Mickler Road
2.1.1
SR A1A
2.1.1.1 Mickler Road Mickler Road at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, one through lane and one channelized right-turn lane Southbound: one left-turn lane, one through lane and one channelized right-turn lane Eastbound: one shared through/left/right-turn lane Westbound: one shared through/left/right-turn lane During the field review, additional conditions were observed at the intersection of Mickler Road and SR A1A. This intersection has mast arm poles with no signs on the arms. Crosswalks are located on each leg, and the sidewalk is present along the west side and north side of the intersection. There is a bicycle lane in the southbound and northbound direction, and lighting is provided at the intersection’s southwest corner.
5
Ponte Vedra/Palm Valley Traffic Study
During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays at the intersection were increased slightly during the AM and PM peak hour, particularly in the AM peak hour. Queues in the eastbound direction during the AM peak hour were approximately 10 to 15 vehicles; however, the maximum queue observed was 25 vehicles during the AM period. There were three to 10 vehicles queued southbound and three to five vehicles queued northbound during the AM peak hour. Queues in the eastbound direction during the PM peak hour averaged four to seven vehicles. There were three to six vehicles queued southbound and five to eight vehicles queued northbound during the PM peak hour. 2.1.1.2 Crossroad Lakes Drive Crossroad Lakes Drive at SR A1A is a four-leg, stop controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, and one shared through/right-turn lane Southbound: one left-turn lane, one through lane and one right-turn lane Eastbound: one shared left/through/right-turn lane Westbound: one shared left/through/right-turn lane During the field review, additional conditions were observed at the intersection of Crossroad Lakes Drive and SR A1A. The crosswalks and sidewalk are located along the west side of the intersection. There is a bicycle lane in the southbound and northbound directions. Lighting is provided along the intersection’s west leg. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were three to five vehicles queued eastbound during the AM peak hour and there were zero to two vehicles queued during the PM peak hour. 2.1.1.3 Plantation Drive Plantation Drive at SR A1A is a three-leg, stop-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and one through lane Southbound: one right-turn lane and one through lane Eastbound: one shared left/right- turn lane During the field review, additional conditions were observed at the intersection of Plantation Drive and SR A1A. A crosswalk and sidewalk is located on the west leg. There is a bicycle lane in the southbound and northbound directions. Lighting is provided along the west leg. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were three to five vehicles queued eastbound during the AM peak hour and there were zero to two vehicles queued during the PM peak hour. 2.1.1.4 Sawgrass Drive Sawgrass Drive at SR A1A is a four-leg, stop-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane 6
Ponte Vedra/Palm Valley Traffic Study
Southbound: one left-turn lane, two through lanes and one right-turn lane Eastbound: one shared through/left-turn lane and one right-turn lane Westbound: one shared through/left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of Sawgrass Drive and SR A1A. The crosswalks and sidewalk are located along the west side of the intersection. There is a bicycle lane in the southbound and northbound directions. There is no lighting present at the intersection. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were one to two vehicles queued eastbound during the AM period and PM period. 2.1.1.5 Palm Valley Road Palm Valley Road at SR A1A is a three-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and two through lanes Southbound: two through lanes and one right-turn lane Eastbound: one left-turn lane and one shared left/right-turn lane During the field review, additional conditions were observed at the intersection of Palm Valley Road and SR A1A. This intersection has mast arm poles with a left-turn yield on green sign (MUTCD R10-12) on the north and south leg mast arms and a no U-turn sign (MUTCD R3-4) on the east mast arm. Pedestrian push-buttons are located on the northwest, southwest and southeast poles. The crosswalks are located on the west and south legs, and the sidewalk is located along the west side of the intersection. There is a bicycle lane in the southbound and northbound directions. Lighting is provided at the intersection’s southwest corner. During the AM and PM peak hours, heavy traffic was present on Palm Valley Road. Queues in the eastbound direction during the AM peak hour were approximately 15 to 20 with a maximum eastbound queue of 25 vehicles. The queues observed during the PM peak hour were approximately 18 to 28 vehicles. There were approximately five to 10 vehicles queued southbound and 10 to 14 vehicles queued northbound during the AM peak hour. There were approximately six to 11 vehicles queued southbound and five to twelve vehicles queued northbound during the PM peak hour. 2.1.1.6 ATP Tour Boulevard ATP Tour Boulevard at SR A1A is a three-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and two through lanes Southbound: two through lanes and one right-turn lane Eastbound: one left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of ATP Tour Boulevard and SR A1A. This intersection has mast arm poles with a left-turn yield on green sign (MUTCD R10-12) on the north and south leg mast arms. Pedestrian push-buttons are located on the northwest and southwest poles. A 7
Ponte Vedra/Palm Valley Traffic Study
crosswalk is located on the west leg, and the sidewalks is located along the west side of the intersection. There is a bicycle lane in the southbound and northbound directions. No lighting is present at the intersection. There is a camera on the northwest corner pole. It was observed that there is some sight-distance obstruction for northbound left-turn vehicles due to trees in the median. During the AM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were approximately two to seven vehicles queued southbound and two to four vehicles queued northbound during the AM peak hour. Heavy traffic was observed during the PM peak hour. The heaviest movement at the intersection during the PM peak hour was southbound. There were approximately 20 to 24 vehicles queued southbound, and extended approximately 620-feet. There were approximately 12 to 15 vehicles queued northbound and seven to 10 vehicles queued eastbound during the PM peak hour. 2.1.1.7 PGA Tour Boulevard PGA Tour Boulevard at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane Southbound: one left-turn lane, two through lanes and one right-turn lane Eastbound: one left-turn lane and one shared through/right-turn lane Westbound: one shared through/left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of PGA Tour Boulevard and SR A1A. This intersection has signal strain poles with a left-turn yield on green sign (MUTCD R10-12) on the north and south leg wires and a no U-turns sign (MUTCD R3-4) on the south leg wire. Pedestrian push buttons are located on each pole. The crosswalks are located on the north, south and west legs. Sidewalks are located along SR A1A on the east and west sides. There is a bicycle lane in the southbound and northbound directions. Lighting is present on the southwest corner. In addition, a project is underway to replace span wires with mast arm assemblies at this location. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were approximately 10 to 16 vehicles queued southbound and 10 to 18 vehicles queued northbound during the AM peak hour. Queues in the eastbound were approximately four to 10 vehicles. There were approximately four to seven vehicles queued southbound and six to 10 vehicles queued northbound during the PM peak hour. Queues in the eastbound direction were approximately five to 15 vehicles. 2.1.1.8 Sawgrass Village Drive Sawgrass Village Drive at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane Southbound: one left-turn lane, two through lanes and one right-turn lane Eastbound: one left-turn lane and one shared through/right-turn lane Westbound: one shared through/left-turn lane and one right-turn lane
8
Ponte Vedra/Palm Valley Traffic Study
During the field review, additional conditions were observed at the intersection of Sawgrass Village Drive and SR A1A. This intersection has signal strain poles with left-turn yield on green sign (MUTCD R10-12) and right turn only (MUTCD R3-5R) on the north and south leg mast arms. The south leg also contains a no U-turn sign (MUTCD R3-4). The pedestrian push buttons are located on each pole. The crosswalks and sidewalks are located on west. There is a bicycle lane in the southbound and northbound directions. Lighting is present at the northwest and northeast corners. There is a camera on the northwest corner pole. It was observed that there is some sight-distance obstruction for northbound left-turn vehicles due to trees in the median. In addition, a project is underway to replace span wires with mast arm assemblies at this location. During the AM peak hour, the heaviest movement at the intersection was northbound through. Queues in the northbound direction during the AM peak hour were approximately 20 to 32 vehicles and extended approximately 500-feet. Queues in the southbound direction were approximately five to eight vehicles. During the PM hour, heavy traffic was observed in the northbound and southbound directions. There were approximately 20 to 27 vehicles queued southbound and 14 to 20 vehicles queued northbound. Queues in the southbound direction extended approximately 500-feet. Heavy traffic was also observed in the eastbound direction during the PM peak hour. The queues in the eastbound direction were approximately 10 to 15 vehicles. The eastbound queues extended approximately 400-feet. 2.1.1.9 Thousand Oaks Boulevard Thousand Oaks Boulevard at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane Southbound: one left-turn lane, two through lanes and one right-turn lane Eastbound: one shared left/through/right-turn lane Westbound: one left-turn lane and one shared through/right-turn lane During the field review, additional conditions were observed at the intersection of Thousand Oaks Boulevard and SR A1A. This intersection has mast arm poles with left-turn yield on green signs (MUTCD R10-12) on the north and south leg mast arms. Pedestrian push buttons are located on each pole. Crosswalks are located on each intersection leg, and the sidewalks are located on both sides of SR A1A and the north side of the east and west legs. There is a bicycle lane in the southbound and northbound directions. Lighting is present along the west side of SR A1A and northeast corner of the intersection. During the AM peak hour, the heaviest movement at the intersection was the northbound through. Queues in the northbound direction during the AM peak hour were approximately 10 to 20 vehicles, and extended approximately 600-feet. Queues in the southbound direction were approximately five to seven vehicles. During the PM peak hour, no operational issues were observed. Queues and delays were minimal. There were approximately three to five vehicles queued southbound and two to four vehicles queued northbound.
9
Ponte Vedra/Palm Valley Traffic Study
2.1.1.10 Corona Road Corona Road at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane Southbound: one left-turn lane, two through lanes and one right-turn lane Eastbound: one shared left/through/right -turn lane Westbound: one shared through/left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of Corona Road and SR A1A. This intersection has mast arm poles with left-turn yield on green signs (MUTCD R10-12) on the north and south leg mast arms. It was observed that one sign is flipped face-up on south leg mast arm. Pedestrian push buttons are located on each pole. A signal head on a pedestal is provided at the southeast corner of the intersection for vehicles traveling westbound. The crosswalks are located on the west, east, and south side legs. There are sidewalks along all legs of the intersection except the north side of the east leg. There is a bicycle lane in the southbound and northbound directions. Lighting is present at the northwest and northeast corners. PV/PVRawlings Elementary school is located at the southwest corner. During the AM hour traffic, no operational issues were observed. Queues and delays were minimal. Queues in the northbound direction during the AM peak hour were approximately four to seven vehicles. Queues in the westbound direction during the AM peak hour were approximately five to eight vehicles. During the PM peak hour, heavy traffic was observed in the northbound direction. There were approximately seven to 13 vehicles queued southbound and 13 to 22 queued northbound during the PM peak hour 2.1.1.11 Library Boulevard Library Boulevard at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and two through lanes Southbound: one left-turn lane, one right-turn lane and two through lanes Eastbound: one shared through/left-turn lane and one right-turn lane Westbound: one shared left/through/right-turn lane During the field review, additional conditions were observed at the intersection of Library Boulevard and SR A1A. The intersection has a new signal traffic mast arm on the west side leg, and there are left-turn yield on green signs (MUTCD R10-12) on the north and south leg mast arms. Crosswalks are located on each intersection leg, and there are sidewalks along both sides of SR A1A and on the south side of the west leg. There is a bicycle lane in the northbound and southbound directions. Lighting is provided on the intersection’s southwest corner, and detector cameras are on each mast arm. There is a Ponte Vedra Beach Library and the Ponte Vedra Fire Department is located near the intersection. During the AM peak hour, there was heavy traffic on SR A1A. The heaviest movement at the intersection was northbound through, due to the traffic queues extending from Solana Road. There were approximately four to 10 vehicles queued southbound and 13 to 21 vehicles queued northbound during the AM peak hour. During the
10
Ponte Vedra/Palm Valley Traffic Study
PM peak hour, there were approximately five to 10 vehicles queued southbound and four to seven vehicles queued northbound. 2.1.1.12 Solana Road Solana Road at SR A1A is a four-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, two through lanes and one right-turn lane Southbound: one left-turn lane, two through lanes and one channelized right-turn lane Eastbound: two left-turn lanes and one shared through/right-turn lane Westbound: one shared through/left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of Solana Road and SR A1A. The intersection has mast arm poles with a right-turn only (MUTCD R3-5R) signage in the north and south leg mast arms. There are two signal pedestals on the southwest corner with count down pedestrian heads, one signal pedestal in the northwest corner and one on the southeast corner. Crosswalks are located on the west and the south legs, and sidewalks are located along the west side of SR A1A north of the intersection and east side of SR A1A south of the intersection. Sidewalk is additionally located on the south side of Solana Road. There is a bicycle lane in the northbound and southbound directions. Lighting is present on the intersection’s southeast and southwest corners. There is a right turn only light-emitting diode (LED) sign on the east leg mast arm and a closed-circuit television (CCTV) camera located on the south leg mast arm. During the AM peak hour, the northbound, southbound and the eastbound trough movements are heavy. Queues in the northbound, southbound and eastbound direction during the AM peak hour were approximately thirty to thirty-four, twenty-four to thirty, and eighteen to thirty-three vehicles, respectively. The traffic during the AM period in the northbound and southbound extended approximately 480-feet and 730-feet, respectively. Queues in the northbound, southbound and eastbound direction during the PM peak hour were approximately 15 to 35, 26 to 35, and 11 to 15 vehicles, respectively. The traffic during the PM period in the northbound and southbound extended approximately 295-feet and 700-feet, respectively. 2.1.1.1 Dolphin Boulevard Dolphin Boulevard is a three leg, stop-controlled intersection. The intersection configuration is as follow: Northbound: one left-turn lane and two through lanes Southbound: two through lanes and one right-turn lane Eastbound: one shared left/right-turn lane During the field review, additional conditions were observed at the intersection of Dolphin Boulevard and SR A1A. There are no sidewalks along the east leg. A crosswalk is located on the west leg, and lighting is present at the intersection’s northwest corner. There is one bicycle lane in the northbound and southbound directions. During the AM and PM peak hours, heavy traffic was observed in the southbound direction. The southbound queues from Solana Road block the eastbound and northbound left movements.
11
Ponte Vedra/Palm Valley Traffic Study
2.1.1.2 Marlin Avenue Marlin Avenue at SR A1A is a three-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and two through lanes Southbound: two through lanes and one right-turn lane Eastbound: one left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of Marlin Avenue and SR A1A. The intersection has signal strain poles with a left-turn yield on green sign (MUTCD R10-12) on the north leg. Signal pedestals with count down pedestrian heads and push buttons are located on the northwest and southwest corners of the intersections. A crosswalk is located on the intersection’s west leg. A sidewalk is located along the west side of SR A1A, and there is lighting present on the southwest corner. There is a bicycle lane in the northbound and southbound directions. There are No Parking signs (MUTCD R8-3) located on the east leg. In addition, a project is underway to replace span wires with mast arm assemblies at this location. During the AM peak hours traffic, no operational issues were observed. Queues and delays were minimal. There were approximately 10 to 15 vehicles queued southbound and 18 to 25 vehicles queued northbound during the AM peak hour. Heavy traffic was observed during the PM peak hour in the southbound direction. There were approximately 15 to 22 vehicles queued southbound and one to four vehicles queued northbound during the PM peak hour. Traffic queues extended from Dolphin Boulevard to the south leg of Marlin Avenue. 2.1.2
Roscoe Boulevard
2.1.2.1 Solana Road Solana Road at North Roscoe Boulevard is a three-leg, stop-controlled intersection. Stop-control is present only on the west leg. The intersection configuration is as follows: Northbound: one through lane Southbound: one through lane Eastbound: one shared left/through/right-turn lane During the field review, additional conditions were observed at the intersection of Roscoe Boulevard and Solana Road. There are no crosswalks, sidewalks or bicycle lanes at this intersection. There is one street light located in the northwest corner. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. Queues in the eastbound during the AM and PM peak hours were approximately one to two vehicles.
12
Ponte Vedra/Palm Valley Traffic Study
2.1.3
Palm Valley Road
2.1.3.1 Roscoe Boulevard Roscoe Boulevard at Palm Valley Road is a three-leg, stop-controlled intersection. configuration is as follows:
The intersection
Northbound: one through lane and one right-turn lane Southbound: one left right-turn lane and one through lane Westbound: one left-turn lane and one right-turn lane During the field review, additional conditions were observed at the intersection of Roscoe Boulevard and Palm Valley Road. The crosswalk and the sidewalk are located along the east side of Palm Valley Road. There are no bicycle lanes, and lighting is present on the southeast, southwest and northeast corners of the intersection. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. Queues in the southbound direction during the AM and PM peak hours were approximately zero to two vehicles. Queues in the westbound direction averaged seven to 12 vehicles in the AM and PM peak hours. 2.1.3.2 Mickler Road Mickler Road at Palm Valley Road is a four-leg, roundabout-controlled intersection. configuration is as follows:
The intersection
Northbound: one shared left/through/right-turn lane Southbound: one shared left/through/right-turn lane Eastbound: one shared left/through/right-turn lane Westbound: one shared left/through/right-turn lane During the field review, additional conditions were observed at the intersection of Mickler Road and Palm Valley Road roundabout. Crosswalks and sidewalks are located on each direction. There are two street lights per each direction. The are no bicycle lanes present. During the AM and PM peak hour traffic, no operational issues were observed. Heavy traffic was observed in the westbound direction during the AM and PM peak hours. Queues in the eastbound direction during the AM and PM peak hour were approximately 25 to 30 vehicles, up to a maximum of 55 vehicles, and extended approximately 1,500-feet. There were approximately five to 11 vehicles queued southbound and four to 10 vehicles queued northbound during the AM peak hour. During the PM peak hour, there were approximately 11 to 18 vehicles queued southbound and five to 10 vehicles queued northbound during the PM peak hour 2.1.3.3 Landrum Lane Landrum Lane at Palm Valley Road is a three-leg, signal-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane and one through lane Southbound: one through lane and one right-turn lane Eastbound: one left-turn lane and one right-turn lane 13
Ponte Vedra/Palm Valley Traffic Study
During the field review, additional conditions were observed at the intersection of Landrum Lane and Palm Valley Road. There are no crosswalks or bicycle lanes at the intersection. Sidewalks start at the southwest corner of the intersection and continue south along Palm Valley Road and west along Landrum Lane. Lighting is present on the northwest corner. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal. There were approximately four to 12 vehicles queued southbound and two to six vehicles queued northbound during the AM peak hour. Queues in the eastbound direction during the AM peak hour were approximately three to six vehicles. There were approximately five to 10 vehicles queued southbound and one to four vehicles queued northbound during the PM peak hour. Queues in the eastbound direction during the PM peak hour were approximately one to four vehicles. 2.1.3.1 Canal Boulevard Canal Boulevard at Palm Valley Road is a four-leg, stop-controlled intersection. The intersection configuration is as follows: Northbound: one left-turn lane, one through lane and one right-turn lane Southbound: one left-turn, one through lane and one channelized right-turn lane Eastbound: one shared through/left-turn lane and one right-turn lane Westbound: one shared left/through/right-turn lane During the field review, additional conditions were observed at the intersection of Canal Boulevard and Palm Valley Road. There are no crosswalks or bicycle lanes at the intersection. Sidewalks start at the southwest corner of the intersection and continue south along Palm Valley Road and west along Canal Blvd. Lighting is present at the southwest corner. During the AM and PM peak hour traffic, no operational issues were observed. Queues and delays were minimal.
14
Ponte Vedra/Palm Valley Traffic Study
Traffic Data Collection To understand and study the existing conditions of the roadways within the study area, traffic counts were conducted along SR A1A from Marlin Avenue to Mickler Road, Palm Valley Road and Roscoe Boulevard. Intersection volume counts were conducted at the nineteen intersections. Traffic volume counts (72-hours) were recorded between the subject intersections on Mickler Road, Palm Valley Road and Solana Road/Roscoe Boulevard. Appendix A and B provide the 72-hour volume counts and turning movement volume counts, respectively. 2.2.1 Truck Average Volume The traffic truck volume was analyzed for each intersection for the AM and PM hours. The following table summarizes the average truck volume. T ABLE 1. AVERAGE T RUCK VOLUME SUMMARY Average Truck Volume
Intersection
AM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
SR A1A and Mickler Road SR A1A and Crossroad Lakes Drive/Oceans Edge Drive SR A1A and Plantation Drive SR A1A and Sawgrass Drive/Fairfield Blvd SR A1A and Palm Valley Road/Old CR 210 SR A1A and ATP Tour Boulevard SR A1A and PGA Tour Boulevard/Country Club Boulevard SR A1A and Sawgrass Village L'Atrium Circle SR A1A and Thousand Oaks Drive/Ocean Place SR A1A and Corona Road/Summerfield Drive SR A1A and Library Boulevard SR A1A and Solana Road SR A1A and Dolphin Boulevard SR A1A and Marlin Avenue Solana Road and Roscoe Boulevard Palm Valley Road and Roscoe Boulevard Palm Valley Road and Canal Boulevard/Possum Trot Road Palm Valley Road and Landrum Lane Mickler Road/Palm Valley Road Roundabout
15
PM 55 42 35 49 65 75 79 76 70 80 79 91 78 78 25 79 41 51 77
54 44 38 45 53 65 63 63 55 59 35 44 52 46 22 67 33 42 54
Ponte Vedra/Palm Valley Traffic Study
2.2.2 Crash Analysis The five-year crash data between 2011 and 2016 was analyzed at SR A1A from Marlin Avenue to Mickler Road, Palm Valley Road, Mickler Road, and Roscoe Boulevard/Solana Road. The crash data was obtained from Signal Four Analytics crash mapping and analysis system for the five-year period from July 1, 2011 through July 31, 2016. A total of 1,082 crashes occurred during this period in the study area. There were seven fatal crashes, 285 injury crashes and 790 crashes that involved damage to vehicle only. Rear end collisions were the most common crashes along SR A1A accounting for 52 percent of the total crashes. Table 2 shows the summary of crashes by severity within the study area. T ABLE 2. CRASH SEVERITY SUMMARY Crash Severity Fatal Injury Property Damage Only Total
2011 1 27 6 34
2012 1 60 96
2013 1 52 173
2014 2 47 172
157
226
221
2015
2016
1 54 205
1 45 138
260
184
Total 7 285 790 1,082
Of the seven fatal crashes, two crashes occurred where the driver was at fault. In the first, the driver failed to drive in a single lane and collided with a cyclist who was traveling in the bike lane. The second crash occurred due to a driver running a stop signal and striking a bicyclist in the bike lane. In the other two crashes, the pedestrian and the bicyclist were at fault. The pedestrians and the bicyclist failed to use a crosswalk and were struck by a vehicle. The other three fatal crashes are non-traffic and geometric related. During the five-year study period, of the crashes that were classified as specific crash events, the highest were rear end collisions (549 crashes) followed by left-turn collisions (103 crashes) and by off road collisions (96 crashes). Table 3 provides a summary of the types of crashes within the study area.
16
Ponte Vedra/Palm Valley Traffic Study
T ABLE 3. CRASH T YPES Harmful Event Backed Into Bicycle Head On Left Entering Left Leaving Left Rear Off Road Opposing Sideswipe Other Parked Vehicle Bicycle Pedestrian Rear End Angle Right/Through Rollover Sideswipe Single Vehicle Unknown Left Turn Right Turn Animal Total
2011 0 0 0 0 0 0 6 0 4 0 0 1 15 1 0 1 1 0 0 5 0 0 34
2012
2013
0 3 1 0 0 0 20 0 13 0 3 1 75 8 0 0 9 0 0 24 3 0 160
0 3 0 0 0 0 26 0 39 0 3 0 111 9 0 2 8 0 6 18 3 1 229
2014 0 4 2 0 0 0 12 0 39 0 4 1 115 9 0 0 11 0 3 22 1 2 225
2015 0 3 1 0 0 0 23 0 33 0 3 0 145 13 0 2 9 0 2 24 3 2 263
2016 0 3 2 0 0 0 15 0 30 0 3 1 103 2 0 2 7 0 0 15 3 1 187
Total 0 16 6 0 0 0 102 0 158 0 16 4 564 42 0 7 45 0 11 108 13 6 1098
Rear end collisions represent nearly 52 percent of the total crashes occurring along SR A1A between Marlin Avenue and Mickler Road, Palm Valley Road and Roscoe Boulevard study corridors for the five-year period analyzed. Eighty-five percent (549 crashes) of the rear end collisions occurred during daylight lighting conditions and approximately 77 percent occurred during “clear� weather conditions. The data indicates that the high occurrence of rear-end collisions may be due to peak periods of heavy congestion along the corridor. Table 4 provides a summary of these types of conditions.
17
Ponte Vedra/Palm Valley Traffic Study
T ABLE 4. CRASH CONDITIONS SUMMARY Conditions
Dark - Lighted Dark - Not Lighted Dawn Daylight Dusk Total Clear Cloudy Fog, Smog, Smoke Rain Unknown Total
2011
2012 2013 2014 Light Conditions
2015
2016
Total
3
6
7
6
7
4
33
0
4
4
5
10
4
27
0
0
1
0
0
0
1
10
61
94
95
127
93
480
2
4
5
9
0
2
22
75 111 115 Weather Conditions
144
103
563
15 10
52
91
89
108
81
431
3
16
11
17
22
16
85
0
1
1
1
0
0
3
2
6
8
8
14
5
43
0
0
0
0
0
0
0
15
75
111
115
144
102
562
Appendix C illustrates the locations of crashes along SR A1A from Marlin Avenue to Mickler Road, Palm Valley Road, Mickler Road, and Roscoe Boulevard/Solana Road corridors for each of the five study years from 2011 through 2016.
18
Ponte Vedra/Palm Valley Traffic Study
Existing Traffic Volumes and LOS 2.3.1 Volumes and LOS Existing traffic volumes on each intersection within the project study area are shown in Figure 2. Congestion currently exists on several of the major roadways within the study area including SR A1A from Marlin Avenue to Mickler Road, Palm Valley Road and Roscoe Boulevard. Intersections that experience the most delay today are: • • • •
SR A1A at Solana Road SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Mickler Road Palm Valley Road at Mickler Road
AM and PM peak hour turning movement volumes are shown in Figure 2. 2.3.2 Cut-Through Volumes Cut-through traffic volumes were accessed along the Palm Valley Road corridor. During the AM and PM peak period the cut-through volume is significant. About 50 percent of the northbound volume utilizes Palm Valley Road and does not continue to SR A1A via Mickler Road. Similarly, about 40 percent of southbound traffic utilizes Palm Valley Road in the AM and PM peak hours rather than continuing southbound on SR A1A. This volume also includes personal vehicles and trucks making trips to residences or places of business on Palm Valley Road.
19
Dolphin Blvd
SR A1A at Solana Rd
30 (27)
1013 (833)
! (
SR A1A at Sawgrass Dr
134 (90) 337 (647)
! (
172 (75) 505 (407)
Palm Valley Rd at Landrum Ln
! (
) (35 ) 44 7 6 ( 24 42) 5 5( 48
! (
22 (9) 791 (597)
) (51 31) 68 4 (4 41 4) 5 6(
! (
) (13 ) 10 (31 21 (92) 20
SR A1A at Crossroad Lakes Dr
61 (42) 1472 (1422) 59 (56) 57 (110) 1509 (1414) 11 (42)
85 (37) 0 (0) 49 (23)
Palm Valley Rd at Mickler Rd
493 (332) 67 (35) 49 (37)
! (
24 (6) 0 (0) 16 (5)
SR A1A at Mickler Rd
174 (183) 11 (19)
2) (34 2) 6 49 (30 8) 1 50 19 (3
! (
122 (139) 2 (5) 36 (27)
! (
77 (68) 7 (10)
884 (970) 42 (32) 960 (674) 268 (151)
SR A1A at Plantation Dr
53 (39) 1 (4) 10 (13)
104 (87) 596 (834)
50 (40) 648 (450) 0 (5)
32 (52) 628 (830) 122 (141)
1 (5) 0 (0) 1 (2)
Palm Valley Rd at Canal Blvd
235 (270) 1270 (1432) 34 (58) 177 (295) 85 (144)
12 (32) 697 (536) 10 (9)
617 (506)
SR A1A at Palm Valley Rd
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Existing Intersection Volumes
11 (29) 52 (56) 4 (18)
72 (41) 193 (207) 19 (9)
! (
94 (85) 1536 (1254)
! (
SR A1A at ATP Tour Blvd
379 (431) 176 (321) 21 (30)
443 (653)
778 (1111)
! (
242 (247) 1425 (1382) 18 (20)
35 (36) 422 (711) 1 (2)
SR A1A at PGA Tour Blvd
186 (227) 1136 (1620)
73 (71) 16 (44) 32 (24)
26 (26)
178 (71) 168 (72)
SR A1A at Sawgrass Village Dr ! (
100 (42) 5 (16) 47 (28)
110 (319) 4 (22) 33 (159)
32 (54) 563 (752) 7 (19)
25 (53) 1450 (1767) 104 (50) 83 (36) 0 (0) 60 (24)
SR A1A at Thousand Oaks Dr
! (
15 (65) 1705 (1706) 14 (30)
64 (67) 1236 (1478) 50 (74)
Solana Rd at North Roscoe Blvd
! (
67 (18) 0 (1) 29 (13)
! (
13 (20) 5 (0) 14 (14)
21 (15) 859 (636) 28 (30)
) (17 19 ) (13 16
SR A1A at Corona Rd
1
186 (133) 43 (67) 99 (85)
144 (108) 2 (4) 160 (146)
10 (17) 1645 (1629) 158 (158)
SR A1A at Library Blvd
0.5 Miles
595 (540) 96 (81) 79 (68)
7 (12) 1508 (1727) 77 (121)
! ( ! (
) ) 26 6 ( (351 1 5 2
67 (56) 0 (0) 37 (50)
34 (132) 1978 (2338)
! ( SR A1A at
(7) 11 1) (21 334
79 (113) 26 (34) 223 (329)
0.25
421 (565) 1481 (1554) 93 (136)
73 (111) 1571 (1500) 0 (1)
19 (18) 0 (0) 151 (177)
0
146 (124) 58 (34)
32 (15)
61 (25)
I 20 (58) 2278 (2104)
2 (2) 0 (0) 0 (0)
! (
17 (27) 2268 (2068)
67 (52) 1591 (1652) 1 (3)
11 (30)
1925 (2224)
SR A1A at Marlin Ave
Legend
! (
Signalized Intersection
! (
Unsignalized Intersection AM (PM) Volumes Figure 2
Page 20
Ponte Vedra/Palm Valley Traffic Study
Intersection Volumes and LOS Intersection operations were determined using traffic counts collected December 8, 2015 and December 9, 2015, in conjunction with the existing signal timing plans for the AM (7:45-8:45) and PM (4:45-5:45) analysis periods. The existing signal timings for each analysis were obtained from the Florida Department of Transportation and St. Johns County Board of County Commissioners Traffic and Transportation Department. Appendix E contains the signal timing plans. The information for each intersection was analyzed using SYNCHRO/SimTraffic package (V9.0). The SYNCHRO analysis reports are provided in Appendix E. Existing LOS was analyzed at the following intersections. • • • • • • • • • • • • • • • • • • •
SR A1A at Mickler Road SR A1A at Crossroad Lakes Drive/Oceans Edge Drive SR A1A at Plantation Drive SR A1A at Sawgrass Drive/Fairfield Boulevard SR A1A at Palm Valley Road/Old CR 210 SR A1A at ATP Tour Boulevard SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Sawgrass Village Drive/L’Atrium Circle SR A1A at Thousand Oaks Boulevard/Ocean Place SR A1A at Corona Road/Summerfield Drive SR A1A at Library Boulevard SR A1A at Solana Road SR A1A at Dolphin Boulevard SR A1A at Marlin Avenue Solana Road at North Roscoe Boulevard Palm Valley Road at Roscoe Boulevard Palm Valley Road at Canal Boulevard/Possum Trot Road Palm Valley Road at Landrum Lane Palm Valley Road at Mickler Road
A Level of Service (LOS) grade of A or B reflect free-flow conditions. A level of service grade of LOS B or LOS C reflect some congestion and slower speeds. A level of service grade of LOS E or LOS F reflects unstable and stopand-go conditions. The desire is to maintain a level of service of LOS D or better on all state roads and a level of service of LOS E or better on local roads. These grades reflect conditions where the additional delays caused by crashes are not considered.
21
Ponte Vedra/Palm Valley Traffic Study
T ABLE 5. E XISTING LEVEL OF SERVICE AND I NTERSECTION DELAY
Level of Service (LOS) and Intersection Delay (sec) Existing Intersection SR A1A and Marlin Avenue
SR A1A and Solana Road
SR A1A and Library Boulevard SR A1A and Corona Road/ Summerfield Drive SR A1A and Thousand Oaks Drive/ Ocean Place SR A1A and Sawgrass Village Drive/ L'Atrium Circle SR A1A and PGA Tour Boulevard/Country Club Boulevard SR A1A and ATP Tour Boulevard
SR A1A and Palm Valley Road/ Old CR 210
SR A1A and Mickler Road
Palm Valley Road and Mickler Road
LOS Standard Below LOS Standard Failing 22
AM Peak
PM Peak
B
B
19.4
17.1
D
D
51.6
45.7
B
B
16.7
11.2
B
B
16.3
16.9
B
A
17.3
5.8
B
C
19.5
33.8
C
D
22.8
37.8
C
C
20.3
24.2
C
C
21.9
20.8
D
C
39.6
28.7
F
F
68.6
78.6
Ponte Vedra/Palm Valley Traffic Study
With the continued development of residential, commercial and retail land uses within the study area, congestion on the major roadways will worsen. Multiple intersections currently operate at a deficient LOS in the AM and PM peak hours. The LOS at intersection of SR A1A at PGA Tour Boulevard/Country Club Boulevard is a LOS D during the afternoon peak hour. The LOS at the intersection of Palm Valley Road and Mickler Road is a LOS F during the morning and afternoon peak hours. The LOS at the intersection of SR A1A and Mickler Road is a LOS F during the morning and afternoon peak hours. At all other intersections, the LOS is a C or better.
23
Ponte Vedra/Palm Valley Traffic Study
Methodology Adopted Travel Demand Forecasting Model The Northeast Regional Planning Model (NERPM-AB) was used in assessing future demand for the Ponte Vedra study area. The modeling effort used in this evaluation was the 2040 Cost Feasible Plan network and contains all updated model input information which was available at the time of the preparation of this report.
Alternatives Analyzed The following alternatives were modeled. 3.2.1 Base Year A base year model of 2010 was developed and assignments were run to conduct reasonableness tests and to compare with the future No Build alternative to estimate growth rates. 3.2.2 No Build This alternative showed the anticipated traffic volumes and travel patterns if no additional improvements are made. Developments considered in the model include the Player’s Club Planned Unit Development near the intersection of Palm Valley Road and SR A1A. 3.2.3 Build Alternative This scenario included the widening of SR A1A from two to four lanes from Mickler Road to ATP Tour Boulevard and four to six lanes from ATP Tour Boulevard to Marlin Avenue. This includes the 2040 Cost Feasible Plan projects. The Build modeling scenario additionally provides for the widening of Mickler Road and the east-west segment of Palm Valley Road from two to four lanes between SR A1A and the Intracoastal Waterway bridge. Scenarios were also modeled for the widening of the north-south segment Palm Valley Road and for widening SR A1A from two to four lanes from Mickler Road to Corona Road and four to six lanes from Corona Road to Marlin Avenue. These scenarios were dismissed due to feasibility and operational impacts.
24
Ponte Vedra/Palm Valley Traffic Study
Design Traffic Volumes 3.3.1 Annual Average Daily Traffic Volumes Annual Average Daily Traffic (AADT) volumes were developed using the following procedure: 1. The growth rate between the 2010 Base Year and 2040 No Build Alternative assignments was determined. 2. Using the growth rates established in step 1, existing traffic count volumes (2015) were escalated to 2040 No Build volumes. Intersection only improvements utilized No Build volumes. 3. By following a similar procedure outlined in steps 1 and 2, the 2040 Build Alternative assignments were determined. In conducting the reasonableness check, areas with questionable results were analyzed as the maximum practical design.
25
Ponte Vedra/Palm Valley Traffic Study
No Build Alternative Intersection Peak Hour Volumes The intersection peak hour volumes for the No Build analysis were developed from the NERPM-AB model AADTs and refined to reflect capacity constraints and local termini. The growth rate from the 2010 to 2040 model was calculated and applied to the existing volumes to obtain the 2040 volumes. Turning movement percentages in the existing counts were assumed to remain the same in the No Build Years. Figure 3 shows the AM and PM peak hour intersection volumes for 2040 No Build.
26
SR A1A at Solana Rd
SR A1A at Sawgrass Dr
! (
220 (100) 660 (540)
Palm Valley Rd at Landrum Ln
SR A1A at Plantation Dr
! (
40 (10) 1300 (980)
) (40 ) 50 0 9 ( 30 20) 7 0( 64
) 0) (60 (125 0 9 50 11 (70) 10
! (
) (20 10 (40) ) 20 (110 20
80 (50) 1800 (1800) 70 (70)
100 (40) 0 (0) 50 (30)
Palm Valley Rd at Mickler Rd
2100 (1400) 280 (150) 200 (150)
! (
30 (10) 0 (0) 20 (10)
SR A1A at Mickler Rd
350 (350) 20 (30)
0) (45 0) 0 64 (59 0) 00 (5 10 20
! (
SR A1A at Crossroad Lakes Dr
! (
90 (80) 10 (10)
1700 (2000) 100 (20)
! (
70 (50) 10 (10) 10 (20)
20 (50) 1100 (880) 20 (10)
180 (120) 460 (900)
Palm Valley Rd at Canal Blvd
140 (160) 10 (10) 40 (30)
30 (20) 1200 (880) 40 (40)
60 (50) 860 (590) 10 (10)
40 (60) 780 (1000) 150 (170)
! (
200 (330) 100 (160)
Palm Valley Rd at Roscoe Blvd
4400 (4500)
Ponte Vedra/ Palm Valley 2040 No Build Intersection Volumes
90 (240) 430 (470) 30 (150)
110 (60) 280 (300) 30 (10)
40 (30) 1300 (1000)
10 (10) 10 (10) 10 (10)
SR A1A at Palm Valley Rd
110 (100)
690 (570)
SR A1A at ATP Tour Blvd
1800 (1500)
! (
290 (330) 1600 (1800) 40 (70)
SR A1A at PGA Tour Blvd
620 (700) 290 (520) 30 (50)
520 (770) 920 (1300)
290 (290) 1700 (1600) 20 (20)
! (
160 (470) 10 (30) 50 (230)
80 (150) 2000 (1900) 20 (60)
SR A1A at Sawgrass Village Dr ! (
110 (50) 10 (20) 50 (30)
220 (270) 1300 (1900)
! (
! (
30 (30)
40 (50) 550 (940) 10 (10)
SR A1A at Thousand Oaks Dr
50 (90) 920 (1200) 10 (30)
30 (70) 1800 (2200) 130 (60) 80 (80) 20 (50) 40 (30)
! (
80 (20) 0 (10) 30 (15)
20 (80) 2100 (2100) 20 (40)
90 (90) 1600 (2000) 70 (100)
90 (40) 0 (0) 70 (30)
20 (30) 10 (0) 20 (20)
140 (120) 830 (1200)
) (20 20 ) (20 20
SR A1A at Corona Rd
1
330 (240) 80 (120) 180 (150)
190 (140) 10 (10) 210 (200)
10 (20) 2000 (2000) 200 (200)
SR A1A at Library Blvd
0.5 Miles
760 (690) 120 (100) 100 (90)
10 (20) 1900 (2200) 100 (150)
! ( ! (
Solana Rd at North Roscoe Blvd
1800 (1100) 530 (240)
40 (160)
Dolphin Blvd
! (
250 (100) 220 (100)
2400 (2800)
! ( SR A1A at
) ) (40 10 (590 0 2 4
80 (70) 10 (10) 60 (70)
60 (40)
0.25
510 (680) 1800 (1900) 110 (160)
70 (30)
) (10 20 0) (36 560
130 (180) 40 (50) 360 (530)
0
160 (140)
40 (20)
90 (140) 2000 (1900) 0 (1)
20 (20) 0 (0) 170 (200)
I 20 (70) 2800 (2600)
3 (3) 0 (0) 0 (0)
! (
20 (30) 2800 (2500)
80 (70) 2000 (2100) 10 (10)
20 (40)
2400 (2700)
SR A1A at Marlin Ave
Legend
! ( ! (
Signalized Intersection Unsignalized Intersection AM (PM) Volumes
Figure 3 Page 27
Ponte Vedra/Palm Valley Traffic Study
Intersection LOS LOS analyses for the No Build Alternative during 2040 were performed using SYNCHRO/SimTraffic package (V9.0). The red and yellow timings were updated from the existing timings to reflect the current computation for yellow and red clearance interval based on ITE’s Traffic Engineering Handbook standards. The SYNCHRO analysis reports are provided in Appendix E. The following locations were analyzed. • • • • • • • • • • • • • • • • • • •
SR A1A at Mickler Road SR A1A at Crossroad Lakes Drive/Oceans Edge Drive SR A1A at Plantation Drive SR A1A at Sawgrass Drive/Fairfield Boulevard SR A1A at Palm Valley Road/Old CR 210 SR A1A at ATP Tour Boulevard SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Sawgrass Village Drive/L’Atrium Circle SR A1A at Thousand Oaks Boulevard/Ocean Place SR A1A at Corona Road/Summerfield Drive SR A1A at Library Boulevard SR A1A at Solana Road SR A1A at Dolphin Boulevard SR A1A at Marlin Avenue Solana Road at North Roscoe Boulevard Palm Valley Road at Roscoe Boulevard Palm Valley Road at Canal Boulevard/Possum Trot Road Palm Valley Road at Landrum Lane Palm Valley Road at Mickler Road
No Build Intersection LOS and delays are shown for 2040 in Table 6.
28
Ponte Vedra/Palm Valley Traffic Study
T ABLE 6. 2040 NO B UILD LEVEL OF SERVICE AND DELAYS
Level of Service (LOS) and Intersection Delay (sec) 2040 No Build Intersection SR A1A and Marlin Avenue
SR A1A and Solana Road
SR A1A and Library Boulevard
AM Peak
PM Peak
D
D
42.4
48.3
F
F
115.8
97.0
D
B
38.6
18.5 E
SR A1A and Corona Road/ Summerfield Drive
D 39.0
60.0
SR A1A and Thousand Oaks Drive/ Ocean Place
C
B
20.5
17.4
SR A1A and Sawgrass Village Drive/ L'Atrium Circle
C
E
33.4
68.7
SR A1A and PGA Tour Boulevard/Country Club Boulevard
D
SR A1A and ATP Tour Boulevard
SR A1A and Palm Valley Road/ Old CR 210
SR A1A and Mickler Road
50.5
LOS Standard Below LOS Standard Failing 29
132.9
C
C
22.8
27.4
C
C
25.0
21.8
F
F
1129.9 Palm Valley Road and Mickler Road
F
F 255.5
770.6 F 255.1
Ponte Vedra/Palm Valley Traffic Study
The LOS will worsen from the existing year through 2040. The intersections of Solana Road, Mickler Road at SR A1A are failing during the AM and PM peak hours by 2040. Palm Valley Road at Mickler Road are failing during the AM and PM peak period.
30
Ponte Vedra/Palm Valley Traffic Study
2040 Intersection Improvements Intersection Improvements Intersection improvements are proposed to alleviate existing congestion in the study area. Typical improvements evaluated include geometric and safety improvements and signal modification. Intersection improvements are proposed at seven locations: • • • • • • •
SR A1A at Mickler Road SR A1A at PGA Tour Boulevard SR A1A at Sawgrass Village Drive SR A1A at Solana Road SR A1A at Dolphin Boulevard Palm Valley Road at Mickler Road Palm Valley Road at Roscoe Boulevard
All signal timing plans for 2040 were adjusted and optimized per the timing needs of the recommended improvements. All unsignalized intersections should be monitored over time for applicable signal warrants and roundabout screening. A potential roundabout at Palm Valley Road at Canal Boulevard may meet LOS standards by 2040; however, right-of-way would need to be acquired at Canal Boulevard for construction. 5.1.1
SR A1A Improvements
5.1.1.1 Mickler Road The proposed configuration at Mickler Road at SR A1A includes improvements on the west leg. The eastbound lanes would be constructed as two left-turn lanes and one shared through/right-turn lane. Right-of-way acquisition is proposed along the north side of Mickler Road. 5.1.1.2 PGA Tour Boulevard The addition of a northbound left-turn lane is proposed at PGA Tour Boulevard. This improvement includes two receiving lanes on the west leg. It is also recommended to add an exclusive eastbound right-turn lane on the west leg to accommodate the heavy right-turns at the intersection. 5.1.1.3 Sawgrass Village Drive Improvements on the west leg of the intersection are proposed at Sawgrass Village Drive. The current lane configuration of one left-turn lane and one shared through/right-turn lane is proposed to change to two leftturn lanes, one through lane and a channelized right-turn lane. 5.1.1.4 Solana Road Improvements are proposed at Solana Road to enhance vehicular safety on the west leg of the intersection. Based on collisions on the west leg and the proximity of La Pasada Circle at Solana Rd intersection to the intersection at SR A1A, it is recommended to convert La Pasada Circle to a right-in/right-out entrance. In doing so, the eastbound left-turn storage will increase by 85-feet. Westbound vehicles on Solana Road wanting to access the shopping center adjacent to La Pasada Circle or vehicles exiting La Pasada Circle wanting to go westbound may use the two driveways west of La Pasada Circle. Vehicles may also use Library Boulevard to access La Pasada Circle. 31
Ponte Vedra/Palm Valley Traffic Study
5.1.1.5 Dolphin Boulevard During the AM and PM peak hours, the heavy traffic in the southbound direction on A1A blocks the intersection at Dolphins Boulevard. “Do Not Block� signs and pavement markings are recommended at this location to prevent delays for the eastbound and northbound left-turn traffic. Figure 4 through 8 show the improvements at the intersections on SR A1A.
32
N 0
10
SR A1 A
50
Feet
d Roa r e l ck Mi
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 4
MICKLER RD AT SR A1A
PAGE 33 kkeller
4/13/2017
7:28:16 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
N 0
PGA TOUR BOULEVARD
10
50
Feet
COUNTRY CLUB BOULEVARD
LEGEND
SRA1A
PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 5
PGA TOUR BLVD AT SR A1A
PAGE 34 kkeller
4/13/2017
7:30:18 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
SRA1A
N 0
10
50
Feet
Sawgrass Village Drive
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 6
SAWGRASS VILLAGE DR AT SR A1A
PAGE 35
kkeller
4/13/2017
7:31:06 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
SRA1A
N 10
50
Feet
Solana Road
e cl r LaPasadaCi
0
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 7
SOLANA RD AT SR A1A
PAGE 36 kkeller
4/13/2017
7:31:45 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
N 0
10
50
Feet
SRA1A
BL OCK
NOT
DO
ON I ERSECT NT I
DONOT BLOCK
d evar nBoul phi Dol
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 8
DOLPHIN BLVD AT SR A1A
PAGE 37 kkeller
4/13/2017
7:27:27 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
Ponte Vedra/Palm Valley Traffic Study
5.1.2
Palm Valley Road Improvements
5.1.2.1 Mickler Road Roundabout To improve capacity and traffic flow, it is proposed to convert the roundabout at Mickler Road at Palm Valley Road to a four-leg, signal-controlled intersection. The proposed intersection configuration is as follows: • • • •
Northbound Palm Valley Road: Two left-turn lanes, one through lane and one shared through/right lane Southbound Mickler Road: One left-turn lane, two through lanes and one right-turn lane Eastbound Palm Valley Road: One shared through/left-turn lane and two right-turn lanes Westbound Palm Valley Road: One shared left/through/right-turn lane
Right-of-way is proposed on the along the east side of Palm Valley Road. 5.1.2.2 Roscoe Boulevard The reconfiguration of Roscoe Boulevard at Palm Valley Road is proposed to enhance safety and traffic flow at the intersection. It is proposed to convert the northbound entrance from Roscoe Boulevard to right-in/right-out only. An off-ramp in the westbound direction will be constructed to allow westbound vehicles access to Roscoe Boulevard. An on-ramp on the north side of the intersection is proposed to allow vehicles to travel westbound on Palm Valley Road. The current median will be extended to the Intracoastal water way bridge, and a sidewalk is proposed along the north side of Palm Valley Road. Right-of-way is proposed for construction of the north side ramps and sidewalk. Figures 10 and 11 show the intersection improvements on Palm Valley Road.
38
LEGEND
eyRoad l m Val Pal
PAVEMENT WIDENING
N
EXISTING PAVEMENT CONCRETE SIDEWALK / 0
RAISED ISLAND
10
50
GRASS
Feet EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
Mi ckl erRoa d
d eyRoa l m Val Pal
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 9
PALM VALLEY RD AT MICKLER RD
PAGE 39
kkeller
4/13/2017
7:29:04 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
N S Roscoe Boul evard
0 20
100 Feet
oad eyR l al V m Pal
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 10
PALM VALLEY RD AT ROSCOE BLVD
PAGE 40
kkeller
4/13/2017
7:29:41 AM
J:\58404_PL014\Build0_11x17_Sheets.dgn
Ponte Vedra/Palm Valley Traffic Study
Intersection LOS LOS analyses for the 2040 intersection improvements were performed using SYNCHRO/SimTraffic package (V9.0). The red and yellow timings were updated from the existing timings to reflect the current computation for yellow and red clearance interval based on ITE’s Traffic Engineering Handbook standards. The SYNCHRO analysis reports are provided in Appendix E. The following locations were analyzed. • • • • • • • • • • • • • • • • • • •
SR A1A at Mickler Road SR A1A at Crossroad Lakes Drive/Oceans Edge Drive SR A1A at Plantation Drive SR A1A at Sawgrass Drive/Fairfield Boulevard SR A1A at Palm Valley Road/Old CR 210 SR A1A at ATP Tour Boulevard SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Sawgrass Village Drive/L’Atrium Circle SR A1A at Thousand Oaks Boulevard/Ocean Place SR A1A at Corona Road/Summerfield Drive SR A1A at Library Boulevard SR A1A at Solana Road SR A1A at Dolphin Boulevard SR A1A at Marlin Avenue Solana Road at North Roscoe Boulevard Palm Valley Road at Roscoe Boulevard Palm Valley Road at Canal Boulevard/Possum Trot Road Palm Valley Road at Landrum Lane Palm Valley Road at Mickler Road
2040 Intersection improvements LOS and delays are shown for 2040 in Table 7.
41
Ponte Vedra/Palm Valley Traffic Study
T ABLE 7. 2040 I NTERSECTION IMPROVEMENTS LEVEL OF SERVICE AND DELAYS
Level of Service (LOS) and Intersection Delay (sec) 2040 Intersection Improvements Intersection SR A1A and Marlin Avenue
SR A1A and Solana Road
AM Peak
PM Peak
C
D
29.9
39.3
F
F
119.8
SR A1A and Library Boulevard SR A1A and Corona Road/ Summerfield Drive SR A1A and Thousand Oaks Drive/ Ocean Place SR A1A and Sawgrass Village Drive/ L'Atrium Circle SR A1A and PGA Tour Boulevard/Country Club Boulevard SR A1A and ATP Tour Boulevard
SR A1A and Palm Valley Road/ Old CR 210
SR A1A and Mickler Road
B
C
19.7
26.1
D
E
38.0
64.9
C
B
20.3
14.9
C
D
30.2
39.4
C
D
31.9
49.1
C
C
21.1
31.5
C
B
32.7
18.6
F
F
292.3 Palm Valley Road and Mickler Road
LOS Standard Below LOS Standard Failing 42
138.3
326.3
E
E
77.9
58.7
Ponte Vedra/Palm Valley Traffic Study
2040 Build Alternative With the continued development of residential, commercial and retail land uses within the study area, congestion on the major roadways currently operating at a deficient LOS will increase. Intersection improvements alone will not be sufficient to meet the needs in the year 2040. Safety improvements and widening of roads in the study area are recommended. Improvements to meet the long-term needs within the corridor include: • • • • •
Widening SR A1A from two to four lanes from Mickler Road to ATP Tour Boulevard Widening SR A1A from four to six lanes from ATP Tour Boulevard to Marlin Avenue Widening Mickler Road and the east-west segment of Palm Valley Road from two to four lanes Constructing a new ramp from Palm Valley Road to Roscoe Boulevard in advance of the Intracoastal Waterway Bridge Constructing new sidewalk and bicycle lanes along Palm Valley Road
Figure 11 shows the locations that are being widened, and the peak hour volumes are shown in Figure 12. Intersection improvements with the widening are shown in Figures 13 to 19. Right-of-way acquisition due to widening is proposed at the following locations: • • • •
Palm Valley Road at Woodsdale Drive entrance The north side of Mickler Road, west of Cuello Court The east side of Palm Valley Road, south of Bay Cove Drive The northwest and northeast corners of the SR A1A at Solana Road intersection
43
SR A1A at Ponte Vedra Lakes Blvd
SR A1A at Solana Rd
I
SR A1A at Marsh Landing Pkwy SR A1A at Marlin Ave
0
0.4 0.8 Miles
1.6
SR A1A at Dolphin Blvd SR A1A at Library Blvd
Solana Rd at North Roscoe Blvd
SR A1A at Thousand Oaks Dr SR A1A at PGA Tour Blvd SR A1A at Palm Valley Rd
SR A1A at Corona Rd SR A1A at Sawgrass Village Dr
SR A1A at ATP Tour Blvd
SR A1A at Sawgrass Dr
Palm Valley Rd at Canal Blvd
SR A1A at Plantation Dr SR A1A at Crossroad Lakes Dr
Palm Valley Rd at Landrum Ln
SR A1A at Mickler Rd
Palm Valley Rd at Mickler Rd
Legend Intersection Improvements 4-lane widening
Palm Valley Rd at Roscoe Blvd
6-lane widening
Ponte Vedra Palm Valley SR A1A Widening Build Alternative
Figure 11 Page 44
SR A1A at Sawgrass Dr
210 (90) 620 (500)
Palm Valley Rd at Landrum Ln
( !
( !
80 (60) 1900 (1900) 80 (70)
100 (40) 0 (0) 50 (30)
Palm Valley Rd at Mickler Rd
2500 (1700) 340 (180) 250 (190)
( !
30 (10) 0 (0) 20 (10)
SR A1A at Mickler Rd
20 (30)
0) (42 0) 0 60 (65 0) 00 (5 10 20
0)
) (20 10 (40) ) 20 (110 20
1700 (2000)
50 (20) 1800 (1300)
) (40 ) 50 0 8 ( 30 70) 6 0( 60
100 (20)
( !
SR A1A at Crossroad Lakes Dr
( !
90 (80) 10 (10) ) (60 30 80 00 (1 12 (70) 10
( !
30 (70) 1600 (1200) 20 (20)
SR A1A at Plantation Dr
70 (50) 10 (10) 10 (20)
40 (30) 1500 (1100) 50 (50)
( !
140 (160) 10 (10) 40 (30)
Palm Valley Rd at Roscoe Blvd
4400 (4500)
Ponte Vedra/Palm Valley 2040 Build Intersection Volumes
50 (130) 200 (240) 20 (80)
110 (60) 290 (310) 30 (10)
( !
200 (330) 100 (160)
50 (70) 890 (1200) 170 (200)
60 (50) 800 (550) 10 (10)
160 (110) 410 (800)
Palm Valley Rd at Canal Blvd
320 (370) 1700 (1900) 50 (80)
SR A1A at Palm Valley Rd
130 (110)
40 (40) 1400 (1200)
SR A1A at ATP Tour Blvd
2000 (1700)
( !
690 (570)
10 (10) 10 (10) 10 (10)
350 (350)
SR A1A at PGA Tour Blvd
850 (960) 390 (720) 50 (70)
600 (880) 1000 (1500)
330 (330) 1900 (1900) 20 (30)
( !
160 (470) 10 (30) 50 (230)
80 (160) 2200 (2000) 20 (60)
SR A1A at Sawgrass Village Dr ! (
( !
30 (30)
40 (50) 520 (870) 10 (10)
( !
120 (50) 10 (20) 50 (30)
250 (310) 1500 (2200)
80 (80) 20 (50) 40 (30)
SR A1A at Thousand Oaks Dr
70 (120) 1300 (1700) 20 (40)
30 (70) 2000 (2400) 140 (70)
90 (40) 0 (0) 70 (30)
( !
80 (20) 0 (10) 30 (15)
20 (90) 2300 (2300) 20 (40)
90 (100) 1800 (2100) 70 (110)
Solana Rd at North Roscoe Blvd
20 (30) 10 (0) 20 (20)
180 (150) 1100 (1500)
) (20 20 ) (20 20
SR A1A at Corona Rd
190 (140) 10 (10) 210 (190)
10 (20) 2200 (2200) 210 (210)
SR A1A at Library Blvd
1
350 (250) 80 (130) 180 (160)
740 (680) 120 (100) 100 (90)
10 (20) 2000 (2300) 100 (160)
! ( ( !
0.5 Miles
510 (690) 1800 (1900) 110 (170)
SR A1A at Solana Rd
( !
1800 (1100) 530 (240)
40 (160)
Dolphin Blvd
( 20 0) (31 490
220 (90) 210 (90)
2400 (2900)
( SR A1A at !
) ) (40 10 (510 0 7 3
80 (70) 10 (10) 50 (60)
60 (40)
0.25
20 (70)
70 (30)
10)
130 (190) 40 (60) 370 (550)
0
160 (140)
40 (20)
100 (150) 2100 (2000) 0 (1)
20 (20) 0 (0) 170 (200)
I 2800 (2600)
3 (3) 0 (0) 0 (0)
( !
20 (30) 2800 (2600)
90 (70) 2100 (2200) 10 (10)
20 (40)
2400 (2800)
SR A1A at Marlin Ave
Legend
! ( ( !
Signalized Intersection Unsignalized Intersection
AM (PM) Volumes
Figure 12 Page 45
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT
N
CONCRETE SIDEWALK / RAISED ISLAND
0
10
50
GRASS
Feet
EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
SR A1 A
oad erR l k c Mi
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 13
MICKLER RD AT SR A1A - BUILD ALTERNATIVE
PAGE 46
kkeller
4/13/2017
7:35:59 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
N 0
10
50
Feet
PGA TOUR BOULEVARD
COUNTRY CLUB BOULEVARD
LEGEND
EXISTING PAVEMENT
SRA1A
SR A1A
PAVEMENT WIDENING
CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 14
PGA TOUR BLVD AT SR A1A - BUILD ALTERNATIVE
PAGE 47
kkeller
4/13/2017
7:39:31 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
N SRA1A
0
10
50
Feet
Sawgrass Village Drive
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 15
SAWGRASS VILLAGE DR AT SR A1A - BUILD ALTERNATIVE
PAGE 48
kkeller
4/13/2017
7:40:13 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
LEGEND PAVEMENT WIDENING
N 10
CONCRETE SIDEWALK /
50
RAISED ISLAND GRASS
Feet
EXISTING
SRA1A
RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
Solana Road
e cl r LaPasadaCi
0
EXISTING PAVEMENT
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 16
SOLANA RD AT SR A1A - BUILD ALTERNATIVE
PAGE 49
kkeller
4/13/2017
7:40:51 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
N 0
10
50
Feet
SRA1A
OCK BL
NOT
DO
ON I ERSECT NT I
DONOT BLOCK
LEGEND
d evar nBoul phi Dol
PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 17
DOLPHIN BLVD AT SR A1A - BUILD ALTERNATIVE
PAGE 50
kkeller
4/13/2017
7:35:08 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
eyRoad l m Val Pal
LEGEND PAVEMENT WIDENING
N
EXISTING PAVEMENT CONCRETE SIDEWALK /
0
10
50
RAISED ISLAND GRASS
Feet
EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
Mi ckl erRoa d
d eyRoa l m Val Pal
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 18
PALM VALLEY RD AT MICKLER RD - BUILD ALTERNATIVE
PAGE 51
kkeller
4/13/2017
7:37:27 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
0 20
S Roscoe Boul evard
d evar SRoscoeBoul
N 100 Feet
oad eyR l al mV Pal
oad eyR l al V m Pal
LEGEND PAVEMENT WIDENING
EXISTING PAVEMENT CONCRETE SIDEWALK / RAISED ISLAND GRASS EXISTING RIGHT -OF-WAY PROPOSED RIGHT -OF-WAY
PONTE VEDRA / PALM VALLEY TRAFFIC STUDY - INTERSECTION IMPROVEMENT
FIGURE 19
PALM VALLEY RD AT ROSCOE BLVD - BUILD ALTERNATIVE
PAGE 52
kkeller
4/13/2017
7:38:22 AM
J:\58404_PL014\Build1_11x17_Sheets.dgn
Ponte Vedra/Palm Valley Traffic Study
Intersection LOS LOS analyses for the 2040 Build Alternative were performed using SYNCHRO/SimTraffic package (V9.0). The red and yellow timings were updated from the existing timings to reflect the current computation for yellow and red clearance interval based on ITE’s Traffic Engineering Handbook standards. The SYNCHRO analysis reports are provided in Appendix E. Arterial analysis performed is located in Appendix F. The following locations were analyzed. • • • • • • • • • • • • • • • • • • •
SR A1A at Mickler Road SR A1A at Crossroad Lakes Drive/Oceans Edge Drive SR A1A at Plantation Drive SR A1A at Sawgrass Drive/Fairfield Boulevard SR A1A at Palm Valley Road/Old CR 210 SR A1A at ATP Tour Boulevard SR A1A at PGA Tour Boulevard/Country Club Boulevard SR A1A at Sawgrass Village Drive/L’Atrium Circle SR A1A at Thousand Oaks Boulevard/Ocean Place SR A1A at Corona Road/ Summerfield Drive SR A1A at Library Boulevard SR A1A at Solana Road SR A1A at Dolphin Boulevard SR A1A at Marlin Avenue Solana Road at North Roscoe Boulevard Palm Valley Road at Roscoe Boulevard Palm Valley Road at Canal Boulevard/Possum Trot Road Palm Valley Road at Landrum Lane Palm Valley Road at Mickler Road
2040 Build Alternative LOS and delays are shown for 2040 in Table 8.
53
Ponte Vedra/Palm Valley Traffic Study
T ABLE 8. 2040 BUILD ALTERNATIVE LEVEL OF SERVICE AND DELAYS
Level of Service (LOS) and Intersection Delay (sec) 2040 Build Alternative Intersection SR A1A and Marlin Avenue
SR A1A and Solana Road
SR A1A and Library Boulevard SR A1A and Corona Road/ Summerfield Drive SR A1A and Thousand Oaks Drive/ Ocean Place SR A1A and Sawgrass Village Drive/ L'Atrium Circle SR A1A and PGA Tour Boulevard/Country Club Boulevard SR A1A and ATP Tour Boulevard
SR A1A and Palm Valley Road/ Old CR 210
SR A1A and Mickler Road
AM Peak
PM Peak
C
D
22.2
44.3
E
E
64.9
66.8
B
B
14.2
18.9
B
C
18.8
23.0
C
B
21.7
10.0
C
C
23.2
33.6
C
C
25.9
30.9
C
C
20.5
26.0
C
B
28.8
19.6
F
F
277.4 Palm Valley Road and Mickler Road
LOS Standard Below LOS Standard Failing 54
146.3
C
C
21.6
25.8
Ponte Vedra/Palm Valley Traffic Study
Cost Estimate The anticipated cost for implementing the recommended project alternatives at the following study intersections is $3.4 million. The following table shows the total cost at each intersection. T ABLE 9. INTERSECTION IMPROVEMENTS Location
Total Cost
SR A1A at Mickler Road SR A1A at PGA Tour Boulevard SR A1A at Sawgrass Village Drive SR A1A at Solana Road SR A1A at Dolphin Boulevard Palm Valley Road at Roscoe Boulevard Mickler Road at Palm Valley Road GRAND TOTAL
$320,000 $320,000 $160,000 $50,000 $50,000 $ 1 million $ 1.5 million $3.4 million
These intersection improvements could be implemented individually or in combination to improve traffic flow in the area. However, the intersection improvements will not be sufficient to meet the needs in the year 2040. The alternatives to address the ultimate needs for the corridor are included in the following table. T ABLE 10. LONG TERM IMPROVEMENTS Location Mickler Road to ATP Tour Boulevard ATP Tour Boulevard to Marlin Avenue Marlin Avenue to JTB GRAND TOTAL
Total Cost $6.4 million $8.2 million $18 million $32.6 million
Right-of-way acquisition due to widening is proposed at the following locations; however, the cost of these impacts are not estimated. The total construction costs of the widening improvements are anticipated to be $32.6 million. • • • •
Palm Valley Road at Woodsdale Drive entrance The north side of Mickler Road, west of Cuello Court The east side of Palm Valley Road, south of Bay Cove Drive The northwest and northeast corners of the SR A1A at Solana Road intersection
The total construction costs of for the intersection improvements and the long-term improvements are anticipated to be $36 million. Cost estimate details are shown Appendix G.
55
Ponte Vedra/Palm Valley Traffic Study
Conclusion Current and future traffic concerns in the Ponte Vedra area prompted this traffic study. Continued traffic growth is anticipated within this study area over the design period for the project, 2040. Intersection improvements to alleviate todays traffic congestion are recommended at the following locations: •
•
•
•
•
•
•
SR A1A at Mickler Road o The proposed configuration at Mickler Road at SR A1A includes improvements on the west leg. The eastbound lanes would be constructed as two left-turn lanes and one shared through/rightturn lane. Right-of-way acquisition is proposed along the north side of Mickler Road. SR A1A at PGA Tour Boulevard o The addition of a northbound left turn lane is proposed at PGA Tour Boulevard. This improvement includes two receiving lanes on the west leg. Also recommended is the addition of an exclusive eastbound right-turn lane on the west leg to accommodate the heavy right-turns at the intersection. SR A1A at Sawgrass Village/L’Atrium Drive o Improvements on the west leg of the intersection are proposed at Sawgrass Village Drive. The current lane configuration of one left-turn lane and one shared through/right-turn lane is proposed to change to two left-turn lanes, one through lane and a channelized right-turn lane. SR A1A at Solana Road o Improvements are proposed at Solana Road to enhance vehicular safety on the west leg of the intersection. Based on collisions on the west leg and the proximity of La Pasada Circle at Solana Road intersection to the intersection at SR A1A, it is recommended to convert La Pasada Circle to a right-in/right-out entrance. In doing so, the eastbound left-turn storage will increase by 85feet. Westbound vehicles on Solana Road wanting to access the shopping center adjacent to La Pasada Circle or vehicles exiting La Pasada Circle wanting to go westbound may use the two driveways west of La Pasada Circle. Vehicles may also use Library Boulevard to access La Pasada Circle. SR A1A at Dolphin Boulevard o During the AM and PM peak hours, the heavy traffic in the southbound direction on A1A blocks the intersection at Dolphins Boulevard. “Do Not Block” signs and pavement markings are recommended at this location to prevent delays for the eastbound and northbound left-turn traffic. Palm Valley Road at Mickler Road o To improve capacity and traffic flow, it is recommended to convert the roundabout at Mickler Road at Palm Valley Road to a four-leg, signal-controlled intersection. Right-of-way acquisition is proposed on the along the east side of Palm Valley Road. Palm Valley Road at Roscoe Boulevard o The reconfiguration of Roscoe Boulevard at Palm Valley Road would enhance safety and traffic flow at the intersection. It is proposed to convert the northbound entrance from Roscoe Boulevard to right-in/right-out only. An off-ramp in the westbound direction will be constructed to allow westbound vehicles access to Roscoe Boulevard. An on-ramp on the north side of the intersection is proposed to allow vehicles to travel westbound on Palm Valley Road. The current 56
Ponte Vedra/Palm Valley Traffic Study
median will be extended to the Intracoastal water way bridge. Right-of-way acquisition is required for construction of the north side ramps and sidewalks. These intersection improvements could be constructed individually or in combination to improve traffic flow in the area. The total construction costs of these standalone intersection improvements are estimated to be $3.4 million. These improvements will not be sufficient to meet the needs in the year 2040. The alternatives to address the ultimate needs for the corridor include: • • • • •
Widening SR A1A from two to four lanes from Mickler Road to ATP Tour Boulevard Widening SR A1A from four to six lanes from ATP Tour Boulevard to J. Turner Butler Boulevard Widening Mickler Road and the east-west segment of Palm Valley Road from two to four lanes Constructing a new ramp from Palm Valley Road to Roscoe Boulevard in advance of the Intracoastal Waterway Bridge and Constructing new sidewalk and bicycle lanes along Palm Valley Road
Right-of-way acquisition due to widening is proposed at the following locations; however, the cost of these impacts are not estimated. • • • •
Palm Valley Road at Woodsdale Drive entrance The north side of Mickler Road, west of Cuello Court The east side of Palm Valley Road, south of Bay Cove Drive The northwest and northeast corners of the SR A1A at Solana Road intersection
The total construction costs of the widening improvements are anticipated to be $32.6 million.
57
Ponte Vedra/Palm Valley Traffic Study
APPENDIX A: 72 HOUR VOLUME COUNTS
58
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
1
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 05:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 05:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 05:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 06:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 4 0 0 0 0 0 0 0 0 0 0 0 0 13 06:15 0 7 3 0 1 1 0 0 0 0 0 0 0 0 0 12 06:30 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 06:45 0 10 6 1 0 0 0 0 0 0 0 0 0 0 0 17 07:00 0 22 8 2 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 0 47 20 3 1 1 0 0 0 0 0 0 0 0 0 72 07:15 0 21 14 0 0 0 0 1 0 0 0 0 0 0 0 36 07:30 0 38 13 0 0 1 0 0 0 0 0 0 0 0 0 52 07:45 0 56 24 0 1 1 0 0 0 0 0 0 0 0 0 82 08:00 0 61 24 3 2 2 0 0 0 0 0 0 0 0 0 92 -----------------------------------------------------------------------------------------------------------Hour Total 0 176 75 3 3 4 0 1 0 0 0 0 0 0 0 262 08:15 08:30 08:45 09:00
0 0 0 0
56 65 59 44
34 17 17 21
0 1 1 0
2 2 1 1
0 0 0 0
0 0 0 0
1 0 1 0
59
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 0 0
93 85 79 67
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
2
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 224 89 2 6 0 0 2 0 0 0 1 0 0 0 324 09:15 0 33 18 0 0 0 0 0 0 0 0 0 0 0 0 51 09:30 1 38 16 0 1 0 0 1 0 0 1 0 0 0 0 58 09:45 0 37 13 0 0 0 0 0 0 0 0 0 0 0 0 50 10:00 0 27 10 0 3 1 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------Hour Total 1 135 57 0 4 1 0 1 0 0 1 0 0 0 0 200 10:15 0 26 15 0 2 0 0 0 0 0 0 0 0 0 0 43 10:30 0 29 15 0 0 0 0 0 0 0 0 0 0 0 0 44 10:45 0 23 14 0 0 1 0 0 0 0 0 0 0 0 0 38 11:00 0 31 19 0 1 1 0 1 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 0 109 63 0 3 2 0 1 0 0 0 0 0 0 0 178 11:15 0 29 9 0 0 0 0 0 0 0 0 0 0 0 0 38 11:30 0 27 10 0 0 0 0 0 0 0 0 0 0 0 0 37 11:45 0 34 11 0 2 1 0 0 0 0 0 0 0 0 0 48 12:00 0 31 17 0 0 0 0 0 0 0 0 0 0 0 0 48 -----------------------------------------------------------------------------------------------------------Hour Total 0 121 47 0 2 1 0 0 0 0 0 0 0 0 0 171 12:15 0 17 20 0 1 0 0 1 0 0 0 0 0 0 0 39 12:30 0 27 10 0 1 0 0 0 0 0 0 0 0 0 0 38 12:45 1 26 12 0 2 0 0 0 0 0 0 0 0 0 0 41 13:00 1 26 14 0 1 1 0 0 0 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 2 96 56 0 5 1 0 1 0 0 0 0 0 0 0 161 13:15 0 32 10 0 0 1 0 0 0 0 0 0 0 0 0 43 13:30 1 35 12 0 1 1 0 0 0 0 0 0 0 0 0 50 13:45 0 41 14 0 1 0 0 0 0 0 0 0 0 0 0 56 14:00 0 29 17 0 0 1 0 1 0 0 0 0 0 0 0 48 -----------------------------------------------------------------------------------------------------------Hour Total 1 137 53 0 2 3 0 1 0 0 0 0 0 0 0 197 14:15 1 49 7 0 0 0 0 0 0 0 0 0 0 0 0 57 14:30 1 46 17 5 2 1 0 0 0 0 0 0 0 0 0 72 14:45 0 32 12 0 1 1 0 0 0 0 0 0 0 0 0 46 15:00 0 28 8 0 0 1 0 0 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------Hour Total 2 155 44 5 3 3 0 0 0 0 0 0 0 0 0 212 15:15 0 42 7 0 0 0 0 0 0 0 0 0 0 0 0 49 15:30 0 51 10 1 0 1 0 0 0 0 0 0 0 0 0 63 15:45 0 50 15 0 0 0 0 0 0 0 0 0 0 0 0 65 16:00 0 36 16 0 1 0 0 0 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 0 179 48 1 1 1 0 0 0 0 0 0 0 0 0 230 16:15 2 63 12 2 0 0 0 1 0 0 0 0 1 0 0 81 16:30 1 55 19 2 1 0 0 0 0 0 0 0 0 0 0 78 16:45 0 53 9 0 0 0 0 0 0 0 0 0 0 0 0 62 17:00 0 41 9 1 2 0 0 1 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 3 212 49 5 3 0 0 2 0 0 0 0 1 0 0 275
60
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
3
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 28 16 0 0 0 0 0 0 0 0 0 0 0 0 44 17:30 2 47 17 0 0 0 0 0 0 0 0 0 0 0 0 66 17:45 0 43 15 0 2 0 0 0 0 0 0 0 0 0 0 60 18:00 0 35 12 0 0 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 2 153 60 0 2 0 0 0 0 0 0 0 0 0 0 217 18:15 0 42 15 0 0 0 0 0 0 0 0 0 0 0 0 57 18:30 0 32 5 0 0 0 0 0 0 0 0 0 0 0 0 37 18:45 0 27 3 0 0 0 0 0 0 0 0 0 0 0 0 30 19:00 1 36 13 0 0 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 1 137 36 0 0 0 0 0 0 0 0 0 0 0 0 174 19:15 0 34 12 0 0 0 0 0 0 0 0 0 0 0 0 46 19:30 1 29 7 0 0 0 0 0 0 0 0 0 0 0 0 37 19:45 0 40 8 0 0 0 0 1 0 0 0 0 0 0 0 49 20:00 1 31 3 0 0 0 0 0 0 0 0 0 0 0 0 35 -----------------------------------------------------------------------------------------------------------Hour Total 2 134 30 0 0 0 0 1 0 0 0 0 0 0 0 167 20:15 0 42 8 0 0 0 0 0 0 0 0 0 0 0 0 50 20:30 0 68 10 0 0 0 0 0 0 0 0 0 0 0 0 78 20:45 0 30 6 0 1 0 0 0 0 0 0 0 0 0 0 37 21:00 0 20 7 0 0 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 160 31 0 1 0 0 0 0 0 0 0 0 0 0 192 21:15 0 18 1 0 0 0 0 0 0 0 0 0 0 0 0 19 21:30 0 16 2 0 0 0 0 0 0 0 0 0 0 0 0 18 21:45 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 22:00 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 54 4 0 0 0 0 0 0 0 0 0 0 0 0 58 22:15 0 13 1 0 0 0 0 0 0 0 0 0 0 0 0 14 22:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 22:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 23:00 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 29 5 0 0 0 0 0 0 0 0 0 0 0 0 34 23:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 10 0 0 1 0 0 0 0 0 0 0 0 0 0 11 24:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 17 1 0 1 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------DAY TOTAL 15 2294 775 19 37 17 0 10 0 0 1 1 1 0 0 3170 PERCENTS 0.5% 72.4% 24.5% 0.6% 1.2% 0.5% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks PM Times PM Peaks
08:00 07:45 08:00 07:45 07:15 241 99 5 7 4
08:00 2
12:45 16:15 15:45 13:45 12:15 12:45 3 212 62 5 5 3
16:15 2
1
08:45 08:15 1 1
07:45 352 15:30 1
61
15:45 277
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
4
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 01:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 05:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 05:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 06:00 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 5 0 0 0 0 0 0 0 0 0 0 0 0 15 06:15 0 7 3 0 1 0 0 0 0 0 0 0 0 0 0 11 06:30 0 6 5 0 0 0 0 0 0 0 0 0 0 0 0 11 06:45 0 13 2 0 1 0 0 0 0 0 0 0 0 0 0 16 07:00 0 19 9 2 0 1 0 0 0 0 0 0 0 0 0 31 -----------------------------------------------------------------------------------------------------------Hour Total 0 45 19 2 2 1 0 0 0 0 0 0 0 0 0 69 07:15 0 32 11 0 1 3 0 0 0 0 0 0 0 0 0 47 07:30 0 33 14 0 0 0 0 1 1 0 0 0 0 0 0 49 07:45 0 67 21 1 2 1 0 0 0 0 0 0 0 0 0 92 08:00 0 51 20 1 1 0 0 0 0 0 0 0 0 0 0 73 -----------------------------------------------------------------------------------------------------------Hour Total 0 183 66 2 4 4 0 1 1 0 0 0 0 0 0 261 08:15 08:30 08:45 09:00
0 0 0 0
58 64 51 51
28 25 14 11
0 1 2 0
1 0 2 0
0 0 0 1
0 0 0 0
0 0 0 0
62
0 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
87 90 70 63
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
5
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 224 78 3 3 1 0 0 0 0 0 1 0 0 0 310 09:15 0 42 15 0 1 1 0 0 0 0 0 0 0 0 0 59 09:30 0 34 9 0 2 1 0 0 0 0 0 0 0 0 0 46 09:45 0 37 19 0 1 0 0 0 0 0 0 0 0 0 0 57 10:00 0 30 14 0 3 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 0 143 57 0 7 2 0 0 0 0 0 0 0 0 0 209 10:15 1 31 10 0 0 1 0 1 0 0 0 0 0 0 0 44 10:30 0 18 9 0 0 0 0 0 0 0 0 0 0 0 0 27 10:45 0 28 8 0 0 2 0 0 0 0 0 0 0 0 0 38 11:00 1 36 14 0 0 1 0 1 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 2 113 41 0 0 4 0 2 0 0 0 0 0 0 0 162 11:15 0 27 11 0 0 0 0 0 0 0 0 0 0 0 0 38 11:30 0 20 12 0 0 2 0 0 0 0 0 0 0 0 0 34 11:45 0 26 20 0 0 0 0 0 0 0 0 0 0 0 0 46 12:00 0 26 11 0 2 0 0 0 1 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 0 99 54 0 2 2 0 0 1 0 0 0 0 0 0 158 12:15 0 34 19 0 1 0 0 1 1 0 0 0 0 0 0 56 12:30 0 27 10 0 1 0 0 0 0 0 0 0 0 0 0 38 12:45 0 25 18 0 1 0 0 0 0 0 0 0 0 0 0 44 13:00 0 36 15 0 1 1 0 0 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 0 122 62 0 4 1 0 1 1 0 0 0 0 0 0 191 13:15 1 45 15 0 0 1 0 0 0 0 0 0 0 0 0 62 13:30 0 50 13 2 3 2 0 0 0 0 0 0 0 0 0 70 13:45 0 43 10 0 0 1 0 1 0 0 0 0 0 0 0 55 14:00 0 27 7 0 0 1 0 0 1 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 1 165 45 2 3 5 0 1 1 0 0 0 0 0 0 223 14:15 3 38 14 0 0 1 0 0 0 0 0 0 0 0 0 56 14:30 0 41 8 1 1 0 0 0 0 0 0 0 0 0 0 51 14:45 0 43 11 0 2 0 0 1 0 0 0 0 0 0 0 57 15:00 0 45 17 0 1 1 0 0 0 0 0 0 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 3 167 50 1 4 2 0 1 0 0 0 0 0 0 0 228 15:15 1 69 9 2 0 1 0 0 0 0 0 0 0 0 0 82 15:30 1 51 15 1 2 2 0 0 0 0 0 0 0 0 0 72 15:45 2 42 7 0 0 1 0 0 0 0 0 0 0 0 0 52 16:00 1 38 13 1 0 1 0 1 0 0 0 0 0 0 0 55 -----------------------------------------------------------------------------------------------------------Hour Total 5 200 44 4 2 5 0 1 0 0 0 0 0 0 0 261 16:15 0 40 17 0 0 0 0 0 0 0 0 0 0 0 0 57 16:30 0 70 19 0 1 0 0 0 0 0 0 0 0 0 0 90 16:45 0 38 15 0 0 0 0 1 0 0 0 0 0 0 0 54 17:00 0 42 19 0 0 0 0 0 0 0 0 0 0 0 0 61 -----------------------------------------------------------------------------------------------------------Hour Total 0 190 70 0 1 0 0 1 0 0 0 0 0 0 0 262
63
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
6
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 37 15 0 0 0 0 0 0 0 0 0 0 0 0 52 17:30 0 41 12 0 0 0 0 0 0 0 0 0 0 0 0 53 17:45 1 34 17 0 2 0 0 0 0 0 0 0 0 0 0 54 18:00 0 51 15 0 0 0 0 0 0 0 0 0 0 0 0 66 -----------------------------------------------------------------------------------------------------------Hour Total 1 163 59 0 2 0 0 0 0 0 0 0 0 0 0 225 18:15 0 46 12 0 0 0 0 0 0 0 0 0 0 0 0 58 18:30 0 49 10 0 0 0 0 0 0 0 0 0 0 0 0 59 18:45 0 38 8 0 0 0 0 0 0 0 0 0 0 0 0 46 19:00 0 31 10 0 0 0 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------Hour Total 0 164 40 0 0 0 0 0 0 0 0 0 0 0 0 204 19:15 0 43 8 0 0 0 0 0 0 0 0 0 0 0 0 51 19:30 0 26 10 0 1 0 0 0 0 0 0 0 0 0 0 37 19:45 1 22 3 0 0 0 0 0 0 0 0 0 0 0 0 26 20:00 0 19 7 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 1 110 28 0 1 0 0 0 0 0 0 0 0 0 0 140 20:15 0 29 2 0 0 0 0 0 0 0 0 0 0 0 0 31 20:30 0 18 2 0 0 0 0 0 0 0 0 0 0 0 0 20 20:45 0 23 5 0 0 0 0 0 0 0 0 0 0 0 0 28 21:00 0 29 3 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 0 99 12 0 0 0 0 0 0 0 0 0 0 0 0 111 21:15 0 22 5 0 0 0 0 0 0 0 0 0 0 0 0 27 21:30 0 19 3 0 0 0 0 0 0 0 0 0 0 0 0 22 21:45 0 16 1 0 0 0 0 0 0 0 0 0 0 0 0 17 22:00 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 71 9 0 0 0 0 0 0 0 0 0 0 0 0 80 22:15 0 14 1 0 0 0 0 0 0 0 0 0 0 0 0 15 22:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 22:45 1 7 0 0 0 0 0 0 0 0 0 0 0 0 0 8 23:00 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 1 41 3 0 0 0 0 0 0 0 0 0 0 0 0 45 23:15 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 23:30 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 23:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 24:00 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 1 14 4 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------DAY TOTAL 15 2340 750 14 35 27 0 8 4 0 0 1 0 0 0 3194 PERCENTS 0.5% 73.3% 23.5% 0.5% 1.1% 0.8% 0.0% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks
10:15 07:45 07:45 08:00 09:15 07:00 2 240 94 4 7 5
10:15 06:45 2 1
PM Times PM Peaks
15:15 14:45 16:15 15:15 12:45 13:00 5 208 70 4 5 5
16:00 12:15 2 1
64
08:00 1
07:45 342 14:45 275
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
7
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 02:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 05:15 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 05:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 06:00 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 7 0 0 0 0 0 0 0 0 0 0 0 0 18 06:15 0 3 2 0 1 0 0 0 0 0 0 0 0 0 0 6 06:30 0 11 2 0 0 1 0 0 0 0 0 0 0 0 0 14 06:45 0 15 5 1 1 0 0 0 0 0 0 0 0 0 0 22 07:00 0 19 12 1 0 0 0 0 1 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 0 48 21 2 2 1 0 0 1 0 0 0 0 0 0 75 07:15 0 24 9 0 0 0 0 0 0 0 0 0 0 0 0 33 07:30 1 41 19 0 0 2 0 1 0 0 0 0 0 0 0 64 07:45 0 67 16 2 3 0 0 1 0 0 0 0 0 0 0 89 08:00 0 63 14 1 0 0 0 1 0 0 0 0 0 0 0 79 -----------------------------------------------------------------------------------------------------------Hour Total 1 195 58 3 3 2 0 3 0 0 0 0 0 0 0 265 08:15 08:30 08:45 09:00
2 0 0 1
41 69 47 41
20 21 18 16
0 2 1 0
2 0 1 1
1 0 2 0
0 0 0 0
0 0 0 0
65
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
66 92 69 59
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
8
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 3 198 75 3 4 3 0 0 0 0 0 0 0 0 0 286 09:15 0 50 23 0 1 1 0 0 0 0 0 0 0 0 0 75 09:30 0 39 13 0 2 1 0 1 0 0 0 0 0 0 0 56 09:45 0 25 14 0 0 0 0 0 0 0 0 0 0 0 0 39 10:00 0 23 9 0 1 0 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 0 137 59 0 4 2 0 1 0 0 0 0 0 0 0 203 10:15 0 32 12 0 1 0 0 0 0 0 0 0 0 0 0 45 10:30 0 23 15 0 1 0 0 0 0 0 0 0 0 0 0 39 10:45 0 40 17 0 0 1 0 0 0 0 0 0 0 0 0 58 11:00 1 36 8 0 1 0 0 0 0 0 0 0 0 0 0 46 -----------------------------------------------------------------------------------------------------------Hour Total 1 131 52 0 3 1 0 0 0 0 0 0 0 0 0 188 11:15 1 25 6 0 0 0 0 0 0 0 1 0 0 0 0 33 11:30 0 27 11 0 0 2 0 1 0 0 0 0 0 0 0 41 11:45 0 18 16 0 0 0 0 0 1 0 0 0 0 0 0 35 12:00 0 38 17 0 0 0 0 1 0 0 0 0 0 0 0 56 -----------------------------------------------------------------------------------------------------------Hour Total 1 108 50 0 0 2 0 2 1 0 1 0 0 0 0 165 12:15 0 33 12 0 1 1 0 0 0 0 0 0 0 0 0 47 12:30 0 23 11 0 0 0 0 0 0 0 0 0 0 0 0 34 12:45 2 32 17 0 1 0 0 0 0 0 0 0 0 0 0 52 13:00 0 34 14 0 2 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 2 122 54 0 4 1 0 0 0 0 0 0 0 0 0 183 13:15 0 36 10 0 0 1 0 1 0 0 0 0 0 0 0 48 13:30 0 35 10 0 0 0 0 0 1 0 0 0 0 0 0 46 13:45 1 24 19 0 2 0 0 0 0 0 0 0 0 0 0 46 14:00 0 36 9 0 0 1 0 0 0 0 0 0 0 0 0 46 -----------------------------------------------------------------------------------------------------------Hour Total 1 131 48 0 2 2 0 1 1 0 0 0 0 0 0 186 14:15 1 41 17 0 1 0 0 0 0 0 0 0 0 0 0 60 14:30 1 48 17 4 1 0 0 0 0 0 0 0 0 0 0 71 14:45 0 34 8 1 1 0 0 0 0 0 0 0 0 0 0 44 15:00 0 46 8 0 1 0 0 0 0 0 0 0 0 0 0 55 -----------------------------------------------------------------------------------------------------------Hour Total 2 169 50 5 4 0 0 0 0 0 0 0 0 0 0 230 15:15 2 53 14 0 0 0 0 0 0 0 0 0 0 0 0 69 15:30 0 41 18 1 0 0 0 0 0 0 0 0 0 0 0 60 15:45 0 30 9 0 0 0 0 0 0 0 0 0 0 0 0 39 16:00 0 38 16 0 0 0 0 0 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 2 162 57 1 0 0 0 0 0 0 0 0 0 0 0 222 16:15 1 77 14 3 1 1 0 0 0 0 0 0 0 0 0 97 16:30 3 46 16 1 1 0 0 0 0 0 0 0 0 0 0 67 16:45 1 35 17 0 0 0 0 0 0 0 0 0 0 0 0 53 17:00 0 47 10 1 0 0 0 0 0 0 0 0 0 0 0 58 -----------------------------------------------------------------------------------------------------------Hour Total 5 205 57 5 2 1 0 0 0 0 0 0 0 0 0 275
66
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1A Site ID: 000000003552 Location: N. Roscoe NB Direction: NORTH Lane: 1 TIME
1
2
Page:
9
File: D0823002.prn City: 16-221 AW Max County: 30.21177, -81.40889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 48 13 0 0 0 0 0 0 0 0 0 0 0 0 61 17:30 0 59 10 0 0 0 0 0 0 0 0 0 0 0 0 69 17:45 0 43 11 0 1 0 0 0 0 0 0 0 0 0 0 55 18:00 0 41 13 0 0 0 0 0 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 0 191 47 0 1 0 0 0 0 0 0 0 0 0 0 239 18:15 1 39 13 0 0 0 0 0 0 0 0 0 0 0 0 53 18:30 0 44 9 0 0 0 0 0 0 0 0 0 0 0 0 53 18:45 0 41 10 0 0 0 0 0 0 0 0 0 0 0 0 51 19:00 0 28 12 0 0 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 1 152 44 0 0 0 0 0 0 0 0 0 0 0 0 197 19:15 0 36 11 0 0 0 0 0 0 0 0 0 0 0 0 47 19:30 1 39 10 0 0 0 0 0 0 0 0 0 0 0 0 50 19:45 0 24 5 0 0 0 0 1 0 0 0 0 0 0 0 30 20:00 1 29 5 0 0 0 0 0 0 0 0 0 0 0 0 35 -----------------------------------------------------------------------------------------------------------Hour Total 2 128 31 0 0 0 0 1 0 0 0 0 0 0 0 162 20:15 0 35 1 0 0 0 0 0 0 0 0 0 0 0 0 36 20:30 0 36 7 0 0 0 0 0 0 0 0 0 0 0 0 43 20:45 0 41 8 0 0 0 0 0 0 0 0 0 0 0 0 49 21:00 0 23 5 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 135 21 0 0 0 0 0 0 0 0 0 0 0 0 156 21:15 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 21:30 0 31 4 0 0 0 0 0 0 0 0 0 0 0 0 35 21:45 1 14 7 0 0 0 0 0 0 0 0 0 0 0 0 22 22:00 1 10 1 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 2 66 13 0 0 0 0 0 0 0 0 0 0 0 0 81 22:15 1 8 2 0 0 0 0 0 0 0 0 0 0 0 0 11 22:30 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 22:45 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 20 4 0 0 0 0 0 0 0 0 0 0 0 0 25 23:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 23:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 23:45 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 24:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 22 2 0 0 0 0 0 0 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------DAY TOTAL 24 2345 755 19 29 15 0 8 3 0 1 0 0 0 0 3199 PERCENTS 0.8% 73.4% 23.7% 0.6% 0.9% 0.4% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.6% Trucks & Buses 2.3% AM Times AM Peaks
07:30 07:45 08:30 07:45 07:30 08:45 3 240 78 5 5 4
07:15 06:15 3 1
PM Times PM Peaks
16:00 16:15 16:00 14:00 12:15 13:15 5 205 63 5 4 2
12:30 12:45 1 1
10:30 1
07:45 326 16:15 275
=================================================================================================================== GRAND TOTAL 54 2280 101 0 7 2 1 0 6979 52 59 26 0 2 0 9563 PERCENTS 0.6% 73.0% 23.9% 0.6% 1.1% 0.6% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
67
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
Page:
1
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 06:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 06:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 06:45 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 07:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 07:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 07:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 07:45 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 08:00 0 7 1 1 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 21 6 1 0 0 0 0 0 0 0 0 0 0 0 28 08:15 08:30 08:45 09:00
0 0 0 0
9 5 6 3
2 2 2 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
68
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
11 7 8 3
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
2
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 23 6 0 0 0 0 0 0 0 0 0 0 0 0 29 09:15 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 09:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 09:45 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 6 10:00 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 2 11 2 0 0 0 0 0 0 0 0 0 0 0 0 15 10:15 1 4 1 0 0 0 0 0 0 0 0 0 0 0 0 6 10:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 10:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 11:00 1 4 3 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 2 14 5 0 0 0 0 0 0 0 0 0 0 0 0 21 11:15 0 0 5 0 0 0 0 0 0 0 0 0 0 0 0 5 11:30 0 2 4 0 1 0 0 0 0 0 0 0 0 0 0 7 11:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 12:00 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 10 0 1 0 0 0 0 0 0 0 0 0 0 21 12:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 12:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 12:45 0 3 4 0 0 0 0 0 0 0 0 0 0 0 0 7 13:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 6 0 0 0 0 0 0 0 0 0 0 0 0 24 13:15 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 13:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 13:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14 14:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 14:30 0 5 1 0 0 0 0 1 0 0 0 0 0 0 0 7 14:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 15:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 5 0 0 0 0 1 0 0 0 0 0 0 0 18 15:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 15:30 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 2 15:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 16:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 3 1 0 0 0 0 0 0 0 0 0 0 0 10 16:15 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 4 16:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 16:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 17:00 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 1 12 3 0 0 0 0 0 0 0 0 0 0 0 0 16
69
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
3
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 17:30 0 8 5 0 1 0 0 0 0 0 0 0 0 0 0 14 17:45 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 18:00 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 1 18 10 0 1 0 0 0 0 0 0 0 0 0 0 30 18:15 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 18:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 18:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 19:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 3 0 0 0 0 0 0 0 0 0 0 0 0 15 19:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 19:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 19:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 20:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 20:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 20:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 20:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 21:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 21:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------DAY TOTAL 6 191 67 2 2 0 0 1 0 0 0 0 0 0 0 269 PERCENTS 2.3% 71.1% 24.9% 0.7% 0.7% 0.0% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 98.1% Trucks & Buses 1.8% AM Times AM Peaks
09:30 07:45 10:45 07:15 10:45 3 27 13 1 1
PM Times PM Peaks
15:30 17:00 17:30 14:45 16:45 1 21 11 1 1
07:45 35 13:45 1
17:00 31
70
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
Page:
4
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06:00 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 06:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 06:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 06:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 07:00 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 2 0 0 0 0 0 0 0 0 0 0 0 0 12 07:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 07:30 0 3 1 0 0 3 0 0 1 0 0 0 0 0 0 8 07:45 1 5 2 0 0 1 0 0 0 0 0 0 0 0 0 9 08:00 0 6 0 1 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 1 16 3 1 0 4 0 0 1 0 0 0 0 0 0 26 08:15 08:30 08:45 09:00
0 0 0 0
6 8 3 3
1 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
71
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
7 8 5 3
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
5
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 20 2 0 0 0 0 1 0 0 0 0 0 0 0 23 09:15 0 4 2 0 1 0 0 0 0 0 0 0 0 0 0 7 09:30 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 09:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 10:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 6 0 1 0 0 0 0 0 0 0 0 0 0 15 10:15 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2 10:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 10:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 11:00 0 3 7 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 10 0 1 0 0 0 0 0 0 0 0 0 0 20 11:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 11:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 11:45 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 3 12:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 4 0 0 1 0 0 0 0 0 0 0 0 0 15 12:15 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 12:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 12:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 13:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 13:15 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 13:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 13:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 14:00 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 16 7 0 0 0 0 0 0 0 0 0 0 0 0 23 14:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 14:30 0 7 2 0 1 0 1 0 0 0 0 0 0 0 0 11 14:45 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 6 15:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 13 6 0 1 0 1 0 0 0 0 0 0 0 0 22 15:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 15:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 15:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 16:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 16:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 16:45 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 17:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15
72
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
6
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 1 5 0 0 0 0 0 0 0 0 0 0 0 0 6 17:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 17:45 1 5 2 0 0 0 0 0 0 0 0 0 0 0 0 8 18:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 1 12 8 0 0 0 0 0 0 0 0 0 0 0 0 21 18:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 18:30 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 18:45 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 19:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14 19:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 19:30 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 5 19:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 20:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 1 12 1 0 0 0 0 0 0 0 0 0 0 0 0 14 20:15 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 20:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 20:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 21:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 21:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 22:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------DAY TOTAL 4 177 70 1 3 5 1 1 1 0 0 0 0 0 0 263 PERCENTS 1.6% 67.4% 26.7% 0.4% 1.1% 1.9% 0.3% 0.3% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 95.4% Trucks & Buses 4.5% AM Times AM Peaks
07:00 07:45 10:15 07:15 08:30 07:00 1 25 10 1 1 4
PM Times PM Peaks
14:00 12:45 14:00 1 16 8
13:45 1
08:00 06:45 1 1 13:45 1
07:30 31 14:00 25
73
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
Page:
7
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 06:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 06:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 06:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 07:00 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 07:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 07:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 07:45 0 5 0 0 0 1 0 0 0 0 0 0 0 0 0 6 08:00 0 8 3 1 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 22 5 1 0 1 0 0 0 0 0 0 0 0 0 29 08:15 08:30 08:45 09:00
0 0 0 0
4 9 3 2
1 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
74
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
5 9 4 2
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
8
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 18 2 0 0 0 0 0 0 0 0 0 0 0 0 20 09:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 09:30 0 5 1 0 1 1 0 0 0 0 0 0 0 0 0 8 09:45 0 2 2 0 1 0 0 0 0 0 0 0 0 0 0 5 10:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 4 0 2 1 0 0 0 0 0 0 0 0 0 17 10:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 10:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 0 2 2 0 1 0 0 0 0 0 0 0 0 0 0 5 11:00 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 4 0 1 0 0 0 0 0 0 0 0 0 0 13 11:15 2 1 2 0 0 0 0 0 0 0 0 0 0 0 0 5 11:30 2 4 3 0 0 0 0 0 0 0 0 0 0 0 0 9 11:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 12:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 4 9 6 0 0 0 0 0 0 0 0 0 0 0 0 19 12:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 12:30 0 1 2 0 1 0 0 0 0 0 0 0 0 0 0 4 12:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 13:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 5 0 1 0 0 0 0 0 0 0 0 0 0 11 13:15 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 3 13:30 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 13:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 14:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 3 0 0 1 0 0 0 0 0 0 0 0 0 11 14:15 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 14:30 2 3 0 0 0 0 0 0 0 0 0 0 0 0 0 5 14:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 15:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 2 9 4 0 0 0 0 0 0 0 0 0 0 0 0 15 15:15 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 15:30 0 5 3 1 0 0 0 0 0 0 0 0 0 0 0 9 15:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 16:00 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 9 1 0 0 0 0 0 0 0 0 0 0 0 21 16:15 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 16:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 16:45 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 17:00 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 17 7 0 0 0 0 0 0 0 0 0 0 0 0 24
75
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1B Site ID: 000000020167 Location: N. Roscoe EB (SB) Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
9
File: SB.prn City: 16-221 AW Max County: 30.21304, -81.40927
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5 17:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 17:45 1 4 3 0 0 0 0 0 0 0 0 0 0 0 0 8 18:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 1 12 7 0 0 0 0 0 0 0 0 0 0 0 0 20 18:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 18:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 18:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 19:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 19:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 19:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 19:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 20:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 20:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 20:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20:45 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 21:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 1 3 0 0 0 0 0 0 0 0 0 0 0 0 0 4 21:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 21:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------DAY TOTAL 8 166 62 2 4 3 0 0 0 0 0 0 0 0 0 245 PERCENTS 3.3% 67.8% 25.3% 0.8% 1.6% 1.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.3% Trucks & Buses 3.6% AM Times AM Peaks
10:45 07:45 10:45 07:15 09:00 07:00 4 26 9 1 2 1
07:45 32
PM Times PM Peaks
13:45 16:15 15:15 14:45 12:15 12:30 2 17 9 1 1 1
15:30 24
=================================================================================================================== GRAND TOTAL 18 199 9 1 1 0 0 0 534 5 8 2 0 0 0 777 PERCENTS 2.4% 68.8% 25.7% 0.6% 1.1% 1.0% 0.1% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
76
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
1
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:45 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 05:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 8 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 06:00 0 6 1 0 0 1 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 16 2 0 0 1 0 0 0 0 0 0 0 0 0 19 06:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 06:30 0 3 3 0 0 0 0 0 1 0 0 0 0 0 0 7 06:45 1 7 1 0 0 0 0 0 0 0 0 0 0 0 0 9 07:00 1 15 5 0 1 0 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 2 29 10 0 1 0 0 0 1 0 0 0 0 0 0 43 07:15 0 19 8 1 1 0 0 0 0 0 0 0 0 0 0 29 07:30 0 40 15 5 0 0 0 0 0 0 0 0 0 0 0 60 07:45 0 53 10 0 0 0 0 0 0 0 0 0 0 0 0 63 08:00 0 39 16 0 1 0 0 0 0 0 0 0 0 0 0 56 -----------------------------------------------------------------------------------------------------------Hour Total 0 151 49 6 2 0 0 0 0 0 0 0 0 0 0 208 08:15 08:30 08:45 09:00
0 0 0 0
46 54 48 37
17 19 18 20
0 0 1 2
1 0 1 0
0 0 0 0
0 0 0 0
0 0 1 0
77
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
64 73 69 59
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
2
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 185 74 3 2 0 0 1 0 0 0 0 0 0 0 265 09:15 1 33 13 0 1 1 0 0 0 0 0 0 0 0 0 49 09:30 0 32 12 0 1 0 0 0 0 0 0 0 0 0 0 45 09:45 0 32 5 0 3 2 0 0 0 0 0 0 0 0 0 42 10:00 0 31 18 0 0 0 0 0 0 0 0 0 0 0 0 49 -----------------------------------------------------------------------------------------------------------Hour Total 1 128 48 0 5 3 0 0 0 0 0 0 0 0 0 185 10:15 1 22 18 0 0 0 0 0 0 0 0 0 0 0 0 41 10:30 0 22 10 0 0 0 0 0 0 0 0 0 0 0 0 32 10:45 0 24 24 0 1 1 0 0 0 0 0 0 0 0 0 50 11:00 0 23 19 0 1 0 0 0 0 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 1 91 71 0 2 1 0 0 0 0 0 0 0 0 0 166 11:15 0 17 12 0 1 0 0 2 0 0 0 0 0 0 0 32 11:30 0 22 11 0 3 1 0 0 0 0 0 0 0 0 0 37 11:45 0 41 18 0 2 0 0 1 0 0 0 0 0 0 0 62 12:00 0 32 10 0 1 1 0 0 0 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 0 112 51 0 7 2 0 3 0 0 0 0 0 0 0 175 12:15 0 32 21 0 0 0 0 0 0 0 0 0 1 0 0 54 12:30 1 34 15 0 2 1 0 1 0 0 0 0 0 0 0 54 12:45 0 42 13 0 1 0 0 0 0 0 0 0 0 0 0 56 13:00 1 33 17 0 0 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 2 141 66 0 3 1 0 1 0 0 0 0 1 0 0 215 13:15 0 31 15 0 1 0 0 0 0 0 0 0 0 0 0 47 13:30 0 31 15 0 0 0 0 0 0 0 0 0 0 0 0 46 13:45 0 34 15 0 0 0 0 0 0 0 0 0 0 0 0 49 14:00 0 37 10 0 0 1 0 0 0 0 0 0 0 0 0 48 -----------------------------------------------------------------------------------------------------------Hour Total 0 133 55 0 1 1 0 0 0 0 0 0 0 0 0 190 14:15 0 41 18 0 0 0 0 0 0 0 0 0 0 0 0 59 14:30 0 45 22 0 1 0 0 0 0 0 0 0 0 0 0 68 14:45 0 43 13 2 0 1 0 0 0 0 0 0 0 0 0 59 15:00 0 42 17 0 0 0 0 0 0 0 0 0 0 0 0 59 -----------------------------------------------------------------------------------------------------------Hour Total 0 171 70 2 1 1 0 0 0 0 0 0 0 0 0 245 15:15 0 46 9 0 0 0 0 0 0 0 0 0 0 0 0 55 15:30 1 35 11 0 2 2 0 0 0 0 0 0 0 0 0 51 15:45 0 42 15 1 2 0 0 0 0 0 0 0 0 0 0 60 16:00 1 49 17 1 1 0 0 0 0 0 0 0 0 0 0 69 -----------------------------------------------------------------------------------------------------------Hour Total 2 172 52 2 5 2 0 0 0 0 0 0 0 0 0 235 16:15 0 43 22 0 2 1 0 0 0 0 0 0 0 0 0 68 16:30 0 40 18 0 2 0 0 0 0 0 0 0 0 0 0 60 16:45 0 49 14 1 2 1 0 1 0 0 0 0 0 0 0 68 17:00 1 70 17 0 1 0 0 0 0 0 0 0 0 0 0 89 -----------------------------------------------------------------------------------------------------------Hour Total 1 202 71 1 7 2 0 1 0 0 0 0 0 0 0 285
78
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/23/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
3
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 65 19 0 2 0 0 0 0 0 0 0 0 0 0 86 17:30 0 75 18 0 0 1 0 0 0 0 0 0 0 0 0 94 17:45 0 85 24 0 1 1 0 0 0 0 0 0 0 0 0 111 18:00 0 103 22 0 1 1 0 0 0 0 0 0 0 0 0 127 -----------------------------------------------------------------------------------------------------------Hour Total 0 328 83 0 4 3 0 0 0 0 0 0 0 0 0 418 18:15 0 66 24 0 0 0 0 1 0 0 0 0 0 0 0 91 18:30 0 51 14 0 0 0 1 0 0 0 0 0 0 0 0 66 18:45 0 52 11 0 1 0 0 0 0 0 0 0 0 0 0 64 19:00 0 21 4 0 0 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 0 190 53 0 1 0 1 1 0 0 0 0 0 0 0 246 19:15 0 35 5 0 0 0 0 0 0 0 0 0 0 0 0 40 19:30 0 31 14 0 0 0 0 0 0 0 0 0 0 0 0 45 19:45 0 19 4 0 0 0 0 0 0 0 0 0 0 0 0 23 20:00 0 25 7 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 0 110 30 0 0 0 0 0 0 0 0 0 0 0 0 140 20:15 1 21 3 0 0 0 0 0 0 0 0 0 0 0 0 25 20:30 0 20 4 0 0 0 0 0 0 0 0 0 0 0 0 24 20:45 0 23 3 0 0 0 0 0 0 0 0 0 0 0 0 26 21:00 0 18 1 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 1 82 11 0 0 0 0 0 0 0 0 0 0 0 0 94 21:15 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 21:30 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 21:45 0 10 3 0 1 0 0 0 0 0 0 0 0 0 0 14 22:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 36 7 0 1 0 0 0 0 0 0 0 0 0 0 44 22:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 22:30 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 22:45 1 4 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 18 2 0 0 0 0 0 0 0 0 0 0 0 0 21 23:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 23:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 23:45 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 6 24:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 1 15 2 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------DAY TOTAL 12 2327 814 14 42 17 1 7 1 0 0 0 1 0 0 3236 PERCENTS 0.4% 72.0% 25.2% 0.5% 1.2% 0.5% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.4% Trucks & Buses 2.5% AM Times AM Peaks
06:15 07:45 08:15 06:45 11:00 09:00 2 192 74 6 7 3
11:00 05:45 3 1
PM Times PM Peaks
12:15 17:30 17:30 14:00 15:30 14:45 17:45 12:15 2 329 88 2 7 3 1 1
08:15 265 12:15 1
79
17:30 423
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
4
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 00:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 1 0 0 0 0 0 0 0 0 0 0 4 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 06:00 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 2 0 0 0 0 0 0 0 0 0 0 0 0 13 06:15 0 15 4 0 0 0 0 0 0 0 0 0 0 0 0 19 06:30 0 10 1 1 0 0 0 0 0 0 0 0 0 0 0 12 06:45 1 8 3 0 1 0 0 0 0 0 0 0 0 0 0 13 07:00 0 12 8 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 1 45 16 1 1 0 0 0 0 0 0 0 0 0 0 64 07:15 0 30 10 2 0 0 0 0 0 0 0 0 0 0 0 42 07:30 0 55 16 3 1 0 0 0 0 0 0 0 0 0 0 75 07:45 0 37 9 0 0 0 0 0 0 0 0 0 0 0 0 46 08:00 0 43 18 0 0 0 0 1 1 0 0 0 0 0 0 63 -----------------------------------------------------------------------------------------------------------Hour Total 0 165 53 5 1 0 0 1 1 0 0 0 0 0 0 226 08:15 08:30 08:45 09:00
0 0 0 0
34 73 49 42
12 19 14 20
0 0 1 2
0 3 1 1
1 0 0 1
0 0 0 0
0 0 0 0
80
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
47 95 65 66
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
5
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 198 65 3 5 2 0 0 0 0 0 0 0 0 0 273 09:15 0 21 10 0 2 1 0 1 0 0 0 0 0 0 0 35 09:30 0 15 10 0 1 0 0 1 0 0 0 0 0 0 0 27 09:45 0 23 6 0 2 0 0 1 0 0 0 0 0 0 0 32 10:00 0 26 8 0 0 1 0 0 0 0 0 0 0 0 0 35 -----------------------------------------------------------------------------------------------------------Hour Total 0 85 34 0 5 2 0 3 0 0 0 0 0 0 0 129 10:15 0 24 12 0 1 0 0 0 0 0 0 0 0 0 0 37 10:30 0 24 15 0 0 0 0 1 0 0 0 0 0 0 0 40 10:45 0 33 8 0 0 1 0 1 0 0 0 0 0 0 0 43 11:00 2 28 9 0 1 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 2 109 44 0 2 1 0 2 0 0 0 0 0 0 0 160 11:15 1 18 9 0 0 0 0 0 1 0 0 0 0 0 0 29 11:30 0 24 13 0 0 1 0 1 0 0 0 0 0 0 0 39 11:45 0 26 14 0 0 0 0 0 0 0 0 0 0 0 0 40 12:00 0 35 11 0 0 1 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 1 103 47 0 0 2 0 1 1 0 0 0 0 0 0 155 12:15 1 43 12 0 4 0 0 0 0 0 0 0 0 0 0 60 12:30 0 43 6 0 0 0 0 0 0 0 0 0 0 0 0 49 12:45 0 59 8 0 1 0 0 0 0 0 0 0 0 0 0 68 13:00 0 56 15 0 0 0 0 0 0 0 0 0 0 0 0 71 -----------------------------------------------------------------------------------------------------------Hour Total 1 201 41 0 5 0 0 0 0 0 0 0 0 0 0 248 13:15 0 57 20 0 0 0 0 0 0 0 0 0 0 0 0 77 13:30 0 41 15 0 1 2 0 1 0 0 0 0 0 0 0 60 13:45 0 59 24 2 1 1 0 0 1 0 1 0 0 0 0 89 14:00 0 59 26 0 2 2 0 0 0 0 0 0 0 0 0 89 -----------------------------------------------------------------------------------------------------------Hour Total 0 216 85 2 4 5 0 1 1 0 1 0 0 0 0 315 14:15 2 60 25 0 0 0 0 1 0 0 0 0 0 0 0 88 14:30 0 64 17 0 1 0 0 0 0 0 0 0 0 0 0 82 14:45 1 64 29 1 0 2 0 0 0 0 0 0 0 0 0 97 15:00 0 66 23 1 2 1 0 1 0 0 0 0 0 0 0 94 -----------------------------------------------------------------------------------------------------------Hour Total 3 254 94 2 3 3 0 2 0 0 0 0 0 0 0 361 15:15 1 75 15 0 1 1 0 0 0 0 0 0 0 0 0 93 15:30 0 64 19 1 1 2 0 1 0 0 0 0 0 0 0 88 15:45 0 48 18 2 2 2 0 0 0 0 0 0 0 0 0 72 16:00 0 47 15 0 2 1 0 0 0 0 0 0 0 0 0 65 -----------------------------------------------------------------------------------------------------------Hour Total 1 234 67 3 6 6 0 1 0 0 0 0 0 0 0 318 16:15 1 41 17 0 0 0 0 0 0 0 0 0 0 0 0 59 16:30 0 49 20 0 1 0 0 0 0 0 0 0 0 0 0 70 16:45 0 54 9 0 2 0 0 1 0 0 0 0 0 0 0 66 17:00 1 60 18 0 0 0 0 0 0 0 0 0 0 0 0 79 -----------------------------------------------------------------------------------------------------------Hour Total 2 204 64 0 3 0 0 1 0 0 0 0 0 0 0 274
81
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/24/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
6
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 67 20 0 0 0 0 0 0 0 0 0 0 0 0 87 17:30 1 60 20 0 2 0 0 0 0 0 0 0 0 0 0 83 17:45 0 69 17 0 0 0 0 0 0 0 0 0 0 0 0 86 18:00 0 67 15 0 0 0 0 0 0 0 0 0 0 0 0 82 -----------------------------------------------------------------------------------------------------------Hour Total 1 263 72 0 2 0 0 0 0 0 0 0 0 0 0 338 18:15 0 56 17 0 0 0 0 1 0 0 0 0 0 0 0 74 18:30 0 55 14 0 1 0 0 0 0 0 0 0 0 0 0 70 18:45 0 42 13 0 1 0 0 0 0 0 0 0 0 0 0 56 19:00 0 51 20 0 0 0 0 0 0 0 0 0 0 0 0 71 -----------------------------------------------------------------------------------------------------------Hour Total 0 204 64 0 2 0 0 1 0 0 0 0 0 0 0 271 19:15 0 29 5 0 0 0 0 0 0 0 0 0 0 0 0 34 19:30 0 26 5 0 0 0 0 0 0 0 0 0 0 0 0 31 19:45 0 32 8 0 0 0 0 0 0 0 0 0 0 0 0 40 20:00 3 31 11 0 0 0 0 0 0 0 0 0 0 0 0 45 -----------------------------------------------------------------------------------------------------------Hour Total 3 118 29 0 0 0 0 0 0 0 0 0 0 0 0 150 20:15 0 20 7 0 0 0 0 0 0 0 0 0 0 0 0 27 20:30 1 19 3 0 0 0 0 0 0 0 0 0 0 0 0 23 20:45 0 13 5 0 0 0 0 0 0 0 0 0 0 0 0 18 21:00 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 1 64 17 0 0 0 0 0 0 0 0 0 0 0 0 82 21:15 0 9 4 0 1 0 0 0 0 0 0 0 0 0 0 14 21:30 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 21:45 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 22:00 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 36 6 0 1 0 0 0 0 0 0 0 0 0 0 43 22:15 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 22:30 1 13 0 0 0 0 0 0 0 0 0 0 0 0 0 14 22:45 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 23:00 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 1 37 5 0 0 0 0 0 0 0 0 0 0 0 0 43 23:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:30 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 6 23:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 24:00 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 1 16 0 0 0 0 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------DAY TOTAL 18 2578 807 16 41 21 0 13 3 0 1 0 0 0 0 3498 PERCENTS 0.6% 73.7% 23.1% 0.5% 1.2% 0.6% 0.0% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks
10:30 08:00 08:15 06:45 08:30 08:15 3 199 65 5 7 2
09:00 07:15 3 1
PM Times PM Peaks
19:45 14:30 14:00 15:00 15:00 14:45 4 269 97 4 6 6
13:30 13:00 2 1
82
08:15 273 13:00 1
14:45 372
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
7
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:30 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 01:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 05:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:45 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 06:00 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 4 0 0 0 0 0 0 0 0 0 0 0 0 13 06:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 06:30 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 06:45 1 3 5 0 1 0 0 0 0 0 0 0 0 0 0 10 07:00 0 11 7 0 1 0 0 0 0 0 1 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 1 29 14 0 2 0 0 0 0 0 1 0 0 0 0 47 07:15 0 27 8 1 0 2 0 0 0 0 0 0 0 0 0 38 07:30 0 52 14 5 0 1 0 0 0 0 0 0 0 0 0 72 07:45 0 43 12 0 0 0 0 0 0 0 0 0 0 0 0 55 08:00 0 34 17 0 0 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 156 51 6 0 3 0 0 0 0 0 0 0 0 0 216 08:15 08:30 08:45 09:00
0 0 0 0
54 68 44 34
17 17 13 17
0 0 1 2
1 0 1 1
0 0 2 0
0 0 0 0
0 0 0 0
83
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
72 85 62 54
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
8
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 200 64 3 3 2 0 0 0 0 1 0 0 0 0 273 09:15 0 35 10 0 2 2 0 0 1 0 0 0 0 0 0 50 09:30 0 23 8 0 0 0 0 0 0 0 0 0 0 0 0 31 09:45 0 21 10 0 1 0 0 0 0 0 0 0 0 0 0 32 10:00 0 24 12 0 1 1 0 1 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 0 103 40 0 4 3 0 1 1 0 0 0 0 0 0 152 10:15 0 27 11 0 2 0 0 0 0 0 0 0 0 0 0 40 10:30 2 19 12 0 0 0 0 0 0 0 0 0 0 0 0 33 10:45 0 10 11 0 1 0 0 0 0 0 0 0 0 0 0 22 11:00 0 13 12 0 0 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 2 69 46 0 3 0 0 0 0 0 0 0 0 0 0 120 11:15 0 29 8 0 0 2 0 0 0 0 0 0 0 0 0 39 11:30 2 29 16 0 0 1 0 0 0 0 0 0 0 0 0 48 11:45 0 28 17 0 0 1 0 0 0 0 0 0 0 0 0 46 12:00 0 26 17 0 0 1 0 0 0 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 2 112 58 0 0 5 0 0 0 0 0 0 0 0 0 177 12:15 0 27 9 0 0 0 0 0 1 0 0 0 0 0 0 37 12:30 0 36 21 0 1 0 0 0 0 0 0 0 0 0 0 58 12:45 1 42 18 0 0 0 0 0 0 0 0 0 0 0 0 61 13:00 0 29 18 0 1 0 0 0 0 0 0 0 0 0 0 48 -----------------------------------------------------------------------------------------------------------Hour Total 1 134 66 0 2 0 0 0 1 0 0 0 0 0 0 204 13:15 0 29 14 0 3 0 0 0 0 0 0 0 0 0 0 46 13:30 0 36 9 0 0 0 0 0 0 0 0 0 0 0 0 45 13:45 0 32 11 0 0 1 0 0 0 0 0 0 0 0 0 44 14:00 0 35 16 0 0 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 132 50 0 3 1 0 0 0 0 0 0 0 0 0 186 14:15 0 30 11 0 1 0 0 0 0 0 0 0 0 0 0 42 14:30 1 42 22 0 1 0 0 0 0 0 0 0 0 0 0 66 14:45 0 38 19 2 0 0 0 0 0 0 0 0 0 0 0 59 15:00 0 26 13 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 1 136 65 2 2 0 0 0 0 0 0 0 0 0 0 206 15:15 0 38 15 0 0 0 0 0 0 0 0 0 0 0 0 53 15:30 0 31 19 0 1 0 0 0 0 0 0 0 0 0 0 51 15:45 0 55 23 2 1 0 0 0 0 0 0 0 0 0 0 81 16:00 0 50 16 1 0 1 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 0 174 73 3 2 1 0 0 0 0 0 0 0 0 0 253 16:15 0 55 13 0 1 3 0 0 0 0 1 0 0 0 0 73 16:30 0 44 21 1 2 0 0 0 0 0 0 0 0 0 0 68 16:45 1 49 15 0 1 0 0 1 0 0 0 0 0 0 0 67 17:00 0 66 23 0 3 1 0 1 0 0 0 0 0 0 0 94 -----------------------------------------------------------------------------------------------------------Hour Total 1 214 72 1 7 4 0 2 0 0 1 0 0 0 0 302
84
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/25/2016 Station #: Site 1C Site ID: 000000003561 Location: Solana Road SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
9
File: D0823001.prn City: 16-221 AW Max County: 30.21299, -81.40874
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 70 17 0 0 0 0 0 0 0 0 0 0 0 0 87 17:30 0 66 17 0 2 0 0 0 0 0 0 0 0 0 0 85 17:45 0 74 23 0 1 0 0 0 0 0 0 0 0 0 0 98 18:00 1 56 11 0 0 0 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 1 266 68 0 3 0 0 0 0 0 0 0 0 0 0 338 18:15 1 63 11 0 0 0 0 0 0 0 0 0 0 0 0 75 18:30 1 51 15 0 0 0 0 0 0 0 0 0 0 0 0 67 18:45 0 47 14 0 0 0 0 0 0 0 1 0 0 0 0 62 19:00 0 36 10 0 0 0 0 0 0 0 0 0 0 0 0 46 -----------------------------------------------------------------------------------------------------------Hour Total 2 197 50 0 0 0 0 0 0 0 1 0 0 0 0 250 19:15 0 48 10 0 0 0 0 0 0 0 0 0 0 0 0 58 19:30 1 43 10 0 0 0 0 0 0 0 0 0 0 0 0 54 19:45 0 35 9 0 0 0 0 0 0 0 0 0 0 0 0 44 20:00 1 22 10 0 0 0 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 2 148 39 0 0 0 0 0 0 0 0 0 0 0 0 189 20:15 0 21 2 0 0 0 0 0 0 0 0 0 0 0 0 23 20:30 0 26 4 0 0 0 0 0 0 0 0 0 0 0 0 30 20:45 0 29 3 0 0 0 0 0 0 0 0 0 0 0 0 32 21:00 0 16 7 0 0 0 0 0 1 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------Hour Total 0 92 16 0 0 0 0 0 1 0 0 0 0 0 0 109 21:15 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21 21:30 0 9 4 0 0 0 0 0 0 0 0 0 0 0 0 13 21:45 3 17 3 0 0 0 0 0 0 0 0 0 0 0 0 23 22:00 1 8 2 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 4 54 10 0 0 0 0 0 0 0 0 0 0 0 0 68 22:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 22:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:45 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 23:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 22 4 0 0 0 0 0 0 0 0 0 0 0 0 26 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 1 2 1 0 0 0 0 0 0 0 0 0 0 0 0 4 23:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 24:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 1 7 1 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------DAY TOTAL 18 2271 800 15 31 19 0 3 3 0 4 0 0 0 0 3164 PERCENTS 0.6% 71.8% 25.3% 0.5% 1.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.6% Trucks & Buses 2.3% AM Times AM Peaks
09:45 08:00 08:00 06:45 08:30 11:15 2 200 64 6 4 5
09:15 08:30 1 1
06:15 1
08:15 273
PM Times PM Peaks
21:15 17:00 17:00 15:45 16:15 15:30 4 276 80 4 7 4
16:15 12:15 2 1
15:30 1
17:00 364
=================================================================================================================== GRAND TOTAL 48 2421 114 1 7 5 1 0 7176 45 57 23 0 0 0 9898 PERCENTS 0.5% 72.5% 24.5% 0.5% 1.2% 0.6% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
85
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
Page:
1
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 00:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 01:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:45 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 1 0 0 0 0 0 0 0 5 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 05:15 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 05:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 05:45 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 3 06:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 6 0 2 0 0 0 0 0 0 0 0 0 0 15 06:15 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 06:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 06:45 0 7 7 0 1 1 0 0 0 0 0 0 0 0 0 16 07:00 0 5 3 1 1 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 19 14 1 2 1 0 0 0 0 0 0 0 0 0 37 07:15 0 9 6 0 0 1 0 0 0 0 0 0 0 0 0 16 07:30 0 21 8 0 1 0 0 0 0 0 0 0 0 0 0 30 07:45 0 24 9 2 2 1 0 0 0 0 0 0 0 0 0 38 08:00 0 36 8 0 0 0 0 0 0 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 0 90 31 2 3 2 0 0 0 0 0 0 0 0 0 128 08:15 08:30 08:45 09:00
0 1 0 0
21 41 51 33
6 12 7 12
0 0 1 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
86
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
27 54 60 45
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
2
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 146 37 1 0 1 0 0 0 0 0 0 0 0 0 186 09:15 0 23 13 2 2 0 0 0 0 0 0 0 0 0 0 40 09:30 0 20 5 0 1 1 0 0 0 0 0 0 0 0 0 27 09:45 1 14 10 0 0 0 0 1 0 0 0 0 0 0 0 26 10:00 0 19 4 0 0 0 0 0 0 0 0 0 0 0 0 23 -----------------------------------------------------------------------------------------------------------Hour Total 1 76 32 2 3 1 0 1 0 0 0 0 0 0 0 116 10:15 0 11 4 0 1 0 0 0 0 0 0 0 0 0 0 16 10:30 0 16 4 0 1 0 0 1 0 0 0 0 0 0 0 22 10:45 0 14 2 0 1 0 0 0 0 0 0 0 0 0 0 17 11:00 0 25 7 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 0 66 17 0 3 0 0 1 0 0 0 0 0 0 0 87 11:15 0 12 7 0 0 0 0 0 0 1 0 0 0 0 0 20 11:30 0 17 9 0 0 0 0 0 0 0 0 0 0 0 0 26 11:45 0 19 10 0 0 1 0 0 1 0 0 0 0 0 0 31 12:00 0 15 5 0 0 2 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 0 63 31 0 0 3 0 0 1 1 0 0 0 0 0 99 12:15 0 13 5 0 1 0 0 1 0 0 0 0 0 0 0 20 12:30 0 17 7 0 2 0 0 0 0 0 0 0 0 0 0 26 12:45 0 15 6 0 1 5 0 0 0 0 0 0 0 0 0 27 13:00 0 13 8 0 1 1 0 0 0 0 0 0 0 0 0 23 -----------------------------------------------------------------------------------------------------------Hour Total 0 58 26 0 5 6 0 1 0 0 0 0 0 0 0 96 13:15 0 23 5 0 0 1 0 0 0 0 0 0 0 0 0 29 13:30 0 28 13 0 2 0 0 0 0 0 0 0 0 0 0 43 13:45 0 12 10 0 0 1 0 0 0 0 0 0 0 0 0 23 14:00 0 18 6 0 1 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 0 81 34 0 3 2 0 0 0 0 0 0 0 0 0 120 14:15 0 18 5 0 0 0 0 0 0 0 0 0 0 0 0 23 14:30 0 22 21 1 1 1 0 0 1 0 0 0 0 0 0 47 14:45 0 24 8 0 0 0 0 0 0 0 0 0 0 0 0 32 15:00 0 21 6 0 2 1 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 0 85 40 1 3 2 0 0 1 0 0 0 0 0 0 132 15:15 0 29 12 2 1 0 0 0 0 0 0 0 0 0 0 44 15:30 0 39 7 0 0 0 0 0 0 0 0 0 0 0 0 46 15:45 0 43 16 1 1 0 0 0 1 0 0 0 0 0 0 62 16:00 0 31 10 0 0 0 0 0 1 0 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 0 142 45 3 2 0 0 0 2 0 0 0 0 0 0 194 16:15 0 21 12 0 1 0 0 0 0 0 0 0 0 0 0 34 16:30 0 37 9 0 0 0 0 0 0 0 0 0 0 0 0 46 16:45 0 24 13 0 1 0 0 0 0 0 0 0 0 0 0 38 17:00 0 36 12 1 0 0 0 1 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 0 118 46 1 2 0 0 1 0 0 0 0 0 0 0 168
87
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
3
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 33 15 0 0 1 0 0 0 0 0 0 0 0 0 49 17:30 1 35 9 0 3 0 0 0 0 0 0 0 0 0 0 48 17:45 0 40 14 0 0 1 0 0 0 0 0 0 0 0 0 55 18:00 0 45 10 0 0 0 0 0 0 0 0 0 0 0 0 55 -----------------------------------------------------------------------------------------------------------Hour Total 1 153 48 0 3 2 0 0 0 0 0 0 0 0 0 207 18:15 0 40 11 0 0 0 0 0 0 0 0 0 0 0 0 51 18:30 0 35 11 0 0 0 0 1 0 0 0 0 0 0 0 47 18:45 0 24 9 0 0 0 0 0 0 1 0 0 0 0 0 34 19:00 0 23 3 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 122 34 0 0 0 0 1 0 1 0 0 0 0 0 158 19:15 0 15 8 0 0 0 0 1 0 0 0 0 0 0 0 24 19:30 0 18 5 0 0 0 0 1 0 0 0 0 0 0 0 24 19:45 0 14 3 0 1 0 0 0 0 0 0 0 0 0 0 18 20:00 0 23 3 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 70 19 0 1 0 0 2 0 0 0 0 0 0 0 92 20:15 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 20:30 0 19 6 0 0 0 0 0 0 0 0 0 0 0 0 25 20:45 0 22 3 0 0 0 0 0 0 0 0 0 0 0 0 25 21:00 0 9 4 0 0 0 0 1 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 64 15 0 0 0 0 1 0 0 0 0 0 0 0 80 21:15 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 21:30 0 9 4 0 0 0 0 0 0 0 0 0 0 0 0 13 21:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 22:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 28 7 0 0 0 0 0 0 0 0 0 0 0 0 35 22:15 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 22:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:45 1 3 2 0 0 0 0 0 0 0 0 0 0 0 0 6 23:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 1 14 6 0 0 0 0 0 0 0 0 0 0 0 0 21 23:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 24:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 2 0 0 0 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------DAY TOTAL 4 1429 494 11 32 20 0 9 4 2 0 0 0 0 0 2005 PERCENTS 0.2% 71.3% 24.7% 0.6% 1.6% 1.0% 0.0% 0.5% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.1% Trucks & Buses 3.8% AM Times AM Peaks
07:45 08:00 08:30 07:00 07:00 11:15 1 149 44 3 4 3
09:45 11:00 10:30 2 1 1
08:30 199
PM Times PM Peaks
16:45 17:30 17:00 14:30 12:15 12:30 1 160 50 3 5 7
18:30 15:15 18:00 2 2 1
17:30 209
88
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
Page:
4
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00:45 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 4 01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 10 01:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:30 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 05:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 05:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 06:00 0 12 3 0 0 0 0 0 0 0 0 0 0 0 0 15 -----------------------------------------------------------------------------------------------------------Hour Total 0 17 6 0 0 0 0 0 0 0 0 0 0 0 0 23 06:15 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 06:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 06:45 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 07:00 0 6 6 1 1 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 19 12 1 1 0 0 0 0 0 0 0 0 0 0 33 07:15 0 11 3 0 0 1 0 0 0 0 0 0 0 0 0 15 07:30 0 24 10 0 0 0 0 0 0 0 0 0 0 0 0 34 07:45 0 55 11 1 0 0 0 0 0 0 0 0 0 0 0 67 08:00 0 30 9 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 0 120 33 1 0 1 0 0 0 0 0 0 0 0 0 155 08:15 08:30 08:45 09:00
0 1 0 1
14 37 61 26
7 8 12 9
0 0 0 1
0 0 1 1
0 1 2 0
0 0 0 0
1 0 0 0
89
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
22 47 76 38
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
5
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 138 36 1 2 3 0 1 0 0 0 0 0 0 0 183 09:15 0 18 4 1 1 1 0 0 0 0 0 0 0 0 0 25 09:30 1 12 4 0 1 2 0 0 0 0 0 0 0 0 0 20 09:45 0 16 7 0 0 1 0 1 0 0 0 0 0 0 0 25 10:00 1 16 6 0 1 0 0 0 0 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------Hour Total 2 62 21 1 3 4 0 1 0 0 0 0 0 0 0 94 10:15 0 13 11 0 0 1 0 0 0 0 0 0 0 0 0 25 10:30 2 17 6 0 1 0 0 1 0 0 0 0 0 0 0 27 10:45 0 14 7 0 0 2 0 0 0 0 0 0 0 0 0 23 11:00 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------Hour Total 2 58 26 0 1 3 0 1 0 0 0 0 0 0 0 91 11:15 0 27 8 0 0 1 0 1 0 0 0 0 0 0 0 37 11:30 0 17 8 0 0 1 0 0 0 0 0 0 0 0 0 26 11:45 0 18 6 0 0 0 0 0 0 0 0 0 0 0 0 24 12:00 0 8 4 0 1 1 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 70 26 0 1 3 0 1 0 0 0 0 0 0 0 101 12:15 1 17 6 0 1 3 0 1 0 0 0 0 2 0 0 31 12:30 0 12 10 0 0 1 0 0 0 0 0 0 0 0 0 23 12:45 0 11 9 1 0 0 0 0 0 0 0 0 0 0 0 21 13:00 0 15 10 0 2 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 1 55 35 1 3 4 0 1 0 0 0 0 2 0 0 102 13:15 0 28 9 0 1 2 0 0 0 0 0 0 0 0 0 40 13:30 0 27 7 1 1 1 0 0 0 0 0 0 0 0 0 37 13:45 0 28 6 0 1 1 0 0 0 0 0 0 0 0 0 36 14:00 0 23 9 0 0 0 0 1 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 0 106 31 1 3 4 0 1 0 0 0 0 0 0 0 146 14:15 0 21 9 1 1 0 0 0 0 0 0 0 0 0 0 32 14:30 0 38 11 1 0 3 0 0 0 0 0 0 0 0 0 53 14:45 0 12 18 1 1 0 0 1 1 0 0 0 0 0 0 34 15:00 0 27 13 0 0 2 0 0 0 0 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 0 98 51 3 2 5 0 1 1 0 0 0 0 0 0 161 15:15 0 29 13 0 0 1 0 0 0 0 0 0 0 0 0 43 15:30 0 24 6 0 0 2 0 0 0 0 0 0 0 0 0 32 15:45 0 22 11 2 0 0 0 0 0 0 0 0 0 0 0 35 16:00 0 19 10 0 1 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 0 94 40 2 1 3 0 0 0 0 0 0 0 0 0 140 16:15 0 15 9 0 2 0 0 0 0 0 0 0 0 0 0 26 16:30 0 36 17 0 1 0 0 0 0 0 0 0 0 0 0 54 16:45 0 19 8 0 0 0 0 0 0 0 0 0 0 0 0 27 17:00 0 34 23 0 0 0 0 0 0 0 0 0 0 0 0 57 -----------------------------------------------------------------------------------------------------------Hour Total 0 104 57 0 3 0 0 0 0 0 0 0 0 0 0 164
90
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
6
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 29 16 0 0 1 0 0 0 0 0 0 0 0 0 46 17:30 0 44 12 0 0 0 0 0 0 0 0 0 0 0 0 56 17:45 0 36 11 0 0 0 0 1 0 0 0 0 0 0 0 48 18:00 0 35 11 0 1 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 0 144 50 0 1 1 0 1 0 0 0 0 0 0 0 197 18:15 0 35 5 0 0 0 0 0 0 0 0 0 0 0 0 40 18:30 0 33 10 0 0 0 0 0 0 0 0 0 0 0 0 43 18:45 0 31 15 0 0 0 0 0 0 0 0 0 0 0 0 46 19:00 0 16 12 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 115 42 0 0 0 0 0 0 0 0 0 0 0 0 157 19:15 0 13 6 0 0 0 0 0 0 0 0 0 0 0 0 19 19:30 0 10 4 0 0 0 0 1 0 0 0 0 0 0 0 15 19:45 0 28 6 0 1 0 0 0 0 0 0 0 0 0 0 35 20:00 0 22 5 0 0 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 73 21 0 1 0 0 1 0 0 0 0 0 0 0 96 20:15 0 11 6 0 0 0 0 0 0 0 0 0 0 0 0 17 20:30 1 20 4 0 0 0 0 0 0 0 0 0 0 0 0 25 20:45 0 18 8 0 0 0 0 0 0 0 0 0 0 0 0 26 21:00 0 28 8 0 0 0 0 1 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------Hour Total 1 77 26 0 0 0 0 1 0 0 0 0 0 0 0 105 21:15 0 11 5 0 0 0 0 0 0 0 0 0 0 0 0 16 21:30 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 21:45 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 22:00 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 37 8 0 0 0 0 0 0 0 0 0 0 0 0 45 22:15 1 5 3 0 0 0 0 0 0 0 0 0 0 0 0 9 22:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 22:45 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 23:00 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 12 6 0 1 0 0 0 0 0 0 0 0 0 0 20 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:45 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 24:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------DAY TOTAL 10 1421 537 11 23 31 0 10 1 0 0 0 2 0 0 2046 PERCENTS 0.5% 69.5% 26.3% 0.6% 1.2% 1.5% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.1% Trucks & Buses 3.8% AM Times AM Peaks
09:45 08:00 07:30 07:00 08:45 08:45 3 142 37 2 4 5
09:45 2
08:30 186
PM Times PM Peaks
12:15 17:30 16:30 14:00 13:00 14:30 1 150 64 3 5 6
14:00 14:00 2 1
91
12:15 2
17:00 207
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
Page:
7
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 01:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 05:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 05:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 06:00 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 14 6 0 0 0 0 0 0 0 0 0 0 0 0 20 06:15 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 06:30 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 06:45 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 07:00 0 4 7 1 1 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 30 15 1 1 0 0 0 0 0 0 0 0 0 0 47 07:15 0 9 4 1 0 0 0 0 0 0 0 0 0 0 0 14 07:30 0 12 12 0 0 0 0 0 0 0 0 0 0 0 0 24 07:45 0 36 12 1 0 0 0 0 0 0 0 0 0 0 0 49 08:00 0 30 7 0 0 1 0 0 0 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------Hour Total 0 87 35 2 0 1 0 0 0 0 0 0 0 0 0 125 08:15 08:30 08:45 09:00
0 1 3 2
30 47 49 46
6 10 17 11
0 0 1 1
0 0 2 0
1 0 0 1
0 0 1 0
0 0 0 0
92
0 0 1 1
0 0 1 0
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 0 0
37 58 75 63
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
8
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 6 172 44 2 2 2 1 0 2 1 0 1 0 0 0 233 09:15 0 11 16 1 1 0 0 0 0 0 0 0 0 0 0 29 09:30 0 12 5 0 0 2 0 2 0 0 0 0 0 0 0 21 09:45 1 20 8 0 0 0 0 0 0 0 0 0 0 0 0 29 10:00 1 11 3 0 0 2 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------Hour Total 2 54 32 1 1 4 0 2 0 0 0 0 0 0 0 96 10:15 1 9 5 0 0 0 0 0 0 0 0 0 0 0 0 15 10:30 0 10 10 0 0 2 0 1 0 0 0 0 0 0 0 23 10:45 0 15 7 0 0 0 0 0 0 0 0 0 0 0 0 22 11:00 0 16 5 0 0 1 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 1 50 27 0 0 3 0 1 0 0 0 0 0 0 0 82 11:15 0 16 12 0 0 0 0 1 0 0 0 0 0 0 0 29 11:30 0 15 10 0 0 3 0 1 0 0 0 0 0 0 0 29 11:45 0 15 8 0 1 0 0 1 0 0 0 0 0 0 0 25 12:00 0 20 7 0 0 1 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 66 37 0 1 4 0 3 0 0 0 0 0 0 0 111 12:15 0 14 7 0 0 2 0 0 0 0 0 0 0 0 0 23 12:30 0 16 4 0 0 2 0 0 0 0 0 0 0 0 0 22 12:45 0 14 7 0 1 2 0 0 0 0 0 0 0 0 0 24 13:00 1 19 10 0 0 0 0 0 0 1 0 0 0 0 0 31 -----------------------------------------------------------------------------------------------------------Hour Total 1 63 28 0 1 6 0 0 0 1 0 0 0 0 0 100 13:15 0 12 10 0 0 0 0 0 0 0 0 0 0 0 0 22 13:30 0 23 4 0 1 0 0 0 0 0 0 0 0 0 0 28 13:45 0 27 10 0 2 2 0 0 1 0 0 0 0 0 0 42 14:00 0 20 6 0 1 1 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 82 30 0 4 3 0 0 1 0 0 0 0 0 0 120 14:15 0 28 11 0 1 0 0 0 0 0 0 0 0 0 0 40 14:30 0 32 10 1 1 1 0 1 1 0 0 0 0 0 0 47 14:45 0 19 5 0 0 2 0 0 0 0 0 0 0 0 0 26 15:00 0 20 10 0 0 2 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 0 99 36 1 2 5 0 1 1 0 0 0 0 0 0 145 15:15 0 20 13 1 0 1 0 0 0 0 0 0 0 0 0 35 15:30 0 36 14 1 0 1 0 0 1 0 0 0 0 0 0 53 15:45 0 32 9 1 0 2 0 0 0 0 0 0 0 0 0 44 16:00 0 28 17 0 0 0 0 0 0 0 0 0 0 0 0 45 -----------------------------------------------------------------------------------------------------------Hour Total 0 116 53 3 0 4 0 0 1 0 0 0 0 0 0 177 16:15 0 27 13 0 2 0 0 0 0 0 0 0 0 0 0 42 16:30 0 28 16 1 0 0 0 1 0 0 0 0 0 0 0 46 16:45 0 24 13 0 1 0 0 0 0 0 0 0 0 0 0 38 17:00 0 33 13 1 0 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 0 112 55 2 3 0 0 1 0 0 0 0 0 0 0 173
93
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2A Site ID: 000000001269 Location: S. Rsocoe Blvd. NB (EB) Direction: NORTH Lane: 1 TIME
1
2
3
4
Page:
9
File: D0816014.prn City: 16-221 AW Max County: 30.13415, -81.38200
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 40 12 0 0 0 0 0 0 0 0 0 0 0 0 52 17:30 0 58 15 0 0 0 0 0 0 0 0 0 0 0 0 73 17:45 0 40 11 0 2 0 0 1 0 0 0 0 0 0 0 54 18:00 0 40 12 0 0 0 0 1 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 0 178 50 0 2 0 0 2 0 0 0 0 0 0 0 232 18:15 0 31 10 0 0 0 0 0 0 0 0 0 0 0 0 41 18:30 0 31 16 0 1 0 0 1 0 0 0 0 0 0 0 49 18:45 3 35 7 0 0 0 0 0 0 0 0 0 0 0 0 45 19:00 0 26 7 0 0 0 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 3 123 40 0 1 0 0 1 0 0 0 0 0 0 0 168 19:15 0 25 3 0 1 0 0 0 0 0 0 0 0 0 0 29 19:30 0 13 8 0 0 0 0 2 0 0 0 0 0 0 0 23 19:45 0 20 3 0 0 0 0 0 0 0 0 0 0 0 0 23 20:00 0 17 3 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 75 17 0 1 0 0 2 0 0 0 0 0 0 0 95 20:15 0 26 15 0 0 0 0 0 0 0 0 0 0 0 0 41 20:30 0 24 1 0 1 0 0 0 0 0 0 0 0 0 0 26 20:45 0 21 2 0 1 0 0 1 0 0 0 0 0 0 0 25 21:00 0 14 4 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 0 85 22 0 2 0 0 1 0 0 0 0 0 0 0 110 21:15 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 21:30 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 21:45 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 22:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 26 6 0 0 0 0 0 0 0 0 0 0 0 0 32 22:15 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 10 22:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 22:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 1 18 4 0 0 0 0 0 0 0 0 0 0 0 0 23 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 24:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------DAY TOTAL 14 1472 541 12 21 32 1 14 5 2 0 1 0 0 0 2115 PERCENTS 0.7% 69.6% 25.6% 0.6% 1.0% 1.6% 0.1% 0.6% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 95.8% Trucks & Buses 4.1% AM Times AM Peaks
08:15 08:15 08:30 07:00 08:30 09:15 08:00 11:00 08:15 08:00 6 172 54 3 3 4 1 3 2 1
PM Times PM Peaks
18:00 17:15 16:00 15:00 13:30 12:15 3 178 59 3 5 6
17:45 13:45 12:15 3 2 1
08:15 1
08:15 233 17:15 232
=================================================================================================================== GRAND TOTAL 28 1572 76 1 10 0 2 0 4322 34 83 33 4 1 0 6166 PERCENTS 0.5% 70.1% 25.5% 0.6% 1.3% 1.4% 0.0% 0.5% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
94
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
1
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 00:30 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 00:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 01:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 01:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 03:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:15 0 3 0 0 0 1 0 0 0 0 0 0 0 0 0 4 04:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 04:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 05:00 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 1 0 0 1 0 0 0 0 0 0 0 0 0 20 05:15 0 5 1 1 0 0 0 0 1 0 0 0 0 0 0 8 05:30 0 12 5 0 0 0 0 0 1 0 0 0 0 0 0 18 05:45 0 13 6 0 0 0 0 0 0 0 0 0 0 0 0 19 06:00 0 13 7 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 43 19 1 0 0 0 0 2 0 0 0 0 0 0 65 06:15 0 21 5 0 0 0 0 0 0 0 0 0 0 0 0 26 06:30 1 34 7 1 1 0 0 0 0 0 0 0 0 0 0 44 06:45 0 38 8 0 0 0 0 0 0 0 0 0 0 0 0 46 07:00 0 63 17 0 1 0 0 0 0 0 0 0 0 0 0 81 -----------------------------------------------------------------------------------------------------------Hour Total 1 156 37 1 2 0 0 0 0 0 0 0 0 0 0 197 07:15 0 79 26 1 1 1 0 0 2 0 0 0 0 0 0 110 07:30 0 102 28 0 2 1 0 0 0 0 0 0 0 0 0 133 07:45 0 107 32 8 3 0 0 1 0 0 0 0 0 0 0 151 08:00 0 112 29 0 0 1 0 0 1 0 0 0 0 0 0 143 -----------------------------------------------------------------------------------------------------------Hour Total 0 400 115 9 6 3 0 1 3 0 0 0 0 0 0 537 08:15 08:30 08:45 09:00
1 1 0 0
176 233 230 237
42 61 52 47
2 1 2 6
0 1 2 0
2 4 0 0
0 0 0 0
0 1 0 0
95
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
223 302 286 290
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
2
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 876 202 11 3 6 0 1 0 0 0 0 0 0 0 1101 09:15 0 99 45 9 4 1 1 1 0 0 0 0 0 0 0 160 09:30 0 66 30 1 1 2 0 0 0 0 0 0 0 0 0 100 09:45 0 79 28 0 3 1 0 1 3 0 0 0 0 0 0 115 10:00 0 69 19 0 2 2 0 1 0 0 0 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 0 313 122 10 10 6 1 3 3 0 0 0 0 0 0 468 10:15 0 61 16 1 4 1 0 1 1 0 0 0 0 0 0 85 10:30 0 62 28 0 0 0 0 0 2 0 0 0 0 0 0 92 10:45 0 97 31 2 3 1 1 1 3 0 0 0 0 0 0 139 11:00 0 82 32 0 1 3 0 0 2 0 0 0 0 0 0 120 -----------------------------------------------------------------------------------------------------------Hour Total 0 302 107 3 8 5 1 2 8 0 0 0 0 0 0 436 11:15 0 77 38 1 3 1 0 1 0 0 0 0 0 0 0 121 11:30 0 86 26 0 2 1 0 1 0 0 0 0 0 0 0 116 11:45 0 98 24 0 3 3 0 1 0 0 0 0 0 0 0 129 12:00 0 86 27 0 0 0 0 0 0 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 0 347 115 1 8 5 0 3 0 0 0 0 0 0 0 479 12:15 0 111 35 1 2 2 1 0 0 0 0 0 0 0 0 152 12:30 1 78 33 1 1 1 0 0 0 0 0 0 0 0 0 115 12:45 1 102 19 1 3 3 0 0 2 0 0 0 0 0 0 131 13:00 1 91 33 0 2 3 0 0 3 0 0 0 0 0 0 133 -----------------------------------------------------------------------------------------------------------Hour Total 3 382 120 3 8 9 1 0 5 0 0 0 0 0 0 531 13:15 0 110 34 0 2 0 0 0 0 0 0 0 0 0 0 146 13:30 0 83 26 0 1 1 0 1 0 0 0 0 0 0 0 112 13:45 2 89 23 0 0 3 1 0 0 0 0 0 0 0 0 118 14:00 0 90 26 0 3 4 0 1 1 0 0 0 0 0 0 125 -----------------------------------------------------------------------------------------------------------Hour Total 2 372 109 0 6 8 1 2 1 0 0 0 0 0 0 501 14:15 0 104 33 5 1 0 0 1 0 0 0 0 0 0 0 144 14:30 0 103 36 0 2 1 0 0 3 0 0 0 0 0 0 145 14:45 0 112 29 2 2 1 0 1 0 0 0 0 0 0 0 147 15:00 1 108 29 0 4 2 1 2 0 0 0 0 0 0 0 147 -----------------------------------------------------------------------------------------------------------Hour Total 1 427 127 7 9 4 1 4 3 0 0 0 0 0 0 583 15:15 0 152 43 3 3 2 1 1 1 0 0 0 0 0 0 206 15:30 0 154 52 1 1 1 0 0 0 0 0 0 0 0 0 209 15:45 1 150 61 5 5 0 0 0 0 0 0 0 0 0 0 222 16:00 0 124 45 5 1 2 0 2 1 0 0 0 0 0 0 180 -----------------------------------------------------------------------------------------------------------Hour Total 1 580 201 14 10 5 1 3 2 0 0 0 0 0 0 817 16:15 1 154 61 2 3 0 0 1 0 0 0 0 0 0 0 222 16:30 2 146 32 1 3 1 0 1 0 0 0 0 0 0 0 186 16:45 0 157 35 2 4 1 0 1 0 0 0 0 0 0 0 200 17:00 0 160 50 6 3 2 0 2 0 0 0 0 0 0 0 223 -----------------------------------------------------------------------------------------------------------Hour Total 3 617 178 11 13 4 0 5 0 0 0 0 0 0 0 831
96
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
3
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 206 52 1 1 0 0 0 0 0 0 0 0 0 0 261 17:30 1 212 57 1 1 0 0 0 1 0 0 0 0 0 0 273 17:45 1 197 51 1 1 0 0 1 0 0 0 0 0 0 0 252 18:00 0 199 48 0 2 0 0 0 0 0 0 0 0 0 0 249 -----------------------------------------------------------------------------------------------------------Hour Total 3 814 208 3 5 0 0 1 1 0 0 0 0 0 0 1035 18:15 0 177 43 0 2 2 0 1 0 0 0 0 0 0 0 225 18:30 0 167 29 0 0 3 0 0 0 0 0 0 0 0 0 199 18:45 0 142 35 0 0 0 0 0 0 0 0 1 1 0 0 179 19:00 1 125 33 0 4 0 0 0 0 0 0 0 0 0 0 163 -----------------------------------------------------------------------------------------------------------Hour Total 1 611 140 0 6 5 0 1 0 0 0 1 1 0 0 766 19:15 0 88 20 0 0 0 0 0 0 0 0 0 0 0 0 108 19:30 1 81 31 0 1 0 0 0 0 0 0 0 0 0 0 114 19:45 0 82 25 0 0 0 0 0 0 0 0 0 0 0 0 107 20:00 4 72 16 0 0 0 0 0 0 0 0 0 0 0 0 92 -----------------------------------------------------------------------------------------------------------Hour Total 5 323 92 0 1 0 0 0 0 0 0 0 0 0 0 421 20:15 0 73 15 0 0 0 0 0 0 0 0 0 0 0 0 88 20:30 1 71 15 0 0 0 0 0 0 0 0 0 0 0 0 87 20:45 0 52 14 0 0 0 0 0 0 0 0 0 0 0 0 66 21:00 0 59 9 0 0 0 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 1 255 53 0 0 0 0 0 0 0 0 0 0 0 0 309 21:15 0 53 10 0 0 0 0 0 0 0 0 0 0 0 0 63 21:30 0 38 8 0 1 0 0 0 0 0 0 0 0 0 0 47 21:45 0 32 4 0 0 0 0 0 0 0 0 0 0 0 0 36 22:00 4 26 5 0 0 0 0 0 0 0 0 0 0 0 0 35 -----------------------------------------------------------------------------------------------------------Hour Total 4 149 27 0 1 0 0 0 0 0 0 0 0 0 0 181 22:15 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21 22:30 0 26 6 0 0 0 0 0 0 0 0 0 0 0 0 32 22:45 0 12 5 0 0 0 0 0 1 0 0 0 0 0 0 18 23:00 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 70 13 0 0 0 0 0 1 0 0 0 0 0 0 84 23:15 0 20 2 0 0 0 0 0 0 0 0 0 0 0 0 22 23:30 0 9 6 0 0 0 0 1 0 0 0 0 0 0 0 16 23:45 0 10 2 0 0 0 0 0 0 0 0 0 0 0 0 12 24:00 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 44 13 0 0 0 0 1 0 0 0 0 0 0 0 58 -----------------------------------------------------------------------------------------------------------DAY TOTAL 27 7133 2007 74 96 61 6 27 29 0 0 1 1 0 0 9462 PERCENTS 0.3% 75.4% 21.3% 0.8% 1.1% 0.6% 0.0% 0.2% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.8% Trucks & Buses 3.1% AM Times AM Peaks
07:45 08:15 08:30 08:30 09:15 11:00 08:30 09:15 10:15 2 876 205 18 10 8 1 3 8
PM Times PM Peaks
19:15 17:15 15:30 15:15 15:00 12:15 14:30 16:00 12:15 5 814 219 14 13 9 2 5 5
97
08:15 1101 18:00 18:00 1 1
17:15 1035
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
4
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 00:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 00:45 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 01:00 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 17 4 0 0 0 0 0 0 0 0 0 0 0 0 21 01:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 14 02:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 02:30 0 3 1 0 1 0 0 0 0 0 0 0 0 0 0 5 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 2 0 1 0 0 0 0 0 0 0 0 0 0 10 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 05:15 0 4 1 1 0 0 0 0 0 0 0 0 0 0 0 6 05:30 0 13 6 0 0 1 0 0 0 0 0 0 0 0 0 20 05:45 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 06:00 0 32 8 0 0 0 0 1 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------Hour Total 0 57 16 1 0 1 0 1 0 0 0 0 0 0 0 76 06:15 0 33 8 0 0 0 0 0 0 0 0 0 0 0 0 41 06:30 0 32 8 1 1 1 0 0 0 0 0 0 0 0 0 43 06:45 0 41 11 0 0 1 0 0 1 0 0 0 0 0 0 54 07:00 1 49 14 0 0 1 0 1 2 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 1 155 41 1 1 3 0 1 3 0 0 0 0 0 0 206 07:15 1 84 24 1 0 0 0 0 0 0 0 0 0 0 0 110 07:30 0 87 47 0 2 0 0 0 0 0 0 0 0 0 0 136 07:45 0 115 27 8 0 0 0 0 0 0 0 0 0 0 0 150 08:00 0 108 26 0 0 2 0 0 0 0 0 0 0 0 0 136 -----------------------------------------------------------------------------------------------------------Hour Total 1 394 124 9 2 2 0 0 0 0 0 0 0 0 0 532 08:15 08:30 08:45 09:00
0 0 0 0
186 237 260 233
42 49 56 51
1 1 0 6
0 0 2 1
1 0 0 1
0 0 0 0
1 0 0 0
98
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
231 287 320 292
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
5
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 916 198 8 3 2 0 1 1 0 0 0 1 0 0 1130 09:15 0 94 27 8 1 2 0 1 0 0 0 0 0 0 0 133 09:30 0 72 28 0 3 3 0 0 0 0 0 0 0 0 0 106 09:45 0 73 18 0 3 0 0 0 0 0 0 0 0 0 0 94 10:00 0 66 27 0 1 1 0 1 1 0 0 0 0 0 0 97 -----------------------------------------------------------------------------------------------------------Hour Total 0 305 100 8 8 6 0 2 1 0 0 0 0 0 0 430 10:15 0 71 20 0 2 3 0 0 2 1 0 0 0 0 0 99 10:30 0 62 32 3 1 6 0 0 0 0 0 0 0 0 0 104 10:45 0 76 28 0 1 2 0 1 0 0 0 0 0 0 0 108 11:00 0 66 18 0 0 0 0 1 0 0 0 0 0 0 0 85 -----------------------------------------------------------------------------------------------------------Hour Total 0 275 98 3 4 11 0 2 2 1 0 0 0 0 0 396 11:15 0 67 32 1 1 3 0 0 0 0 0 0 0 0 0 104 11:30 0 83 27 0 0 4 1 0 0 0 0 0 0 0 0 115 11:45 0 87 25 1 3 2 0 2 0 0 0 0 0 0 0 120 12:00 0 75 22 0 3 1 0 0 0 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 0 312 106 2 7 10 1 2 0 0 0 0 0 0 0 440 12:15 0 100 21 0 0 2 0 0 1 0 0 0 0 0 0 124 12:30 0 105 25 0 2 3 1 1 0 0 0 0 0 0 0 137 12:45 0 80 35 1 0 3 0 0 0 0 0 0 0 0 0 119 13:00 0 89 41 0 2 2 1 0 2 0 0 0 0 0 0 137 -----------------------------------------------------------------------------------------------------------Hour Total 0 374 122 1 4 10 2 1 3 0 0 0 0 0 0 517 13:15 1 97 38 3 1 2 0 0 0 0 0 0 0 0 0 142 13:30 0 96 26 1 1 2 0 1 0 0 0 0 0 0 0 127 13:45 0 84 45 2 2 7 0 0 0 0 0 0 0 0 0 140 14:00 0 88 40 0 2 2 0 0 1 0 0 0 0 0 0 133 -----------------------------------------------------------------------------------------------------------Hour Total 1 365 149 6 6 13 0 1 1 0 0 0 0 0 0 542 14:15 0 132 39 3 4 3 0 2 0 0 0 0 0 0 0 183 14:30 1 139 45 1 1 2 0 0 0 0 1 0 0 0 0 190 14:45 1 104 37 5 2 3 0 1 0 0 0 0 0 0 0 153 15:00 0 112 32 5 1 0 0 0 0 0 0 0 0 0 0 150 -----------------------------------------------------------------------------------------------------------Hour Total 2 487 153 14 8 8 0 3 0 0 1 0 0 0 0 676 15:15 0 128 53 4 3 2 0 1 0 0 0 0 0 0 0 191 15:30 0 154 44 2 2 6 0 0 0 0 0 0 0 0 0 208 15:45 1 133 46 2 4 2 0 0 0 0 0 0 0 0 0 188 16:00 4 134 38 7 3 1 0 0 1 0 1 0 0 0 0 189 -----------------------------------------------------------------------------------------------------------Hour Total 5 549 181 15 12 11 0 1 1 0 1 0 0 0 0 776 16:15 0 160 41 2 2 2 0 0 0 0 1 0 0 0 0 208 16:30 0 162 52 0 3 1 0 0 0 0 0 0 0 0 0 218 16:45 0 156 61 0 1 1 0 1 0 0 0 0 0 0 0 220 17:00 0 177 44 0 1 0 0 0 0 0 0 0 0 0 0 222 -----------------------------------------------------------------------------------------------------------Hour Total 0 655 198 2 7 4 0 1 0 0 1 0 0 0 0 868
99
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
6
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 183 41 0 1 0 0 0 0 0 0 0 0 0 0 225 17:30 2 200 52 0 3 1 0 0 1 0 0 0 0 0 0 259 17:45 0 204 60 0 1 0 0 0 1 0 0 0 0 0 0 266 18:00 3 196 57 0 1 0 0 0 0 0 0 1 0 0 0 258 -----------------------------------------------------------------------------------------------------------Hour Total 5 783 210 0 6 1 0 0 2 0 0 1 0 0 0 1008 18:15 0 140 34 1 0 0 0 1 1 0 0 0 0 0 0 177 18:30 0 168 42 0 1 0 0 0 0 0 0 0 0 0 0 211 18:45 0 143 31 0 0 1 0 0 0 0 0 0 0 0 0 175 19:00 0 122 27 0 0 0 0 0 0 0 0 0 0 0 0 149 -----------------------------------------------------------------------------------------------------------Hour Total 0 573 134 1 1 1 0 1 1 0 0 0 0 0 0 712 19:15 1 101 27 0 1 0 0 1 0 0 0 0 0 0 0 131 19:30 0 96 18 0 1 0 0 0 0 0 0 0 0 0 0 115 19:45 0 96 15 0 0 0 0 1 0 0 0 0 0 0 0 112 20:00 0 84 12 0 1 0 0 0 0 0 0 0 0 0 0 97 -----------------------------------------------------------------------------------------------------------Hour Total 1 377 72 0 3 0 0 2 0 0 0 0 0 0 0 455 20:15 1 67 8 0 0 0 0 0 0 0 0 0 0 0 0 76 20:30 0 71 25 0 0 0 0 0 0 0 0 0 0 0 0 96 20:45 0 75 12 0 0 0 0 0 0 0 0 0 0 0 0 87 21:00 1 64 18 0 0 0 0 0 0 0 0 0 0 0 0 83 -----------------------------------------------------------------------------------------------------------Hour Total 2 277 63 0 0 0 0 0 0 0 0 0 0 0 0 342 21:15 0 53 10 0 0 0 0 0 0 0 0 0 0 0 0 63 21:30 0 50 4 0 0 0 0 0 0 0 0 0 0 0 0 54 21:45 0 40 13 0 0 0 0 0 0 0 0 0 0 0 0 53 22:00 0 29 8 0 0 0 0 0 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------Hour Total 0 172 35 0 0 0 0 0 0 0 0 0 0 0 0 207 22:15 0 23 4 0 0 0 0 0 0 0 0 0 0 0 0 27 22:30 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 22:45 0 22 5 0 0 0 0 0 0 0 0 0 0 0 0 27 23:00 0 15 1 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------Hour Total 0 78 13 0 0 0 0 0 0 0 0 0 0 0 0 91 23:15 0 11 3 0 0 0 0 0 0 0 0 0 0 0 0 14 23:30 0 14 3 0 0 0 0 0 0 0 0 0 0 0 0 17 23:45 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 24:00 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 41 9 0 0 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------DAY TOTAL 18 7199 2031 71 73 83 3 19 15 1 3 1 1 0 0 9518 PERCENTS 0.2% 75.7% 21.4% 0.8% 0.8% 0.9% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.1% Trucks & Buses 2.8% AM Times AM Peaks
06:30 08:15 08:15 08:30 09:30 10:00 10:45 11:00 06:15 09:30 2 916 198 15 9 12 1 3 3 1
PM Times PM Peaks
15:15 17:15 17:15 14:45 15:15 13:30 12:15 13:30 12:15 5 783 210 16 12 14 2 3 3
100
08:00 1 15:30 17:15 2 1
08:15 1130 17:15 1008
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
7
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 00:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 00:45 1 5 1 0 0 0 0 0 0 0 0 0 0 0 0 7 01:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 1 20 4 0 0 0 0 0 0 0 0 0 0 0 0 25 01:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 01:30 0 2 1 0 0 0 0 0 0 1 0 0 0 0 0 4 01:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 3 0 0 0 0 0 0 1 0 0 0 0 0 13 02:15 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 03:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 04:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:30 0 5 1 0 1 0 0 1 0 0 0 0 0 0 0 8 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 2 0 1 0 0 1 0 0 0 0 0 0 0 16 05:15 0 3 3 1 0 0 0 0 0 0 0 0 0 0 0 7 05:30 0 7 5 0 0 1 0 0 0 0 0 0 0 0 0 13 05:45 0 9 2 0 1 0 0 0 0 0 0 0 0 0 0 12 06:00 0 12 7 0 0 1 0 0 1 0 0 0 0 0 0 21 -----------------------------------------------------------------------------------------------------------Hour Total 0 31 17 1 1 2 0 0 1 0 0 0 0 0 0 53 06:15 0 42 14 0 0 0 0 0 0 0 0 0 0 0 0 56 06:30 0 31 5 1 1 1 0 0 0 0 0 0 0 0 0 39 06:45 0 30 16 1 0 2 0 1 0 0 0 0 0 0 0 50 07:00 0 41 16 0 2 0 0 0 0 0 0 0 0 0 0 59 -----------------------------------------------------------------------------------------------------------Hour Total 0 144 51 2 3 3 0 1 0 0 0 0 0 0 0 204 07:15 1 75 17 1 1 0 0 0 0 0 0 0 0 0 0 95 07:30 0 85 27 0 1 1 0 0 0 0 0 0 0 0 0 114 07:45 0 98 25 8 1 1 0 0 0 0 0 0 0 0 0 133 08:00 0 106 31 0 0 2 0 1 1 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 1 364 100 9 3 4 0 1 1 0 0 0 0 0 0 483 08:15 08:30 08:45 09:00
1 0 1 0
189 238 291 229
45 60 53 44
1 1 0 3
1 2 0 0
1 6 1 3
0 0 0 0
0 0 1 0
101
0 0 1 0
0 0 0 1
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
238 307 349 280
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
8
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 947 202 5 3 11 0 1 1 1 0 0 1 0 0 1174 09:15 0 122 30 11 6 2 0 0 0 0 0 0 0 0 0 171 09:30 1 87 22 0 2 3 0 0 1 0 0 0 0 0 0 116 09:45 0 87 27 1 1 3 0 2 1 0 0 0 0 0 0 122 10:00 0 80 19 0 1 2 0 0 0 0 0 0 0 0 0 102 -----------------------------------------------------------------------------------------------------------Hour Total 1 376 98 12 10 10 0 2 2 0 0 0 0 0 0 511 10:15 0 83 30 0 0 4 0 0 0 0 0 0 0 0 0 117 10:30 0 71 31 0 3 3 0 1 0 0 0 0 1 0 0 110 10:45 0 86 29 1 1 1 1 0 0 0 0 0 0 0 0 119 11:00 0 79 31 0 1 3 0 2 0 0 0 0 0 0 0 116 -----------------------------------------------------------------------------------------------------------Hour Total 0 319 121 1 5 11 1 3 0 0 0 0 1 0 0 462 11:15 0 80 26 0 1 5 0 0 1 0 0 0 0 0 0 113 11:30 0 90 26 0 4 6 0 2 0 0 0 0 0 0 0 128 11:45 1 74 29 0 1 2 0 0 3 0 0 0 0 0 0 110 12:00 1 84 32 0 3 4 0 1 0 0 0 0 0 0 0 125 -----------------------------------------------------------------------------------------------------------Hour Total 2 328 113 0 9 17 0 3 4 0 0 0 0 0 0 476 12:15 1 100 40 0 2 1 0 0 0 0 0 0 0 0 0 144 12:30 0 84 36 0 2 8 0 0 1 0 0 0 0 0 0 131 12:45 0 97 35 0 2 4 0 2 1 0 0 0 0 0 0 141 13:00 1 93 32 0 2 7 0 1 0 0 0 0 0 0 0 136 -----------------------------------------------------------------------------------------------------------Hour Total 2 374 143 0 8 20 0 3 2 0 0 0 0 0 0 552 13:15 1 97 35 0 2 1 0 0 0 0 0 0 0 0 0 136 13:30 0 91 30 0 1 3 0 1 0 0 0 0 0 0 0 126 13:45 1 87 30 0 2 6 0 1 0 0 0 0 0 0 0 127 14:00 0 87 36 0 3 3 0 0 0 0 0 0 0 0 0 129 -----------------------------------------------------------------------------------------------------------Hour Total 2 362 131 0 8 13 0 2 0 0 0 0 0 0 0 518 14:15 0 103 36 4 0 2 0 0 0 0 0 0 0 0 0 145 14:30 1 122 37 1 1 1 0 2 0 0 0 0 0 0 0 165 14:45 0 116 41 1 0 5 0 0 0 0 0 0 0 0 0 163 15:00 0 99 44 1 0 2 0 0 0 0 0 0 0 0 0 146 -----------------------------------------------------------------------------------------------------------Hour Total 1 440 158 7 1 10 0 2 0 0 0 0 0 0 0 619 15:15 0 155 52 4 1 4 0 0 1 0 0 0 0 0 0 217 15:30 0 155 53 0 2 2 0 0 1 0 0 0 0 0 0 213 15:45 0 162 44 3 3 2 0 0 1 0 0 0 0 0 0 215 16:00 2 134 33 6 1 2 0 1 1 0 1 0 0 0 0 181 -----------------------------------------------------------------------------------------------------------Hour Total 2 606 182 13 7 10 0 1 4 0 1 0 0 0 0 826 16:15 1 152 36 4 8 1 0 1 0 0 1 0 0 0 0 204 16:30 0 170 49 0 2 2 0 0 0 0 0 0 0 0 0 223 16:45 1 169 49 4 3 3 0 0 0 0 0 0 0 0 0 229 17:00 1 164 49 5 5 0 0 0 0 0 0 0 0 0 0 224 -----------------------------------------------------------------------------------------------------------Hour Total 3 655 183 13 18 6 0 1 0 0 1 0 0 0 0 880
102
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 2B Site ID: 000000003561 Location: Palm Valley Rd. WB Direction: WEST Lane: 1 TIME
1
2
3
Page:
9
File: WB.prn City: 16-221 AW Max County: 30.13658, -81.38083
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 175 56 2 4 1 0 0 0 0 0 0 0 0 0 239 17:30 0 235 61 1 1 1 0 0 0 0 0 0 0 0 0 299 17:45 0 212 60 0 1 0 0 0 0 0 0 0 0 0 0 273 18:00 1 209 49 0 3 0 0 0 0 0 0 0 0 0 0 262 -----------------------------------------------------------------------------------------------------------Hour Total 2 831 226 3 9 2 0 0 0 0 0 0 0 0 0 1073 18:15 1 186 44 0 2 0 0 0 0 0 0 0 0 0 0 233 18:30 0 172 57 0 0 0 0 0 0 0 0 0 0 0 0 229 18:45 0 132 40 1 1 0 0 2 1 0 0 0 0 0 0 177 19:00 0 134 37 0 0 0 0 0 0 0 0 0 0 0 0 171 -----------------------------------------------------------------------------------------------------------Hour Total 1 624 178 1 3 0 0 2 1 0 0 0 0 0 0 810 19:15 0 112 23 0 0 0 0 0 0 0 0 0 0 0 0 135 19:30 1 107 19 0 0 0 0 0 1 0 0 0 0 0 0 128 19:45 0 83 16 0 0 0 0 0 0 0 0 0 0 0 0 99 20:00 0 65 21 0 1 0 0 0 0 0 0 0 0 0 0 87 -----------------------------------------------------------------------------------------------------------Hour Total 1 367 79 0 1 0 0 0 1 0 0 0 0 0 0 449 20:15 0 89 26 0 1 0 0 1 0 0 0 0 0 0 0 117 20:30 1 76 17 0 0 0 0 0 0 0 0 0 0 0 0 94 20:45 0 71 14 0 0 0 0 0 0 0 0 0 0 0 0 85 21:00 1 59 15 0 0 0 0 0 0 0 0 0 0 0 0 75 -----------------------------------------------------------------------------------------------------------Hour Total 2 295 72 0 1 0 0 1 0 0 0 0 0 0 0 371 21:15 0 69 15 0 0 0 0 0 0 0 0 0 0 0 0 84 21:30 0 67 6 0 0 0 0 1 0 0 0 0 0 0 0 74 21:45 3 43 12 0 0 0 0 0 0 0 0 0 0 0 0 58 22:00 0 32 7 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 3 211 40 0 0 0 0 1 0 0 0 0 0 0 0 255 22:15 0 27 10 0 0 0 0 0 0 0 0 0 0 0 0 37 22:30 0 37 2 0 0 0 0 0 0 0 0 0 0 0 0 39 22:45 1 16 2 0 0 0 0 0 0 0 0 0 0 0 0 19 23:00 0 16 2 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 1 96 16 0 0 0 0 0 0 0 0 0 0 0 0 113 23:15 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:30 0 13 1 0 0 0 0 0 0 0 0 0 0 0 0 14 23:45 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 24:00 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 36 5 0 0 0 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------DAY TOTAL 27 7457 2127 67 91 119 1 25 17 2 2 0 2 0 0 9937 PERCENTS 0.3% 75.1% 21.5% 0.7% 1.0% 1.1% 0.0% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.7% Trucks & Buses 3.2% AM Times AM Peaks
08:00 08:15 08:15 08:30 09:15 11:15 10:00 10:45 11:00 00:45 2 947 202 15 10 17 1 4 4 1
PM Times PM Peaks
16:00 17:30 17:00 16:00 16:15 12:15 4 842 226 14 18 20
12:45 15:15 4 4
08:00 1 15:30 2
08:15 1174 17:15 1073
=================================================================================================================== GRAND TOTAL 72 6165 260 10 61 5 4 0 21789 212 263 71 3 2 0 28917 PERCENTS 0.3% 75.4% 21.4% 0.8% 0.8% 0.9% 0.0% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
103
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
1
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 00:30 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 00:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21 01:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 2 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 1 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:15 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 2 04:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:45 0 3 1 0 0 0 0 0 0 1 0 0 0 0 0 5 05:00 1 8 0 0 0 0 0 0 0 1 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 1 14 1 0 0 0 0 0 0 3 0 0 0 0 0 19 05:15 2 6 2 0 0 0 0 0 0 0 0 0 0 0 0 10 05:30 0 11 1 0 0 0 1 0 0 0 0 0 0 0 0 13 05:45 0 9 6 0 0 1 0 0 0 0 0 0 0 0 0 16 06:00 2 8 1 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 4 34 10 0 0 1 1 0 0 0 0 0 0 0 0 50 06:15 1 10 1 0 0 1 0 0 0 0 0 0 0 0 0 13 06:30 3 30 8 0 0 1 1 0 0 0 0 0 0 0 0 43 06:45 2 21 5 0 0 0 0 0 0 0 0 0 0 0 0 28 07:00 1 32 15 0 0 1 2 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 7 93 29 0 0 3 3 0 0 0 0 0 0 0 0 135 07:15 5 52 18 0 1 2 0 0 1 0 0 0 0 0 0 79 07:30 8 78 19 0 0 1 1 0 7 0 0 0 0 0 0 114 07:45 12 47 3 0 0 0 2 0 2 1 0 0 2 0 0 69 08:00 33 33 5 1 0 0 3 0 3 0 0 1 9 0 0 88 -----------------------------------------------------------------------------------------------------------Hour Total 58 210 45 1 1 3 6 0 13 1 0 1 11 0 0 350 08:15 08:30 08:45 09:00
32 21 11 20
37 55 65 80
6 4 16 27
0 1 0 1
0 0 1 0
1 0 2 2
2 0 1 0
0 0 1 0
104
1 3 3 1
1 1 1 0
0 0 0 0
3 6 3 0
6 8 8 1
0 0 0 0
0 0 0 0
89 99 112 132
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
2
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 84 237 53 2 1 5 3 1 8 3 0 12 23 0 0 432 09:15 14 69 27 0 1 2 3 1 0 0 0 1 0 0 0 118 09:30 13 49 16 0 0 1 2 0 3 2 0 2 2 0 0 90 09:45 9 55 20 0 1 4 2 0 1 0 0 0 0 0 0 92 10:00 10 54 20 0 0 0 1 0 1 1 0 0 0 0 0 87 -----------------------------------------------------------------------------------------------------------Hour Total 46 227 83 0 2 7 8 1 5 3 0 3 2 0 0 387 10:15 17 60 19 0 0 1 1 0 0 1 0 1 0 0 0 100 10:30 7 60 17 0 0 1 4 0 1 0 0 1 0 0 0 91 10:45 0 74 22 0 2 1 0 0 1 0 0 0 0 0 0 100 11:00 0 75 23 0 1 3 0 0 1 0 0 0 0 0 0 103 -----------------------------------------------------------------------------------------------------------Hour Total 24 269 81 0 3 6 5 0 3 1 0 2 0 0 0 394 11:15 0 85 22 0 0 1 0 1 0 0 0 0 0 0 0 109 11:30 0 95 18 0 5 1 0 1 0 0 0 0 0 0 0 120 11:45 1 71 20 0 1 0 0 0 0 0 0 0 0 0 0 93 12:00 1 92 22 0 1 1 0 0 0 0 0 0 0 0 0 117 -----------------------------------------------------------------------------------------------------------Hour Total 2 343 82 0 7 3 0 2 0 0 0 0 0 0 0 439 12:15 0 82 27 0 1 0 0 1 0 0 0 0 0 0 0 111 12:30 0 91 23 0 2 0 0 0 0 0 0 0 0 0 0 116 12:45 0 79 30 0 2 2 0 0 1 0 0 0 0 0 0 114 13:00 0 105 23 0 4 0 0 1 0 0 0 0 0 0 0 133 -----------------------------------------------------------------------------------------------------------Hour Total 0 357 103 0 9 2 0 2 1 0 0 0 0 0 0 474 13:15 0 92 28 0 0 2 0 1 0 0 0 0 0 0 0 123 13:30 0 80 22 0 1 0 0 0 0 0 0 0 0 0 0 103 13:45 0 118 20 0 0 1 0 0 0 0 0 0 0 0 0 139 14:00 0 111 25 0 2 2 0 0 1 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 0 401 95 0 3 5 0 1 1 0 0 0 0 0 0 506 14:15 0 109 23 1 3 0 0 0 1 0 0 0 0 0 0 137 14:30 0 79 16 0 2 1 0 1 1 0 0 0 0 0 0 100 14:45 0 92 13 0 1 2 0 0 0 0 0 1 1 0 0 110 15:00 0 49 6 0 0 0 0 0 0 0 0 0 0 0 0 55 -----------------------------------------------------------------------------------------------------------Hour Total 0 329 58 1 6 3 0 1 2 0 0 1 1 0 0 402 15:15 0 112 21 0 1 0 0 0 0 1 0 0 0 0 0 135 15:30 1 101 25 0 2 1 0 1 0 0 0 0 1 0 0 132 15:45 0 99 24 0 1 0 0 0 1 0 0 0 1 0 0 126 16:00 0 133 25 0 3 1 0 1 0 0 0 0 0 0 0 163 -----------------------------------------------------------------------------------------------------------Hour Total 1 445 95 0 7 2 0 2 1 1 0 0 2 0 0 556 16:15 0 134 25 0 0 0 0 0 0 0 0 0 0 0 0 159 16:30 0 116 25 0 3 0 0 0 0 0 0 0 0 0 0 144 16:45 2 130 26 1 4 0 0 0 0 0 0 0 0 0 0 163 17:00 0 160 30 2 3 0 0 1 0 0 0 0 0 0 0 196 -----------------------------------------------------------------------------------------------------------Hour Total 2 540 106 3 10 0 0 1 0 0 0 0 0 0 0 662
105
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
3
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 165 32 2 0 0 0 0 0 0 0 0 0 0 0 199 17:30 0 154 21 2 2 0 0 0 0 0 0 0 0 0 0 179 17:45 0 144 31 0 0 0 0 0 0 0 0 0 0 0 0 175 18:00 0 149 21 0 1 2 0 1 0 0 1 0 0 0 0 175 -----------------------------------------------------------------------------------------------------------Hour Total 0 612 105 4 3 2 0 1 0 0 1 0 0 0 0 728 18:15 0 145 28 0 1 2 0 0 0 0 0 0 0 0 0 176 18:30 0 155 17 0 1 0 0 0 0 0 0 0 0 0 0 173 18:45 1 129 26 0 2 0 0 0 0 0 0 0 0 0 0 158 19:00 0 98 20 0 1 0 0 0 0 0 0 0 0 0 0 119 -----------------------------------------------------------------------------------------------------------Hour Total 1 527 91 0 5 2 0 0 0 0 0 0 0 0 0 626 19:15 0 75 12 0 0 0 0 0 0 0 0 0 0 0 0 87 19:30 0 86 27 0 0 0 0 0 0 0 0 0 0 0 0 113 19:45 0 78 15 0 0 0 0 0 0 0 0 0 0 0 0 93 20:00 0 74 20 0 1 0 0 0 0 0 0 0 0 0 0 95 -----------------------------------------------------------------------------------------------------------Hour Total 0 313 74 0 1 0 0 0 0 0 0 0 0 0 0 388 20:15 0 72 8 0 0 0 0 0 0 0 0 0 0 0 0 80 20:30 0 79 9 0 0 0 0 0 1 0 0 0 0 0 0 89 20:45 0 60 7 0 0 0 0 0 0 0 0 0 0 0 0 67 21:00 0 66 7 0 0 0 0 0 0 0 0 0 0 0 0 73 -----------------------------------------------------------------------------------------------------------Hour Total 0 277 31 0 0 0 0 0 1 0 0 0 0 0 0 309 21:15 0 47 7 0 0 0 0 0 0 0 0 0 0 0 0 54 21:30 0 36 6 0 0 0 0 0 0 0 0 0 0 0 0 42 21:45 0 24 4 0 0 0 0 0 0 0 0 0 0 0 0 28 22:00 0 28 1 0 0 0 0 0 0 0 0 0 0 0 0 29 -----------------------------------------------------------------------------------------------------------Hour Total 0 135 18 0 0 0 0 0 0 0 0 0 0 0 0 153 22:15 0 27 2 0 0 0 0 0 0 0 0 0 0 0 0 29 22:30 0 17 6 0 0 0 0 0 0 0 0 0 0 0 0 23 22:45 0 13 4 0 0 0 0 0 1 0 0 0 0 0 0 18 23:00 0 14 2 0 0 0 0 0 1 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------Hour Total 0 71 14 0 0 0 0 0 2 0 0 0 0 0 0 87 23:15 0 14 1 0 0 0 0 0 0 0 0 0 0 0 0 15 23:30 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 23:45 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 24:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 36 2 0 0 0 0 0 0 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------DAY TOTAL 231 5502 1179 11 58 44 27 12 37 12 1 19 39 0 0 7172 PERCENTS 3.3% 76.8% 16.5% 0.2% 0.9% 0.6% 0.3% 0.1% 0.5% 0.1% 0.0% 0.2% 0.5% 0.0% 0.0% 100% Passenger Vehicles 96.3% Trucks & Buses 3.6% AM Times AM Peaks
07:45 11:15 09:00 07:45 10:45 09:00 07:30 08:30 07:15 09:30 98 343 90 2 8 9 8 2 13 4
08:00 08:00 13 31
08:30 461
PM Times PM Peaks
16:00 17:00 17:00 16:45 16:00 13:15 2 623 114 7 10 5
12:15 13:45 14:30 17:15 14:00 14:45 2 3 1 1 1 2
17:00 749
106
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
4
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 00:30 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 01:00 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 25 6 0 0 0 0 0 0 0 0 0 0 0 0 31 01:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 02:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:00 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 1 0 0 0 0 0 0 0 0 0 6 04:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 3 0 0 0 0 0 0 1 0 0 0 0 0 0 4 05:00 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 1 0 0 0 0 0 1 0 0 0 0 0 0 13 05:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 05:30 0 11 3 0 0 1 0 0 0 0 0 0 0 0 0 15 05:45 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 06:00 0 19 5 0 0 0 0 0 0 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------Hour Total 0 47 10 0 0 1 0 0 0 0 0 0 0 0 0 58 06:15 0 21 3 1 0 0 0 0 0 0 0 0 0 0 0 25 06:30 1 13 2 0 0 1 0 0 0 0 0 0 0 0 0 17 06:45 0 22 10 0 0 0 0 1 0 0 0 0 0 0 0 33 07:00 0 35 9 0 0 0 0 0 0 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 1 91 24 1 0 1 0 1 0 0 0 0 0 0 0 119 07:15 0 57 17 1 1 0 0 0 0 0 0 0 0 0 0 76 07:30 0 94 27 2 1 0 0 0 0 0 0 0 0 0 0 124 07:45 0 62 18 0 0 0 0 0 0 0 0 0 0 0 0 80 08:00 1 75 17 0 0 1 0 0 1 0 0 0 0 0 0 95 -----------------------------------------------------------------------------------------------------------Hour Total 1 288 79 3 2 1 0 0 1 0 0 0 0 0 0 375 08:15 08:30 08:45 09:00
0 0 0 0
78 96 95 84
17 18 20 23
0 0 1 3
0 2 2 3
0 0 1 0
0 0 0 0
0 0 0 0
107
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 1 0 0
0 0 0 0
0 0 0 0
95 117 120 113
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
5
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 353 78 4 7 1 0 0 1 0 0 0 1 0 0 445 09:15 0 71 21 1 2 2 0 0 0 0 0 0 0 0 0 97 09:30 0 52 26 0 2 1 0 1 0 0 0 0 0 0 0 82 09:45 0 57 21 0 1 1 0 0 0 0 0 0 0 0 0 80 10:00 0 51 25 0 1 2 0 0 1 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 0 231 93 1 6 6 0 1 1 0 0 0 0 0 0 339 10:15 0 51 23 0 0 2 0 0 0 0 0 0 0 0 0 76 10:30 0 67 20 0 3 2 0 0 1 0 0 0 0 0 0 93 10:45 0 70 19 0 0 0 0 1 0 0 0 0 0 0 0 90 11:00 1 67 22 0 0 2 0 0 0 0 0 0 0 0 0 92 -----------------------------------------------------------------------------------------------------------Hour Total 1 255 84 0 3 6 0 1 1 0 0 0 0 0 0 351 11:15 0 82 16 0 1 1 0 0 0 0 0 0 0 0 0 100 11:30 0 80 22 0 0 4 0 1 0 0 0 0 0 0 0 107 11:45 0 75 25 0 3 0 0 0 0 0 0 0 0 0 0 103 12:00 0 71 31 0 3 1 0 0 0 0 0 0 0 0 0 106 -----------------------------------------------------------------------------------------------------------Hour Total 0 308 94 0 7 6 0 1 0 0 0 0 0 0 0 416 12:15 0 97 23 1 1 0 0 0 1 0 0 0 0 0 0 123 12:30 0 102 24 0 0 0 0 0 1 0 0 0 0 0 0 127 12:45 1 97 34 0 1 1 0 0 1 0 0 0 2 0 0 137 13:00 0 98 31 0 3 0 0 0 0 0 0 0 0 0 0 132 -----------------------------------------------------------------------------------------------------------Hour Total 1 394 112 1 5 1 0 0 3 0 0 0 2 0 0 519 13:15 1 88 32 0 2 2 0 1 1 0 1 0 0 0 0 128 13:30 0 80 19 0 1 0 0 0 0 0 0 0 0 0 0 100 13:45 0 99 36 2 3 1 0 0 1 0 1 0 0 0 0 143 14:00 0 69 19 0 2 2 0 0 0 0 1 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 1 336 106 2 8 5 0 1 2 0 3 0 0 0 0 464 14:15 0 94 22 0 1 0 0 2 1 0 0 0 0 0 0 120 14:30 0 89 23 0 0 0 0 0 0 0 0 0 0 0 0 112 14:45 0 67 17 0 2 0 0 0 0 0 0 0 0 0 0 86 15:00 0 41 9 1 2 0 0 0 1 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 0 291 71 1 5 0 0 2 2 0 0 0 0 0 0 372 15:15 1 102 31 0 4 0 0 1 0 0 2 0 1 0 0 142 15:30 0 102 23 0 1 0 0 0 1 0 1 0 0 0 0 128 15:45 0 93 25 2 2 0 0 0 0 0 0 0 0 0 0 122 16:00 0 135 16 3 3 0 0 0 0 0 0 0 0 0 0 157 -----------------------------------------------------------------------------------------------------------Hour Total 1 432 95 5 10 0 0 1 1 0 3 0 1 0 0 549 16:15 0 121 17 2 0 0 0 0 0 0 0 0 0 0 0 140 16:30 1 151 25 0 3 0 0 0 0 0 0 0 0 0 0 180 16:45 0 151 27 0 0 0 0 0 0 0 0 0 0 0 0 178 17:00 0 140 22 0 0 0 0 0 0 0 0 0 0 0 0 162 -----------------------------------------------------------------------------------------------------------Hour Total 1 563 91 2 3 0 0 0 0 0 0 0 0 0 0 660
108
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
6
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 147 29 0 1 0 0 0 1 0 0 0 0 0 0 178 17:30 0 162 23 0 2 0 0 1 0 1 0 0 0 0 0 189 17:45 1 127 35 0 1 0 0 0 0 0 0 0 0 0 0 164 18:00 0 145 24 0 1 0 0 0 0 0 0 0 0 0 0 170 -----------------------------------------------------------------------------------------------------------Hour Total 1 581 111 0 5 0 0 1 1 1 0 0 0 0 0 701 18:15 0 130 28 0 0 0 0 0 1 0 0 0 0 0 0 159 18:30 0 132 25 0 0 0 0 0 0 0 0 0 0 0 0 157 18:45 1 134 21 0 0 1 0 0 0 0 0 0 0 0 0 157 19:00 0 106 14 0 0 0 0 0 0 0 0 0 0 0 0 120 -----------------------------------------------------------------------------------------------------------Hour Total 1 502 88 0 0 1 0 0 1 0 0 0 0 0 0 593 19:15 0 104 13 0 0 0 0 0 0 0 0 0 0 0 0 117 19:30 0 90 16 0 0 0 0 0 0 0 0 0 0 0 0 106 19:45 0 79 11 0 0 0 0 0 0 0 0 0 0 0 0 90 20:00 0 71 9 0 0 0 0 0 0 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 0 344 49 0 0 0 0 0 0 0 0 0 0 0 0 393 20:15 0 76 7 0 0 0 0 0 0 0 0 0 0 0 0 83 20:30 0 52 13 0 0 0 0 0 0 0 0 0 0 0 0 65 20:45 0 72 11 0 0 0 0 0 0 0 0 0 0 0 0 83 21:00 0 72 18 0 0 0 0 0 0 0 0 0 0 0 0 90 -----------------------------------------------------------------------------------------------------------Hour Total 0 272 49 0 0 0 0 0 0 0 0 0 0 0 0 321 21:15 0 51 6 0 0 0 0 0 0 0 0 0 0 0 0 57 21:30 0 43 7 0 0 0 0 0 0 0 0 0 0 0 0 50 21:45 0 35 7 0 0 0 0 0 0 0 0 0 0 0 0 42 22:00 0 21 7 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 150 27 0 0 0 0 0 0 0 0 0 0 0 0 177 22:15 0 27 9 0 0 0 0 0 0 0 0 0 0 0 0 36 22:30 0 17 2 0 0 0 0 0 0 0 0 0 0 0 0 19 22:45 0 16 1 0 1 0 0 0 0 0 0 0 0 0 0 18 23:00 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 73 12 0 1 0 0 0 0 0 0 0 0 0 0 86 23:15 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 23:30 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 23:45 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 24:00 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 31 8 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------DAY TOTAL 9 5601 1292 20 62 30 0 9 15 1 6 0 4 0 0 7049 PERCENTS 0.2% 79.5% 18.4% 0.3% 0.9% 0.4% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.9% Trucks & Buses 2.0% AM Times AM Peaks
05:45 08:15 09:30 08:30 08:30 09:45 1 353 95 5 9 7
10:45 08:00 2 2
07:45 1
08:30 447
PM Times PM Peaks
12:30 16:45 12:30 15:30 15:15 13:15 2 600 121 7 10 5
13:30 12:15 16:45 13:15 2 3 1 3
12:15 2
16:45 707
109
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
7
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 00:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 00:45 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 01:00 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 29 2 0 0 0 0 0 0 0 0 0 0 0 0 31 01:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 02:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 04:15 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 3 04:30 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2 04:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 2 0 1 0 0 1 0 0 0 0 0 0 0 17 05:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 05:30 0 12 2 0 0 1 0 0 1 0 0 0 0 0 0 16 05:45 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 06:00 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 32 6 0 0 1 0 0 1 0 0 0 0 0 0 40 06:15 0 10 1 1 0 0 0 0 0 0 0 0 0 0 0 12 06:30 0 19 5 0 0 1 0 0 0 0 0 0 0 0 0 25 06:45 0 19 13 0 2 0 0 0 0 0 0 0 0 0 0 34 07:00 0 37 12 0 1 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 0 85 31 1 3 1 0 0 0 0 0 0 0 0 0 121 07:15 0 58 10 1 2 1 0 0 0 0 0 0 0 0 0 72 07:30 0 83 30 3 0 2 0 0 0 0 0 0 0 0 0 118 07:45 0 64 10 0 1 0 0 2 1 0 0 1 0 0 0 79 08:00 0 73 18 0 1 0 0 0 0 0 0 0 0 0 0 92 -----------------------------------------------------------------------------------------------------------Hour Total 0 278 68 4 4 3 0 2 1 0 0 1 0 0 0 361 08:15 08:30 08:45 09:00
0 0 0 0
85 99 109 89
18 29 41 22
0 0 1 5
0 0 0 1
2 3 4 2
0 0 0 0
0 0 0 0
110
0 0 0 0
0 0 0 0
0 1 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
105 132 156 119
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
8
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 382 110 6 1 11 0 0 0 0 2 0 0 0 0 512 09:15 0 68 14 0 1 0 0 0 1 0 0 0 0 0 0 84 09:30 0 70 16 0 1 1 0 0 0 0 0 0 0 0 0 88 09:45 0 76 22 0 2 1 0 0 0 0 0 0 0 0 0 101 10:00 0 88 30 0 1 3 0 0 0 0 0 0 0 0 0 122 -----------------------------------------------------------------------------------------------------------Hour Total 0 302 82 0 5 5 0 0 1 0 0 0 0 0 0 395 10:15 0 59 18 0 0 1 0 0 0 0 0 0 0 0 0 78 10:30 0 72 33 0 1 1 0 0 0 0 0 1 0 0 0 108 10:45 0 70 22 0 1 1 0 0 0 0 0 0 0 0 0 94 11:00 0 76 30 0 1 3 0 0 0 0 0 0 0 0 0 110 -----------------------------------------------------------------------------------------------------------Hour Total 0 277 103 0 3 6 0 0 0 0 0 1 0 0 0 390 11:15 0 75 21 0 2 3 0 0 0 0 0 0 0 0 0 101 11:30 0 76 24 0 2 1 0 0 2 0 0 0 0 0 0 105 11:45 0 64 24 0 2 2 0 0 0 0 0 0 0 0 0 92 12:00 1 70 31 1 0 2 0 1 0 0 0 0 0 0 0 106 -----------------------------------------------------------------------------------------------------------Hour Total 1 285 100 1 6 8 0 1 2 0 0 0 0 0 0 404 12:15 0 67 21 0 4 3 0 0 1 1 0 0 0 0 0 97 12:30 1 97 17 0 2 2 0 1 0 0 0 0 0 0 0 120 12:45 0 78 19 0 0 1 0 1 0 0 1 0 0 0 0 100 13:00 0 102 36 1 1 1 0 0 0 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 1 344 93 1 7 7 0 2 1 1 1 0 0 0 0 458 13:15 0 89 25 0 2 1 0 2 0 0 0 0 0 0 0 119 13:30 0 85 21 0 2 3 0 0 0 0 0 0 0 0 0 111 13:45 0 96 26 0 3 1 0 0 0 0 0 0 0 0 0 126 14:00 0 109 30 0 0 1 0 1 0 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 0 379 102 0 7 6 0 3 0 0 0 0 0 0 0 497 14:15 0 101 23 0 0 1 0 0 0 0 0 0 0 0 0 125 14:30 0 98 26 0 0 0 0 0 0 0 0 0 0 0 0 124 14:45 0 103 25 2 1 0 0 0 0 0 0 0 0 0 0 131 15:00 0 51 9 0 0 0 0 0 1 0 0 0 0 0 0 61 -----------------------------------------------------------------------------------------------------------Hour Total 0 353 83 2 1 1 0 0 1 0 0 0 0 0 0 441 15:15 0 92 31 0 0 1 0 0 1 0 0 0 2 0 0 127 15:30 0 123 24 0 3 0 0 0 1 0 0 0 0 0 0 151 15:45 0 110 26 0 1 1 0 0 0 0 0 0 1 0 0 139 16:00 1 137 26 1 1 0 0 0 0 0 0 0 0 0 0 166 -----------------------------------------------------------------------------------------------------------Hour Total 1 462 107 1 5 2 0 0 2 0 0 0 3 0 0 583 16:15 0 114 29 0 2 0 0 0 0 0 0 0 0 0 0 145 16:30 0 144 34 0 0 0 0 0 0 0 0 0 0 0 0 178 16:45 0 122 32 2 0 0 0 0 0 0 0 0 0 0 0 156 17:00 0 132 27 2 2 0 0 1 0 0 0 0 0 0 0 164 -----------------------------------------------------------------------------------------------------------Hour Total 0 512 122 4 4 0 0 1 0 0 0 0 0 0 0 643
111
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3A Site ID: 000000003587 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
9
File: SB.prn City: 16-221 AW Max County: 30.17797, -81.38828
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 160 31 2 0 0 0 0 0 0 0 0 0 0 0 193 17:30 0 182 26 1 1 0 0 0 0 0 0 0 0 0 0 210 17:45 0 134 25 0 0 0 0 0 0 0 0 0 0 0 0 159 18:00 0 146 32 0 1 0 0 0 0 0 0 0 0 0 0 179 -----------------------------------------------------------------------------------------------------------Hour Total 0 622 114 3 2 0 0 0 0 0 0 0 0 0 0 741 18:15 0 153 19 0 1 0 0 0 0 0 0 0 0 0 0 173 18:30 0 126 23 0 1 0 0 0 1 0 0 0 0 0 0 151 18:45 0 123 19 0 0 0 0 0 0 0 0 0 0 0 0 142 19:00 0 101 20 0 0 0 0 0 1 0 0 0 0 0 0 122 -----------------------------------------------------------------------------------------------------------Hour Total 0 503 81 0 2 0 0 0 2 0 0 0 0 0 0 588 19:15 0 101 13 0 0 0 0 0 0 0 0 0 0 0 0 114 19:30 1 89 7 0 0 0 0 0 0 0 0 0 0 0 0 97 19:45 0 77 10 0 0 0 0 0 0 0 0 0 0 0 0 87 20:00 0 66 16 0 0 0 0 0 0 0 0 0 0 0 0 82 -----------------------------------------------------------------------------------------------------------Hour Total 1 333 46 0 0 0 0 0 0 0 0 0 0 0 0 380 20:15 0 84 12 0 0 0 0 1 0 0 0 0 0 0 0 97 20:30 0 74 10 0 1 0 0 0 0 0 0 0 0 0 0 85 20:45 0 55 10 0 0 0 0 0 0 0 0 0 0 0 0 65 21:00 1 54 11 0 0 0 0 0 0 0 0 0 0 0 0 66 -----------------------------------------------------------------------------------------------------------Hour Total 1 267 43 0 1 0 0 1 0 0 0 0 0 0 0 313 21:15 0 62 13 0 0 0 0 0 0 0 0 0 0 0 0 75 21:30 0 64 7 0 1 0 0 0 0 0 0 0 0 0 0 72 21:45 0 43 9 0 0 0 0 0 0 0 0 0 0 0 0 52 22:00 0 25 5 0 0 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 0 194 34 0 1 0 0 0 0 0 0 0 0 0 0 229 22:15 0 25 5 0 0 0 0 0 0 0 0 0 0 0 0 30 22:30 0 39 4 0 0 0 0 0 0 0 0 0 0 0 0 43 22:45 0 14 1 0 0 0 0 0 0 0 0 0 0 0 0 15 23:00 0 11 2 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 89 12 0 0 0 0 0 0 0 0 0 0 0 0 101 23:15 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 23:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 23:45 0 13 1 0 0 0 0 0 0 0 0 0 0 0 0 14 24:00 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 38 3 0 0 0 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------DAY TOTAL 5 5800 1347 23 53 51 0 11 11 1 3 2 3 0 0 7310 PERCENTS 0.1% 79.4% 18.5% 0.4% 0.8% 0.6% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.8% Trucks & Buses 2.1% AM Times AM Peaks
11:15 08:15 08:15 08:15 11:00 08:15 1 382 110 6 7 11
07:00 10:45 2 2
08:00 07:00 2 1
PM Times PM Peaks
12:15 17:15 16:30 16:45 13:00 12:15 1 622 124 7 8 7
12:30 14:45 12:15 12:15 4 3 1 1
08:15 512 15:00 3
17:15 741
=================================================================================================================== GRAND TOTAL 245 3818 173 27 63 10 46 0 16903 54 125 32 14 21 0 21531 PERCENTS 1.2% 78.6% 17.8% 0.3% 0.9% 0.6% 0.1% 0.1% 0.2% 0.0% 0.0% 0.0% 0.2% 0.0% 0.0% 100%
112
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
1
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 01:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:45 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 03:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 1 0 0 0 0 0 0 0 4 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5 04:45 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 05:00 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 6 0 0 0 0 0 1 0 0 0 0 0 0 20 05:15 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 05:30 0 8 2 0 0 0 0 0 1 0 0 0 0 0 0 11 05:45 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13 06:00 0 24 2 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 47 6 0 0 0 0 0 1 0 0 0 0 0 0 54 06:15 1 30 3 0 1 0 0 0 0 0 0 0 0 0 0 35 06:30 0 47 8 1 0 0 0 0 0 0 0 0 0 0 0 56 06:45 0 41 11 0 0 2 0 0 0 0 0 0 0 0 0 54 07:00 1 58 18 2 0 1 0 0 1 0 0 0 0 0 0 81 -----------------------------------------------------------------------------------------------------------Hour Total 2 176 40 3 1 3 0 0 1 0 0 0 0 0 0 226 07:15 0 62 11 0 0 1 0 0 0 0 0 0 0 0 0 74 07:30 0 98 22 1 0 0 0 0 0 0 0 0 0 0 0 121 07:45 0 143 33 3 0 0 0 0 0 0 1 0 0 0 0 180 08:00 0 154 35 0 2 0 0 0 1 0 0 0 0 0 0 192 -----------------------------------------------------------------------------------------------------------Hour Total 0 457 101 4 2 1 0 0 1 0 1 0 0 0 0 567 08:15 08:30 08:45 09:00
0 0 0 0
146 126 136 110
29 29 30 22
2 1 1 1
2 1 1 1
0 0 0 1
0 0 0 0
0 0 0 0
113
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
179 157 168 135
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
2
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 518 110 5 5 1 0 0 0 0 0 0 0 0 0 639 09:15 0 78 18 0 0 0 0 0 1 0 0 0 0 0 0 97 09:30 0 116 35 0 1 1 0 0 0 0 0 0 0 0 0 153 09:45 0 100 25 0 2 0 0 1 0 0 0 0 0 0 0 128 10:00 0 80 22 0 2 1 0 0 0 0 0 0 0 0 0 105 -----------------------------------------------------------------------------------------------------------Hour Total 0 374 100 0 5 2 0 1 1 0 0 0 0 0 0 483 10:15 0 75 12 0 2 0 0 0 1 0 0 1 1 0 0 92 10:30 0 76 23 0 1 0 1 1 0 0 0 0 0 0 0 102 10:45 0 85 26 0 2 1 0 1 0 0 0 0 0 0 0 115 11:00 0 80 30 0 0 0 0 0 2 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 0 316 91 0 5 1 1 2 3 0 0 1 1 0 0 421 11:15 0 78 25 0 1 0 0 0 0 0 0 0 0 0 0 104 11:30 0 96 10 0 2 0 0 0 0 0 0 0 0 0 0 108 11:45 0 89 20 0 1 0 0 1 0 0 0 0 0 0 0 111 12:00 0 95 22 0 2 0 0 1 0 0 0 0 0 0 0 120 -----------------------------------------------------------------------------------------------------------Hour Total 0 358 77 0 6 0 0 2 0 0 0 0 0 0 0 443 12:15 0 91 26 0 1 1 0 0 1 0 0 0 0 0 0 120 12:30 0 90 21 0 3 2 0 0 0 0 0 0 0 0 0 116 12:45 1 90 33 1 0 0 0 0 0 0 0 0 0 0 0 125 13:00 0 88 32 0 2 0 0 0 0 0 0 0 0 0 0 122 -----------------------------------------------------------------------------------------------------------Hour Total 1 359 112 1 6 3 0 0 1 0 0 0 0 0 0 483 13:15 0 86 21 0 1 1 0 0 0 0 0 0 0 0 0 109 13:30 0 82 24 0 1 1 0 0 0 0 0 0 0 0 0 108 13:45 0 62 17 0 2 0 0 0 1 0 0 0 0 0 0 82 14:00 0 86 15 0 2 1 0 0 1 0 0 0 0 0 0 105 -----------------------------------------------------------------------------------------------------------Hour Total 0 316 77 0 6 3 0 0 2 0 0 0 0 0 0 404 14:15 0 110 26 3 1 1 0 0 1 0 0 0 0 0 0 142 14:30 0 98 16 1 5 2 0 0 0 0 0 0 0 0 0 122 14:45 0 97 31 0 1 0 0 0 0 0 0 0 0 0 0 129 15:00 5 57 16 0 1 1 1 0 0 3 0 3 2 0 0 89 -----------------------------------------------------------------------------------------------------------Hour Total 5 362 89 4 8 4 1 0 1 3 0 3 2 0 0 482 15:15 3 55 20 0 3 0 0 0 0 1 0 2 1 0 0 85 15:30 3 77 15 1 0 0 0 0 0 0 0 0 0 0 0 96 15:45 1 88 16 0 2 1 0 0 0 0 0 0 0 0 0 108 16:00 0 85 24 0 1 1 0 0 1 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 7 305 75 1 6 2 0 0 1 1 0 2 1 0 0 401 16:15 0 101 21 2 0 0 0 0 0 0 0 0 0 0 0 124 16:30 1 110 25 1 2 0 0 1 0 0 0 0 0 0 0 140 16:45 0 87 24 0 2 1 0 1 1 0 0 0 0 0 0 116 17:00 0 93 32 1 0 1 0 1 0 0 0 0 0 0 0 128 -----------------------------------------------------------------------------------------------------------Hour Total 1 391 102 4 4 2 0 3 1 0 0 0 0 0 0 508
114
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
3
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 84 23 0 1 0 0 0 0 0 0 0 0 0 0 108 17:30 0 107 27 0 0 0 0 1 0 0 0 0 0 0 0 135 17:45 0 109 20 0 0 1 0 0 0 0 1 0 0 0 0 131 18:00 0 74 16 0 1 1 0 0 0 0 0 0 0 0 0 92 -----------------------------------------------------------------------------------------------------------Hour Total 0 374 86 0 2 2 0 1 0 0 1 0 0 0 0 466 18:15 0 97 23 0 1 0 0 0 0 0 0 0 0 0 0 121 18:30 1 79 19 0 0 0 0 0 0 0 0 0 0 0 0 99 18:45 0 87 15 0 0 0 0 0 0 0 0 0 0 0 0 102 19:00 0 78 13 0 0 0 0 0 0 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 1 341 70 0 1 0 0 0 0 0 0 0 0 0 0 413 19:15 0 52 13 0 0 0 0 0 0 0 0 0 0 0 0 65 19:30 1 78 12 0 0 0 0 0 0 0 0 0 0 0 0 91 19:45 1 47 7 0 0 0 0 0 0 0 0 0 0 0 0 55 20:00 0 38 4 0 0 0 0 0 0 0 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 2 215 36 0 0 0 0 0 0 0 0 0 0 0 0 253 20:15 0 41 9 0 0 0 0 0 0 0 0 0 0 0 0 50 20:30 0 52 18 0 0 0 0 0 0 0 0 0 0 0 0 70 20:45 0 48 4 0 0 0 0 0 0 0 0 0 0 0 0 52 21:00 0 44 10 0 0 0 0 0 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 0 185 41 0 0 0 0 0 0 0 0 0 0 0 0 226 21:15 0 19 4 0 0 0 0 0 1 0 0 0 0 0 0 24 21:30 0 19 1 0 1 0 0 0 0 0 0 0 0 0 0 21 21:45 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 22:00 0 10 3 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 60 10 0 1 0 0 0 1 0 0 0 0 0 0 72 22:15 0 19 1 0 0 0 0 0 0 0 0 0 0 0 0 20 22:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 22:45 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:00 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 44 2 0 0 0 0 0 0 0 0 0 0 0 0 46 23:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:30 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 23:45 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 24:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 15 2 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------DAY TOTAL 20 5244 1238 22 58 24 2 10 15 4 2 6 4 0 0 6649 PERCENTS 0.4% 78.9% 18.7% 0.4% 0.9% 0.4% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.7% Trucks & Buses 2.2% AM Times AM Peaks
06:15 07:45 07:45 07:00 09:30 06:30 09:45 09:45 10:15 2 569 126 6 7 4 1 2 3
07:00 09:30 09:30 1 1 1
07:45 708
PM Times PM Peaks
15:00 17:00 12:15 13:45 13:45 13:45 14:15 16:15 13:30 14:30 17:00 14:30 14:30 12 393 112 4 10 4 1 3 3 4 1 5 3
16:15 508
115
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
4
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 1 0 0 0 0 0 0 0 0 0 0 7 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 01:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 3 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 0 0 1 0 0 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:15 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 05:00 0 2 5 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 5 0 0 1 0 0 0 0 0 0 0 0 0 16 05:15 0 2 2 0 0 0 0 0 1 0 0 0 0 0 0 5 05:30 0 8 2 0 0 0 0 0 1 0 0 0 0 0 0 11 05:45 0 10 2 0 0 0 0 0 0 0 0 0 0 0 0 12 06:00 0 19 4 0 0 1 0 0 0 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------Hour Total 0 39 10 0 0 1 0 0 2 0 0 0 0 0 0 52 06:15 0 20 5 0 0 0 0 0 0 0 0 0 0 0 0 25 06:30 1 33 5 1 1 1 0 0 1 0 0 0 0 0 0 43 06:45 0 47 19 1 0 1 0 0 0 0 0 0 0 0 0 68 07:00 1 61 20 2 1 0 0 0 0 0 0 0 0 0 0 85 -----------------------------------------------------------------------------------------------------------Hour Total 2 161 49 4 2 2 0 0 1 0 0 0 0 0 0 221 07:15 0 58 17 0 0 0 0 0 0 0 0 0 0 0 0 75 07:30 0 102 21 1 0 0 0 0 0 0 0 0 0 0 0 124 07:45 0 135 34 3 2 0 0 0 0 0 0 0 0 0 0 174 08:00 0 144 31 0 1 0 0 1 0 0 0 0 0 0 0 177 -----------------------------------------------------------------------------------------------------------Hour Total 0 439 103 4 3 0 0 1 0 0 0 0 0 0 0 550 08:15 08:30 08:45 09:00
0 1 0 0
148 134 134 111
24 27 31 31
1 0 2 0
1 0 3 1
2 0 1 0
0 0 0 0
0 0 0 0
116
0 1 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
176 163 172 143
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
5
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 527 113 3 5 3 0 0 2 0 0 0 0 0 0 654 09:15 0 95 23 0 2 0 0 0 0 0 0 0 0 0 0 120 09:30 1 95 23 1 2 1 0 0 0 0 0 0 0 0 0 123 09:45 0 111 32 0 1 0 0 1 0 0 0 0 0 0 0 145 10:00 0 83 18 0 1 1 0 1 0 0 0 0 0 0 0 104 -----------------------------------------------------------------------------------------------------------Hour Total 1 384 96 1 6 2 0 2 0 0 0 0 0 0 0 492 10:15 0 82 20 0 2 1 0 0 0 0 0 0 0 0 0 105 10:30 0 71 24 0 1 1 0 1 0 0 0 0 0 0 0 98 10:45 0 78 26 0 0 3 0 1 0 0 0 0 0 0 0 108 11:00 0 78 13 0 0 2 0 0 0 0 0 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 0 309 83 0 3 7 0 2 0 0 0 0 0 0 0 404 11:15 0 64 21 0 3 1 0 1 0 0 0 0 0 0 0 90 11:30 0 83 20 0 1 0 0 0 0 0 0 0 0 0 0 104 11:45 0 78 15 0 1 0 0 0 0 0 0 0 0 0 0 94 12:00 0 77 24 0 1 0 0 0 0 0 0 0 0 0 0 102 -----------------------------------------------------------------------------------------------------------Hour Total 0 302 80 0 6 1 0 1 0 0 0 0 0 0 0 390 12:15 0 91 22 0 2 2 0 0 0 0 0 0 0 0 0 117 12:30 0 75 17 0 2 4 0 0 0 1 0 0 0 0 0 99 12:45 1 75 22 0 0 2 0 0 0 0 0 0 0 0 0 100 13:00 1 85 24 0 2 0 0 0 1 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 2 326 85 0 6 8 0 0 1 1 0 0 0 0 0 429 13:15 0 83 18 5 1 2 0 0 0 0 0 0 0 0 0 109 13:30 1 70 33 1 1 0 0 0 1 0 0 0 0 0 0 107 13:45 0 72 22 0 1 1 0 0 0 0 0 0 0 0 0 96 14:00 0 81 18 0 1 0 0 1 0 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 1 306 91 6 4 3 0 1 1 0 0 0 0 0 0 413 14:15 1 110 23 1 1 1 0 1 0 0 0 0 0 0 0 138 14:30 0 86 30 0 1 0 0 0 1 0 0 0 0 0 0 118 14:45 0 80 39 0 0 0 0 0 1 0 0 0 0 0 0 120 15:00 6 36 14 1 1 4 0 0 1 0 0 1 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 7 312 106 2 3 5 0 1 3 0 0 1 0 0 0 440 15:15 6 102 16 1 0 0 0 0 1 3 0 0 2 0 0 131 15:30 0 77 24 1 0 0 0 0 0 0 0 0 0 0 0 102 15:45 0 72 16 1 0 0 0 0 0 0 0 0 0 0 0 89 16:00 1 91 23 0 0 1 0 0 1 0 0 0 0 0 0 117 -----------------------------------------------------------------------------------------------------------Hour Total 7 342 79 3 0 1 0 0 2 3 0 0 2 0 0 439 16:15 1 93 19 0 1 1 0 0 0 0 0 0 0 0 0 115 16:30 0 79 14 0 2 0 0 0 0 0 0 0 0 0 0 95 16:45 1 79 10 0 0 0 0 0 1 0 0 0 0 0 0 91 17:00 0 82 25 0 2 0 0 0 0 0 0 0 0 0 0 109 -----------------------------------------------------------------------------------------------------------Hour Total 2 333 68 0 5 1 0 0 1 0 0 0 0 0 0 410
117
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
6
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 85 18 0 3 1 0 0 1 0 0 0 0 0 0 108 17:30 0 82 18 0 0 0 0 0 0 0 0 0 0 0 0 100 17:45 0 101 10 0 0 0 0 0 0 0 0 0 0 0 0 111 18:00 0 91 18 0 1 0 0 0 0 0 0 0 0 0 0 110 -----------------------------------------------------------------------------------------------------------Hour Total 0 359 64 0 4 1 0 0 1 0 0 0 0 0 0 429 18:15 1 88 17 0 0 0 0 0 0 0 0 0 0 0 0 106 18:30 0 88 20 0 0 0 0 0 0 0 0 0 0 0 0 108 18:45 0 81 15 0 0 0 0 0 0 0 0 0 0 0 0 96 19:00 1 73 9 0 0 0 0 0 0 0 0 0 0 0 0 83 -----------------------------------------------------------------------------------------------------------Hour Total 2 330 61 0 0 0 0 0 0 0 0 0 0 0 0 393 19:15 0 47 8 0 0 0 0 0 0 0 0 0 0 0 0 55 19:30 0 48 8 0 0 0 0 0 0 0 0 0 0 0 0 56 19:45 1 44 8 0 0 0 0 0 0 0 0 0 0 0 0 53 20:00 1 43 3 0 0 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 2 182 27 0 0 0 0 0 0 0 0 0 0 0 0 211 20:15 0 34 8 0 0 0 0 0 0 0 0 0 0 0 0 42 20:30 1 53 6 0 0 0 0 0 0 0 0 0 0 0 0 60 20:45 0 53 7 0 0 0 0 0 0 0 0 0 0 0 0 60 21:00 1 31 4 0 0 0 0 1 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------Hour Total 2 171 25 0 0 0 0 1 0 0 0 0 0 0 0 199 21:15 0 24 3 0 0 0 0 0 0 0 0 0 0 0 0 27 21:30 0 22 3 0 0 0 0 0 0 0 0 0 0 0 0 25 21:45 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 22:00 0 11 2 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 70 10 0 0 0 0 0 0 0 0 0 0 0 0 80 22:15 0 21 2 0 0 0 0 0 0 0 0 0 0 0 0 23 22:30 0 17 1 0 0 0 0 0 0 0 0 0 0 0 0 18 22:45 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 23:00 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 54 5 0 0 0 0 0 0 0 0 0 0 0 0 59 23:15 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 23:30 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 23:45 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 24:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 7 0 0 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------DAY TOTAL 29 4990 1170 23 49 36 0 9 14 4 0 1 2 0 0 6327 PERCENTS 0.5% 78.9% 18.5% 0.4% 0.8% 0.6% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.8% Trucks & Buses 2.1% AM Times AM Peaks
06:15 07:45 07:45 07:00 08:45 10:15 2 561 116 6 8 7
09:45 04:45 3 2
PM Times PM Peaks
14:30 17:45 14:00 12:45 16:30 12:15 12 368 110 6 7 8
13:30 14:30 14:30 2 4 3
118
07:45 690 14:15 14:30 1 2
14:00 477
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
7
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00:30 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 1 0 0 0 0 0 0 0 0 0 0 4 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 4 5 0 0 1 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 5 0 0 1 0 0 0 0 0 0 0 0 0 14 05:15 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 05:30 0 4 7 0 1 1 0 0 0 0 0 0 0 0 0 13 05:45 0 13 1 0 0 0 0 0 1 0 0 0 0 0 0 15 06:00 0 15 5 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 39 15 0 1 1 0 0 1 0 0 0 0 0 0 57 06:15 1 20 6 1 0 0 0 0 0 0 0 0 0 0 0 28 06:30 0 37 7 0 1 0 0 0 0 0 0 0 0 0 0 45 06:45 0 38 10 1 0 0 0 0 0 0 0 0 0 0 0 49 07:00 1 56 16 1 1 1 0 0 0 0 0 0 1 0 0 77 -----------------------------------------------------------------------------------------------------------Hour Total 2 151 39 3 2 1 0 0 0 0 0 0 1 0 0 199 07:15 0 66 12 0 0 1 0 0 0 0 0 0 0 0 0 79 07:30 0 106 19 1 0 0 0 0 0 0 0 0 0 0 0 126 07:45 0 145 29 3 1 0 0 0 0 0 0 0 0 0 0 178 08:00 2 137 33 0 1 1 1 1 0 0 0 0 0 0 0 176 -----------------------------------------------------------------------------------------------------------Hour Total 2 454 93 4 2 2 1 1 0 0 0 0 0 0 0 559 08:15 08:30 08:45 09:00
0 0 0 0
140 135 122 114
33 23 29 27
1 1 2 1
0 0 0 2
2 1 0 0
0 0 0 0
0 0 0 0
119
1 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
177 160 153 145
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
8
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 511 112 5 2 3 0 0 1 0 0 0 1 0 0 635 09:15 0 87 33 0 0 2 0 1 0 0 0 0 0 0 0 123 09:30 1 91 28 0 2 2 0 0 0 0 0 0 0 0 0 124 09:45 1 96 20 0 1 3 0 1 0 0 0 0 0 0 0 122 10:00 0 82 24 0 2 2 0 1 0 0 0 0 0 0 0 111 -----------------------------------------------------------------------------------------------------------Hour Total 2 356 105 0 5 9 0 3 0 0 0 0 0 0 0 480 10:15 0 94 18 0 0 4 0 0 0 0 0 0 0 0 0 116 10:30 0 83 26 0 1 5 0 0 0 0 0 0 0 0 0 115 10:45 1 93 21 0 1 0 0 0 0 0 0 0 0 0 0 116 11:00 1 76 16 0 0 2 0 0 0 0 0 0 0 0 0 95 -----------------------------------------------------------------------------------------------------------Hour Total 2 346 81 0 2 11 0 0 0 0 0 0 0 0 0 442 11:15 0 69 26 0 1 2 0 0 0 0 0 0 0 0 0 98 11:30 1 62 21 0 2 0 0 1 0 0 0 0 0 0 0 87 11:45 0 79 20 0 1 2 0 0 0 0 0 0 0 0 0 102 12:00 3 101 18 0 1 3 0 0 0 0 0 0 0 0 0 126 -----------------------------------------------------------------------------------------------------------Hour Total 4 311 85 0 5 7 0 1 0 0 0 0 0 0 0 413 12:15 0 82 24 0 1 3 0 0 1 0 0 0 0 0 0 111 12:30 0 77 19 0 0 2 0 0 2 0 0 0 0 0 0 100 12:45 0 89 15 0 3 3 0 1 1 0 0 0 0 0 0 112 13:00 1 82 26 0 3 2 0 0 0 0 0 0 0 0 0 114 -----------------------------------------------------------------------------------------------------------Hour Total 1 330 84 0 7 10 0 1 4 0 0 0 0 0 0 437 13:15 0 83 29 0 2 2 0 0 1 0 0 0 0 0 0 117 13:30 0 71 25 0 3 1 0 1 0 0 0 0 0 0 0 101 13:45 0 75 22 0 2 2 0 0 1 0 0 0 0 0 0 102 14:00 0 68 19 0 2 3 0 2 0 0 0 0 0 0 0 94 -----------------------------------------------------------------------------------------------------------Hour Total 0 297 95 0 9 8 0 3 2 0 0 0 0 0 0 414 14:15 2 105 27 4 2 1 0 0 0 0 0 0 0 0 0 141 14:30 0 86 19 0 2 1 0 0 0 0 0 0 0 0 0 108 14:45 1 82 22 0 1 0 0 0 1 0 0 0 0 0 0 107 15:00 1 54 23 0 1 0 0 0 0 0 0 0 0 0 0 79 -----------------------------------------------------------------------------------------------------------Hour Total 4 327 91 4 6 2 0 0 1 0 0 0 0 0 0 435 15:15 1 75 17 1 1 2 0 0 1 1 0 0 0 0 0 99 15:30 1 74 15 1 0 0 0 0 2 0 0 0 0 0 0 93 15:45 0 75 16 0 1 0 0 1 1 0 0 0 0 0 0 94 16:00 0 96 18 0 1 0 0 0 0 0 0 0 0 0 0 115 -----------------------------------------------------------------------------------------------------------Hour Total 2 320 66 2 3 2 0 1 4 1 0 0 0 0 0 401 16:15 1 106 20 2 0 0 0 0 0 0 0 0 0 0 0 129 16:30 0 107 23 2 3 1 0 0 0 0 0 0 0 0 0 136 16:45 0 80 20 0 1 0 0 0 0 0 0 0 0 0 0 101 17:00 0 89 17 0 0 1 0 0 0 0 0 0 0 0 0 107 -----------------------------------------------------------------------------------------------------------Hour Total 1 382 80 4 4 2 0 0 0 0 0 0 0 0 0 473
120
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3B Site ID: 000000003101 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
9
File: NB.prn City: 16-221 AW max County: 30.17610, -81.38754
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 94 18 0 0 0 0 0 1 0 0 0 0 0 0 114 17:30 0 87 23 0 0 1 0 0 0 0 0 0 0 0 0 111 17:45 3 94 8 0 1 0 1 0 2 0 0 0 1 0 0 110 18:00 0 98 10 0 0 1 2 1 0 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 4 373 59 0 1 2 3 1 3 0 0 0 1 0 0 447 18:15 0 88 11 0 0 0 1 0 0 0 0 0 0 0 0 100 18:30 1 99 11 0 0 0 0 0 0 0 0 0 0 0 0 111 18:45 1 90 15 0 0 0 0 0 0 0 0 0 0 0 0 106 19:00 0 83 8 0 0 0 0 0 0 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 2 360 45 0 0 0 1 0 0 0 0 0 0 0 0 408 19:15 0 76 12 0 0 0 1 0 0 0 0 0 0 0 0 89 19:30 1 64 10 0 0 0 0 0 0 0 0 0 0 0 0 75 19:45 1 57 13 0 0 0 0 0 0 0 0 0 0 0 0 71 20:00 0 36 9 0 0 0 0 0 0 0 0 0 0 0 0 45 -----------------------------------------------------------------------------------------------------------Hour Total 2 233 44 0 0 0 1 0 0 0 0 0 0 0 0 280 20:15 1 39 8 0 0 0 0 0 0 0 0 0 0 0 0 48 20:30 1 56 15 0 0 0 0 0 0 0 0 0 0 0 0 72 20:45 1 49 5 0 0 0 1 0 0 0 0 0 0 0 0 56 21:00 1 33 8 0 0 0 1 0 1 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 4 177 36 0 0 0 2 0 1 0 0 0 0 0 0 220 21:15 0 15 4 0 0 0 0 0 0 0 0 0 0 0 0 19 21:30 0 17 3 0 0 1 1 0 0 0 0 0 0 0 0 22 21:45 1 19 3 0 0 0 0 0 1 0 0 0 0 0 0 24 22:00 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 1 65 10 0 0 1 1 0 1 0 0 0 0 0 0 79 22:15 0 20 0 0 0 0 1 0 0 0 0 0 0 0 0 21 22:30 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 22:45 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 23:00 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 47 1 0 0 0 1 0 0 0 0 0 0 0 0 49 23:15 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 23:45 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 24:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 26 2 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------DAY TOTAL 33 5134 1151 22 50 62 10 11 18 1 0 0 3 0 0 6495 PERCENTS 0.6% 79.1% 17.8% 0.4% 0.8% 0.9% 0.1% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks
11:15 07:45 07:45 07:00 09:00 09:45 07:15 09:15 05:00 4 557 118 5 5 14 1 3 1
06:15 1
07:45 691
PM Times PM Peaks
14:15 16:00 13:00 13:30 12:45 12:15 17:30 13:15 12:15 14:30 4 389 102 4 11 10 4 3 4 1
17:00 1
16:00 481
=================================================================================================================== GRAND TOTAL 82 3559 157 12 47 2 9 0 15368 67 122 30 9 7 0 19471 PERCENTS 0.5% 79.0% 18.3% 0.4% 0.9% 0.6% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
121
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
1
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 06:00 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 06:15 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 06:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 06:45 0 6 3 0 0 1 0 0 0 0 0 0 0 0 0 10 07:00 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 1 18 7 0 0 1 0 0 0 0 0 0 0 0 0 27 07:15 0 6 6 0 0 0 0 0 0 0 0 0 0 0 0 12 07:30 0 17 2 0 0 0 0 0 0 0 0 0 0 0 0 19 07:45 0 17 10 0 0 0 0 0 0 0 0 0 0 0 0 27 08:00 0 17 10 0 1 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 57 28 0 1 0 0 0 0 0 0 0 0 0 0 86 08:15 08:30 08:45 09:00
0 0 0 0
27 16 10 20
5 7 9 1
1 0 0 0
2 0 0 1
0 0 0 0
0 0 0 0
0 0 0 0
122
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
35 23 19 22
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
2
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 73 22 1 3 0 0 0 0 0 0 0 0 0 0 99 09:15 0 7 11 0 0 0 0 0 0 0 0 0 0 0 0 18 09:30 0 10 8 0 0 0 0 0 0 0 0 0 0 0 0 18 09:45 1 6 7 0 0 1 0 0 1 0 0 0 0 0 0 16 10:00 0 9 2 0 1 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 1 32 28 0 1 1 0 0 1 0 0 0 0 0 0 64 10:15 0 13 7 0 0 1 0 0 0 0 0 0 0 0 0 21 10:30 0 7 3 2 0 0 0 0 0 0 0 0 0 0 0 12 10:45 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 11:00 0 6 7 0 0 1 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 33 19 2 0 2 0 0 0 0 0 0 0 0 0 56 11:15 0 13 3 0 0 0 0 0 0 0 0 0 0 0 0 16 11:30 0 12 4 0 2 0 1 0 0 0 0 0 0 0 0 19 11:45 0 18 7 0 1 1 0 0 0 0 0 0 0 0 0 27 12:00 0 16 3 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 0 59 17 0 3 1 1 0 0 0 0 0 0 0 0 81 12:15 0 19 5 0 2 1 0 0 0 0 0 0 0 0 0 27 12:30 0 10 6 0 0 0 0 0 0 0 0 0 0 0 0 16 12:45 0 12 7 0 0 0 0 0 0 0 0 0 0 0 0 19 13:00 0 14 12 0 0 1 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 55 30 0 2 2 0 0 0 0 0 0 0 0 0 89 13:15 1 14 10 0 1 0 0 0 0 0 0 0 0 0 0 26 13:30 0 22 10 0 0 1 0 0 0 0 0 0 0 0 0 33 13:45 1 17 6 0 0 1 0 1 0 0 0 0 0 0 0 26 14:00 0 15 9 0 0 1 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 2 68 35 0 1 3 0 1 0 0 0 0 0 0 0 110 14:15 0 20 6 0 0 1 0 0 0 0 0 0 0 0 0 27 14:30 0 30 4 0 0 0 0 0 0 0 0 0 0 0 0 34 14:45 1 19 4 0 1 1 0 1 0 0 0 0 0 0 0 27 15:00 2 26 11 0 1 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 3 95 25 0 2 2 0 1 0 0 0 0 0 0 0 128 15:15 0 13 3 0 2 0 0 0 0 0 0 0 0 0 0 18 15:30 0 21 3 0 0 2 0 0 0 0 0 0 0 0 0 26 15:45 0 19 6 0 0 0 0 0 0 0 0 0 0 0 0 25 16:00 0 21 6 1 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 74 18 1 2 2 0 0 0 0 0 0 0 0 0 97 16:15 0 15 6 0 0 1 0 0 0 0 0 0 0 0 0 22 16:30 0 34 1 0 0 0 0 0 0 0 0 0 0 0 0 35 16:45 1 15 7 0 0 0 0 0 0 0 0 0 0 0 0 23 17:00 1 25 6 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 2 89 20 0 0 1 0 0 0 0 0 0 0 0 0 112
123
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
3
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 25 3 0 0 0 0 0 0 0 0 0 0 0 0 29 17:30 1 15 8 0 0 0 0 0 0 0 0 0 0 0 0 24 17:45 0 16 4 0 0 0 0 0 0 0 0 0 0 0 0 20 18:00 0 19 1 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 2 75 16 0 0 0 0 0 0 0 0 0 0 0 0 93 18:15 1 18 6 0 0 0 0 0 0 0 0 0 0 0 0 25 18:30 0 10 13 0 0 0 0 0 0 0 0 0 0 0 0 23 18:45 0 6 1 0 1 0 0 0 0 0 0 0 0 0 0 8 19:00 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 1 44 21 0 1 0 0 0 0 0 0 0 0 0 0 67 19:15 0 15 2 0 0 0 0 0 0 0 0 0 0 0 0 17 19:30 0 13 3 0 0 0 0 0 0 0 0 0 0 0 0 16 19:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 20:00 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 40 8 0 0 0 0 0 0 0 0 0 0 0 0 48 20:15 0 3 1 0 0 1 0 0 0 0 0 0 0 0 0 5 20:30 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 20:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 21:00 0 10 1 0 1 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 20 6 0 1 1 0 0 0 0 0 0 0 0 0 28 21:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 21:30 0 2 2 0 1 0 0 0 0 0 0 0 0 0 0 5 21:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:00 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 5 0 1 0 0 0 0 0 0 0 0 0 0 17 22:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 23:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------DAY TOTAL 12 864 309 4 18 16 1 2 1 0 0 0 0 0 0 1227 PERCENTS 1.0% 70.5% 25.2% 0.4% 1.5% 1.3% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.5% Trucks & Buses 3.4% AM Times AM Peaks
05:30 07:30 07:45 09:45 07:30 09:30 10:45 1 78 32 2 3 2 1
PM Times PM Peaks
16:45 16:30 12:45 15:15 14:30 13:30 4 99 39 1 4 4
09:00 1 13:00 1
07:45 113 14:15 128
124
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
4
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:30 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 3 01:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 06:00 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 06:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 06:30 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 4 06:45 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 07:00 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 8 0 0 0 0 0 0 0 0 0 0 0 0 21 07:15 0 8 7 0 0 1 0 0 0 0 0 0 0 0 0 16 07:30 0 19 3 0 0 0 0 1 0 0 0 0 0 0 0 23 07:45 0 19 11 0 0 0 0 0 0 0 0 0 0 0 0 30 08:00 1 17 7 0 1 0 0 1 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 1 63 28 0 1 1 0 2 0 0 0 0 0 0 0 96 08:15 08:30 08:45 09:00
1 0 0 0
20 23 12 7
6 8 2 5
0 0 0 1
0 0 0 0
2 0 0 1
0 1 0 0
0 0 0 0
125
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
29 32 15 14
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
5
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 62 21 1 0 3 1 0 0 1 0 0 0 0 0 90 09:15 0 12 4 0 0 0 0 0 0 0 0 0 0 0 0 16 09:30 0 9 7 0 0 2 0 0 1 0 0 0 0 0 0 19 09:45 0 9 6 0 1 0 0 0 0 0 0 0 0 0 0 16 10:00 0 9 8 0 0 2 0 0 1 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 39 25 0 1 4 0 0 2 0 0 0 0 0 0 71 10:15 0 6 9 0 2 0 0 0 0 0 0 0 0 0 0 17 10:30 0 12 5 0 1 0 0 0 0 0 0 0 0 0 0 18 10:45 1 9 6 0 1 1 0 0 0 0 0 0 0 0 0 18 11:00 1 18 8 0 0 1 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 2 45 28 0 4 2 0 0 0 0 0 0 0 0 0 81 11:15 0 14 6 0 0 0 0 0 0 0 0 0 0 0 0 20 11:30 0 9 7 0 0 1 0 0 1 0 0 0 0 0 0 18 11:45 0 7 6 0 0 0 0 0 0 0 0 0 0 0 0 13 12:00 0 19 6 0 0 0 0 1 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 49 25 0 0 1 0 1 1 0 0 0 0 0 0 77 12:15 0 17 12 0 0 0 0 0 0 0 0 0 0 0 0 29 12:30 0 14 7 0 0 4 0 0 0 0 0 0 0 0 0 25 12:45 0 10 5 0 0 0 0 0 0 0 0 0 0 0 0 15 13:00 1 18 5 0 1 1 1 1 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 1 59 29 0 1 5 1 1 0 0 0 0 0 0 0 97 13:15 0 15 2 0 0 2 0 0 0 0 0 0 0 0 0 19 13:30 0 14 6 0 0 1 0 0 0 0 0 0 0 0 0 21 13:45 0 17 10 0 0 0 0 0 0 0 0 0 0 0 0 27 14:00 0 10 6 0 0 1 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------Hour Total 0 56 24 0 0 4 0 0 0 0 0 0 0 0 0 84 14:15 0 12 3 0 3 3 0 0 0 0 0 0 0 0 0 21 14:30 0 16 7 0 0 0 0 0 0 0 0 0 0 0 0 23 14:45 0 17 7 0 0 0 0 0 0 0 0 0 0 0 0 24 15:00 0 19 9 1 0 1 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 0 64 26 1 3 4 0 0 0 0 0 0 0 0 0 98 15:15 1 14 8 0 0 1 0 0 1 0 0 0 0 0 0 25 15:30 0 12 7 0 0 1 0 0 0 0 0 0 0 0 0 20 15:45 0 12 2 0 0 0 0 0 0 1 0 0 0 0 0 15 16:00 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------Hour Total 1 52 19 0 0 2 0 0 1 1 0 0 0 0 0 76 16:15 1 9 9 0 0 2 0 0 0 0 0 0 0 0 0 21 16:30 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 16:45 0 17 3 0 0 0 0 0 0 0 0 0 0 0 0 20 17:00 0 12 6 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 1 56 21 0 0 2 0 0 0 0 0 0 0 0 0 80
126
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
6
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 22 5 0 0 0 0 0 0 0 0 0 0 0 0 27 17:30 0 13 5 0 0 0 0 0 0 0 0 0 0 0 0 18 17:45 0 12 6 0 0 0 0 0 0 0 0 0 0 0 0 18 18:00 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------Hour Total 0 61 18 0 0 0 0 0 0 0 0 0 0 0 0 79 18:15 0 11 5 0 0 0 0 0 0 0 0 0 0 0 0 16 18:30 0 9 3 0 0 0 0 0 0 0 0 0 0 0 0 12 18:45 0 12 7 0 0 0 0 0 0 0 0 0 0 0 0 19 19:00 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 42 19 0 0 0 0 0 0 0 0 0 0 0 0 61 19:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 19:30 0 10 2 0 0 0 0 0 0 0 0 0 0 0 0 12 19:45 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 20:00 0 11 4 0 0 0 0 0 0 0 0 0 0 0 0 15 -----------------------------------------------------------------------------------------------------------Hour Total 0 35 9 0 0 0 0 0 0 0 0 0 0 0 0 44 20:15 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 20:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 20:45 1 10 5 0 0 0 0 0 0 0 0 0 0 0 0 16 21:00 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 1 23 9 0 0 0 0 0 0 0 0 0 0 0 0 33 21:15 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 21:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 21:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:00 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 5 0 0 0 0 0 0 0 0 0 0 0 0 23 22:15 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 22:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 22:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 23:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 23:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------DAY TOTAL 8 761 321 2 12 28 2 4 4 2 0 0 0 0 0 1144 PERCENTS 0.7% 66.6% 28.1% 0.2% 1.1% 2.5% 0.1% 0.3% 0.3% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 95.2% Trucks & Buses 4.7% AM Times AM Peaks
07:30 07:45 07:45 08:15 09:45 09:15 07:45 07:15 09:15 08:00 2 79 32 1 4 4 1 2 2 1
07:45 118
PM Times PM Peaks
12:15 16:30 14:30 14:15 13:30 12:30 12:15 12:15 14:30 15:00 1 69 31 1 3 7 1 1 1 1
14:30 102
127
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
7
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 06:00 0 3 4 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 5 0 0 0 0 0 0 0 0 0 0 0 0 10 06:15 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 06:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 06:45 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 6 07:00 0 6 3 0 1 0 1 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 11 0 1 0 1 0 0 0 0 0 0 0 0 21 07:15 0 11 11 0 0 0 0 0 0 0 0 0 0 0 0 22 07:30 0 10 8 0 0 0 0 0 0 0 0 0 0 0 0 18 07:45 0 19 9 0 0 0 0 0 0 0 0 0 0 0 0 28 08:00 2 21 11 0 0 0 0 1 1 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 2 61 39 0 0 0 0 1 1 0 0 0 0 0 0 104 08:15 08:30 08:45 09:00
0 0 0 0
23 21 10 14
11 8 7 4
0 0 0 0
1 0 0 0
1 0 0 1
0 0 0 0
0 0 0 0
128
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
36 29 17 19
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
8
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 68 30 0 1 2 0 0 0 0 0 0 0 0 0 101 09:15 0 13 5 0 0 0 0 0 1 0 0 0 0 0 0 19 09:30 0 11 8 0 0 1 0 0 1 0 0 0 0 0 0 21 09:45 0 6 0 0 0 2 0 0 0 0 0 0 0 0 0 8 10:00 1 9 2 0 0 1 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 1 39 15 0 0 4 0 0 2 0 0 0 0 0 0 61 10:15 0 14 2 1 0 2 0 0 0 0 0 0 0 0 0 19 10:30 0 11 4 0 0 2 0 0 0 0 0 0 0 0 0 17 10:45 0 15 9 0 0 1 0 0 0 0 0 0 0 0 0 25 11:00 0 10 3 0 0 1 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 50 18 1 0 6 0 0 0 0 0 0 0 0 0 75 11:15 0 13 5 0 0 2 0 0 0 0 0 0 0 0 0 20 11:30 0 8 6 0 2 1 0 0 0 0 0 0 0 0 0 17 11:45 0 11 9 0 0 1 0 0 0 0 0 0 0 0 0 21 12:00 1 9 10 0 0 1 0 0 0 0 0 0 0 0 0 21 -----------------------------------------------------------------------------------------------------------Hour Total 1 41 30 0 2 5 0 0 0 0 0 0 0 0 0 79 12:15 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 12:30 0 16 14 0 1 2 0 0 0 0 0 0 0 0 0 33 12:45 0 11 7 0 1 0 0 1 0 0 0 0 0 0 0 20 13:00 0 12 3 0 0 2 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------Hour Total 0 46 28 0 2 4 0 1 0 0 0 0 0 0 0 81 13:15 0 11 10 0 1 0 0 0 0 0 0 0 0 0 0 22 13:30 0 7 4 0 0 0 0 0 0 0 0 0 0 0 0 11 13:45 1 15 4 0 1 1 0 0 0 0 0 0 0 0 0 22 14:00 0 18 10 0 0 2 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 1 51 28 0 2 3 0 0 0 0 0 0 0 0 0 85 14:15 0 22 5 0 0 0 0 0 0 0 0 0 0 0 0 27 14:30 2 19 4 0 1 1 0 0 0 0 0 0 0 0 0 27 14:45 0 18 8 0 0 1 0 0 0 0 0 0 0 0 0 27 15:00 1 12 6 0 1 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 3 71 23 0 2 2 0 0 0 0 0 0 0 0 0 101 15:15 1 19 7 0 1 0 0 0 0 0 0 0 0 0 0 28 15:30 0 15 2 0 0 3 0 0 0 0 0 0 0 0 0 20 15:45 0 22 7 0 1 1 0 0 0 0 0 0 0 0 0 31 16:00 0 15 4 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 1 71 20 0 2 4 0 0 0 0 0 0 0 0 0 98 16:15 0 16 2 0 0 0 0 0 0 0 0 0 0 0 0 18 16:30 1 12 5 0 0 0 0 0 0 0 0 0 0 0 0 18 16:45 0 19 4 0 1 0 0 0 0 0 0 0 0 0 0 24 17:00 0 27 5 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 1 74 16 0 1 0 0 0 0 0 0 0 0 0 0 92
129
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 3C Site ID: 000000003718 Location: Canal Blvd. EB Direction: EAST Lane: 1 TIME
1
2
Page:
9
File: EB.prn City: 16-221 AW Max County: 30.17718, -81.38889
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 28 3 0 0 0 0 0 0 0 0 0 0 0 0 31 17:30 1 14 4 0 0 0 0 0 0 0 0 0 0 0 0 19 17:45 1 13 8 0 0 0 0 0 0 0 0 0 0 0 0 22 18:00 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------Hour Total 2 69 17 0 0 0 0 0 0 0 0 0 0 0 0 88 18:15 0 16 4 0 1 0 0 0 0 0 0 0 0 0 0 21 18:30 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 18:45 0 7 2 0 1 0 0 0 0 0 0 0 0 0 0 10 19:00 1 8 3 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 1 39 12 0 2 0 0 0 0 0 0 0 0 0 0 54 19:15 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 19:30 0 11 3 0 1 0 0 0 0 0 0 0 0 0 0 15 19:45 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5 20:00 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 26 7 0 1 0 0 0 0 0 0 0 0 0 0 34 20:15 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 20:30 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 20:45 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 12 21:00 1 5 1 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 1 37 3 0 0 0 0 0 0 0 0 0 0 0 0 41 21:15 0 6 1 0 0 0 0 0 0 1 0 0 0 0 0 8 21:30 0 19 1 0 0 0 0 0 0 0 0 0 0 0 0 20 21:45 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 22:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 37 5 0 0 0 0 0 0 1 0 0 0 0 0 43 22:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:30 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 1 7 0 0 0 0 0 0 0 0 0 0 0 0 0 8 23:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------DAY TOTAL 15 811 308 1 16 30 1 2 3 1 0 0 0 0 0 1188 PERCENTS 1.3% 68.3% 26.0% 0.1% 1.4% 2.6% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 95.4% Trucks & Buses 4.5% AM Times AM Peaks
07:15 07:45 07:15 09:30 10:45 09:45 06:15 07:15 08:45 2 84 39 1 2 7 1 1 2
PM Times PM Peaks
14:30 16:45 12:30 4 88 34
12:30 12:15 3 4
12:15 1
07:45 129 20:30 1
14:00 111
=================================================================================================================== GRAND TOTAL 35 938 46 4 8 0 0 0 2436 7 74 8 3 0 0 3559 PERCENTS 1.0% 68.5% 26.4% 0.2% 1.3% 2.1% 0.1% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
130
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
Page:
1
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 01:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 2 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 2 05:00 0 1 1 0 0 0 1 0 1 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 1 0 2 1 0 0 0 0 0 9 05:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 05:30 0 3 0 0 0 0 1 0 0 0 0 0 0 0 0 4 05:45 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 5 06:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 1 15 3 0 0 0 1 0 0 0 0 0 0 0 0 20 06:15 0 6 0 1 0 0 0 0 0 0 0 0 0 0 0 7 06:30 0 14 3 0 1 0 2 0 0 0 0 1 0 0 0 21 06:45 0 11 2 0 0 0 1 0 0 0 0 0 0 0 0 14 07:00 1 5 0 0 0 1 2 0 0 2 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 1 36 5 1 1 1 5 0 0 2 0 1 0 0 0 53 07:15 1 3 1 0 0 0 11 0 0 2 0 0 1 0 0 19 07:30 2 3 0 0 0 1 30 0 5 6 0 0 1 0 0 48 07:45 1 5 0 0 0 2 17 0 0 3 0 0 0 0 0 28 08:00 6 5 0 0 0 0 27 0 2 2 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 10 16 1 0 0 3 85 0 7 13 0 0 2 0 0 137 08:15 08:30 08:45 09:00
5 2 6 7
3 7 3 6
0 0 1 0
0 0 0 0
0 0 0 0
2 2 1 1
36 35 30 29
0 0 0 2
131
5 0 2 2
3 4 6 8
0 0 0 0
1 0 0 0
2 2 3 4
0 0 0 0
0 0 0 0
57 52 52 59
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
2
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 20 19 1 0 0 6 130 2 9 21 0 1 11 0 0 220 09:15 9 3 0 0 0 0 14 0 5 5 0 0 1 0 0 37 09:30 1 4 0 0 0 0 17 0 2 7 0 0 4 0 0 35 09:45 4 5 0 0 0 0 9 0 1 4 0 0 0 0 0 23 10:00 2 3 0 0 0 0 19 0 1 3 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 16 15 0 0 0 0 59 0 9 19 0 0 5 0 0 123 10:15 5 1 0 0 0 0 10 0 2 3 0 0 0 0 0 21 10:30 2 1 0 0 0 1 20 0 0 2 0 0 1 0 0 27 10:45 6 24 8 1 0 1 9 0 0 1 0 0 0 0 0 50 11:00 0 67 27 0 1 3 0 0 1 0 0 0 0 0 0 99 -----------------------------------------------------------------------------------------------------------Hour Total 13 93 35 1 1 5 39 0 3 6 0 0 1 0 0 197 11:15 0 75 26 0 0 1 0 1 0 0 0 0 0 0 0 103 11:30 0 75 18 0 3 0 0 1 0 0 0 0 0 0 0 97 11:45 1 74 26 0 2 2 0 0 0 0 0 0 0 0 0 105 12:00 0 72 14 0 1 0 0 0 0 0 1 0 0 0 0 88 -----------------------------------------------------------------------------------------------------------Hour Total 1 296 84 0 6 3 0 2 0 0 1 0 0 0 0 393 12:15 0 93 23 0 1 0 0 1 0 0 0 0 0 0 0 118 12:30 0 77 25 0 2 0 0 0 0 0 0 0 0 0 0 104 12:45 0 79 24 0 2 1 0 0 1 0 0 0 0 0 0 107 13:00 0 88 24 0 3 0 0 1 0 0 1 0 0 0 0 117 -----------------------------------------------------------------------------------------------------------Hour Total 0 337 96 0 8 1 0 2 1 0 1 0 0 0 0 446 13:15 0 85 26 0 0 1 0 1 0 0 0 0 0 0 0 113 13:30 0 79 21 0 2 0 0 0 0 0 0 0 0 0 0 102 13:45 0 96 22 0 0 2 0 0 0 0 0 0 0 0 0 120 14:00 0 91 25 1 1 3 0 0 0 0 0 0 0 0 0 121 -----------------------------------------------------------------------------------------------------------Hour Total 0 351 94 1 3 6 0 1 0 0 0 0 0 0 0 456 14:15 0 104 24 1 1 0 0 0 2 0 0 0 0 0 0 132 14:30 0 88 16 0 1 1 0 0 1 0 0 0 0 0 0 107 14:45 0 86 14 1 1 1 0 0 0 0 0 0 0 0 0 103 15:00 0 47 12 0 0 0 0 1 0 0 0 0 0 0 0 60 -----------------------------------------------------------------------------------------------------------Hour Total 0 325 66 2 3 2 0 1 3 0 0 0 0 0 0 402 15:15 2 99 18 0 1 0 0 0 1 0 0 0 0 0 0 121 15:30 0 88 29 0 0 2 0 0 0 0 0 0 0 0 0 119 15:45 1 104 31 2 1 0 0 0 1 0 0 0 0 0 0 140 16:00 0 124 23 2 2 0 0 1 0 0 0 0 0 0 0 152 -----------------------------------------------------------------------------------------------------------Hour Total 3 415 101 4 4 2 0 1 2 0 0 0 0 0 0 532 16:15 1 124 27 0 1 0 0 0 0 0 0 1 0 0 0 154 16:30 0 105 25 0 2 0 0 2 0 0 0 0 0 0 0 134 16:45 0 122 26 1 1 2 0 0 0 0 0 0 0 0 0 152 17:00 1 143 33 1 2 0 0 1 0 0 0 0 0 0 0 181 -----------------------------------------------------------------------------------------------------------Hour Total 2 494 111 2 6 2 0 3 0 0 0 1 0 0 0 621
132
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
3
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 158 35 3 1 0 0 0 0 0 0 0 0 0 0 198 17:30 1 157 21 2 2 1 0 1 0 0 0 0 0 0 0 185 17:45 1 132 30 0 1 0 0 1 0 0 0 0 0 0 0 165 18:00 0 147 25 0 1 2 0 1 0 0 0 0 0 0 0 176 -----------------------------------------------------------------------------------------------------------Hour Total 3 594 111 5 5 3 0 3 0 0 0 0 0 0 0 724 18:15 0 141 30 0 1 1 0 0 0 0 0 0 0 0 0 173 18:30 0 134 18 0 0 0 0 0 0 0 0 0 0 0 0 152 18:45 2 112 27 0 2 0 0 1 0 0 0 0 0 0 0 144 19:00 0 91 20 0 0 0 0 0 0 0 0 0 0 0 0 111 -----------------------------------------------------------------------------------------------------------Hour Total 2 478 95 0 3 1 0 1 0 0 0 0 0 0 0 580 19:15 1 74 14 0 0 0 0 0 0 0 0 0 0 0 0 89 19:30 1 64 18 0 0 0 0 0 0 0 0 0 0 0 0 83 19:45 1 77 15 0 0 0 0 0 0 0 0 0 0 0 0 93 20:00 1 71 17 0 0 0 0 0 0 0 0 0 0 0 0 89 -----------------------------------------------------------------------------------------------------------Hour Total 4 286 64 0 0 0 0 0 0 0 0 0 0 0 0 354 20:15 0 64 9 0 0 0 0 0 0 0 0 0 0 0 0 73 20:30 0 73 14 0 0 0 0 0 1 0 0 0 0 0 0 88 20:45 0 50 5 0 0 0 0 0 0 0 0 0 0 0 0 55 21:00 1 67 5 0 0 0 0 0 0 0 0 0 0 0 0 73 -----------------------------------------------------------------------------------------------------------Hour Total 1 254 33 0 0 0 0 0 1 0 0 0 0 0 0 289 21:15 0 44 5 0 0 0 0 0 0 0 0 0 0 0 0 49 21:30 0 29 6 0 1 0 0 0 0 0 0 0 0 0 0 36 21:45 0 26 3 0 0 0 0 0 0 0 0 0 0 0 0 29 22:00 0 25 2 0 0 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 124 16 0 1 0 0 0 0 0 0 0 0 0 0 141 22:15 0 19 2 0 0 0 0 0 0 0 0 0 0 0 0 21 22:30 0 18 6 0 0 0 0 0 0 0 0 0 0 0 0 24 22:45 0 10 3 0 0 0 0 0 1 0 0 0 0 0 0 14 23:00 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 -----------------------------------------------------------------------------------------------------------Hour Total 0 60 13 0 0 0 0 0 1 0 0 0 0 0 0 74 23:15 0 15 1 0 0 0 0 0 0 0 0 0 0 0 0 16 23:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:45 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 24:00 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 35 2 0 0 0 0 0 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------DAY TOTAL 77 4254 935 16 41 35 320 16 38 62 2 3 19 0 0 5818 PERCENTS 1.4% 73.2% 16.1% 0.3% 0.8% 0.6% 5.5% 0.2% 0.6% 1.0% 0.0% 0.0% 0.3% 0.0% 0.0% 100% Passenger Vehicles 90.5% Trucks & Buses 9.4% AM Times AM Peaks
08:30 11:15 11:00 05:30 11:00 07:45 08:15 08:15 07:30 08:45 11:15 05:45 08:45 24 296 97 1 6 6 130 2 12 26 1 1 12
11:00 404
PM Times PM Peaks
17:00 17:15 16:30 16:45 12:15 13:15 4 594 119 7 8 6
17:00 729
15:45 13:45 3 3
133
12:15 15:30 1 1
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
4
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 00:30 0 1 2 0 1 0 0 0 0 0 0 0 0 0 0 4 00:45 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 01:00 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 20 6 0 1 0 0 0 0 0 0 0 0 0 0 27 01:15 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 4 1 0 1 0 0 0 0 0 0 0 0 0 0 6 02:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 2 0 1 0 0 0 0 0 0 0 0 0 0 18 02:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:00 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 1 0 0 0 0 0 0 0 0 0 6 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 3 05:00 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 1 0 0 0 0 0 1 0 0 0 0 0 0 12 05:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 05:30 0 12 3 0 0 1 0 0 0 0 0 0 0 0 0 16 05:45 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 06:00 0 17 3 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 44 8 0 0 1 0 0 0 0 0 0 0 0 0 53 06:15 0 28 3 0 0 0 0 0 0 0 0 0 0 0 0 31 06:30 1 11 4 0 1 1 0 0 0 0 0 0 0 0 0 18 06:45 0 20 10 0 0 0 0 1 0 0 0 0 0 0 0 31 07:00 0 35 8 0 0 0 0 0 1 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 1 94 25 0 1 1 0 1 1 0 0 0 0 0 0 124 07:15 0 59 13 1 1 0 0 0 0 0 0 0 0 0 0 74 07:30 0 107 31 2 1 0 0 0 0 0 0 0 0 0 0 141 07:45 0 67 20 0 0 0 0 0 0 0 0 0 0 0 0 87 08:00 1 67 26 0 1 0 0 0 1 0 0 0 0 0 0 96 -----------------------------------------------------------------------------------------------------------Hour Total 1 300 90 3 3 0 0 0 1 0 0 0 0 0 0 398 08:15 08:30 08:45 09:00
0 0 0 0
95 98 110 96
25 30 21 23
0 1 1 3
1 1 2 3
0 0 0 0
0 0 0 0
0 0 0 0
134
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
121 130 135 125
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
5
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 399 99 5 7 0 0 0 1 0 0 0 0 0 0 511 09:15 0 64 19 2 2 1 0 0 0 0 0 0 0 0 0 88 09:30 0 49 26 0 2 3 0 1 0 0 0 0 0 0 0 81 09:45 0 48 13 0 1 1 0 0 0 0 0 0 0 0 0 63 10:00 0 53 25 0 0 2 0 0 1 0 0 0 0 0 0 81 -----------------------------------------------------------------------------------------------------------Hour Total 0 214 83 2 5 7 0 1 1 0 0 0 0 0 0 313 10:15 0 56 19 0 2 1 0 0 0 0 0 0 0 0 0 78 10:30 0 65 18 1 1 3 0 0 0 0 0 0 0 0 0 88 10:45 1 76 16 1 0 2 0 1 0 0 0 0 0 0 0 97 11:00 0 63 24 0 0 2 0 0 0 0 1 0 0 0 0 90 -----------------------------------------------------------------------------------------------------------Hour Total 1 260 77 2 3 8 0 1 0 0 1 0 0 0 0 353 11:15 0 64 21 0 1 1 0 0 0 0 0 0 0 0 0 87 11:30 0 81 22 0 0 1 1 0 0 0 0 0 0 0 0 105 11:45 0 73 26 0 1 4 0 2 0 0 0 0 0 0 0 106 12:00 0 84 19 0 2 1 0 0 0 0 0 0 0 0 0 106 -----------------------------------------------------------------------------------------------------------Hour Total 0 302 88 0 4 7 1 2 0 0 0 0 0 0 0 404 12:15 0 91 25 1 1 0 0 0 1 0 0 0 0 0 0 119 12:30 0 102 25 0 1 1 1 0 0 0 0 0 0 0 0 130 12:45 0 78 24 0 0 2 0 0 1 0 0 0 0 0 0 105 13:00 1 94 31 0 1 0 1 0 1 0 0 0 0 0 0 129 -----------------------------------------------------------------------------------------------------------Hour Total 1 365 105 1 3 3 2 0 3 0 0 0 0 0 0 483 13:15 1 90 29 0 1 1 0 0 0 0 1 0 0 0 0 123 13:30 0 75 17 0 0 2 0 1 0 0 0 0 0 0 0 95 13:45 1 85 28 1 2 1 0 0 2 0 1 0 0 0 0 121 14:00 0 51 15 1 1 2 0 0 0 0 0 0 0 0 0 70 -----------------------------------------------------------------------------------------------------------Hour Total 2 301 89 2 4 6 0 1 2 0 2 0 0 0 0 409 14:15 1 87 26 0 3 2 0 1 0 0 0 0 0 0 0 120 14:30 0 82 21 0 0 1 0 0 0 0 0 0 0 0 0 104 14:45 1 65 25 1 1 0 0 0 0 0 0 0 0 0 0 93 15:00 0 54 19 1 2 0 0 0 0 0 0 0 0 0 0 76 -----------------------------------------------------------------------------------------------------------Hour Total 2 288 91 2 6 3 0 1 0 0 0 0 0 0 0 393 15:15 0 117 29 0 4 3 0 1 0 0 1 0 0 0 0 155 15:30 1 87 23 0 3 3 0 0 0 0 0 0 0 0 0 117 15:45 0 91 28 2 1 0 0 0 0 0 0 0 0 0 0 122 16:00 2 116 22 1 2 0 0 0 0 0 0 0 0 0 0 143 -----------------------------------------------------------------------------------------------------------Hour Total 3 411 102 3 10 6 0 1 0 0 1 0 0 0 0 537 16:15 1 113 24 3 0 2 0 0 0 0 0 1 0 0 0 144 16:30 0 145 20 0 1 0 0 0 0 0 0 0 0 0 0 166 16:45 0 141 24 0 0 0 0 0 0 0 0 0 0 0 0 165 17:00 0 130 22 0 0 0 0 0 0 0 1 0 0 0 0 153 -----------------------------------------------------------------------------------------------------------Hour Total 1 529 90 3 1 2 0 0 0 0 1 1 0 0 0 628
135
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
6
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 151 25 0 1 0 0 0 1 0 0 0 0 0 0 178 17:30 2 151 29 0 1 0 0 1 0 0 0 0 0 0 0 184 17:45 1 119 34 0 1 0 0 0 1 0 0 0 0 0 0 156 18:00 1 131 31 0 0 0 0 0 0 0 0 0 0 0 0 163 -----------------------------------------------------------------------------------------------------------Hour Total 4 552 119 0 3 0 0 1 2 0 0 0 0 0 0 681 18:15 0 118 31 0 0 0 0 0 1 0 0 0 0 0 0 150 18:30 0 133 23 0 0 0 0 1 0 0 0 0 0 0 0 157 18:45 0 121 22 0 0 1 0 0 0 0 0 0 0 0 0 144 19:00 0 94 18 0 0 0 0 0 0 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 0 466 94 0 0 1 0 1 1 0 0 0 0 0 0 563 19:15 0 85 13 0 0 0 0 0 0 0 0 0 0 0 0 98 19:30 0 72 14 0 0 0 0 0 0 0 0 0 0 0 0 86 19:45 0 91 11 0 0 0 0 0 0 0 0 0 0 0 0 102 20:00 1 67 4 0 0 0 0 0 0 0 0 0 0 0 0 72 -----------------------------------------------------------------------------------------------------------Hour Total 1 315 42 0 0 0 0 0 0 0 0 0 0 0 0 358 20:15 0 63 6 0 0 0 0 0 0 0 0 0 0 0 0 69 20:30 0 57 10 0 0 0 0 0 0 0 0 0 0 0 0 67 20:45 0 71 5 0 0 0 0 0 0 0 0 0 0 0 0 76 21:00 1 79 16 0 0 0 0 0 0 0 0 0 0 0 0 96 -----------------------------------------------------------------------------------------------------------Hour Total 1 270 37 0 0 0 0 0 0 0 0 0 0 0 0 308 21:15 0 52 4 0 0 0 0 0 0 0 0 0 0 0 0 56 21:30 0 41 5 0 0 0 0 0 0 0 0 0 0 0 0 46 21:45 0 37 8 0 0 0 0 0 0 0 0 0 0 0 0 45 22:00 0 20 5 0 0 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 0 150 22 0 0 0 0 0 0 0 0 0 0 0 0 172 22:15 0 22 7 0 0 0 0 0 0 0 0 0 0 0 0 29 22:30 0 16 2 0 0 0 0 0 0 0 0 0 0 0 0 18 22:45 0 14 1 0 0 0 0 0 0 0 0 0 0 0 0 15 23:00 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 63 11 0 0 0 0 0 0 0 0 0 0 0 0 74 23:15 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 11 23:30 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 23:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 24:00 1 4 3 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 1 30 7 0 0 0 0 0 0 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------DAY TOTAL 19 5405 1290 23 52 46 3 10 13 0 5 1 0 0 0 6867 PERCENTS 0.3% 78.8% 18.8% 0.4% 0.8% 0.7% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.7% Trucks & Buses 2.2% AM Times AM Peaks
05:45 08:15 07:30 08:30 08:45 10:00 10:45 11:00 08:00 1 399 102 7 9 8 1 2 2
10:15 1
08:15 511
PM Times PM Peaks
15:30 16:45 17:30 15:30 14:45 13:30 12:15 13:30 12:15 4 573 125 6 10 7 2 2 3
13:00 15:30 2 1
17:15 681
136
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
7
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 00:30 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 00:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 24 0 0 0 0 0 0 0 0 0 0 0 0 0 24 01:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13 02:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 04:30 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2 04:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 05:00 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 1 0 1 0 0 1 0 0 0 0 0 0 0 15 05:15 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 05:30 0 10 2 0 0 1 0 0 1 0 0 0 0 0 0 14 05:45 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 06:00 0 6 5 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 30 9 0 0 1 0 0 1 0 0 0 0 0 0 41 06:15 0 13 3 0 1 0 0 0 0 0 0 0 0 0 0 17 06:30 0 18 4 0 0 1 0 0 0 0 0 0 0 0 0 23 06:45 0 17 13 0 2 0 0 0 0 0 0 0 0 0 0 32 07:00 0 33 9 0 2 0 0 0 0 0 0 0 0 0 0 44 -----------------------------------------------------------------------------------------------------------Hour Total 0 81 29 0 5 1 0 0 0 0 0 0 0 0 0 116 07:15 0 60 12 1 1 1 0 0 0 0 0 0 0 0 0 75 07:30 0 82 32 2 2 1 0 0 0 0 1 0 0 0 0 120 07:45 0 58 19 0 1 0 1 0 1 0 0 0 0 0 0 80 08:00 0 73 23 0 3 0 0 1 1 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 0 273 86 3 7 2 1 1 2 0 1 0 0 0 0 376 08:15 08:30 08:45 09:00
1 0 0 0
88 112 107 98
25 39 50 20
0 1 1 2
0 1 0 4
2 4 1 4
0 0 1 0
1 2 0 0
137
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
117 159 161 128
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
8
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 405 134 4 5 11 1 3 0 0 1 0 0 0 0 565 09:15 1 69 15 1 2 1 0 0 0 0 0 0 0 0 0 89 09:30 0 73 19 0 0 1 0 0 0 0 0 0 0 0 0 93 09:45 1 64 16 0 3 2 0 0 0 0 0 0 0 0 0 86 10:00 0 73 20 0 0 3 0 0 0 0 0 0 0 0 0 96 -----------------------------------------------------------------------------------------------------------Hour Total 2 279 70 1 5 7 0 0 0 0 0 0 0 0 0 364 10:15 0 64 18 0 0 2 0 0 0 0 0 0 0 0 0 84 10:30 0 69 31 0 1 2 0 0 0 0 0 0 0 0 0 103 10:45 0 68 25 0 1 1 0 1 0 0 0 2 0 0 0 98 11:00 0 70 26 0 2 3 0 0 0 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 0 271 100 0 4 8 0 1 0 0 0 2 0 0 0 386 11:15 0 65 20 0 0 2 0 0 0 0 0 0 0 0 0 87 11:30 0 76 19 0 4 2 0 0 1 0 0 0 0 0 0 102 11:45 1 61 23 0 1 3 0 0 1 0 0 0 0 0 0 90 12:00 0 71 34 0 0 1 0 1 0 0 0 0 0 0 0 107 -----------------------------------------------------------------------------------------------------------Hour Total 1 273 96 0 5 8 0 1 2 0 0 0 0 0 0 386 12:15 1 71 18 0 2 3 0 0 1 0 0 0 0 0 0 96 12:30 0 83 29 0 3 6 1 1 0 0 0 0 0 0 0 123 12:45 1 84 20 0 1 1 0 2 0 0 1 0 0 0 0 110 13:00 0 79 28 1 1 4 0 0 0 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 2 317 95 1 7 14 1 3 1 0 1 0 0 0 0 442 13:15 1 84 26 0 1 1 0 0 0 0 0 0 0 0 0 113 13:30 0 87 23 0 1 4 0 1 0 0 0 0 0 0 0 116 13:45 0 70 23 0 2 2 0 1 0 0 0 0 0 0 0 98 14:00 0 102 25 0 1 3 0 1 0 0 0 0 0 0 0 132 -----------------------------------------------------------------------------------------------------------Hour Total 1 343 97 0 5 10 0 3 0 0 0 0 0 0 0 459 14:15 0 106 26 0 0 1 0 0 1 0 0 0 0 0 0 134 14:30 0 94 19 0 0 0 0 0 0 0 0 0 0 0 0 113 14:45 0 94 21 2 1 1 0 0 0 0 0 0 0 0 0 119 15:00 0 57 7 0 0 0 0 0 1 0 0 0 0 0 0 65 -----------------------------------------------------------------------------------------------------------Hour Total 0 351 73 2 1 2 0 0 2 0 0 0 0 0 0 431 15:15 0 86 29 0 2 0 0 0 0 0 0 1 0 0 0 118 15:30 0 106 31 0 4 1 0 0 0 1 0 1 0 0 0 144 15:45 0 101 22 0 1 1 0 0 0 0 0 0 0 0 0 125 16:00 0 136 25 2 3 1 0 0 0 0 0 0 0 0 0 167 -----------------------------------------------------------------------------------------------------------Hour Total 0 429 107 2 10 3 0 0 0 1 0 2 0 0 0 554 16:15 1 106 33 0 2 0 0 0 0 0 0 0 0 0 0 142 16:30 0 124 35 0 0 0 0 0 0 0 0 1 0 0 0 160 16:45 1 121 27 1 2 0 0 0 0 0 0 0 0 0 0 152 17:00 0 121 28 2 2 0 0 1 0 0 0 0 0 0 0 154 -----------------------------------------------------------------------------------------------------------Hour Total 2 472 123 3 6 0 0 1 0 0 0 1 0 0 0 608
138
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4A Site ID: 000000009379 Location: Palm Valley Rd. SB Direction: SOUTH Lane: 1 TIME
1
2
3
Page:
9
File: SB.prn City: 16-221 AW Max County: 30.16563, -81.38618
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 152 38 2 1 0 1 0 0 0 0 0 0 0 0 194 17:30 0 158 30 1 2 0 0 0 0 0 0 0 0 0 0 191 17:45 0 131 23 0 0 0 0 0 0 0 0 0 0 0 0 154 18:00 0 128 31 0 2 0 0 0 0 0 0 0 0 0 0 161 -----------------------------------------------------------------------------------------------------------Hour Total 0 569 122 3 5 0 1 0 0 0 0 0 0 0 0 700 18:15 0 154 16 0 1 0 0 0 0 0 0 0 0 0 0 171 18:30 0 121 23 0 1 0 0 1 1 0 0 0 0 0 0 147 18:45 0 122 26 0 0 0 0 0 0 0 0 0 0 0 0 148 19:00 0 97 17 0 0 0 0 0 1 0 0 0 0 0 0 115 -----------------------------------------------------------------------------------------------------------Hour Total 0 494 82 0 2 0 0 1 2 0 0 0 0 0 0 581 19:15 0 84 11 0 0 0 0 0 0 0 0 0 0 0 0 95 19:30 1 84 9 0 0 0 0 0 0 0 0 0 0 0 0 94 19:45 0 59 7 0 0 0 0 0 0 0 0 0 0 0 0 66 20:00 0 58 12 0 0 0 0 0 0 0 0 0 0 0 0 70 -----------------------------------------------------------------------------------------------------------Hour Total 1 285 39 0 0 0 0 0 0 0 0 0 0 0 0 325 20:15 0 77 12 0 0 0 0 1 0 0 0 0 0 0 0 90 20:30 0 67 9 0 0 0 0 0 0 0 0 0 0 0 0 76 20:45 0 51 7 0 0 0 0 0 0 0 0 0 0 0 0 58 21:00 1 56 10 0 0 0 0 0 0 0 0 0 0 0 0 67 -----------------------------------------------------------------------------------------------------------Hour Total 1 251 38 0 0 0 0 1 0 0 0 0 0 0 0 291 21:15 0 54 11 0 0 0 0 0 0 0 0 0 0 0 0 65 21:30 1 56 5 0 0 0 0 0 0 0 0 0 0 0 0 62 21:45 1 50 11 0 0 0 0 0 0 0 0 0 0 0 0 62 22:00 0 25 5 0 0 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 2 185 32 0 0 0 0 0 0 0 0 0 0 0 0 219 22:15 0 26 2 0 0 0 0 0 0 0 0 0 0 0 0 28 22:30 0 31 4 0 0 0 0 0 0 0 0 0 0 0 0 35 22:45 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 17 23:00 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 83 8 0 0 0 0 0 0 0 0 0 0 0 0 91 23:15 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 23:45 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 24:00 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 34 5 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------DAY TOTAL 13 5484 1348 19 68 67 4 16 10 1 3 5 0 0 0 7038 PERCENTS 0.2% 78.0% 19.2% 0.3% 1.0% 1.0% 0.0% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks
09:00 08:15 08:00 08:30 09:00 08:15 07:00 07:45 07:15 2 405 137 5 9 11 1 4 2
06:45 10:00 1 2
08:15 565
PM Times PM Peaks
21:00 17:30 16:30 16:45 15:15 12:15 12:15 12:15 14:15 14:45 12:15 14:45 3 571 128 6 10 14 1 3 2 1 1 2
17:15 700
=================================================================================================================== GRAND TOTAL 109 3573 161 327 61 10 19 0 15143 58 148 42 63 9 0 19723 PERCENTS 0.6% 76.8% 18.2% 0.3% 0.9% 0.8% 1.6% 0.2% 0.3% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
139
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
1
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 01:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 03:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 3 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2 03:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5 04:45 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 05:00 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 7 0 0 0 0 0 1 0 0 0 0 0 0 23 05:15 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 05:30 0 10 3 0 0 0 0 0 1 0 0 0 0 0 0 14 05:45 0 16 1 0 0 0 0 0 0 0 0 0 0 0 0 17 06:00 0 18 2 1 1 0 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 0 49 9 1 1 0 0 0 1 0 0 0 0 0 0 61 06:15 0 25 4 0 0 0 0 0 0 0 0 0 0 0 0 29 06:30 0 60 9 1 0 1 0 0 0 0 0 0 0 0 0 71 06:45 0 38 11 3 0 1 0 0 0 0 0 0 0 0 0 53 07:00 0 74 16 1 0 1 0 0 1 0 0 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 0 197 40 5 0 3 0 0 1 0 0 0 0 0 0 246 07:15 0 91 18 1 1 1 0 0 0 0 0 0 0 0 0 112 07:30 0 143 21 3 1 0 0 0 0 0 0 0 0 0 0 168 07:45 0 131 26 0 1 0 0 0 0 0 0 0 0 0 0 158 08:00 0 155 42 0 2 0 0 0 1 0 0 0 0 0 0 200 -----------------------------------------------------------------------------------------------------------Hour Total 0 520 107 4 5 1 0 0 1 0 0 0 0 0 0 638 08:15 08:30 08:45 09:00
0 0 0 0
171 139 105 129
30 27 32 23
4 2 0 0
2 1 0 2
0 0 0 1
0 0 0 0
0 0 0 0
140
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
207 169 137 155
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
2
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 544 112 6 5 1 0 0 0 0 0 0 0 0 0 668 09:15 0 106 22 0 0 0 0 1 1 0 0 0 0 0 0 130 09:30 0 110 32 1 4 1 0 0 0 0 0 0 0 0 0 148 09:45 2 89 23 0 4 0 0 1 0 0 0 0 0 0 0 119 10:00 0 77 22 0 1 1 0 0 0 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 2 382 99 1 9 2 0 2 1 0 0 0 0 0 0 498 10:15 0 80 18 1 3 1 0 0 0 1 0 0 0 0 0 104 10:30 0 72 22 0 1 1 0 1 0 0 0 0 0 0 0 97 10:45 0 78 28 0 2 2 0 1 0 0 0 0 0 0 0 111 11:00 0 68 21 0 0 1 0 0 1 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 0 298 89 1 6 5 0 2 1 1 0 0 0 0 0 403 11:15 0 75 25 0 3 0 0 0 0 0 0 0 0 0 0 103 11:30 0 84 13 0 2 1 0 0 0 0 0 0 0 0 0 100 11:45 0 73 22 0 2 0 0 1 0 0 0 0 0 0 0 98 12:00 0 91 37 0 1 1 0 0 0 0 0 0 0 0 0 130 -----------------------------------------------------------------------------------------------------------Hour Total 0 323 97 0 8 2 0 1 0 0 0 0 0 0 0 431 12:15 0 75 22 1 2 0 0 1 1 0 0 0 0 0 0 102 12:30 0 89 30 0 2 1 1 0 0 0 0 0 0 0 0 123 12:45 1 85 39 1 0 1 0 0 0 0 0 0 0 0 0 127 13:00 0 80 25 1 1 1 0 0 0 0 0 0 0 0 0 108 -----------------------------------------------------------------------------------------------------------Hour Total 1 329 116 3 5 3 1 1 1 0 0 0 0 0 0 460 13:15 0 82 18 1 2 2 0 0 0 0 0 0 0 0 0 105 13:30 1 66 24 3 0 0 0 0 0 0 0 0 0 0 0 94 13:45 0 59 23 4 6 0 0 0 2 0 0 0 0 0 0 94 14:00 1 71 24 5 0 1 0 0 0 0 0 0 0 0 0 102 -----------------------------------------------------------------------------------------------------------Hour Total 2 278 89 13 8 3 0 0 2 0 0 0 0 0 0 395 14:15 0 102 23 1 0 0 0 0 1 0 0 0 0 0 0 127 14:30 1 87 18 2 4 1 0 0 0 0 0 0 0 0 0 113 14:45 0 92 33 2 1 0 0 0 0 0 0 0 0 0 0 128 15:00 0 79 22 2 1 1 0 1 0 0 0 0 0 0 0 106 -----------------------------------------------------------------------------------------------------------Hour Total 1 360 96 7 6 2 0 1 1 0 0 0 0 0 0 474 15:15 1 57 17 0 2 0 0 0 1 0 0 0 0 0 0 78 15:30 0 66 20 0 1 1 0 0 1 0 0 0 0 0 0 89 15:45 0 76 16 0 2 2 0 0 0 0 0 0 0 0 0 96 16:00 2 73 22 1 1 0 0 0 0 0 0 0 0 0 0 99 -----------------------------------------------------------------------------------------------------------Hour Total 3 272 75 1 6 3 0 0 2 0 0 0 0 0 0 362 16:15 0 104 17 2 0 0 0 0 0 0 0 0 0 0 0 123 16:30 0 109 31 1 2 0 0 1 0 0 0 0 0 0 0 144 16:45 0 87 24 0 2 1 0 1 1 0 0 0 0 0 0 116 17:00 0 86 23 2 0 1 0 0 0 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 0 386 95 5 4 2 0 2 1 0 0 0 0 0 0 495
141
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
3
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 83 28 0 2 0 0 0 0 0 0 0 0 0 0 113 17:30 0 107 26 0 0 0 0 1 0 0 0 0 0 0 0 134 17:45 0 97 24 0 0 1 0 1 0 0 0 0 0 0 0 123 18:00 0 79 17 0 1 1 0 0 0 0 0 0 0 0 0 98 -----------------------------------------------------------------------------------------------------------Hour Total 0 366 95 0 3 2 0 2 0 0 0 0 0 0 0 468 18:15 0 97 19 0 1 0 0 0 0 0 0 0 0 0 0 117 18:30 1 95 21 0 0 1 0 0 0 0 0 0 0 0 0 118 18:45 0 92 18 0 0 0 0 0 0 0 0 0 0 0 0 110 19:00 0 68 18 0 0 0 0 0 0 0 0 0 0 0 0 86 -----------------------------------------------------------------------------------------------------------Hour Total 1 352 76 0 1 1 0 0 0 0 0 0 0 0 0 431 19:15 0 46 14 0 0 0 0 0 0 0 0 0 0 0 0 60 19:30 0 63 11 0 0 0 0 1 0 0 0 0 0 0 0 75 19:45 0 40 9 0 1 0 0 0 0 0 0 0 0 0 0 50 20:00 0 36 4 0 0 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 0 185 38 0 1 0 0 1 0 0 0 0 0 0 0 225 20:15 0 46 11 0 0 0 0 0 0 0 0 0 0 0 0 57 20:30 0 41 19 0 0 0 0 0 0 0 0 0 0 0 0 60 20:45 0 40 7 0 0 0 0 0 0 0 0 0 0 0 0 47 21:00 0 27 6 0 0 0 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 0 154 43 0 0 0 0 0 0 0 0 0 0 0 0 197 21:15 0 19 4 0 0 0 0 0 0 0 0 0 0 0 0 23 21:30 0 21 1 0 1 0 0 0 0 0 0 0 0 0 0 23 21:45 0 19 3 0 0 0 0 0 0 0 0 0 0 0 0 22 22:00 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 71 10 0 1 0 0 0 0 0 0 0 0 0 0 82 22:15 0 18 3 0 0 0 0 1 0 0 0 0 0 0 0 22 22:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 22:45 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 23:00 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 42 4 0 0 0 0 1 0 0 0 0 0 0 0 47 23:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:30 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 23:45 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 14 1 0 0 0 0 0 0 0 0 0 0 0 0 16 -----------------------------------------------------------------------------------------------------------DAY TOTAL 11 5154 1304 47 69 30 1 14 13 1 0 0 0 0 0 6644 PERCENTS 0.2% 77.6% 19.7% 0.8% 1.0% 0.4% 0.0% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.3% Trucks & Buses 2.6% AM Times AM Peaks
09:00 07:30 08:00 06:45 09:30 10:00 2 600 131 8 12 5
09:00 03:45 09:30 2 1 1
PM Times PM Peaks
15:15 16:15 12:15 13:15 13:45 12:30 12:15 16:00 13:30 3 386 116 13 10 5 1 2 3
142
07:45 734 16:15 495
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
4
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 1 0 0 0 0 0 0 0 0 0 0 7 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 01:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 0 2 0 1 0 0 0 0 0 0 0 0 0 0 3 02:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 1 0 0 0 0 0 0 0 0 0 0 7 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 05:00 0 3 5 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 5 0 0 0 0 0 0 0 0 0 0 0 0 15 05:15 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5 05:30 0 13 2 0 0 0 0 0 1 0 0 0 0 0 0 16 05:45 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 06:00 0 22 5 0 0 1 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 52 10 0 0 1 0 0 2 0 0 0 0 0 0 65 06:15 0 28 8 0 0 0 0 0 0 0 0 0 0 0 0 36 06:30 1 34 8 2 0 1 0 0 1 0 0 0 0 0 0 47 06:45 0 49 11 2 1 1 0 0 0 0 0 0 0 0 0 64 07:00 0 68 24 2 1 0 0 0 0 0 0 0 0 0 0 95 -----------------------------------------------------------------------------------------------------------Hour Total 1 179 51 6 2 2 0 0 1 0 0 0 0 0 0 242 07:15 0 91 23 1 1 0 0 0 0 0 0 0 0 0 0 116 07:30 0 158 21 5 1 0 0 0 0 0 0 0 0 0 0 185 07:45 0 112 34 0 2 0 0 0 0 0 0 0 0 0 0 148 08:00 0 129 42 0 2 0 0 1 0 0 0 0 0 0 0 174 -----------------------------------------------------------------------------------------------------------Hour Total 0 490 120 6 6 0 0 1 0 0 0 0 0 0 0 623 08:15 08:30 08:45 09:00
0 1 0 0
161 149 114 109
21 40 24 26
3 1 0 0
2 1 2 2
2 0 0 0
0 0 0 0
0 0 0 0
143
1 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
190 192 141 137
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
5
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 533 111 4 7 2 0 0 2 0 0 0 0 0 0 660 09:15 0 95 24 1 1 0 0 0 0 0 0 0 0 0 0 121 09:30 1 104 32 2 6 1 0 1 0 0 0 0 0 0 0 147 09:45 2 90 26 0 1 0 0 0 0 0 0 0 0 0 0 119 10:00 0 85 23 1 0 1 0 1 0 0 0 0 0 0 0 111 -----------------------------------------------------------------------------------------------------------Hour Total 3 374 105 4 8 2 0 2 0 0 0 0 0 0 0 498 10:15 0 66 21 0 2 1 0 0 0 0 0 0 0 0 0 90 10:30 0 72 27 1 0 1 0 2 0 0 0 0 0 0 0 103 10:45 0 73 31 0 1 2 0 1 0 0 0 0 0 0 0 108 11:00 0 63 21 0 1 2 0 0 0 0 0 0 0 0 0 87 -----------------------------------------------------------------------------------------------------------Hour Total 0 274 100 1 4 6 0 3 0 0 0 0 0 0 0 388 11:15 0 59 17 1 2 1 0 1 0 0 0 0 0 0 0 81 11:30 0 78 20 3 2 1 0 0 0 0 0 0 0 0 0 104 11:45 0 62 19 0 0 0 0 0 0 0 0 0 0 0 0 81 12:00 0 63 24 2 1 1 0 0 0 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 0 262 80 6 5 3 0 1 0 0 0 0 0 0 0 357 12:15 0 92 29 0 2 0 0 0 0 0 0 0 0 0 0 123 12:30 0 90 21 3 1 4 0 0 1 1 0 0 0 0 0 121 12:45 0 79 24 3 3 2 0 0 0 0 0 0 0 0 0 111 13:00 0 82 27 2 1 0 0 0 1 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 0 343 101 8 7 6 0 0 2 1 0 0 0 0 0 468 13:15 1 70 26 1 0 2 0 0 1 0 0 0 0 0 0 101 13:30 0 78 29 1 1 0 0 1 0 0 0 0 0 0 0 110 13:45 0 74 23 2 1 3 0 0 0 0 0 0 0 0 0 103 14:00 0 85 22 2 0 0 0 1 0 0 0 0 0 0 0 110 -----------------------------------------------------------------------------------------------------------Hour Total 1 307 100 6 2 5 0 2 1 0 0 0 0 0 0 424 14:15 0 94 19 0 1 1 0 1 0 0 0 0 0 0 0 116 14:30 0 71 30 0 1 0 0 0 0 0 0 0 0 0 0 102 14:45 0 79 35 0 0 0 0 0 1 0 0 0 0 0 0 115 15:00 0 88 22 0 3 0 0 0 0 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 0 332 106 0 5 1 0 1 1 0 0 0 0 0 0 446 15:15 0 101 17 1 1 0 0 0 0 0 0 0 0 0 0 120 15:30 0 70 19 1 1 0 0 0 0 0 0 0 0 0 0 91 15:45 0 59 13 2 1 0 0 0 1 0 0 0 0 0 0 76 16:00 0 88 27 1 0 2 0 1 0 0 0 0 0 0 0 119 -----------------------------------------------------------------------------------------------------------Hour Total 0 318 76 5 3 2 0 1 1 0 0 0 0 0 0 406 16:15 0 82 18 0 1 0 0 0 0 0 0 0 0 0 0 101 16:30 0 79 13 0 2 0 0 0 0 0 0 0 0 0 0 94 16:45 0 71 16 0 0 0 0 0 0 0 0 0 0 0 0 87 17:00 1 68 24 0 1 0 0 0 0 0 0 0 0 0 0 94 -----------------------------------------------------------------------------------------------------------Hour Total 1 300 71 0 4 0 0 0 0 0 0 0 0 0 0 376
144
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
6
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 71 25 0 3 1 0 0 1 0 0 0 0 0 0 101 17:30 0 93 16 0 0 0 0 0 0 0 0 0 0 0 0 109 17:45 0 88 19 0 0 0 0 0 0 0 0 0 0 0 0 107 18:00 0 96 24 0 1 0 0 0 0 0 0 0 0 0 0 121 -----------------------------------------------------------------------------------------------------------Hour Total 0 348 84 0 4 1 0 0 1 0 0 0 0 0 0 438 18:15 0 96 16 0 0 0 0 0 0 0 0 0 0 0 0 112 18:30 0 85 17 0 0 0 0 0 0 0 0 0 0 0 0 102 18:45 0 66 17 0 0 0 0 0 0 0 0 0 0 0 0 83 19:00 0 75 17 0 1 0 0 0 0 0 0 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 0 322 67 0 1 0 0 0 0 0 0 0 0 0 0 390 19:15 0 41 17 0 0 0 0 0 0 0 0 0 0 0 0 58 19:30 0 45 12 0 0 0 0 0 0 0 0 0 0 0 0 57 19:45 0 36 9 0 0 0 0 0 0 0 0 0 0 0 0 45 20:00 0 33 3 0 0 0 0 0 0 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 0 155 41 0 0 0 0 0 0 0 0 0 0 0 0 196 20:15 0 30 9 0 0 0 0 0 0 0 0 0 0 0 0 39 20:30 0 44 11 0 0 0 0 0 0 0 0 0 0 0 0 55 20:45 0 43 10 0 0 0 0 0 0 0 0 0 0 0 0 53 21:00 0 28 9 0 1 0 0 0 0 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------Hour Total 0 145 39 0 1 0 0 0 0 0 0 0 0 0 0 185 21:15 0 21 2 0 0 0 0 0 0 0 0 0 0 0 0 23 21:30 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21 21:45 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 22:00 0 17 2 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 0 76 8 0 0 0 0 0 0 0 0 0 0 0 0 84 22:15 0 23 2 0 0 0 0 0 0 0 0 0 0 0 0 25 22:30 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 12 22:45 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 23:00 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 53 4 0 0 0 0 0 0 0 0 0 0 0 0 57 23:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 23:30 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 23:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 24:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 6 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------DAY TOTAL 7 4899 1290 46 61 31 0 11 11 1 0 0 0 0 0 6357 PERCENTS 0.2% 77.1% 20.3% 0.8% 1.0% 0.4% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.4% Trucks & Buses 2.5% AM Times AM Peaks
09:00 07:30 07:45 06:45 08:45 10:15 3 560 137 10 11 6
10:00 04:45 4 2
07:45 704
PM Times PM Peaks
12:30 17:30 12:45 12:30 12:15 12:30 1 373 106 9 7 8
13:30 12:30 12:15 3 3 1
12:15 468
145
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
7
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00:30 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 2 0 0 0 0 0 0 0 0 0 0 0 0 13 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 1 0 0 0 0 0 0 0 0 0 0 5 03:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:00 0 2 4 0 0 1 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 5 0 0 1 0 0 0 0 0 0 0 0 0 13 05:15 0 9 3 0 0 0 0 0 0 0 0 0 0 0 0 12 05:30 0 13 3 0 1 1 0 0 0 0 0 0 0 0 0 18 05:45 0 14 2 1 0 0 0 0 1 0 0 0 0 0 0 18 06:00 0 16 4 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 0 52 12 1 1 1 0 0 1 0 0 0 0 0 0 68 06:15 1 20 5 1 0 1 0 0 0 0 0 0 0 0 0 28 06:30 0 42 7 0 0 0 0 0 0 0 0 0 0 0 0 49 06:45 0 48 11 3 0 0 0 0 0 0 0 0 0 0 0 62 07:00 0 53 24 2 0 1 0 0 0 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 1 163 47 6 0 2 0 0 0 0 0 0 0 0 0 219 07:15 0 87 12 1 1 1 0 0 0 0 0 0 0 0 0 102 07:30 0 148 22 4 0 0 0 0 0 0 0 0 0 0 0 174 07:45 0 122 28 0 1 1 0 0 0 0 0 0 0 0 0 152 08:00 0 142 35 0 0 2 0 1 0 0 0 0 0 0 0 180 -----------------------------------------------------------------------------------------------------------Hour Total 0 499 97 5 2 4 0 1 0 0 0 0 0 0 0 608 08:15 08:30 08:45 09:00
1 0 0 0
162 149 111 105
28 27 30 26
5 1 0 0
0 2 0 2
1 0 0 0
0 0 0 0
0 0 0 0
146
2 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
199 179 141 133
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
8
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 527 111 6 4 1 0 0 2 0 0 0 0 0 0 652 09:15 0 87 36 0 0 2 0 0 0 0 0 0 0 0 0 125 09:30 0 113 32 3 3 2 0 0 0 0 0 0 0 0 0 153 09:45 0 84 22 0 2 3 0 1 0 0 0 0 0 0 0 112 10:00 0 78 17 0 3 2 0 1 0 1 0 0 0 0 0 102 -----------------------------------------------------------------------------------------------------------Hour Total 0 362 107 3 8 9 0 2 0 1 0 0 0 0 0 492 10:15 0 80 27 0 1 2 0 0 1 0 0 0 0 0 0 111 10:30 0 78 22 0 1 5 0 0 0 0 0 0 0 0 0 106 10:45 1 82 15 0 2 0 0 0 0 0 0 0 0 0 0 100 11:00 0 72 20 0 0 3 0 2 0 0 0 0 0 0 0 97 -----------------------------------------------------------------------------------------------------------Hour Total 1 312 84 0 4 10 0 2 1 0 0 0 0 0 0 414 11:15 0 70 20 0 0 0 1 0 0 0 0 0 0 0 0 91 11:30 0 66 20 0 0 3 0 1 0 0 0 0 0 0 0 90 11:45 0 76 31 0 0 1 0 1 1 0 0 0 0 0 0 110 12:00 0 83 26 0 3 1 0 0 0 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 0 295 97 0 3 5 1 2 1 0 0 0 0 0 0 404 12:15 0 66 29 1 5 1 0 0 1 0 0 0 0 0 0 103 12:30 1 54 24 0 2 3 0 0 1 0 0 0 0 0 0 85 12:45 0 84 22 0 0 1 0 1 0 0 0 0 0 0 0 108 13:00 0 78 30 1 1 1 0 1 0 0 0 0 0 0 0 112 -----------------------------------------------------------------------------------------------------------Hour Total 1 282 105 2 8 6 0 2 2 0 0 0 0 0 0 408 13:15 0 68 18 0 0 0 0 1 0 1 0 0 0 0 0 88 13:30 0 64 19 4 2 3 2 0 0 0 0 0 0 0 0 94 13:45 0 65 20 5 4 0 0 1 0 0 0 0 0 0 0 95 14:00 0 68 22 2 0 0 0 1 1 0 0 0 0 0 0 94 -----------------------------------------------------------------------------------------------------------Hour Total 0 265 79 11 6 3 2 3 1 1 0 0 0 0 0 371 14:15 0 87 15 0 1 2 0 0 0 0 0 0 0 0 0 105 14:30 1 89 27 0 1 2 1 0 0 0 0 0 0 0 0 121 14:45 0 78 35 1 3 1 0 0 0 0 0 0 0 0 0 118 15:00 0 82 25 1 2 1 0 0 0 0 0 0 0 0 0 111 -----------------------------------------------------------------------------------------------------------Hour Total 1 336 102 2 7 6 1 0 0 0 0 0 0 0 0 455 15:15 0 81 23 0 1 2 1 0 0 0 0 0 0 0 0 108 15:30 0 63 19 0 1 2 0 0 1 0 0 0 0 0 0 86 15:45 1 80 24 0 2 0 0 0 0 0 0 0 0 0 0 107 16:00 0 94 23 0 0 0 0 0 0 0 0 0 0 0 0 117 -----------------------------------------------------------------------------------------------------------Hour Total 1 318 89 0 4 4 1 0 1 0 0 0 0 0 0 418 16:15 0 89 26 2 1 0 0 0 1 0 0 0 0 0 0 119 16:30 1 89 24 1 2 0 0 0 0 1 0 0 0 0 0 118 16:45 1 92 19 1 0 0 0 1 0 0 0 0 0 0 0 114 17:00 0 132 26 1 0 0 0 0 0 0 0 0 0 0 0 159 -----------------------------------------------------------------------------------------------------------Hour Total 2 402 95 5 3 0 0 1 1 1 0 0 0 0 0 510
147
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4B Site ID: 000000020167 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
9
File: D0816009.prn City: 16-221 AW Max County: 30.16283, -81.38580
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 99 9 0 0 0 0 0 1 0 0 0 0 0 0 109 17:30 1 80 24 0 2 0 0 0 0 0 0 0 0 0 0 107 17:45 1 83 21 0 0 0 0 0 0 0 0 0 0 0 0 105 18:00 0 93 17 0 0 0 0 0 0 0 0 0 0 0 0 110 -----------------------------------------------------------------------------------------------------------Hour Total 2 355 71 0 2 0 0 0 1 0 0 0 0 0 0 431 18:15 1 69 19 0 0 0 0 0 0 0 0 0 0 0 0 89 18:30 0 88 20 0 0 0 0 0 0 0 0 0 0 0 0 108 18:45 1 67 18 0 0 0 0 0 0 0 0 0 0 0 0 86 19:00 0 70 13 0 0 0 0 0 0 0 0 0 0 0 0 83 -----------------------------------------------------------------------------------------------------------Hour Total 2 294 70 0 0 0 0 0 0 0 0 0 0 0 0 366 19:15 0 63 11 0 0 0 0 0 0 0 0 0 0 0 0 74 19:30 0 74 14 0 0 0 0 0 0 0 0 0 0 0 0 88 19:45 0 67 10 0 0 0 0 0 0 0 0 0 0 0 0 77 20:00 0 33 9 0 0 0 0 0 0 0 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 0 237 44 0 0 0 0 0 0 0 0 0 0 0 0 281 20:15 0 58 9 0 0 0 0 0 0 0 0 0 0 0 0 67 20:30 0 66 22 0 1 0 0 0 0 0 0 0 0 0 0 89 20:45 0 43 8 0 0 0 0 0 0 0 0 0 0 0 0 51 21:00 0 19 4 0 0 0 0 0 0 0 0 0 0 0 0 23 -----------------------------------------------------------------------------------------------------------Hour Total 0 186 43 0 1 0 0 0 0 0 0 0 0 0 0 230 21:15 0 26 6 0 0 0 0 0 0 0 0 0 0 0 0 32 21:30 1 17 0 0 0 0 0 0 0 0 0 0 0 0 0 18 21:45 0 19 6 0 0 0 0 0 0 0 0 0 0 0 0 25 22:00 2 12 5 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 3 74 17 0 0 0 0 0 0 0 0 0 0 0 0 94 22:15 0 13 1 0 0 0 0 0 0 0 0 0 0 0 0 14 22:30 0 10 2 0 0 0 0 0 0 0 0 0 0 0 0 12 22:45 0 12 1 0 0 1 0 0 0 0 0 0 0 0 0 14 23:00 0 9 2 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 44 6 0 0 1 0 0 0 0 0 0 0 0 0 51 23:15 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 23:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 23:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 24:00 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 1 0 1 0 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------DAY TOTAL 15 5048 1285 41 55 53 5 13 11 3 0 0 0 0 0 6529 PERCENTS 0.3% 77.4% 19.7% 0.7% 0.9% 0.8% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.2% Trucks & Buses 2.7% AM Times AM Peaks
05:30 07:45 08:45 06:45 09:30 09:45 10:30 11:00 07:30 09:15 1 575 124 10 9 12 1 4 2 1
07:45 710
PM Times PM Peaks
17:30 16:30 14:30 13:15 12:15 12:15 12:45 12:30 12:15 12:30 3 412 110 11 8 6 2 3 2 1
16:15 510
=================================================================================================================== GRAND TOTAL 33 3879 185 6 35 0 0 0 15101 134 114 38 5 0 0 19530 PERCENTS 0.2% 77.4% 19.9% 0.7% 1.0% 0.6% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
148
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
1
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 00:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:45 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 3 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:15 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 05:30 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 05:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 06:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 6 0 1 0 0 0 0 0 0 0 0 0 0 0 8 06:15 0 3 3 0 1 0 0 0 0 0 0 0 0 0 0 7 06:30 1 19 5 0 0 0 0 0 0 0 0 0 0 0 0 25 06:45 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 07:00 2 3 1 1 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 3 31 11 1 1 0 0 0 0 0 0 0 0 0 0 47 07:15 2 13 3 0 0 0 0 0 0 0 0 0 0 0 0 18 07:30 1 55 8 0 1 1 0 0 0 0 0 0 0 0 0 66 07:45 10 55 10 10 1 0 0 0 0 1 0 1 0 0 0 88 08:00 3 32 7 0 0 0 0 0 1 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 16 155 28 10 2 1 0 0 1 1 0 1 0 0 0 215 08:15 08:30 08:45 09:00
6 4 2 1
89 89 64 20
14 16 5 2
0 5 1 1
1 0 0 0
0 0 0 0
2 0 0 0
0 0 0 0
149
2 1 0 0
0 0 0 0
0 0 0 0
1 0 0 0
1 1 0 0
0 0 0 0
0 0 0 0
116 116 72 24
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
2
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 13 262 37 7 1 0 2 0 3 0 0 1 2 0 0 328 09:15 2 19 10 0 1 2 0 0 1 0 0 0 0 0 0 35 09:30 1 35 4 0 0 0 0 0 0 0 0 0 0 0 0 40 09:45 0 44 6 0 0 0 0 0 0 0 0 0 0 0 0 50 10:00 2 25 9 0 1 0 0 0 0 0 0 0 0 0 0 37 -----------------------------------------------------------------------------------------------------------Hour Total 5 123 29 0 2 2 0 0 1 0 0 0 0 0 0 162 10:15 2 26 5 0 0 0 0 0 0 0 0 0 0 0 0 33 10:30 0 25 3 0 0 1 0 0 0 0 0 0 0 0 0 29 10:45 4 42 9 0 1 0 0 1 1 0 0 0 0 0 0 58 11:00 1 28 9 0 0 0 0 0 0 1 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 7 121 26 0 1 1 0 1 1 1 0 0 0 0 0 159 11:15 0 31 7 0 0 0 0 0 0 0 0 0 0 0 0 38 11:30 0 18 5 0 0 1 0 1 0 0 0 0 0 0 0 25 11:45 0 39 11 0 0 0 0 0 0 0 0 0 0 0 0 50 12:00 0 30 6 0 0 0 0 0 0 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 0 118 29 0 0 1 0 1 0 0 0 0 0 0 0 149 12:15 0 26 5 0 0 0 0 0 0 0 0 0 0 0 0 31 12:30 0 23 8 0 1 0 0 0 1 0 0 0 0 0 0 33 12:45 0 31 5 0 0 0 0 0 0 0 0 0 0 0 0 36 13:00 0 28 7 0 0 0 0 0 1 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 0 108 25 0 1 0 0 0 2 0 0 0 0 0 0 136 13:15 0 17 6 0 0 0 0 0 0 0 0 0 0 0 0 23 13:30 0 25 3 0 0 0 0 0 0 0 0 0 0 0 0 28 13:45 0 18 1 0 0 1 0 0 0 0 0 0 0 0 0 20 14:00 0 21 7 0 1 0 0 0 0 0 0 0 0 0 0 29 -----------------------------------------------------------------------------------------------------------Hour Total 0 81 17 0 1 1 0 0 0 0 0 0 0 0 0 100 14:15 0 56 11 8 3 0 0 0 0 0 0 0 0 0 0 78 14:30 0 34 8 1 1 1 0 0 0 0 0 0 0 0 0 45 14:45 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 15:00 0 29 10 0 1 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 0 137 32 9 5 1 0 0 0 0 0 0 0 0 0 184 15:15 0 91 6 5 1 0 0 0 0 0 0 0 0 0 0 103 15:30 1 59 11 0 2 0 0 0 0 0 0 0 0 0 0 73 15:45 0 34 13 1 0 0 0 2 0 0 0 0 0 0 0 50 16:00 1 40 9 2 1 0 0 0 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 2 224 39 8 4 0 0 2 0 0 0 0 0 0 0 279 16:15 0 54 2 0 0 0 0 0 0 0 0 0 0 0 0 56 16:30 1 44 10 1 1 0 0 0 0 0 0 0 0 0 0 57 16:45 0 28 9 1 0 0 0 0 0 0 0 0 0 0 0 38 17:00 0 26 5 0 0 0 0 0 0 0 0 0 0 0 0 31 -----------------------------------------------------------------------------------------------------------Hour Total 1 152 26 2 1 0 0 0 0 0 0 0 0 0 0 182
150
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
3
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 31 11 0 0 0 0 0 0 0 0 0 0 0 0 42 17:30 0 31 9 0 0 0 0 0 0 0 0 0 0 0 0 40 17:45 0 29 3 0 0 0 0 0 0 0 0 0 0 0 0 32 18:00 0 29 5 0 0 0 0 0 0 0 0 0 0 0 0 34 -----------------------------------------------------------------------------------------------------------Hour Total 0 120 28 0 0 0 0 0 0 0 0 0 0 0 0 148 18:15 0 35 3 0 0 0 0 0 0 0 0 0 0 0 0 38 18:30 0 18 2 0 0 0 0 0 0 0 0 0 0 0 0 20 18:45 0 37 5 0 0 0 0 0 0 0 0 0 0 0 0 42 19:00 0 53 11 0 0 0 0 0 0 0 0 0 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 0 143 21 0 0 0 0 0 0 0 0 0 0 0 0 164 19:15 0 41 3 0 0 0 0 0 0 0 0 0 0 0 0 44 19:30 2 18 1 0 0 0 0 0 0 0 0 0 0 0 0 21 19:45 0 32 5 0 0 0 0 0 0 0 0 0 0 0 0 37 20:00 0 20 1 0 0 0 0 0 0 0 0 0 0 0 0 21 -----------------------------------------------------------------------------------------------------------Hour Total 2 111 10 0 0 0 0 0 0 0 0 0 0 0 0 123 20:15 1 5 1 0 0 0 0 0 0 0 0 0 0 0 0 7 20:30 0 39 7 0 0 0 0 0 0 0 0 0 0 0 0 46 20:45 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 21:00 0 15 2 0 0 0 0 1 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 1 69 10 0 0 0 0 1 0 0 0 0 0 0 0 81 21:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 21:30 0 1 1 0 0 0 0 1 0 0 0 0 0 0 0 3 21:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 4 0 0 0 0 1 0 0 0 0 0 0 0 14 22:15 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 22:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 23:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 23:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 24:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------DAY TOTAL 52 1981 376 38 19 7 2 6 8 2 0 2 2 0 0 2495 PERCENTS 2.1% 79.4% 15.1% 1.6% 0.8% 0.3% 0.1% 0.3% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.5% Trucks & Buses 3.4% AM Times AM Peaks
07:45 08:00 07:45 07:45 07:30 08:30 07:30 10:45 07:45 07:00 23 274 47 15 3 2 2 2 4 1
PM Times PM Peaks
19:30 15:15 15:00 13:45 13:45 13:45 3 224 40 9 5 2
15:00 12:15 2 2
151
07:30 07:45 2 2
07:45 363 15:15 279
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
4
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 00:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 1 0 0 0 0 0 0 0 2 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 1 0 1 0 0 0 0 0 0 0 0 0 4 05:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 05:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 06:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 06:15 0 15 3 0 1 0 0 0 0 0 0 0 0 0 0 19 06:30 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 06:45 0 5 2 1 0 1 0 0 0 0 0 0 0 0 0 9 07:00 0 12 1 1 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 41 7 2 1 1 0 0 0 0 0 0 0 0 0 52 07:15 0 15 5 0 0 0 0 0 0 0 0 0 0 0 0 20 07:30 0 35 9 0 2 0 0 0 0 0 0 0 0 0 0 46 07:45 0 57 7 12 2 0 0 0 0 0 0 0 0 0 0 78 08:00 0 40 3 0 0 0 0 0 0 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 0 147 24 12 4 0 0 0 0 0 0 0 0 0 0 187 08:15 08:30 08:45 09:00
0 0 0 0
97 113 81 40
19 14 16 8
1 3 1 0
1 0 2 0
0 0 1 0
0 0 0 0
0 0 0 0
152
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
118 130 101 48
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
5
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 0 331 57 5 3 1 0 0 0 0 0 0 0 0 0 397 09:15 0 25 4 0 0 2 0 0 0 0 0 0 0 0 0 31 09:30 1 35 10 0 0 0 0 0 0 0 0 0 0 0 0 46 09:45 1 34 9 0 0 1 0 0 0 0 0 0 0 0 0 45 10:00 1 23 5 0 1 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 3 117 28 0 1 3 0 0 0 0 0 0 0 0 0 152 10:15 0 32 4 0 1 0 1 0 1 0 0 0 0 0 0 39 10:30 0 20 8 0 1 0 0 0 0 0 0 0 0 0 0 29 10:45 0 17 6 0 0 1 0 0 0 0 1 0 0 0 0 25 11:00 0 15 3 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 0 84 21 0 2 1 1 0 1 0 1 0 0 0 0 111 11:15 0 14 5 0 0 1 0 0 0 0 0 0 0 0 0 20 11:30 0 22 4 0 0 0 0 0 0 0 0 0 0 0 0 26 11:45 1 48 9 0 0 0 0 0 0 0 0 0 0 0 0 58 12:00 0 26 6 0 0 1 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 1 110 24 0 0 2 0 0 0 0 0 0 0 0 0 137 12:15 0 23 5 0 0 0 0 0 0 0 0 0 0 0 0 28 12:30 0 14 1 0 1 0 0 0 0 0 0 0 0 0 0 16 12:45 1 32 11 0 0 0 0 1 0 0 0 0 0 0 0 45 13:00 0 21 5 0 1 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 1 90 22 0 2 0 0 1 0 0 0 0 0 0 0 116 13:15 0 55 6 8 3 0 0 0 1 0 0 0 0 0 0 73 13:30 0 25 3 1 0 0 0 0 0 0 0 0 0 0 0 29 13:45 0 22 7 0 1 0 0 0 0 0 0 0 0 0 0 30 14:00 0 43 7 0 1 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 145 23 9 5 0 0 0 1 0 0 0 0 0 0 183 14:15 1 80 14 4 2 0 0 0 0 0 0 0 0 0 0 101 14:30 0 39 7 0 0 1 0 0 0 0 0 0 0 0 0 47 14:45 0 21 6 1 0 0 0 0 0 0 0 0 0 0 0 28 15:00 0 26 4 2 0 0 0 0 1 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 1 166 31 7 2 1 0 0 1 0 0 0 0 0 0 209 15:15 0 32 8 1 1 0 0 0 0 0 0 0 0 0 0 42 15:30 1 35 5 0 0 0 0 0 0 0 0 0 0 0 0 41 15:45 0 39 6 0 0 0 0 0 0 0 0 0 0 0 0 45 16:00 0 33 11 0 1 0 0 0 0 0 0 0 0 0 0 45 -----------------------------------------------------------------------------------------------------------Hour Total 1 139 30 1 2 0 0 0 0 0 0 0 0 0 0 173 16:15 0 29 7 0 0 0 0 0 0 0 0 0 0 0 0 36 16:30 0 31 3 0 1 0 0 0 0 0 0 0 0 0 0 35 16:45 0 27 3 0 0 0 0 0 0 0 0 0 0 0 0 30 17:00 0 42 5 0 0 0 0 0 0 0 0 0 0 0 0 47 -----------------------------------------------------------------------------------------------------------Hour Total 0 129 18 0 1 0 0 0 0 0 0 0 0 0 0 148
153
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
6
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 42 12 0 1 0 0 0 0 0 0 0 0 0 0 55 17:30 0 28 2 0 1 0 0 1 0 0 0 0 0 0 0 32 17:45 0 23 6 0 0 0 0 0 0 0 0 0 0 0 0 29 18:00 1 21 4 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 1 114 24 0 2 0 0 1 0 0 0 0 0 0 0 142 18:15 0 28 3 0 0 0 0 0 0 0 0 0 0 0 0 31 18:30 2 42 14 0 0 0 0 0 0 0 0 0 0 0 0 58 18:45 0 37 2 0 0 0 0 0 0 0 0 0 0 0 0 39 19:00 0 21 2 0 0 0 0 0 0 0 0 0 0 0 0 23 -----------------------------------------------------------------------------------------------------------Hour Total 2 128 21 0 0 0 0 0 0 0 0 0 0 0 0 151 19:15 0 21 4 0 0 0 0 0 0 0 0 0 0 0 0 25 19:30 0 21 3 0 0 0 0 0 0 0 0 0 0 0 0 24 19:45 0 19 2 0 0 0 0 0 0 0 0 0 0 0 0 21 20:00 0 23 3 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 84 12 0 0 0 0 0 0 0 0 0 0 0 0 96 20:15 0 19 3 0 0 0 0 0 0 0 0 0 0 0 0 22 20:30 1 12 3 0 0 0 0 0 0 0 0 0 0 0 0 16 20:45 0 16 1 0 0 0 0 0 0 0 0 0 0 0 0 17 21:00 0 14 4 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 1 61 11 0 0 0 0 0 0 0 0 0 0 0 0 73 21:15 0 14 3 0 0 0 0 0 1 0 0 0 0 0 0 18 21:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 21:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 22:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 24 5 0 0 0 0 0 1 0 0 0 0 0 0 30 22:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 22:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 23:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 23:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------DAY TOTAL 11 1929 360 37 25 10 1 3 4 0 1 0 0 0 0 2381 PERCENTS 0.5% 81.1% 15.2% 1.6% 1.0% 0.4% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.5% Trucks & Buses 3.4% AM Times AM Peaks
09:15 08:00 08:15 07:45 07:30 08:30 09:30 01:45 09:30 3 331 57 16 5 3 1 1 1
PM Times PM Peaks
17:45 13:45 13:45 12:45 12:30 13:45 3 184 35 9 5 1
12:15 12:30 1 1
154
10:00 1
08:15 397 13:45 229
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
7
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 05:15 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 2 05:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:45 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 06:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 1 1 0 0 0 0 0 0 0 0 0 0 7 06:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 06:30 0 10 3 1 0 1 0 0 0 0 0 0 0 0 0 15 06:45 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 07:00 0 9 4 1 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 30 9 2 0 1 0 0 0 0 0 0 0 0 0 42 07:15 1 13 1 0 0 0 0 0 0 0 0 0 0 0 0 15 07:30 0 32 9 0 2 0 0 1 0 0 0 0 0 0 0 44 07:45 0 73 9 11 2 0 0 0 0 0 0 0 0 0 0 95 08:00 1 29 11 0 0 0 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------Hour Total 2 147 30 11 4 0 0 1 0 0 0 0 0 0 0 195 08:15 08:30 08:45 09:00
0 1 0 0
91 124 44 25
17 21 6 5
0 3 3 0
1 0 0 0
0 1 0 0
0 0 0 0
0 0 0 0
155
0 1 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
109 151 53 30
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
8
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 1 284 49 6 1 1 0 0 1 0 0 0 0 0 0 343 09:15 0 13 5 0 1 1 0 0 0 0 0 0 0 0 0 20 09:30 0 38 7 0 0 0 0 0 0 0 0 0 0 0 0 45 09:45 0 46 5 0 0 0 0 0 0 0 0 0 0 0 0 51 10:00 1 23 9 0 0 0 0 0 0 0 0 0 0 0 0 33 -----------------------------------------------------------------------------------------------------------Hour Total 1 120 26 0 1 1 0 0 0 0 0 0 0 0 0 149 10:15 0 26 9 0 1 0 0 0 0 0 0 0 0 0 0 36 10:30 0 18 6 0 0 0 1 0 0 0 0 0 0 0 0 25 10:45 0 45 9 0 0 0 0 0 0 0 0 0 0 0 0 54 11:00 1 23 8 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------Hour Total 1 112 32 0 1 0 1 0 0 0 0 0 0 0 0 147 11:15 0 24 3 0 0 1 0 0 0 0 0 0 0 0 0 28 11:30 0 25 5 0 0 0 0 0 1 0 0 0 0 0 0 31 11:45 0 29 8 0 0 0 0 0 0 0 0 0 0 0 0 37 12:00 0 32 3 0 1 0 0 0 0 0 0 0 0 0 0 36 -----------------------------------------------------------------------------------------------------------Hour Total 0 110 19 0 1 1 0 0 1 0 0 0 0 0 0 132 12:15 0 27 11 0 1 0 0 0 0 0 0 0 0 0 0 39 12:30 0 31 4 0 0 0 0 0 0 0 0 0 0 0 0 35 12:45 0 28 3 0 2 0 0 0 0 0 0 0 0 0 0 33 13:00 0 22 6 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------Hour Total 0 108 24 0 3 0 0 0 0 0 0 0 0 0 0 135 13:15 0 17 2 0 0 0 0 0 0 0 0 0 0 0 0 19 13:30 0 18 6 0 0 0 0 1 0 0 0 0 0 0 0 25 13:45 0 17 8 0 0 0 0 0 0 0 0 0 0 0 0 25 14:00 0 19 4 0 1 0 0 0 0 0 0 0 0 0 0 24 -----------------------------------------------------------------------------------------------------------Hour Total 0 71 20 0 1 0 0 1 0 0 0 0 0 0 0 93 14:15 0 59 9 8 3 0 0 0 0 0 0 0 0 0 0 79 14:30 0 25 2 1 0 0 0 0 0 0 0 0 0 0 0 28 14:45 1 18 6 0 0 0 0 0 0 0 0 0 0 0 0 25 15:00 0 37 12 0 1 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 1 139 29 9 4 0 0 0 0 0 0 0 0 0 0 182 15:15 1 79 16 5 3 0 0 1 0 0 0 0 0 0 0 105 15:30 1 61 11 0 1 0 0 1 0 0 0 0 0 0 0 75 15:45 0 44 4 1 0 0 0 0 1 0 0 0 0 0 0 50 16:00 0 56 9 2 0 1 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 2 240 40 8 4 1 0 2 1 0 0 0 0 0 0 298 16:15 0 50 4 0 0 0 0 0 0 0 0 0 0 0 0 54 16:30 0 40 7 1 0 0 0 0 0 0 0 0 0 0 0 48 16:45 0 25 3 0 1 0 0 0 0 0 0 0 0 0 0 29 17:00 0 33 9 0 0 0 0 0 0 0 0 0 0 0 0 42 -----------------------------------------------------------------------------------------------------------Hour Total 0 148 23 1 1 0 0 0 0 0 0 0 0 0 0 173
156
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 4C Site ID: 000000009369 Location: Landrum Lane EB Direction: EAST Lane: 1 TIME
1
2
Page:
9
File: EB.prn City: 16-221 AW Max County: 30.16445, -81.38714
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 51 6 0 0 0 0 0 0 0 0 0 0 0 0 57 17:30 0 30 2 0 0 0 0 0 0 0 0 0 0 0 0 32 17:45 0 37 2 0 0 0 0 0 0 0 0 0 0 0 0 39 18:00 0 19 7 0 1 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 137 17 0 1 0 0 0 0 0 0 0 0 0 0 155 18:15 0 30 3 0 0 0 0 0 0 0 0 0 0 0 0 33 18:30 0 66 15 0 0 0 0 0 0 0 0 0 0 0 0 81 18:45 0 53 14 0 0 0 0 0 0 0 0 0 0 0 0 67 19:00 0 23 4 0 0 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 0 172 36 0 0 0 0 0 0 0 0 0 0 0 0 208 19:15 0 36 2 0 0 0 0 0 0 0 0 0 0 0 0 38 19:30 0 15 2 0 0 0 0 0 0 0 0 0 0 0 0 17 19:45 1 16 4 0 0 0 0 0 0 0 0 0 0 0 0 21 20:00 0 14 3 0 0 0 0 0 0 0 0 0 0 0 0 17 -----------------------------------------------------------------------------------------------------------Hour Total 1 81 11 0 0 0 0 0 0 0 0 0 0 0 0 93 20:15 1 11 1 0 0 0 0 0 0 0 0 0 0 0 0 13 20:30 0 39 7 0 0 0 0 0 0 0 0 0 0 0 0 46 20:45 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 21:00 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 1 65 10 0 0 0 0 0 0 0 0 0 0 0 0 76 21:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 21:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 21:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 3 0 0 0 0 0 0 0 0 0 0 0 0 12 22:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 22:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 23:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 23:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 23:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 24:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------DAY TOTAL 10 1994 381 38 23 5 1 4 3 0 0 0 0 0 0 2459 PERCENTS 0.5% 81.1% 15.5% 1.6% 0.9% 0.2% 0.0% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.9% Trucks & Buses 3.0% AM Times AM Peaks
07:15 07:45 07:45 07:45 07:30 08:30 09:45 06:45 07:45 2 317 58 14 5 2 1 1 1
07:45 396
PM Times PM Peaks
14:45 15:15 14:45 13:45 14:45 15:15 3 240 45 9 5 1
15:15 298
14:45 15:00 2 1
=================================================================================================================== GRAND TOTAL 73 1117 67 4 15 1 2 0 5904 113 22 13 2 2 0 7335 PERCENTS 1.0% 80.5% 15.3% 1.6% 1.0% 0.3% 0.0% 0.1% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
157
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
1
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 01:15 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 01:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 02:15 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 02:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 4 0 0 0 0 0 1 0 0 0 0 0 0 0 5 03:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 4 0 0 0 0 1 0 0 0 0 0 0 0 10 03:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 04:45 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 05:00 0 4 4 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 7 0 0 0 0 0 0 0 0 0 0 0 0 22 05:15 0 12 7 0 0 0 0 0 0 0 0 0 0 0 0 19 05:30 0 12 8 0 0 1 0 0 1 0 0 0 0 0 0 22 05:45 0 13 2 0 1 0 0 0 0 0 0 0 0 0 0 16 06:00 0 36 6 0 0 1 0 0 0 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 0 73 23 0 1 2 0 0 1 0 0 0 0 0 0 100 06:15 1 30 6 0 1 1 0 0 0 0 0 0 0 0 0 39 06:30 1 55 16 4 1 1 0 0 0 0 0 0 0 0 0 78 06:45 0 60 19 4 1 4 0 0 0 0 0 0 0 0 0 88 07:00 0 79 32 2 1 1 1 1 1 0 0 0 0 0 0 118 -----------------------------------------------------------------------------------------------------------Hour Total 2 224 73 10 4 7 1 1 1 0 0 0 0 0 0 323 07:15 0 115 39 2 2 1 0 0 1 0 0 0 0 0 0 160 07:30 0 139 32 1 3 0 0 0 0 0 0 0 0 0 0 175 07:45 2 168 71 0 2 0 0 0 0 0 0 3 0 0 0 246 08:00 1 210 59 2 5 0 0 1 1 0 0 0 0 0 0 279 -----------------------------------------------------------------------------------------------------------Hour Total 3 632 201 5 12 1 0 1 2 0 0 3 0 0 0 860 08:15 08:30 08:45 09:00
1 0 4 0
191 177 144 169
63 67 73 75
4 0 1 0
3 3 1 2
0 0 0 2
2 0 0 0
0 0 0 0
158
0 0 0 2
0 0 0 0
0 1 0 1
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
264 248 223 251
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
2
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 5 681 278 5 9 2 2 0 2 0 2 0 0 0 0 986 09:15 3 150 52 1 5 0 0 1 0 0 0 0 0 0 0 212 09:30 1 120 54 1 6 1 0 0 0 0 0 0 0 0 0 183 09:45 1 111 51 0 6 0 0 2 1 0 0 0 0 0 0 172 10:00 0 116 36 1 3 2 0 1 0 1 0 0 0 0 0 160 -----------------------------------------------------------------------------------------------------------Hour Total 5 497 193 3 20 3 0 4 1 1 0 0 0 0 0 727 10:15 0 96 19 2 4 1 0 0 3 0 0 0 0 0 0 125 10:30 0 95 39 0 3 2 0 0 1 0 0 0 0 0 0 140 10:45 1 92 30 0 2 1 0 3 0 0 0 0 0 0 0 129 11:00 0 100 42 0 0 3 0 0 0 0 0 0 0 0 0 145 -----------------------------------------------------------------------------------------------------------Hour Total 1 383 130 2 9 7 0 3 4 0 0 0 0 0 0 539 11:15 0 92 38 2 4 0 0 0 1 0 0 0 0 0 0 137 11:30 1 93 45 0 3 1 1 2 0 0 0 0 0 0 0 146 11:45 0 101 43 0 1 4 0 1 0 0 0 0 0 0 0 150 12:00 0 111 34 0 1 2 0 0 1 0 0 0 0 0 0 149 -----------------------------------------------------------------------------------------------------------Hour Total 1 397 160 2 9 7 1 3 2 0 0 0 0 0 0 582 12:15 0 96 25 1 2 1 0 0 1 0 0 0 0 0 0 126 12:30 0 103 42 1 2 3 0 1 0 0 0 0 0 0 0 152 12:45 0 90 33 0 0 0 0 1 0 0 0 0 0 0 0 124 13:00 0 90 31 3 2 2 0 0 1 0 0 0 0 0 0 129 -----------------------------------------------------------------------------------------------------------Hour Total 0 379 131 5 6 6 0 2 2 0 0 0 0 0 0 531 13:15 0 79 23 0 2 0 0 0 0 1 0 0 0 0 0 105 13:30 1 93 33 5 1 1 0 1 1 0 0 0 0 0 0 136 13:45 0 84 37 7 4 0 0 1 0 0 0 0 0 0 0 133 14:00 1 105 28 2 1 2 0 0 0 0 0 0 0 0 0 139 -----------------------------------------------------------------------------------------------------------Hour Total 2 361 121 14 8 3 0 2 1 1 0 0 0 0 0 513 14:15 0 107 33 0 1 2 0 0 1 0 0 0 0 0 0 144 14:30 0 93 38 2 3 1 0 0 0 0 0 0 0 0 0 137 14:45 1 92 34 1 1 1 0 2 0 0 1 0 0 0 0 133 15:00 0 107 24 0 1 1 0 1 0 0 0 0 0 0 0 134 -----------------------------------------------------------------------------------------------------------Hour Total 1 399 129 3 6 5 0 3 1 0 1 0 0 0 0 548 15:15 1 134 28 0 1 0 0 2 0 0 0 0 0 0 0 166 15:30 0 83 34 0 2 0 1 0 0 0 0 0 0 0 0 120 15:45 0 87 31 0 0 1 0 0 1 0 0 0 0 0 0 120 16:00 2 143 38 1 1 1 0 0 0 0 0 0 0 0 0 186 -----------------------------------------------------------------------------------------------------------Hour Total 3 447 131 1 4 2 1 2 1 0 0 0 0 0 0 592 16:15 1 197 51 3 1 1 0 0 0 0 0 0 0 0 0 254 16:30 1 121 44 5 3 0 0 1 0 0 0 0 0 0 0 175 16:45 0 114 41 0 0 2 0 1 1 0 0 0 0 0 0 159 17:00 0 120 33 1 0 1 0 1 0 0 0 0 0 0 0 156 -----------------------------------------------------------------------------------------------------------Hour Total 2 552 169 9 4 4 0 3 1 0 0 0 0 0 0 744
159
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
3
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 134 39 0 0 0 0 0 0 0 0 0 0 0 0 174 17:30 1 152 48 0 1 0 1 0 0 0 0 0 0 0 0 203 17:45 0 141 32 0 1 2 0 0 0 0 0 0 0 0 0 176 18:00 1 137 30 0 1 0 0 0 0 0 0 0 0 0 0 169 -----------------------------------------------------------------------------------------------------------Hour Total 3 564 149 0 3 2 1 0 0 0 0 0 0 0 0 722 18:15 2 117 36 0 0 0 0 0 0 0 0 0 0 0 0 155 18:30 0 125 30 0 0 0 0 1 0 0 0 0 0 0 0 156 18:45 0 127 52 0 0 0 0 0 0 0 0 0 0 0 0 179 19:00 1 110 30 0 0 0 0 0 0 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 3 479 148 0 0 0 0 1 0 0 0 0 0 0 0 631 19:15 1 88 33 0 0 0 0 0 0 0 0 0 0 0 0 122 19:30 0 89 23 0 0 0 0 0 0 0 0 0 0 0 0 112 19:45 0 65 15 0 0 0 0 1 0 0 0 0 0 0 0 81 20:00 1 54 16 0 0 0 0 0 0 0 0 0 0 0 0 71 -----------------------------------------------------------------------------------------------------------Hour Total 2 296 87 0 0 0 0 1 0 0 0 0 0 0 0 386 20:15 0 71 21 0 0 0 0 0 0 0 0 0 0 0 0 92 20:30 0 54 18 0 0 0 0 0 0 0 0 0 0 0 0 72 20:45 0 70 16 0 0 0 0 0 0 0 0 0 0 0 0 86 21:00 0 41 10 0 0 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 236 65 0 0 0 0 0 0 0 0 0 0 0 0 301 21:15 0 28 2 0 0 0 0 0 0 0 0 0 0 0 0 30 21:30 0 36 5 0 1 0 0 0 0 0 0 0 0 0 0 42 21:45 0 32 2 0 0 0 0 0 0 0 0 0 0 0 0 34 22:00 0 17 5 0 0 0 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 0 113 14 0 1 0 0 0 0 0 0 0 0 0 0 128 22:15 0 13 4 0 0 0 0 0 0 0 0 0 0 0 0 17 22:30 0 14 3 0 0 0 0 0 0 0 0 0 0 0 0 17 22:45 0 13 3 0 0 0 0 0 0 0 0 0 0 0 0 16 23:00 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 51 11 0 0 0 0 0 0 0 0 0 0 0 0 62 23:15 0 10 3 0 0 0 0 0 0 0 0 0 0 0 0 13 23:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 23:45 1 1 2 0 0 0 0 0 0 0 0 0 0 0 0 4 24:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 1 19 8 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------DAY TOTAL 34 6827 2237 59 96 51 6 27 19 2 3 3 0 0 0 9364 PERCENTS 0.4% 73.0% 23.9% 0.7% 1.1% 0.5% 0.0% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.1% Trucks & Buses 2.8% AM Times AM Peaks
08:45 07:45 08:15 06:30 09:15 11:00 07:30 10:45 09:45 09:15 08:15 07:00 8 746 278 12 20 8 2 5 5 1 2 3
07:45 1037
PM Times PM Peaks
15:45 16:00 16:00 13:00 13:00 12:15 14:45 14:30 12:15 12:30 14:00 4 575 174 15 9 6 1 5 2 1 1
16:00 774
160
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
4
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 00:45 0 3 1 0 1 0 0 0 0 0 0 0 0 0 0 5 01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 14 3 0 1 0 0 0 0 0 0 0 0 0 0 18 01:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 01:30 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:00 0 2 0 0 1 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 1 8 2 0 1 0 0 0 0 0 0 0 0 0 0 12 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 03:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 1 3 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 04:30 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 04:45 0 6 1 0 0 0 0 1 0 0 0 0 0 0 0 8 05:00 0 3 6 0 1 1 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 10 0 1 1 0 1 0 0 0 0 0 0 0 31 05:15 0 12 2 0 0 0 0 0 0 0 0 0 0 0 0 14 05:30 0 8 5 0 0 0 0 0 1 0 0 0 0 0 0 14 05:45 0 14 5 0 0 0 0 0 0 0 0 0 0 0 0 19 06:00 0 36 12 0 0 2 0 0 1 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 70 24 0 0 2 0 0 2 0 0 0 0 0 0 98 06:15 0 34 12 2 0 1 1 0 0 0 0 0 0 0 0 50 06:30 1 50 14 2 1 5 1 0 1 1 0 0 0 0 0 76 06:45 1 59 20 4 1 1 0 0 1 0 0 0 0 0 0 87 07:00 0 91 50 3 2 1 0 0 0 0 0 0 0 0 0 147 -----------------------------------------------------------------------------------------------------------Hour Total 2 234 96 11 4 8 2 0 2 1 0 0 0 0 0 360 07:15 0 106 42 1 2 0 0 0 0 0 0 0 0 0 0 151 07:30 0 148 44 2 2 0 1 0 0 0 0 0 0 0 0 197 07:45 0 175 64 1 5 0 1 0 1 0 0 0 0 0 0 247 08:00 0 195 62 0 4 1 0 1 1 0 0 0 0 0 0 264 -----------------------------------------------------------------------------------------------------------Hour Total 0 624 212 4 13 1 2 1 2 0 0 0 0 0 0 859 08:15 08:30 08:45 09:00
0 1 0 1
170 193 147 158
58 41 59 59
3 0 1 0
4 1 2 3
2 1 1 1
0 0 0 0
1 2 2 0
161
0 2 0 0
0 0 0 0
0 1 1 0
0 0 0 2
0 0 0 0
0 0 0 0
0 0 0 0
238 242 213 224
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
5
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 668 217 4 10 5 0 5 2 0 2 2 0 0 0 917 09:15 0 155 59 2 4 0 1 2 1 0 0 0 0 0 0 224 09:30 0 140 53 2 4 1 0 0 0 0 0 0 0 0 0 200 09:45 0 98 35 0 0 1 0 0 1 0 0 0 0 0 0 135 10:00 0 101 42 1 1 4 0 1 0 0 0 0 0 0 0 150 -----------------------------------------------------------------------------------------------------------Hour Total 0 494 189 5 9 6 1 3 2 0 0 0 0 0 0 709 10:15 1 83 30 0 3 2 0 1 0 0 0 0 0 0 0 120 10:30 2 89 26 0 1 1 0 2 0 0 0 0 0 0 0 121 10:45 0 82 44 0 0 3 0 1 1 0 0 0 0 0 0 131 11:00 0 78 27 0 0 2 0 0 1 0 0 0 0 0 0 108 -----------------------------------------------------------------------------------------------------------Hour Total 3 332 127 0 4 8 0 4 2 0 0 0 0 0 0 480 11:15 0 68 31 1 1 2 0 1 0 0 0 0 0 0 0 104 11:30 1 99 26 3 1 0 0 0 0 0 2 0 0 0 0 132 11:45 0 81 32 0 0 0 0 0 0 0 0 0 0 0 0 113 12:00 0 84 34 2 3 2 0 0 0 0 0 0 0 0 0 125 -----------------------------------------------------------------------------------------------------------Hour Total 1 332 123 6 5 4 0 1 0 0 2 0 0 0 0 474 12:15 1 96 37 1 1 3 0 0 0 1 0 0 0 0 0 140 12:30 0 105 26 5 2 4 1 0 0 0 0 0 0 0 0 143 12:45 0 88 48 3 2 2 0 1 0 1 0 0 0 0 0 145 13:00 0 109 47 3 0 0 0 0 1 0 0 0 0 0 0 160 -----------------------------------------------------------------------------------------------------------Hour Total 1 398 158 12 5 9 1 1 1 2 0 0 0 0 0 588 13:15 0 93 32 0 0 3 0 0 0 0 0 0 0 0 0 128 13:30 0 84 32 2 1 4 0 0 0 0 0 0 0 0 0 123 13:45 0 111 32 2 0 1 0 0 1 0 0 0 0 0 0 147 14:00 1 79 42 0 1 2 0 1 2 0 0 0 0 0 0 128 -----------------------------------------------------------------------------------------------------------Hour Total 1 367 138 4 2 10 0 1 3 0 0 0 0 0 0 526 14:15 0 124 42 0 2 1 0 0 1 0 0 0 0 0 0 170 14:30 0 114 51 0 2 3 0 0 1 0 0 0 0 0 0 171 14:45 1 104 32 0 0 0 0 0 0 0 0 0 0 0 0 137 15:00 1 183 41 2 1 2 1 1 0 0 0 0 0 0 0 232 -----------------------------------------------------------------------------------------------------------Hour Total 2 525 166 2 5 6 1 1 2 0 0 0 0 0 0 710 15:15 2 168 42 8 1 2 1 0 0 0 0 0 1 0 0 225 15:30 0 114 31 1 0 1 0 0 0 0 0 0 0 0 0 147 15:45 2 125 23 2 1 1 0 0 0 1 0 0 0 0 0 155 16:00 0 133 35 0 2 2 0 0 0 0 0 0 0 0 0 172 -----------------------------------------------------------------------------------------------------------Hour Total 4 540 131 11 4 6 1 0 0 1 0 0 1 0 0 699 16:15 1 109 23 0 3 1 0 1 1 0 0 0 0 0 0 139 16:30 2 118 31 0 1 1 0 1 1 0 0 0 0 0 0 155 16:45 1 119 24 0 0 1 0 1 0 0 0 0 0 0 0 146 17:00 0 120 35 1 0 0 0 0 1 0 0 0 0 0 0 157 -----------------------------------------------------------------------------------------------------------Hour Total 4 466 113 1 4 3 0 3 3 0 0 0 0 0 0 597
162
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
6
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 143 37 0 1 1 0 0 0 0 0 0 0 0 0 182 17:30 0 126 31 0 1 0 0 0 0 0 0 0 0 0 0 158 17:45 0 153 42 0 0 0 0 0 0 0 0 0 0 0 0 195 18:00 0 167 42 0 1 0 0 0 0 0 0 0 0 0 0 210 -----------------------------------------------------------------------------------------------------------Hour Total 0 589 152 0 3 1 0 0 0 0 0 0 0 0 0 745 18:15 1 149 34 0 0 0 0 0 0 0 0 0 0 0 0 184 18:30 0 142 36 0 0 0 0 0 0 0 0 0 0 0 0 178 18:45 1 114 31 0 1 0 0 0 0 0 0 0 0 0 0 147 19:00 0 122 45 0 0 0 0 1 0 0 0 0 0 0 0 168 -----------------------------------------------------------------------------------------------------------Hour Total 2 527 146 0 1 0 0 1 0 0 0 0 0 0 0 677 19:15 1 77 29 0 1 0 0 0 0 0 0 0 0 0 0 108 19:30 0 65 20 0 1 0 0 0 0 0 0 0 0 0 0 86 19:45 1 73 12 0 0 0 0 0 0 0 0 0 0 0 0 86 20:00 1 58 9 0 0 0 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 3 273 70 0 2 0 0 0 0 0 0 0 0 0 0 348 20:15 0 54 21 0 0 0 0 0 0 0 0 0 0 0 0 75 20:30 0 69 19 0 0 0 0 0 0 0 0 0 0 0 0 88 20:45 0 70 20 0 0 0 0 0 0 0 0 0 0 0 0 90 21:00 0 31 8 0 0 0 0 1 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 0 224 68 0 0 0 0 1 0 0 0 0 0 0 0 293 21:15 0 21 6 0 0 0 0 0 0 0 0 0 0 0 0 27 21:30 0 41 9 0 0 0 0 0 0 0 0 0 0 0 0 50 21:45 0 28 6 0 0 0 0 0 0 0 0 0 0 0 0 34 22:00 0 21 5 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------Hour Total 0 111 26 0 0 0 0 0 0 0 0 0 0 0 0 137 22:15 0 14 7 0 0 0 0 0 0 0 0 0 0 0 0 21 22:30 0 13 3 0 0 0 0 0 0 0 0 0 0 0 0 16 22:45 0 15 4 0 0 0 0 0 0 0 0 0 0 0 0 19 23:00 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 49 14 0 0 0 0 0 0 0 0 0 0 0 0 63 23:15 0 9 3 0 0 0 0 0 0 0 0 0 0 0 0 12 23:30 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 23:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 24:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 23 6 0 0 0 0 0 0 0 0 0 0 0 0 29 -----------------------------------------------------------------------------------------------------------DAY TOTAL 26 6890 2194 60 74 70 8 23 21 4 4 2 1 0 0 9377 PERCENTS 0.3% 73.5% 23.4% 0.7% 0.8% 0.8% 0.1% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.1% Trucks & Buses 2.8% AM Times AM Peaks
09:45 07:45 08:45 06:15 07:30 10:00 05:45 08:00 07:45 05:45 08:00 08:15 3 733 230 11 15 10 2 6 4 1 2 2
PM Times PM Peaks
15:00 17:45 13:45 15:00 15:45 13:15 14:30 16:00 13:45 12:15 5 611 167 13 7 10 2 3 5 2
163
07:45 991 14:30 1
17:45 767
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
7
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 00:45 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 01:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 01:15 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 01:30 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:45 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 2 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 0 0 1 0 0 0 0 0 0 0 0 0 0 4 03:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 04:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 05:00 0 3 7 0 1 1 0 1 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 8 0 1 1 0 1 0 0 0 0 0 0 0 21 05:15 0 14 6 0 0 0 0 0 0 0 0 0 0 0 0 20 05:30 0 15 6 0 0 2 0 0 1 0 0 0 0 0 0 24 05:45 0 20 1 0 0 1 0 0 0 0 0 0 0 0 0 22 06:00 0 27 4 0 1 1 1 1 0 0 0 0 0 0 0 35 -----------------------------------------------------------------------------------------------------------Hour Total 0 76 17 0 1 4 1 1 1 0 0 0 0 0 0 101 06:15 1 29 6 2 0 1 1 0 0 0 0 0 0 0 0 40 06:30 1 45 19 1 2 2 0 0 0 0 0 0 0 0 0 70 06:45 1 74 15 6 0 1 0 0 0 0 0 0 0 0 0 97 07:00 0 65 36 1 0 2 1 0 0 0 0 0 0 0 0 105 -----------------------------------------------------------------------------------------------------------Hour Total 3 213 76 10 2 6 2 0 0 0 0 0 0 0 0 312 07:15 0 113 38 2 2 2 0 0 0 0 0 0 0 0 0 157 07:30 0 137 36 2 3 2 0 1 1 0 0 0 0 0 0 182 07:45 0 187 50 1 8 2 0 0 0 0 0 0 0 0 0 248 08:00 2 209 61 0 3 1 0 0 1 0 0 0 0 0 0 277 -----------------------------------------------------------------------------------------------------------Hour Total 2 646 185 5 16 7 0 1 2 0 0 0 0 0 0 864 08:15 08:30 08:45 09:00
1 1 2 1
167 170 185 174
70 41 61 50
4 0 1 0
3 2 0 1
3 2 3 1
0 1 0 0
2 2 0 2
164
1 0 2 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
251 219 255 229
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
8
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 5 696 222 5 6 9 1 6 3 0 1 0 0 0 0 954 09:15 1 155 60 1 2 4 0 0 3 0 0 0 0 0 0 226 09:30 0 120 46 2 6 2 0 3 0 0 0 0 0 0 0 179 09:45 2 111 47 0 2 4 0 1 0 0 0 0 0 0 0 167 10:00 1 91 37 0 1 5 0 0 1 0 0 0 0 0 0 136 -----------------------------------------------------------------------------------------------------------Hour Total 4 477 190 3 11 15 0 4 4 0 0 0 0 0 0 708 10:15 0 129 44 1 3 3 0 0 1 0 0 0 0 0 0 181 10:30 0 111 38 0 2 5 0 2 0 0 0 0 0 0 0 158 10:45 0 108 23 0 3 2 1 1 0 0 0 0 0 0 0 138 11:00 0 105 33 0 2 4 0 1 0 0 1 0 0 0 0 146 -----------------------------------------------------------------------------------------------------------Hour Total 0 453 138 1 10 14 1 4 1 0 1 0 0 0 0 623 11:15 0 66 41 0 0 2 0 1 0 0 0 0 0 0 0 110 11:30 0 86 37 1 1 2 0 0 0 0 0 0 0 0 0 127 11:45 0 93 29 0 1 3 0 0 0 0 0 0 0 0 0 126 12:00 3 98 34 1 3 6 0 1 0 0 0 0 0 0 0 146 -----------------------------------------------------------------------------------------------------------Hour Total 3 343 141 2 5 13 0 2 0 0 0 0 0 0 0 509 12:15 0 93 44 0 0 5 0 0 1 0 0 0 0 0 0 143 12:30 0 88 38 0 1 4 0 0 0 0 0 0 0 0 0 131 12:45 0 93 34 1 1 5 0 1 0 0 0 0 0 0 0 135 13:00 0 114 35 1 3 4 0 0 0 0 0 0 0 0 0 157 -----------------------------------------------------------------------------------------------------------Hour Total 0 388 151 2 5 18 0 1 1 0 0 0 0 0 0 566 13:15 0 68 32 0 0 3 0 3 0 0 0 0 0 0 0 106 13:30 0 89 32 6 4 4 0 0 0 0 0 0 0 0 0 135 13:45 1 91 32 5 4 4 0 0 0 0 0 0 0 0 0 137 14:00 0 77 32 2 1 4 0 2 0 0 0 0 0 0 0 118 -----------------------------------------------------------------------------------------------------------Hour Total 1 325 128 13 9 15 0 5 0 0 0 0 0 0 0 496 14:15 3 114 42 1 2 1 0 0 0 0 0 0 0 0 0 163 14:30 0 103 30 1 1 4 0 0 0 0 0 0 0 0 0 139 14:45 0 84 25 2 2 1 0 0 2 0 0 0 1 0 0 117 15:00 3 101 37 0 0 0 0 0 0 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 6 402 134 4 5 6 0 0 2 0 0 0 1 0 0 560 15:15 1 135 40 0 3 1 1 1 0 0 0 0 0 0 0 182 15:30 2 73 16 1 0 3 0 0 3 0 0 0 0 0 0 98 15:45 1 114 31 2 1 0 0 1 0 0 0 0 0 0 0 150 16:00 0 172 43 0 0 0 0 0 0 0 0 0 0 0 0 215 -----------------------------------------------------------------------------------------------------------Hour Total 4 494 130 3 4 4 1 2 3 0 0 0 0 0 0 645 16:15 2 194 51 7 3 3 1 1 1 0 0 0 0 0 0 263 16:30 1 136 45 2 1 1 0 0 0 0 0 0 1 0 0 187 16:45 0 137 43 0 2 0 0 0 1 0 0 0 0 0 0 183 17:00 0 124 31 0 1 0 0 0 0 0 0 0 0 0 0 156 -----------------------------------------------------------------------------------------------------------Hour Total 3 591 170 9 7 4 1 1 2 0 0 0 1 0 0 789
165
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5A Site ID: 000000003552 Location: Palm Valley Rd. NB Direction: NORTH Lane: 1 TIME
1
2
3
Page:
9
File: NB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 128 35 0 0 0 0 1 0 0 0 0 0 0 0 164 17:30 0 150 38 0 2 0 0 0 0 0 0 0 0 0 0 190 17:45 0 158 55 0 2 1 0 0 0 0 0 0 0 0 0 216 18:00 2 141 49 0 0 0 0 0 0 0 0 0 0 0 0 192 -----------------------------------------------------------------------------------------------------------Hour Total 2 577 177 0 4 1 0 1 0 0 0 0 0 0 0 762 18:15 0 144 27 0 0 0 0 0 0 0 0 0 0 0 0 171 18:30 0 151 24 0 1 0 0 0 0 0 0 0 0 0 0 176 18:45 2 112 31 0 1 0 0 0 1 0 0 0 0 0 0 147 19:00 1 122 35 0 0 0 0 0 0 0 0 0 0 0 0 158 -----------------------------------------------------------------------------------------------------------Hour Total 3 529 117 0 2 0 0 0 1 0 0 0 0 0 0 652 19:15 0 100 26 0 1 0 0 0 0 0 0 0 0 0 0 127 19:30 0 94 26 0 0 0 0 1 0 0 0 0 0 0 0 121 19:45 1 78 22 0 1 0 0 0 0 0 0 0 0 0 0 102 20:00 0 65 15 0 0 0 0 0 0 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 1 337 89 0 2 0 0 1 0 0 0 0 0 0 0 430 20:15 1 63 23 0 0 0 0 0 0 0 0 0 0 0 0 87 20:30 0 71 29 0 0 0 0 0 0 0 0 0 0 0 0 100 20:45 0 76 19 0 0 0 0 0 0 0 0 0 0 0 0 95 21:00 0 53 10 0 0 0 0 0 0 0 0 0 0 0 0 63 -----------------------------------------------------------------------------------------------------------Hour Total 1 263 81 0 0 0 0 0 0 0 0 0 0 0 0 345 21:15 0 31 6 0 0 0 0 0 0 0 0 0 0 0 0 37 21:30 0 28 12 0 1 0 0 1 0 0 0 0 0 0 0 42 21:45 0 23 6 0 0 0 0 0 0 0 0 0 0 0 0 29 22:00 1 19 1 0 0 0 0 0 0 0 0 0 0 0 0 21 -----------------------------------------------------------------------------------------------------------Hour Total 1 101 25 0 1 0 0 1 0 0 0 0 0 0 0 129 22:15 0 20 4 0 0 0 0 0 0 0 0 0 0 0 0 24 22:30 0 14 6 0 0 0 0 0 0 0 0 0 0 0 0 20 22:45 0 21 3 0 0 0 0 0 0 0 0 0 0 0 0 24 23:00 0 14 4 0 0 0 0 0 0 0 0 0 0 0 0 18 -----------------------------------------------------------------------------------------------------------Hour Total 0 69 17 0 0 0 0 0 0 0 0 0 0 0 0 86 23:15 0 10 4 0 0 0 0 0 0 0 0 0 0 0 0 14 23:30 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 23:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 24:00 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 30 8 0 0 0 0 0 0 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------DAY TOTAL 39 7050 2208 57 92 117 7 31 20 0 2 0 2 0 0 9625 PERCENTS 0.5% 73.3% 23.0% 0.6% 0.9% 1.2% 0.0% 0.3% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.5% Trucks & Buses 3.4% AM Times AM Peaks
08:00 07:45 08:00 06:45 07:30 09:45 05:30 08:15 08:30 6 733 233 11 17 17 2 6 5
PM Times PM Peaks
15:00 16:00 16:00 13:30 13:00 12:15 14:30 13:15 14:45 7 639 182 14 11 18 1 5 5
08:00 1
08:00 1002 14:00 1
16:00 848
=================================================================================================================== GRAND TOTAL 99 6639 262 21 60 9 3 0 20767 176 238 81 6 5 0 28366 PERCENTS 0.4% 73.3% 23.5% 0.7% 0.9% 0.8% 0.0% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
166
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
Page:
1
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 00:30 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 00:45 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 1 15 2 0 0 0 0 0 0 0 0 0 0 0 0 18 01:15 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 6 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 1 0 0 0 0 0 0 1 0 0 0 0 0 0 2 04:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:45 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5 05:00 0 3 1 0 0 0 0 0 1 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 7 2 0 0 0 0 0 3 0 0 0 0 0 0 12 05:15 0 4 2 1 0 0 0 0 0 0 0 0 0 0 0 7 05:30 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 05:45 0 13 4 0 0 0 0 0 0 0 0 0 0 0 0 17 06:00 0 8 3 0 0 0 0 0 0 0 0 0 0 0 0 11 -----------------------------------------------------------------------------------------------------------Hour Total 0 32 12 1 0 0 0 0 0 0 0 0 0 0 0 45 06:15 0 12 1 1 1 0 0 0 0 0 0 0 0 0 0 15 06:30 1 26 4 0 0 0 0 0 0 0 0 0 0 0 0 31 06:45 0 26 5 0 0 0 0 0 0 0 0 0 0 0 0 31 07:00 0 33 5 1 1 0 0 0 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------Hour Total 1 97 15 2 2 0 0 0 0 0 0 0 0 0 0 117 07:15 0 44 18 0 0 1 0 0 2 0 0 0 0 0 0 65 07:30 0 67 14 0 3 1 0 0 0 0 0 0 0 0 0 85 07:45 0 65 14 7 4 0 0 1 0 0 0 0 0 0 0 91 08:00 0 65 21 0 0 1 0 0 1 0 0 0 0 0 0 88 -----------------------------------------------------------------------------------------------------------Hour Total 0 241 67 7 7 3 0 1 3 0 0 0 0 0 0 329 08:15 08:30 08:45 09:00
0 0 2 0
104 119 121 109
35 38 35 26
0 0 0 5
1 6 1 0
1 1 0 0
0 0 0 0
2 0 0 0
167
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
143 164 160 140
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
2
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 453 134 5 8 2 0 2 1 0 0 0 0 0 0 607 09:15 1 62 32 2 2 0 0 1 0 0 0 0 0 0 0 100 09:30 0 51 19 0 0 2 0 0 2 0 0 0 0 0 0 74 09:45 0 70 17 0 6 0 0 1 0 0 0 0 0 0 0 94 10:00 0 56 17 0 2 1 0 0 1 0 0 0 0 0 0 77 -----------------------------------------------------------------------------------------------------------Hour Total 1 239 85 2 10 3 0 2 3 0 0 0 0 0 0 345 10:15 0 49 15 0 1 0 0 1 1 0 0 0 0 0 0 67 10:30 0 48 22 0 0 0 0 0 1 0 0 0 0 0 0 71 10:45 0 85 24 2 1 1 0 1 3 0 0 0 0 0 0 117 11:00 1 65 22 0 2 2 0 0 1 0 0 0 0 0 0 93 -----------------------------------------------------------------------------------------------------------Hour Total 1 247 83 2 4 3 0 2 6 0 0 0 0 0 0 348 11:15 0 56 25 0 0 1 0 1 0 0 0 0 0 0 0 83 11:30 1 70 22 1 1 0 0 1 0 0 0 0 0 0 0 96 11:45 1 81 22 0 2 3 0 0 0 0 0 0 0 0 0 109 12:00 0 65 24 0 1 1 0 0 0 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 2 272 93 1 4 5 0 2 0 0 0 0 0 0 0 379 12:15 0 92 25 1 2 0 0 1 0 0 0 0 0 0 0 121 12:30 0 61 30 0 3 1 0 0 0 0 0 0 0 0 0 95 12:45 0 74 14 0 3 2 0 0 2 0 0 0 0 0 0 95 13:00 0 82 25 0 0 0 0 0 1 0 0 0 0 0 0 108 -----------------------------------------------------------------------------------------------------------Hour Total 0 309 94 1 8 3 0 1 3 0 0 0 0 0 0 419 13:15 0 71 23 0 1 1 0 1 0 0 0 0 0 0 0 97 13:30 0 67 20 0 1 0 0 1 0 0 0 0 0 0 0 89 13:45 0 71 17 0 0 2 0 0 0 0 0 0 0 0 0 90 14:00 0 74 20 1 1 2 0 0 1 0 0 0 0 0 0 99 -----------------------------------------------------------------------------------------------------------Hour Total 0 283 80 1 3 5 0 2 1 0 0 0 0 0 0 375 14:15 0 86 27 5 4 0 0 0 1 0 0 0 0 0 0 123 14:30 0 83 20 2 1 1 0 0 1 0 0 0 0 0 0 108 14:45 0 68 10 0 2 1 0 1 1 0 0 0 0 0 0 83 15:00 0 61 20 0 1 0 0 1 0 0 0 0 0 0 0 83 -----------------------------------------------------------------------------------------------------------Hour Total 0 298 77 7 8 2 0 2 3 0 0 0 0 0 0 397 15:15 0 98 30 4 1 0 0 1 1 0 0 0 0 0 0 135 15:30 1 95 38 1 3 2 1 0 1 0 0 0 0 0 0 142 15:45 2 101 38 2 4 0 0 0 1 0 0 0 0 0 0 148 16:00 0 101 28 3 0 1 0 1 0 0 0 0 0 0 0 134 -----------------------------------------------------------------------------------------------------------Hour Total 3 395 134 10 8 3 1 2 3 0 0 0 0 0 0 559 16:15 1 121 33 0 0 0 0 0 1 0 0 0 0 0 0 156 16:30 3 114 33 1 0 0 0 2 0 0 0 0 0 0 0 153 16:45 0 109 29 2 2 1 0 0 0 0 0 0 0 0 0 143 17:00 1 102 38 2 2 0 0 0 0 0 0 0 0 0 0 145 -----------------------------------------------------------------------------------------------------------Hour Total 5 446 133 5 4 1 0 2 1 0 0 0 0 0 0 597
168
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
3
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 2 120 47 0 2 0 0 0 0 0 0 0 0 0 0 171 17:30 2 121 36 1 1 0 0 1 1 0 0 0 0 0 0 163 17:45 3 119 39 1 2 0 0 0 1 0 0 0 0 0 0 165 18:00 1 130 33 0 1 0 0 2 0 0 0 0 0 0 0 167 -----------------------------------------------------------------------------------------------------------Hour Total 8 490 155 2 6 0 0 3 2 0 0 0 0 0 0 666 18:15 2 122 41 0 2 1 0 1 0 0 0 0 0 0 0 169 18:30 3 115 24 0 0 1 0 0 1 0 0 0 0 0 0 144 18:45 1 102 23 0 3 0 0 1 0 0 0 0 0 0 0 130 19:00 0 89 30 0 0 0 0 0 0 0 0 0 0 0 0 119 -----------------------------------------------------------------------------------------------------------Hour Total 6 428 118 0 5 2 0 2 1 0 0 0 0 0 0 562 19:15 0 76 13 0 0 0 0 0 0 0 0 0 0 0 0 89 19:30 1 51 23 0 0 0 0 0 0 0 0 0 0 0 0 75 19:45 1 77 16 0 0 0 0 0 0 0 0 0 0 0 0 94 20:00 1 66 12 0 0 0 0 0 0 0 0 0 0 0 0 79 -----------------------------------------------------------------------------------------------------------Hour Total 3 270 64 0 0 0 0 0 0 0 0 0 0 0 0 337 20:15 0 50 15 0 0 0 0 0 0 0 0 0 0 0 0 65 20:30 0 69 16 0 0 0 0 0 0 0 0 0 0 0 0 85 20:45 0 50 4 0 0 0 0 0 0 0 0 0 0 0 0 54 21:00 1 55 6 0 0 0 0 1 0 0 0 0 0 0 0 63 -----------------------------------------------------------------------------------------------------------Hour Total 1 224 41 0 0 0 0 1 0 0 0 0 0 0 0 267 21:15 0 40 4 0 0 0 0 0 0 0 0 0 0 0 0 44 21:30 0 31 5 0 1 0 0 0 0 0 0 0 0 0 0 37 21:45 0 15 3 0 0 0 0 0 0 0 0 0 0 0 0 18 22:00 0 17 2 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 0 103 14 0 1 0 0 0 0 0 0 0 0 0 0 118 22:15 0 18 3 0 0 0 0 0 0 0 0 0 0 0 0 21 22:30 0 19 4 0 0 0 0 0 0 0 0 0 0 0 0 23 22:45 0 7 4 0 0 0 0 0 1 0 0 0 0 0 0 12 23:00 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 52 13 0 0 0 0 0 1 0 0 0 0 0 0 66 23:15 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 14 23:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 23:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 24:00 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 29 2 0 0 0 0 0 0 0 0 0 0 0 0 31 -----------------------------------------------------------------------------------------------------------DAY TOTAL 34 4942 1421 46 78 32 1 24 31 0 0 0 0 0 0 6609 PERCENTS 0.6% 74.8% 21.6% 0.7% 1.2% 0.4% 0.0% 0.3% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.7% Trucks & Buses 3.2% AM Times AM Peaks
08:30 08:15 08:15 07:00 07:45 11:00 3 453 134 8 11 6
07:30 10:00 3 6
08:15 607
PM Times PM Peaks
17:45 17:30 17:00 15:15 15:00 13:15 14:45 17:30 14:00 9 492 160 10 9 5 1 4 4
17:15 666
169
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
Page:
4
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 4 2 0 1 0 0 0 0 0 0 0 0 0 0 7 00:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 01:00 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 4 0 1 0 0 0 0 0 0 0 0 0 0 20 01:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 2 0 0 0 0 0 0 0 0 0 0 0 0 15 02:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 3 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 2 0 1 0 0 0 0 0 0 0 0 0 0 5 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:45 0 2 0 0 0 0 0 0 1 0 0 0 0 0 0 3 05:00 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 11 1 0 0 0 0 0 1 0 0 0 0 0 0 13 05:15 0 4 0 1 0 0 0 0 0 0 0 0 0 0 0 5 05:30 0 8 3 0 0 1 0 0 0 0 0 0 0 0 0 12 05:45 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 06:00 0 12 3 0 0 0 0 0 0 0 0 0 0 0 0 15 -----------------------------------------------------------------------------------------------------------Hour Total 0 32 7 1 0 1 0 0 0 0 0 0 0 0 0 41 06:15 0 19 4 0 1 0 0 0 0 0 0 0 0 0 0 24 06:30 1 19 4 1 0 1 0 0 0 0 0 0 0 0 0 26 06:45 0 26 10 0 0 1 0 1 1 0 0 0 0 0 0 39 07:00 0 28 6 1 0 1 0 0 2 0 0 0 0 0 0 38 -----------------------------------------------------------------------------------------------------------Hour Total 1 92 24 2 1 3 0 1 3 0 0 0 0 0 0 127 07:15 0 49 16 0 0 0 0 0 0 0 0 0 0 0 0 65 07:30 0 55 21 0 3 0 0 0 0 0 0 0 0 0 0 79 07:45 0 52 15 10 0 0 0 0 0 0 0 0 0 0 0 77 08:00 0 64 16 0 0 1 0 0 0 0 0 0 0 0 0 81 -----------------------------------------------------------------------------------------------------------Hour Total 0 220 68 10 3 1 0 0 0 0 0 0 0 0 0 302 08:15 08:30 08:45 09:00
1 2 1 2
112 121 126 100
31 32 41 27
0 0 1 3
0 2 0 4
0 0 0 0
0 0 0 0
0 0 2 0
170
1 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 0 0 0
0 0 0 0
145 157 172 137
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
5
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 6 459 131 4 6 0 0 2 2 0 0 0 1 0 0 611 09:15 0 60 13 2 0 3 0 0 0 0 0 0 0 0 0 78 09:30 0 52 22 0 3 2 0 0 0 0 0 0 0 0 0 79 09:45 2 48 12 0 2 0 0 0 0 0 0 0 0 0 0 64 10:00 1 45 20 0 0 1 0 0 0 0 0 0 0 0 0 67 -----------------------------------------------------------------------------------------------------------Hour Total 3 205 67 2 5 6 0 0 0 0 0 0 0 0 0 288 10:15 0 43 17 0 2 2 0 0 2 0 0 0 0 0 0 66 10:30 0 49 20 2 1 3 0 0 0 0 0 0 0 0 0 75 10:45 2 61 26 0 1 2 0 1 0 0 0 0 0 0 0 93 11:00 0 44 18 0 1 0 0 0 0 0 0 0 0 0 0 63 -----------------------------------------------------------------------------------------------------------Hour Total 2 197 81 2 5 7 0 1 2 0 0 0 0 0 0 297 11:15 0 52 24 0 0 3 0 0 1 0 0 0 0 0 0 80 11:30 0 67 19 0 0 1 1 0 0 0 0 0 0 0 0 88 11:45 0 85 29 0 3 4 0 2 0 0 0 0 0 0 0 123 12:00 0 69 19 0 1 1 0 0 0 0 0 0 0 0 0 90 -----------------------------------------------------------------------------------------------------------Hour Total 0 273 91 0 4 9 1 2 1 0 0 0 0 0 0 381 12:15 0 86 23 0 0 0 0 0 1 0 0 0 0 0 0 110 12:30 0 79 24 0 1 1 1 0 0 0 0 0 0 0 0 106 12:45 0 69 22 1 0 1 0 1 1 0 0 0 0 0 0 95 13:00 1 63 29 1 2 1 0 0 1 0 0 0 0 0 0 98 -----------------------------------------------------------------------------------------------------------Hour Total 1 297 98 2 3 3 1 1 3 0 0 0 0 0 0 409 13:15 1 79 28 4 1 2 0 0 0 0 0 0 0 0 0 115 13:30 0 67 17 2 0 2 0 1 0 0 0 0 0 0 0 89 13:45 0 64 36 0 2 3 0 0 0 0 0 0 0 0 0 105 14:00 0 60 21 0 1 1 0 0 0 0 0 0 0 0 0 83 -----------------------------------------------------------------------------------------------------------Hour Total 1 270 102 6 4 8 0 1 0 0 0 0 0 0 0 392 14:15 1 99 34 3 5 2 0 1 0 0 0 0 0 0 0 145 14:30 0 84 25 1 2 2 0 0 0 0 0 0 0 0 0 114 14:45 1 73 25 1 0 0 0 1 0 0 0 0 0 0 0 101 15:00 0 64 23 3 1 0 0 0 0 0 0 0 0 0 0 91 -----------------------------------------------------------------------------------------------------------Hour Total 2 320 107 8 8 4 0 2 0 0 0 0 0 0 0 451 15:15 1 99 37 1 4 4 0 1 0 0 0 0 0 0 0 147 15:30 0 90 42 1 4 3 0 0 0 0 0 0 0 0 0 140 15:45 0 89 21 0 3 1 0 0 0 0 0 0 0 0 0 114 16:00 3 83 30 4 3 0 0 0 1 0 0 0 0 0 0 124 -----------------------------------------------------------------------------------------------------------Hour Total 4 361 130 6 14 8 0 1 1 0 0 0 0 0 0 525 16:15 0 100 45 2 0 1 0 0 0 0 0 0 0 0 0 148 16:30 2 114 35 0 2 0 0 0 0 0 0 0 0 0 0 153 16:45 2 112 34 1 1 0 0 0 1 0 0 0 0 0 0 151 17:00 1 117 27 0 0 0 0 0 0 0 0 0 0 0 0 145 -----------------------------------------------------------------------------------------------------------Hour Total 5 443 141 3 3 1 0 0 1 0 0 0 0 0 0 597
171
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
6
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 2 118 36 0 1 0 0 2 1 0 0 0 0 0 0 160 17:30 4 107 38 0 3 0 0 1 0 0 0 0 0 0 0 153 17:45 0 104 49 0 1 1 1 2 2 0 0 0 0 0 0 160 18:00 2 139 43 0 4 0 0 1 0 0 0 0 0 0 0 189 -----------------------------------------------------------------------------------------------------------Hour Total 8 468 166 0 9 1 1 6 3 0 0 0 0 0 0 662 18:15 0 113 24 0 0 0 0 0 1 0 0 0 0 0 0 138 18:30 2 122 37 0 2 0 0 0 0 0 0 0 0 0 0 163 18:45 0 96 19 0 0 1 0 0 0 0 0 0 0 0 0 116 19:00 1 100 19 0 0 0 0 0 0 0 0 0 0 0 0 120 -----------------------------------------------------------------------------------------------------------Hour Total 3 431 99 0 2 1 0 0 1 0 0 0 0 0 0 537 19:15 1 78 15 0 0 0 0 0 0 0 0 0 0 0 0 94 19:30 0 74 10 0 1 0 0 0 0 0 0 0 0 0 0 85 19:45 0 73 10 0 0 0 0 0 0 0 0 0 0 0 0 83 20:00 0 68 4 0 0 0 0 0 0 0 0 0 0 0 0 72 -----------------------------------------------------------------------------------------------------------Hour Total 1 293 39 0 1 0 0 0 0 0 0 0 0 0 0 334 20:15 2 48 7 0 0 0 0 0 0 0 0 0 0 0 0 57 20:30 0 53 12 0 0 0 0 0 0 0 0 0 0 0 0 65 20:45 0 49 7 0 0 0 0 0 0 0 0 0 0 0 0 56 21:00 0 63 12 0 0 0 0 0 0 0 0 0 0 0 0 75 -----------------------------------------------------------------------------------------------------------Hour Total 2 213 38 0 0 0 0 0 0 0 0 0 0 0 0 253 21:15 0 45 7 0 0 0 0 0 0 0 0 0 0 0 0 52 21:30 0 34 5 0 0 0 0 0 0 0 0 0 0 0 0 39 21:45 0 27 6 0 0 0 0 0 0 0 0 0 0 0 0 33 22:00 0 14 5 0 0 0 0 0 0 0 0 0 0 0 0 19 -----------------------------------------------------------------------------------------------------------Hour Total 0 120 23 0 0 0 0 0 0 0 0 0 0 0 0 143 22:15 0 17 5 0 0 0 0 0 0 0 0 0 0 0 0 22 22:30 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 13 22:45 0 10 1 0 0 0 0 0 0 0 0 0 0 0 0 11 23:00 0 13 0 0 0 0 0 0 0 0 0 0 0 0 0 13 -----------------------------------------------------------------------------------------------------------Hour Total 0 52 7 0 0 0 0 0 0 0 0 0 0 0 0 59 23:15 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 23:30 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 23:45 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 24:00 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 -----------------------------------------------------------------------------------------------------------Hour Total 0 25 5 0 0 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------DAY TOTAL 39 4815 1434 46 70 53 3 17 18 0 0 0 1 0 0 6496 PERCENTS 0.7% 74.2% 22.1% 0.8% 1.0% 0.8% 0.0% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.7% Trucks & Buses 3.2% AM Times AM Peaks
08:15 08:15 08:15 07:00 09:00 11:15 10:45 08:00 06:15 6 459 131 11 9 9 1 2 3
PM Times PM Peaks
16:45 17:45 17:15 12:45 15:15 13:00 12:15 17:15 12:15 9 478 166 8 14 8 1 6 3
172
08:15 1
08:15 611 17:15 662
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
Page:
7
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 00:45 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 01:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 2 0 0 0 0 0 0 0 0 0 0 0 0 17 01:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 10 0 0 0 0 0 0 0 0 0 0 0 0 0 10 02:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 3 0 0 1 0 0 0 0 0 0 0 0 0 0 4 04:30 0 2 0 0 0 0 0 1 0 0 0 0 0 0 0 3 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 9 0 0 1 0 0 1 0 0 0 0 0 0 0 11 05:15 0 4 3 1 0 0 0 0 0 0 0 0 0 0 0 8 05:30 0 4 2 0 0 1 0 0 0 0 0 0 0 0 0 7 05:45 0 6 1 0 1 0 0 0 1 0 0 0 0 0 0 9 06:00 0 7 3 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 0 21 9 1 1 1 0 0 1 0 0 0 0 0 0 34 06:15 0 21 4 1 0 0 0 0 0 0 0 0 0 0 0 26 06:30 0 19 6 0 0 1 0 0 0 0 0 0 0 0 0 26 06:45 0 19 10 0 1 2 0 1 0 0 0 0 0 0 0 33 07:00 0 27 9 1 2 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 0 86 29 2 3 3 0 1 0 0 0 0 0 0 0 124 07:15 0 47 14 0 0 0 0 0 0 0 0 0 0 0 0 61 07:30 1 53 12 0 2 1 0 0 0 0 0 0 0 0 0 69 07:45 0 55 18 9 2 1 0 0 0 0 0 0 0 0 0 85 08:00 1 59 18 0 0 0 0 1 1 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 2 214 62 9 4 2 0 1 1 0 0 0 0 0 0 295 08:15 08:30 08:45 09:00
1 3 3 2
108 107 115 123
36 39 41 35
0 1 1 3
1 2 0 2
1 1 1 2
0 0 1 0
0 2 0 0
173
0 0 1 1
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
147 155 163 168
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
8
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 9 453 151 5 5 5 1 2 2 0 0 0 0 0 0 633 09:15 0 59 22 1 2 1 0 1 0 0 0 0 0 0 0 86 09:30 0 70 17 1 0 1 0 0 0 0 0 0 0 0 0 89 09:45 0 66 18 0 2 3 0 0 0 0 0 0 0 0 0 89 10:00 0 52 18 0 1 1 0 0 0 0 0 0 0 0 0 72 -----------------------------------------------------------------------------------------------------------Hour Total 0 247 75 2 5 6 0 1 0 0 0 0 0 0 0 336 10:15 0 53 16 0 0 1 0 0 1 0 0 0 0 0 0 71 10:30 0 53 29 0 3 2 1 0 1 0 0 0 0 0 0 89 10:45 0 82 27 0 0 1 0 0 1 0 0 0 0 0 0 111 11:00 0 56 22 0 2 2 0 0 0 0 0 0 0 0 0 82 -----------------------------------------------------------------------------------------------------------Hour Total 0 244 94 0 5 6 1 0 3 0 0 0 0 0 0 353 11:15 0 65 14 0 1 4 0 0 0 0 0 0 0 0 0 84 11:30 0 64 23 0 4 2 0 0 1 0 0 0 0 0 0 94 11:45 1 56 24 0 0 2 0 0 2 0 0 0 0 0 0 85 12:00 0 78 34 0 2 0 0 1 0 0 0 0 0 0 0 115 -----------------------------------------------------------------------------------------------------------Hour Total 1 263 95 0 7 8 0 1 3 0 0 0 0 0 0 378 12:15 1 66 20 1 1 3 0 0 0 0 0 0 0 0 0 92 12:30 0 77 30 0 3 6 0 0 1 0 0 0 0 0 0 117 12:45 0 70 19 0 0 1 0 3 0 0 0 0 0 0 0 93 13:00 0 66 28 0 2 5 0 0 0 0 0 0 0 0 0 101 -----------------------------------------------------------------------------------------------------------Hour Total 1 279 97 1 6 15 0 3 1 0 0 0 0 0 0 403 13:15 1 70 22 0 0 1 0 0 0 0 0 0 0 0 0 94 13:30 0 67 21 0 2 5 0 1 0 0 0 0 0 0 0 96 13:45 0 63 21 0 1 2 0 0 0 0 0 0 0 0 0 87 14:00 0 63 19 1 0 2 0 0 0 0 0 0 0 0 0 85 -----------------------------------------------------------------------------------------------------------Hour Total 1 263 83 1 3 10 0 1 0 0 0 0 0 0 0 362 14:15 0 87 26 5 1 2 0 0 0 0 0 0 0 0 0 121 14:30 0 83 23 2 0 0 0 1 0 0 0 0 0 0 0 109 14:45 0 80 23 0 0 1 0 0 0 0 0 0 0 0 0 104 15:00 0 70 26 1 0 0 0 0 1 0 0 0 0 0 0 98 -----------------------------------------------------------------------------------------------------------Hour Total 0 320 98 8 1 3 0 1 1 0 0 0 0 0 0 432 15:15 2 101 39 2 1 2 0 0 0 0 0 0 0 0 0 147 15:30 3 90 36 1 3 1 0 2 0 0 0 0 0 0 0 136 15:45 1 102 33 1 3 2 0 0 0 0 0 0 0 0 0 142 16:00 0 106 28 2 2 1 0 1 1 0 0 0 0 0 0 141 -----------------------------------------------------------------------------------------------------------Hour Total 6 399 136 6 9 6 0 3 1 0 0 0 0 0 0 566 16:15 1 99 30 1 5 0 0 0 0 0 0 0 0 0 0 136 16:30 0 116 32 2 0 0 0 0 0 0 0 0 0 0 0 150 16:45 1 112 29 3 2 0 0 0 0 0 0 0 0 0 0 147 17:00 2 111 39 0 5 0 0 0 0 0 0 0 0 0 0 157 -----------------------------------------------------------------------------------------------------------Hour Total 4 438 130 6 12 0 0 0 0 0 0 0 0 0 0 590
174
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5B Site ID: 000000009352 Location: Palm Valley Rd EB Direction: EAST Lane: 1 TIME
1
2
3
Page:
9
File: EB.prn City: 16-221 AW Max County: 30.14943, -81.37749
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 2 110 40 0 1 0 0 0 0 0 0 0 0 0 0 153 17:30 4 109 32 0 2 2 0 0 1 0 0 0 0 0 0 150 17:45 1 111 32 0 4 0 0 1 0 0 0 0 0 0 0 149 18:00 4 123 43 0 1 0 0 0 1 0 0 0 0 0 0 172 -----------------------------------------------------------------------------------------------------------Hour Total 11 453 147 0 8 2 0 1 2 0 0 0 0 0 0 624 18:15 1 138 30 0 0 1 0 0 0 0 0 0 0 0 0 170 18:30 0 141 41 0 2 0 0 0 1 0 0 0 0 0 0 185 18:45 1 115 27 0 0 0 0 0 0 0 0 0 0 0 0 143 19:00 1 92 19 0 0 0 0 0 1 0 0 0 0 0 0 113 -----------------------------------------------------------------------------------------------------------Hour Total 3 486 117 0 2 1 0 0 2 0 0 0 0 0 0 611 19:15 0 81 14 0 0 0 0 0 0 0 0 0 0 0 0 95 19:30 1 74 9 0 0 0 0 0 0 0 0 0 0 0 0 84 19:45 0 68 12 0 0 0 0 0 0 0 0 0 0 0 0 80 20:00 0 48 16 0 0 0 0 0 0 0 0 0 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 1 271 51 0 0 0 0 0 0 0 0 0 0 0 0 323 20:15 0 67 10 0 0 0 0 1 0 0 0 0 0 0 0 78 20:30 0 77 14 0 0 0 0 0 0 0 0 0 0 0 0 91 20:45 0 47 4 0 0 0 0 0 0 0 0 0 0 0 0 51 21:00 1 39 9 0 0 0 0 0 0 0 0 0 0 0 0 49 -----------------------------------------------------------------------------------------------------------Hour Total 1 230 37 0 0 0 0 1 0 0 0 0 0 0 0 269 21:15 0 50 8 0 0 0 0 0 0 0 0 0 0 0 0 58 21:30 1 45 3 0 0 0 0 1 0 0 0 0 0 0 0 50 21:45 1 38 9 0 0 0 0 0 0 0 0 0 0 0 0 48 22:00 0 15 5 0 0 0 0 0 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 2 148 25 0 0 0 0 1 0 0 0 0 0 0 0 176 22:15 0 19 2 0 0 0 0 0 0 0 0 0 0 0 0 21 22:30 0 21 3 0 0 0 0 0 0 0 0 0 0 0 0 24 22:45 0 15 1 0 0 0 0 0 0 0 0 0 0 0 0 16 23:00 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 63 7 0 0 0 0 0 0 0 0 0 0 0 0 70 23:15 0 7 2 0 0 0 0 0 0 0 0 0 0 0 0 9 23:30 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 23:45 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 24:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 24 4 0 0 0 0 0 0 0 0 0 0 0 0 28 -----------------------------------------------------------------------------------------------------------DAY TOTAL 42 4942 1451 41 72 68 2 18 17 0 0 0 0 0 0 6653 PERCENTS 0.7% 74.3% 21.9% 0.7% 1.0% 1.0% 0.0% 0.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 96.7% Trucks & Buses 3.2% AM Times AM Peaks
08:15 08:15 08:15 07:00 10:45 11:00 08:00 07:45 10:00 9 453 151 10 7 10 1 3 3
08:15 633
PM Times PM Peaks
17:15 18:00 17:15 13:45 15:30 12:15 11 517 147 8 13 15
17:45 676
12:45 17:15 4 2
=================================================================================================================== GRAND TOTAL 115 4306 220 6 66 0 1 0 14699 133 153 59 0 0 0 19758 PERCENTS 0.6% 74.4% 21.8% 0.7% 1.2% 0.8% 0.0% 0.2% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
175
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
1
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 3 0 0 0 0 1 0 0 0 0 0 0 0 9 00:30 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 13 4 0 0 0 0 1 0 0 0 0 0 0 0 18 01:15 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 02:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 02:45 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 03:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 1 0 0 0 0 0 0 0 0 0 0 6 03:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3 03:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 3 0 0 0 0 0 0 0 0 0 0 0 0 5 04:15 0 2 0 0 0 1 0 0 0 0 0 0 0 0 0 3 04:30 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 04:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 5 2 0 0 0 0 0 0 0 0 0 0 0 0 7 -----------------------------------------------------------------------------------------------------------Hour Total 0 12 2 0 0 1 0 0 0 0 0 0 0 0 0 15 05:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 05:45 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 06:00 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 15 7 0 0 0 0 0 0 0 0 0 0 0 0 22 06:15 0 8 6 0 0 0 0 0 0 0 0 0 0 0 0 14 06:30 0 17 4 0 1 0 0 0 0 0 0 0 0 0 0 22 06:45 0 25 6 0 0 0 0 0 0 0 0 0 0 0 0 31 07:00 0 27 14 0 0 0 0 0 0 0 0 0 0 0 0 41 -----------------------------------------------------------------------------------------------------------Hour Total 0 77 30 0 1 0 0 0 0 0 0 0 0 0 0 108 07:15 0 42 15 1 0 0 0 0 0 0 0 0 0 0 0 58 07:30 0 65 18 2 1 0 0 0 0 0 0 0 0 0 0 86 07:45 0 66 20 0 1 1 0 0 0 0 0 0 0 0 0 88 08:00 0 56 13 0 0 0 0 0 0 0 0 0 0 0 0 69 -----------------------------------------------------------------------------------------------------------Hour Total 0 229 66 3 2 1 0 0 0 0 0 0 0 0 0 301 08:15 08:30 08:45 09:00
1 2 1 0
90 113 108 102
21 42 27 25
2 0 1 3
0 0 1 1
1 1 0 0
0 0 0 0
0 0 0 0
176
0 1 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
115 159 138 131
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
2
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 4 413 115 6 2 2 0 0 1 0 0 0 0 0 0 543 09:15 1 58 17 4 0 1 1 0 0 0 0 0 0 0 0 82 09:30 0 35 22 1 0 0 0 1 0 0 0 0 0 0 0 59 09:45 0 28 13 0 0 1 0 0 0 0 0 0 0 0 0 42 10:00 0 39 13 0 0 3 0 0 0 0 0 0 0 0 0 55 -----------------------------------------------------------------------------------------------------------Hour Total 1 160 65 5 0 5 1 1 0 0 0 0 0 0 0 238 10:15 0 38 12 0 0 1 0 0 0 0 0 0 0 0 0 51 10:30 0 29 22 0 0 0 0 1 0 0 0 0 0 0 0 52 10:45 0 35 17 0 1 1 1 0 1 0 0 0 0 0 0 56 11:00 0 37 20 0 3 1 0 0 0 0 0 0 0 0 0 61 -----------------------------------------------------------------------------------------------------------Hour Total 0 139 71 0 4 3 1 1 1 0 0 0 0 0 0 220 11:15 0 30 17 0 2 1 0 0 0 0 0 0 0 0 0 50 11:30 0 43 9 0 0 2 0 0 0 0 0 0 0 0 0 54 11:45 0 45 21 0 1 1 0 0 0 0 0 0 0 0 0 68 12:00 0 52 17 0 1 1 0 0 0 0 0 0 0 0 0 71 -----------------------------------------------------------------------------------------------------------Hour Total 0 170 64 0 4 5 0 0 0 0 0 0 0 0 0 243 12:15 0 58 23 1 0 1 1 1 0 0 0 0 0 0 0 85 12:30 1 45 16 0 0 0 0 0 0 0 0 0 0 0 0 62 12:45 2 49 11 0 1 0 0 0 1 0 0 0 0 0 0 64 13:00 0 48 15 0 0 1 0 0 0 0 0 0 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 3 200 65 1 1 2 1 1 1 0 0 0 0 0 0 275 13:15 0 45 13 0 0 0 0 0 0 0 0 0 0 0 0 58 13:30 0 46 6 0 3 1 0 0 0 0 0 0 0 0 0 56 13:45 1 51 15 0 0 1 1 0 0 0 0 0 0 0 0 69 14:00 0 50 17 0 1 1 0 1 0 0 0 0 0 0 0 70 -----------------------------------------------------------------------------------------------------------Hour Total 1 192 51 0 4 3 1 1 0 0 0 0 0 0 0 253 14:15 1 57 15 0 0 0 0 0 0 0 0 0 0 0 0 73 14:30 0 54 21 0 0 0 0 0 1 0 0 0 0 0 0 76 14:45 0 58 27 1 2 0 0 0 0 0 0 0 0 0 0 88 15:00 1 82 33 1 1 2 1 1 0 0 0 0 0 0 0 122 -----------------------------------------------------------------------------------------------------------Hour Total 2 251 96 2 3 2 1 1 1 0 0 0 0 0 0 359 15:15 0 75 33 0 1 1 0 0 0 0 0 0 0 0 0 110 15:30 0 86 29 1 0 0 0 0 0 0 0 0 0 0 0 116 15:45 0 66 34 4 1 0 0 0 0 0 0 0 0 0 0 105 16:00 0 53 26 1 0 1 0 1 0 0 0 0 0 0 0 82 -----------------------------------------------------------------------------------------------------------Hour Total 0 280 122 6 2 2 0 1 0 0 0 0 0 0 0 413 16:15 0 69 25 0 1 0 0 2 0 0 0 0 0 0 0 97 16:30 0 60 19 0 2 0 0 0 0 0 0 0 0 0 0 81 16:45 0 66 20 1 2 1 0 0 0 0 0 0 0 0 0 90 17:00 0 87 26 4 2 2 0 0 0 0 0 0 0 0 0 121 -----------------------------------------------------------------------------------------------------------Hour Total 0 282 90 5 7 3 0 2 0 0 0 0 0 0 0 389
177
Peggy Malone & Associates CLASSIFICATION SUMMARY Tue 8/16/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
3
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 86 35 0 0 0 0 0 1 0 0 0 0 0 0 122 17:30 2 119 37 0 1 1 1 0 0 0 0 0 0 0 0 161 17:45 0 92 40 0 1 0 0 0 0 0 0 0 0 0 0 133 18:00 0 93 32 0 1 0 0 0 0 0 0 0 0 0 0 126 -----------------------------------------------------------------------------------------------------------Hour Total 2 390 144 0 3 1 1 0 1 0 0 0 0 0 0 542 18:15 0 81 22 0 1 1 0 0 0 0 0 0 0 0 0 105 18:30 0 86 20 0 0 0 0 0 0 0 0 0 0 0 0 106 18:45 0 65 18 1 0 0 0 0 0 0 0 0 0 0 0 84 19:00 0 55 15 0 1 0 0 0 0 0 0 0 0 0 0 71 -----------------------------------------------------------------------------------------------------------Hour Total 0 287 75 1 2 1 0 0 0 0 0 0 0 0 0 366 19:15 0 43 12 0 0 0 0 0 0 0 0 0 0 0 0 55 19:30 1 44 13 0 1 0 0 0 0 0 0 0 0 0 0 59 19:45 0 39 7 0 0 0 0 0 0 0 0 0 0 0 0 46 20:00 3 33 10 0 0 0 0 0 0 0 0 0 0 0 0 46 -----------------------------------------------------------------------------------------------------------Hour Total 4 159 42 0 1 0 0 0 0 0 0 0 0 0 0 206 20:15 0 34 8 0 0 0 0 0 0 0 0 0 0 0 0 42 20:30 1 32 8 0 0 0 0 0 0 0 0 0 0 0 0 41 20:45 0 25 6 0 0 0 0 0 0 0 0 0 0 0 0 31 21:00 0 23 4 0 0 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 1 114 26 0 0 0 0 0 0 0 0 0 0 0 0 141 21:15 0 18 4 0 0 0 0 0 0 0 0 0 0 0 0 22 21:30 0 19 2 0 0 0 0 0 0 0 0 0 0 0 0 21 21:45 0 23 3 0 0 0 0 0 0 0 0 0 0 0 0 26 22:00 2 14 3 0 0 0 0 1 0 0 0 0 0 0 0 20 -----------------------------------------------------------------------------------------------------------Hour Total 2 74 12 0 0 0 0 1 0 0 0 0 0 0 0 89 22:15 0 14 2 0 0 0 0 0 0 0 0 0 0 0 0 16 22:30 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 6 22:45 0 9 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:00 0 11 1 0 0 0 0 0 0 0 0 0 0 0 0 12 -----------------------------------------------------------------------------------------------------------Hour Total 0 38 6 0 0 0 0 0 0 0 0 0 0 0 0 44 23:15 0 8 4 0 0 0 0 0 0 0 0 0 0 0 0 12 23:30 0 12 3 0 0 0 0 1 0 0 0 0 0 0 0 16 23:45 0 7 1 0 0 0 0 0 0 0 0 0 0 0 0 8 24:00 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 -----------------------------------------------------------------------------------------------------------Hour Total 0 29 10 0 0 0 0 1 0 0 0 0 0 0 0 40 -----------------------------------------------------------------------------------------------------------DAY TOTAL 20 3535 1169 29 37 31 6 11 5 0 0 0 0 0 0 4843 PERCENTS 0.5% 73.0% 24.2% 0.6% 0.7% 0.6% 0.1% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.5% Trucks & Buses 2.4% AM Times AM Peaks
08:00 08:15 08:15 08:45 10:30 09:15 08:30 00:30 07:45 4 413 115 9 6 5 1 1 1
08:15 543
PM Times PM Peaks
19:15 17:15 17:15 15:00 16:15 16:45 12:15 15:30 12:15 4 390 144 6 7 4 1 3 1
17:15 542
178
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
4
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 4 1 0 0 0 0 0 0 0 0 0 0 0 0 5 00:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 00:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 1 0 0 0 0 1 0 0 0 0 0 0 0 7 01:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 01:45 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 4 02:15 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 4 02:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 03:15 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:30 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -----------------------------------------------------------------------------------------------------------Hour Total 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 04:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 05:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 5 05:15 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 10 05:45 0 4 2 0 0 0 0 1 0 0 0 0 0 0 0 7 06:00 0 17 8 0 0 0 0 0 0 0 0 0 0 0 0 25 -----------------------------------------------------------------------------------------------------------Hour Total 0 27 15 0 0 0 0 1 0 0 0 0 0 0 0 43 06:15 0 14 5 0 0 0 0 0 0 0 0 0 0 0 0 19 06:30 0 12 4 0 1 0 0 0 0 0 0 0 0 0 0 17 06:45 0 22 2 0 0 0 0 0 0 0 0 0 0 0 0 24 07:00 1 26 12 0 0 0 0 0 0 0 0 0 0 0 0 39 -----------------------------------------------------------------------------------------------------------Hour Total 1 74 23 0 1 0 0 0 0 0 0 0 0 0 0 99 07:15 0 44 10 1 0 0 0 0 0 0 0 0 0 0 0 55 07:30 0 60 21 2 0 0 0 0 0 0 0 0 0 0 0 83 07:45 0 75 16 0 1 1 0 0 0 0 0 0 0 0 0 93 08:00 0 59 21 0 0 0 0 0 0 0 0 0 0 0 0 80 -----------------------------------------------------------------------------------------------------------Hour Total 0 238 68 3 1 1 0 0 0 0 0 0 0 0 0 311 08:15 08:30 08:45 09:00
0 2 1 0
91 110 112 99
24 52 26 30
1 0 0 2
0 1 1 0
1 0 1 0
0 0 0 0
1 0 0 0
179
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
118 165 141 131
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
5
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 3 412 132 3 2 2 0 1 0 0 0 0 0 0 0 555 09:15 0 38 15 5 1 0 0 1 0 0 0 0 0 0 0 60 09:30 0 36 15 0 1 1 0 1 0 0 0 0 0 0 0 54 09:45 1 49 15 0 3 0 0 0 0 0 0 0 0 0 0 68 10:00 0 39 13 0 1 0 0 0 0 0 0 0 0 0 0 53 -----------------------------------------------------------------------------------------------------------Hour Total 1 162 58 5 6 1 0 2 0 0 0 0 0 0 0 235 10:15 0 36 11 0 1 1 0 1 0 1 0 0 0 0 0 51 10:30 0 36 17 1 1 3 0 0 0 0 0 0 0 0 0 58 10:45 0 36 14 0 0 0 0 0 0 0 0 0 0 0 0 50 11:00 0 34 9 0 2 0 0 0 0 0 0 0 0 0 0 45 -----------------------------------------------------------------------------------------------------------Hour Total 0 142 51 1 4 4 0 1 0 1 0 0 0 0 0 204 11:15 0 35 15 0 0 2 0 1 0 0 0 0 0 0 0 53 11:30 0 33 16 0 1 2 0 1 0 0 0 0 0 0 0 53 11:45 0 40 13 0 1 0 0 0 0 0 0 0 0 0 0 54 12:00 0 35 15 0 1 0 0 0 0 0 0 0 0 0 0 51 -----------------------------------------------------------------------------------------------------------Hour Total 0 143 59 0 3 4 0 2 0 0 0 0 0 0 0 211 12:15 0 40 17 1 1 2 0 0 1 0 0 0 0 0 0 62 12:30 0 53 13 1 1 2 0 0 0 0 0 0 0 0 0 70 12:45 1 40 13 0 2 1 0 1 0 0 0 0 0 0 0 58 13:00 0 58 18 0 1 1 0 0 0 0 0 0 0 0 0 78 -----------------------------------------------------------------------------------------------------------Hour Total 1 191 61 2 5 6 0 1 1 0 0 0 0 0 0 268 13:15 0 42 21 1 0 0 0 1 0 0 0 0 0 0 0 65 13:30 0 51 10 0 1 0 0 0 0 0 0 0 0 0 0 62 13:45 0 56 20 1 1 5 0 0 1 0 0 0 0 0 0 84 14:00 0 44 18 0 1 0 0 0 0 0 0 0 0 0 0 63 -----------------------------------------------------------------------------------------------------------Hour Total 0 193 69 2 3 5 0 1 1 0 0 0 0 0 0 274 14:15 0 65 16 0 2 1 0 1 0 0 0 0 0 0 0 85 14:30 0 61 30 0 1 0 0 0 0 0 0 0 0 0 0 92 14:45 0 78 31 3 3 3 0 0 0 0 0 0 0 0 0 118 15:00 0 65 22 1 0 0 0 0 0 0 0 0 0 0 0 88 -----------------------------------------------------------------------------------------------------------Hour Total 0 269 99 4 6 4 0 1 0 0 0 0 0 0 0 383 15:15 0 67 38 1 0 0 0 0 0 0 0 0 0 0 0 106 15:30 0 83 18 0 0 2 0 1 0 0 0 0 0 0 0 104 15:45 0 73 29 2 1 2 0 0 0 0 0 0 0 0 0 107 16:00 2 78 27 4 1 0 0 3 0 0 0 0 0 0 0 115 -----------------------------------------------------------------------------------------------------------Hour Total 2 301 112 7 2 4 0 4 0 0 0 0 0 0 0 432 16:15 0 70 23 0 1 0 0 1 0 0 0 0 0 0 0 95 16:30 0 85 34 0 1 1 0 0 0 0 0 0 0 0 0 121 16:45 0 61 35 0 2 1 0 1 0 0 0 0 0 0 0 100 17:00 1 88 30 0 1 0 0 0 0 0 0 0 0 0 0 120 -----------------------------------------------------------------------------------------------------------Hour Total 1 304 122 0 5 2 0 2 0 0 0 0 0 0 0 436
180
Peggy Malone & Associates CLASSIFICATION SUMMARY Wed 8/17/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
6
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 0 96 23 0 0 0 0 0 0 0 0 0 0 0 0 119 17:30 1 112 30 0 2 1 0 0 1 0 0 0 0 0 0 147 17:45 0 95 36 0 1 0 0 0 0 0 0 0 0 0 0 132 18:00 1 96 36 0 0 0 0 0 0 0 0 0 0 0 0 133 -----------------------------------------------------------------------------------------------------------Hour Total 2 399 125 0 3 1 0 0 1 0 0 0 0 0 0 531 18:15 1 66 18 0 1 0 0 2 0 0 0 0 0 0 0 88 18:30 0 69 21 0 1 0 0 0 0 0 0 0 0 0 0 91 18:45 0 66 13 0 0 0 0 0 0 0 0 0 0 0 0 79 19:00 0 53 13 0 1 0 0 0 0 0 0 0 0 0 0 67 -----------------------------------------------------------------------------------------------------------Hour Total 1 254 65 0 3 0 0 2 0 0 0 0 0 0 0 325 19:15 0 53 13 0 0 0 0 0 0 0 0 0 0 0 0 66 19:30 0 42 13 0 0 0 0 0 0 0 0 0 0 0 0 55 19:45 0 54 11 0 0 0 0 1 0 0 0 0 0 0 0 66 20:00 0 43 6 0 1 0 0 0 0 0 0 0 0 0 0 50 -----------------------------------------------------------------------------------------------------------Hour Total 0 192 43 0 1 0 0 1 0 0 0 0 0 0 0 237 20:15 0 41 6 0 0 0 0 0 0 0 0 0 0 0 0 47 20:30 0 35 13 0 0 0 0 0 0 0 0 0 0 0 0 48 20:45 0 48 9 0 0 0 0 0 0 0 0 0 0 0 0 57 21:00 1 35 10 0 0 0 0 0 0 0 0 0 0 0 0 46 -----------------------------------------------------------------------------------------------------------Hour Total 1 159 38 0 0 0 0 0 0 0 0 0 0 0 0 198 21:15 0 28 1 0 0 0 0 0 0 0 0 0 0 0 0 29 21:30 0 29 4 0 0 0 0 0 0 0 0 0 0 0 0 33 21:45 0 20 6 0 0 0 0 0 0 0 0 0 0 0 0 26 22:00 0 19 3 0 0 0 0 0 0 0 0 0 0 0 0 22 -----------------------------------------------------------------------------------------------------------Hour Total 0 96 14 0 0 0 0 0 0 0 0 0 0 0 0 110 22:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 22:30 0 6 3 0 0 0 0 0 0 0 0 0 0 0 0 9 22:45 0 10 3 0 0 0 0 0 0 0 0 0 0 0 0 13 23:00 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 30 6 0 0 0 0 0 0 0 0 0 0 0 0 36 23:15 0 5 3 0 0 0 0 0 0 0 0 0 0 0 0 8 23:30 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 23:45 0 6 1 0 0 0 0 0 0 0 0 0 0 0 0 7 24:00 0 8 1 0 0 0 0 0 0 0 0 0 0 0 0 9 -----------------------------------------------------------------------------------------------------------Hour Total 0 25 7 0 0 0 0 0 0 0 0 0 0 0 0 32 -----------------------------------------------------------------------------------------------------------DAY TOTAL 13 3631 1173 27 45 34 0 20 3 1 0 0 0 0 0 4947 PERCENTS 0.3% 73.4% 23.8% 0.6% 0.9% 0.6% 0.0% 0.4% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.3% Trucks & Buses 2.6% AM Times AM Peaks
08:00 08:15 08:15 08:30 09:15 10:30 3 412 132 7 6 5
08:45 2
09:30 1
PM Times PM Peaks
17:30 17:15 17:15 15:15 14:00 12:15 3 399 125 7 7 6
15:30 12:15 5 1
181
08:15 555 17:15 531
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
7
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------00:15 0 5 1 0 0 0 0 0 0 0 0 0 0 0 0 6 00:30 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 00:45 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0 3 01:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 1 11 3 0 0 0 0 0 0 0 0 0 0 0 0 15 01:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 01:30 0 1 1 0 0 0 0 0 1 0 0 0 0 0 0 3 01:45 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 02:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 5 3 0 0 0 0 0 1 0 0 0 0 0 0 9 02:15 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 5 02:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2 03:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 8 03:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 03:30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 -----------------------------------------------------------------------------------------------------------Hour Total 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 04:15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:30 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 04:45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 05:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 -----------------------------------------------------------------------------------------------------------Hour Total 0 4 3 0 0 0 0 0 0 0 0 0 0 0 0 7 05:15 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 05:30 0 6 4 0 0 0 0 0 0 0 0 0 0 0 0 10 05:45 0 3 1 0 0 0 0 0 0 0 0 0 0 0 0 4 06:00 0 8 6 0 0 0 0 0 0 0 0 0 0 0 0 14 -----------------------------------------------------------------------------------------------------------Hour Total 0 18 12 0 0 0 0 0 0 0 0 0 0 0 0 30 06:15 0 25 9 0 0 0 0 0 0 0 0 0 0 0 0 34 06:30 0 9 1 0 1 0 0 0 0 0 0 0 0 0 0 11 06:45 0 12 8 0 0 0 0 0 0 0 0 0 0 0 0 20 07:00 1 22 7 0 0 0 0 0 0 0 0 0 0 0 0 30 -----------------------------------------------------------------------------------------------------------Hour Total 1 68 25 0 1 0 0 0 0 0 0 0 0 0 0 95 07:15 0 31 5 2 0 0 0 0 0 0 0 0 0 0 0 38 07:30 0 57 25 1 0 0 0 0 0 0 0 0 0 0 0 83 07:45 0 61 20 0 0 0 0 0 0 0 0 0 0 0 0 81 08:00 0 55 26 0 2 2 0 0 0 0 0 0 0 0 0 85 -----------------------------------------------------------------------------------------------------------Hour Total 0 204 76 3 2 2 0 0 0 0 0 0 0 0 0 287 08:15 08:30 08:45 09:00
0 2 0 0
95 117 128 99
22 39 32 27
1 0 0 3
0 1 0 3
0 1 0 1
0 0 0 0
0 0 0 0
182
1 0 0 0
0 0 0 0
0 0 0 0
0 0 1 0
0 0 0 0
0 0 0 0
0 0 0 0
119 160 161 133
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
8
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Hour Total 2 439 120 4 4 2 0 0 1 0 0 1 0 0 0 573 09:15 1 51 14 3 0 2 0 0 0 0 0 0 0 0 0 71 09:30 0 49 11 1 1 2 0 0 1 0 0 0 0 0 0 65 09:45 0 36 16 0 0 0 0 1 0 0 0 0 0 0 0 53 10:00 0 33 17 0 1 3 0 0 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 1 169 58 4 2 7 0 1 1 0 0 0 0 0 0 243 10:15 0 44 15 0 0 1 0 1 0 0 0 0 0 0 0 61 10:30 0 35 23 0 1 1 0 1 0 0 0 0 0 0 0 61 10:45 0 41 16 1 0 1 0 0 0 0 0 0 0 0 0 59 11:00 0 37 15 0 0 1 0 1 0 0 0 0 0 0 0 54 -----------------------------------------------------------------------------------------------------------Hour Total 0 157 69 1 1 4 0 3 0 0 0 0 0 0 0 235 11:15 0 40 21 0 1 4 0 1 1 0 0 0 0 0 0 68 11:30 0 42 14 0 1 1 0 1 0 0 0 0 0 0 0 59 11:45 0 50 14 1 0 2 0 0 0 0 0 0 0 0 0 67 12:00 0 38 24 0 2 4 0 0 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 0 170 73 1 4 11 0 2 1 0 0 0 0 0 0 262 12:15 0 43 39 0 2 0 0 0 1 0 0 0 0 0 0 85 12:30 0 34 19 0 1 0 0 0 1 0 0 0 0 0 0 55 12:45 1 50 15 0 2 2 0 0 0 0 0 0 0 0 0 70 13:00 0 49 15 0 1 2 0 1 0 0 0 0 0 0 0 68 -----------------------------------------------------------------------------------------------------------Hour Total 1 176 88 0 6 4 0 1 2 0 0 0 0 0 0 278 13:15 2 53 19 0 1 0 0 0 0 0 0 0 0 0 0 75 13:30 0 50 19 1 0 0 0 1 0 0 0 0 0 0 0 71 13:45 1 40 21 0 2 2 0 0 0 0 0 0 0 0 0 66 14:00 1 46 23 0 1 2 0 0 0 0 0 0 0 0 0 73 -----------------------------------------------------------------------------------------------------------Hour Total 4 189 82 1 4 4 0 1 0 0 0 0 0 0 0 285 14:15 0 55 25 0 0 0 0 0 0 0 0 0 0 0 0 80 14:30 1 67 21 0 1 2 0 2 0 0 0 0 0 0 0 94 14:45 0 68 19 2 2 3 0 0 0 0 0 0 0 0 0 94 15:00 0 65 35 0 1 2 0 0 0 0 0 0 0 0 0 103 -----------------------------------------------------------------------------------------------------------Hour Total 1 255 100 2 4 7 0 2 0 0 0 0 0 0 0 371 15:15 1 70 25 0 1 1 0 0 0 0 0 0 0 0 0 98 15:30 1 83 36 0 0 1 0 0 0 0 0 0 0 0 0 121 15:45 0 68 26 2 1 1 0 0 1 0 0 0 0 0 0 99 16:00 2 68 27 3 3 2 0 0 0 0 0 0 0 0 0 105 -----------------------------------------------------------------------------------------------------------Hour Total 4 289 114 5 5 5 0 0 1 0 0 0 0 0 0 423 16:15 0 68 17 1 1 0 0 1 0 0 0 0 0 0 0 88 16:30 0 72 25 0 2 1 0 0 0 0 0 0 0 0 0 100 16:45 0 75 33 2 1 2 0 0 0 0 0 0 0 0 0 113 17:00 1 88 33 3 3 1 0 0 0 0 0 0 0 0 0 129 -----------------------------------------------------------------------------------------------------------Hour Total 1 303 108 6 7 4 0 1 0 0 0 0 0 0 0 430
183
Peggy Malone & Associates CLASSIFICATION SUMMARY Thu 8/18/2016 Station #: Site 5C Site ID: 000000009392 Location: Mickler Rd. WB Direction: WEST Lane: 1 TIME
1
2
Page:
9
File: Rd.prn City: 16-221 AW Max County: 30.15221, -81.37584
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
-----------------------------------------------------------------------------------------------------------17:15 1 104 31 1 1 1 0 1 0 0 0 0 0 0 0 140 17:30 0 125 37 0 0 0 0 0 0 0 0 0 0 0 0 162 17:45 0 111 40 0 0 0 0 0 0 0 0 0 0 0 0 151 18:00 1 92 31 0 1 0 0 0 0 0 0 0 0 0 0 125 -----------------------------------------------------------------------------------------------------------Hour Total 2 432 139 1 2 1 0 1 0 0 0 0 0 0 0 578 18:15 0 83 22 0 2 0 0 0 0 0 0 0 0 0 0 107 18:30 0 59 21 0 0 0 0 0 0 0 0 0 0 0 0 80 18:45 1 67 17 1 0 0 0 1 0 0 0 0 0 0 0 87 19:00 0 62 17 0 0 0 0 0 0 0 0 0 0 0 0 79 -----------------------------------------------------------------------------------------------------------Hour Total 1 271 77 1 2 0 0 1 0 0 0 0 0 0 0 353 19:15 1 58 14 0 0 0 0 0 0 0 0 0 0 0 0 73 19:30 0 43 13 0 0 0 0 0 0 0 0 0 0 0 0 56 19:45 1 43 11 0 0 0 0 0 0 0 0 0 0 0 0 55 20:00 0 54 10 0 0 0 0 0 0 0 0 0 0 0 0 64 -----------------------------------------------------------------------------------------------------------Hour Total 2 198 48 0 0 0 0 0 0 0 0 0 0 0 0 248 20:15 0 40 15 0 0 0 0 0 0 0 0 0 0 0 0 55 20:30 1 34 12 0 0 0 0 0 0 0 0 0 0 0 0 47 20:45 0 42 9 0 0 0 0 1 0 0 0 0 0 0 0 52 21:00 0 35 8 0 0 0 0 0 0 0 0 0 0 0 0 43 -----------------------------------------------------------------------------------------------------------Hour Total 1 151 44 0 0 0 0 1 0 0 0 0 0 0 0 197 21:15 0 29 11 0 0 0 0 0 0 0 0 0 0 0 0 40 21:30 0 35 3 0 0 0 0 0 0 0 0 0 0 0 0 38 21:45 1 24 5 0 0 0 0 0 0 0 0 0 0 0 0 30 22:00 0 19 7 0 1 0 0 0 0 0 0 0 0 0 0 27 -----------------------------------------------------------------------------------------------------------Hour Total 1 107 26 0 1 0 0 0 0 0 0 0 0 0 0 135 22:15 0 22 1 0 0 0 0 0 0 0 0 0 0 0 0 23 22:30 0 17 0 0 0 0 0 0 0 0 0 0 0 0 0 17 22:45 1 8 1 0 0 0 0 0 0 0 0 0 0 0 0 10 23:00 0 8 2 0 0 0 0 0 0 0 0 0 0 0 0 10 -----------------------------------------------------------------------------------------------------------Hour Total 1 55 4 0 0 0 0 0 0 0 0 0 0 0 0 60 23:15 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 23:30 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 7 23:45 0 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 24:00 0 6 2 0 0 0 0 0 0 0 0 0 0 0 0 8 -----------------------------------------------------------------------------------------------------------Hour Total 0 21 5 0 0 0 0 0 0 0 0 0 0 0 0 26 -----------------------------------------------------------------------------------------------------------DAY TOTAL 24 3703 1278 29 45 51 0 14 7 0 0 1 0 0 0 5152 PERCENTS 0.5% 71.9% 24.9% 0.6% 0.9% 0.9% 0.0% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100% Passenger Vehicles 97.1% Trucks & Buses 2.8% AM Times AM Peaks
08:30 08:15 08:15 08:45 08:15 11:15 3 439 120 7 4 11
09:45 00:45 3 1
PM Times PM Peaks
13:15 17:15 17:00 15:30 15:45 14:30 4 432 141 6 7 8
12:45 12:15 2 2
08:00 1
08:15 573 17:00 582
=================================================================================================================== GRAND TOTAL 57 3620 127 6 15 0 0 0 10869 85 116 45 1 1 0 14942 PERCENTS 0.4% 72.8% 24.3% 0.6% 0.8% 0.7% 0.0% 0.3% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 100%
184
Ponte Vedra/Palm Valley Traffic Study
APPENDIX B: TURNING MOVEMENT COUNTS
185
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. AM : : 12/9/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
5 0 2 2 9
65 130 166 240 601
0 0 1 0 1
0 0 0 0 0
70 130 169 242 611
100 164 231 264 759
0 0 1 2 3
0 0 0 0 0
100 164 232 266 762
5 6 9 14 34
13 15 13 23 64
0 0 0 0 0
18 21 22 37 98
188 315 423 545 1471
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
4 7 10 4 25
226 296 380 418 1320
2 0 1 1 4
0 0 0 0 0
232 303 391 423 1349
414 451 543 571 1979
3 2 4 3 12
0 0 0 0 0
417 453 547 574 1991
7 9 9 15 40
28 26 41 39 134
0 0 0 0 0
35 35 50 54 174
684 791 988 1051 3514
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
10 11 8 4 33
518 536 449 513 2016
1 4 1 2 8
0 0 0 0 0
529 551 458 519 2057
553 574 564 557 2248
2 8 6 6 22
0 0 0 0 0
555 582 570 563 2270
16 11 14 17 58
38 30 38 30 136
0 0 0 0 0
54 41 52 47 194
1138 1174 1080 1129 4521
Grand Total Apprch % Total %
67 1.7 0.7
3937 98 41.4
13 0.3 0.1
0 0 0
4017
4986 99.3 52.5
37 0.7 0.4
0 0 0
5023
132 28.3 1.4
334 71.7 3.5
0 0 0
466
9506
42.3
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 10 518 08:00 AM 08:15 AM 11 536 8 449 08:30 AM 08:45 AM 4 513 Total Volume 33 2016 % App. Total 1.6 98 PHF .750 .940
52.8
SR A1A Northbound
4.9
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
1 4 1 2 8 0.4 .500
529 551 458 519 2057
553 574 564 557 2248 99 .979
2 8 6 6 22 1 .688
555 582 570 563 2270
16 11 14 17 58 29.9 .853
38 30 38 30 136 70.1 .895
54 41 52 47 194
1138 1174 1080 1129 4521
.898
.963
.933
186
.975
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. AM : : 12/9/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
6 5 7 3 21
0 0 0 0 0
0 0 0 0 0
6 5 7 3 21
1 1 4 3 9
1 0 0 2 3
0 0 0 0 0
2 1 4 5 12
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 1 1
8 6 11 9 34
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 0 1 1
15 10 3 14 42
0 0 0 0 0
0 0 0 0 0
15 10 3 15 43
3 3 6 3 15
0 0 0 0 0
0 0 0 0 0
3 3 6 3 15
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
18 13 9 18 58
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
19 10 14 10 53
0 0 0 0 0
0 0 0 0 0
19 10 14 10 53
5 4 4 6 19
0 0 1 0 1
0 0 0 0 0
5 4 5 6 20
2 0 0 0 2
1 0 0 0 1
0 0 0 0 0
3 0 0 0 3
27 14 19 16 76
Grand Total Apprch % Total %
1 0.9 0.6
116 99.1 69
0 0 0
0 0 0
117
43 91.5 25.6
4 8.5 2.4
0 0 0
47
2 50 1.2
2 50 1.2
0 0 0
4
168
69.6
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 14 07:45 AM 1 0 08:00 AM 19 0 10 08:15 AM 08:30 AM 0 14 Total Volume 1 57 % App. Total 1.7 98.3 PHF .250 .750
28
SR A1A Northbound
2.4
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
15 19 10 14 58
3 5 4 4 16 94.1 .800
0 0 0 1 1 5.9 .250
3 5 4 5 17
0 2 0 0 2 66.7 .250
0 1 0 0 1 33.3 .250
0 3 0 0 3
18 27 14 19 78
.250
.722
.763
187
.850
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. AM : : 12/9/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
5 0 2 2 9
71 135 173 243 622
0 0 1 0 1
0 0 0 0 0
76 135 176 245 632
101 165 235 267 768
1 0 1 4 6
0 0 0 0 0
102 165 236 271 774
5 6 9 14 34
13 15 13 24 65
0 0 0 0 0
18 21 22 38 99
196 321 434 554 1505
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
4 7 10 5 26
241 306 383 432 1362
2 0 1 1 4
0 0 0 0 0
247 313 394 438 1392
417 454 549 574 1994
3 2 4 3 12
0 0 0 0 0
420 456 553 577 2006
7 9 9 15 40
28 26 41 39 134
0 0 0 0 0
35 35 50 54 174
702 804 997 1069 3572
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
10 11 8 4 33
537 546 463 523 2069
1 4 1 2 8
0 0 0 0 0
548 561 472 529 2110
558 578 568 563 2267
2 8 7 6 23
0 0 0 0 0
560 586 575 569 2290
18 11 14 17 60
39 30 38 30 137
0 0 0 0 0
57 41 52 47 197
1165 1188 1099 1145 4597
Grand Total Apprch % Total %
68 1.6 0.7
4053 98 41.9
13 0.3 0.1
0 0 0
4134
5029 99.2 52
41 0.8 0.4
0 0 0
5070
134 28.5 1.4
336 71.5 3.5
0 0 0
470
9674
42.7
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 10 537 08:00 AM 08:15 AM 11 546 8 463 08:30 AM 08:45 AM 4 523 Total Volume 33 2069 % App. Total 1.6 98.1 PHF .750 .947
52.4
SR A1A Northbound
4.9
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
1 4 1 2 8 0.4 .500
548 561 472 529 2110
558 578 568 563 2267 99 .981
2 8 7 6 23 1 .719
560 586 575 569 2290
18 11 14 17 60 30.5 .833
39 30 38 30 137 69.5 .878
57 41 52 47 197
1165 1188 1099 1145 4597
.864
.967
.940
188
.977
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. PM : : 12/9/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
34 29 32 29 124
500 533 589 571 2193
3 6 1 0 10
0 0 0 0 0
537 568 622 600 2327
434 433 473 468 1808
6 12 7 18 43
0 0 0 0 0
440 445 480 486 1851
11 8 11 10 40
23 36 26 27 112
1 2 1 2 6
35 46 38 39 158
1012 1059 1140 1125 4336
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
35 35 32 32 134
582 556 551 549 2238
4 2 0 1 7
0 0 0 0 0
621 593 583 582 2379
503 517 489 441 1950
16 13 11 11 51
0 0 0 0 0
519 530 500 452 2001
11 11 2 12 36
21 33 42 23 119
3 1 0 0 4
35 45 44 35 159
1175 1168 1127 1069 4539
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
34 39 26 25 124
533 503 398 446 1880
1 2 1 0 4
0 0 0 0 0
568 544 425 471 2008
452 466 313 288 1519
13 9 6 6 34
0 0 0 0 0
465 475 319 294 1553
7 12 5 5 29
29 36 28 16 109
1 2 0 0 3
37 50 33 21 141
1070 1069 777 786 3702
Grand Total Apprch % Total %
382 5.7 3
6311 94 50.2
21 0.3 0.2
0 0 0
6714
5277 97.6 42
128 2.4 1
0 0 0
5405
105 22.9 0.8
340 74.2 2.7
13 2.8 0.1
458
12577
53.4
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM 32 04:30 PM 589 29 571 04:45 PM 05:00 PM 582 35 05:15 PM 35 556 Total Volume 131 2298 % App. Total 5.4 94.3 PHF .936 .975
43
SR A1A Northbound
3.6
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
1 0 4 2 7 0.3 .438
622 600 621 593 2436
473 468 503 517 1961 97.3 .948
7 18 16 13 54 2.7 .750
480 486 519 530 2015
11 10 11 11 43 28.7 .977
26 27 21 33 107 71.3 .811
37 37 32 44 150
1139 1123 1172 1167 4601
.852
.981
.979
189
.950
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. PM : : 12/9/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
6 4 0 2 12
0 0 0 0 0
0 0 0 0 0
6 4 0 2 12
10 6 6 10 32
0 0 0 0 0
0 0 0 0 0
10 6 6 10 32
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 1 1 2
16 10 7 13 46
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 1 0 1
0 2 5 2 9
0 0 0 0 0
0 0 0 0 0
0 2 6 2 10
7 7 3 3 20
0 0 0 2 2
0 0 0 0 0
7 7 3 5 22
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7 9 9 7 32
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
4 1 0 1 6
0 0 0 0 0
0 0 0 0 0
4 1 0 1 6
3 3 3 2 11
0 0 0 0 0
0 0 0 0 0
3 3 3 2 11
0 0 0 0 0
2 0 1 0 3
0 0 0 0 0
2 0 1 0 3
9 4 4 3 20
Grand Total Apprch % Total %
1 3.6 1
27 96.4 27.6
0 0 0
0 0 0
28
63 96.9 64.3
2 3.1 2
0 0 0
65
0 0 0
5 100 5.1
0 0 0
5
98
28.6
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 0 04:00 PM 6 04:15 PM 0 4 04:30 PM 0 0 04:45 PM 0 2 Total Volume 0 12 % App. Total 0 100 PHF .000 .500
66.3
SR A1A Northbound
5.1
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
6 4 0 2 12
10 6 6 10 32 100 .800
0 0 0 0 0 0 .000
10 6 6 10 32
0 0 0 0 0 0 .000
0 0 1 1 2 100 .500
0 0 1 1 2
16 10 7 13 46
.500
.719
.500
190
.800
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T5-SR A1A and Marlin Ave. PM : : 12/9/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
Marlin Ave. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
34 29 32 29 124
506 537 589 573 2205
3 6 1 0 10
0 0 0 0 0
543 572 622 602 2339
444 439 479 478 1840
6 12 7 18 43
0 0 0 0 0
450 451 486 496 1883
11 8 11 10 40
23 36 27 28 114
1 2 1 2 6
35 46 39 40 160
1028 1069 1147 1138 4382
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
35 35 33 32 135
582 558 556 551 2247
4 2 0 1 7
0 0 0 0 0
621 595 589 584 2389
510 524 492 444 1970
16 13 11 13 53
0 0 0 0 0
526 537 503 457 2023
11 11 2 12 36
21 33 42 23 119
3 1 0 0 4
35 45 44 35 159
1182 1177 1136 1076 4571
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
34 39 26 25 124
537 504 398 447 1886
1 2 1 0 4
0 0 0 0 0
572 545 425 472 2014
455 469 316 290 1530
13 9 6 6 34
0 0 0 0 0
468 478 322 296 1564
7 12 5 5 29
31 36 29 16 112
1 2 0 0 3
39 50 34 21 144
1079 1073 781 789 3722
Grand Total Apprch % Total %
383 5.7 3
6338 94 50
21 0.3 0.2
0 0 0
6742
5340 97.6 42.1
130 2.4 1
0 0 0
5470
105 22.7 0.8
345 74.5 2.7
13 2.8 0.1
463
12675
53.2
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM 32 04:30 PM 589 29 573 04:45 PM 05:00 PM 582 35 05:15 PM 35 558 Total Volume 131 2302 % App. Total 5.4 94.3 PHF .936 .977
43.2
SR A1A Northbound
3.7
Marlin Ave. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
1 0 4 2 7 0.3 .438
622 602 621 595 2440
479 478 510 524 1991 97.4 .950
7 18 16 13 54 2.6 .750
486 496 526 537 2045
11 10 11 11 43 28.3 .977
27 28 21 33 109 71.7 .826
38 38 32 44 152
1146 1136 1179 1176 4637
.864
.983
.981
191
.952
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. AM : : 12/8/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 1 0 0 1
62 99 182 254 597
0 0 0 0 0
0 0 0 0 0
62 100 182 254 598
114 150 222 295 781
1 1 1 4 7
0 0 0 0 0
115 151 223 299 788
1 1 4 9 15
2 5 7 2 16
0 0 0 1 1
3 6 11 12 32
180 257 416 565 1418
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
2 2 3 3 10
212 323 366 489 1390
0 0 0 0 0
0 0 0 0 0
214 325 369 492 1400
373 477 543 492 1885
1 2 0 2 5
0 0 0 0 0
374 479 543 494 1890
13 12 14 14 53
8 10 10 8 36
0 1 1 0 2
21 23 25 22 91
609 827 937 1008 3381
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 3 3 1 8
427 425 414 426 1692
0 0 0 0 0
0 0 0 0 0
428 428 417 427 1700
423 457 481 535 1896
6 7 2 0 15
0 0 0 0 0
429 464 483 535 1911
22 15 10 7 54
5 7 12 6 30
0 2 1 0 3
27 24 23 13 87
884 916 923 975 3698
Grand Total Apprch % Total %
19 0.5 0.2
3679 99.5 43.3
0 0 0
0 0 0
3698
4562 99.4 53.7
27 0.6 0.3
0 0 0
4589
122 58.1 1.4
82 39 1
6 2.9 0.1
210
8497
43.5
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 366 07:30 AM 3 3 07:45 AM 489 1 427 08:00 AM 08:15 AM 3 425 Total Volume 10 1707 % App. Total 0.6 99.4 PHF .833 .873
54
SR A1A Northbound
2.5
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
369 492 428 428 1717
543 492 423 457 1915 99.2 .882
0 2 6 7 15 0.8 .536
543 494 429 464 1930
14 14 22 15 65 68.4 .739
10 8 5 7 30 31.6 .750
24 22 27 22 95
936 1008 884 914 3742
.880
.928
.872
192
.889
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. AM : : 12/8/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
0 1 3 6 10
0 0 0 0 0
0 0 0 0 0
0 1 3 6 10
0 1 3 3 7
0 0 0 0 0
0 0 0 0 0
0 1 3 3 7
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 2 6 9 17
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 1 0 1
11 6 13 9 39
0 0 0 0 0
0 0 0 0 0
11 6 14 9 40
1 1 9 12 23
0 0 0 0 0
0 0 0 0 0
1 1 9 12 23
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
13 7 23 21 64
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 1 0 1
13 6 11 8 38
0 0 0 0 0
0 0 0 0 0
13 6 12 8 39
7 8 2 8 25
0 0 0 0 0
0 0 0 0 0
7 8 2 8 25
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
20 14 14 17 65
Grand Total Apprch % Total %
2 2.2 1.4
87 97.8 59.6
0 0 0
0 0 0
89
55 100 37.7
0 0 0
0 0 0
55
2 100 1.4
0 0 0
0 0 0
2
146
61
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 1 13 07:45 AM 0 9 08:00 AM 0 13 08:15 AM 0 6 Total Volume 1 41 % App. Total 2.4 97.6 PHF .250 .788
37.7
SR A1A Northbound
1.4
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
14 9 13 6 42
9 12 7 8 36 100 .750
0 0 0 0 0 0 .000
9 12 7 8 36
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
23 21 20 14 78
.000
.848
.750
193
.750
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. AM : : 12/8/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 1 0 0 1
62 100 185 260 607
0 0 0 0 0
0 0 0 0 0
62 101 185 260 608
114 151 225 298 788
1 1 1 4 7
0 0 0 0 0
115 152 226 302 795
1 1 4 9 15
2 5 7 2 16
0 0 0 1 1
3 6 11 12 32
180 259 422 574 1435
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
2 2 4 3 11
223 329 379 498 1429
0 0 0 0 0
0 0 0 0 0
225 331 383 501 1440
374 478 552 504 1908
1 2 0 2 5
0 0 0 0 0
375 480 552 506 1913
14 12 14 14 54
8 10 10 8 36
0 1 1 0 2
22 23 25 22 92
622 834 960 1029 3445
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 3 4 1 9
440 431 425 434 1730
0 0 0 0 0
0 0 0 0 0
441 434 429 435 1739
430 465 483 543 1921
6 7 2 0 15
0 0 0 0 0
436 472 485 543 1936
22 15 10 8 55
5 7 12 6 30
0 2 1 0 3
27 24 23 14 88
904 930 937 992 3763
Grand Total Apprch % Total %
21 0.6 0.2
3766 99.4 43.6
0 0 0
0 0 0
3787
4617 99.4 53.4
27 0.6 0.3
0 0 0
4644
124 58.5 1.4
82 38.7 0.9
6 2.8 0.1
212
8643
43.8
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 379 07:30 AM 4 3 07:45 AM 498 1 440 08:00 AM 08:15 AM 3 431 Total Volume 11 1748 % App. Total 0.6 99.4 PHF .688 .878
53.7
SR A1A Northbound
2.5
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
383 501 441 434 1759
552 504 430 465 1951 99.2 .884
0 2 6 7 15 0.8 .536
552 506 436 472 1966
14 14 22 15 65 68.4 .739
10 8 5 7 30 31.6 .750
24 22 27 22 95
959 1029 904 928 3820
.880
.928
.878
194
.890
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. PM : : 12/8/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
6 21 11 7 45
524 561 551 528 2164
0 0 0 0 0
0 0 0 0 0
530 582 562 535 2209
431 463 491 463 1848
15 15 6 7 43
0 0 0 0 0
446 478 497 470 1891
4 7 8 2 21
3 5 1 3 12
0 1 0 0 1
7 13 9 5 34
983 1073 1068 1010 4134
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
8 6 9 10 33
564 579 524 519 2186
0 1 0 0 1
0 0 0 0 0
572 586 533 529 2220
522 551 567 517 2157
2 6 12 9 29
0 0 0 0 0
524 557 579 526 2186
12 8 3 11 34
3 7 2 6 18
3 0 0 0 3
18 15 5 17 55
1114 1158 1117 1072 4461
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
8 9 17 10 44
548 551 546 386 2031
0 1 1 2 4
0 0 0 0 0
556 561 564 398 2079
453 358 291 260 1362
8 6 6 8 28
0 0 0 0 0
461 364 297 268 1390
4 12 8 12 36
4 1 3 3 11
0 2 0 0 2
8 15 11 15 49
1025 940 872 681 3518
Grand Total Apprch % Total %
122 1.9 1
6381 98 52.7
5 0.1 0
0 0 0
6508
5367 98.2 44.3
100 1.8 0.8
0 0 0
5467
91 65.9 0.8
41 29.7 0.3
6 4.3 0
138
12113
53.7
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 8 564 05:00 PM 6 05:15 PM 579 9 524 05:30 PM 05:45 PM 519 10 Total Volume 33 2186 % App. Total 1.5 98.5 PHF .825 .944
45.1
SR A1A Northbound
1.1
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 1 0 0 1 0 .250
572 586 533 529 2220
522 551 567 517 2157 98.7 .951
2 6 12 9 29 1.3 .604
524 557 579 526 2186
12 8 3 11 34 65.4 .708
3 7 2 6 18 34.6 .643
15 15 5 17 52
1111 1158 1117 1072 4458
.765
.962
.947
195
.944
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. PM : : 12/8/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
3 4 2 3 12
0 0 0 0 0
0 0 0 0 0
3 4 2 3 12
11 13 8 6 38
0 1 0 0 1
0 0 0 0 0
11 14 8 6 39
0 0 1 0 1
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
14 18 11 9 52
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 1 1
3 1 2 1 7
0 0 0 0 0
0 0 0 0 0
3 1 2 2 8
7 6 2 1 16
0 0 0 0 0
0 0 0 0 0
7 6 2 1 16
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
10 7 4 3 24
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 1 1
1 2 3 1 7
0 0 0 0 0
0 0 0 0 0
1 2 3 2 8
4 2 3 1 10
0 0 0 0 0
0 0 0 0 0
4 2 3 1 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 4 6 3 18
Grand Total Apprch % Total %
2 7.1 2.1
26 92.9 27.7
0 0 0
0 0 0
28
64 98.5 68.1
1 1.5 1.1
0 0 0
65
1 100 1.1
0 0 0
0 0 0
1
94
29.8
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 0 3 04:00 PM 04:15 PM 0 4 04:30 PM 0 2 04:45 PM 0 3 Total Volume 0 12 % App. Total 0 100 PHF .000 .750
69.1
SR A1A Northbound
1.1
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
3 4 2 3 12
11 13 8 6 38 97.4 .731
0 1 0 0 1 2.6 .250
11 14 8 6 39
0 0 1 0 1 100 .250
0 0 0 0 0 0 .000
0 0 1 0 1
14 18 11 9 52
.250
.722
.750
196
.696
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T6 SR A1A & Dolphin Blvd. PM : : 12/8/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
Dolphin Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
6 21 11 7 45
527 565 553 531 2176
0 0 0 0 0
0 0 0 0 0
533 586 564 538 2221
442 476 499 469 1886
15 16 6 7 44
0 0 0 0 0
457 492 505 476 1930
4 7 9 2 22
3 5 1 3 12
0 1 0 0 1
7 13 10 5 35
997 1091 1079 1019 4186
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
8 6 9 11 34
567 580 526 520 2193
0 1 0 0 1
0 0 0 0 0
575 587 535 531 2228
529 557 569 518 2173
2 6 12 9 29
0 0 0 0 0
531 563 581 527 2202
12 8 3 11 34
3 7 2 6 18
3 0 0 0 3
18 15 5 17 55
1124 1165 1121 1075 4485
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
8 9 17 11 45
549 553 549 387 2038
0 1 1 2 4
0 0 0 0 0
557 563 567 400 2087
457 360 294 261 1372
8 6 6 8 28
0 0 0 0 0
465 366 300 269 1400
4 12 8 12 36
4 1 3 3 11
0 2 0 0 2
8 15 11 15 49
1030 944 878 684 3536
Grand Total Apprch % Total %
124 1.9 1
6407 98 52.5
5 0.1 0
0 0 0
6536
5431 98.2 44.5
101 1.8 0.8
0 0 0
5532
92 66.2 0.8
41 29.5 0.3
6 4.3 0
139
12207
53.5
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 8 567 05:00 PM 6 05:15 PM 580 9 526 05:30 PM 05:45 PM 520 11 Total Volume 34 2193 % App. Total 1.5 98.4 PHF .773 .945
45.3
SR A1A Northbound
1.1
Dolphin Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 1 0 0 1 0 .250
575 587 535 531 2228
529 557 569 518 2173 98.7 .955
2 6 12 9 29 1.3 .604
531 563 581 527 2202
12 8 3 11 34 65.4 .708
3 7 2 6 18 34.6 .643
15 15 5 17 52
1121 1165 1121 1075 4482
.765
.962
.949
197
.948
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. AM : : 12/9/2015 :1
Groups Printed- Car Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
14 27 14 37 92
50 88 149 201 488
2 2 7 9 20
0 0 0 0 0
66 117 170 247 600
3 15 14 9 41
0 0 2 2 4
4 2 2 4 12
0 0 0 0 0
7 17 18 15 57
0 4 3 7 14
67 107 161 165 500
1 1 2 4 8
0 0 0 0 0
68 112 166 176 522
0 3 6 6 15
1 2 4 5 12
39 42 69 88 238
0 0 0 0 0
40 47 79 99 265
181 293 433 537 1444
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
49 69 81 74 273
176 217 297 338 1028
10 13 15 13 51
0 0 0 0 0
235 299 393 425 1352
24 28 45 47 144
5 11 8 8 32
10 11 7 20 48
0 0 0 0 0
39 50 60 75 224
8 7 4 9 28
280 300 366 371 1317
4 4 4 10 22
0 0 0 0 0
292 311 374 390 1367
3 9 11 17 40
8 6 8 15 37
117 120 148 154 539
0 0 0 0 0
128 135 167 186 616
694 795 994 1076 3559
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
109 125 102 125 461
383 384 359 374 1500
19 28 33 29 109
0 0 1 2 3
511 537 495 530 2073
30 41 67 50 188
8 7 19 11 45
24 27 25 23 99
0 0 0 5 5
62 75 111 89 337
14 15 18 8 55
374 390 357 390 1511
15 14 18 10 57
0 0 0 0 0
403 419 393 408 1623
21 16 22 21 80
23 17 37 21 98
147 147 143 144 581
0 0 0 0 0
191 180 202 186 759
1167 1211 1201 1213 4792
Grand Total Apprch % Total %
826 20.5 8.4
3016 74.9 30.8
180 4.5 1.8
3 0.1 0
4025
373 60.4 3.8
81 13.1 0.8
159 25.7 1.6
5 0.8 0.1
618
97 2.8 1
3328 94.8 34
87 2.5 0.9
0 0 0
3512
135 8.2 1.4
147 9 1.5
1358 82.8 13.9
0 0 0
1640
9795
41.1
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 109 383 19 08:00 AM 28 08:15 AM 125 384 08:30 AM 102 359 33 08:45 AM 125 374 29 Total Volume 461 1500 109 % App. Total 22.3 72.5 5.3 PHF .922 .977 .826
6.3
511 537 494 528 2070 .964
35.9
SR A1A Northbound
16.7
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
30 41 67 50 188 56.6 .701
8 7 19 11 45 13.6 .592
24 27 25 23 99 29.8 .917
62 75 111 84 332
14 15 18 8 55 3.4 .764
374 390 357 390 1511 93.1 .969
15 14 18 10 57 3.5 .792
403 419 393 408 1623
21 16 22 21 80 10.5 .909
23 17 37 21 98 12.9 .662
147 147 143 144 581 76.5 .988
191 180 202 186 759
1167 1211 1200 1206 4784
.939
.988
.748
198
.968
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. AM : : 12/9/2015 :1
Groups Printed- Truck Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 1 1 1 3
3 5 5 3 16
0 1 0 1 2
0 0 0 0 0
3 7 6 5 21
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
0 0 0 2 2
1 2 2 6 11
0 1 0 0 1
0 0 0 0 0
1 3 2 8 14
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 0 0 1
5 10 9 13 37
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 1 0 1 3
11 9 4 7 31
0 0 1 0 1
0 0 0 0 0
12 10 5 8 35
2 0 0 1 3
0 1 0 0 1
0 0 0 1 1
0 0 0 0 0
2 1 0 2 5
0 0 1 0 1
3 3 4 3 13
0 0 1 3 4
0 0 0 0 0
3 3 6 6 18
0 0 1 0 1
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 1 1 2
17 14 12 17 60
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
4 3 3 1 11
16 6 13 6 41
0 0 0 1 1
0 0 0 0 0
20 9 16 8 53
0 0 0 1 1
0 0 1 2 3
1 1 0 1 3
0 0 0 0 0
1 1 1 4 7
1 0 2 0 3
4 2 3 6 15
0 1 0 1 2
0 0 0 0 0
5 3 5 7 20
1 1 1 0 3
1 2 0 0 3
1 1 2 1 5
0 0 0 0 0
3 4 3 1 11
29 17 25 20 91
Grand Total Apprch % Total %
17 15.6 9
88 80.7 46.8
4 3.7 2.1
0 0 0
109
4 30.8 2.1
5 38.5 2.7
4 30.8 2.1
0 0 0
13
6 11.5 3.2
39 75 20.7
7 13.5 3.7
0 0 0
52
4 28.6 2.1
4 28.6 2.1
6 42.9 3.2
0 0 0
14
188
58
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 0 08:00 AM 4 16 08:15 AM 3 6 0 08:30 AM 3 13 0 08:45 AM 1 6 1 Total Volume 11 41 1 % App. Total 20.8 77.4 1.9 PHF .688 .641 .250
6.9
20 9 16 8 53 .663
27.7
SR A1A Northbound
7.4
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 1 1 14.3 .250
0 0 1 2 3 42.9 .375
1 1 0 1 3 42.9 .750
1 1 1 4 7
1 0 2 0 3 15 .375
4 2 3 6 15 75 .625
0 1 0 1 2 10 .500
5 3 5 7 20
1 1 1 0 3 27.3 .750
1 2 0 0 3 27.3 .375
1 1 2 1 5 45.5 .625
3 4 3 1 11
29 17 25 20 91
.688
.784
.438
199
.714
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. AM : : 12/9/2015 :1
Groups Printed- Combined Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
14 28 15 38 95
53 93 154 204 504
2 3 7 10 22
0 0 0 0 0
69 124 176 252 621
3 15 14 9 41
0 0 3 2 5
4 2 2 4 12
0 0 0 0 0
7 17 19 15 58
0 4 3 9 16
68 109 163 171 511
1 2 2 4 9
0 0 0 0 0
69 115 168 184 536
0 3 6 6 15
1 2 4 5 12
40 42 69 88 239
0 0 0 0 0
41 47 79 99 266
186 303 442 550 1481
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
50 70 81 75 276
187 226 301 345 1059
10 13 16 13 52
0 0 0 0 0
247 309 398 433 1387
26 28 45 48 147
5 12 8 8 33
10 11 7 21 49
0 0 0 0 0
41 51 60 77 229
8 7 5 9 29
283 303 370 374 1330
4 4 5 13 26
0 0 0 0 0
295 314 380 396 1385
3 9 12 17 41
8 6 8 16 38
117 120 148 154 539
0 0 0 0 0
128 135 168 187 618
711 809 1006 1093 3619
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
113 128 105 126 472
399 390 372 380 1541
19 28 33 30 110
0 0 1 2 3
531 546 511 538 2126
30 41 67 51 189
8 7 20 13 48
25 28 25 24 102
0 0 0 5 5
63 76 112 93 344
15 15 20 8 58
378 392 360 396 1526
15 15 18 11 59
0 0 0 0 0
408 422 398 415 1643
22 17 23 21 83
24 19 37 21 101
148 148 145 145 586
0 0 0 0 0
194 184 205 187 770
1196 1228 1226 1233 4883
Grand Total Apprch % Total %
843 20.4 8.4
3104 75.1 31.1
184 4.5 1.8
3 0.1 0
4134
377 59.7 3.8
86 13.6 0.9
163 25.8 1.6
5 0.8 0.1
631
103 2.9 1
3367 94.5 33.7
94 2.6 0.9
0 0 0
3564
139 8.4 1.4
151 9.1 1.5
1364 82.5 13.7
0 0 0
1654
9983
41.4
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 19 113 08:00 AM 399 390 28 08:15 AM 128 08:30 AM 105 372 33 08:45 AM 126 380 30 Total Volume 472 1541 110 % App. Total 22.2 72.6 5.2 PHF .922 .966 .833
6.3
531 546 510 536 2123 .972
35.7
SR A1A Northbound
16.6
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
30 41 67 51 189 55.8 .705
8 7 20 13 48 14.2 .600
25 28 25 24 102 30.1 .911
63 76 112 88 339
15 15 20 8 58 3.5 .725
378 392 360 396 1526 92.9 .963
15 15 18 11 59 3.6 .819
408 422 398 415 1643
22 17 23 21 83 10.8 .902
24 19 37 21 101 13.1 .682
148 148 145 145 586 76.1 .990
194 184 205 187 770
1196 1228 1225 1226 4875
.939
.992
.757
200
.973
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. PM : : 12/9/2015 :1
Groups Printed- Car Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
128 118 127 140 513
374 376 396 369 1515
32 38 26 36 132
0 0 0 0 0
534 532 549 545 2160
35 29 28 28 120
16 18 20 15 69
24 19 14 22 79
0 0 0 0 0
75 66 62 65 268
16 25 8 13 62
321 349 354 328 1352
22 22 9 11 64
0 0 0 0 0
359 396 371 352 1478
11 15 24 24 74
24 22 11 22 79
103 115 140 142 500
0 0 0 0 0
138 152 175 188 653
1106 1146 1157 1150 4559
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
139 140 144 133 556
405 382 392 354 1533
37 36 27 39 139
0 0 0 0 0
581 558 563 526 2228
33 34 35 29 131
10 18 24 14 66
16 23 23 18 80
0 0 0 0 0
59 75 82 61 277
16 12 15 15 58
346 355 331 319 1351
10 10 11 18 49
0 0 0 0 0
372 377 357 352 1458
11 16 17 22 66
14 22 23 23 82
128 128 133 134 523
0 0 0 0 0
153 166 173 179 671
1165 1176 1175 1118 4634
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
152 144 112 125 533
369 361 317 303 1350
34 46 27 32 139
0 0 0 0 0
555 551 456 460 2022
32 30 27 23 112
17 15 14 16 62
23 19 22 22 86
0 0 0 0 0
72 64 63 61 260
24 31 16 16 87
336 306 212 179 1033
20 21 11 12 64
0 0 0 0 0
380 358 239 207 1184
19 16 16 19 70
32 28 22 11 93
103 94 87 72 356
0 0 0 0 0
154 138 125 102 519
1161 1111 883 830 3985
Grand Total Apprch % Total %
1602 25 12.2
4398 68.6 33.4
410 6.4 3.1
0 0 0
6410
363 45.1 2.8
197 24.5 1.5
245 30.4 1.9
0 0 0
805
207 5 1.6
3736 90.7 28.4
177 4.3 1.3
0 0 0
4120
210 11.4 1.6
254 13.8 1.9
1379 74.8 10.5
0 0 0
1843
13178
48.6
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 140 369 36 04:45 PM 139 05:00 PM 405 37 05:15 PM 140 382 36 05:30 PM 392 27 144 Total Volume 563 1548 136 % App. Total 25.1 68.9 6.1 PHF .977 .956 .919
6.1
545 581 558 563 2247 .967
31.3
SR A1A Northbound
14
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
28 33 34 35 130 46.3 .929
15 10 18 24 67 23.8 .698
22 16 23 23 84 29.9 .913
65 59 75 82 281
13 16 12 15 56 3.8 .875
328 346 355 331 1360 93.3 .958
11 10 10 11 42 2.9 .955
352 372 377 357 1458
24 11 16 17 68 10 .708
22 14 22 23 81 11.9 .880
142 128 128 133 531 78.1 .935
188 153 166 173 680
1150 1165 1176 1175 4666
.904
.992
.857
201
.967
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. PM : : 12/9/2015 :1
Groups Printed- Truck Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
3 3 0 0 6
0 1 0 0 1
0 0 0 0 0
3 4 0 0 7
1 0 0 3 4
1 0 0 0 1
0 0 1 1 2
0 0 0 0 0
2 0 1 4 7
0 0 0 0 0
5 5 3 5 18
0 0 0 0 0
0 0 0 0 0
5 5 3 5 18
0 0 0 0 0
0 0 2 0 2
0 3 1 2 6
0 0 0 0 0
0 3 3 2 8
10 12 7 11 40
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 1 1 0 2
2 2 2 4 10
0 0 0 0 0
0 0 0 0 0
2 3 3 4 12
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
8 3 3 4 18
0 0 0 0 0
0 0 0 0 0
8 3 3 4 18
0 0 0 0 0
0 0 0 0 0
4 3 0 1 8
0 0 0 0 0
4 3 0 1 8
14 9 6 9 38
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
1 0 0 0 1
1 3 1 1 6
0 0 0 0 0
0 0 0 0 0
2 3 1 1 7
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 3 2 1 9
0 0 0 0 0
0 0 0 0 0
3 3 2 1 9
0 0 0 0 0
0 0 0 0 0
1 1 1 1 4
0 0 0 0 0
1 1 1 1 4
6 7 4 3 20
Grand Total Apprch % Total %
3 11.5 3.1
22 84.6 22.4
1 3.8 1
0 0 0
26
4 57.1 4.1
1 14.3 1
2 28.6 2
0 0 0
7
0 0 0
45 100 45.9
0 0 0
0 0 0
45
0 0 0
2 10 2
18 90 18.4
0 0 0
20
98
26.5
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:15 PM 0 04:15 PM 3 1 0 0 0 04:30 PM 04:45 PM 0 0 0 05:00 PM 0 2 0 Total Volume 0 5 1 % App. Total 0 83.3 16.7 PHF .000 .417 .250
7.1
4 0 0 2 6 .375
45.9
SR A1A Northbound
20.4
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 3 0 3 60 .250
0 0 0 0 0 0 .000
0 1 1 0 2 40 .500
0 1 4 0 5
0 0 0 0 0 0 .000
5 3 5 8 21 100 .656
0 0 0 0 0 0 .000
5 3 5 8 21
0 0 0 0 0 0 .000
0 2 0 0 2 16.7 .250
3 1 2 4 10 83.3 .625
3 3 2 4 12
12 7 11 14 44
.750
.786
.313
202
.656
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T7-SR A1A and Solana Rd. PM : : 12/9/2015 :1
Groups Printed- Combined Solana Rd. SR A1A Westbound Northbound
SR A1A Southbound
Solana Rd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
128 118 127 140 513
377 379 396 369 1521
32 39 26 36 133
0 0 0 0 0
537 536 549 545 2167
36 29 28 31 124
17 18 20 15 70
24 19 15 23 81
0 0 0 0 0
77 66 63 69 275
16 25 8 13 62
326 354 357 333 1370
22 22 9 11 64
0 0 0 0 0
364 401 374 357 1496
11 15 24 24 74
24 22 13 22 81
103 118 141 144 506
0 0 0 0 0
138 155 178 190 661
1116 1158 1164 1161 4599
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
139 141 145 133 558
407 384 394 358 1543
37 36 27 39 139
0 0 0 0 0
583 561 566 530 2240
33 34 35 29 131
10 18 24 14 66
16 23 23 18 80
0 0 0 0 0
59 75 82 61 277
16 12 15 15 58
354 358 334 323 1369
10 10 11 18 49
0 0 0 0 0
380 380 360 356 1476
11 16 17 22 66
14 22 23 23 82
132 131 133 135 531
0 0 0 0 0
157 169 173 180 679
1179 1185 1181 1127 4672
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
153 144 112 125 534
370 364 318 304 1356
34 46 27 32 139
0 0 0 0 0
557 554 457 461 2029
32 30 27 23 112
17 15 14 16 62
23 19 22 22 86
0 0 0 0 0
72 64 63 61 260
24 31 16 16 87
339 309 214 180 1042
20 21 11 12 64
0 0 0 0 0
383 361 241 208 1193
19 16 16 19 70
32 28 22 11 93
104 95 88 73 360
0 0 0 0 0
155 139 126 103 523
1167 1118 887 833 4005
Grand Total Apprch % Total %
1605 24.9 12.1
4420 68.7 33.3
411 6.4 3.1
0 0 0
6436
367 45.2 2.8
198 24.4 1.5
247 30.4 1.9
0 0 0
812
207 5 1.6
3781 90.8 28.5
177 4.2 1.3
0 0 0
4165
210 11.3 1.6
256 13.7 1.9
1397 75 10.5
0 0 0
1863
13276
48.5
SR A1A Southbound
Solana Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 140 369 36 04:45 PM 139 05:00 PM 407 37 05:15 PM 141 384 36 05:30 PM 394 27 145 Total Volume 565 1554 136 % App. Total 25.1 68.9 6 PHF .974 .955 .919
6.1
545 583 561 566 2255 .967
31.4
SR A1A Northbound
14
Solana Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
31 33 34 35 133 46.7 .950
15 10 18 24 67 23.5 .698
23 16 23 23 85 29.8 .924
69 59 75 82 285
13 16 12 15 56 3.8 .875
333 354 358 334 1379 93.4 .963
11 10 10 11 42 2.8 .955
357 380 380 360 1477
24 11 16 17 68 9.9 .708
22 14 22 23 81 11.8 .880
144 132 131 133 540 78.4 .938
190 157 169 173 689
1161 1179 1185 1181 4706
.907
.993
.869
203
.972
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. AM : : 12/9/2015 :1
Groups Printed- Car Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 1 1 1 3
53 89 154 203 499
1 0 1 0 2
0 0 0 0 0
54 90 156 204 504
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
74 113 159 201 547
6 10 7 12 35
0 0 0 0 0
80 123 166 213 582
1 5 6 5 17
0 0 0 0 0
3 2 4 2 11
0 0 0 0 0
4 7 10 7 28
138 220 332 424 1114
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
6 6 6 12 30
187 236 304 363 1090
1 0 3 1 5
0 0 0 0 0
194 242 313 376 1125
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
291 318 351 381 1341
8 12 11 16 47
0 0 0 1 1
299 330 362 398 1389
6 12 15 31 64
0 0 0 0 0
5 0 1 4 10
0 0 0 0 0
11 12 16 35 74
504 584 691 811 2590
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
12 22 21 16 71
420 407 386 405 1618
0 0 0 0 0
0 0 0 0 0
432 429 407 421 1689
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 2 2
0 0 0 0 0
367 397 405 364 1533
13 16 27 28 84
0 0 0 0 0
380 413 432 392 1617
37 41 38 25 141
0 0 0 0 0
7 3 5 3 18
0 0 0 0 0
44 44 43 28 159
856 886 882 843 3467
Grand Total Apprch % Total %
104 3.1 1.5
3207 96.7 44.7
7 0.2 0.1
0 0 0
3318
2 50 0
0 0 0
0 0 0
2 50 0
4
0 0 0
3421 95.3 47.7
166 4.6 2.3
1 0 0
3588
222 85.1 3.1
0 0 0
39 14.9 0.5
0 0 0
261
7171
46.3
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 0 12 08:00 AM 420 407 0 08:15 AM 22 08:30 AM 21 386 0 08:45 AM 16 405 0 Total Volume 71 1618 0 % App. Total 4.2 95.8 0 PHF .807 .963 .000
0.1
432 429 407 421 1689 .977
50
SR A1A Northbound
3.6
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
367 397 405 364 1533 94.8 .946
13 16 27 28 84 5.2 .750
380 413 432 392 1617
37 41 38 25 141 88.7 .860
0 0 0 0 0 0 .000
7 3 5 3 18 11.3 .643
44 44 43 28 159
856 886 882 841 3465
.903
.978
.000
204
.936
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. AM : : 12/9/2015 :1
Groups Printed- Truck Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
3 5 7 4 19
0 0 0 0 0
0 0 0 0 0
3 5 7 4 19
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 3 3 8 15
0 0 1 0 1
0 0 0 0 0
1 3 4 8 16
0 0 1 0 1
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 1 1 2
4 8 12 13 37
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 1 0 0 1
11 7 5 8 31
0 0 0 0 0
0 0 0 0 0
11 8 5 8 32
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 6 7 18
0 1 0 0 1
0 0 0 0 0
2 4 6 7 19
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
14 12 12 15 53
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
18 10 15 7 50
0 0 0 0 0
0 0 0 0 0
18 10 15 7 50
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 3 6 7 21
0 1 0 1 2
0 0 0 0 0
5 4 6 8 23
2 1 1 2 6
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 1 1 2 6
25 15 22 17 79
Grand Total Apprch % Total %
1 1 0.6
100 99 59.2
0 0 0
0 0 0
101
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
54 93.1 32
4 6.9 2.4
0 0 0
58
9 90 5.3
0 0 0
1 10 0.6
0 0 0
10
169
59.8
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 0 0 08:00 AM 18 08:15 AM 0 10 0 08:30 AM 0 15 0 08:45 AM 0 7 0 Total Volume 0 50 0 % App. Total 0 100 0 PHF .000 .694 .000
0
18 10 15 7 50 .694
34.3
SR A1A Northbound
5.9
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
5 3 6 7 21 91.3 .750
0 1 0 1 2 8.7 .500
5 4 6 8 23
2 1 1 2 6 100 .750
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
2 1 1 2 6
25 15 22 17 79
.750
.790
.000
205
.719
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. AM : : 12/9/2015 :1
Groups Printed- Combined Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 1 1 1 3
56 94 161 207 518
1 0 1 0 2
0 0 0 0 0
57 95 163 208 523
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
75 116 162 209 562
6 10 8 12 36
0 0 0 0 0
81 126 170 221 598
1 5 7 5 18
0 0 0 0 0
3 2 4 3 12
0 0 0 0 0
4 7 11 8 30
142 228 344 437 1151
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
6 7 6 12 31
198 243 309 371 1121
1 0 3 1 5
0 0 0 0 0
205 250 318 384 1157
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
293 321 357 388 1359
8 13 11 16 48
0 0 0 1 1
301 334 368 405 1408
7 12 16 31 66
0 0 0 0 0
5 0 1 4 10
0 0 0 0 0
12 12 17 35 76
518 596 703 826 2643
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
12 22 21 16 71
438 417 401 412 1668
0 0 0 0 0
0 0 0 0 0
450 439 422 428 1739
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 2 2
0 0 0 0 0
372 400 411 371 1554
13 17 27 29 86
0 0 0 0 0
385 417 438 400 1640
39 42 39 27 147
0 0 0 0 0
7 3 5 3 18
0 0 0 0 0
46 45 44 30 165
881 901 904 860 3546
Grand Total Apprch % Total %
105 3.1 1.4
3307 96.7 45.1
7 0.2 0.1
0 0 0
3419
2 50 0
0 0 0
0 0 0
2 50 0
4
0 0 0
3475 95.3 47.3
170 4.7 2.3
1 0 0
3646
231 85.2 3.1
0 0 0
40 14.8 0.5
0 0 0
271
7340
46.6
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 0 12 08:00 AM 438 417 0 08:15 AM 22 08:30 AM 21 401 0 08:45 AM 16 412 0 Total Volume 71 1668 0 % App. Total 4.1 95.9 0 PHF .807 .952 .000
0.1
450 439 422 428 1739 .966
49.7
SR A1A Northbound
3.7
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
372 400 411 371 1554 94.8 .945
13 17 27 29 86 5.2 .741
385 417 438 400 1640
39 42 39 27 147 89.1 .875
0 0 0 0 0 0 .000
7 3 5 3 18 10.9 .643
46 45 44 30 165
881 901 904 858 3544
.897
.980
.000
206
.936
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. PM : : 12/9/2015 :1
Groups Printed- Car Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
18 19 17 18 72
388 400 422 402 1612
2 0 1 1 4
0 0 0 0 0
408 419 440 421 1688
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
330 394 358 342 1424
17 34 34 24 109
0 0 0 0 0
347 429 392 366 1534
42 48 44 41 175
0 0 0 0 0
6 3 2 4 15
0 0 0 0 0
48 51 46 45 190
803 899 878 832 3412
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
19 8 5 8 40
417 408 423 391 1639
0 2 0 1 3
0 0 0 0 0
436 418 428 400 1682
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
372 382 362 351 1467
20 22 44 29 115
0 0 0 0 0
392 405 406 381 1584
50 36 48 35 169
0 0 0 0 0
5 2 6 3 16
0 0 0 0 0
55 38 54 38 185
883 861 888 819 3451
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
13 13 11 18 55
403 386 346 322 1457
2 0 1 2 5
0 0 0 0 0
418 399 358 342 1517
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
407 361 237 206 1211
23 31 15 17 86
0 0 0 0 0
430 392 252 223 1297
32 13 45 32 122
0 0 0 0 0
3 1 4 2 10
0 0 0 0 0
35 14 49 34 132
883 805 659 599 2946
Grand Total Apprch % Total %
167 3.4 1.7
4708 96.3 48
12 0.2 0.1
0 0 0
4887
0 0 0
0 0 0
0 0 0
0 0 0
0
3 0.1 0
4102 92.9 41.8
310 7 3.2
0 0 0
4415
466 91.9 4.8
0 0 0
41 8.1 0.4
0 0 0
507
9809
49.8
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:15 PM 400 0 04:15 PM 19 04:30 PM 17 422 1 04:45 PM 18 402 1 05:00 PM 19 417 0 Total Volume 73 1641 2 % App. Total 4.3 95.6 0.1 PHF .961 .972 .500
0
419 440 421 436 1716 .975
45
SR A1A Northbound
5.2
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
1 0 0 0 1 0.1 .250
394 358 342 372 1466 92.8 .930
34 34 24 20 112 7.1 .824
429 392 366 392 1579
48 44 41 50 183 92.9 .915
0 0 0 0 0 0 .000
3 2 4 5 14 7.1 .700
51 46 45 55 197
899 878 832 883 3492
.895
.971
.000
207
.920
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. PM : : 12/9/2015 :1
Groups Printed- Truck Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
4 3 1 2 10
0 0 0 0 0
0 0 0 0 0
4 3 1 2 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7 8 4 5 24
0 0 0 0 0
0 0 0 0 0
7 8 4 5 24
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
11 12 5 7 35
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 2 0 0 2
1 0 2 3 6
0 0 0 0 0
0 0 0 0 0
1 2 2 3 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
6 3 3 4 16
0 1 0 0 1
0 0 0 0 0
6 4 3 4 17
1 1 0 0 2
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
2 1 0 0 3
9 7 5 7 28
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 1 0 1 2
1 1 1 0 3
0 0 0 0 0
0 0 0 0 0
1 2 1 1 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 2 0 7
0 0 0 0 0
0 0 0 0 0
2 3 2 0 7
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 5 3 1 12
Grand Total Apprch % Total %
4 17.4 5.3
19 82.6 25.3
0 0 0
0 0 0
23
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
47 97.9 62.7
1 2.1 1.3
0 0 0
48
3 75 4
0 0 0
1 25 1.3
0 0 0
4
75
30.7
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 0 0 04:00 PM 4 0 3 0 04:15 PM 04:30 PM 0 1 0 04:45 PM 0 2 0 Total Volume 0 10 0 % App. Total 0 100 0 PHF .000 .625 .000
0
4 3 1 2 10 .625
64
SR A1A Northbound
5.3
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
7 8 4 5 24 100 .750
0 0 0 0 0 0 .000
7 8 4 5 24
0 1 0 0 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 1 0 0 1
11 12 5 7 35
.250
.729
.000
208
.750
Peggy Malone & Associates, Inc. (904) 992-8072
File Name Site Code Start Date Page No
: T8-SR A1A and Libray Blvd. PM : : 12/9/2015 :1
Groups Printed- Combined Library Blvd. SR A1A Westbound Northbound
SR A1A Southbound
Private Driveway Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
18 19 17 18 72
392 403 423 404 1622
2 0 1 1 4
0 0 0 0 0
412 422 441 423 1698
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
337 402 362 347 1448
17 34 34 24 109
0 0 0 0 0
354 437 396 371 1558
42 49 44 41 176
0 0 0 0 0
6 3 2 4 15
0 0 0 0 0
48 52 46 45 191
814 911 883 839 3447
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
19 10 5 8 42
418 408 425 394 1645
0 2 0 1 3
0 0 0 0 0
437 420 430 403 1690
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
378 385 365 355 1483
20 23 44 29 116
0 0 0 0 0
398 409 409 385 1601
51 37 48 35 171
0 0 0 0 0
6 2 6 3 17
0 0 0 0 0
57 39 54 38 188
892 868 893 826 3479
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
13 14 11 19 57
404 387 347 322 1460
2 0 1 2 5
0 0 0 0 0
419 401 359 343 1522
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
409 364 239 206 1218
23 31 15 17 86
0 0 0 0 0
432 395 254 223 1304
32 13 45 32 122
0 0 0 0 0
3 1 4 2 10
0 0 0 0 0
35 14 49 34 132
886 810 662 600 2958
Grand Total Apprch % Total %
171 3.5 1.7
4727 96.3 47.8
12 0.2 0.1
0 0 0
4910
0 0 0
0 0 0
0 0 0
0 0 0
0
3 0.1 0
4149 93 42
311 7 3.1
0 0 0
4463
469 91.8 4.7
0 0 0
42 8.2 0.4
0 0 0
511
9884
49.7
SR A1A Southbound
Library Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:15 PM 403 0 04:15 PM 19 04:30 PM 17 423 1 04:45 PM 18 404 1 05:00 PM 19 418 0 Total Volume 73 1648 2 % App. Total 4.2 95.6 0.1 PHF .961 .974 .500
0
422 441 423 437 1723 .977
45.2
SR A1A Northbound
5.2
Private Driveway Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
1 0 0 0 1 0.1 .250
402 362 347 378 1489 92.9 .926
34 34 24 20 112 7 .824
437 396 371 398 1602
49 44 41 51 185 92.5 .907
0 0 0 0 0 0 .000
3 2 4 6 15 7.5 .625
52 46 45 57 200
911 883 839 892 3525
.877
.967
.000
209
.916
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. AM : : 12/8/2015 :1
Groups Printed- Car Corona Rd. Westbound
SR A1A Southbound
SR A1A Northbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 1 2
51 78 144 194 467
1 6 6 27 40
0 0 0 0 0
52 84 151 222 509
3 6 14 17 40
0 0 0 0 0
3 4 9 10 26
0 0 0 0 0
6 10 23 27 66
4 11 9 9 33
72 107 159 190 528
1 0 1 1 3
0 0 0 0 0
77 118 169 200 564
0 0 1 1 2
0 0 0 0 0
2 4 3 5 14
0 0 0 1 1
2 4 4 7 17
137 216 347 456 1156
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 0 0 4 5
149 258 315 382 1104
14 17 17 16 64
1 0 1 0 2
165 275 333 402 1175
25 33 25 35 118
0 0 0 0 0
21 13 20 22 76
0 0 0 0 0
46 46 45 57 194
11 19 21 27 78
276 288 373 366 1303
2 0 2 2 6
0 5 0 0 5
289 312 396 395 1392
1 3 0 2 6
1 0 0 1 2
4 7 1 2 14
0 0 1 0 1
6 10 2 5 23
506 643 776 859 2784
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 1 1 2 5
353 357 283 306 1299
23 19 16 31 89
0 0 0 0 0
377 377 300 339 1393
31 45 29 27 132
1 0 1 1 3
64 42 31 41 178
2 0 0 0 2
98 87 61 69 315
36 42 46 50 174
402 422 432 338 1594
2 0 5 4 11
0 0 0 1 1
440 464 483 393 1780
6 6 0 1 13
2 1 1 0 4
0 4 7 3 14
0 1 1 1 3
8 12 9 5 34
923 940 853 806 3522
Grand Total Apprch % Total %
12 0.4 0.2
2870 93.3 38.5
193 6.3 2.6
2 0.1 0
3077
290 50.4 3.9
3 0.5 0
280 48.7 3.8
2 0.3 0
575
285 7.6 3.8
3425 91.7 45.9
20 0.5 0.3
6 0.2 0.1
3736
21 28.4 0.3
6 8.1 0.1
42 56.8 0.6
5 6.8 0.1
74
7462
41.2
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 16 07:45 AM 4 382 08:00 AM 1 353 23 1 357 19 08:15 AM 08:30 AM 1 283 16 Total Volume 7 1375 74 % App. Total 0.5 94.4 5.1 PHF .438 .900 .804
7.7
402 377 377 300 1456 .905
50.1
SR A1A Northbound
1
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
35 31 45 29 140 46.5 .778
0 1 0 1 2 0.7 .500
22 64 42 31 159 52.8 .621
57 96 87 61 301
27 36 42 46 151 8.5 .821
366 402 422 432 1622 91 .939
2 2 0 5 9 0.5 .450
395 440 464 483 1782
2 6 6 0 14 43.8 .583
1 2 1 1 5 15.6 .625
2 0 4 7 13 40.6 .464
5 8 11 8 32
859 921 939 852 3571
.727
.951
.784
210
.922
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. AM : : 12/8/2015 :1
Groups Printed- Truck Corona Rd. SR A1A Westbound Northbound
SR A1A Southbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
5 3 7 4 19
0 0 0 0 0
0 0 0 0 0
5 3 7 4 19
0 0 2 0 2
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 2 1 3
0 0 0 0 0
2 3 7 4 16
0 0 0 0 0
0 0 0 0 0
2 3 7 4 16
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7 6 16 9 38
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 0 0 0
11 7 13 7 38
0 0 0 3 3
0 0 0 0 0
11 7 13 10 41
0 0 0 1 1
0 0 0 0 0
2 1 0 0 3
0 0 0 0 0
2 1 0 1 4
2 0 0 2 4
4 2 10 5 21
0 0 0 0 0
0 0 0 0 0
6 2 10 7 25
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
19 10 23 18 70
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
10 10 6 7 33
0 0 0 0 0
0 0 0 0 0
10 10 6 7 33
1 2 0 1 4
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
1 3 0 1 5
2 1 2 0 5
4 7 7 13 31
0 1 0 0 1
0 0 0 0 0
6 9 9 13 37
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
17 22 15 21 75
Grand Total Apprch % Total %
0 0 0
90 96.8 49.2
3 3.2 1.6
0 0 0
93
7 58.3 3.8
0 0 0
5 41.7 2.7
0 0 0
12
9 11.5 4.9
68 87.2 37.2
1 1.3 0.5
0 0 0
78
0 0 0
0 0 0
0 0 0
0 0 0
0
183
50.8
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 0 07:30 AM 0 13 07:45 AM 0 7 3 0 10 0 08:00 AM 08:15 AM 0 10 0 Total Volume 0 40 3 % App. Total 0 93 7 PHF .000 .769 .250
6.6
13 10 10 10 43 .827
42.6
SR A1A Northbound
0
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 1 1 2 4 80 .500
0 0 0 0 0 0 .000
0 0 0 1 1 20 .250
0 1 1 3 5
0 2 2 1 5 15.6 .625
10 5 4 7 26 81.2 .650
0 0 0 1 1 3.1 .250
10 7 6 9 32
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
23 18 17 22 80
.000
.870
.417
211
.800
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. AM : : 12/8/2015 :1
Groups Printed- Combined Corona Rd. SR A1A Westbound Northbound
SR A1A Southbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 1 2
56 81 151 198 486
1 6 6 27 40
0 0 0 0 0
57 87 158 226 528
3 6 16 17 42
0 0 0 0 0
3 4 9 11 27
0 0 0 0 0
6 10 25 28 69
4 11 9 9 33
74 110 166 194 544
1 0 1 1 3
0 0 0 0 0
79 121 176 204 580
0 0 1 1 2
0 0 0 0 0
2 4 3 5 14
0 0 0 1 1
2 4 4 7 17
144 222 363 465 1194
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 0 0 4 5
160 265 328 389 1142
14 17 17 19 67
1 0 1 0 2
176 282 346 412 1216
25 33 25 36 119
0 0 0 0 0
23 14 20 22 79
0 0 0 0 0
48 47 45 58 198
13 19 21 29 82
280 290 383 371 1324
2 0 2 2 6
0 5 0 0 5
295 314 406 402 1417
1 3 0 2 6
1 0 0 1 2
4 7 1 2 14
0 0 1 0 1
6 10 2 5 23
525 653 799 877 2854
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 1 1 2 5
363 367 289 313 1332
23 19 16 31 89
0 0 0 0 0
387 387 306 346 1426
32 47 29 28 136
1 0 1 1 3
64 43 31 41 179
2 0 0 0 2
99 90 61 70 320
38 43 48 50 179
406 429 439 351 1625
2 1 5 4 12
0 0 0 1 1
446 473 492 406 1817
6 6 0 1 13
2 1 1 0 4
0 4 7 3 14
0 1 1 1 3
8 12 9 5 34
940 962 868 827 3597
Grand Total Apprch % Total %
12 0.4 0.2
2960 93.4 38.7
196 6.2 2.6
2 0.1 0
3170
297 50.6 3.9
3 0.5 0
285 48.6 3.7
2 0.3 0
587
294 7.7 3.8
3493 91.6 45.7
21 0.6 0.3
6 0.2 0.1
3814
21 28.4 0.3
6 8.1 0.1
42 56.8 0.5
5 6.8 0.1
74
7645
41.5
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 19 07:45 AM 4 389 08:00 AM 1 363 23 1 367 19 08:15 AM 08:30 AM 1 289 16 Total Volume 7 1408 77 % App. Total 0.5 94.4 5.2 PHF .438 .905 .837
7.7
412 387 387 306 1492 .905
49.9
SR A1A Northbound
1
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
36 32 47 29 144 47.1 .766
0 1 0 1 2 0.7 .500
22 64 43 31 160 52.3 .625
58 97 90 61 306
29 38 43 48 158 8.7 .823
371 406 429 439 1645 90.7 .937
2 2 1 5 10 0.6 .500
402 446 473 492 1813
2 6 6 0 14 43.8 .583
1 2 1 1 5 15.6 .625
2 0 4 7 13 40.6 .464
5 8 11 8 32
877 938 961 867 3643
.727
.948
.789
212
.921
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. PM : : 12/8/2015 :1
Groups Printed- Car Corona Rd. Westbound
SR A1A Southbound
SR A1A Northbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
3 5 1 4 13
383 381 373 434 1571
35 28 59 32 154
0 0 0 0 0
421 414 433 470 1738
17 11 16 35 79
3 2 4 0 9
31 34 32 39 136
0 0 0 0 0
51 47 52 74 224
39 20 32 36 127
328 341 359 344 1372
3 6 5 8 22
0 0 1 0 1
370 367 397 388 1522
1 1 4 1 7
2 2 0 0 4
4 3 16 12 35
0 1 1 2 4
7 7 21 15 50
849 835 903 947 3534
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 4 4 5 13
446 428 412 401 1687
31 28 30 19 108
0 0 0 0 0
477 460 446 425 1808
26 23 20 28 97
2 1 1 0 4
33 37 37 38 145
0 0 0 0 0
61 61 58 66 246
41 43 34 29 147
444 433 399 392 1668
2 4 3 5 14
0 0 0 0 0
487 480 436 426 1829
1 4 3 2 10
0 0 0 0 0
1 4 3 3 11
1 0 0 0 1
3 8 6 5 22
1028 1009 946 922 3905
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
4 8 6 2 20
375 356 370 318 1419
34 30 38 25 127
0 0 0 0 0
413 394 414 345 1566
23 36 19 17 95
0 0 0 1 1
31 27 16 17 91
0 0 0 0 0
54 63 35 35 187
26 25 17 21 89
338 272 240 220 1070
4 4 6 1 15
0 0 0 0 0
368 301 263 242 1174
1 2 3 3 9
0 0 0 0 0
4 5 0 2 11
0 0 0 0 0
5 7 3 5 20
840 765 715 627 2947
Grand Total Apprch % Total %
46 0.9 0.4
4677 91.5 45
389 7.6 3.7
0 0 0
5112
271 41.2 2.6
14 2.1 0.1
372 56.6 3.6
0 0 0
657
363 8 3.5
4110 90.8 39.6
51 1.1 0.5
1 0 0
4525
26 28.3 0.3
4 4.3 0
57 62 0.5
5 5.4 0
92
10386
49.2
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 434 04:45 PM 4 32 05:00 PM 0 31 446 4 428 28 05:15 PM 05:30 PM 4 412 30 Total Volume 12 1720 121 % App. Total 0.6 92.8 6.5 PHF .750 .964 .945
6.3
470 477 460 446 1853 .971
43.6
SR A1A Northbound
0.9
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
35 26 23 20 104 40.9 .743
0 2 1 1 4 1.6 .500
39 33 37 37 146 57.5 .936
74 61 61 58 254
36 41 43 34 154 8.6 .895
344 444 433 399 1620 90.5 .912
8 2 4 3 17 0.9 .531
388 487 480 436 1791
1 1 4 3 9 31 .563
0 0 0 0 0 0 .000
12 1 4 3 20 69 .417
13 2 8 6 29
945 1027 1009 946 3927
.558
.956
.858
213
.919
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. PM : : 12/8/2015 :1
Groups Printed- Truck Corona Rd. SR A1A Westbound Northbound
SR A1A Southbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 1 0 0 1
3 7 5 1 16
0 0 0 0 0
0 0 0 0 0
3 8 5 1 17
1 1 0 1 3
0 0 0 0 0
0 2 2 0 4
0 0 0 0 0
1 3 2 1 7
1 0 0 3 4
7 14 7 1 29
0 0 0 0 0
0 0 0 0 0
8 14 7 4 33
0 0 1 0 1
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 2 0 2
12 25 16 6 59
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
2 2 2 1 7
0 0 0 0 0
0 0 0 0 0
2 2 2 1 7
3 0 0 0 3
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
3 0 0 1 4
1 0 0 1 2
3 3 2 4 12
0 0 0 0 0
0 0 0 0 0
4 3 2 5 14
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
9 5 4 7 25
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 0 3 0 4
0 0 0 0 0
0 0 0 0 0
1 0 3 0 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 0 2 0 6
0 0 0 0 0
0 0 0 0 0
4 0 2 0 6
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 0 5 0 10
Grand Total Apprch % Total %
1 3.6 1.1
27 96.4 28.7
0 0 0
0 0 0
28
6 54.5 6.4
0 0 0
5 45.5 5.3
0 0 0
11
6 11.3 6.4
47 88.7 50
0 0 0
0 0 0
53
1 50 1.1
0 0 0
1 50 1.1
0 0 0
2
94
29.8
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 3 0 04:15 PM 0 1 7 0 5 0 04:30 PM 04:45 PM 0 1 0 Total Volume 1 16 0 % App. Total 5.9 94.1 0 PHF .250 .571 .000
11.7
3 8 5 1 17 .531
56.4
SR A1A Northbound
2.1
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 1 0 1 3 42.9 .750
0 0 0 0 0 0 .000
0 2 2 0 4 57.1 .500
1 3 2 1 7
1 0 0 3 4 12.1 .333
7 14 7 1 29 87.9 .518
0 0 0 0 0 0 .000
8 14 7 4 33
0 0 1 0 1 50 .250
0 0 0 0 0 0 .000
0 0 1 0 1 50 .250
0 0 2 0 2
12 25 16 6 59
.250
.590
.583
214
.589
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T9 SR A1A and Summerfield Dr Corona Rd. PM : : 12/8/2015 :1
Groups Printed- Combined Corona Rd. SR A1A Westbound Northbound
SR A1A Southbound
Summerfield Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
3 6 1 4 14
386 388 378 435 1587
35 28 59 32 154
0 0 0 0 0
424 422 438 471 1755
18 12 16 36 82
3 2 4 0 9
31 36 34 39 140
0 0 0 0 0
52 50 54 75 231
40 20 32 39 131
335 355 366 345 1401
3 6 5 8 22
0 0 1 0 1
378 381 404 392 1555
1 1 5 1 8
2 2 0 0 4
4 3 17 12 36
0 1 1 2 4
7 7 23 15 52
861 860 919 953 3593
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 4 4 5 13
448 430 414 402 1694
31 28 30 19 108
0 0 0 0 0
479 462 448 426 1815
29 23 20 28 100
2 1 1 0 4
33 37 37 39 146
0 0 0 0 0
64 61 58 67 250
42 43 34 30 149
447 436 401 396 1680
2 4 3 5 14
0 0 0 0 0
491 483 438 431 1843
1 4 3 2 10
0 0 0 0 0
1 4 3 3 11
1 0 0 0 1
3 8 6 5 22
1037 1014 950 929 3930
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
4 8 6 2 20
376 356 373 318 1423
34 30 38 25 127
0 0 0 0 0
414 394 417 345 1570
23 36 19 17 95
0 0 0 1 1
31 27 16 17 91
0 0 0 0 0
54 63 35 35 187
26 25 17 21 89
342 272 242 220 1076
4 4 6 1 15
0 0 0 0 0
372 301 265 242 1180
1 2 3 3 9
0 0 0 0 0
4 5 0 2 11
0 0 0 0 0
5 7 3 5 20
845 765 720 627 2957
Grand Total Apprch % Total %
47 0.9 0.4
4704 91.5 44.9
389 7.6 3.7
0 0 0
5140
277 41.5 2.6
14 2.1 0.1
377 56.4 3.6
0 0 0
668
369 8.1 3.5
4157 90.8 39.7
51 1.1 0.5
1 0 0
4578
27 28.7 0.3
4 4.3 0
58 61.7 0.6
5 5.3 0
94
10480
49
SR A1A Southbound
Corona Rd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 435 04:45 PM 4 32 05:00 PM 0 31 448 4 430 28 05:15 PM 05:30 PM 4 414 30 Total Volume 12 1727 121 % App. Total 0.6 92.8 6.5 PHF .750 .964 .945
6.4
471 479 462 448 1860 .971
43.7
SR A1A Northbound
0.9
Summerfield Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
36 29 23 20 108 41.9 .750
0 2 1 1 4 1.6 .500
39 33 37 37 146 56.6 .936
75 64 61 58 258
39 42 43 34 158 8.8 .919
345 447 436 401 1629 90.3 .911
8 2 4 3 17 0.9 .531
392 491 483 438 1804
1 1 4 3 9 31 .563
0 0 0 0 0 0 .000
12 1 4 3 20 69 .417
13 2 8 6 29
951 1036 1014 950 3951
.558
.953
.860
215
.919
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place AM : : 12/8/2015 :1
Groups Printed- Car Ocean Place Westbound
SR A1A Southbound
SR A1A Northbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 1 1 3 6
50 82 150 196 478
2 0 0 0 2
0 0 0 0 0
53 83 151 199 486
2 4 4 5 15
0 0 0 0 0
3 4 1 6 14
0 0 3 0 3
5 8 8 11 32
0 1 0 2 3
63 105 162 189 519
0 0 1 4 5
0 0 0 0 0
63 106 163 195 527
4 2 8 5 19
0 0 0 0 0
7 14 13 17 51
0 1 0 1 2
11 17 21 23 72
132 214 343 428 1117
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 11 4 8 26
157 223 314 378 1072
1 2 0 7 10
0 0 0 2 2
161 236 318 395 1110
9 9 11 15 44
0 1 0 0 1
5 6 7 11 29
2 1 0 0 3
16 17 18 26 77
1 2 0 6 9
279 306 369 367 1321
3 3 5 4 15
0 0 0 0 0
283 311 374 377 1345
5 14 15 12 46
1 0 0 0 1
13 17 19 19 68
0 0 0 1 1
19 31 34 32 116
479 595 744 830 2648
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
3 11 2 1 17
335 376 331 302 1344
21 64 12 3 100
1 2 0 0 3
360 453 345 306 1464
19 15 18 11 63
0 0 0 1 1
5 4 9 5 23
4 1 0 3 8
28 20 27 20 95
5 1 2 4 12
439 403 466 322 1630
1 5 5 7 18
0 0 0 0 0
445 409 473 333 1660
16 15 17 10 58
0 0 0 0 0
22 27 15 12 76
0 0 0 0 0
38 42 32 22 134
871 924 877 681 3353
Grand Total Apprch % Total %
49 1.6 0.7
2894 94.6 40.7
112 3.7 1.6
5 0.2 0.1
3060
122 59.8 1.7
2 1 0
66 32.4 0.9
14 6.9 0.2
204
24 0.7 0.3
3470 98.2 48.7
38 1.1 0.5
0 0 0
3532
123 38.2 1.7
1 0.3 0
195 60.6 2.7
3 0.9 0
322
7118
43
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 7 07:45 AM 8 378 08:00 AM 3 335 21 08:15 AM 376 11 64 08:30 AM 2 331 12 Total Volume 24 1420 104 % App. Total 1.6 91.7 6.7 PHF .545 .939 .406
2.9
393 359 451 345 1548 .858
49.6
SR A1A Northbound
4.5
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
15 19 15 18 67 69.8 .882
0 0 0 0 0 0 .000
11 5 4 9 29 30.2 .659
26 24 19 27 96
6 5 1 2 14 0.8 .583
367 439 403 466 1675 98.3 .899
4 1 5 5 15 0.9 .750
377 445 409 473 1704
12 16 15 17 60 42 .882
0 0 0 0 0 0 .000
19 22 27 15 83 58 .769
31 38 42 32 143
827 866 921 877 3491
.851
.948
.889
216
.901
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place AM : : 12/8/2015 :1
Groups Printed- Truck Ocean Place SR A1A Westbound Northbound
SR A1A Southbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 0 1
5 2 6 4 17
0 0 0 0 0
0 0 0 0 0
5 2 7 4 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 5 3 13
1 0 0 0 1
0 0 0 0 0
3 3 5 3 14
0 1 0 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
8 6 12 8 34
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 0 0 0
13 9 12 4 38
0 0 0 0 0
0 0 0 0 0
13 9 12 4 38
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7 1 13 7 28
0 0 0 0 0
0 0 0 0 0
7 1 13 7 28
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
20 10 25 11 66
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 1 0 1
10 10 6 8 34
0 0 0 0 0
0 0 0 0 0
10 10 7 8 35
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
8 6 9 11 34
0 0 0 0 0
0 0 0 0 0
8 6 9 11 34
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
18 16 16 19 69
Grand Total Apprch % Total %
2 2.2 1.2
89 97.8 52.7
0 0 0
0 0 0
91
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
75 98.7 44.4
1 1.3 0.6
0 0 0
76
2 100 1.2
0 0 0
0 0 0
0 0 0
2
169
53.8
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 0 07:30 AM 0 12 07:45 AM 0 4 0 0 10 0 08:00 AM 08:15 AM 0 10 0 Total Volume 0 36 0 % App. Total 0 100 0 PHF .000 .750 .000
0
12 4 10 10 36 .750
45
SR A1A Northbound
1.2
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
13 7 8 6 34 100 .654
0 0 0 0 0 0 .000
13 7 8 6 34
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
25 11 18 16 70
.000
.700
.000
217
.654
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place AM : : 12/8/2015 :1
Groups Printed- Combined Ocean Place SR A1A Westbound Northbound
SR A1A Southbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 1 2 3 7
55 84 156 200 495
2 0 0 0 2
0 0 0 0 0
58 85 158 203 504
2 4 4 5 15
0 0 0 0 0
3 4 1 6 14
0 0 3 0 3
5 8 8 11 32
0 1 0 2 3
65 108 167 192 532
1 0 1 4 6
0 0 0 0 0
66 109 168 198 541
4 3 8 6 21
0 0 0 0 0
7 14 13 17 51
0 1 0 1 2
11 18 21 24 74
140 220 355 436 1151
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 11 4 8 26
170 232 326 382 1110
1 2 0 7 10
0 0 0 2 2
174 245 330 399 1148
9 9 11 15 44
0 1 0 0 1
5 6 7 11 29
2 1 0 0 3
16 17 18 26 77
1 2 0 6 9
286 307 382 374 1349
3 3 5 4 15
0 0 0 0 0
290 312 387 384 1373
5 14 15 12 46
1 0 0 0 1
13 17 19 19 68
0 0 0 1 1
19 31 34 32 116
499 605 769 841 2714
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
3 11 3 1 18
345 386 337 310 1378
21 64 12 3 100
1 2 0 0 3
370 463 352 314 1499
19 15 18 11 63
0 0 0 1 1
5 4 9 5 23
4 1 0 3 8
28 20 27 20 95
5 1 2 4 12
447 409 475 333 1664
1 5 5 7 18
0 0 0 0 0
453 415 482 344 1694
16 15 17 10 58
0 0 0 0 0
22 27 15 12 76
0 0 0 0 0
38 42 32 22 134
889 940 893 700 3422
Grand Total Apprch % Total %
51 1.6 0.7
2983 94.7 40.9
112 3.6 1.5
5 0.2 0.1
3151
122 59.8 1.7
2 1 0
66 32.4 0.9
14 6.9 0.2
204
24 0.7 0.3
3545 98.3 48.6
39 1.1 0.5
0 0 0
3608
125 38.6 1.7
1 0.3 0
195 60.2 2.7
3 0.9 0
324
7287
43.2
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 8 382 7 08:00 AM 3 345 21 08:15 AM 11 386 64 08:30 AM 3 337 12 Total Volume 25 1450 104 % App. Total 1.6 91.8 6.6 PHF .568 .939 .406
2.8
397 369 461 352 1579 .856
49.5
SR A1A Northbound
4.4
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
15 19 15 18 67 69.8 .882
0 0 0 0 0 0 .000
11 5 4 9 29 30.2 .659
26 24 19 27 96
6 5 1 2 14 0.8 .583
374 447 409 475 1705 98.3 .897
4 1 5 5 15 0.9 .750
384 453 415 482 1734
12 16 15 17 60 42 .882
0 0 0 0 0 0 .000
19 22 27 15 83 58 .769
31 38 42 32 143
838 884 937 893 3552
.851
.948
.889
218
.899
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place PM : : 12/8/2015 :1
Groups Printed- Car Ocean Place Westbound
SR A1A Southbound
SR A1A Northbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
15 19 13 9 56
393 388 400 448 1629
12 9 4 9 34
0 1 0 0 1
420 417 417 466 1720
5 6 12 5 28
0 0 1 1 2
6 6 4 0 16
1 1 0 1 3
12 13 17 7 49
10 6 5 7 28
379 367 356 362 1464
14 7 20 14 55
1 0 0 0 1
404 380 381 383 1548
8 6 12 9 35
0 0 0 0 0
13 13 9 15 50
0 0 2 1 3
21 19 23 25 88
857 829 838 881 3405
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
17 15 12 18 62
444 448 417 395 1704
11 14 16 15 56
0 0 1 0 1
472 477 446 428 1823
8 2 3 6 19
0 0 0 0 0
4 5 4 5 18
0 1 0 0 1
12 8 7 11 38
5 6 12 3 26
456 456 421 386 1719
15 17 19 13 64
0 0 0 0 0
476 479 452 402 1809
5 4 5 10 24
0 0 0 0 0
5 9 7 11 32
0 0 1 1 2
10 13 13 22 58
970 977 918 863 3728
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
24 27 25 21 97
400 356 375 308 1439
5 13 8 3 29
0 0 0 0 0
429 396 408 332 1565
5 7 5 5 22
0 0 0 0 0
5 6 4 2 17
0 0 0 0 0
10 13 9 7 39
5 8 7 5 25
340 303 244 247 1134
13 16 11 10 50
0 0 0 0 0
358 327 262 262 1209
14 5 8 10 37
1 0 0 0 1
7 10 13 4 34
0 0 0 2 2
22 15 21 16 74
819 751 700 617 2887
Grand Total Apprch % Total %
215 4.2 2.1
4772 93.4 47.6
119 2.3 1.2
2 0 0
5108
69 54.8 0.7
2 1.6 0
51 40.5 0.5
4 3.2 0
126
79 1.7 0.8
4317 94.5 43.1
169 3.7 1.7
1 0 0
4566
96 43.6 1
1 0.5 0
116 52.7 1.2
7 3.2 0.1
220
10020
51
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 9 04:45 PM 9 448 05:00 PM 444 11 17 15 448 14 05:15 PM 05:30 PM 12 417 16 Total Volume 53 1757 50 % App. Total 2.8 94.5 2.7 PHF .779 .980 .781
1.3
466 472 477 445 1860 .975
45.6
SR A1A Northbound
2.2
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
5 8 2 3 18 56.2 .563
1 0 0 0 1 3.1 .250
0 4 5 4 13 40.6 .650
6 12 7 7 32
7 5 6 12 30 1.7 .625
362 456 456 421 1695 94.7 .929
14 15 17 19 65 3.6 .855
383 476 479 452 1790
9 5 4 5 23 39 .639
0 0 0 0 0 0 .000
15 5 9 7 36 61 .600
24 10 13 12 59
879 970 976 916 3741
.615
.958
.667
219
.934
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place PM : : 12/8/2015 :1
Groups Printed- Truck Ocean Place SR A1A Westbound Northbound
SR A1A Southbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 1 0 1
4 10 6 2 22
0 0 0 0 0
0 0 0 0 0
4 10 7 2 23
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 0 1
0 1 0 0 1
8 13 5 2 28
0 1 0 0 1
0 0 0 0 0
8 15 5 2 30
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
12 26 13 4 55
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
2 2 4 2 10
0 0 0 0 0
0 0 0 0 0
2 2 4 2 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 3 3 4 13
0 0 0 0 0
0 0 0 0 0
3 3 3 4 13
0 0 1 0 1
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 1 1 2
5 5 8 7 25
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 0 3 0 4
0 0 0 0 0
0 0 0 0 0
1 0 3 0 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 0 0 1 3
0 0 0 0 0
0 0 0 0 0
2 0 0 1 3
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 0 3 1 7
Grand Total Apprch % Total %
1 2.7 1.1
36 97.3 41.4
0 0 0
0 0 0
37
0 0 0
0 0 0
1 100 1.1
0 0 0
1
1 2.2 1.1
44 95.7 50.6
1 2.2 1.1
0 0 0
46
2 66.7 2.3
0 0 0
1 33.3 1.1
0 0 0
3
87
42.5
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 4 0 0 04:15 PM 0 10 04:30 PM 6 0 1 04:45 PM 0 2 0 Total Volume 1 22 0 % App. Total 4.3 95.7 0 PHF .250 .550 .000
1.1
4 10 7 2 23 .575
52.9
SR A1A Northbound
3.4
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 1 0 1 100 .250
0 0 1 0 1
0 1 0 0 1 3.3 .250
8 13 5 2 28 93.3 .538
0 1 0 0 1 3.3 .250
8 15 5 2 30
0 1 0 0 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 1 0 0 1
12 26 13 4 55
.250
.529
.250
220
.500
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T12 SR A1A and Thousand Oaks Dr_Ocean Place PM : : 12/8/2015 :1
Groups Printed- Combined Ocean Place SR A1A Westbound Northbound
SR A1A Southbound
Thousand Oaks Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
15 19 14 9 57
397 398 406 450 1651
12 9 4 9 34
0 1 0 0 1
424 427 424 468 1743
5 6 12 5 28
0 0 1 1 2
6 6 5 0 17
1 1 0 1 3
12 13 18 7 50
10 7 5 7 29
387 380 361 364 1492
14 8 20 14 56
1 0 0 0 1
412 395 386 385 1578
8 7 12 9 36
0 0 0 0 0
13 13 9 15 50
0 0 2 1 3
21 20 23 25 89
869 855 851 885 3460
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
17 15 12 18 62
446 450 421 397 1714
11 14 16 15 56
0 0 1 0 1
474 479 450 430 1833
8 2 3 6 19
0 0 0 0 0
4 5 4 5 18
0 1 0 0 1
12 8 7 11 38
5 6 12 3 26
459 459 424 390 1732
15 17 19 13 64
0 0 0 0 0
479 482 455 406 1822
5 4 6 10 25
0 0 0 0 0
5 9 7 12 33
0 0 1 1 2
10 13 14 23 60
975 982 926 870 3753
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
24 27 25 21 97
401 356 378 308 1443
5 13 8 3 29
0 0 0 0 0
430 396 411 332 1569
5 7 5 5 22
0 0 0 0 0
5 6 4 2 17
0 0 0 0 0
10 13 9 7 39
5 8 7 5 25
342 303 244 248 1137
13 16 11 10 50
0 0 0 0 0
360 327 262 263 1212
14 5 8 10 37
1 0 0 0 1
7 10 13 4 34
0 0 0 2 2
22 15 21 16 74
822 751 703 618 2894
Grand Total Apprch % Total %
216 4.2 2.1
4808 93.4 47.6
119 2.3 1.2
2 0 0
5145
69 54.3 0.7
2 1.6 0
52 40.9 0.5
4 3.1 0
127
80 1.7 0.8
4361 94.6 43.1
170 3.7 1.7
1 0 0
4612
98 43.9 1
1 0.4 0
117 52.5 1.2
7 3.1 0.1
223
10107
50.9
SR A1A Southbound
Ocean Place Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 9 04:45 PM 9 450 05:00 PM 446 11 17 15 450 14 05:15 PM 05:30 PM 12 421 16 Total Volume 53 1767 50 % App. Total 2.8 94.5 2.7 PHF .779 .982 .781
1.3
468 474 479 449 1870 .976
45.6
SR A1A Northbound
2.2
Thousand Oaks Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
5 8 2 3 18 56.2 .563
1 0 0 0 1 3.1 .250
0 4 5 4 13 40.6 .650
6 12 7 7 32
7 5 6 12 30 1.7 .625
364 459 459 424 1706 94.7 .929
14 15 17 19 65 3.6 .855
385 479 482 455 1801
9 5 4 6 24 40 .667
0 0 0 0 0 0 .000
15 5 9 7 36 60 .600
24 10 13 13 60
883 975 981 924 3763
.625
.959
.667
221
.934
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle AM : : 12/8/2015 :1
Groups Printed- Car L'Atrium Circle Westbound
SR A1A Southbound
SR A1A Northbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
9 14 29 49 101
53 71 111 157 392
2 1 1 2 6
0 0 0 0 0
64 86 141 208 499
5 11 6 7 29
0 0 1 0 1
0 3 1 7 11
1 0 2 0 3
6 14 10 14 44
0 1 2 0 3
60 97 130 177 464
2 3 1 3 9
0 0 0 0 0
62 101 133 180 476
2 0 4 1 7
0 0 0 0 0
1 4 7 9 21
0 0 0 0 0
3 4 11 10 28
135 205 295 412 1047
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
34 31 62 67 194
139 186 277 348 950
5 1 0 7 13
0 0 0 0 0
178 218 339 422 1157
18 11 11 17 57
1 0 1 1 3
5 9 4 11 29
2 0 1 0 3
26 20 17 29 92
1 2 2 4 9
241 284 341 337 1203
8 10 10 15 43
0 0 0 0 0
250 296 353 356 1255
4 7 4 5 20
0 0 0 1 1
19 12 26 21 78
0 0 0 1 1
23 19 30 28 100
477 553 739 835 2604
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
52 60 55 61 228
274 318 301 255 1148
10 8 7 6 31
0 0 0 0 0
336 386 363 322 1407
39 29 15 18 101
4 0 0 4 8
13 13 9 10 45
2 2 2 0 6
58 44 26 32 160
3 1 2 3 9
419 326 389 284 1418
19 6 16 25 66
0 2 1 3 6
441 335 408 315 1499
14 7 7 8 36
0 1 2 0 3
29 27 28 9 93
1 1 2 0 4
44 36 39 17 136
879 801 836 686 3202
Grand Total Apprch % Total %
523 17.1 7.6
2490 81.3 36.3
50 1.6 0.7
0 0 0
3063
187 63.2 2.7
12 4.1 0.2
85 28.7 1.2
12 4.1 0.2
296
21 0.7 0.3
3085 95.5 45
118 3.7 1.7
6 0.2 0.1
3230
63 23.9 0.9
4 1.5 0.1
192 72.7 2.8
5 1.9 0.1
264
6853
44.7
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 7 07:45 AM 67 348 08:00 AM 52 274 10 60 318 8 08:15 AM 08:30 AM 55 301 7 Total Volume 234 1241 32 % App. Total 15.5 82.3 2.1 PHF .873 .892 .800
4.3
422 336 386 363 1507 .893
47.1
SR A1A Northbound
3.9
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
17 39 29 15 100 66.2 .641
1 4 0 0 5 3.3 .313
11 13 13 9 46 30.5 .885
29 56 42 24 151
4 3 1 2 10 0.7 .625
337 419 326 389 1471 95.7 .878
15 19 6 16 56 3.6 .737
356 441 333 407 1537
5 14 7 7 33 23.2 .589
1 0 1 2 4 2.8 .500
21 29 27 28 105 73.9 .905
27 43 35 37 142
834 876 796 831 3337
.826
.952
.674
222
.871
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle AM : : 12/8/2015 :1
Groups Printed- Truck L'Atrium Circle SR A1A Westbound Northbound
SR A1A Southbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
2 1 1 1 5
3 2 5 3 13
0 0 0 0 0
0 0 0 0 0
5 3 6 4 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 3 3 3 12
0 0 0 0 0
0 0 0 0 0
3 3 3 3 12
0 0 1 1 2
0 0 0 0 0
1 0 2 0 3
0 0 0 0 0
1 0 3 1 5
9 6 12 8 35
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 1 3 0 7
10 8 6 6 30
1 0 0 0 1
0 0 0 0 0
14 9 9 6 38
0 0 1 0 1
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 1 0 2
0 0 1 0 1
6 1 10 7 24
0 0 0 0 0
0 0 0 0 0
6 1 11 7 25
0 0 1 0 1
0 0 0 0 0
1 0 2 2 5
0 0 0 0 0
1 0 3 2 6
22 10 24 15 71
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 1 1 2
10 10 3 6 29
0 1 1 1 3
0 0 0 0 0
10 11 5 8 34
0 0 0 2 2
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 2 3
0 0 1 1 2
7 7 6 11 31
0 0 1 0 1
0 0 0 0 0
7 7 8 12 34
0 0 0 0 0
0 0 0 0 0
1 1 1 1 4
0 0 0 0 0
1 1 1 1 4
18 19 15 23 75
Grand Total Apprch % Total %
14 15.6 7.7
72 80 39.8
4 4.4 2.2
0 0 0
90
3 60 1.7
0 0 0
2 40 1.1
0 0 0
5
3 4.2 1.7
67 94.4 37
1 1.4 0.6
0 0 0
71
3 20 1.7
0 0 0
12 80 6.6
0 0 0
15
181
49.7
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 6 0 07:30 AM 3 07:45 AM 0 6 0 0 0 08:00 AM 10 08:15 AM 0 10 1 Total Volume 3 32 1 % App. Total 8.3 88.9 2.8 PHF .250 .800 .250
2.8
9 6 10 11 36 .818
39.2
SR A1A Northbound
8.3
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 0 0 0 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
1 0 0 0 1
1 0 0 0 1 3.1 .250
10 7 7 7 31 96.9 .775
0 0 0 0 0 0 .000
11 7 7 7 32
1 0 0 0 1 14.3 .250
0 0 0 0 0 0 .000
2 2 1 1 6 85.7 .750
3 2 1 1 7
24 15 18 19 76
.583
.792
.250
223
.727
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle AM : : 12/8/2015 :1
Groups Printed- Combined L'Atrium Circle SR A1A Westbound Northbound
SR A1A Southbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
11 15 30 50 106
56 73 116 160 405
2 1 1 2 6
0 0 0 0 0
69 89 147 212 517
5 11 6 7 29
0 0 1 0 1
0 3 1 7 11
1 0 2 0 3
6 14 10 14 44
0 1 2 0 3
63 100 133 180 476
2 3 1 3 9
0 0 0 0 0
65 104 136 183 488
2 0 5 2 9
0 0 0 0 0
2 4 9 9 24
0 0 0 0 0
4 4 14 11 33
144 211 307 420 1082
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
37 32 65 67 201
149 194 283 354 980
6 1 0 7 14
0 0 0 0 0
192 227 348 428 1195
18 11 12 17 58
1 0 1 1 3
6 9 4 11 30
2 0 1 0 3
27 20 18 29 94
1 2 3 4 10
247 285 351 344 1227
8 10 10 15 43
0 0 0 0 0
256 297 364 363 1280
4 7 5 5 21
0 0 0 1 1
20 12 28 23 83
0 0 0 1 1
24 19 33 30 106
499 563 763 850 2675
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
52 60 56 62 230
284 328 304 261 1177
10 9 8 7 34
0 0 0 0 0
346 397 368 330 1441
39 29 15 20 103
4 0 0 4 8
13 13 10 10 46
2 2 2 0 6
58 44 27 34 163
3 1 3 4 11
426 333 395 295 1449
19 6 17 25 67
0 2 1 3 6
448 342 416 327 1533
14 7 7 8 36
0 1 2 0 3
30 28 29 10 97
1 1 2 0 4
45 37 40 18 140
897 820 851 709 3277
Grand Total Apprch % Total %
537 17 7.6
2562 81.3 36.4
54 1.7 0.8
0 0 0
3153
190 63.1 2.7
12 4 0.2
87 28.9 1.2
12 4 0.2
301
24 0.7 0.3
3152 95.5 44.8
119 3.6 1.7
6 0.2 0.1
3301
66 23.7 0.9
4 1.4 0.1
204 73.1 2.9
5 1.8 0.1
279
7034
44.8
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 7 07:45 AM 67 354 08:00 AM 52 284 10 60 328 9 08:15 AM 08:30 AM 56 304 8 Total Volume 235 1270 34 % App. Total 15.3 82.5 2.2 PHF .877 .897 .850
4.3
428 346 397 368 1539 .899
46.9
SR A1A Northbound
4
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
17 39 29 15 100 65.8 .641
1 4 0 0 5 3.3 .313
11 13 13 10 47 30.9 .904
29 56 42 25 152
4 3 1 3 11 0.7 .688
344 426 333 395 1498 95.7 .879
15 19 6 17 57 3.6 .750
363 448 340 415 1566
5 14 7 7 33 22.4 .589
1 0 1 2 4 2.7 .500
23 30 28 29 110 74.8 .917
29 44 36 38 147
849 894 815 846 3404
.835
.952
.679
224
.874
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle PM : : 12/8/2015 :1
Groups Printed- Car L'Atrium Circle Westbound
SR A1A Southbound
SR A1A Northbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
64 48 69 58 239
331 319 346 363 1359
13 23 13 13 62
0 0 0 0 0
408 390 428 434 1660
13 9 5 10 37
1 7 5 3 16
3 4 7 8 22
0 0 0 0 0
17 20 17 21 75
3 12 5 9 29
338 345 310 305 1298
26 24 21 29 100
0 0 1 2 3
367 381 337 345 1430
36 24 37 37 134
5 8 4 9 26
49 47 65 68 229
3 0 3 2 8
93 79 109 116 397
885 870 891 916 3562
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
72 63 75 76 286
340 362 363 325 1390
13 14 17 18 62
0 0 0 0 0
425 439 455 419 1738
12 7 11 19 49
2 6 5 2 15
7 4 8 7 26
0 0 0 0 0
21 17 24 28 90
11 15 7 15 48
353 384 363 355 1455
28 25 27 20 100
3 0 0 1 4
395 424 397 391 1607
40 46 35 33 154
2 1 10 5 18
99 77 75 57 308
0 0 0 0 0
141 124 120 95 480
982 1004 996 933 3915
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
69 74 53 40 236
334 274 320 253 1181
18 12 15 10 55
0 0 0 0 0
421 360 388 303 1472
4 8 9 5 26
2 4 6 1 13
5 5 4 1 15
1 0 0 0 1
12 17 19 7 55
8 7 9 5 29
308 250 213 223 994
19 14 8 14 55
6 6 0 0 12
341 277 230 242 1090
34 34 34 21 123
5 6 5 9 25
64 65 37 32 198
0 0 0 0 0
103 105 76 62 346
877 759 713 614 2963
Grand Total Apprch % Total %
761 15.6 7.3
3930 80.7 37.6
179 3.7 1.7
0 0 0
4870
112 50.9 1.1
44 20 0.4
63 28.6 0.6
1 0.5 0
220
106 2.6 1
3747 90.8 35.9
255 6.2 2.4
19 0.5 0.2
4127
411 33.6 3.9
69 5.6 0.7
735 60.1 7
8 0.7 0.1
1223
10440
46.6
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 72 340 13 05:15 PM 63 362 14 75 17 05:30 PM 363 05:45 PM 325 76 18 Total Volume 286 1390 62 % App. Total 16.5 80 3.6 PHF .941 .957 .861
2.1
425 439 455 419 1738 .955
39.5
SR A1A Northbound
11.7
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
12 7 11 19 49 54.4 .645
2 6 5 2 15 16.7 .625
7 4 8 7 26 28.9 .813
21 17 24 28 90
11 15 7 15 48 3 .800
353 384 363 355 1455 90.8 .947
28 25 27 20 100 6.2 .893
392 424 397 390 1603
40 46 35 33 154 32.1 .837
2 1 10 5 18 3.8 .450
99 77 75 57 308 64.2 .778
141 124 120 95 480
979 1004 996 932 3911
.851
.974
.804
225
.945
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle PM : : 12/8/2015 :1
Groups Printed- Truck L'Atrium Circle SR A1A Westbound Northbound
SR A1A Southbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 1 1
3 8 8 1 20
0 0 1 0 1
0 0 0 0 0
3 8 9 2 22
0 3 1 0 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 3 1 0 4
2 0 0 0 2
9 13 10 2 34
0 0 0 0 0
0 0 0 0 0
11 13 10 2 36
0 0 1 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
14 24 21 4 63
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 1 0 0 1
1 0 2 3 6
1 0 0 0 1
0 0 0 0 0
2 1 2 3 8
0 1 1 0 2
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 1 1 0 3
0 0 0 0 0
3 2 2 4 11
1 0 0 0 1
0 0 0 0 0
4 2 2 4 12
0 1 0 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
7 5 5 8 25
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 0 4 0 5
0 0 0 0 0
0 0 0 0 0
1 0 4 0 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 0 0 1
3 0 5 0 8
Grand Total Apprch % Total %
2 5.7 2.1
31 88.6 32.3
2 5.7 2.1
0 0 0
35
6 85.7 6.2
0 0 0
1 14.3 1
0 0 0
7
2 4 2.1
47 94 49
1 2 1
0 0 0
50
3 75 3.1
0 0 0
1 25 1
0 0 0
4
96
36.5
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 3 0 04:15 PM 0 0 8 0 8 04:30 PM 1 04:45 PM 1 0 1 Total Volume 1 20 1 % App. Total 4.5 90.9 4.5 PHF .250 .625 .250
7.3
3 8 9 2 22 .611
52.1
SR A1A Northbound
4.2
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 3 1 0 4 100 .333
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 3 1 0 4
2 0 0 0 2 5.6 .250
9 13 10 2 34 94.4 .654
0 0 0 0 0 0 .000
11 13 10 2 36
0 0 1 0 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 1 0 1
14 24 21 4 63
.250
.656
.333
226
.692
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T13 SR A1A and Sawgrass Village L'Atrium_Circle PM : : 12/8/2015 :1
Groups Printed- Combined L'Atrium Circle SR A1A Westbound Northbound
SR A1A Southbound
Sawgrass Village Dr. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
64 48 69 59 240
334 327 354 364 1379
13 23 14 13 63
0 0 0 0 0
411 398 437 436 1682
13 12 6 10 41
1 7 5 3 16
3 4 7 8 22
0 0 0 0 0
17 23 18 21 79
5 12 5 9 31
347 358 320 307 1332
26 24 21 29 100
0 0 1 2 3
378 394 347 347 1466
36 24 38 37 135
5 8 4 9 26
49 47 65 68 229
3 0 3 2 8
93 79 110 116 398
899 894 912 920 3625
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
72 64 75 76 287
341 362 365 328 1396
14 14 17 18 63
0 0 0 0 0
427 440 457 422 1746
12 8 12 19 51
2 6 5 2 15
8 4 8 7 27
0 0 0 0 0
22 18 25 28 93
11 15 7 15 48
356 386 365 359 1466
29 25 27 20 101
3 0 0 1 4
399 426 399 395 1619
40 47 35 34 156
2 1 10 5 18
99 77 75 57 308
0 0 0 0 0
141 125 120 96 482
989 1009 1001 941 3940
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
69 74 53 40 236
335 274 324 253 1186
18 12 15 10 55
0 0 0 0 0
422 360 392 303 1477
4 8 9 5 26
2 4 6 1 13
5 5 4 1 15
1 0 0 0 1
12 17 19 7 55
8 7 9 5 29
309 250 214 223 996
19 14 8 14 55
6 6 0 0 12
342 277 231 242 1092
34 34 34 21 123
5 6 5 9 25
65 65 37 32 199
0 0 0 0 0
104 105 76 62 347
880 759 718 614 2971
Grand Total Apprch % Total %
763 15.6 7.2
3961 80.8 37.6
181 3.7 1.7
0 0 0
4905
118 52 1.1
44 19.4 0.4
64 28.2 0.6
1 0.4 0
227
108 2.6 1
3794 90.8 36
256 6.1 2.4
19 0.5 0.2
4177
414 33.7 3.9
69 5.6 0.7
736 60 7
8 0.7 0.1
1227
10536
46.6
SR A1A Southbound
L'Atrium Circle Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 72 341 14 05:15 PM 64 362 14 75 17 05:30 PM 365 05:45 PM 328 76 18 Total Volume 287 1396 63 % App. Total 16.4 80 3.6 PHF .944 .956 .875
2.2
427 440 457 422 1746 .955
39.6
SR A1A Northbound
11.6
Sawgrass Village Dr. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
12 8 12 19 51 54.8 .671
2 6 5 2 15 16.1 .625
8 4 8 7 27 29 .844
22 18 25 28 93
11 15 7 15 48 3 .800
356 386 365 359 1466 90.8 .949
29 25 27 20 101 6.3 .871
396 426 399 394 1615
40 47 35 34 156 32.4 .830
2 1 10 5 18 3.7 .450
99 77 75 57 308 63.9 .778
141 125 120 96 482
986 1009 1001 940 3936
.855
.975
.830
227
.948
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. AM : : 12/8/2015 :1
Groups Printed- Car Country Club Blvd. Westbound
SR A1A Southbound
SR A1A Northbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
5 2 10 10 27
45 62 99 146 352
0 3 5 5 13
0 0 0 0 0
50 67 114 161 392
1 4 9 9 23
0 0 1 0 1
0 2 2 3 7
0 0 0 0 0
1 6 12 12 31
0 1 1 2 4
66 97 125 159 447
4 6 6 12 28
0 0 0 0 0
70 104 132 173 479
4 9 6 16 35
0 2 0 2 4
2 5 4 9 20
0 0 1 0 1
6 16 11 27 60
127 193 269 373 962
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
9 11 9 20 49
127 203 267 309 906
4 2 9 19 34
0 0 0 0 0
140 216 285 348 989
9 11 22 17 59
0 1 3 5 9
5 4 7 8 24
1 1 1 2 5
15 17 33 32 97
2 5 2 3 12
229 264 338 321 1152
28 23 32 50 133
1 0 1 2 4
260 292 373 376 1301
26 30 25 44 125
3 1 1 10 15
9 22 10 20 61
0 0 0 1 1
38 53 36 75 202
453 578 727 831 2589
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
10 14 15 18 57
289 320 284 263 1156
7 13 11 8 39
0 0 0 0 0
306 347 310 289 1252
21 20 15 12 68
5 5 1 3 14
9 6 9 6 30
0 0 1 0 1
35 31 26 21 113
4 5 5 4 18
412 340 325 277 1354
58 59 68 59 244
0 0 1 1 2
474 404 399 341 1618
58 63 52 58 231
9 3 4 5 21
23 17 17 14 71
1 0 1 3 5
91 83 74 80 328
906 865 809 731 3311
Grand Total Apprch % Total %
133 5.1 1.9
2414 91.7 35.2
86 3.3 1.3
0 0 0
2633
150 62.2 2.2
24 10 0.3
61 25.3 0.9
6 2.5 0.1
241
34 1 0.5
2953 86.9 43
405 11.9 5.9
6 0.2 0.1
3398
391 66.3 5.7
40 6.8 0.6
152 25.8 2.2
7 1.2 0.1
590
6862
38.4
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 309 07:45 AM 20 19 08:00 AM 10 289 7 14 13 08:15 AM 320 08:30 AM 15 284 11 Total Volume 59 1202 50 % App. Total 4.5 91.7 3.8 PHF .738 .939 .658
3.5
348 306 347 310 1311 .942
49.5
SR A1A Northbound
8.6
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
17 21 20 15 73 60.3 .869
5 5 5 1 16 13.2 .800
8 9 6 9 32 26.4 .889
30 35 31 25 121
3 4 5 5 17 1 .850
321 412 340 325 1398 84.7 .848
50 58 59 68 235 14.2 .864
374 474 404 398 1650
44 58 63 52 217 67.8 .861
10 9 3 4 26 8.1 .650
20 23 17 17 77 24.1 .837
74 90 83 73 320
826 905 865 806 3402
.889
.940
.864
228
.870
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. AM : : 12/8/2015 :1
Groups Printed- Truck Country Club Blvd. SR A1A Westbound Northbound
SR A1A Southbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 2 3
3 2 5 2 12
0 0 0 0 0
0 0 0 0 0
3 2 6 4 15
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 4 3 3 14
0 0 1 1 2
0 0 0 0 0
4 4 4 4 16
0 0 0 1 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 1 2
7 7 10 9 33
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 1 1 0 3
10 7 6 6 29
0 0 0 0 0
0 0 0 0 0
11 8 7 6 32
0 0 1 0 1
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 1 0 2
0 0 1 0 1
5 1 9 6 21
0 0 2 1 3
0 0 0 0 0
5 1 12 7 25
1 1 1 2 5
0 0 0 0 0
1 0 1 1 3
0 0 0 0 0
2 1 2 3 8
19 10 22 16 67
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 3 1 0 5
7 8 3 6 24
0 0 0 1 1
0 0 0 0 0
8 11 4 7 30
0 0 0 1 1
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 2 2
0 0 1 0 1
7 7 7 9 30
3 0 3 2 8
0 0 0 0 0
10 7 11 11 39
0 3 1 2 6
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 3 2 3 8
18 21 17 23 79
Grand Total Apprch % Total %
11 14.3 6.1
65 84.4 36.3
1 1.3 0.6
0 0 0
77
2 50 1.1
0 0 0
2 50 1.1
0 0 0
4
2 2.5 1.1
65 81.2 36.3
13 16.2 7.3
0 0 0
80
12 66.7 6.7
0 0 0
6 33.3 3.4
0 0 0
18
179
43
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 1 7 0 08:15 AM 0 3 8 1 3 0 08:30 AM 08:45 AM 0 6 1 Total Volume 5 24 1 % App. Total 16.7 80 3.3 PHF .417 .750 .250
2.2
8 11 4 7 30 .682
44.7
SR A1A Northbound
10.1
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 1 1 50 .250
0 0 0 0 0 0 .000
0 0 0 1 1 50 .250
0 0 0 2 2
0 0 1 0 1 2.6 .250
7 7 7 9 30 76.9 .833
3 0 3 2 8 20.5 .667
10 7 11 11 39
0 3 1 2 6 75 .500
0 0 0 0 0 0 .000
0 0 1 1 2 25 .500
0 3 2 3 8
18 21 17 23 79
.667
.859
.250
229
.886
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. AM : : 12/8/2015 :1
Groups Printed- Combined Country Club Blvd. SR A1A Westbound Northbound
SR A1A Southbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
5 2 11 12 30
48 64 104 148 364
0 3 5 5 13
0 0 0 0 0
53 69 120 165 407
1 4 9 9 23
0 0 1 0 1
0 2 2 3 7
0 0 0 0 0
1 6 12 12 31
0 1 1 2 4
70 101 128 162 461
4 6 7 13 30
0 0 0 0 0
74 108 136 177 495
4 9 6 17 36
0 2 0 2 4
2 6 4 9 21
0 0 1 0 1
6 17 11 28 62
134 200 279 382 995
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
10 12 10 20 52
137 210 273 315 935
4 2 9 19 34
0 0 0 0 0
151 224 292 354 1021
9 11 23 17 60
0 1 3 5 9
6 4 7 8 25
1 1 1 2 5
16 17 34 32 99
2 5 3 3 13
234 265 347 327 1173
28 23 34 51 136
1 0 1 2 4
265 293 385 383 1326
27 31 26 46 130
3 1 1 10 15
10 22 11 21 64
0 0 0 1 1
40 54 38 78 210
472 588 749 847 2656
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
11 17 16 18 62
296 328 287 269 1180
7 13 11 9 40
0 0 0 0 0
314 358 314 296 1282
21 20 15 13 69
5 5 1 3 14
9 6 9 7 31
0 0 1 0 1
35 31 26 23 115
4 5 6 4 19
419 347 332 286 1384
61 59 71 61 252
0 0 1 1 2
484 411 410 352 1657
58 66 53 60 237
9 3 4 5 21
23 17 18 15 73
1 0 1 3 5
91 86 76 83 336
924 886 826 754 3390
Grand Total Apprch % Total %
144 5.3 2
2479 91.5 35.2
87 3.2 1.2
0 0 0
2710
152 62 2.2
24 9.8 0.3
63 25.7 0.9
6 2.4 0.1
245
36 1 0.5
3018 86.8 42.9
418 12 5.9
6 0.2 0.1
3478
403 66.3 5.7
40 6.6 0.6
158 26 2.2
7 1.2 0.1
608
7041
38.5
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 315 07:45 AM 20 19 08:00 AM 11 296 7 17 13 08:15 AM 328 08:30 AM 16 287 11 Total Volume 64 1226 50 % App. Total 4.8 91.5 3.7 PHF .800 .934 .658
3.5
354 314 358 314 1340 .936
49.4
SR A1A Northbound
8.6
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
17 21 20 15 73 60.3 .869
5 5 5 1 16 13.2 .800
8 9 6 9 32 26.4 .889
30 35 31 25 121
3 4 5 6 18 1.1 .750
327 419 347 332 1425 84.6 .850
51 61 59 71 242 14.4 .852
381 484 411 409 1685
46 58 66 53 223 68 .845
10 9 3 4 26 7.9 .650
21 23 17 18 79 24.1 .859
77 90 86 75 328
842 923 886 823 3474
.911
.941
.864
230
.870
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. PM : : 12/8/2015 :1
Groups Printed- Car Country Club Blvd. Westbound
SR A1A Southbound
SR A1A Northbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
23 19 18 20 80
336 306 338 359 1339
13 23 14 15 65
0 0 0 0 0
372 348 370 394 1484
17 10 17 14 58
9 9 10 8 36
9 5 9 8 31
1 0 0 0 1
36 24 36 30 126
8 9 14 4 35
319 321 286 302 1228
61 67 60 56 244
1 0 0 0 1
389 397 360 362 1508
54 60 65 75 254
6 5 0 0 11
28 17 32 20 97
4 1 1 2 8
92 83 98 97 370
889 852 864 883 3488
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
16 19 12 17 64
346 382 391 329 1448
23 18 18 23 82
0 0 0 0 0
385 419 421 369 1594
22 17 16 15 70
15 10 11 4 40
7 6 3 9 25
0 0 0 0 0
44 33 30 28 135
6 5 5 6 22
367 364 339 346 1416
65 72 53 59 249
0 0 0 0 0
438 441 397 411 1687
81 88 76 72 317
10 11 13 3 37
28 29 36 25 118
0 0 0 1 1
119 128 125 101 473
986 1021 973 909 3889
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
21 8 28 12 69
337 279 320 257 1193
17 15 16 10 58
0 0 0 0 0
375 302 364 279 1320
14 9 12 6 41
10 7 10 4 31
4 8 7 3 22
0 0 0 0 0
28 24 29 13 94
6 8 6 4 24
287 242 202 197 928
55 56 40 38 189
0 0 0 0 0
348 306 248 239 1141
52 60 35 39 186
10 8 8 5 31
30 33 17 24 104
2 0 1 0 3
94 101 61 68 324
845 733 702 599 2879
Grand Total Apprch % Total %
213 4.8 2.1
3980 90.5 38.8
205 4.7 2
0 0 0
4398
169 47.6 1.6
107 30.1 1
78 22 0.8
1 0.3 0
355
81 1.9 0.8
3572 82.4 34.8
682 15.7 6.6
1 0 0
4336
757 64.9 7.4
79 6.8 0.8
319 27.3 3.1
12 1 0.1
1167
10256
42.9
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 16 346 23 05:15 PM 382 18 19 12 18 05:30 PM 391 05:45 PM 17 329 23 Total Volume 64 1448 82 % App. Total 4 90.8 5.1 PHF .842 .926 .891
3.5
385 419 421 369 1594 .947
42.3
SR A1A Northbound
11.4
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
22 17 16 15 70 51.9 .795
15 10 11 4 40 29.6 .667
7 6 3 9 25 18.5 .694
44 33 30 28 135
6 5 5 6 22 1.3 .917
367 364 339 346 1416 83.9 .965
65 72 53 59 249 14.8 .865
438 441 397 411 1687
81 88 76 72 317 67.2 .901
10 11 13 3 37 7.8 .712
28 29 36 25 118 25 .819
119 128 125 100 472
986 1021 973 908 3888
.922
.952
.767
231
.956
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. PM : : 12/8/2015 :1
Groups Printed- Truck Country Club Blvd. SR A1A Westbound Northbound
SR A1A Southbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
3 8 8 0 19
0 0 0 0 0
0 0 0 0 0
3 8 8 0 19
0 0 0 2 2
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 2 3
0 0 0 0 0
9 10 6 2 27
0 1 1 1 3
0 0 0 0 0
9 11 7 3 30
2 3 1 1 7
0 0 0 0 0
2 1 1 0 4
0 0 0 0 0
4 4 2 1 11
16 24 17 6 63
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
2 1 4 3 10
0 0 0 0 0
0 0 0 0 0
2 1 4 3 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 2 1 2 9
0 0 0 0 0
0 0 0 0 0
4 2 1 2 9
7 1 0 0 8
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
7 1 0 2 10
13 4 5 7 29
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 2 0 2
0 1 1 0 2
0 0 0 0 0
0 0 0 0 0
0 1 3 0 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 1 1 3
0 0 0 0 0
0 0 0 0 0
0 1 1 1 3
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
1 2 4 1 8
Grand Total Apprch % Total %
2 6.1 2
31 93.9 31
0 0 0
0 0 0
33
2 66.7 2
0 0 0
1 33.3 1
0 0 0
3
0 0 0
39 92.9 39
3 7.1 3
0 0 0
42
16 72.7 16
0 0 0
6 27.3 6
0 0 0
22
100
33
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 3 0 04:15 PM 0 0 8 0 8 0 04:30 PM 04:45 PM 0 0 0 Total Volume 0 19 0 % App. Total 0 100 0 PHF .000 .594 .000
3
3 8 8 0 19 .594
42
SR A1A Northbound
22
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 2 2 66.7 .250
0 0 0 0 0 0 .000
0 1 0 0 1 33.3 .250
0 1 0 2 3
0 0 0 0 0 0 .000
9 10 6 2 27 90 .675
0 1 1 1 3 10 .750
9 11 7 3 30
2 3 1 1 7 63.6 .583
0 0 0 0 0 0 .000
2 1 1 0 4 36.4 .500
4 4 2 1 11
16 24 17 6 63
.688
.656
.375
232
.682
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T14-SR A1A and TPC_Country Club Blvd. PM : : 12/8/2015 :1
Groups Printed- Combined Country Club Blvd. SR A1A Westbound Northbound
SR A1A Southbound
TPC Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
23 19 18 20 80
339 314 346 359 1358
13 23 14 15 65
0 0 0 0 0
375 356 378 394 1503
17 10 17 16 60
9 9 10 8 36
9 6 9 8 32
1 0 0 0 1
36 25 36 32 129
8 9 14 4 35
328 331 292 304 1255
61 68 61 57 247
1 0 0 0 1
398 408 367 365 1538
56 63 66 76 261
6 5 0 0 11
30 18 33 20 101
4 1 1 2 8
96 87 100 98 381
905 876 881 889 3551
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
16 19 12 17 64
348 383 395 332 1458
23 18 18 23 82
0 0 0 0 0
387 420 425 372 1604
22 17 16 15 70
15 10 11 4 40
7 6 3 9 25
0 0 0 0 0
44 33 30 28 135
6 5 5 6 22
371 366 340 348 1425
65 72 53 59 249
0 0 0 0 0
442 443 398 413 1696
88 89 76 72 325
10 11 13 3 37
28 29 36 27 120
0 0 0 1 1
126 129 125 103 483
999 1025 978 916 3918
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
21 8 30 12 71
337 280 321 257 1195
17 15 16 10 58
0 0 0 0 0
375 303 367 279 1324
14 9 12 6 41
10 7 10 4 31
4 8 7 3 22
0 0 0 0 0
28 24 29 13 94
6 8 6 4 24
287 243 203 198 931
55 56 40 38 189
0 0 0 0 0
348 307 249 240 1144
53 60 35 39 187
10 8 8 5 31
30 33 17 24 104
2 0 1 0 3
95 101 61 68 325
846 735 706 600 2887
Grand Total Apprch % Total %
215 4.9 2.1
4011 90.5 38.7
205 4.6 2
0 0 0
4431
171 47.8 1.7
107 29.9 1
79 22.1 0.8
1 0.3 0
358
81 1.9 0.8
3611 82.5 34.9
685 15.6 6.6
1 0 0
4378
773 65 7.5
79 6.6 0.8
325 27.3 3.1
12 1 0.1
1189
10356
42.8
SR A1A Southbound
Country Club Blvd. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 16 348 23 05:15 PM 383 18 19 12 18 05:30 PM 395 05:45 PM 17 332 23 Total Volume 64 1458 82 % App. Total 4 90.9 5.1 PHF .842 .923 .891
3.5
387 420 425 372 1604 .944
42.3
SR A1A Northbound
11.5
TPC Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
22 17 16 15 70 51.9 .795
15 10 11 4 40 29.6 .667
7 6 3 9 25 18.5 .694
44 33 30 28 135
6 5 5 6 22 1.3 .917
371 366 340 348 1425 84 .960
65 72 53 59 249 14.7 .865
442 443 398 413 1696
88 89 76 72 325 67.4 .913
10 11 13 3 37 7.7 .712
28 29 36 27 120 24.9 .833
126 129 125 102 482
999 1025 978 915 3917
.934
.955
.767
233
.957
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. AM : : 12/8/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
4 8 10 20 42
46 66 97 140 349
0 0 0 0 0
0 0 0 0 0
50 74 107 160 391
66 90 125 174 455
4 6 4 6 20
2 0 0 0 2
72 96 129 180 477
5 4 14 4 27
3 9 13 8 33
2 0 0 0 2
10 13 27 12 62
132 183 263 352 930
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
17 14 22 44 97
117 218 230 278 843
0 0 0 0 0
0 0 0 0 0
134 232 252 322 940
225 289 367 368 1249
10 10 14 22 56
0 0 0 0 0
235 299 381 390 1305
15 11 13 11 50
20 10 26 25 81
1 0 1 0 2
36 21 40 36 133
405 552 673 748 2378
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
64 35 38 54 191
260 305 259 244 1068
0 0 0 0 0
0 0 0 0 0
324 340 297 298 1259
431 399 311 341 1482
30 22 18 26 96
0 0 0 0 0
461 421 329 367 1578
27 24 17 23 91
67 53 25 24 169
0 1 1 0 2
94 78 43 47 262
879 839 669 712 3099
Grand Total Apprch % Total %
330 12.7 5.2
2260 87.3 35.3
0 0 0
0 0 0
2590
3186 94.8 49.7
172 5.1 2.7
2 0.1 0
3360
168 36.8 2.6
283 61.9 4.4
6 1.3 0.1
457
6407
40.4
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 22 230 07:30 AM 07:45 AM 44 278 260 08:00 AM 64 08:15 AM 35 305 Total Volume 165 1073 % App. Total 13.3 86.7 PHF .645 .880
52.4
SR A1A Northbound
7.1
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
252 322 324 340 1238
367 368 431 399 1565 94.7 .908
14 22 30 22 88 5.3 .733
381 390 461 421 1653
13 11 27 24 75 30.5 .694
26 25 67 53 171 69.5 .638
39 36 94 77 246
672 748 879 838 3137
.654
.892
.910
234
.896
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. AM : : 12/8/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 1 2
3 2 4 1 10
0 0 0 0 0
0 0 0 0 0
3 2 5 2 12
3 4 4 4 15
1 2 0 1 4
0 0 0 0 0
4 6 4 5 19
0 0 2 1 3
0 0 0 1 1
0 0 0 0 0
0 0 2 2 4
7 8 11 9 35
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 1 1 2 5
9 9 7 6 31
0 0 0 0 0
0 0 0 0 0
10 10 8 8 36
4 2 12 5 23
0 0 0 2 2
0 0 0 0 0
4 2 12 7 25
2 0 1 4 7
1 0 0 0 1
0 0 0 0 0
3 0 1 4 8
17 12 21 19 69
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 2 0 0 3
6 8 3 8 25
0 0 0 0 0
0 0 0 0 0
7 10 3 8 28
11 4 7 12 34
0 0 0 0 0
0 0 0 0 0
11 4 7 12 34
0 0 2 0 2
0 3 4 1 8
0 0 0 0 0
0 3 6 1 10
18 17 16 21 72
Grand Total Apprch % Total %
10 13.2 5.7
66 86.8 37.5
0 0 0
0 0 0
76
72 92.3 40.9
6 7.7 3.4
0 0 0
78
12 54.5 6.8
10 45.5 5.7
0 0 0
22
176
43.2
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 1 7 07:30 AM 07:45 AM 6 2 08:00 AM 1 6 08:15 AM 2 8 Total Volume 6 27 % App. Total 18.2 81.8 PHF .750 .844
44.3
SR A1A Northbound
12.5
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
8 8 7 10 33
12 5 11 4 32 94.1 .667
0 2 0 0 2 5.9 .250
12 7 11 4 34
1 4 0 0 5 62.5 .313
0 0 0 3 3 37.5 .250
1 4 0 3 8
21 19 18 17 75
.500
.893
.825
235
.708
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. AM : : 12/8/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
4 8 11 21 44
49 68 101 141 359
0 0 0 0 0
0 0 0 0 0
53 76 112 162 403
69 94 129 178 470
5 8 4 7 24
2 0 0 0 2
76 102 133 185 496
5 4 16 5 30
3 9 13 9 34
2 0 0 0 2
10 13 29 14 66
139 191 274 361 965
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
18 15 23 46 102
126 227 237 284 874
0 0 0 0 0
0 0 0 0 0
144 242 260 330 976
229 291 379 373 1272
10 10 14 24 58
0 0 0 0 0
239 301 393 397 1330
17 11 14 15 57
21 10 26 25 82
1 0 1 0 2
39 21 41 40 141
422 564 694 767 2447
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
65 37 38 54 194
266 313 262 252 1093
0 0 0 0 0
0 0 0 0 0
331 350 300 306 1287
442 403 318 353 1516
30 22 18 26 96
0 0 0 0 0
472 425 336 379 1612
27 24 19 23 93
67 56 29 25 177
0 1 1 0 2
94 81 49 48 272
897 856 685 733 3171
Grand Total Apprch % Total %
340 12.8 5.2
2326 87.2 35.3
0 0 0
0 0 0
2666
3258 94.8 49.5
178 5.2 2.7
2 0.1 0
3438
180 37.6 2.7
293 61.2 4.5
6 1.3 0.1
479
6583
40.5
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 23 237 07:30 AM 07:45 AM 46 284 266 08:00 AM 65 08:15 AM 37 313 Total Volume 171 1100 % App. Total 13.5 86.5 PHF .658 .879
52.2
SR A1A Northbound
7.3
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
260 330 331 350 1271
379 373 442 403 1597 94.7 .903
14 24 30 22 90 5.3 .750
393 397 472 425 1687
14 15 27 24 80 31.5 .741
26 25 67 56 174 68.5 .649
40 40 94 80 254
693 767 897 855 3212
.676
.895
.908
236
.894
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. PM : : 12/8/2015 :1
Groups Printed- Car SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
48 51 73 65 237
338 318 317 378 1351
0 0 0 0 0
0 0 0 0 0
386 369 390 443 1588
316 296 253 299 1164
16 31 20 23 90
0 0 0 0 0
332 327 273 322 1254
38 38 41 35 152
78 70 68 63 279
0 0 2 1 3
116 108 111 99 434
834 804 774 864 3276
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
59 47 55 55 216
401 437 387 332 1557
6 1 0 0 7
0 0 0 0 0
466 485 442 387 1780
319 323 306 298 1246
24 15 20 19 78
0 0 0 0 0
343 338 326 317 1324
37 29 42 34 142
81 83 66 70 300
1 0 0 0 1
119 112 108 104 443
928 935 876 808 3547
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
49 38 47 33 167
335 314 293 264 1206
0 0 0 0 0
0 0 0 0 0
384 352 340 297 1373
247 244 201 182 874
18 11 11 8 48
0 0 0 0 0
265 255 212 190 922
34 23 22 21 100
58 48 37 42 185
0 0 0 0 0
92 71 59 63 285
741 678 611 550 2580
Grand Total Apprch % Total %
620 13.1 6.6
4114 86.8 43.8
7 0.1 0.1
0 0 0
4741
3284 93.8 34.9
216 6.2 2.3
0 0 0
3500
394 33.9 4.2
764 65.7 8.1
4 0.3 0
1162
9403
50.4
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 378 04:45 PM 65 59 401 05:00 PM 05:15 PM 47 437 05:30 PM 55 387 Total Volume 226 1603 % App. Total 12.3 87.3 PHF .869 .917
37.2
SR A1A Northbound
12.4
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 6 1 0 7 0.4 .292
443 466 485 442 1836
299 319 323 306 1247 93.8 .965
23 24 15 20 82 6.2 .854
322 343 338 326 1329
35 37 29 42 143 32.8 .851
63 81 83 66 293 67.2 .883
98 118 112 108 436
863 927 935 876 3601
.924
.963
.946
237
.969
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. PM : : 12/8/2015 :1
Groups Printed- Truck SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
1 1 1 1 4
3 11 7 3 24
0 0 0 0 0
0 0 0 0 0
4 12 8 4 28
11 6 4 3 24
1 2 1 1 5
0 0 0 0 0
12 8 5 4 29
0 2 0 1 3
1 2 2 0 5
0 0 0 0 0
1 4 2 1 8
17 24 15 9 65
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 1 1
9 2 3 2 16
0 0 0 0 0
0 0 0 0 0
9 2 3 3 17
3 2 0 2 7
0 1 1 0 2
0 0 0 0 0
3 3 1 2 9
0 0 0 1 1
0 1 1 0 2
0 0 0 0 0
0 1 1 1 3
12 6 5 6 29
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 1 1
1 1 1 0 3
0 0 0 0 0
0 0 0 0 0
1 1 1 1 4
1 1 1 1 4
0 0 0 0 0
0 0 0 0 0
1 1 1 1 4
0 1 0 1 2
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
2 3 2 3 10
Grand Total Apprch % Total %
6 12.2 5.8
43 87.8 41.3
0 0 0
0 0 0
49
35 83.3 33.7
7 16.7 6.7
0 0 0
42
6 46.2 5.8
7 53.8 6.7
0 0 0
13
104
47.1
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 3 04:00 PM 1 1 04:15 PM 11 04:30 PM 1 7 04:45 PM 1 3 Total Volume 4 24 % App. Total 14.3 85.7 PHF 1.00 .545
40.4
SR A1A Northbound
12.5
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
4 12 8 4 28
11 6 4 3 24 82.8 .545
1 2 1 1 5 17.2 .625
12 8 5 4 29
0 2 0 1 3 37.5 .375
1 2 2 0 5 62.5 .625
1 4 2 1 8
17 24 15 9 65
.500
.677
.583
238
.604
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T15-SR A1A and ATP Tour Blvd. PM : : 12/8/2015 :1
Groups Printed- Combined SR A1A Northbound
SR A1A Southbound
ATP Tour Blvd. Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Thru
Left
Peds
App. Total
Right
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
49 52 74 66 241
341 329 324 381 1375
0 0 0 0 0
0 0 0 0 0
390 381 398 447 1616
327 302 257 302 1188
17 33 21 24 95
0 0 0 0 0
344 335 278 326 1283
38 40 41 36 155
79 72 70 63 284
0 0 2 1 3
117 112 113 100 442
851 828 789 873 3341
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
59 47 55 56 217
410 439 390 334 1573
6 1 0 0 7
0 0 0 0 0
475 487 445 390 1797
322 325 306 300 1253
24 16 21 19 80
0 0 0 0 0
346 341 327 319 1333
37 29 42 35 143
81 84 67 70 302
1 0 0 0 1
119 113 109 105 446
940 941 881 814 3576
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
49 38 47 34 168
336 315 294 264 1209
0 0 0 0 0
0 0 0 0 0
385 353 341 298 1377
248 245 202 183 878
18 11 11 8 48
0 0 0 0 0
266 256 213 191 926
34 24 22 22 102
58 48 37 42 185
0 0 0 0 0
92 72 59 64 287
743 681 613 553 2590
Grand Total Apprch % Total %
626 13.1 6.6
4157 86.8 43.7
7 0.1 0.1
0 0 0
4790
3319 93.7 34.9
223 6.3 2.3
0 0 0
3542
400 34 4.2
771 65.6 8.1
4 0.3 0
1175
9507
50.4
SR A1A Southbound Start Time Right Thru Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 381 04:45 PM 66 59 410 05:00 PM 05:15 PM 47 439 05:30 PM 55 390 Total Volume 227 1620 % App. Total 12.2 87.4 PHF .860 .923
37.3
SR A1A Northbound
12.4
ATP Tour Blvd. Eastbound
Left
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
0 6 1 0 7 0.4 .292
447 475 487 445 1854
302 322 325 306 1255 93.7 .965
24 24 16 21 85 6.3 .885
326 346 341 327 1340
36 37 29 42 144 32.8 .857
63 81 84 67 295 67.2 .878
99 118 113 109 439
872 939 941 881 3633
.930
.965
.952
239
.968
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Westbound St. Westbound
A1A Southbound
: T16 A1A & Old CR 210 AM : : 12/8/2015 :1
A1A Northbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
17 26 49 57 149
30 45 63 82 220
0 0 0 0 0
0 0 0 0 0
47 71 112 139 369
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
47 68 81 114 310
0 1 2 1 4
0 0 0 0 0
47 69 83 115 314
0 0 0 2 2
0 0 0 0 0
25 34 41 72 172
0 2 0 0 2
25 36 41 74 176
119 176 236 328 859
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
53 112 112 117 394
81 110 123 175 489
0 0 0 0 0
0 0 0 0 0
134 222 235 292 883
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
147 203 242 227 819
1 5 13 7 26
0 0 0 0 0
148 208 255 234 845
5 5 4 7 21
0 0 0 0 0
82 104 139 161 486
1 1 0 0 2
88 110 143 168 509
370 540 633 694 2237
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
115 109 88 106 418
184 222 182 154 742
0 0 0 0 0
0 0 0 0 0
299 331 270 260 1160
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
284 273 210 221 988
8 6 9 8 31
0 0 0 0 0
292 279 219 229 1019
7 6 6 9 28
0 0 0 0 0
183 138 125 143 589
1 1 1 0 3
191 145 132 152 620
782 755 621 641 2799
Grand Total Apprch % Total %
961 39.8 16.3
1451 60.2 24.6
0 0 0
0 0 0
2412
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
2117 97.2 35.9
61 2.8 1
0 0 0
2178
51 3.9 0.9
0 0 0
1247 95.6 21.2
7 0.5 0.1
1305
5895
40.9
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 112 123 0 07:45 AM 175 0 117 115 184 0 08:00 AM 08:15 AM 109 0 222 Total Volume 453 704 0 % App. Total 39.2 60.8 0 PHF .968 .793 .000
0
235 292 299 331 1157 .874
36.9
A1A Northbound
22.1
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
242 227 284 273 1026 96.8 .903
13 7 8 6 34 3.2 .654
255 234 292 279 1060
4 7 7 6 24 3.7 .857
0 0 0 0 0 0 .000
139 161 183 138 621 96.3 .848
143 168 190 144 645
633 694 781 754 2862
.849
.916
.000
240
.908
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T16 A1A & Old CR 210 AM : : 12/8/2015 :1
Groups Printed- Truck Westbound St. A1A Westbound Northbound
A1A Southbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 2 2 2 7
2 0 3 0 5
0 0 0 0 0
0 0 0 0 0
3 2 5 2 12
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 3 2 3 11
0 0 0 0 0
0 0 0 0 0
3 3 2 3 11
0 0 1 0 1
0 0 0 0 0
2 3 2 3 10
0 0 0 0 0
2 3 3 3 11
8 8 10 8 34
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
7 5 3 4 19
3 3 5 5 16
0 0 0 0 0
0 0 0 0 0
10 8 8 9 35
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 2 6 7 18
0 0 0 0 0
0 0 0 0 0
3 2 6 7 18
0 0 0 0 0
0 0 0 0 0
0 0 6 1 7
0 0 0 0 0
0 0 6 1 7
13 10 20 17 60
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
4 4 2 3 13
2 4 4 6 16
0 0 0 0 0
0 0 0 0 0
6 8 6 9 29
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
6 3 3 6 18
0 0 0 0 0
0 0 0 0 0
6 3 3 6 18
0 0 0 0 0
0 0 0 0 0
5 0 4 6 15
0 0 0 0 0
5 0 4 6 15
17 11 13 21 62
Grand Total Apprch % Total %
39 51.3 25
37 48.7 23.7
0 0 0
0 0 0
76
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
47 100 30.1
0 0 0
0 0 0
47
1 3 0.6
0 0 0
32 97 20.5
0 0 0
33
156
48.7
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 0 07:30 AM 3 5 07:45 AM 5 0 4 4 2 0 08:00 AM 08:15 AM 4 4 0 Total Volume 15 16 0 % App. Total 48.4 51.6 0 PHF .938 .800 .000
0
8 9 6 8 31 .861
30.1
A1A Northbound
21.2
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
6 7 6 3 22 100 .786
0 0 0 0 0 0 .000
6 7 6 3 22
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
6 1 5 0 12 100 .500
6 1 5 0 12
20 17 17 11 65
.500
.813
.000
241
.786
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T16 A1A & Old CR 210 AM : : 12/8/2015 :1
Groups Printed- Combined Westbound St. A1A Westbound Northbound
A1A Southbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
18 28 51 59 156
32 45 66 82 225
0 0 0 0 0
0 0 0 0 0
50 73 117 141 381
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
50 71 83 117 321
0 1 2 1 4
0 0 0 0 0
50 72 85 118 325
0 0 1 2 3
0 0 0 0 0
27 37 43 75 182
0 2 0 0 2
27 39 44 77 187
127 184 246 336 893
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
60 117 115 121 413
84 113 128 180 505
0 0 0 0 0
0 0 0 0 0
144 230 243 301 918
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
150 205 248 234 837
1 5 13 7 26
0 0 0 0 0
151 210 261 241 863
5 5 4 7 21
0 0 0 0 0
82 104 145 162 493
1 1 0 0 2
88 110 149 169 516
383 550 653 711 2297
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
119 113 90 109 431
186 226 186 160 758
0 0 0 0 0
0 0 0 0 0
305 339 276 269 1189
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
290 276 213 227 1006
8 6 9 8 31
0 0 0 0 0
298 282 222 235 1037
7 6 6 9 28
0 0 0 0 0
188 138 129 149 604
1 1 1 0 3
196 145 136 158 635
799 766 634 662 2861
Grand Total Apprch % Total %
1000 40.2 16.5
1488 59.8 24.6
0 0 0
0 0 0
2488
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
2164 97.3 35.8
61 2.7 1
0 0 0
2225
52 3.9 0.9
0 0 0
1279 95.6 21.1
7 0.5 0.1
1338
6051
41.1
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 115 128 0 07:45 AM 180 0 121 119 186 0 08:00 AM 08:15 AM 113 0 226 Total Volume 468 720 0 % App. Total 39.4 60.6 0 PHF .967 .796 .000
0
243 301 305 339 1188 .876
36.8
A1A Northbound
22.1
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
248 234 290 276 1048 96.9 .903
13 7 8 6 34 3.1 .654
261 241 298 282 1082
4 7 7 6 24 3.7 .857
0 0 0 0 0 0 .000
145 162 188 138 633 96.3 .842
149 169 195 144 657
653 711 798 765 2927
.842
.917
.000
242
.908
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Westbound St. Westbound
A1A Southbound
: T16 A1A & Old CR 210 PM : : 12/8/2015 :1
A1A Northbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
148 145 131 138 562
212 202 221 280 915
1 1 3 0 5
0 0 0 0 0
361 348 355 418 1482
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
184 183 162 197 726
16 4 7 10 37
0 0 0 0 0
200 187 169 207 763
8 6 6 6 26
0 0 0 0 0
154 150 120 115 539
1 1 2 0 4
163 157 128 121 569
724 692 652 746 2814
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
167 178 165 147 657
260 282 265 224 1031
2 1 0 1 4
0 0 0 0 0
429 461 430 372 1692
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
209 213 208 177 807
8 4 5 5 22
0 0 0 0 0
217 217 213 182 829
7 5 8 8 28
0 0 0 0 0
135 127 124 132 518
1 1 0 0 2
143 133 132 140 548
789 811 775 694 3069
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
166 132 132 120 550
209 210 179 168 766
0 0 0 1 1
0 0 0 0 0
375 342 311 289 1317
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
156 151 126 114 547
8 4 1 2 15
0 0 0 0 0
164 155 127 116 562
6 3 4 3 16
0 0 0 0 0
114 99 78 78 369
0 0 1 0 1
120 102 83 81 386
659 599 521 486 2265
Grand Total Apprch % Total %
1769 39.4 21.7
2712 60.4 33.3
10 0.2 0.1
0 0 0
4491
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
2080 96.6 25.5
74 3.4 0.9
0 0 0
2154
70 4.7 0.9
0 0 0
1426 94.9 17.5
7 0.5 0.1
1503
8148
55.1
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 138 280 0 05:00 PM 167 260 2 05:15 PM 1 178 282 05:30 PM 165 265 0 Total Volume 648 1087 3 % App. Total 37.3 62.5 0.2 PHF .910 .964 .375
0
418 429 461 430 1738 .943
26.4
A1A Northbound
18.4
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
197 209 213 208 827 96.8 .971
10 8 4 5 27 3.2 .675
207 217 217 213 854
6 7 5 8 26 4.9 .813
0 0 0 0 0 0 .000
115 135 127 124 501 95.1 .928
121 142 132 132 527
746 788 810 775 3119
.928
.963
.000
243
.984
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T16 A1A & Old CR 210 PM : : 12/8/2015 :1
Groups Printed- Truck Westbound St. A1A Westbound Northbound
A1A Southbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 6 4 2 12
3 3 7 3 16
0 0 0 0 0
0 0 0 0 0
3 9 11 5 28
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
8 3 1 1 13
0 0 1 0 1
0 0 0 0 0
8 3 2 1 14
0 0 0 0 0
0 0 0 0 0
4 2 3 2 11
0 0 0 0 0
4 2 3 2 11
15 14 16 8 53
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
2 1 0 1 4
6 1 1 3 11
0 0 0 0 0
0 0 0 0 0
8 2 1 4 15
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 2 2 1 6
0 0 0 0 0
0 0 0 0 0
1 2 2 1 6
0 0 0 0 0
0 0 0 0 0
2 1 0 1 4
0 0 0 0 0
2 1 0 1 4
11 5 3 6 25
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 1 0 0 1
0 1 1 1 3
0 0 0 0 0
0 0 0 0 0
0 2 1 1 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
1 0 1 0 2
1 3 2 2 8
Grand Total Apprch % Total %
17 36.2 19.8
30 63.8 34.9
0 0 0
0 0 0
47
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
21 95.5 24.4
1 4.5 1.2
0 0 0
22
0 0 0
0 0 0
17 100 19.8
0 0 0
17
86
54.7
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 3 0 04:15 PM 3 0 6 4 0 04:30 PM 7 04:45 PM 2 3 0 Total Volume 12 16 0 % App. Total 42.9 57.1 0 PHF .500 .571 .000
0
3 9 11 5 28 .636
25.6
A1A Northbound
19.8
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
8 3 1 1 13 92.9 .406
0 0 1 0 1 7.1 .250
8 3 2 1 14
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
4 2 3 2 11 100 .688
4 2 3 2 11
15 14 16 8 53
.688
.828
.000
244
.438
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T16 A1A & Old CR 210 PM : : 12/8/2015 :1
Groups Printed- Combined Westbound St. A1A Westbound Northbound
A1A Southbound
Old CR 210 Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
148 151 135 140 574
215 205 228 283 931
1 1 3 0 5
0 0 0 0 0
364 357 366 423 1510
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
192 186 163 198 739
16 4 8 10 38
0 0 0 0 0
208 190 171 208 777
8 6 6 6 26
0 0 0 0 0
158 152 123 117 550
1 1 2 0 4
167 159 131 123 580
739 706 668 754 2867
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
169 179 165 148 661
266 283 266 227 1042
2 1 0 1 4
0 0 0 0 0
437 463 431 376 1707
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
210 215 210 178 813
8 4 5 5 22
0 0 0 0 0
218 219 215 183 835
7 5 8 8 28
0 0 0 0 0
137 128 124 133 522
1 1 0 0 2
145 134 132 141 552
800 816 778 700 3094
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
166 133 132 120 551
209 211 180 169 769
0 0 0 1 1
0 0 0 0 0
375 344 312 290 1321
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
156 152 126 115 549
8 4 1 2 15
0 0 0 0 0
164 156 127 117 564
6 3 4 3 16
0 0 0 0 0
115 99 79 78 371
0 0 1 0 1
121 102 84 81 388
660 602 523 488 2273
Grand Total Apprch % Total %
1786 39.4 21.7
2742 60.4 33.3
10 0.2 0.1
0 0 0
4538
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
2101 96.6 25.5
75 3.4 0.9
0 0 0
2176
70 4.6 0.9
0 0 0
1443 94.9 17.5
7 0.5 0.1
1520
8234
55.1
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 0 04:45 PM 140 283 05:00 PM 169 266 2 05:15 PM 283 1 179 05:30 PM 165 266 0 Total Volume 653 1098 3 % App. Total 37.2 62.6 0.2 PHF .912 .970 .375
0
423 437 463 431 1754 .947
26.4
A1A Northbound
18.5
Old CR 210 Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
198 210 215 210 833 96.9 .969
10 8 4 5 27 3.1 .675
208 218 219 215 860
6 7 5 8 26 4.9 .813
0 0 0 0 0 0 .000
117 137 128 124 506 95.1 .923
123 144 133 132 532
754 799 815 778 3146
.924
.965
.000
245
.982
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Sawgrass Dr Westbound
A1A Southbound
: T17 A1A & Fairfield Blvd_Sawgrass Dr AM : : 12/8/2015 :1 A1A Northbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
2 3 2 1 8
17 26 38 54 135
2 5 4 10 21
0 0 0 0 0
21 34 44 65 164
7 4 9 13 33
1 4 0 5 10
0 1 1 1 3
0 0 0 0 0
8 9 10 19 46
2 1 3 1 7
43 53 70 99 265
0 2 1 3 6
0 0 0 0 0
45 56 74 103 278
0 1 1 2 4
0 0 0 2 2
1 3 6 5 15
0 0 9 2 11
1 4 16 11 32
75 103 144 198 520
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
4 3 6 7 20
64 83 86 119 352
11 8 18 31 68
0 0 0 0 0
79 94 110 157 440
20 30 35 27 112
2 2 0 0 4
1 4 1 5 11
0 0 0 0 0
23 36 36 32 127
2 4 4 8 18
120 177 226 181 704
4 3 10 8 25
0 0 0 0 0
126 184 240 197 747
1 3 3 3 10
2 0 0 0 2
5 8 8 10 31
0 5 1 5 11
8 16 12 18 54
236 330 398 404 1368
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
12 6 5 11 34
135 195 163 101 594
32 29 27 35 123
0 0 0 0 0
179 230 195 147 751
37 33 23 28 121
1 1 0 0 2
13 8 10 9 40
0 0 0 0 0
51 42 33 37 163
1 6 9 7 23
224 255 181 197 857
4 2 5 6 17
0 0 0 0 0
229 263 195 210 897
2 1 3 1 7
1 0 0 3 4
25 11 7 7 50
0 0 2 2 4
28 12 12 13 65
487 547 435 407 1876
Grand Total Apprch % Total %
62 4.6 1.6
1081 79.8 28.7
212 15.6 5.6
0 0 0
1355
266 79.2 7.1
16 4.8 0.4
54 16.1 1.4
0 0 0
336
48 2.5 1.3
1826 95 48.5
48 2.5 1.3
0 0 0
1922
21 13.9 0.6
8 5.3 0.2
96 63.6 2.6
26 17.2 0.7
151
3764
36
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 135 32 08:00 AM 12 08:15 AM 6 29 195 5 163 27 08:30 AM 08:45 AM 11 101 35 Total Volume 34 594 123 % App. Total 4.5 79.1 16.4 PHF .708 .762 .879
8.9
179 230 195 147 751 .816
51.1
A1A Northbound
4
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
37 33 23 28 121 74.2 .818
1 1 0 0 2 1.2 .500
13 8 10 9 40 24.5 .769
51 42 33 37 163
1 6 9 7 23 2.6 .639
224 255 181 197 857 95.5 .840
4 2 5 6 17 1.9 .708
229 263 195 210 897
2 1 3 1 7 11.5 .583
1 0 0 3 4 6.6 .333
25 11 7 7 50 82 .500
28 12 10 11 61
487 547 433 405 1872
.545
.856
.799
246
.853
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T17 A1A & Fairfield Blvd_Sawgrass Dr AM : : 12/8/2015 :1
Groups Printed- Truck Sawgrass Dr A1A Westbound Northbound
A1A Southbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
2 0 1 1 4
0 0 2 0 2
0 0 0 0 0
2 0 3 1 6
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
3 3 2 0 8
0 0 0 1 1
0 0 0 0 0
3 3 2 1 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 3 5 4 17
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 1 1 2
2 2 1 6 11
0 0 2 0 2
0 0 0 0 0
2 2 4 7 15
1 1 1 2 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 1 1 2 5
0 0 1 2 3
1 2 6 6 15
0 0 0 1 1
0 0 0 0 0
1 2 7 9 19
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 5 12 18 39
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 0 0 2 3
0 5 5 6 16
0 1 2 0 3
0 0 0 0 0
1 6 7 8 22
0 0 0 3 3
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 3 3
0 1 1 0 2
5 4 3 3 15
0 1 0 1 2
0 0 0 0 0
5 6 4 4 19
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
6 13 11 15 45
Grand Total Apprch % Total %
5 11.6 5
31 72.1 30.7
7 16.3 6.9
0 0 0
43
10 100 9.9
0 0 0
0 0 0
0 0 0
10
5 10.6 5
38 80.9 37.6
4 8.5 4
0 0 0
47
1 100 1
0 0 0
0 0 0
0 0 0
1
101
42.6
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 1 07:30 AM 1 2 07:45 AM 1 0 6 1 0 0 08:00 AM 08:15 AM 0 5 1 Total Volume 3 12 3 % App. Total 16.7 66.7 16.7 PHF .750 .500 .375
9.9
4 7 1 6 18 .643
46.5
A1A Northbound
1
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 2 0 0 3 100 .375
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
1 2 0 0 3
1 2 0 1 4 14.8 .500
6 6 5 4 21 77.8 .875
0 1 0 1 2 7.4 .500
7 9 5 6 27
0 0 0 1 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 1 1
12 18 6 13 49
.250
.681
.375
247
.750
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T17 A1A & Fairfield Blvd_Sawgrass Dr AM : : 12/8/2015 :1
Groups Printed- Combined Sawgrass Dr A1A Westbound Northbound
A1A Southbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
2 3 2 1 8
19 26 39 55 139
2 5 6 10 23
0 0 0 0 0
23 34 47 66 170
7 4 9 15 35
1 4 0 5 10
0 1 1 1 3
0 0 0 0 0
8 9 10 21 48
2 1 3 1 7
46 56 72 99 273
0 2 1 4 7
0 0 0 0 0
48 59 76 104 287
0 1 1 2 4
0 0 0 2 2
1 3 6 5 15
0 0 9 2 11
1 4 16 11 32
80 106 149 202 537
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
4 3 7 8 22
66 85 87 125 363
11 8 20 31 70
0 0 0 0 0
81 96 114 164 455
21 31 36 29 117
2 2 0 0 4
1 4 1 5 11
0 0 0 0 0
24 37 37 34 132
2 4 5 10 21
121 179 232 187 719
4 3 10 9 26
0 0 0 0 0
127 186 247 206 766
1 3 3 3 10
2 0 0 0 2
5 8 8 10 31
0 5 1 5 11
8 16 12 18 54
240 335 410 422 1407
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
13 6 5 13 37
135 200 168 107 610
32 30 29 35 126
0 0 0 0 0
180 236 202 155 773
37 33 23 31 124
1 1 0 0 2
13 8 10 9 40
0 0 0 0 0
51 42 33 40 166
1 7 10 7 25
229 259 184 200 872
4 3 5 7 19
0 0 0 0 0
234 269 199 214 916
2 2 3 1 8
1 0 0 3 4
25 11 7 7 50
0 0 2 2 4
28 13 12 13 66
493 560 446 422 1921
Grand Total Apprch % Total %
67 4.8 1.7
1112 79.5 28.8
219 15.7 5.7
0 0 0
1398
276 79.8 7.1
16 4.6 0.4
54 15.6 1.4
0 0 0
346
53 2.7 1.4
1864 94.7 48.2
52 2.6 1.3
0 0 0
1969
22 14.5 0.6
8 5.3 0.2
96 63.2 2.5
26 17.1 0.7
152
3865
36.2
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 135 32 08:00 AM 13 08:15 AM 6 30 200 5 168 29 08:30 AM 08:45 AM 13 107 35 Total Volume 37 610 126 % App. Total 4.8 78.9 16.3 PHF .712 .763 .900
9
180 236 202 155 773 .819
50.9
A1A Northbound
3.9
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
37 33 23 31 124 74.7 .838
1 1 0 0 2 1.2 .500
13 8 10 9 40 24.1 .769
51 42 33 40 166
1 7 10 7 25 2.7 .625
229 259 184 200 872 95.2 .842
4 3 5 7 19 2.1 .679
234 269 199 214 916
2 2 3 1 8 12.9 .667
1 0 0 3 4 6.5 .333
25 11 7 7 50 80.6 .500
28 13 10 11 62
493 560 444 420 1917
.554
.856
.814
248
.851
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Sawgrass Dr Westbound
A1A Southbound
: T17 A1A & Fairfield Blvd_Sawgrass Dr PM : : 12/8/2015 :1 A1A Northbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
15 13 11 14 53
172 141 155 201 669
37 41 39 47 164
0 0 0 0 0
224 195 205 262 886
33 25 31 34 123
4 2 1 1 8
5 11 7 5 28
0 0 0 0 0
42 38 39 40 159
11 12 8 9 40
158 155 132 148 593
0 6 0 4 10
0 0 0 0 0
169 173 140 161 643
9 3 3 5 20
3 0 1 2 6
5 13 6 6 30
0 2 3 0 5
17 18 13 13 61
452 424 397 476 1749
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
9 16 13 12 50
213 191 215 175 794
28 32 33 23 116
0 0 0 0 0
250 239 261 210 960
45 32 28 32 137
2 0 1 0 3
5 8 8 2 23
0 0 0 0 0
52 40 37 34 163
9 5 7 4 25
149 156 176 146 627
4 4 3 3 14
0 0 0 0 0
162 165 186 153 666
3 3 1 2 9
0 1 0 0 1
9 7 17 7 40
0 0 1 0 1
12 11 19 9 51
476 455 503 406 1840
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
8 21 10 9 48
164 136 118 125 543
32 31 31 21 115
0 0 0 0 0
204 188 159 155 706
18 17 14 13 62
2 1 1 0 4
4 4 3 3 14
0 0 0 0 0
24 22 18 16 80
7 5 4 2 18
129 118 87 83 417
3 2 1 2 8
0 0 0 0 0
139 125 92 87 443
8 0 2 2 12
2 0 1 0 3
6 8 6 3 23
1 0 0 1 2
17 8 9 6 40
384 343 278 264 1269
Grand Total Apprch % Total %
151 5.9 3.1
2006 78.6 41.3
395 15.5 8.1
0 0 0
2552
322 80.1 6.6
15 3.7 0.3
65 16.2 1.3
0 0 0
402
83 4.7 1.7
1637 93.4 33.7
32 1.8 0.7
0 0 0
1752
41 27 0.8
10 6.6 0.2
93 61.2 1.9
8 5.3 0.2
152
4858
52.5
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 14 201 47 05:00 PM 9 213 28 05:15 PM 191 32 16 05:30 PM 13 33 215 Total Volume 52 820 140 % App. Total 5.1 81 13.8 PHF .813 .953 .745
8.3
262 250 239 261 1012 .966
36.1
A1A Northbound
3.1
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
34 45 32 28 139 82.2 .772
1 2 0 1 4 2.4 .500
5 5 8 8 26 15.4 .813
40 52 40 37 169
9 9 5 7 30 4.5 .833
148 149 156 176 629 93.3 .893
4 4 4 3 15 2.2 .938
161 162 165 186 674
5 3 3 1 12 22.2 .600
2 0 1 0 3 5.6 .375
6 9 7 17 39 72.2 .574
13 12 11 18 54
476 476 455 502 1909
.750
.951
.813
249
.906
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T17 A1A & Fairfield Blvd_Sawgrass Dr PM : : 12/8/2015 :1
Groups Printed- Truck Sawgrass Dr A1A Westbound Northbound
A1A Southbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
1 1 0 0 2
1 4 7 3 15
1 0 0 1 2
0 0 0 0 0
3 5 7 4 19
0 0 1 0 1
1 0 0 0 1
0 2 0 0 2
0 0 0 0 0
1 2 1 0 4
2 0 0 0 2
8 3 4 2 17
0 0 0 0 0
0 0 0 0 0
10 3 4 2 19
1 1 0 0 2
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
2 1 0 0 3
16 11 12 6 45
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
4 2 1 3 10
0 0 0 0 0
0 0 0 0 0
4 2 1 3 10
0 0 0 0 0
1 0 0 0 1
0 1 0 0 1
0 0 0 0 0
1 1 0 0 2
0 0 0 0 0
2 2 1 1 6
0 0 0 0 0
0 0 0 0 0
2 2 1 1 6
1 0 0 0 1
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
2 0 0 0 2
9 5 2 4 20
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 1 0 2
Grand Total Apprch % Total %
2 6.7 3
25 83.3 37.3
3 10 4.5
0 0 0
30
1 14.3 1.5
2 28.6 3
4 57.1 6
0 0 0
7
2 8 3
23 92 34.3
0 0 0
0 0 0
25
3 60 4.5
2 40 3
0 0 0
0 0 0
5
67
44.8
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 1 04:00 PM 1 1 04:15 PM 1 4 0 0 0 04:30 PM 7 04:45 PM 0 3 1 Total Volume 2 15 2 % App. Total 10.5 78.9 10.5 PHF .500 .536 .500
10.4
3 5 7 4 19 .679
37.3
A1A Northbound
7.5
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 1 0 1 25 .250
1 0 0 0 1 25 .250
0 2 0 0 2 50 .250
1 2 1 0 4
2 0 0 0 2 10.5 .250
8 3 4 2 17 89.5 .531
0 0 0 0 0 0 .000
10 3 4 2 19
1 1 0 0 2 66.7 .500
1 0 0 0 1 33.3 .250
0 0 0 0 0 0 .000
2 1 0 0 3
16 11 12 6 45
.375
.703
.500
250
.475
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T17 A1A & Fairfield Blvd_Sawgrass Dr PM : : 12/8/2015 :1
Groups Printed- Combined Sawgrass Dr A1A Westbound Northbound
A1A Southbound
Fairfield Blvd Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
16 14 11 14 55
173 145 162 204 684
38 41 39 48 166
0 0 0 0 0
227 200 212 266 905
33 25 32 34 124
5 2 1 1 9
5 13 7 5 30
0 0 0 0 0
43 40 40 40 163
13 12 8 9 42
166 158 136 150 610
0 6 0 4 10
0 0 0 0 0
179 176 144 163 662
10 4 3 5 22
4 0 1 2 7
5 13 6 6 30
0 2 3 0 5
19 19 13 13 64
468 435 409 482 1794
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
9 16 13 12 50
217 193 216 178 804
28 32 33 23 116
0 0 0 0 0
254 241 262 213 970
45 32 28 32 137
3 0 1 0 4
5 9 8 2 24
0 0 0 0 0
53 41 37 34 165
9 5 7 4 25
151 158 177 147 633
4 4 3 3 14
0 0 0 0 0
164 167 187 154 672
4 3 1 2 10
1 1 0 0 2
9 7 17 7 40
0 0 1 0 1
14 11 19 9 53
485 460 505 410 1860
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
8 21 10 9 48
164 136 118 125 543
32 32 31 21 116
0 0 0 0 0
204 189 159 155 707
18 17 14 13 62
2 1 1 0 4
4 4 4 3 15
0 0 0 0 0
24 22 19 16 81
7 5 4 2 18
129 118 87 83 417
3 2 1 2 8
0 0 0 0 0
139 125 92 87 443
8 0 2 2 12
2 0 1 0 3
6 8 6 3 23
1 0 0 1 2
17 8 9 6 40
384 344 279 264 1271
Grand Total Apprch % Total %
153 5.9 3.1
2031 78.7 41.2
398 15.4 8.1
0 0 0
2582
323 79 6.6
17 4.2 0.3
69 16.9 1.4
0 0 0
409
85 4.8 1.7
1660 93.4 33.7
32 1.8 0.6
0 0 0
1777
44 28 0.9
12 7.6 0.2
93 59.2 1.9
8 5.1 0.2
157
4925
52.4
A1A Southbound
Sawgrass Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 14 204 48 05:00 PM 9 28 217 05:15 PM 193 32 16 05:30 PM 13 216 33 Total Volume 52 830 141 % App. Total 5.1 81.1 13.8 PHF .813 .956 .734
8.3
266 254 241 262 1023 .961
36.1
A1A Northbound
3.2
Fairfield Blvd Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
34 45 32 28 139 81.3 .772
1 3 0 1 5 2.9 .417
5 5 9 8 27 15.8 .750
40 53 41 37 171
9 9 5 7 30 4.4 .833
150 151 158 177 636 93.4 .898
4 4 4 3 15 2.2 .938
163 164 167 187 681
5 4 3 1 13 23.2 .650
2 1 1 0 4 7.1 .500
6 9 7 17 39 69.6 .574
13 14 11 18 56
482 485 460 504 1931
.778
.958
.807
251
.910
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Westbound St. Westbound
A1A Southbound
: T18 A1A & Plantation Dr AM : : 12/8/2015 :1
A1A Northbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
3 6 6 5 20
15 34 29 52 130
0 0 0 0 0
0 0 0 0 0
18 40 35 57 150
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
42 44 59 87 232
0 0 2 1 3
0 0 0 0 0
42 44 61 88 235
1 0 0 1 2
0 0 0 0 0
5 5 7 9 26
1 0 1 5 7
7 5 8 15 35
67 89 104 160 420
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
7 5 7 19 38
55 92 85 117 349
0 0 0 0 0
0 0 0 0 0
62 97 92 136 387
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
99 154 198 184 635
1 1 1 1 4
0 0 0 0 0
100 155 199 185 639
2 2 1 1 6
0 0 0 0 0
17 19 22 17 75
7 0 0 0 7
26 21 23 18 88
188 273 314 339 1114
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
15 40 30 12 97
140 167 157 108 572
0 0 0 0 0
0 0 0 0 0
155 207 187 120 669
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
194 227 166 175 762
3 12 6 1 22
0 0 0 0 0
197 239 172 176 784
1 0 5 2 8
0 0 0 0 0
25 18 17 22 82
2 2 5 0 9
28 20 27 24 99
380 466 386 320 1552
Grand Total Apprch % Total %
155 12.9 5
1051 87.1 34.1
0 0 0
0 0 0
1206
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
1629 98.3 52.8
29 1.7 0.9
0 0 0
1658
16 7.2 0.5
0 0 0
183 82.4 5.9
23 10.4 0.7
222
3086
39.1
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 19 117 0 08:00 AM 15 140 0 08:15 AM 0 40 167 08:30 AM 30 157 0 Total Volume 104 581 0 % App. Total 15.2 84.8 0 PHF .650 .870 .000
0
136 155 207 187 685 .827
53.7
A1A Northbound
7.2
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
184 194 227 166 771 97.2 .849
1 3 12 6 22 2.8 .458
185 197 239 172 793
1 1 0 5 7 8.3 .350
0 0 0 0 0 0 .000
17 25 18 17 77 91.7 .770
18 26 18 22 84
339 378 464 381 1562
.808
.842
.000
252
.829
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T18 A1A & Plantation Dr AM : : 12/8/2015 :1
Groups Printed- Truck Westbound St. A1A Westbound Northbound
A1A Southbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 3 1 9
0 0 0 0 0
0 0 0 0 0
2 3 3 1 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 4 2 11
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 0 0 0
4 2 1 5 12
0 0 0 0 0
0 0 0 0 0
4 2 1 5 12
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 3 6 8 18
0 0 0 0 0
0 0 0 0 0
1 3 6 8 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 5 7 13 30
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
1 5 4 6 16
0 0 0 0 0
0 0 0 0 0
1 5 4 6 16
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 5 3 6 18
0 0 0 0 0
0 0 0 0 0
4 5 3 6 18
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 10 7 12 34
Grand Total Apprch % Total %
0 0 0
30 100 40
0 0 0
0 0 0
30
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
45 100 60
0 0 0
0 0 0
45
0 0 0
0 0 0
0 0 0
0 0 0
0
75
40
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 0 1 0 0 07:45 AM 0 5 08:00 AM 0 1 0 08:15 AM 0 5 0 Total Volume 0 12 0 % App. Total 0 100 0 PHF .000 .600 .000
0
1 5 1 5 12 .600
60
A1A Northbound
0
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
6 8 4 5 23 100 .719
0 0 0 0 0 0 .000
6 8 4 5 23
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
7 13 5 10 35
.000
.673
.000
253
.719
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T18 A1A & Plantation Dr AM : : 12/8/2015 :1
Groups Printed- Combined Westbound St. A1A Westbound Northbound
A1A Southbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
3 6 6 5 20
15 34 30 53 132
0 0 0 0 0
0 0 0 0 0
18 40 36 58 152
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
44 47 62 88 241
0 0 2 1 3
0 0 0 0 0
44 47 64 89 244
1 0 0 1 2
0 0 0 0 0
5 5 7 9 26
1 0 1 5 7
7 5 8 15 35
69 92 108 162 431
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
7 5 7 19 38
59 94 86 122 361
0 0 0 0 0
0 0 0 0 0
66 99 93 141 399
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
100 157 204 192 653
1 1 1 1 4
0 0 0 0 0
101 158 205 193 657
2 2 1 1 6
0 0 0 0 0
17 19 22 17 75
7 0 0 0 7
26 21 23 18 88
193 278 321 352 1144
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
15 40 30 12 97
141 172 161 114 588
0 0 0 0 0
0 0 0 0 0
156 212 191 126 685
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
198 232 169 181 780
3 12 6 1 22
0 0 0 0 0
201 244 175 182 802
1 0 5 2 8
0 0 0 0 0
25 18 17 22 82
2 2 5 0 9
28 20 27 24 99
385 476 393 332 1586
Grand Total Apprch % Total %
155 12.5 4.9
1081 87.5 34.2
0 0 0
0 0 0
1236
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
1674 98.3 53
29 1.7 0.9
0 0 0
1703
16 7.2 0.5
0 0 0
183 82.4 5.8
23 10.4 0.7
222
3161
39.1
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 19 122 0 08:00 AM 15 141 0 08:15 AM 0 40 172 08:30 AM 30 161 0 Total Volume 104 596 0 % App. Total 14.9 85.1 0 PHF .650 .866 .000
0
141 156 212 191 700 .825
53.9
A1A Northbound
7
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
192 198 232 169 791 97.3 .852
1 3 12 6 22 2.7 .458
193 201 244 175 813
1 1 0 5 7 8.3 .350
0 0 0 0 0 0 .000
17 25 18 17 77 91.7 .770
18 26 18 22 84
352 383 474 388 1597
.808
.842
.000
254
.833
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Westbound St. Westbound
A1A Southbound
: T18 A1A & Plantation Dr PM : : 12/8/2015 :1
A1A Northbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
19 15 20 16 70
174 136 140 191 641
0 0 0 0 0
0 0 0 0 0
193 151 160 207 711
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
154 138 126 140 558
0 2 3 3 8
0 0 0 0 0
154 140 129 143 566
2 2 1 3 8
0 0 0 0 0
15 16 14 17 62
0 0 0 0 0
17 18 15 20 70
364 309 304 370 1347
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
22 28 21 21 92
215 203 212 173 803
0 0 0 0 0
0 0 0 0 0
237 231 233 194 895
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
150 152 149 141 592
0 5 1 1 7
0 0 0 0 0
150 157 150 142 599
3 4 0 2 9
0 0 0 0 0
12 15 24 11 62
4 2 3 0 9
19 21 27 13 80
406 409 410 349 1574
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
23 19 18 19 79
144 125 100 102 471
0 0 0 0 0
0 0 0 0 0
167 144 118 121 550
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
102 104 79 73 358
1 2 0 0 3
0 0 0 0 0
103 106 79 73 361
1 0 0 0 1
0 0 0 0 0
26 15 6 4 51
0 0 1 0 1
27 15 7 4 53
297 265 204 198 964
Grand Total Apprch % Total %
241 11.2 6.2
1915 88.8 49.3
0 0 0
0 0 0
2156
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
1508 98.8 38.8
18 1.2 0.5
0 0 0
1526
18 8.9 0.5
0 0 0
175 86.2 4.5
10 4.9 0.3
203
3885
55.5
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 16 191 0 0 05:00 PM 22 215 05:15 PM 203 0 28 05:30 PM 21 212 0 Total Volume 87 821 0 % App. Total 9.6 90.4 0 PHF .777 .955 .000
0
207 237 231 233 908 .958
39.3
A1A Northbound
5.2
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
140 150 152 149 591 98.5 .972
3 0 5 1 9 1.5 .450
143 150 157 150 600
3 3 4 0 10 12.8 .625
0 0 0 0 0 0 .000
17 12 15 24 68 87.2 .708
20 15 19 24 78
370 402 407 407 1586
.813
.974
.000
255
.955
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T18 A1A & Plantation Dr PM : : 12/8/2015 :1
Groups Printed- Truck Westbound St. A1A Westbound Northbound
A1A Southbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
4 6 8 3 21
0 0 0 0 0
0 0 0 0 0
4 6 8 3 21
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
10 3 2 2 17
0 0 0 0 0
0 0 0 0 0
10 3 2 2 17
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
14 9 10 5 38
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
5 4 1 2 12
0 0 0 0 0
0 0 0 0 0
5 4 1 2 12
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 1 1 1 5
0 0 0 0 0
0 0 0 0 0
2 1 1 1 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
7 5 2 3 17
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 1 1 3
Grand Total Apprch % Total %
0 0 0
35 100 60.3
0 0 0
0 0 0
35
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
23 100 39.7
0 0 0
0 0 0
23
0 0 0
0 0 0
0 0 0
0 0 0
0
58
60.3
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 4 0 04:15 PM 0 6 0 0 0 04:30 PM 8 04:45 PM 0 3 0 Total Volume 0 21 0 % App. Total 0 100 0 PHF .000 .656 .000
0
4 6 8 3 21 .656
39.7
A1A Northbound
0
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
10 3 2 2 17 100 .425
0 0 0 0 0 0 .000
10 3 2 2 17
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
14 9 10 5 38
.000
.679
.000
256
.425
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T18 A1A & Plantation Dr PM : : 12/8/2015 :1
Groups Printed- Combined Westbound St. A1A Westbound Northbound
A1A Southbound
Plantation Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
19 15 20 16 70
178 142 148 194 662
0 0 0 0 0
0 0 0 0 0
197 157 168 210 732
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
164 141 128 142 575
0 2 3 3 8
0 0 0 0 0
164 143 131 145 583
2 2 1 3 8
0 0 0 0 0
15 16 14 17 62
0 0 0 0 0
17 18 15 20 70
378 318 314 375 1385
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
22 28 21 21 92
220 207 213 175 815
0 0 0 0 0
0 0 0 0 0
242 235 234 196 907
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
152 153 150 142 597
0 5 1 1 7
0 0 0 0 0
152 158 151 143 604
3 4 0 2 9
0 0 0 0 0
12 15 24 11 62
4 2 3 0 9
19 21 27 13 80
413 414 412 352 1591
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
23 19 18 19 79
145 125 101 102 473
0 0 0 0 0
0 0 0 0 0
168 144 119 121 552
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
102 104 79 74 359
1 2 0 0 3
0 0 0 0 0
103 106 79 74 362
1 0 0 0 1
0 0 0 0 0
26 15 6 4 51
0 0 1 0 1
27 15 7 4 53
298 265 205 199 967
Grand Total Apprch % Total %
241 11 6.1
1950 89 49.5
0 0 0
0 0 0
2191
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
1531 98.8 38.8
18 1.2 0.5
0 0 0
1549
18 8.9 0.5
0 0 0
175 86.2 4.4
10 4.9 0.3
203
3943
55.6
A1A Southbound
Westbound St. Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 16 194 0 0 05:00 PM 22 220 05:15 PM 207 0 28 05:30 PM 21 213 0 Total Volume 87 834 0 % App. Total 9.4 90.6 0 PHF .777 .948 .000
0
210 242 235 234 921 .951
39.3
A1A Northbound
5.1
Plantation Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
142 152 153 150 597 98.5 .975
3 0 5 1 9 1.5 .450
145 152 158 151 606
3 3 4 0 10 12.8 .625
0 0 0 0 0 0 .000
17 12 15 24 68 87.2 .708
20 15 19 24 78
375 409 412 409 1605
.813
.974
.000
257
.959
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr AM : : 12/8/2015 :1
Groups Printed- Car Oceans Edge Dr Westbound
A1A Southbound
A1A Northbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 0 0 3 4
15 30 26 50 121
0 0 2 0 2
0 0 0 0 0
16 30 28 53 127
1 2 1 2 6
0 0 0 0 0
1 0 1 1 3
0 0 0 0 0
2 2 2 3 9
1 0 0 1 2
32 39 65 70 206
0 0 0 1 1
0 0 0 0 0
33 39 65 72 209
1 1 3 6 11
0 0 0 0 0
7 3 5 14 29
0 1 2 2 5
8 5 10 22 45
59 76 105 150 390
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
2 4 3 3 12
51 90 79 116 336
0 2 0 0 2
0 0 0 0 0
53 96 82 119 350
3 4 5 3 15
0 0 0 0 0
1 1 3 3 8
0 0 0 0 0
4 5 8 6 23
0 0 0 4 4
82 141 181 151 555
0 4 1 2 7
0 0 0 0 0
82 145 182 157 566
2 12 2 8 24
0 0 0 0 0
13 13 18 23 67
6 2 0 0 8
21 27 20 31 99
160 273 292 313 1038
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
5 12 8 4 29
117 149 170 98 534
5 2 0 0 7
0 0 0 0 0
127 163 178 102 570
5 10 6 3 24
0 0 0 0 0
6 4 3 1 14
0 0 0 0 0
11 14 9 4 38
2 2 1 2 7
163 209 154 154 680
1 1 6 1 9
0 0 0 0 0
166 212 161 157 696
15 13 10 14 52
0 0 0 0 0
26 18 17 13 74
0 4 0 0 4
41 35 27 27 130
345 424 375 290 1434
Grand Total Apprch % Total %
45 4.3 1.6
991 94.7 34.6
11 1.1 0.4
0 0 0
1047
45 64.3 1.6
0 0 0
25 35.7 0.9
0 0 0
70
13 0.9 0.5
1441 98 50.3
17 1.2 0.6
0 0 0
1471
87 31.8 3
0 0 0
170 62 5.9
17 6.2 0.6
274
2862
36.6
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 3 116 0 08:00 AM 5 117 5 08:15 AM 149 2 12 08:30 AM 8 0 170 Total Volume 28 552 7 % App. Total 4.8 94 1.2 PHF .583 .812 .350
2.4
119 127 163 178 587 .824
51.4
A1A Northbound
9.6
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
3 5 10 6 24 60 .600
0 0 0 0 0 0 .000
3 6 4 3 16 40 .667
6 11 14 9 40
4 2 2 1 9 1.3 .563
151 163 209 154 677 97.3 .810
2 1 1 6 10 1.4 .417
157 166 212 161 696
8 15 13 10 46 35.4 .767
0 0 0 0 0 0 .000
23 26 18 17 84 64.6 .808
31 41 31 27 130
313 345 420 375 1453
.793
.865
.714
258
.821
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr AM : : 12/8/2015 :1
Groups Printed- Truck Oceans Edge Dr A1A Westbound Northbound
A1A Southbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 3 1 9
0 0 0 0 0
0 0 0 0 0
2 3 3 1 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 4 2 11
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
1 0 0 3 4
4 2 0 3 9
0 0 1 0 1
0 0 0 0 0
5 2 1 6 14
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 3 4 9 18
0 1 0 0 1
0 0 0 0 0
2 4 4 9 19
1 0 0 1 2
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
1 0 1 1 3
8 6 6 16 36
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 1 0 2 3
1 4 3 5 13
0 0 0 0 0
0 0 0 0 0
1 5 3 7 16
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 1 1
1 0 0 0 1
4 5 2 6 17
1 0 1 0 2
0 0 0 0 0
6 5 3 6 20
0 2 0 1 3
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 2 1 2 5
7 12 7 16 42
Grand Total Apprch % Total %
7 21.9 7.9
24 75 27
1 3.1 1.1
0 0 0
32
0 0 0
0 0 0
1 100 1.1
0 0 0
1
1 2.1 1.1
44 91.7 49.4
3 6.2 3.4
0 0 0
48
5 62.5 5.6
0 0 0
3 37.5 3.4
0 0 0
8
89
36
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 3 0 07:45 AM 3 08:00 AM 0 1 0 1 0 08:15 AM 4 08:30 AM 0 3 0 Total Volume 4 11 0 % App. Total 26.7 73.3 0 PHF .333 .688 .000
1.1
6 1 5 3 15 .625
53.9
A1A Northbound
9
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 1 0 0 1 4.3 .250
9 4 5 2 20 87 .556
0 1 0 1 2 8.7 .500
9 6 5 3 23
1 0 2 0 3 75 .375
0 0 0 0 0 0 .000
0 0 0 1 1 25 .250
1 0 2 1 4
16 7 12 7 42
.500
.656
.000
259
.639
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr AM : : 12/8/2015 :1
Groups Printed- Combined Oceans Edge Dr A1A Westbound Northbound
A1A Southbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 0 0 3 4
15 30 27 51 123
0 0 2 0 2
0 0 0 0 0
16 30 29 54 129
1 2 1 2 6
0 0 0 0 0
1 0 1 1 3
0 0 0 0 0
2 2 2 3 9
1 0 0 1 2
34 42 68 71 215
0 0 0 1 1
0 0 0 0 0
35 42 68 73 218
1 1 3 6 11
0 0 0 0 0
7 3 5 14 29
0 1 2 2 5
8 5 10 22 45
61 79 109 152 401
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 4 3 6 16
55 92 79 119 345
0 2 1 0 3
0 0 0 0 0
58 98 83 125 364
3 4 5 3 15
0 0 0 0 0
1 1 3 3 8
0 0 0 0 0
4 5 8 6 23
0 0 0 4 4
84 144 185 160 573
0 5 1 2 8
0 0 0 0 0
84 149 186 166 585
3 12 2 9 26
0 0 0 0 0
13 13 19 23 68
6 2 0 0 8
22 27 21 32 102
168 279 298 329 1074
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
5 13 8 6 32
118 153 173 103 547
5 2 0 0 7
0 0 0 0 0
128 168 181 109 586
5 10 6 3 24
0 0 0 0 0
6 4 3 2 15
0 0 0 0 0
11 14 9 5 39
3 2 1 2 8
167 214 156 160 697
2 1 7 1 11
0 0 0 0 0
172 217 164 163 716
15 15 10 15 55
0 0 0 0 0
26 18 18 14 76
0 4 0 0 4
41 37 28 29 135
352 436 382 306 1476
Grand Total Apprch % Total %
52 4.8 1.8
1015 94.1 34.4
12 1.1 0.4
0 0 0
1079
45 63.4 1.5
0 0 0
26 36.6 0.9
0 0 0
71
14 0.9 0.5
1485 97.8 50.3
20 1.3 0.7
0 0 0
1519
92 32.6 3.1
0 0 0
173 61.3 5.9
17 6 0.6
282
2951
36.6
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 6 119 0 08:00 AM 5 118 5 08:15 AM 153 2 13 08:30 AM 8 0 173 Total Volume 32 563 7 % App. Total 5.3 93.5 1.2 PHF .615 .814 .350
2.4
125 128 168 181 602 .831
51.5
A1A Northbound
9.6
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
3 5 10 6 24 60 .600
0 0 0 0 0 0 .000
3 6 4 3 16 40 .667
6 11 14 9 40
4 3 2 1 10 1.4 .625
160 167 214 156 697 96.9 .814
2 2 1 7 12 1.7 .429
166 172 217 164 719
9 15 15 10 49 36.6 .817
0 0 0 0 0 0 .000
23 26 18 18 85 63.4 .817
32 41 33 28 134
329 352 432 382 1495
.817
.865
.714
260
.828
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr PM : : 12/8/2015 :1
Groups Printed- Car Oceans Edge Dr Westbound
A1A Southbound
A1A Northbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
21 5 8 14 48
144 130 127 164 565
4 5 1 3 13
1 0 1 0 2
170 140 137 181 628
0 1 2 0 3
0 0 0 0 0
1 2 1 0 4
0 0 0 0 0
1 3 3 0 7
0 0 1 2 3
147 125 120 127 519
8 8 6 9 31
0 0 0 0 0
155 133 127 138 553
9 5 7 4 25
1 0 0 0 1
11 10 6 10 37
0 0 1 3 4
21 15 14 17 67
347 291 281 336 1255
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
12 14 13 20 59
192 190 193 154 729
4 5 7 3 19
0 0 0 0 0
208 209 213 177 807
3 1 2 3 9
0 0 0 0 0
2 2 1 1 6
0 0 0 0 0
5 3 3 4 15
2 1 4 0 7
126 143 132 127 528
9 5 9 8 31
0 0 0 0 0
137 149 145 135 566
5 5 8 3 21
0 0 0 0 0
8 9 10 5 32
3 8 2 0 13
16 22 20 8 66
366 383 381 324 1454
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
13 19 15 20 67
130 105 71 77 383
0 5 3 4 12
0 0 0 0 0
143 129 89 101 462
5 2 9 6 22
0 0 0 0 0
0 2 0 0 2
0 0 0 0 0
5 4 9 6 24
3 1 1 1 6
93 88 57 57 295
5 8 2 9 24
0 0 0 0 0
101 97 60 67 325
3 2 3 3 11
0 0 0 0 0
7 8 14 8 37
0 0 0 0 0
10 10 17 11 48
259 240 175 185 859
Grand Total Apprch % Total %
174 9.2 4.9
1677 88.4 47
44 2.3 1.2
2 0.1 0.1
1897
34 73.9 1
0 0 0
12 26.1 0.3
0 0 0
46
16 1.1 0.4
1342 92.9 37.6
86 6 2.4
0 0 0
1444
57 31.5 1.6
1 0.6 0
106 58.6 3
17 9.4 0.5
181
3568
53.2
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 164 3 04:45 PM 14 05:00 PM 12 192 4 14 190 5 05:15 PM 05:30 PM 13 193 7 Total Volume 53 739 19 % App. Total 6.5 91.1 2.3 PHF .946 .957 .679
1.3
181 208 209 213 811 .952
40.5
A1A Northbound
5.1
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 3 1 2 6 54.5 .500
0 0 0 0 0 0 .000
0 2 2 1 5 45.5 .625
0 5 3 3 11
2 2 1 4 9 1.6 .563
127 126 143 132 528 92.8 .923
9 9 5 9 32 5.6 .889
138 137 149 145 569
4 5 5 8 22 37.3 .688
0 0 0 0 0 0 .000
10 8 9 10 37 62.7 .925
14 13 14 18 59
333 363 375 379 1450
.819
.956
.550
261
.955
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr PM : : 12/8/2015 :1
Groups Printed- Truck Oceans Edge Dr A1A Westbound Northbound
A1A Southbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 1 0 0 1
4 6 8 3 21
0 0 0 0 0
0 0 0 0 0
4 7 8 3 22
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
13 4 0 2 19
1 0 0 0 1
0 0 0 0 0
14 4 0 2 20
0 1 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 1 0 2
18 12 9 5 44
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 1 0 0 1
4 5 1 2 12
0 0 0 0 0
0 0 0 0 0
4 6 1 2 13
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 1 2 0 6
0 0 0 0 0
0 0 0 0 0
3 1 2 0 6
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
7 8 3 2 20
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
Grand Total Apprch % Total %
2 5.4 3
35 94.6 53
0 0 0
0 0 0
37
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
25 96.2 37.9
1 3.8 1.5
0 0 0
26
3 100 4.5
0 0 0
0 0 0
0 0 0
3
66
56.1
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 4 0 04:15 PM 6 0 1 0 0 04:30 PM 8 04:45 PM 0 3 0 Total Volume 1 21 0 % App. Total 4.5 95.5 0 PHF .250 .656 .000
0
4 7 8 3 22 .688
39.4
A1A Northbound
4.5
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
13 4 0 2 19 95 .365
1 0 0 0 1 5 .250
14 4 0 2 20
0 1 1 0 2 100 .500
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 1 1 0 2
18 12 9 5 44
.500
.611
.000
262
.357
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T19 A1A & Crossroad Lakes Dr_Oceans Edge Dr PM : : 12/8/2015 :1
Groups Printed- Combined Oceans Edge Dr A1A Westbound Northbound
A1A Southbound
Crossroad Lakes Dr Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
21 6 8 14 49
148 136 135 167 586
4 5 1 3 13
1 0 1 0 2
174 147 145 184 650
0 1 2 0 3
0 0 0 0 0
1 2 1 0 4
0 0 0 0 0
1 3 3 0 7
0 0 1 2 3
160 129 120 129 538
9 8 6 9 32
0 0 0 0 0
169 137 127 140 573
9 6 8 4 27
1 0 0 0 1
11 10 6 10 37
0 0 1 3 4
21 16 15 17 69
365 303 290 341 1299
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
12 15 13 20 60
196 195 194 156 741
4 5 7 3 19
0 0 0 0 0
212 215 214 179 820
3 1 2 3 9
0 0 0 0 0
2 2 1 1 6
0 0 0 0 0
5 3 3 4 15
2 1 4 0 7
129 144 134 127 534
9 5 9 8 31
0 0 0 0 0
140 150 147 135 572
5 6 8 3 22
0 0 0 0 0
8 9 10 5 32
3 8 2 0 13
16 23 20 8 67
373 391 384 326 1474
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
13 19 15 20 67
131 105 72 77 385
0 5 3 4 12
0 0 0 0 0
144 129 90 101 464
5 2 9 6 22
0 0 0 0 0
0 2 0 0 2
0 0 0 0 0
5 4 9 6 24
3 1 1 1 6
93 88 57 57 295
5 8 2 9 24
0 0 0 0 0
101 97 60 67 325
3 2 3 3 11
0 0 0 0 0
7 8 14 8 37
0 0 0 0 0
10 10 17 11 48
260 240 176 185 861
Grand Total Apprch % Total %
176 9.1 4.8
1712 88.5 47.1
44 2.3 1.2
2 0.1 0.1
1934
34 73.9 0.9
0 0 0
12 26.1 0.3
0 0 0
46
16 1.1 0.4
1367 93 37.6
87 5.9 2.4
0 0 0
1470
60 32.6 1.7
1 0.5 0
106 57.6 2.9
17 9.2 0.5
184
3634
53.2
A1A Southbound
Oceans Edge Dr Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 14 167 3 05:00 PM 12 4 196 05:15 PM 195 5 15 05:30 PM 13 194 7 Total Volume 54 752 19 % App. Total 6.5 91.2 2.3 PHF .900 .959 .679
1.3
184 212 215 214 825 .959
40.5
A1A Northbound
5.1
Crossroad Lakes Dr Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 3 1 2 6 54.5 .500
0 0 0 0 0 0 .000
0 2 2 1 5 45.5 .625
0 5 3 3 11
2 2 1 4 9 1.6 .563
129 129 144 134 536 92.9 .931
9 9 5 9 32 5.5 .889
140 140 150 147 577
4 5 6 8 23 38.3 .719
0 0 0 0 0 0 .000
10 8 9 10 37 61.7 .925
14 13 15 18 60
338 370 383 382 1473
.833
.961
.550
263
.962
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Ponte Vedra Blvd Westbound
A1A Southbound
: T20 A1A & Mickler Rd AM : : 12/8/2015 :1
A1A Northbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
3 9 17 22 51
8 23 12 21 64
0 0 0 6 6
0 0 0 0 0
11 32 29 49 121
1 1 2 2 6
1 0 3 3 7
0 0 0 0 0
0 0 0 0 0
2 1 5 5 13
0 0 0 0 0
19 23 28 38 108
3 4 8 7 22
0 0 0 0 0
22 27 36 45 130
3 0 2 9 14
1 2 5 7 15
11 15 28 32 86
0 0 0 0 0
15 17 35 48 115
50 77 105 147 379
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
17 53 49 53 172
29 41 34 47 151
2 5 3 4 14
0 0 0 0 0
48 99 86 104 337
3 3 3 6 15
5 14 5 6 30
0 2 0 0 2
0 0 0 0 0
8 19 8 12 47
1 2 4 3 10
40 50 75 42 207
16 14 13 19 62
0 0 0 0 0
57 66 92 64 279
3 6 5 13 27
4 6 6 9 25
50 87 102 114 353
0 0 0 0 0
57 99 113 136 405
170 283 299 316 1068
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
96 119 106 77 398
29 34 60 36 159
6 6 3 2 17
0 0 0 0 0
131 159 169 115 574
1 2 2 7 12
13 15 13 14 55
1 2 1 3 7
0 0 0 0 0
15 19 16 24 74
5 10 1 9 25
53 71 49 57 230
18 22 10 18 68
0 0 0 0 0
76 103 60 84 323
8 13 13 18 52
13 16 22 10 61
122 139 105 89 455
0 0 0 0 0
143 168 140 117 568
365 449 385 340 1539
Grand Total Apprch % Total %
621 60.2 20.8
374 36.2 12.5
37 3.6 1.2
0 0 0
1032
33 24.6 1.1
92 68.7 3.1
9 6.7 0.3
0 0 0
134
35 4.8 1.2
545 74.5 18.3
152 20.8 5.1
0 0 0
732
93 8.5 3.1
101 9.3 3.4
894 82.2 29.9
0 0 0
1088
2986
34.6
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 96 29 6 08:15 AM 34 6 119 106 3 08:30 AM 60 08:45 AM 77 36 2 Total Volume 398 159 17 % App. Total 69.3 27.7 3 PHF .836 .663 .708
4.5
131 159 169 115 574 .849
24.5
A1A Northbound
36.4
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 2 2 7 12 16.2 .429
13 15 13 14 55 74.3 .917
1 2 1 3 7 9.5 .583
15 19 16 24 74
5 10 1 9 25 7.7 .625
53 71 49 57 230 71.2 .810
18 22 10 18 68 21.1 .773
76 103 60 84 323
8 13 13 18 52 9.2 .722
13 16 22 10 61 10.7 .693
122 139 105 89 455 80.1 .818
143 168 140 117 568
365 449 385 340 1539
.845
.857
.771
264
.784
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T20 A1A & Mickler Rd AM : : 12/8/2015 :1
Groups Printed- Truck Ponte Vedra Blvd A1A Westbound Northbound
A1A Southbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 3 0 0 4
0 0 1 0 1
0 0 0 0 0
1 3 1 0 5
0 0 0 0 0
0 0 0 0 0
1 0 3 1 5
0 0 0 0 0
1 0 3 1 5
2 3 5 2 12
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
4 1 0 0 5
1 1 0 2 4
1 0 0 2 3
0 0 0 0 0
6 2 0 4 12
1 0 0 0 1
0 0 1 0 1
0 1 0 0 1
0 0 0 0 0
1 1 1 0 3
1 0 0 0 1
0 1 1 3 5
1 0 3 0 4
0 0 0 0 0
2 1 4 3 10
1 1 1 0 3
0 0 0 0 0
1 3 3 6 13
0 0 0 0 0
2 4 4 6 16
11 8 9 13 41
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 5 0 6 11
1 1 2 2 6
0 0 0 0 0
0 0 0 0 0
1 6 2 8 17
0 0 0 0 0
0 0 5 1 6
0 0 0 0 0
0 0 0 0 0
0 0 5 1 6
0 0 0 0 0
2 2 1 2 7
0 1 2 1 4
0 0 0 0 0
2 3 3 3 11
0 0 2 1 3
5 0 2 0 7
3 3 1 4 11
0 0 0 0 0
8 3 5 5 21
11 12 15 17 55
Grand Total Apprch % Total %
18 58.1 16.7
10 32.3 9.3
3 9.7 2.8
0 0 0
31
1 11.1 0.9
7 77.8 6.5
1 11.1 0.9
0 0 0
9
1 3.8 0.9
16 61.5 14.8
9 34.6 8.3
0 0 0
26
6 14.3 5.6
7 16.7 6.5
29 69 26.9
0 0 0
42
108
28.7
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 0 1 0 08:15 AM 5 1 0 0 0 08:30 AM 2 08:45 AM 2 0 6 Total Volume 11 6 0 % App. Total 64.7 35.3 0 PHF .458 .750 .000
8.3
1 6 2 8 17 .531
24.1
A1A Northbound
38.9
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 5 1 6 100 .300
0 0 0 0 0 0 .000
0 0 5 1 6
0 0 0 0 0 0 .000
2 2 1 2 7 63.6 .875
0 1 2 1 4 36.4 .500
2 3 3 3 11
0 0 2 1 3 14.3 .375
5 0 2 0 7 33.3 .350
3 3 1 4 11 52.4 .688
8 3 5 5 21
11 12 15 17 55
.656
.809
.300
265
.917
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T20 A1A & Mickler Rd AM : : 12/8/2015 :1
Groups Printed- Combined Ponte Vedra Blvd A1A Westbound Northbound
A1A Southbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
3 9 18 23 53
8 23 12 21 64
0 0 0 6 6
0 0 0 0 0
11 32 30 50 123
1 1 2 2 6
1 0 3 3 7
0 0 0 0 0
0 0 0 0 0
2 1 5 5 13
0 0 0 0 0
20 26 28 38 112
3 4 9 7 23
0 0 0 0 0
23 30 37 45 135
3 0 2 9 14
1 2 5 7 15
12 15 31 33 91
0 0 0 0 0
16 17 38 49 120
52 80 110 149 391
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
21 54 49 53 177
30 42 34 49 155
3 5 3 6 17
0 0 0 0 0
54 101 86 108 349
4 3 3 6 16
5 14 6 6 31
0 3 0 0 3
0 0 0 0 0
9 20 9 12 50
2 2 4 3 11
40 51 76 45 212
17 14 16 19 66
0 0 0 0 0
59 67 96 67 289
4 7 6 13 30
4 6 6 9 25
51 90 105 120 366
0 0 0 0 0
59 103 117 142 421
181 291 308 329 1109
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
96 124 106 83 409
30 35 62 38 165
6 6 3 2 17
0 0 0 0 0
132 165 171 123 591
1 2 2 7 12
13 15 18 15 61
1 2 1 3 7
0 0 0 0 0
15 19 21 25 80
5 10 1 9 25
55 73 50 59 237
18 23 12 19 72
0 0 0 0 0
78 106 63 87 334
8 13 15 19 55
18 16 24 10 68
125 142 106 93 466
0 0 0 0 0
151 171 145 122 589
376 461 400 357 1594
Grand Total Apprch % Total %
639 60.1 20.7
384 36.1 12.4
40 3.8 1.3
0 0 0
1063
34 23.8 1.1
99 69.2 3.2
10 7 0.3
0 0 0
143
36 4.7 1.2
561 74 18.1
161 21.2 5.2
0 0 0
758
99 8.8 3.2
108 9.6 3.5
923 81.7 29.8
0 0 0
1130
3094
34.4
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 96 30 6 08:15 AM 35 6 124 106 3 08:30 AM 62 08:45 AM 83 38 2 Total Volume 409 165 17 % App. Total 69.2 27.9 2.9 PHF .825 .665 .708
4.6
132 165 171 123 591 .864
24.5
A1A Northbound
36.5
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 2 2 7 12 15 .429
13 15 18 15 61 76.2 .847
1 2 1 3 7 8.8 .583
15 19 21 25 80
5 10 1 9 25 7.5 .625
55 73 50 59 237 71 .812
18 23 12 19 72 21.6 .783
78 106 63 87 334
8 13 15 19 55 9.3 .724
18 16 24 10 68 11.5 .708
125 142 106 93 466 79.1 .820
151 171 145 122 589
376 461 400 357 1594
.861
.864
.800
266
.788
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No Groups Printed- Car Ponte Vedra Blvd Westbound
A1A Southbound
: T20 A1A & Mickler Rd PM : : 12/8/2015 :1
A1A Northbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
73 60 75 94 302
75 68 52 69 264
3 5 4 10 22
0 0 0 0 0
151 133 131 173 588
4 6 8 9 27
11 10 13 9 43
1 6 4 5 16
0 0 0 0 0
16 22 25 23 86
1 4 1 3 9
52 50 50 54 206
10 10 9 10 39
0 0 0 0 0
63 64 60 67 254
16 17 11 5 49
13 10 8 14 45
99 69 62 77 307
0 0 0 0 0
128 96 81 96 401
358 315 297 359 1329
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
99 111 119 84 413
97 83 69 73 322
8 3 8 4 23
0 0 0 0 0
204 197 196 161 758
11 4 5 6 26
10 17 16 19 62
3 6 4 1 14
0 0 0 0 0
24 27 25 26 102
2 4 0 2 8
48 47 55 43 193
11 9 9 11 40
0 0 0 0 0
61 60 64 56 241
16 7 9 12 44
7 10 4 3 24
73 91 89 81 334
0 0 0 0 0
96 108 102 96 402
385 392 387 339 1503
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
78 49 39 39 205
52 52 36 40 180
6 1 3 2 12
0 0 0 0 0
136 102 78 81 397
2 3 1 4 10
6 8 8 1 23
0 0 2 1 3
0 0 0 0 0
8 11 11 6 36
0 0 1 1 2
38 38 19 21 116
5 4 11 1 21
0 0 0 0 0
43 42 31 23 139
9 14 7 10 40
6 4 6 3 19
54 54 41 42 191
0 0 0 0 0
69 72 54 55 250
256 227 174 165 822
Grand Total Apprch % Total %
920 52.8 25.2
766 43.9 21
57 3.3 1.6
0 0 0
1743
63 28.1 1.7
128 57.1 3.5
33 14.7 0.9
0 0 0
224
19 3 0.5
515 81.2 14.1
100 15.8 2.7
0 0 0
634
133 12.6 3.6
88 8.4 2.4
832 79 22.8
0 0 0
1053
3654
47.7
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 94 69 10 05:00 PM 99 8 97 111 83 3 05:15 PM 69 8 05:30 PM 119 Total Volume 423 318 29 % App. Total 54.9 41.3 3.8 PHF .889 .820 .725
6.1
173 204 197 196 770 .944
17.4
A1A Northbound
28.8
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
9 11 4 5 29 29.3 .659
9 10 17 16 52 52.5 .765
5 3 6 4 18 18.2 .750
23 24 27 25 99
3 2 4 0 9 3.6 .563
54 48 47 55 204 81 .927
10 11 9 9 39 15.5 .886
67 61 60 64 252
5 16 7 9 37 9.2 .578
14 7 10 4 35 8.7 .625
77 73 91 89 330 82.1 .907
96 96 108 102 402
359 385 392 387 1523
.931
.971
.917
267
.940
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T20 A1A & Mickler Rd PM : : 12/8/2015 :1
Groups Printed- Truck Ponte Vedra Blvd A1A Westbound Northbound
A1A Southbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
2 5 3 2 12
1 1 4 1 7
0 1 1 0 2
0 0 0 0 0
3 7 8 3 21
0 0 0 0 0
0 1 0 0 1
0 1 0 0 1
0 0 0 0 0
0 2 0 0 2
0 1 0 0 1
1 1 0 1 3
1 2 0 0 3
0 0 0 0 0
2 4 0 1 7
3 1 0 0 4
1 3 0 0 4
12 3 0 1 16
0 0 0 0 0
16 7 0 1 24
21 20 8 5 54
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
4 2 0 1 7
0 2 0 2 4
0 0 1 0 1
0 0 0 0 0
4 4 1 3 12
0 0 0 0 0
2 0 2 0 4
0 0 0 0 0
0 0 0 0 0
2 0 2 0 4
0 0 0 0 0
1 0 1 1 3
1 1 0 0 2
0 0 0 0 0
2 1 1 1 5
0 0 0 0 0
0 0 0 0 0
0 1 0 1 2
0 0 0 0 0
0 1 0 1 2
8 6 4 5 23
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
3 0 1 0 4
Grand Total Apprch % Total %
21 60 25.9
11 31.4 13.6
3 8.6 3.7
0 0 0
35
0 0 0
6 85.7 7.4
1 14.3 1.2
0 0 0
7
1 8.3 1.2
6 50 7.4
5 41.7 6.2
0 0 0
12
5 18.5 6.2
4 14.8 4.9
18 66.7 22.2
0 0 0
27
81
43.2
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 2 1 0 04:15 PM 1 5 1 3 1 04:30 PM 4 04:45 PM 2 1 0 Total Volume 12 7 2 % App. Total 57.1 33.3 9.5 PHF .600 .438 .500
8.6
3 7 8 3 21 .656
14.8
A1A Northbound
33.3
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 1 0 0 1 50 .250
0 1 0 0 1 50 .250
0 2 0 0 2
0 1 0 0 1 14.3 .250
1 1 0 1 3 42.9 .750
1 2 0 0 3 42.9 .375
2 4 0 1 7
3 1 0 0 4 16.7 .333
1 3 0 0 4 16.7 .333
12 3 0 1 16 66.7 .333
16 7 0 1 24
21 20 8 5 54
.375
.643
.250
268
.438
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: T20 A1A & Mickler Rd PM : : 12/8/2015 :1
Groups Printed- Combined Ponte Vedra Blvd A1A Westbound Northbound
A1A Southbound
Mickler Red Eastbound
Start Time
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Right
Thru
Left
Peds
App. Total
Int. Total
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
75 65 78 96 314
76 69 56 70 271
3 6 5 10 24
0 0 0 0 0
154 140 139 176 609
4 6 8 9 27
11 11 13 9 44
1 7 4 5 17
0 0 0 0 0
16 24 25 23 88
1 5 1 3 10
53 51 50 55 209
11 12 9 10 42
0 0 0 0 0
65 68 60 68 261
19 18 11 5 53
14 13 8 14 49
111 72 62 78 323
0 0 0 0 0
144 103 81 97 425
379 335 305 364 1383
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
103 113 119 85 420
97 85 69 75 326
8 3 9 4 24
0 0 0 0 0
208 201 197 164 770
11 4 5 6 26
12 17 18 19 66
3 6 4 1 14
0 0 0 0 0
26 27 27 26 106
2 4 0 2 8
49 47 56 44 196
12 10 9 11 42
0 0 0 0 0
63 61 65 57 246
16 7 9 12 44
7 10 4 3 24
73 92 89 82 336
0 0 0 0 0
96 109 102 97 404
393 398 391 344 1526
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
79 49 40 39 207
52 52 36 40 180
6 1 3 2 12
0 0 0 0 0
137 102 79 81 399
2 3 1 4 10
7 8 8 1 24
0 0 2 1 3
0 0 0 0 0
9 11 11 6 37
0 0 1 1 2
38 38 19 21 116
5 4 11 1 21
0 0 0 0 0
43 42 31 23 139
10 14 7 10 41
6 4 6 3 19
54 54 41 42 191
0 0 0 0 0
70 72 54 55 251
259 227 175 165 826
Grand Total Apprch % Total %
941 52.9 25.2
777 43.7 20.8
60 3.4 1.6
0 0 0
1778
63 27.3 1.7
134 58 3.6
34 14.7 0.9
0 0 0
231
20 3.1 0.5
521 80.7 13.9
105 16.3 2.8
0 0 0
646
138 12.8 3.7
92 8.5 2.5
850 78.7 22.8
0 0 0
1080
3735
47.6
A1A Southbound
Ponte Vedra Blvd Westbound
Start Time Right Thru Left App. Total Peak Hour Analysis From 04:00 PM to 06:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 96 70 10 05:00 PM 103 8 97 113 85 3 05:15 PM 69 9 05:30 PM 119 Total Volume 431 321 30 % App. Total 55.1 41 3.8 PHF .905 .827 .750
6.2
176 208 201 197 782 .940
17.3
A1A Northbound
28.9
Mickler Red Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
9 11 4 5 29 28.2 .659
9 12 17 18 56 54.4 .778
5 3 6 4 18 17.5 .750
23 26 27 27 103
3 2 4 0 9 3.5 .563
55 49 47 56 207 80.5 .924
10 12 10 9 41 16 .854
68 63 61 65 257
5 16 7 9 37 9.2 .578
14 7 10 4 35 8.7 .625
78 73 92 89 332 82.2 .902
97 96 109 102 404
364 393 398 391 1546
.927
.971
.954
269
.945
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe AM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 0 2 1 1 4
Thru 5 4 8 19 36
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 9 12 15 28 64
Left 0 0 0 1 1
Peds 0 0 0 2 2
Thru 0 0 0 0 0
Left 0 2 4 2 8
Peds 1 0 0 0 1
Int. Total
9 12 15 31 67
Right 0 0 2 0 2
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
5 6 9 20 40
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 2 6 2 11
15 20 30 53 118
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 0 1 2 6
27 52 61 53 193
0 0 0 0 0
0 0 0 0 0
30 52 62 55 199
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
35 51 76 79 241
0 0 3 2 5
0 0 0 0 0
35 51 79 81 246
2 4 1 3 10
0 0 0 0 0
6 2 7 5 20
0 0 0 0 0
8 6 8 8 30
73 109 149 144 475
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
2 1 1 3 7
59 70 65 53 247
0 0 0 0 0
0 0 0 0 0
61 71 66 56 254
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 0 0 1
0 0 1 0 1
84 80 74 66 304
5 1 2 2 10
0 0 0 0 0
89 81 77 68 315
9 2 1 2 14
0 0 0 0 0
2 6 6 2 16
0 0 0 0 0
11 8 7 4 30
162 160 150 128 600
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
5 3 3 4 15
44 37 30 45 156
0 1 1 1 3
0 0 0 0 0
49 41 34 50 174
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 1 0 0 1
50 53 46 35 184
0 4 1 2 7
0 0 0 0 0
50 58 47 37 192
0 1 1 0 2
0 0 0 0 0
6 1 4 2 13
0 0 0 0 0
6 2 5 2 15
105 102 86 89 382
Grand Total Apprch % Total %
32 4.8 2
632 94.8 40.1
3 0.4 0.2
0 0 0
667
1 50 0.1
0 0 0
1 50 0.1
0 0 0
2
2 0.2 0.1
793 96.7 50.3
23 2.8 1.5
2 0.2 0.1
820
28 32.6 1.8
0 0 0
57 66.3 3.6
1 1.2 0.1
86
1575
42.3
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 53 0 55 2 08:00 AM 2 59 0 61 08:15 AM 1 0 70 71 08:30 AM 1 65 0 66 Total Volume 6 247 0 253 % App. Total 2.4 97.6 0 PHF .750 .882 .000 .891
0.1
Driveway Westbound
52.1
N. Roscoe Blvd. Northbound
5.5
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 1 0 0 1 100 .250
0 1 0 0 1
0 0 0 1 1 0.3 .250
79 84 80 74 317 96.6 .943
2 5 1 2 10 3 .500
81 89 81 77 328
3 9 2 1 15 44.1 .417
0 0 0 0 0 0 .000
5 2 6 6 19 55.9 .792
8 11 8 7 34
144 162 160 150 616
.773
.951
.250
270
.921
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe AM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 0 0 0 0 0
Thru 0 1 0 2 3
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 2 0 2 2 6
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Int. Total
2 0 2 2 6
Right 0 0 0 0 0
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
0 1 0 2 3
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 0 0 0
2 1 2 4 9
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 0 0 0 0
1 5 1 1 8
0 0 0 0 0
0 0 0 0 0
1 5 1 1 8
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 1 3 8 13
0 0 0 1 1
0 0 0 0 0
1 1 3 9 14
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
2 6 4 11 23
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
1 1 1 3 6
0 0 0 0 0
0 0 0 0 0
1 1 1 3 6
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 4 2 1 10
0 0 0 0 0
0 0 0 0 0
3 4 2 1 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 5 3 4 16
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
0 0 0 0 0
2 2 5 0 9
0 0 0 0 0
0 0 0 0 0
2 2 5 0 9
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 2 2 5 10
0 0 0 0 0
0 0 0 0 0
1 2 2 5 10
0 0 1 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
4 4 8 5 21
Grand Total Apprch % Total %
0 0 0
26 100 37.7
0 0 0
0 0 0
26
1 100 1.4
0 0 0
0 0 0
0 0 0
1
0 0 0
39 97.5 56.5
1 2.5 1.4
0 0 0
40
2 100 2.9
0 0 0
0 0 0
0 0 0
2
69
37.7
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 0 0 5 5 07:30 AM 0 1 0 1 07:45 AM 0 1 0 1 08:00 AM 0 1 0 1 Total Volume 0 8 0 8 % App. Total 0 100 0 PHF .000 .400 .000 .400
1.4
Driveway Westbound
58
N. Roscoe Blvd. Northbound
2.9
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
1 3 8 3 15 93.8 .469
0 0 1 0 1 6.2 .250
1 3 9 3 16
0 0 1 0 1 100 .250
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 1 0 1
6 4 11 4 25
.250
.568
.000
271
.444
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe AM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 0 2 1 1 4
Thru 5 5 8 21 39
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 11 12 17 30 70
Left 0 0 0 1 1
Peds 0 0 0 2 2
Thru 0 0 0 0 0
Left 0 2 4 2 8
Peds 1 0 0 0 1
Int. Total
11 12 17 33 73
Right 0 0 2 0 2
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
5 7 9 22 43
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
1 2 6 2 11
17 21 32 57 127
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 0 1 2 6
28 57 62 54 201
0 0 0 0 0
0 0 0 0 0
31 57 63 56 207
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
36 52 79 87 254
0 0 3 3 6
0 0 0 0 0
36 52 82 90 260
2 4 1 4 11
0 0 0 0 0
6 2 7 5 20
0 0 0 0 0
8 6 8 9 31
75 115 153 155 498
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
2 1 1 3 7
60 71 66 56 253
0 0 0 0 0
0 0 0 0 0
62 72 67 59 260
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 0 0 1
0 0 1 0 1
87 84 76 67 314
5 1 2 2 10
0 0 0 0 0
92 85 79 69 325
9 2 1 2 14
0 0 0 0 0
2 6 6 2 16
0 0 0 0 0
11 8 7 4 30
166 165 153 132 616
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
5 3 3 4 15
46 39 35 45 165
0 1 1 1 3
0 0 0 0 0
51 43 39 50 183
1 1 0 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 1 0 0 2
0 1 0 0 1
51 55 48 40 194
0 4 1 2 7
0 0 0 0 0
51 60 49 42 202
0 1 2 0 3
0 0 0 0 0
6 1 4 2 13
0 0 0 0 0
6 2 6 2 16
109 106 94 94 403
Grand Total Apprch % Total %
32 4.6 1.9
658 94.9 40
3 0.4 0.2
0 0 0
693
2 66.7 0.1
0 0 0
1 33.3 0.1
0 0 0
3
2 0.2 0.1
832 96.7 50.6
24 2.8 1.5
2 0.2 0.1
860
30 34.1 1.8
0 0 0
57 64.8 3.5
1 1.1 0.1
88
1644
42.2
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 1 62 0 63 07:45 AM 54 0 56 2 08:00 AM 2 60 0 62 08:15 AM 1 0 71 72 Total Volume 6 247 0 253 % App. Total 2.4 97.6 0 PHF .750 .870 .000 .878
0.2
Driveway Westbound
52.3
N. Roscoe Blvd. Northbound
5.4
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 1 0 1 100 .250
0 0 1 0 1
0 0 0 0 0 0 .000
79 87 87 84 337 96.6 .968
3 3 5 1 12 3.4 .600
82 90 92 85 349
1 4 9 2 16 44.4 .444
0 0 0 0 0 0 .000
7 5 2 6 20 55.6 .714
8 9 11 8 36
153 155 166 165 639
.818
.962
.250
272
.948
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe PM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 2 5 0 2 9
Thru 53 41 59 61 214
Left 0 1 0 1 2
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 45 60 62 50 217
Left 2 1 3 1 7
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 1 2 3 2 8
Peds 0 0 0 0 0
Int. Total
47 62 65 51 225
Right 0 0 2 0 2
App. Total
0 0 1 0 1
Right 0 1 0 0 1
App. Total
55 47 59 64 225
Right 0 0 1 0 1
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
1 2 5 2 10
103 111 130 117 461
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
4 5 2 9 20
59 50 61 78 248
0 0 0 0 0
0 0 0 0 0
63 55 63 87 268
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
82 72 63 50 267
3 0 1 2 6
0 0 0 0 0
85 72 64 52 273
1 0 1 2 4
0 0 0 0 0
5 3 2 4 14
0 0 0 0 0
6 3 3 6 18
154 130 130 147 561
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
6 6 5 3 20
74 87 106 120 387
1 0 2 0 3
0 0 0 0 0
81 93 113 123 410
0 1 0 0 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 2 0 0 2
0 0 0 0 0
41 63 53 46 203
1 2 2 1 6
0 0 0 0 0
42 65 55 47 209
4 5 1 2 12
0 0 0 0 0
3 7 3 3 16
0 0 0 0 0
7 12 4 5 28
130 172 172 175 649
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
5 3 3 2 13
87 65 60 22 234
0 0 2 0 2
0 0 0 0 0
92 68 65 24 249
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
1 0 0 1 2
54 37 29 47 167
3 0 1 1 5
0 0 0 0 0
58 37 30 49 174
5 1 0 1 7
0 0 0 0 0
3 6 1 1 11
0 0 0 0 0
8 7 1 2 18
158 112 96 76 442
Grand Total Apprch % Total %
62 5.4 2.9
1083 94 51.3
7 0.6 0.3
0 0 0
1152
5 83.3 0.2
0 0 0
1 16.7 0
0 0 0
6
3 0.3 0.1
854 96.9 40.4
24 2.7 1.1
0 0 0
881
25 33.8 1.2
0 0 0
49 66.2 2.3
0 0 0
74
2113
54.5
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:15 PM 05:15 PM 87 0 93 6 05:30 PM 5 106 113 2 05:45 PM 3 0 120 123 06:00 PM 5 87 0 92 Total Volume 19 400 2 421 % App. Total 4.5 95 0.5 PHF .792 .833 .250 .856
0.3
Driveway Westbound
41.7
N. Roscoe Blvd. Northbound
3.5
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 0 0 0 1 50 .250
0 0 0 0 0 0 .000
1 0 0 0 1 50 .250
2 0 0 0 2
0 0 0 1 1 0.4 .250
63 53 46 54 216 96 .857
2 2 1 3 8 3.6 .667
65 55 47 58 225
5 1 2 5 13 44.8 .650
0 0 0 0 0 0 .000
7 3 3 3 16 55.2 .571
12 4 5 8 29
172 172 175 158 677
.604
.967
.250
273
.865
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe PM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 0 0 0 0 0
Thru 0 4 3 3 10
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 1 1 0 1 3
Left 0 1 0 0 1
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Int. Total
1 2 0 1 4
Right 0 1 0 0 1
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
0 4 3 3 10
Right 0 0 0 0 0
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
0 1 0 0 1
1 7 3 4 15
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 0 0
3 3 5 1 12
0 0 0 0 0
0 0 0 0 0
3 3 5 1 12
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 5 0 0 7
0 0 0 0 0
0 0 0 0 0
2 5 0 0 7
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 8 5 1 19
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
2 1 2 2 7
0 0 0 0 0
0 0 0 0 0
2 1 2 2 7
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
2 0 2 0 4
0 0 0 0 0
0 0 0 0 0
2 0 2 0 4
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
5 2 4 2 13
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
1 1 1 0 3
0 0 0 0 0
0 0 0 0 0
1 1 1 0 3
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 1 1 1 4
Grand Total Apprch % Total %
0 0 0
32 100 62.7
0 0 0
0 0 0
32
0 0 0
1 100 2
0 0 0
0 0 0
1
0 0 0
15 93.8 29.4
1 6.2 2
0 0 0
16
2 100 3.9
0 0 0
0 0 0
0 0 0
2
51
62.7
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:45 PM 03:45 PM 0 3 0 3 04:00 PM 0 3 0 3 04:15 PM 0 3 0 3 04:30 PM 0 0 5 5 Total Volume 0 14 0 14 % App. Total 0 100 0 PHF .000 .700 .000 .700
2
Driveway Westbound
31.4
N. Roscoe Blvd. Northbound
3.9
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
1 2 5 0 8 100 .400
0 0 0 0 0 0 .000
1 2 5 0 8
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
4 5 8 5 22
.000
.688
.000
274
.400
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Driveway N. Roscoe Blvd. Westbound Northbound
Solana Rd. Southbound
Start Time
: 1-N Roscoe_Solana and N Roscoe PM : : 8/23/2016 :1 N. Roscoe Blvd. Eastbound
Right 2 5 0 2 9
Thru 53 45 62 64 224
Left 0 1 0 1 2
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 46 61 62 51 220
Left 2 2 3 1 8
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 1 2 3 2 8
Peds 0 0 0 0 0
Int. Total
48 64 65 52 229
Right 0 1 2 0 3
App. Total
0 0 1 0 1
Right 0 1 0 0 1
App. Total
55 51 62 67 235
Right 0 0 1 0 1
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
1 3 5 2 11
104 118 133 121 476
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
4 5 2 9 20
62 53 66 79 260
0 0 0 0 0
0 0 0 0 0
66 58 68 88 280
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
0 0 0 0 0
84 77 63 50 274
3 0 1 2 6
0 0 0 0 0
87 77 64 52 280
1 0 1 2 4
0 0 0 0 0
5 3 2 4 14
0 0 0 0 0
6 3 3 6 18
159 138 135 148 580
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
6 6 5 3 20
76 88 108 122 394
1 0 2 0 3
0 0 0 0 0
83 94 115 125 417
0 1 0 0 1
1 0 0 0 1
0 1 0 0 1
0 0 0 0 0
1 2 0 0 3
0 0 0 0 0
43 63 55 46 207
1 2 2 1 6
0 0 0 0 0
44 65 57 47 213
4 6 1 2 13
0 0 0 0 0
3 7 3 3 16
0 0 0 0 0
7 13 4 5 29
135 174 176 177 662
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
5 3 3 2 13
88 66 61 22 237
0 0 2 0 2
0 0 0 0 0
93 69 66 24 252
0 0 0 1 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 1 1
1 0 0 1 2
54 37 29 48 168
3 0 1 1 5
0 0 0 0 0
58 37 30 50 175
5 1 0 1 7
0 0 0 0 0
3 6 1 1 11
0 0 0 0 0
8 7 1 2 18
159 113 97 77 446
Grand Total Apprch % Total %
62 5.2 2.9
1115 94.2 51.5
7 0.6 0.3
0 0 0
1184
5 71.4 0.2
1 14.3 0
1 14.3 0
0 0 0
7
3 0.3 0.1
869 96.9 40.2
25 2.8 1.2
0 0 0
897
27 35.5 1.2
0 0 0
49 64.5 2.3
0 0 0
76
2164
54.7
Solana Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:15 PM 05:15 PM 88 0 94 6 05:30 PM 5 108 115 2 05:45 PM 3 0 122 125 06:00 PM 5 88 0 93 Total Volume 19 406 2 427 % App. Total 4.4 95.1 0.5 PHF .792 .832 .250 .854
0.3
Driveway Westbound
41.5
N. Roscoe Blvd. Northbound
3.5
N. Roscoe Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 0 0 0 1 50 .250
0 0 0 0 0 0 .000
1 0 0 0 1 50 .250
2 0 0 0 2
0 0 0 1 1 0.4 .250
63 55 46 54 218 96 .865
2 2 1 3 8 3.5 .667
65 57 47 58 227
6 1 2 5 14 46.7 .583
0 0 0 0 0 0 .000
7 3 3 3 16 53.3 .571
13 4 5 8 30
174 176 177 159 686
.577
.969
.250
275
.873
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. AM : : 8/16/2016 :1
Groups Printed- Car Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Thru 24 45 45 75 189
Left 0 1 2 0 3
Peds 0 0 0 0 0
App. Total 24 46 47 75 192
Right 0 0 3 1 4
Left 6 6 11 6 29
Peds 5 0 4 3 12
App. Total 11 6 18 10 45
Right 2 6 12 13 33
Thru 38 66 61 86 251
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 40 72 73 99 284
Int. Total 75 124 138 184 521
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
100 118 141 121 480
1 12 4 10 27
0 0 0 0 0
101 130 145 131 507
2 5 6 5 18
14 22 25 42 103
2 2 2 1 7
18 29 33 48 128
34 58 59 51 202
132 156 203 249 740
0 0 0 0 0
0 0 0 0 0
166 214 262 300 942
285 373 440 479 1577
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
200 278 274 287 1039
17 5 7 5 34
0 0 0 0 0
217 283 281 292 1073
2 2 2 4 10
22 51 55 43 171
1 0 1 2 4
25 53 58 49 185
109 55 48 43 255
242 222 227 217 908
0 0 0 0 0
0 0 0 0 0
351 277 275 260 1163
593 613 614 601 2421
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
148 95 106 81 430
6 1 3 5 15
0 0 0 0 0
154 96 109 86 445
0 1 5 5 11
33 25 20 19 97
1 0 0 2 3
34 26 25 26 111
40 30 27 18 115
203 180 145 137 665
0 0 0 0 0
0 0 0 0 0
243 210 172 155 780
431 332 306 267 1336
Grand Total Apprch % Total %
2138 96.4 36.5
79 3.6 1.3
0 0 0
2217
43 9.2 0.7
400 85.3 6.8
26 5.5 0.4
469
605 19.1 10.3
2564 80.9 43.8
0 0 0
0 0 0
3169
5855
37.9
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 200 17 08:15 AM 278 5 08:30 AM 274 7 08:45 AM 5 287 Total Volume 1039 34 % App. Total 96.8 3.2 PHF .905 .500
8
Roscoe Rd. Westbound
54.1
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
217 283 281 292 1073
2 2 2 4 10 5.5 .625
22 51 55 43 171 94.5 .777
24 53 57 47 181
109 55 48 43 255 21.9 .585
242 222 227 217 908 78.1 .938
0 0 0 0 0 0 .000
351 277 275 260 1163
592 613 613 599 2417
.828
.986
.919
276
.794
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. AM : : 8/16/2016 :1
Groups Printed- Truck Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Thru 0 2 1 0 3
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 0 2 1 0 3
Right 0 0 0 1 1
Left 0 0 0 1 1
Peds 0 0 0 0 0
App. Total 0 0 0 2 2
Right 0 0 3 0 3
Thru 1 6 12 7 26
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 1 6 15 7 29
Int. Total 1 8 16 9 34
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
5 3 12 2 22
1 0 0 0 1
0 0 0 0 0
6 3 12 2 23
0 0 1 0 1
1 0 1 1 3
0 0 0 0 0
1 0 2 1 4
0 7 3 1 11
5 7 4 5 21
0 0 0 0 0
0 0 0 0 0
5 14 7 6 32
12 17 21 9 59
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
2 6 1 6 15
1 1 1 0 3
0 0 0 0 0
3 7 2 6 18
0 0 0 0 0
0 0 3 0 3
0 0 0 0 0
0 0 3 0 3
2 1 1 1 5
9 2 4 5 20
0 0 0 0 0
0 0 0 0 0
11 3 5 6 25
14 10 10 12 46
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
16 4 6 7 33
0 0 0 1 1
0 0 0 0 0
16 4 6 8 34
1 1 0 0 2
3 1 0 0 4
0 0 0 0 0
4 2 0 0 6
3 2 2 2 9
6 9 9 6 30
0 0 0 0 0
0 0 0 0 0
9 11 11 8 39
29 17 17 16 79
Grand Total Apprch % Total %
73 93.6 33.5
5 6.4 2.3
0 0 0
78
4 26.7 1.8
11 73.3 5
0 0 0
15
97 77.6 44.5
0 0 0
0 0 0
218
6.9
28 22.4 12.8
125
35.8
57.3
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 09:00 AM 09:00 AM 0 16 09:15 AM 4 0 09:30 AM 6 0 09:45 AM 7 1 Total Volume 33 1 % App. Total 97.1 2.9 PHF .516 .250
Roscoe Rd. Westbound
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
16 4 6 8 34
1 1 0 0 2 33.3 .500
3 1 0 0 4 66.7 .333
4 2 0 0 6
3 2 2 2 9 23.1 .750
6 9 9 6 30 76.9 .833
0 0 0 0 0 0 .000
9 11 11 8 39
29 17 17 16 79
.886
.681
.531
277
.375
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. AM : : 8/16/2016 :1
Groups Printed- Combined Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Thru 24 47 46 75 192
Left 0 1 2 0 3
Peds 0 0 0 0 0
App. Total 24 48 48 75 195
Right 0 0 3 2 5
Left 6 6 11 7 30
Peds 5 0 4 3 12
App. Total 11 6 18 12 47
Right 2 6 15 13 36
Thru 39 72 73 93 277
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 41 78 88 106 313
Int. Total 76 132 154 193 555
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
105 121 153 123 502
2 12 4 10 28
0 0 0 0 0
107 133 157 133 530
2 5 7 5 19
15 22 26 43 106
2 2 2 1 7
19 29 35 49 132
34 65 62 52 213
137 163 207 254 761
0 0 0 0 0
0 0 0 0 0
171 228 269 306 974
297 390 461 488 1636
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
202 284 275 293 1054
18 6 8 5 37
0 0 0 0 0
220 290 283 298 1091
2 2 2 4 10
22 51 58 43 174
1 0 1 2 4
25 53 61 49 188
111 56 49 44 260
251 224 231 222 928
0 0 0 0 0
0 0 0 0 0
362 280 280 266 1188
607 623 624 613 2467
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
164 99 112 88 463
6 1 3 6 16
0 0 0 0 0
170 100 115 94 479
1 2 5 5 13
36 26 20 19 101
1 0 0 2 3
38 28 25 26 117
43 32 29 20 124
209 189 154 143 695
0 0 0 0 0
0 0 0 0 0
252 221 183 163 819
460 349 323 283 1415
Grand Total Apprch % Total %
2211 96.3 36.4
84 3.7 1.4
0 0 0
2295
47 9.7 0.8
411 84.9 6.8
26 5.4 0.4
484
633 19.2 10.4
2661 80.8 43.8
0 0 0
0 0 0
3294
6073
37.8
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 202 18 08:15 AM 284 6 08:30 AM 275 8 08:45 AM 5 293 Total Volume 1054 37 % App. Total 96.6 3.4 PHF .899 .514
8
Roscoe Rd. Westbound
54.2
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
220 290 283 298 1091
2 2 2 4 10 5.4 .625
22 51 58 43 174 94.6 .750
24 53 60 47 184
111 56 49 44 260 21.9 .586
251 224 231 222 928 78.1 .924
0 0 0 0 0 0 .000
362 280 280 266 1188
606 623 623 611 2463
.820
.988
.915
278
.767
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. PM : : 8/16/2016 :1
Groups Printed- Car Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Thru 183 195 217 172 767
Left 4 3 4 5 16
Peds 0 0 0 0 0
App. Total 187 198 221 177 783
Right 6 4 10 3 23
Left 32 45 48 35 160
Peds 0 1 1 1 3
App. Total 38 50 59 39 186
Right 37 24 31 55 147
Thru 159 105 105 201 570
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 196 129 136 256 717
Int. Total 421 377 416 472 1686
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
194 178 192 198 762
11 6 8 10 35
0 0 0 0 0
205 184 200 208 797
3 6 5 7 21
32 37 32 36 137
0 0 0 0 0
35 43 37 43 158
70 42 33 37 182
249 154 145 132 680
1 0 0 0 1
0 0 0 0 0
320 196 178 169 863
560 423 415 420 1818
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
251 265 231 246 993
7 6 9 7 29
0 0 0 0 0
258 271 240 253 1022
4 2 4 7 17
46 42 49 46 183
0 0 0 0 0
50 44 53 53 200
40 32 40 34 146
184 194 158 160 696
0 0 0 0 0
0 0 0 0 0
224 226 198 194 842
532 541 491 500 2064
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
211 197 156 158 722
7 9 7 5 28
0 0 0 0 0
218 206 163 163 750
7 8 10 6 31
46 29 16 17 108
0 6 2 0 8
53 43 28 23 147
30 45 46 27 148
140 155 168 121 584
0 0 0 0 0
0 0 0 0 0
170 200 214 148 732
441 449 405 334 1629
Grand Total Apprch % Total %
3244 96.8 45.1
108 3.2 1.5
0 0 0
3352
92 13.3 1.3
588 85.1 8.2
11 1.6 0.2
691
623 19.8 8.7
2530 80.2 35.2
1 0 0
0 0 0
3154
7197
46.6
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 251 7 05:15 PM 6 265 05:30 PM 231 9 05:45 PM 246 7 Total Volume 993 29 % App. Total 97.2 2.8 PHF .937 .806
9.6
Roscoe Rd. Westbound
43.8
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
258 271 240 253 1022
4 2 4 7 17 8.5 .607
46 42 49 46 183 91.5 .934
50 44 53 53 200
40 32 40 34 146 17.3 .913
184 194 158 160 696 82.7 .897
0 0 0 0 0 0 .000
224 226 198 194 842
532 541 491 500 2064
.931
.954
.943
279
.943
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. PM : : 8/16/2016 :1
Groups Printed- Truck Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Thru 9 7 9 9 34
Left 0 0 1 0 1
Peds 0 0 0 0 0
App. Total 9 7 10 9 35
Right 0 0 0 0 0
Left 1 1 3 1 6
Peds 0 0 0 0 0
App. Total 1 1 3 1 6
Right 0 1 1 0 2
Thru 2 3 1 3 9
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 2 4 2 3 11
Int. Total 12 12 15 13 52
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
6 3 6 11 26
0 0 0 0 0
0 0 0 0 0
6 3 6 11 26
0 0 0 1 1
2 2 1 2 7
0 0 0 0 0
2 2 1 3 8
3 3 1 1 8
8 9 6 2 25
0 0 0 0 0
0 0 0 0 0
11 12 7 3 33
19 17 14 17 67
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
2 5 7 1 15
0 0 0 0 0
0 0 0 0 0
2 5 7 1 15
0 1 0 0 1
3 3 2 0 8
0 0 0 0 0
3 4 2 0 9
0 1 0 0 1
0 2 2 1 5
0 0 0 0 0
0 0 0 0 0
0 3 2 1 6
5 12 11 2 30
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
5 2 1 2 10
0 0 0 0 0
0 0 0 0 0
5 2 1 2 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
5 3 1 2 11
Grand Total Apprch % Total %
85 98.8 53.1
1 1.2 0.6
0 0 0
86
2 8.7 1.2
21 91.3 13.1
0 0 0
23
39 76.5 24.4
0 0 0
0 0 0
160
14.4
12 23.5 7.5
51
53.8
31.9
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 6 0 04:15 PM 3 0 04:30 PM 6 0 04:45 PM 0 11 Total Volume 26 0 % App. Total 100 0 PHF .591 .000
Roscoe Rd. Westbound
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
6 3 6 11 26
0 0 0 1 1 12.5 .250
2 2 1 2 7 87.5 .875
2 2 1 3 8
3 3 1 1 8 24.2 .667
8 9 6 2 25 75.8 .694
0 0 0 0 0 0 .000
11 12 7 3 33
19 17 14 17 67
.688
.882
.591
280
.667
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 2-Palm Valley Rd. and Roscoe Rd. PM : : 8/16/2016 :1
Groups Printed- Combined Roscoe Rd. Westbound
Palm Valley Rd. Southbound
Palm Valley Rd. Northbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Thru 192 202 226 181 801
Left 4 3 5 5 17
Peds 0 0 0 0 0
App. Total 196 205 231 186 818
Right 6 4 10 3 23
Left 33 46 51 36 166
Peds 0 1 1 1 3
App. Total 39 51 62 40 192
Right 37 25 32 55 149
Thru 161 108 106 204 579
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total 198 133 138 259 728
Int. Total 433 389 431 485 1738
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
200 181 198 209 788
11 6 8 10 35
0 0 0 0 0
211 187 206 219 823
3 6 5 8 22
34 39 33 38 144
0 0 0 0 0
37 45 38 46 166
73 45 34 38 190
257 163 151 134 705
1 0 0 0 1
0 0 0 0 0
331 208 185 172 896
579 440 429 437 1885
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
253 270 238 247 1008
7 6 9 7 29
0 0 0 0 0
260 276 247 254 1037
4 3 4 7 18
49 45 51 46 191
0 0 0 0 0
53 48 55 53 209
40 33 40 34 147
184 196 160 161 701
0 0 0 0 0
0 0 0 0 0
224 229 200 195 848
537 553 502 502 2094
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
216 199 157 160 732
7 9 7 5 28
0 0 0 0 0
223 208 164 165 760
7 8 10 6 31
46 29 16 17 108
0 6 2 0 8
53 43 28 23 147
30 46 46 27 149
140 155 168 121 584
0 0 0 0 0
0 0 0 0 0
170 201 214 148 733
446 452 406 336 1640
Grand Total Apprch % Total %
3329 96.8 45.2
109 3.2 1.5
0 0 0
3438
94 13.2 1.3
609 85.3 8.3
11 1.5 0.1
714
635 19.8 8.6
2569 80.2 34.9
1 0 0
0 0 0
3205
7357
46.7
Palm Valley Rd. Southbound Start Time Thru Left Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 253 7 05:15 PM 6 270 05:30 PM 238 9 05:45 PM 247 7 Total Volume 1008 29 % App. Total 97.2 2.8 PHF .933 .806
9.7
Roscoe Rd. Westbound
43.6
Palm Valley Rd. Northbound
App. Total
Right
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
260 276 247 254 1037
4 3 4 7 18 8.6 .643
49 45 51 46 191 91.4 .936
53 48 55 53 209
40 33 40 34 147 17.3 .919
184 196 160 161 701 82.7 .894
0 0 0 0 0 0 .000
224 229 200 195 848
537 553 502 502 2094
.926
.947
.939
281
.950
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. AM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 1 1 0 4 6
Thru 12 40 27 46 125
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 34 54 51 71 210
Left 1 0 1 2 4
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 1 1 9 5 16
Peds 0 0 0 0 0
Int. Total
35 54 52 73 214
Right 1 4 0 5 10
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
13 41 27 50 131
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
2 5 9 10 26
50 100 88 133 371
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 5 8 11 27
70 101 58 87 316
0 2 0 1 3
0 0 0 0 0
73 108 66 99 346
0 0 0 1 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 1 2
0 0 0 0 0
72 103 175 175 525
3 4 12 10 29
0 0 0 0 0
75 107 187 185 554
2 10 7 2 21
0 0 0 0 0
9 8 21 23 61
0 0 0 0 0
11 18 28 25 82
159 234 281 310 984
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
5 7 12 17 41
91 115 116 113 435
0 0 0 0 0
0 0 0 0 0
96 122 128 130 476
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
157 148 159 125 589
10 17 11 8 46
0 0 0 0 0
167 165 170 133 635
14 7 8 13 42
0 0 0 0 0
18 14 12 8 52
0 0 0 0 0
32 21 20 21 94
295 309 318 284 1206
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
10 8 10 11 39
104 76 77 69 326
0 0 0 0 0
0 0 0 0 0
114 84 87 80 365
0 1 1 2 4
0 1 0 0 1
1 1 0 0 2
0 0 0 0 0
1 3 1 2 7
1 4 2 4 11
92 132 107 98 429
7 13 5 9 34
0 0 0 0 0
100 149 114 111 474
10 7 4 4 25
0 0 0 0 0
8 8 10 7 33
0 0 0 0 0
18 15 14 11 58
233 251 216 204 904
Grand Total Apprch % Total %
113 8.6 3.3
1202 91.2 34.7
3 0.2 0.1
0 0 0
1318
5 50 0.1
1 10 0
4 40 0.1
0 0 0
10
11 0.6 0.3
1753 93.4 50.6
113 6 3.3
0 0 0
1877
98 37.7 2.8
0 0 0
162 62.3 4.7
0 0 0
260
3465
38
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 11 87 99 1 08:00 AM 5 91 0 96 08:15 AM 7 115 0 122 08:30 AM 0 12 116 128 Total Volume 35 409 1 445 % App. Total 7.9 91.9 0.2 PHF .729 .881 .250 .869
0.3
Possum Trot Rd. Westbound
54.2
Palm Valley Rd. Northbound
7.5
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 0 0 0 1 50 .250
0 0 0 0 0 0 .000
0 0 1 0 1 50 .250
1 0 1 0 2
0 0 0 0 0 0 .000
175 157 148 159 639 93 .913
10 10 17 11 48 7 .706
185 167 165 170 687
2 14 7 8 31 31.6 .554
0 0 0 0 0 0 .000
23 18 14 12 67 68.4 .728
25 32 21 20 98
310 295 309 318 1232
.766
.969
.500
282
.928
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. AM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 0 0 0 1 1
Thru 1 1 1 0 3
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 1 2 2 4 9
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 0 0 1 0 1
Peds 0 0 0 0 0
Int. Total
1 2 2 4 9
Right 0 0 0 0 0
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
1 1 1 1 4
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 0 1 0 1
2 3 4 5 14
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
0 2 0 0 2
5 6 4 2 17
0 0 0 0 0
0 0 0 0 0
5 8 4 2 19
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 0 3 2 8
0 1 0 0 1
0 0 0 0 0
3 1 3 2 9
0 0 0 2 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 2 2
8 9 7 6 30
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 0 0 0 0
3 4 4 3 14
0 0 0 0 0
0 0 0 0 0
3 4 4 3 14
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 2 2 3 10
1 1 0 0 2
0 0 0 0 0
4 3 2 3 12
4 0 0 1 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 0 0 1 5
11 7 6 7 31
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
0 1 1 1 3
5 7 5 5 22
0 0 0 0 0
0 0 0 0 0
5 8 6 6 25
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 3 2 1 9
0 1 1 2 4
0 0 0 0 0
3 4 3 3 13
0 0 1 1 2
0 0 0 0 0
0 0 0 1 1
0 0 0 0 0
0 0 1 2 3
8 12 10 11 41
Grand Total Apprch % Total %
6 9.7 5.2
56 90.3 48.3
0 0 0
0 0 0
62
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
36 83.7 31
7 16.3 6
0 0 0
43
9 81.8 7.8
0 0 0
2 18.2 1.7
0 0 0
11
116
53.4
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 09:00 AM 09:00 AM 0 5 0 5 09:15 AM 0 1 7 8 09:30 AM 1 5 0 6 09:45 AM 1 5 0 6 Total Volume 3 22 0 25 % App. Total 12 88 0 PHF .750 .786 .000 .781
0
Possum Trot Rd. Westbound
37.1
Palm Valley Rd. Northbound
9.5
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
3 3 2 1 9 69.2 .750
0 1 1 2 4 30.8 .500
3 4 3 3 13
0 0 1 1 2 66.7 .500
0 0 0 0 0 0 .000
0 0 0 1 1 33.3 .250
0 0 1 2 3
8 12 10 11 41
.375
.854
.000
283
.813
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. AM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 1 1 0 5 7
Thru 13 41 28 46 128
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 35 56 53 75 219
Left 1 0 1 2 4
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 1 1 10 5 17
Peds 0 0 0 0 0
Int. Total
36 56 54 77 223
Right 1 4 0 5 10
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
14 42 28 51 135
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
2 5 10 10 27
52 103 92 138 385
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
3 7 8 11 29
75 107 62 89 333
0 2 0 1 3
0 0 0 0 0
78 116 70 101 365
0 0 0 1 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 1 2
0 0 0 0 0
75 103 178 177 533
3 5 12 10 30
0 0 0 0 0
78 108 190 187 563
2 10 7 4 23
0 0 0 0 0
9 8 21 23 61
0 0 0 0 0
11 18 28 27 84
167 243 288 316 1014
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
5 7 12 17 41
94 119 120 116 449
0 0 0 0 0
0 0 0 0 0
99 126 132 133 490
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
160 150 161 128 599
11 18 11 8 48
0 0 0 0 0
171 168 172 136 647
18 7 8 14 47
0 0 0 0 0
18 14 12 8 52
0 0 0 0 0
36 21 20 22 99
306 316 324 291 1237
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
10 9 11 12 42
109 83 82 74 348
0 0 0 0 0
0 0 0 0 0
119 92 93 86 390
0 1 1 2 4
0 1 0 0 1
1 1 0 0 2
0 0 0 0 0
1 3 1 2 7
1 4 2 4 11
95 135 109 99 438
7 14 6 11 38
0 0 0 0 0
103 153 117 114 487
10 7 5 5 27
0 0 0 0 0
8 8 10 8 34
0 0 0 0 0
18 15 15 13 61
241 263 226 215 945
Grand Total Apprch % Total %
119 8.6 3.3
1258 91.2 35.1
3 0.2 0.1
0 0 0
1380
5 50 0.1
1 10 0
4 40 0.1
0 0 0
10
11 0.6 0.3
1789 93.2 50
120 6.2 3.4
0 0 0
1920
107 39.5 3
0 0 0
164 60.5 4.6
0 0 0
271
3581
38.5
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 11 89 101 1 08:00 AM 5 94 0 99 08:15 AM 7 119 0 126 08:30 AM 0 12 120 132 Total Volume 35 422 1 458 % App. Total 7.6 92.1 0.2 PHF .729 .879 .250 .867
0.3
Possum Trot Rd. Westbound
53.6
Palm Valley Rd. Northbound
7.6
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
1 0 0 0 1 50 .250
0 0 0 0 0 0 .000
0 0 1 0 1 50 .250
1 0 1 0 2
0 0 0 0 0 0 .000
177 160 150 161 648 92.8 .915
10 11 18 11 50 7.2 .694
187 171 168 172 698
4 18 7 8 37 35.6 .514
0 0 0 0 0 0 .000
23 18 14 12 67 64.4 .728
27 36 21 20 104
316 306 316 324 1262
.722
.974
.500
284
.933
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. PM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 18 12 7 17 54
Thru 113 118 119 142 492
Left 0 0 1 0 1
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 2 0 2
Peds 0 0 0 0 0
Thru 79 85 97 97 358
Left 20 20 6 8 54
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 6 11 16 15 48
Peds 0 0 0 0 0
Int. Total
99 106 104 107 416
Right 13 10 7 13 43
App. Total
0 0 4 0 4
Right 0 1 1 2 4
App. Total
131 130 127 159 547
Right 0 0 2 0 2
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
19 21 23 28 91
249 257 258 294 1058
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
21 13 21 6 61
140 127 134 182 583
0 0 0 1 1
0 0 0 0 0
161 140 155 189 645
1 0 1 0 2
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
1 0 2 1 4
0 3 4 2 9
119 120 105 116 460
9 7 8 7 31
0 0 0 0 0
128 130 117 125 500
13 9 12 15 49
0 0 1 0 1
7 18 10 18 53
0 0 0 0 0
20 27 23 33 103
310 297 297 348 1252
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
8 13 9 11 41
187 166 161 163 677
0 0 0 0 0
0 0 0 0 0
195 179 170 174 718
1 1 2 4 8
0 0 0 1 1
1 0 0 2 3
0 0 0 0 0
2 1 2 7 12
1 0 2 1 4
96 118 116 90 420
9 14 8 8 39
0 0 0 0 0
106 132 126 99 463
16 9 10 12 47
0 0 0 0 0
13 15 10 9 47
0 0 0 0 0
29 24 20 21 94
332 336 318 301 1287
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
16 17 11 8 52
157 153 148 111 569
0 0 0 0 0
0 0 0 0 0
173 170 159 119 621
0 0 0 1 1
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 1 2
0 0 1 0 1
102 93 96 82 373
15 9 7 5 36
0 0 0 0 0
117 102 104 87 410
13 10 5 7 35
0 0 0 0 0
9 12 3 3 27
0 2 0 0 2
22 24 8 10 64
312 296 272 217 1097
Grand Total Apprch % Total %
208 8.2 4.4
2321 91.7 49.4
2 0.1 0
0 0 0
2531
13 59.1 0.3
1 4.5 0
8 36.4 0.2
0 0 0
22
18 1 0.4
1611 90.1 34.3
160 8.9 3.4
0 0 0
1789
174 49.4 3.7
1 0.3 0
175 49.7 3.7
2 0.6 0
352
4694
53.9
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 6 182 189 1 05:00 PM 8 0 187 195 166 0 179 05:15 PM 13 05:30 PM 9 161 0 170 Total Volume 36 696 1 733 % App. Total 4.9 95 0.1 PHF .692 .930 .250 .940
0.5
Possum Trot Rd. Westbound
38.1
Palm Valley Rd. Northbound
7.5
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 1 1 2 4 66.7 .500
0 0 0 0 0 0 .000
1 1 0 0 2 33.3 .500
1 2 1 2 6
2 1 0 2 5 1 .625
116 96 118 116 446 91.2 .945
7 9 14 8 38 7.8 .679
125 106 132 126 489
15 16 9 10 50 47.2 .781
0 0 0 0 0 0 .000
18 13 15 10 56 52.8 .778
33 29 24 20 106
348 332 336 318 1334
.803
.958
.750
285
.926
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. PM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 0 1 0 1 2
Thru 4 3 3 4 14
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 2 0 2 1 5
Left 2 2 1 2 7
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 0 1 0 0 1
Peds 0 0 0 0 0
Int. Total
4 2 3 3 12
Right 1 2 0 1 4
App. Total
0 0 0 0 0
Right 0 0 0 0 0
App. Total
4 4 3 5 16
Right 0 0 0 0 0
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
1 3 0 1 5
9 9 6 9 33
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 1 0 1
0 1 3 4 8
0 0 0 1 1
0 0 0 0 0
0 1 4 5 10
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 2 6 2 11
1 0 0 1 2
0 0 0 0 0
2 2 6 3 13
0 0 1 0 1
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 1 0 2
3 3 11 8 25
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
0 0 0 0 0
4 3 4 2 13
0 0 0 0 0
0 0 0 0 0
4 3 4 2 13
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
1 1 0 1 3
0 0 1 0 1
0 0 0 0 0
1 1 1 1 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
5 5 5 3 18
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
2 0 1 0 3
0 0 0 0 0
0 0 0 0 0
2 0 1 0 3
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
1 0 0 0 1
0 0 0 0 0
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 0 1
3 0 2 0 5
Grand Total Apprch % Total %
3 7.1 3.7
38 90.5 46.9
1 2.4 1.2
0 0 0
42
1 100 1.2
0 0 0
0 0 0
0 0 0
1
0 0 0
19 63.3 23.5
11 36.7 13.6
0 0 0
30
5 62.5 6.2
0 0 0
3 37.5 3.7
0 0 0
8
81
51.9
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:00 PM 03:00 PM 0 0 4 4 03:15 PM 3 0 4 1 03:30 PM 0 3 0 3 03:45 PM 1 4 0 5 Total Volume 2 14 0 16 % App. Total 12.5 87.5 0 PHF .500 .875 .000 .800
1.2
Possum Trot Rd. Westbound
37
Palm Valley Rd. Northbound
9.9
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0 0 .000
0 0 0 0 0
0 0 0 0 0 0 .000
2 0 2 1 5 41.7 .625
2 2 1 2 7 58.3 .875
4 2 3 3 12
1 2 0 1 4 80 .500
0 0 0 0 0 0 .000
0 1 0 0 1 20 .250
1 3 0 1 5
9 9 6 9 33
.417
.917
.000
286
.750
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Possum Trot Rd. Palm Valley Rd. Westbound Northbound
Palm Valley Rd. Southbound
Start Time
: 3-Palm Valley Rd. and Canal Blvd_Possum Trot Rd. PM : : 8/16/2016 :1 Canal Blvd. Eastbound
Right 18 13 7 18 56
Thru 117 121 122 146 506
Left 0 0 1 0 1
Peds 0 0 0 0 0
App. Total
Thru 0 0 0 0 0
Left 0 0 2 0 2
Peds 0 0 0 0 0
Thru 81 85 99 98 363
Left 22 22 7 10 61
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 6 12 16 15 49
Peds 0 0 0 0 0
Int. Total
103 108 107 110 428
Right 14 12 7 14 47
App. Total
0 0 4 0 4
Right 0 1 1 2 4
App. Total
135 134 130 164 563
Right 0 0 2 0 2
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
20 24 23 29 96
258 266 264 303 1091
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
21 13 22 6 62
140 128 137 186 591
0 0 0 2 2
0 0 0 0 0
161 141 159 194 655
1 0 1 0 2
0 0 0 0 0
0 0 1 1 2
0 0 0 0 0
1 0 2 1 4
0 3 4 2 9
120 122 111 118 471
10 7 8 8 33
0 0 0 0 0
130 132 123 128 513
13 9 13 15 50
0 0 1 0 1
8 18 10 18 54
0 0 0 0 0
21 27 24 33 105
313 300 308 356 1277
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
8 13 9 11 41
191 169 165 165 690
0 0 0 0 0
0 0 0 0 0
199 182 174 176 731
1 2 2 4 9
0 0 0 1 1
1 0 0 2 3
0 0 0 0 0
2 2 2 7 13
1 0 2 1 4
97 119 116 91 423
9 14 9 8 40
0 0 0 0 0
107 133 127 100 467
16 9 10 12 47
0 0 0 0 0
13 15 10 9 47
0 0 0 0 0
29 24 20 21 94
337 341 323 304 1305
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
16 17 11 8 52
159 153 149 111 572
0 0 0 0 0
0 0 0 0 0
175 170 160 119 624
0 0 0 1 1
0 0 0 0 0
0 0 1 0 1
0 0 0 0 0
0 0 1 1 2
0 0 1 0 1
102 93 96 82 373
16 9 7 5 37
0 0 0 0 0
118 102 104 87 411
13 10 5 7 35
0 0 0 0 0
9 12 4 3 28
0 2 0 0 2
22 24 9 10 65
315 296 274 217 1102
Grand Total Apprch % Total %
211 8.2 4.4
2359 91.7 49.4
3 0.1 0.1
0 0 0
2573
14 60.9 0.3
1 4.3 0
8 34.8 0.2
0 0 0
23
18 1 0.4
1630 89.6 34.1
171 9.4 3.6
0 0 0
1819
179 49.7 3.7
1 0.3 0
178 49.4 3.7
2 0.6 0
360
4775
53.9
Palm Valley Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 6 186 194 2 05:00 PM 8 0 191 199 169 0 182 05:15 PM 13 05:30 PM 9 165 0 174 Total Volume 36 711 2 749 % App. Total 4.8 94.9 0.3 PHF .692 .931 .250 .941
0.5
Possum Trot Rd. Westbound
38.1
Palm Valley Rd. Northbound
7.5
Canal Blvd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 1 2 2 5 71.4 .625
0 0 0 0 0 0 .000
1 1 0 0 2 28.6 .500
1 2 2 2 7
2 1 0 2 5 1 .625
118 97 119 116 450 90.9 .945
8 9 14 9 40 8.1 .714
128 107 133 127 495
15 16 9 10 50 47.2 .781
0 0 0 0 0 0 .000
18 13 15 10 56 52.8 .778
33 29 24 20 106
356 337 341 323 1357
.803
.953
.875
287
.930
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane AM : : 8/16/2016 :1
Groups Printed- Car Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Right 6 21 7 11 45
Thru 9 18 25 34 86
Peds 0 0 0 0 0
App. Total 15 39 32 45 131
Thru 26 34 40 63 163
Left 3 29 8 17 57
Peds 0 0 0 0 0
App. Total 29 63 48 80 220
Right 5 4 3 3 15
Left 3 20 5 5 33
Peds 0 0 0 0 0
App. Total 8 24 8 8 48
Int. Total 52 126 88 133 399
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
29 73 27 28 157
51 42 46 63 202
1 0 0 0 1
81 115 73 91 360
60 89 138 149 436
39 61 23 41 164
0 0 0 0 0
99 150 161 190 600
6 40 37 15 98
12 24 44 28 108
0 0 0 0 0
18 64 81 43 206
198 329 315 324 1166
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
32 37 34 36 139
76 82 102 105 365
0 0 0 0 0
108 119 136 141 504
126 112 109 125 472
57 49 19 22 147
0 0 0 0 0
183 161 128 147 619
59 53 36 13 161
56 57 34 10 157
0 0 0 0 0
115 110 70 23 318
406 390 334 311 1441
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
27 31 11 25 94
73 55 59 63 250
0 2 2 0 4
100 88 72 88 348
91 112 99 71 373
23 30 10 21 84
0 0 0 0 0
114 142 109 92 457
11 19 27 19 76
18 27 24 17 86
0 0 1 0 1
29 46 52 36 163
243 276 233 216 968
Grand Total Apprch % Total %
435 32.4 10.9
903 67.2 22.7
5 0.4 0.1
1343
1444 76.2 36.3
452 23.8 11.4
0 0 0
1896
350 47.6 8.8
384 52.2 9.7
1 0.1 0
735
3974
18.5
33.8
Palm Valley Rd. Southbound Start Time Right Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 28 08:00 AM 32 08:15 AM 37 08:30 AM 34 Total Volume 131 % App. Total 28.9 PHF .885
47.7
Palm Valley Rd. Northbound
Landrum Lane Eastbound
Thru
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
63 76 82 102 323 71.1 .792
91 108 119 136 454
149 126 112 109 496 74.9 .832
41 57 49 19 166 25.1 .728
190 183 161 128 662
15 59 53 36 163 48.2 .691
28 56 57 34 175 51.8 .768
43 115 110 70 338
324 406 390 334 1454
.735
.895
.835
288
.871
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane AM : : 8/16/2016 :1
Groups Printed- Truck Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Right 0 1 1 0 2
Thru 1 0 0 0 1
Peds 0 0 0 0 0
App. Total 1 1 1 0 3
Thru 1 1 2 5 9
Left 0 0 2 0 2
Peds 0 0 0 0 0
App. Total 1 1 4 5 11
Right 1 0 0 1 2
Left 1 0 0 0 1
Peds 0 0 0 0 0
App. Total 2 0 0 1 3
Int. Total 4 2 5 6 17
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
2 3 1 2 8
1 3 3 2 9
0 0 0 0 0
3 6 4 4 17
3 0 1 3 7
1 4 0 1 6
0 0 0 0 0
4 4 1 4 13
0 3 10 0 13
0 0 3 0 3
0 0 0 0 0
0 3 13 0 16
7 13 18 8 46
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
0 1 0 0 1
7 2 3 2 14
0 0 0 0 0
7 3 3 2 15
4 0 2 2 8
0 5 0 0 5
0 0 0 0 0
4 5 2 2 13
1 3 1 1 6
0 1 2 0 3
0 0 0 0 0
1 4 3 1 9
12 12 8 5 37
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
0 0 0 0 0
7 7 8 6 28
0 0 0 0 0
7 7 8 6 28
5 4 4 1 14
0 2 0 0 2
0 0 0 0 0
5 6 4 1 16
1 0 1 1 3
1 0 0 2 3
0 0 0 0 0
2 0 1 3 6
14 13 13 10 50
Grand Total Apprch % Total %
11 17.5 7.3
52 82.5 34.7
0 0 0
63
38 71.7 25.3
15 28.3 10
0 0 0
53
24 70.6 16
10 29.4 6.7
0 0 0
34
150
35.3
22.7
42
Palm Valley Rd. Southbound Start Time Right Thru Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 3 3 07:30 AM 1 3 07:45 AM 2 2 08:00 AM 0 7 Total Volume 6 15 % App. Total 28.6 71.4 PHF .500 .536
Palm Valley Rd. Northbound
Landrum Lane Eastbound
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
6 4 4 7 21
0 1 3 4 8 61.5 .500
4 0 1 0 5 38.5 .313
4 1 4 4 13
3 10 0 1 14 82.4 .350
0 3 0 0 3 17.6 .250
3 13 0 1 17
13 18 8 12 51
.327
.708
.750
289
.813
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane AM : : 8/16/2016 :1
Groups Printed- Combined Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
Right 6 22 8 11 47
Thru 10 18 25 34 87
Peds 0 0 0 0 0
App. Total 16 40 33 45 134
Thru 27 35 42 68 172
Left 3 29 10 17 59
Peds 0 0 0 0 0
App. Total 30 64 52 85 231
Right 6 4 3 4 17
Left 4 20 5 5 34
Peds 0 0 0 0 0
App. Total 10 24 8 9 51
Int. Total 56 128 93 139 416
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
31 76 28 30 165
52 45 49 65 211
1 0 0 0 1
84 121 77 95 377
63 89 139 152 443
40 65 23 42 170
0 0 0 0 0
103 154 162 194 613
6 43 47 15 111
12 24 47 28 111
0 0 0 0 0
18 67 94 43 222
205 342 333 332 1212
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
32 38 34 36 140
83 84 105 107 379
0 0 0 0 0
115 122 139 143 519
130 112 111 127 480
57 54 19 22 152
0 0 0 0 0
187 166 130 149 632
60 56 37 14 167
56 58 36 10 160
0 0 0 0 0
116 114 73 24 327
418 402 342 316 1478
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
27 31 11 25 94
80 62 67 69 278
0 2 2 0 4
107 95 80 94 376
96 116 103 72 387
23 32 10 21 86
0 0 0 0 0
119 148 113 93 473
12 19 28 20 79
19 27 24 19 89
0 0 1 0 1
31 46 53 39 169
257 289 246 226 1018
Grand Total Apprch % Total %
446 31.7 10.8
955 67.9 23.2
5 0.4 0.1
1406
1482 76 35.9
467 24 11.3
0 0 0
1949
374 48.6 9.1
394 51.2 9.6
1 0.1 0
769
4124
18.6
34.1
Palm Valley Rd. Southbound Start Time Right Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 30 08:00 AM 32 08:15 AM 38 08:30 AM 34 Total Volume 134 % App. Total 28.5 PHF .882
47.3
Palm Valley Rd. Northbound
Landrum Lane Eastbound
Thru
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
65 83 84 105 337 71.5 .802
95 115 122 139 471
152 130 112 111 505 74.6 .831
42 57 54 19 172 25.4 .754
194 187 166 130 677
15 60 56 37 168 48.6 .700
28 56 58 36 178 51.4 .767
43 116 114 73 346
332 418 402 342 1494
.746
.894
.847
290
.872
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane PM : : 8/16/2016 :1
Groups Printed- Car Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Right 15 19 21 43 98
Thru 96 104 113 111 424
Peds 0 0 0 0 0
App. Total 111 123 134 154 522
Thru 59 62 82 71 274
Left 19 17 12 27 75
Peds 0 0 0 0 0
App. Total 78 79 94 98 349
Right 50 43 26 22 141
Left 38 29 19 27 113
Peds 0 0 0 0 0
App. Total 88 72 45 49 254
Int. Total 277 274 273 301 1125
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
16 10 18 24 68
135 116 134 156 541
0 0 0 0 0
151 126 152 180 609
98 121 95 95 409
18 15 13 17 63
0 0 0 0 0
116 136 108 112 472
27 38 21 16 102
23 16 15 15 69
0 0 0 0 0
50 54 36 31 171
317 316 296 323 1252
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
26 18 20 27 91
160 169 149 144 622
0 0 0 0 0
186 187 169 171 713
88 115 104 80 387
19 18 20 17 74
0 0 0 0 0
107 133 124 97 461
18 20 18 23 79
21 15 19 11 66
0 0 0 0 0
39 35 37 34 145
332 355 330 302 1319
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
25 22 21 22 90
140 129 125 87 481
0 0 0 0 0
165 151 146 109 571
102 87 85 62 336
17 22 18 26 83
0 0 0 0 0
119 109 103 88 419
24 13 19 29 85
17 10 23 31 81
0 0 0 0 0
41 23 42 60 166
325 283 291 257 1156
Grand Total Apprch % Total %
347 14.4 7.2
2068 85.6 42.6
0 0 0
2415
1406 82.7 29
295 17.3 6.1
0 0 0
1701
407 55.3 8.4
329 44.7 6.8
0 0 0
736
4852
15.2
49.8
Palm Valley Rd. Southbound Start Time Right Thru Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 24 156 05:00 PM 160 26 05:15 PM 18 169 05:30 PM 20 149 Total Volume 88 634 % App. Total 12.2 87.8 PHF .846 .938
35.1
Palm Valley Rd. Northbound
Landrum Lane Eastbound
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
180 186 187 169 722
95 88 115 104 402 84.5 .874
17 19 18 20 74 15.5 .925
112 107 133 124 476
16 18 20 18 72 50.7 .900
15 21 15 19 70 49.3 .833
31 39 35 37 142
323 332 355 330 1340
.910
.944
.965
291
.895
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane PM : : 8/16/2016 :1
Groups Printed- Truck Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Right 0 0 1 2 3
Thru 5 3 4 3 15
Peds 0 0 0 0 0
App. Total 5 3 5 5 18
Thru 1 1 3 3 8
Left 1 1 0 0 2
Peds 0 0 0 0 0
App. Total 2 2 3 3 10
Right 5 2 2 2 11
Left 1 1 0 1 3
Peds 0 0 0 0 0
App. Total 6 3 2 3 14
Int. Total 13 8 10 11 42
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 1 1 0 2
1 2 3 4 10
0 0 0 0 0
1 3 4 4 12
2 3 5 3 13
0 0 0 1 1
0 0 0 0 0
2 3 5 4 14
0 2 1 0 3
0 0 0 0 0
0 0 0 0 0
0 2 1 0 3
3 8 10 8 29
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
2 0 0 0 2
3 3 3 3 12
0 0 0 0 0
5 3 3 3 14
1 0 1 1 3
0 0 0 0 0
0 0 0 0 0
1 0 1 1 3
0 0 0 0 0
0 1 0 0 1
0 0 0 0 0
0 1 0 0 1
6 4 4 4 18
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
0 0 0 0 0
2 1 1 0 4
0 0 0 0 0
2 1 1 0 4
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
1 0 1 0 2
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 1 2 0 6
Grand Total Apprch % Total %
7 14.6 7.4
41 85.4 43.2
0 0 0
48
26 89.7 27.4
3 10.3 3.2
0 0 0
29
4 22.2 4.2
0 0 0
95
30.5
14 77.8 14.7
18
50.5
18.9
Palm Valley Rd. Southbound Start Time Right Thru Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:00 PM 03:00 PM 0 5 03:15 PM 0 3 03:30 PM 1 4 03:45 PM 3 2 Total Volume 3 15 % App. Total 16.7 83.3 PHF .375 .750
Palm Valley Rd. Northbound
Landrum Lane Eastbound
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
5 3 5 5 18
1 1 3 3 8 80 .667
1 1 0 0 2 20 .500
2 2 3 3 10
5 2 2 2 11 78.6 .550
1 1 0 1 3 21.4 .750
6 3 2 3 14
13 8 10 11 42
.583
.808
.900
292
.833
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
: 4-Palm Valley Rd. and Landrum Lane PM : : 8/16/2016 :1
Groups Printed- Combined Palm Valley Rd. Northbound
Palm Valley Rd. Southbound
Landrum Lane Eastbound
Start Time 03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
Right 15 19 22 45 101
Thru 101 107 117 114 439
Peds 0 0 0 0 0
App. Total 116 126 139 159 540
Thru 60 63 85 74 282
Left 20 18 12 27 77
Peds 0 0 0 0 0
App. Total 80 81 97 101 359
Right 55 45 28 24 152
Left 39 30 19 28 116
Peds 0 0 0 0 0
App. Total 94 75 47 52 268
Int. Total 290 282 283 312 1167
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
16 11 19 24 70
136 118 137 160 551
0 0 0 0 0
152 129 156 184 621
100 124 100 98 422
18 15 13 18 64
0 0 0 0 0
118 139 113 116 486
27 40 22 16 105
23 16 15 15 69
0 0 0 0 0
50 56 37 31 174
320 324 306 331 1281
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
28 18 20 27 93
163 172 152 147 634
0 0 0 0 0
191 190 172 174 727
89 115 105 81 390
19 18 20 17 74
0 0 0 0 0
108 133 125 98 464
18 20 18 23 79
21 16 19 11 67
0 0 0 0 0
39 36 37 34 146
338 359 334 306 1337
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
25 22 21 22 90
142 130 126 87 485
0 0 0 0 0
167 152 147 109 575
103 87 86 62 338
17 22 18 26 83
0 0 0 0 0
120 109 104 88 421
24 13 19 29 85
17 10 23 31 81
0 0 0 0 0
41 23 42 60 166
328 284 293 257 1162
Grand Total Apprch % Total %
354 14.4 7.2
2109 85.6 42.6
0 0 0
2463
1432 82.8 28.9
298 17.2 6
0 0 0
1730
421 55.8 8.5
333 44.2 6.7
0 0 0
754
4947
15.2
49.8
Palm Valley Rd. Southbound Start Time Right Thru Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 24 160 05:00 PM 163 28 05:15 PM 18 172 05:30 PM 20 152 Total Volume 90 647 % App. Total 12.2 87.8 PHF .804 .940
35
Palm Valley Rd. Northbound
Landrum Lane Eastbound
App. Total
Thru
Left
App. Total
Right
Left
App. Total
Int. Total
184 191 190 172 737
98 89 115 105 407 84.4 .885
18 19 18 20 75 15.6 .938
116 108 133 125 482
16 18 20 18 72 50.3 .900
15 21 16 19 71 49.7 .845
31 39 36 37 143
331 338 359 334 1362
.917
.948
.965
293
.906
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Business Entrance Westbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about AM : : 8/16/2016 :1 CR 210 Northbound
Palm Valley Rd. Eastbound
Right 4 8 6 6 24
Thru 11 10 23 34 78
Left 0 2 1 1 4
Peds 0 0 0 0 0
App. Total
Thru 1 0 0 1 2
Left 1 0 1 0 2
Peds 0 0 0 0 0
Thru 17 25 39 41 122
Left 19 40 38 60 157
Peds 0 0 0 0 0
Thru 1 1 3 0 5
Left 3 5 3 1 12
Peds 0 0 0 0 0
Int. Total
36 67 79 104 286
Right 7 27 26 36 96
App. Total
2 0 2 1 5
Right 0 2 2 3 7
App. Total
15 20 30 41 106
Right 0 0 1 0 1
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
11 33 32 37 113
64 120 143 183 510
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
14 29 23 15 81
41 56 60 53 210
0 0 2 0 2
0 0 0 0 0
55 85 85 68 293
0 1 2 2 5
0 3 7 3 13
2 2 7 3 14
0 0 0 0 0
2 6 16 8 32
0 4 5 4 13
65 84 115 118 382
83 85 109 146 423
0 0 0 0 0
148 173 229 268 818
56 66 65 73 260
2 6 4 2 14
4 7 16 9 36
0 0 0 0 0
62 79 85 84 310
267 343 415 428 1453
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
18 23 10 14 65
95 135 126 110 466
1 1 4 5 11
0 0 0 0 0
114 159 140 129 542
2 3 3 0 8
0 8 8 4 20
3 6 7 8 24
0 0 0 0 0
5 17 18 12 52
4 7 4 4 19
134 133 111 108 486
117 108 110 121 456
0 0 0 0 0
255 248 225 233 961
116 144 141 118 519
7 4 10 8 29
10 13 11 8 42
0 0 0 0 0
133 161 162 134 590
507 585 545 508 2145
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
11 10 8 16 45
58 45 28 32 163
5 3 4 5 17
0 0 0 0 0
74 58 40 53 225
3 2 4 3 12
7 8 2 8 25
6 7 4 5 22
0 0 0 0 0
16 17 10 16 59
7 3 3 3 16
97 78 70 75 320
106 104 86 76 372
0 0 0 0 0
210 185 159 154 708
81 55 67 61 264
7 5 1 3 16
5 9 16 9 39
0 0 0 0 0
93 69 84 73 319
393 329 293 296 1311
Grand Total Apprch % Total %
215 18.4 4
917 78.6 16.9
34 2.9 0.6
0 0 0
1166
26 17.6 0.5
60 40.5 1.1
62 41.9 1.1
0 0 0
148
55 2 1
1310 47.2 24.2
1408 50.8 26
0 0 0
2773
1139 85.5 21
64 4.8 1.2
129 9.7 2.4
0 0 0
1332
5419
21.5
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 18 95 1 114 08:15 AM 1 23 135 159 08:30 AM 10 126 4 140 08:45 AM 14 110 129 5 Total Volume 65 466 11 542 % App. Total 12 86 2 PHF .707 .863 .550 .852
2.7
Business Entrance Westbound
51.2
CR 210 Northbound
24.6
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
2 3 3 0 8 15.4 .667
0 8 8 4 20 38.5 .625
3 6 7 8 24 46.2 .750
5 17 18 12 52
4 7 4 4 19 2 .679
134 133 111 108 486 50.6 .907
117 108 110 121 456 47.5 .942
255 248 225 233 961
116 144 141 118 519 88 .901
7 4 10 8 29 4.9 .725
10 13 11 8 42 7.1 .808
133 161 162 134 590
507 585 545 508 2145
.910
.917
.722
294
.942
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Business Entrance Westbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about AM : : 8/16/2016 :1 CR 210 Northbound
Palm Valley Rd. Eastbound
Right 0 0 0 0 0
Thru 0 1 1 0 2
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 1 0 1 0 2
Left 0 0 0 0 0
Peds 0 0 0 0 0
Thru 1 3 4 6 14
Left 0 3 5 2 10
Peds 0 0 0 0 0
Thru 0 0 0 0 0
Left 0 1 0 1 2
Peds 0 0 0 0 0
Int. Total
1 6 9 8 24
Right 0 1 0 1 2
App. Total
1 0 1 0 2
Right 0 0 0 0 0
App. Total
0 1 1 0 2
Right 0 0 0 0 0
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
0 2 0 2 4
2 9 11 10 32
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
2 2 0 0 4
0 1 1 0 2
0 0 0 0 0
0 0 0 0 0
2 3 1 0 6
0 0 0 0 0
0 0 1 1 2
0 1 0 0 1
0 0 0 0 0
0 1 1 1 3
0 0 0 0 0
2 2 5 4 13
2 1 0 3 6
0 0 0 0 0
4 3 5 7 19
3 4 9 2 18
0 0 0 0 0
0 1 2 0 3
0 0 0 0 0
3 5 11 2 21
9 12 18 10 49
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
1 1 0 0 2
2 1 2 3 8
0 0 0 1 1
0 0 0 0 0
3 2 2 4 11
0 0 0 0 0
1 0 0 0 1
0 1 0 0 1
0 0 0 0 0
1 1 0 0 2
0 0 0 0 0
0 0 1 2 3
9 2 1 3 15
0 0 0 0 0
9 2 2 5 18
3 5 1 5 14
0 1 0 0 1
0 1 0 0 1
0 0 0 0 0
3 7 1 5 16
16 12 5 14 47
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
0 0 0 1 1
9 2 1 1 13
1 0 0 1 2
0 0 0 0 0
10 2 1 3 16
0 0 0 1 1
0 2 0 1 3
0 0 1 0 1
0 0 0 0 0
0 2 1 2 5
0 0 2 0 2
3 6 4 5 18
5 3 5 1 14
0 0 0 0 0
8 9 11 6 34
5 4 5 5 19
1 0 1 0 2
0 0 1 0 1
0 0 0 0 0
6 4 7 5 22
24 17 20 16 77
Grand Total Apprch % Total %
7 20 3.4
25 71.4 12.2
3 8.6 1.5
0 0 0
35
1 8.3 0.5
8 66.7 3.9
3 25 1.5
0 0 0
12
2 2.1 1
48 50.5 23.4
45 47.4 22
0 0 0
95
53 84.1 25.9
3 4.8 1.5
7 11.1 3.4
0 0 0
63
205
17.1
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 09:00 AM 09:00 AM 0 9 1 10 09:15 AM 0 2 0 2 09:30 AM 0 1 0 1 09:45 AM 1 1 3 1 Total Volume 1 13 2 16 % App. Total 6.2 81.2 12.5 PHF .250 .361 .500 .400
5.9
Business Entrance Westbound
46.3
CR 210 Northbound
30.7
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 1 1 20 .250
0 2 0 1 3 60 .375
0 0 1 0 1 20 .250
0 2 1 2 5
0 0 2 0 2 5.9 .250
3 6 4 5 18 52.9 .750
5 3 5 1 14 41.2 .700
8 9 11 6 34
5 4 5 5 19 86.4 .950
1 0 1 0 2 9.1 .500
0 0 1 0 1 4.5 .250
6 4 7 5 22
24 17 20 16 77
.786
.802
.625
295
.773
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Business Entrance CR 210 Westbound Northbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about AM : : 8/16/2016 :1 Palm Valley Rd. Eastbound
Right 4 8 6 6 24
Thru 11 11 24 34 80
Left 0 2 1 1 4
Peds 0 0 0 0 0
App. Total
Thru 2 0 1 1 4
Left 1 0 1 0 2
Peds 0 0 0 0 0
Thru 18 28 43 47 136
Left 19 43 43 62 167
Peds 0 0 0 0 0
Thru 1 1 3 0 5
Left 3 6 3 2 14
Peds 0 0 0 0 0
Int. Total
37 73 88 112 310
Right 7 28 26 37 98
App. Total
3 0 3 1 7
Right 0 2 2 3 7
App. Total
15 21 31 41 108
Right 0 0 1 0 1
App. Total
06:00 AM 06:15 AM 06:30 AM 06:45 AM Total
11 35 32 39 117
66 129 154 193 542
07:00 AM 07:15 AM 07:30 AM 07:45 AM Total
16 31 23 15 85
41 57 61 53 212
0 0 2 0 2
0 0 0 0 0
57 88 86 68 299
0 1 2 2 5
0 3 8 4 15
2 3 7 3 15
0 0 0 0 0
2 7 17 9 35
0 4 5 4 13
67 86 120 122 395
85 86 109 149 429
0 0 0 0 0
152 176 234 275 837
59 70 74 75 278
2 6 4 2 14
4 8 18 9 39
0 0 0 0 0
65 84 96 86 331
276 355 433 438 1502
08:00 AM 08:15 AM 08:30 AM 08:45 AM Total
19 24 10 14 67
97 136 128 113 474
1 1 4 6 12
0 0 0 0 0
117 161 142 133 553
2 3 3 0 8
1 8 8 4 21
3 7 7 8 25
0 0 0 0 0
6 18 18 12 54
4 7 4 4 19
134 133 112 110 489
126 110 111 124 471
0 0 0 0 0
264 250 227 238 979
119 149 142 123 533
7 5 10 8 30
10 14 11 8 43
0 0 0 0 0
136 168 163 139 606
523 597 550 522 2192
09:00 AM 09:15 AM 09:30 AM 09:45 AM Total
11 10 8 17 46
67 47 29 33 176
6 3 4 6 19
0 0 0 0 0
84 60 41 56 241
3 2 4 4 13
7 10 2 9 28
6 7 5 5 23
0 0 0 0 0
16 19 11 18 64
7 3 5 3 18
100 84 74 80 338
111 107 91 77 386
0 0 0 0 0
218 194 170 160 742
86 59 72 66 283
8 5 2 3 18
5 9 17 9 40
0 0 0 0 0
99 73 91 78 341
417 346 313 312 1388
Grand Total Apprch % Total %
222 18.5 3.9
942 78.4 16.7
37 3.1 0.7
0 0 0
1201
27 16.9 0.5
68 42.5 1.2
65 40.6 1.2
0 0 0
160
57 2 1
1358 47.4 24.1
1453 50.7 25.8
0 0 0
2868
1192 85.4 21.2
67 4.8 1.2
136 9.7 2.4
0 0 0
1395
5624
21.4
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 06:00 AM to 09:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 19 97 1 117 08:15 AM 1 24 136 161 08:30 AM 10 128 4 142 08:45 AM 14 113 133 6 Total Volume 67 474 12 553 % App. Total 12.1 85.7 2.2 PHF .698 .871 .500 .859
2.8
Business Entrance Westbound
51
CR 210 Northbound
24.8
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
2 3 3 0 8 14.8 .667
1 8 8 4 21 38.9 .656
3 7 7 8 25 46.3 .781
6 18 18 12 54
4 7 4 4 19 1.9 .679
134 133 112 110 489 49.9 .912
126 110 111 124 471 48.1 .935
264 250 227 238 979
119 149 142 123 533 88 .894
7 5 10 8 30 5 .750
10 14 11 8 43 7.1 .768
136 168 163 139 606
523 597 550 522 2192
.902
.918
.750
296
.927
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Car Business Entrance Westbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about PM : : 8/16/2016 :1 CR 210 Northbound
Palm Valley Rd. Eastbound
Right 15 9 8 11 43
Thru 83 97 81 59 320
Left 10 6 9 6 31
Peds 0 0 0 0 0
App. Total
Thru 5 10 9 11 35
Left 18 18 14 20 70
Peds 0 0 0 0 0
Thru 88 61 48 86 283
Left 64 45 66 73 248
Peds 0 0 0 0 0
Thru 12 10 13 16 51
Left 16 11 11 12 50
Peds 0 0 0 0 0
Int. Total
156 113 119 164 552
Right 105 113 120 101 439
App. Total
27 30 25 33 115
Right 4 7 5 5 21
App. Total
108 112 98 76 394
Right 4 2 2 2 10
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
133 134 144 129 540
424 389 386 402 1601
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
14 8 8 6 36
71 65 70 95 301
11 6 10 15 42
0 0 0 0 0
96 79 88 116 379
5 3 4 3 15
17 15 23 11 66
17 13 10 14 54
0 0 0 0 0
39 31 37 28 135
10 8 7 8 33
127 55 63 68 313
120 101 78 77 376
0 0 0 0 0
257 164 148 153 722
133 116 112 118 479
14 20 15 16 65
11 13 12 8 44
0 0 0 0 0
158 149 139 142 588
550 423 412 439 1824
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
9 23 10 8 50
94 124 109 91 418
9 15 14 19 57
0 0 0 0 0
112 162 133 118 525
5 1 4 9 19
0 6 14 0 20
26 23 29 30 108
0 0 0 0 0
31 30 47 39 147
11 8 11 4 34
73 98 61 64 296
84 88 89 96 357
0 0 0 0 0
168 194 161 164 687
152 129 130 144 555
18 13 20 14 65
6 13 8 12 39
0 0 0 0 0
176 155 158 170 659
487 541 499 491 2018
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
19 11 5 7 42
79 78 73 54 284
6 13 7 9 35
0 0 0 0 0
104 102 85 70 361
4 8 7 5 24
14 12 9 10 45
26 17 24 20 87
0 0 0 0 0
44 37 40 35 156
7 5 9 9 30
64 62 77 46 249
84 82 92 73 331
0 0 0 0 0
155 149 178 128 610
144 124 108 93 469
16 10 11 12 49
9 11 7 13 40
0 0 0 0 0
169 145 126 118 558
472 433 429 351 1685
Grand Total Apprch % Total %
171 10.3 2.4
1323 79.7 18.6
165 9.9 2.3
0 0 0
1659
68 12.3 1
166 30 2.3
319 57.7 4.5
0 0 0
553
118 4.6 1.7
1141 44.4 16
1312 51 18.4
0 0 0
2571
1942 82.8 27.2
230 9.8 3.2
173 7.4 2.4
0 0 0
2345
7128
23.3
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 9 94 9 112 05:15 PM 15 23 124 162 05:30 PM 10 109 14 133 05:45 PM 8 91 118 19 Total Volume 50 418 57 525 % App. Total 9.5 79.6 10.9 PHF .543 .843 .750 .810
7.8
Business Entrance Westbound
36.1
CR 210 Northbound
32.9
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
5 1 4 9 19 12.9 .528
0 6 14 0 20 13.6 .357
26 23 29 30 108 73.5 .900
31 30 47 39 147
11 8 11 4 34 4.9 .773
73 98 61 64 296 43.1 .755
84 88 89 96 357 52 .930
168 194 161 164 687
152 129 130 144 555 84.2 .913
18 13 20 14 65 9.9 .813
6 13 8 12 39 5.9 .750
176 155 158 170 659
487 541 499 491 2018
.936
.933
.782
297
.885
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Truck Business Entrance Westbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about PM : : 8/16/2016 :1 CR 210 Northbound
Palm Valley Rd. Eastbound
Right 0 0 1 0 1
Thru 2 2 6 4 14
Left 0 0 0 0 0
Peds 0 0 0 0 0
App. Total
Thru 0 0 1 0 1
Left 0 1 1 1 3
Peds 0 0 0 0 0
Thru 2 0 1 3 6
Left 0 2 1 1 4
Peds 0 0 0 0 0
Thru 0 2 1 0 3
Left 0 1 1 0 2
Peds 0 0 0 0 0
Int. Total
2 2 2 4 10
Right 6 4 6 4 20
App. Total
0 1 2 1 4
Right 0 0 0 0 0
App. Total
2 2 7 4 15
Right 0 0 0 0 0
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
6 7 8 4 25
10 12 19 13 54
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
0 0 0 1 1
2 2 4 6 14
0 0 0 0 0
0 0 0 0 0
2 2 4 7 15
0 0 1 0 1
0 1 0 0 1
0 0 0 0 0
0 0 0 0 0
0 1 1 0 2
1 0 0 0 1
2 4 0 1 7
2 4 3 2 11
0 0 0 0 0
5 8 3 3 19
1 1 5 3 10
0 0 0 0 0
0 1 1 0 2
0 0 0 0 0
1 2 6 3 12
8 13 14 13 48
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
1 1 0 0 2
0 1 2 1 4
0 1 0 0 1
0 0 0 0 0
1 3 2 1 7
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 1 1 2
0 1 1 1 3
0 0 0 0 0
0 1 2 2 5
2 4 4 1 11
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
2 4 4 1 11
3 8 8 4 23
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
1 0 1 0 2
1 0 0 1 2
0 0 0 0 0
0 0 0 0 0
2 0 1 1 4
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 2 3 0 9
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
4 2 3 0 9
6 2 4 1 13
Grand Total Apprch % Total %
6 14.6 4.3
34 82.9 24.6
1 2.4 0.7
0 0 0
41
1 16.7 0.7
2 33.3 1.4
3 50 2.2
0 0 0
6
1 2.9 0.7
15 44.1 10.9
18 52.9 13
0 0 0
34
50 87.7 36.2
3 5.3 2.2
4 7 2.9
0 0 0
57
138
29.7
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 03:00 PM 03:00 PM 0 2 0 2 03:15 PM 0 2 0 2 0 03:30 PM 1 6 7 03:45 PM 0 4 0 4 Total Volume 1 14 0 15 % App. Total 6.7 93.3 0 PHF .250 .583 .000 .536
4.3
Business Entrance Westbound
24.6
CR 210 Northbound
41.3
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
0 0 0 0 0 0 .000
0 0 1 0 1 25 .250
0 1 1 1 3 75 .750
0 1 2 1 4
0 0 0 0 0 0 .000
2 0 1 3 6 60 .500
0 2 1 1 4 40 .500
2 2 2 4 10
6 4 6 4 20 80 .833
0 2 1 0 3 12 .375
0 1 1 0 2 8 .500
6 7 8 4 25
10 12 19 13 54
.781
.711
.500
298
.625
Peggy Malone & Associates, Inc. (888) 247-8602 File Name Site Code Start Date Page No
Groups Printed- Combined Business Entrance CR 210 Westbound Northbound
Mickler Rd. Southbound
Start Time
: 5-CR 210_Mickler Rd_Palm Valley Round-about PM : : 8/16/2016 :1 Palm Valley Rd. Eastbound
Right 15 9 9 11 44
Thru 85 99 87 63 334
Left 10 6 9 6 31
Peds 0 0 0 0 0
App. Total
Thru 5 10 10 11 36
Left 18 19 15 21 73
Peds 0 0 0 0 0
Thru 90 61 49 89 289
Left 64 47 67 74 252
Peds 0 0 0 0 0
Thru 12 12 14 16 54
Left 16 12 12 12 52
Peds 0 0 0 0 0
Int. Total
158 115 121 168 562
Right 111 117 126 105 459
App. Total
27 31 27 34 119
Right 4 7 5 5 21
App. Total
110 114 105 80 409
Right 4 2 2 2 10
App. Total
03:00 PM 03:15 PM 03:30 PM 03:45 PM Total
139 141 152 133 565
434 401 405 415 1655
04:00 PM 04:15 PM 04:30 PM 04:45 PM Total
14 8 8 7 37
73 67 74 101 315
11 6 10 15 42
0 0 0 0 0
98 81 92 123 394
5 3 5 3 16
17 16 23 11 67
17 13 10 14 54
0 0 0 0 0
39 32 38 28 137
11 8 7 8 34
129 59 63 69 320
122 105 81 79 387
0 0 0 0 0
262 172 151 156 741
134 117 117 121 489
14 20 15 16 65
11 14 13 8 46
0 0 0 0 0
159 151 145 145 600
558 436 426 452 1872
05:00 PM 05:15 PM 05:30 PM 05:45 PM Total
10 24 10 8 52
94 125 111 92 422
9 16 14 19 58
0 0 0 0 0
113 165 135 119 532
5 1 4 9 19
0 6 14 0 20
26 23 29 30 108
0 0 0 0 0
31 30 47 39 147
11 8 11 4 34
73 98 62 65 298
84 89 90 97 360
0 0 0 0 0
168 195 163 166 692
154 133 134 145 566
18 13 20 14 65
6 13 8 12 39
0 0 0 0 0
178 159 162 171 670
490 549 507 495 2041
06:00 PM 06:15 PM 06:30 PM 06:45 PM Total
20 11 6 7 44
80 78 73 55 286
6 13 7 9 35
0 0 0 0 0
106 102 86 71 365
4 8 7 5 24
14 12 9 10 45
26 17 24 20 87
0 0 0 0 0
44 37 40 35 156
7 5 9 9 30
64 62 77 46 249
84 82 92 73 331
0 0 0 0 0
155 149 178 128 610
148 126 111 93 478
16 10 11 12 49
9 11 7 13 40
0 0 0 0 0
173 147 129 118 567
478 435 433 352 1698
Grand Total Apprch % Total %
177 10.4 2.4
1357 79.8 18.7
166 9.8 2.3
0 0 0
1700
69 12.3 0.9
168 30.1 2.3
322 57.6 4.4
0 0 0
559
119 4.6 1.6
1156 44.4 15.9
1330 51.1 18.3
0 0 0
2605
1992 82.9 27.4
233 9.7 3.2
177 7.4 2.4
0 0 0
2402
7266
23.4
Mickler Rd. Southbound Start Time Right Thru Left App. Total Peak Hour Analysis From 03:00 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 10 94 9 113 05:15 PM 16 24 125 165 05:30 PM 10 111 14 135 05:45 PM 8 92 119 19 Total Volume 52 422 58 532 % App. Total 9.8 79.3 10.9 PHF .542 .844 .763 .806
7.7
Business Entrance Westbound
35.9
CR 210 Northbound
33.1
Palm Valley Rd. Eastbound
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Right
Thru
Left
App. Total
Int. Total
5 1 4 9 19 12.9 .528
0 6 14 0 20 13.6 .357
26 23 29 30 108 73.5 .900
31 30 47 39 147
11 8 11 4 34 4.9 .773
73 98 62 65 298 43.1 .760
84 89 90 97 360 52 .928
168 195 163 166 692
154 133 134 145 566 84.5 .919
18 13 20 14 65 9.7 .813
6 13 8 12 39 5.8 .750
178 159 162 171 670
490 549 507 495 2041
.941
.929
.782
299
.887
Ponte Vedra/Palm Valley Traffic Study
APPENDIX C: CRASH LOCATIONS
300
SR A1A at Marlin Ave
( ! ! ( ( !
I
( !
! ( ( ! ( !
SR A1A at Dolphin Blvd
0 0.25 0.5
( ! ! ( ( ! ( ! SR A1A at (! ! ( Solana Rd ( ! SR A 1A ( ! ( at Library Blvd ! ( ! ( !
! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( !
Solana Rd at North Roscoe Blvd
SR A1A at Corona Rd
SR A1A at Thousand Oaks Blvd
( ! ! ( ( !
SR A1A at Sawgrass Village Dr
! ( ( ! ( ! ( ! ( ! ! ( ( !
SR A1A at PGA Tour Blvd
! ( ( ! SR A1A at ATP Tour Blvd
( !
SR A1A at Palm Valley Rd
! ( ( !
( ! ( !
! ( ( ! ( !
( !
( !
Palm Valley Rd at Canal Blvd
SR A1A at Sawgrass Dr
! ( ( !
SR A1A at Plantation Dr
! (
! (
( !
( ! SR A1A at Crossroad Lakes Dr
Palm Valley Road at Landrum Lane
! (
SR A1A at Mickler Rd
! (
( !
Legend ( ! ( ! ( !
Palm Valley Road at Mickler Rd
( !
Fatal Crashes
Injury Crashes
Property Damage Only Crashes Intersections
( !
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Comprehensive Traffic Study Ponte Vedra Crashes (07/01/2011 - 07/1/2012) 301
Miles 1
SR A1A at Marlin Ave
! ( ( !
I
! ( ( ! ! ( ( ! ( !
SR A1A at Dolphin Blvd
! ( ( !
0 0.25 0.5
! ( ( !
( ! ( !
( SR A1A at ! ( ! ! !! ( ( ( ( ! ! Solana Rd ( SR A 1A ( ! ( ! ( at Library Blvd ! ( ! ( ! ( ! ( ! ! ( ( ! ( ! ( !
( !! ( ( !
! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( !
Solana Rd at North Roscoe Blvd
( ! ( ! ! ( ! (
SR A1A at Corona Rd
! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( (! !
! ( ( !
( ! ! (
( !
! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ( ! ! ( ! ! ( ( ! ( ! ( ! ( !
SR A1A at Thousand Oaks Blvd
SR A1A at Sawgrass Village Dr SR A1A at PGA Tour Blvd
SR A1A at ATP Tour Blvd
SR A1A at Palm Valley Rd
SR A1A at Sawgrass Dr
! ( ( ! ! ( Palm Valley Rd at Canal Blvd
! ( ( !
SR A1A at Plantation Dr
( !
! ( ( ! ( ! ( !
( ! ( !
! ( ( ! ( !
Palm Valley Road at Landrum Lane
( ! ( !
( ! ! ( ( !
Legend
( ! ( !
Fatal Crashes
Injury Crashes
Property Damage Only Crashes Intersections
( !
( ( ! !
!! ( (
( !
SR A1A at Crossroad Lakes Dr
! (
SR A1A at Mickler Rd
Palm Valley Road at Mickler Rd
! ( ( ! ( ! ( !
( !
( !! ( ! (
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Comprehensive Traffic Study Ponte Vedra Crashes (07/02/2012 - 07/1/2013) 302
Miles 1
SR A1A at Marlin Ave
! ( ( ! ( ! ( ! ( ! ( ! ( ! ( !
I
( ! SR A1A at Dolphin Blvd
( ! ! ( ( ! ( !
!! ( (
0 0.25 0.5
! ( ( ! ( ! ( ! SR A1A at ( ! ! ( ( ! ( ! ( ! ( ! ( ! ( ! ( Solana Rd ! SR A 1A ( ! ( ! ( ! ( ! ( at Library Blvd ! ! ( ( ! ! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( !
( ! ( !
Solana Rd at North Roscoe Blvd
SR A1A at Corona Rd
SR A1A at Thousand Oaks Blvd
! ( ( ! ( ! ( !
( !
SR A1A at Sawgrass Village Dr SR A1A at PGA Tour Blvd
! ( ( ! ( ! ( ! ! ( ( !
SR A1A at ATP Tour Blvd
( ! ( ! ( ! ! ( ( ! ( ! ( ! ( ! ( !
SR A1A at Palm Valley Rd
( ! ! ( ( ! ! ( ( ! ( !
! ( ( (! ! ( ! ( !
SR A1A at Sawgrass Dr
( ! ( !
! ( ( ! ! (
( !
( !
Palm Valley Rd at Canal Blvd
SR A1A at Plantation Dr
( !
( !
( !
( !
( ! ( !
Palm Valley Road at Landrum Lane
! ( ( !
SR A1A at Crossroad Lakes Dr
! (
SR A1A at Mickler Rd
! (( !
( ! ( !
( !
( !
( ! ! (
Palm Valley Road at Mickler Rd
Legend ( !
Fatal Crashes
( !
Injury Crashes
( !
Property Damage Only Crashes Intersections
( !
( ! ( ! ! ( ( !
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Comprehensive Traffic Study Ponte Vedra Crashes (07/02/2013 - 07/1/2014) 303
Miles 1
SR A1A at Marlin Ave
! ( ( !
SR A1A at Dolphin Blvd
( ! ( ! ! (
( !
SR A1A at Corona Rd
( ! ! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( !
Solana Rd at North Roscoe Blvd
( !
0 0.25 0.5
! ( ( ! ( ! ( ! ( ! ( SR A1A at ! ( ! ( ! ( ! ( ! Rd ( Solana ! SR A 1A ( ! ( ! ( ! ( at Library Blvd ! ( ! ( ! ( !
( (! !
( (! !! (
I SR A1A at Thousand Oaks Blvd
( ! SR A1A at Sawgrass Village Dr
( ! ! (
( !
SR A1A at PGA Tour Blvd
( ! ( ! ( ! ( ! ! ( ( ! ( ! ( ! ( ! ( ! ( ! ! ( ( ! ( ! ( ! ( (! ! ( ! ( ! ( ! ( !
SR A1A at ATP Tour Blvd
SR A1A at Palm Valley Rd
! ( ( !
( (! ! ! (
SR A1A at Sawgrass Dr
( ! ( ! ( ! Palm Valley Rd at Canal Blvd
! ( ( !
SR A1A at Plantation Dr
( !
( ! ( ! ( ! ! (
SR A1A at Crossroad Lakes Dr
Palm Valley Road at Landrum Lane
! ( ( !
( !
( !
SR A1A at Mickler Rd
( ! ( ! ( ! ! ( ( !
( !
Legend ( !
Fatal Crashes
( !
Injury Crashes
( !
Property Damage Only Crashes Intersections
Palm Valley Road at Mickler Rd
! ( ( ! ( ! ( !
( ! ! (
! (
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Comprehensive Traffic Study Ponte Vedra Crashes (07/02/2014 - 07/1/2015) 304
Miles 1
SR A1A at Marlin Ave
! ( ( ! ( ! ( !
I
( !
( ! ! (
SR A1A at Dolphin Blvd
! ( ( !
0 0.25 0.5
( !
( !
( ! SR A1A at ! ( ( !! ( ( Solana Rd ! ( ! SR A 1A ( ! ( ! ( ! ( at Library Blvd ! ! ( ( ! ( ! ( ! ( ! ( !
( (! ! ! (
( !
SR A1A at Corona Rd
( ! ! ( ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( !
( ! Solana Rd at North Roscoe Blvd
SR A1A at Thousand Oaks Blvd
! ( ( ! ( ! ( ! ( ! ( !
( !
( ! ( ! ( ! ! ( ( ! ( ! ( ! ( ! (! ! ( ( ! ( ! ( ! ( ! ! ( ! ( ( ! ( !
( ! ! (
( !
SR A1A at Sawgrass Village Dr SR A1A at PGA Tour Blvd
SR A1A at ATP Tour Blvd
SR A1A at Palm Valley Rd
SR A1A at Sawgrass Dr
( !
( !
( ! Palm Valley Rd at Canal Blvd
! (
( ! ( ! SR A1A at Plantation Dr
! ( ( ! !! ( (
( !
( !
( ! ( ! ! ( ( !
SR A1A at Crossroad Lakes Dr
Palm Valley Road at Landrum Lane
( !
( !! !! ( (! ( (
! (
SR A1A at Mickler Rd
( !
( ! !! ( (( !
Legend ( !
Fatal Crashes
( !
Injury Crashes
( !
Property Damage Only Crashes Intersections
Palm Valley Road at Mickler Rd
! ( ( ! ! ( ( ! ( !
( ! ( !! (
( ! ! (
Palm Valley Rd at Roscoe Blvd
Ponte Vedra/ Palm Valley Comprehensive Traffic Study Ponte Vedra Crashes (07/02/2015 - 07/31/2016) 305
Miles 1
Ponte Vedra/Palm Valley Traffic Study
APPENDIX D: TIMING PLANS
306
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & CR 210/Palm Valley Rd ID#: System: SR A1A 1 File Name: CR 210/Palm Valley Rd
MOVEMENT
Coord Ø
Coord Ø
Ø
1 2 3 4 5 6 7 8
MIN
EXT
CLR
RED
18
2.5
4.8
2.0
MAX1 MAX II
40
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination WLK
FDW RECALLMem.
45
Min
MxP SPLITS
6 4 18
3.0 3.0 2.5
4.4 4.8 4.8
2.0 2.0 2.0
20 40 40
30 45 45
9
29
7
24
Min
MxP
Cycle Lengths Sec
1
2
3
4
5
6
7
150
150
150
110
110
130
110
8
9
1 2 3 4 5 6 7 8
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
1
2
3
4
5
6
7
8
9
95
105
100
75
79
85
77
55 16 79
45 16 89
50 15 85
35 16 59
31 16 63
45 15 70
33 16 61
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
82
20
75
102
69
4
32
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
SPLITS
1 2 3 4 5 6 7 8
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
307
1
2
3
4
1
2
3
4
88
98
93
78
49 9 72
39 9 82
44 8 78
39 8 63
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & ATP Tour Blvd ID#: System: SR A1A 2 File Name: ATP Tour Blvd
MOVEMENT
Coord Ø
Coord Ø
Ø
1 2 3 4 5 6 7 8
MIN
EXT
CLR
RED
18
2.5
4.8
2.0
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination
MAX1 MAX II
40
WLK
FDW RECALLMem.
45
Min
MxP SPLITS
6 4 18
3.0 3.0 2.5
3.4 4.8 4.8
2.9 2.0 2.0
30 20 40
45 45 45
8
31
Min
MxP
Cycle Lengths Sec
1
2
3
4
5
6
7
150
150
150
110
110
130
110
8
9
1 2 3 4 5 6 7 8
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
1
2
3
4
5
6
7
8
9
115
104
111
80
77
95
77
35 23 92
46 18 86
39 18 93
30 13 67
33 13 64
35 16 79
33 15 62
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
76
2
68
71
43
107
6
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
SPLITS
1 2 3 4 5 6 7 8
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
308
1
2
3
4
1
2
3
4
108
97
104
88
29 16 85
40 11 79
33 11 86
29 9 72
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & PGA Tour Rd/Country Club Blvd ID#: System: SR A1A 3 File Name: PGA Tour Rd/Country Club Blvd
MOVEMENT
Coord Ø
Coord Ø
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
4 18
3.0 2.5
4.8 4.8
2.0 2.0
6 4 18 4 6
3.0 3.0 2.5 3.0 3.0
1
2
3
4
5
150
150
150
110
110
3.4 4.8 4.8 3.4 3.4
3.2 2.0 2.0 2.5 3.2
MAX1 MAX II
20 40 30 20 40 20 30
30 60
WLK
7
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination FDW RECALLMem.
31
50 30 60 30 40
7
38
7
30
6
7
8
130
110
Min
Min
MxP
MxP
Cycle Lengths Sec
9
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
14 84
16 82
18 80
14 64
13 66
15 63
13 67
52 32 66 15 37
52 28 70 16 36
52 28 70 14 38
32 22 56 16 16
31 18 61 15 16
52 24 54 15 37
30 20 60 15 15
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
78
143
70
12
100
48
62
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
309
1
2
3
4
SPLITS
1
2
3
4
1 2 3 4 5 6 7 8
8 97
10 81
12 84
9 74
27 26 79 10 12
41 22 69 11 25
36 22 74 9 22
29 18 65 10 14
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & L'Atrium Dr/Sawgrass Village Dr ID#: System: SR A1A 4 File Name: L'Atrium Dr/Sawgrass Village Dr
MOVEMENT
Coord Ø
Coord Ø
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
4 18
3.0 2.5
4.9 4.9
2.0 2.0
6 4 18 4 6
3.0 3.0 2.5 3.0 3.0
1
2
3
4
5
150
150
150
110
110
3.4 4.8 4.9 3.4 3.4
3.2 2.0 2.0 2.4 3.2
MAX1 MAX II
20 40 30 20 40 20 30
45 60
WLK
7
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination FDW RECALLMem.
23
50 45 60 45 45
7
37
7
27
6
7
8
130
110
Min
Min
MxP
MxP
Cycle Lengths Sec
9
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
15 84
14 85
15 84
14 59
13 60
15 64
13 61
51 16 83 20 31
51 20 79 28 23
51 15 84 33 18
37 16 57 20 17
37 15 58 22 15
51 18 61 22 29
36 15 59 22 14
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
88
142
59
7
100
41
55
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
310
1
2
3
4
SPLITS
1
2
3
4
1 2 3 4 5 6 7 8
9 91
8 84
9 81
9 69
32 10 90 15 12
40 14 78 23 12
42 9 81 28 9
34 12 66 17 12
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & Thousand Oaks Blvd/Ocean Pl ID#: System: SR A1A 5 File Name: Thousand Oaks Blvd/Ocean Pl
MOVEMENT
Coord Ø
Coord Ø
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
4 18
3.0 2.5
4.8 4.8
2.0 2.0
MAX1 MAX II
15 45
30 30
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination
WLK
8
FDW RECALLMem.
21
6 4 18
3.0 3.0 2.5
3.4 4.8 4.8
3.2 2.0 2.0
25 15 45
30 30 30
7
33
7
20
6
3.0
3.4
3.2
25
30
10
38
1
2
3
4
5
6
7
8
9
150
150
150
110
110
130
110
Min
Min
MxP
MxP
Cycle Lengths Sec
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
20 75
14 81
15 80
15 75
14 74
14 61
15 75
55 14 81
55 14 81
55 15 80
20 15 75
22 14 74
55 15 60
20 15 75
55
55
55
20
22
55
20
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
144
58
131
76
48
100
12
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
311
1
2
3
4
SPLITS
1
2
3
4
1 2 3 4 5 6 7 8
14 99
8 104
9 107
8 82
19 8 105
20 8 104
16 9 107
22 9 81
19
20
16
22
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & Corona Rd (CR 210)/Summerfield Dr ID#: System: SR A1A Flash No Flash Time Schedule 7 File Name: Corona Rd (CR 210)/Summerfield D Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination MOVEMENT
Coord Ø
Coord Ø
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
4 18
3.0 2.5
4.9 4.9
2.0 2.0
MAX1 MAX II
20 40 30 20 40 30
45 45
6 4 18
3.0 3.0 2.5
3.4 4.9 4.9
3.2 2.0 2.0
45 45 45 45
6
3.0
3.4
3.2
1
2
3
4
5
6
7
150
150
150
110
110
130
110
WLK
7
FDW RECALLMem.
16
7
38
7
22
Min
Min
MxP
MxP
Cycle Lengths Sec
8
9
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
21 77
17 81
23 75
18 67
20 63
18 60
19 65
52 14 84
52 14 84
52 15 83
25 14 71
27 15 68
52 14 64
26 13 71
52
52
52
25
27
52
26
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
2
58
118
65
44
101
3
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
312
1
2
3
4
SPLITS
1
2
3
4
1 2 3 4 5 6 7 8
15 89
11 93
17 90
12 74
28 8 96
28 8 96
25 9 98
26 8 78
28
28
25
26
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & Library Blvd ID#: System: SR A1A 8 File Name: Library Blvd
MOVEMENT
Coord Ø
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
4 18
3.0 4.0
4.8 4.8
2.0 2.0
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination
MAX1 MAX II
WLK
7
FDW RECALLMem.
8
6 4 18
3.0 3.0 4.0
3.7 4.8 4.8
2.5 2.0 2.0
7
32
7
24
6
3.0
3.7
2.4
7
34
1
2
3
4
5
6
7
8
9
150
150
150
110
110
130
110
8
9
Min
Min
MxP
MxP
Cycle Lengths Sec
Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
60
145
49
6
91
23
59
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
313
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
15 98
15 100
15 100
15 63
15 61
15 80
15 62
22 23 90
20 21 94
20 23 92
17 20 58
19 20 56
20 22 73
18 20 57
15
15
15
15
15
15
15
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & Solana Rd ID#: System: SR A1A 9 File Name: Solana Rd
MOVEMENT
Coord Ø
Coord Ø
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination
Ø
MIN
EXT
CLR
RED
1 2 3 4 5 6 7 8
5 18
3.0 4.0
4.8 4.8
2.0 2.0
5 18 6 6
3.0 4.0 3.0 3.0
1
2
3
4
5
6
7
8
9
150
150
150
110
110
130
110
150
150
4.8 4.8 3.4 4.0
2.0 2.0 3.0 2.3
MAX1 MAX II
20 50
20 50 40 30
WLK
FDW RECALLMem.
15 65
15 65 20 22
Min
7
17
7
32
Min
MxP
MxP
Cycle Lengths Sec
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
SPLITS
1
2
3
4
5
6
7
8
9
1 2 3 4 5 6 7 8
21 61
21 58
19 62
20 47
19 47
18 45
20 49
21 75
20 78
15 67 22 46
15 64 25 46
14 67 23 46
15 52 21 22
16 50 22 22
16 47 21 46
15 54 20 21
15 81 22 32
14 84 21 31
MAX_2 (Seconds) Patterns 5 6 7
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
1
2
3
4
5
6
7
8
9
SPLITS
1
2
3
4
52
134
39
106
81
14
49
52
39
1 2 3 4 5 6 7 8
15 69
15 69
14 72
12 57
9 75 16 26
9 75 19 23
8 78 15 25
10 59 15 22
Time 0:00 6:30 7:45 8:45 9:30 14:30 16:15 18:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 2 8 8 2 1 1 2 2 2 3 3 3 3 9 9 3 3 3 3 4 4 2 Free 1
Time 0:00 7:30 9:30 19:00 22:00
Day Plan Weekend Pat Split Seq Free 1 5 5 2 6 6 6 7 7 2 Free 1
314
5
6
7
9
FDOT, DISTRIC 2 FINANCIAL NUMBER: PHASE(Ø) TIMING SHEET Location: SR A1A & Marlin Ave ID#: System: SR A1A 10 File Name: Marlin Ave
MOVEMENT
Coord Ø
Coord Ø
Ø
1 2 3 4 5 6 7 8
MIN
EXT
CLR
RED
18
2.5
4.8
2.0
Flash No Flash Time Schedule Max 1 ALL OTHER TIMES Note Rest in walk+Ped Recall during Coordination
MAX1 MAX II
40
WLK
FDW RECALLMem.
30
Min
MxP SPLITS
6 4 18
3.0 3.0 2.5
3.4 4.8 4.8
3.3 2.0 2.0
25 15 40
30 30 30
7
16
Min
MxP
Cycle Lengths Sec
1
2
3
4
5
6
7
150
150
150
110
110
130
110
8
9
1 2 3 4 5 6 7 8
Splits (Seconds) Patterns 4 5 6
1
2
3
7
8
9
1
2
3
4
5
6
7
8
9
125
124
126
90
90
105
89
25 14 111
26 15 109
24 15 111
20 13 77
20 15 75
25 14 91
21 13 76
8
9
8
9
Alternative Table Offsets Cycles Sec 1 2 3
1
2
3
4
5
6
7
75
65
124
24
103
39
63
Time 0:00 6:30 9:30 15:15 19:00 21:30
Day Plan Weekday Pat Split Seq Free 1 1 1 1 2 2 1 3 3 1 4 4 1 Free 1
Time 0:00 7:30 9:30 19:00 22:00
8
9
SPLITS
1 2 3 4 5 6 7 8
Day Plan Weekend Pat Split Seq Free 1 5 5 1 6 6 1 7 7 1 Free 1 1
315
1
2
3
4
1
2
3
4
118
117
119
98
18 7 104
19 8 102
17 8 104
18 7 84
MAX_2 (Seconds) Patterns 5 6 7 5
6
7
PALM VALLEY ROAD AT LANDRUM LANE CABINET ADDRESS: 4408-1 PALM VALLEY ROAD (BEACHES ENERGY)
LANDRUM LANE
INTERSECTION ID: 103
N
L 8 R
L 8
2
PALM VALLEY ROAD
L2
2 1 L1
6
L 4
PALM VALLEY ROAD
6
L6
8
8
L 4
Ø8
Ø2
Ø1
Ø6
Ø8
Ø6
Ø1
Ø2
SIGNAL OPERATING PLAN SOP 12
Ø3
TIMING FUNCTION
Ø1
Ø2
Ø3
Ø4
Ø5
Ø6
Ø7
Ø8
MINIMUM GREEN (INITIAL)
8
16
---
---
---
16
---
8
EXTENSION (PASSAGE)
3.0
4.0
---
---
---
4.0
---
3.0
MAX GREEN 1
20
40
---
---
---
40
---
25
YELLOW CLEAR
4.4
4.4
---
---
---
4.4
---
4.0
ALL RED
2.0
2.0
---
---
---
2.0
---
2.0
PED WALK
---
---
---
---
---
---
---
---
PED CLEAR
---
---
---
---
---
---
---
---
316
UPDATED 2/4/16
SR A1A NORTH AT MICKLER ROAD CABINET ADDRESS: 4495 MICKLER ROAD (BEACHES ENERGY)
PONTE VEDRA BLVD.
INTERSECTION ID: 104
8 L P2
P2
P8 P4
SR A1A
2
L 2A
4
L 2B
4 4
2 5
L1
1
L 4L 5
6 8 L 6B
L 6A
8
L 4
SR A1A
6 8
P8
L 4
L 4
P4
P6
P6 4 L
N
MICKLER ROAD Ø2 Ø2 Ø5 Ø2
Ø1 Ø5
Ø4
Ø4
OR Ø8
Ø6
Ø1
Ø1
SIGNAL OPERATING PLAN SOP 9
Ø5
Ø4
Ø3
Ø8
Ø6
Ø2
TIMING FUNCTION
Ø1
Ø2
Ø3
Ø4
Ø5
Ø6
Ø7
Ø8
MINIMUM GREEN (INITIAL)
4.0
18
---
6.0
4.0
18
--
6.0
EXTENSION (PASSAGE)
3.0
2.5
---
3.0
3.0
2.5
---
3.0
MAX GREEN 1
15
50
---
45
15
50
---
25
YELLOW CLEAR
4.8
4.8
---
4.0
4.8
4.8
---
3.7
ALL RED
2.0
2.0
---
2.0
2.0
2.0
---
2.1
PED WALK
---
7
---
7
---
7
---
7
PED CLEAR
---
11
---
16
---
14
---
15
317
UPDATED 5/27/15
Ponte Vedra/Palm Valley Traffic Study
APPENDIX E: SYNCHRO
318
Signalized Existing AM Reports
319
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
493 493 1900
67 67 1900 6.0 1.00 0.99 0.96 1771 0.96 1771 0.85 79 2 715 NA 4
49 49 1900
4 4 1900
11 11 1900
0.85 5 0 0 Split 8
21 21 1900 6.8 1.00 1.00 0.95 1770 0.46 850 0.85 25 0 25 pm+pt 1 6 23.5 23.5 0.23 6.8 3.0 215 0.00 0.02 0.12 31.0 1.00 0.2 31.2 C
176 176 1900 6.8 1.00 1.00 1.00 1863 1.00 1863 0.85 207 0 207 NA 6
379 379 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.85 446 354 92 Perm
72 72 1900 6.8 1.00 1.00 0.95 1770 0.50 924 0.85 85 0 85 pm+pt 5 2 25.3 25.3 0.25 6.8 3.0 254 c0.01 0.07 0.33 31.3 1.00 0.8 32.1 C
193 193 1900 6.8 1.00 0.99 1.00 1838 1.00 1838 0.85 227 3 246 NA 2
19 19 1900
0.85 58 0 0
52 52 1900 5.8 1.00 0.98 1.00 1816 1.00 1816 0.85 61 6 73 NA 8
0.85 580 0 0 Split 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
44.8 44.8 0.44 6.0 3.0 774 c0.40
7.8 7.8 0.08 5.8 3.0 138 c0.04
0.92 27.2 1.00 16.5 43.7 D 43.7 D
0.53 45.5 1.00 3.6 49.1 D 49.1 D 39.6 0.78 102.4 75.8% 15
0.85 13 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
21.2 21.2 0.21 6.8 2.5 385 0.11 0.54 36.2 1.00 1.1 37.4 D 35.3 D
6 21.2 21.2 0.21 6.8 2.5 327 0.06 0.28 34.2 1.00 0.3 34.5 C
0.85 22 0 0
22.1 22.1 0.22 6.8 2.5 396 c0.13 0.62 36.4 1.00 2.6 39.0 D 37.2 D
D 25.4 D
Synchro 9 Report Page 1
320
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
617 617 1900 6.4 0.97 0.99 0.95 3427 0.95 3427 0.91 678 2 705 Prot 4
26 26 1900
30 30 1900 6.8 1.00 1.00 0.95 1770 0.26 477 0.91 33 0 33 pm+pt 5 2 98.8 98.8 0.66 6.8 3.0 360 0.00 0.06 0.09 10.5 1.00 0.1 10.6 B
1013 1013 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.91 1113 0 1113 NA 2
778 443 778 443 1900 1900 6.8 6.4 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.91 0.91 855 487 0 82 855 405 NA pm+ov 6 4 6 86.6 124.6 86.6 124.6 0.58 0.83 6.8 6.4 2.5 3.0 2043 1314 0.24 0.08 0.18 0.42 0.31 17.7 2.9 0.85 0.00 0.5 0.1 15.6 0.1 B A 10.0 B
38.0 38.0 0.25 6.4 3.0 868 c0.21 0.81 52.6 1.00 5.8 58.5 E 58.5 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.91 29 0 0
21.9 0.60 150.0 57.4% 15
98.8 98.8 0.66 6.8 2.5 2331 c0.31 0.48 12.7 1.00 0.7 13.5 B 13.4 B
SBR
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
C 20.0 B
Synchro 9 Report Page 3
321
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
177 177 1900 6.3 1.00 1.00 0.95 1770 0.95 1770 0.89 199 0 199 Prot 4
85 85 1900 6.3 1.00 0.85 1.00 1583 1.00 1583 0.89 96 82 14 Perm
94 94 1900 6.8 1.00 1.00 0.95 1770 0.16 293 0.89 106 0 106 pm+pt 5 2 114.8 114.8 0.77 6.8 3.0 302 0.02 0.25 0.35 8.4 1.09 0.6 9.7 A
1536 1536 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.89 1726 0 1726 NA 2
1136 1136 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.89 1276 0 1276 NA 6
186 186 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.89 209 31 178 Perm
114.8 114.8 0.77 6.8 2.5 2708 c0.49
100.1 100.1 0.67 6.8 2.5 2361 0.36
0.64 8.1 1.43 1.0 12.5 B 12.3 B
0.54 13.0 1.54 0.7 20.7 C 20.8 C
22.1 22.1 0.15 6.3 3.0 260 c0.11 0.77 61.5 1.00 12.6 74.0 E 67.9 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 22.1 22.1 0.15 6.3 3.0 233 0.01 0.06 55.0 1.00 0.1 55.1 E
20.3 0.69 150.0 63.2% 15
6 100.1 100.1 0.67 6.8 2.5 1056 0.11 0.17 9.4 2.23 0.3 21.1 C
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
C 19.9 B
Synchro 9 Report Page 4
322
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
79 79 1900 5.9 1.00 1.00 0.95 1770 0.46 851 0.94 84 0 84 pm+pt 7 4 25.8 25.8 0.17 5.9 3.0 206 c0.03 0.04 0.41 54.1 1.00 1.3 55.4 E
26 26 1900 6.6 1.00 0.87 1.00 1613 1.00 1613 0.94 28 196 69 NA 4
223 223 1900
32 32 1900
0.94 237 0 0
0.94 34 0 0 Perm
16 73 16 73 1900 1900 6.6 6.8 1.00 1.00 1.00 0.85 0.97 1.00 1803 1583 0.65 1.00 1207 1583 0.94 0.94 17 78 0 69 51 9 NA pm+ov 8 1 8 10.1 17.0 10.1 17.0 0.07 0.11 6.6 6.8 3.0 3.0 81 179 0.00 c0.04 0.00 0.63 0.05 68.1 59.3 1.00 1.00 14.3 0.1 82.5 59.4 F E 68.5 E
242 242 1900 6.8 1.00 1.00 0.95 1770 0.11 208 0.94 257 0 257 pm+pt 5 2 110.8 110.8 0.74 6.8 3.0 371 c0.10 c0.41 0.69 26.6 1.83 4.3 53.1 D
1425 1425 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.94 1516 0 1516 NA 2
18 18 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.94 19 7 12 Perm
50 50 1900 6.8 1.00 1.00 0.95 1770 0.13 236 0.94 53 0 53 pm+pt 1 6 90.0 90.0 0.60 6.8 3.0 212 0.01 0.14 0.25 14.2 0.73 0.5 10.9 B
1236 1236 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.94 1315 0 1315 NA 6
64 64 1900 5.9 1.00 0.85 1.00 1583 1.00 1583 0.94 68 64 4 Over 7
83.1 83.1 0.55 6.8 2.5 1960 0.37
9.8 9.8 0.07 5.9 3.0 103 0.00
0.67 23.7 0.64 1.6 16.7 B 18.9 B
0.04 65.7 1.00 0.1 65.9 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 25.8 25.8 0.17 6.6 3.0 277 0.04 0.25 53.7 1.00 0.5 54.2 D 54.5 D 22.8 0.69 150.0 90.0% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
97.1 97.1 0.65 6.8 2.5 2290 c0.43 0.66 16.3 0.56 1.2 10.3 B 16.4 B
2 97.1 97.1 0.65 6.8 2.5 1024 0.01 0.01 9.4 1.00 0.0 9.4 A
C 26.1 E
Synchro 9 Report Page 5
323
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
110 110 1900 5.8 1.00 1.00 0.95 1770 0.46 854 0.95 116 0 116 pm+pt 7 4 29.8 29.8 0.20 5.8 3.0 254 c0.04 0.05 0.46 51.7 1.00 1.3 53.0 D
4 4 1900 6.6 1.00 0.87 1.00 1612 1.00 1612 0.95 4 28 11 NA 4
33 33 1900
47 47 1900
0.95 35 0 0
0.95 49 0 0 Perm
5 100 5 100 1900 1900 6.6 6.9 1.00 1.00 1.00 0.85 0.96 1.00 1782 1583 0.72 1.00 1337 1583 0.95 0.95 5 105 0 83 54 22 NA pm+ov 8 1 8 10.1 16.6 10.1 16.6 0.07 0.11 6.6 6.9 3.0 3.0 90 175 0.01 c0.04 0.01 0.60 0.13 68.0 60.2 1.00 1.00 10.3 0.3 78.3 60.5 E E 66.5 E
57 57 1900 6.8 1.00 1.00 0.95 1770 0.14 265 0.95 60 0 60 pm+pt 5 2 99.3 99.3 0.66 6.8 3.0 235 c0.01 0.16 0.26 12.1 0.34 0.5 4.6 A
1509 1509 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 1588 0 1588 NA 2
11 11 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 12 5 7 Perm
34 34 1900 6.9 1.00 1.00 0.95 1770 0.09 161 0.95 36 0 36 pm+pt 1 6 100.4 100.4 0.67 6.9 3.0 177 0.01 0.13 0.20 15.3 0.85 0.5 13.5 B
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 29.8 29.8 0.20 6.6 3.0 320 0.01 0.03 48.5 1.00 0.0 48.5 D 51.8 D 19.5 0.66 150.0 71.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
93.3 93.3 0.62 6.9 2.5 2201 c0.45 0.72 19.4 0.47 1.6 10.8 B 10.6 B
2 93.3 93.3 0.62 6.9 2.5 984 0.00 0.01 10.8 1.00 0.0 10.8 B
SBT
SBR
1270 235 1270 235 1900 1900 6.9 5.8 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.95 0.95 1337 247 0 69 1337 178 NA pm+ov 6 7 6 93.9 107.8 93.9 107.8 0.63 0.72 6.9 5.8 2.5 3.0 2215 1137 0.38 0.01 0.10 0.60 0.16 16.9 6.7 1.05 5.05 1.1 0.1 18.8 33.8 B C 20.9 C
B 26.2 C
Synchro 9 Report Page 6
324
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
83 83 1900
0 0 1900 6.6 1.00 0.94 0.97 1708 0.78 1372 0.95 0 70 80 NA 4
60 60 1900
29 29 1900 6.6 1.00 1.00 0.95 1770 0.60 1116 0.95 31 0 31 Perm
0 0 1900 6.6 1.00 0.85 1.00 1583 1.00 1583 0.95 0 64 7 NA 8
67 67 1900
15 15 1900 6.8 1.00 1.00 0.95 1770 0.15 271 0.95 16 0 16 pm+pt 5 2 107.6 107.6 0.72 6.8 3.0 218 0.00 0.05 0.07 6.8 0.46 0.1 3.2 A
1705 1705 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 1795 0 1795 NA 2
14 14 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 15 4 11 Perm
104 104 1900 6.8 1.00 1.00 0.95 1770 0.07 133 0.95 109 0 109 pm+pt 1 6 122.5 122.5 0.82 6.8 3.0 223 c0.03 0.36 0.49 17.7 2.22 1.3 40.7 D
1450 1450 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 1526 0 1526 NA 6
25 25 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 26 6 20 Perm
0.95 87 0 0 Perm
0.95 63 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 14.1 14.1 0.09 6.6 3.0 104
14.1 14.1 0.09 6.6 3.0 128 c0.06 0.63 65.4 1.00 9.2 74.6 E 74.6 E
0.03 0.30 63.3 1.00 1.6 64.9 E
17.3 0.70 150.0 84.7% 15
0.95 71 0 0
14.1 14.1 0.09 6.6 3.0 148 0.00 0.05 61.8 1.00 0.1 62.0 E 62.9 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
105.2 105.2 0.70 6.8 2.5 2482 c0.51 0.72 13.6 1.15 1.4 17.0 B 16.8 B
2 105.2 105.2 0.70 6.8 2.5 1110 0.01 0.01 6.7 1.00 0.0 6.7 A
113.3 113.3 0.76 6.8 2.5 2673 c0.43 0.57 7.9 0.91 0.7 7.9 A 10.0 A
6 113.3 113.3 0.76 6.8 2.5 1195 0.01 0.02 4.5 1.00 0.0 4.6 A
B 20.2 E
Synchro 9 Report Page 7
325
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13 1900
5 5 1900 6.6 1.00 0.94 0.98 1716 0.85 1486 0.95 5 12 22
14 14 1900
160 160 1900
0.95 15 0 0
0.95 168 0 0
2 2 1900 6.6 1.00 1.00 0.95 1775 0.70 1311 0.95 2 0 170
144 144 1900 6.6 1.00 0.85 1.00 1583 1.00 1583 0.95 152 107 45
10 10 1900 6.9 1.00 1.00 0.95 1770 0.11 208 0.95 11 0 11
1645 1645 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 1732 0 1732
158 158 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 166 60 106
77 77 1900 6.9 1.00 1.00 0.95 1770 0.06 118 0.95 81 0 81
1508 1508 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 1587 0 1587
NA 8
Perm
pm+pt 5 2 98.3 98.3 0.66 6.9 3.0 161 0.00 0.04 0.07 11.8 0.69 0.1 8.2 A
NA 2
Perm
pm+pt 1 6 110.7 110.7 0.74 6.9 3.0 181 c0.03 0.30 0.45 20.1 1.00 1.8 21.8 C
NA 6
7 7 1900 6.9 1.00 0.85 1.00 1425 1.00 1425 0.95 7 2 5 0 Perm
0.95 14 0 0 Perm
NA 4
Perm
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 25.1 25.1 0.17 6.6 3.0 248
25.1 25.1 0.17 6.6 3.0 219
0.01 0.09 52.8 1.00 0.2 52.9 D 52.9 D
c0.13 0.78 59.8 1.00 15.7 75.5 E 65.3 E 16.3 0.76 150.0 82.4% 15
8 25.1 25.1 0.17 6.6 3.0 264 0.03 0.17 53.5 1.00 0.3 53.8 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
95.9 95.9 0.64 6.9 2.5 2262 c0.49 0.77 19.1 0.34 1.8 8.4 A 8.0 A
2 95.9 95.9 0.64 6.9 2.5 1012 0.07 0.10 10.5 0.36 0.2 3.9 A
102.1 102.1 0.68 6.9 2.5 2408 c0.45 0.66 13.9 1.00 1.4 15.3 B 15.6 B
6 102.1 102.1 0.68 6.9 2.5 969 0.00 0.00 7.7 1.00 0.0 7.7 A
B 20.4 E
Synchro 9 Report Page 8
326
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
19 19 1900 6.2 1.00 1.00 0.95 1770 0.95 1770 0.97 20 0 20 Prot 4
0 0 1900
151 151 1900 6.2 1.00 0.85 1.00 1583 1.00 1583 0.97 156 144 12 Prot 4
0 0 1900
0 0 1900 6.1 1.00 0.86 1.00 1611 1.00 1611 0.97 0 2 0 NA 8
2 2 1900
73 73 1900 6.8 1.00 1.00 0.95 1770 0.07 124 0.97 75 0 75 pm+pt 5 2 65.7 65.7 0.69 6.8 3.0 186 c0.02 0.25 0.40 13.3 1.00 1.4 14.7 B
1571 1571 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.97 1620 0 1620 NA 2
0 0 1900
1 1 1900 6.8 1.00 1.00 0.95 1770 0.10 183 0.97 1 0 1 pm+pt 1 6 55.9 55.9 0.59 6.8 3.0 122 0.00 0.00 0.01 10.1 1.00 0.0 10.1 B
1591 1591 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.97 1640 0 1640 NA 6
67 67 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 69 29 40 Perm
0.97 0 0 0
0.97 0 0 0
0.97 2 0 0
8 7.2 7.2 0.08 6.2 3.0 134 c0.01
7.2 7.2 0.08 6.2 3.0 120 0.01
1.0 1.0 0.01 6.1 3.0 16 c0.00
0.15 41.0 1.00 0.5 41.5 D
0.10 40.8 1.00 0.4 41.2 D
0.00 46.5 1.00 0.0 46.5 D 46.5 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
41.2 D 16.7 0.71 94.9 74.2% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
0.97 0 0 0
59.9 59.9 0.63 6.8 4.0 2233 c0.46 0.73 11.9 1.00 1.3 13.2 B 13.3 B
55.0 55.0 0.58 6.8 4.0 2051 c0.46 0.80 15.6 1.00 2.4 18.0 B 17.7 B
6 55.0 55.0 0.58 6.8 4.0 917 0.03 0.04 8.6 1.00 0.0 8.6 A
B 25.9 D
Synchro 9 Report Page 2
327
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
595 595 1900 6.4 0.97 1.00 0.95 3433 0.95 3433 0.97 613 0 613 Split 8
96 96 1900 6.4 1.00 0.93 1.00 1737 1.00 1737 0.97 99 20 160 NA 8
79 79 1900
99 99 1900
0.97 81 0 0
0.97 102 0 0 Split 7
61 61 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.97 63 0 63 Prot 5
1472 1472 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.97 1518 0 1518 NA 2
59 59 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 61 33 28 Perm
93 93 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.97 96 0 96 Prot 1
27.2 27.2 0.18 6.4 3.0 622 c0.18
27.2 27.2 0.18 6.4 3.0 314 0.09
6.7 6.7 0.04 6.8 3.0 79 0.04
69.2 69.2 0.46 6.8 4.0 1632 c0.43
0.99 61.2 1.00 32.1 93.3 F
0.51 55.4 1.00 1.4 56.8 E 85.0 F
43 186 43 186 1900 1900 6.4 6.8 1.00 1.00 1.00 0.85 0.97 1.00 1800 1583 0.97 1.00 1800 1583 0.97 0.97 44 192 0 102 146 90 NA pm+ov 7 1 7 14.9 27.2 14.9 27.2 0.10 0.18 6.4 6.8 3.0 3.0 178 287 c0.08 0.03 0.03 0.82 0.32 66.2 53.3 1.00 1.00 25.1 0.6 91.3 53.9 F D 70.1 E
0.80 71.0 1.00 41.2 112.1 F
0.93 38.1 1.00 10.9 49.0 D 50.5 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
51.6 0.95 150.0 92.6% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
2 69.2 69.2 0.46 6.8 4.0 730 0.02 0.04 22.2 1.00 0.1 22.3 C
12.3 12.3 0.08 6.8 3.0 145 0.05 0.66 66.8 1.19 7.1 86.9 F
SBT
SBR
1481 421 1481 421 1900 1900 6.8 6.4 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1527 434 0 139 1527 295 NA pm+ov 6 8 6 74.8 102.0 74.8 102.0 0.50 0.68 6.8 6.4 4.0 3.0 1764 1143 c0.43 0.05 0.14 0.87 0.26 33.2 9.3 0.89 3.89 4.0 0.1 33.4 36.3 C D 36.5 D
D 26.4 F
Synchro 9 Report Page 9
328
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
146 146 1900 6.7 1.00 1.00 0.95 1770 0.95 1770 0.95 154 0 154 Prot 4
58 58 1900 6.7 1.00 0.85 1.00 1583 1.00 1583 0.95 61 35 26 Perm
20 20 1900 6.8 1.00 1.00 0.95 1770 0.04 81 0.95 21 0 21 pm+pt 5 2 119.8 119.8 0.80 6.8 3.0 106 0.00 0.15 0.20 18.2 1.35 0.5 25.1 C
2278 2278 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2398 0 2398 NA 2
1978 1978 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2082 0 2082 NA 6
34 34 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 36 8 28 Perm
119.8 119.8 0.80 6.8 2.5 2826 c0.68
109.3 109.3 0.73 6.8 2.5 2578 0.59
0.85 9.4 1.62 1.8 17.1 B 17.1 B
0.81 13.4 1.00 2.8 16.3 B 16.1 B
16.7 16.7 0.11 6.7 3.0 197 c0.09 0.78 64.9 1.00 18.0 82.9 F 76.6 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 16.7 16.7 0.11 6.7 3.0 176 0.02 0.15 60.2 1.00 0.4 60.6 E
19.4 0.88 150.0 82.3% 15
6 109.3 109.3 0.73 6.8 2.5 1153 0.02 0.02 5.6 1.00 0.0 5.7 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
B 20.3 E
Synchro 9 Report Page 10
329
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
178 178 1900 6.0 1.00 1.00 0.95 1770 0.95 1770 0.89 200 0 200 Prot 8
168 168 1900 6.0 1.00 0.85 1.00 1583 1.00 1583 0.89 189 150 39 Perm
172 172 1900 6.4 1.00 1.00 0.95 1770 0.31 577 0.89 193 0 193 pm+pt 1 6 32.5 32.5 0.57 6.4 3.0 501 0.06 0.17 0.39 7.0 1.00 0.5 7.5 A
505 505 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 567 0 567 NA 6
337 337 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 379 0 379 NA 2
134 134 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.89 151 103 48 Perm
32.5 32.5 0.57 6.4 4.0 1067 c0.30
18.0 18.0 0.32 6.4 4.0 591 c0.20
0.53 7.4 1.00 0.7 8.1 A 7.9 A
0.64 16.6 1.00 2.7 19.2 B 17.7 B
11.8 11.8 0.21 6.0 3.0 368 c0.11 0.54 20.0 1.00 1.6 21.7 C 20.1 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 11.8 11.8 0.21 6.0 3.0 329 0.02 0.12 18.2 1.00 0.2 18.4 B
13.8 0.64 56.7 52.8% 15
2 18.0 18.0 0.32 6.4 4.0 502 0.03 0.10 13.6 1.00 0.1 13.7 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
B 18.8 A
Synchro 9 Report Page 11
330
Unsignalized Existing AM Reports
331
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
21.9
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
7 563 32 7 563 32 0 0 0 Free Free Free - None 380 - 380 0 0 86 86 86 2 2 2 8 655 37
12 697 10 12 697 10 0 0 0 Free Free Free - None 425 0 0 86 86 86 2 2 2 14 810 12
85 0 49 85 0 49 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 99 0 57
16 0 24 16 0 24 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 19 0 28
Minor1 1529 1521 655 671 671 858 850 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 ~ 96 118 466 446 455 352 377 -
Minor2 1543 1515 816 844 844 699 671 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 94 119 377 358 379 430 455 -
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 822 4.12 2.218 807 -
Approach HCM Control Delay, s HCM LOS
SE 0.1
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
807 -
0 -
0 -
NELn1 NWL NWT NWR 124 932 1.257 0.015 232.3 8.9 F A 9.9 0 $: Delay exceeds 300s
Major2 655 4.12 2.218 932 -
0 -
932 -
0 -
NW 0.1
SEL 807 0.01 9.5 A 0
~ 87 ~ 87 442 321 NE 232.3 F
115 115 450 371
466 -
81 81 354 374
116 116 373 450
377 -
SW 38.5 E
SET SERSWLn1 - 153 - 0.304 - 38.5 E 1.2
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
*: All major volume in platoon
Synchro 9 Report Page 2
332
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
8 EBL
EBR
NBL
NBT
SBT SBR
77 77 0 Stop 0 0 0 84 2 92
7 7 0 Stop None 84 2 8
22 791 22 791 0 0 Free Free - None 465 0 0 84 84 2 2 26 942
596 104 596 104 0 0 Free Free - None - 260 0 0 84 84 2 2 710 124
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1704 710 994 6.42 5.42 5.42 3.518 101 487 358
710 6.22 3.318 434 -
Major1 710 4.12 2.218 889 -
98 98 487 348
434 -
889 -
Approach HCM Control Delay, s HCM LOS
EB 150.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 889 0.029 9.2 A 0.1
0 -
NB 0.2
NBT EBLn1 - 105 - 0.952 - 150.3 F 5.8
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
Synchro 9 Report Page 3
333
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
04/04/2017
18.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBT EBR
WBL WBT WBR
NBL
53 1 10 53 1 10 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 62 1 12
36 2 122 36 2 122 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 42 2 142
21 859 28 21 859 28 0 0 0 Free Free Free - None 150 - 150 0 0 86 86 86 2 2 2 24 999 33
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1563 2062 1014 1014 549 1048 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 76 54 256 314 488 303
Approach HCM Control Delay, s HCM LOS
EB $ 365.8 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
~ 44 ~ 44 249 342
NBL 870 0.028 9.3 A 0.1
42 42 249 295
365 6.94 3.32 632 632 -
Minor1 1697 2062 1048 1048 649 1014 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 60 54 244 303 425 314 48 48 237 330
42 42 295 249
499 6.94 3.32 517 -
Major1 730 4.14 2.22 870 -
517 -
870 -
WB 68 F
0 -
0 -
SBL
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
SBT SBR
122 628 32 122 628 32 0 0 0 Free Free Free - None 230 - 375 0 0 86 86 86 2 2 2 142 730 37 Major2 999 4.14 2.22 689 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 44 632 48 517 689 - 1.427 0.018 0.921 0.274 0.206 -$ 431.5 10.8 239.3 14.6 11.6 F B F B B 6.2 0.1 3.8 1.1 0.8
$: Delay exceeds 300s
NBT NBR
689 -
0 -
0 -
SB 1.8
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
334
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
57.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
32 32 0 Stop 0 0 0 92 2 35
61 61 0 Stop None 92 2 66
17 17 0 Free 185 92 2 18
2268 2268 0 Free None 0 0 92 2 2465
1925 11 1925 11 0 0 Free Free - None - 150 0 0 92 92 2 2 2092 12
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 3362 2092 1270 6.84 5.84 5.84 3.52 ~6 81 228
1046 6.94 3.32 225 -
Major1 2092 4.14 2.22 260 -
~6 ~6 81 212
225 -
260 -
Approach HCM Control Delay, s HCM LOS
EB $ 2673.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 260 0.071 19.9 C 0.2
0 -
NB 0.1
NBT EBLn1 17 - 5.946 $- 2673.3 F - 13.3
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
335
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
19 19 0 Stop 0 0 0 96 2 20
16 16 0 Stop None 96 2 17
11 334 11 334 0 0 Free Free - None 0 0 96 96 2 2 11 348
251 6 251 6 0 0 Free Free - None 0 0 96 96 2 2 261 6
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 636 265 371 6.42 5.42 5.42 3.518 442 779 698
265 6.22 3.318 774 -
Major1 268 4.12 2.218 1296 -
437 437 779 690
774 -
1296 -
Approach HCM Control Delay, s HCM LOS
EB 12.1 B
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1296 0.009 7.8 A 0
0 -
NB 0.2
NBT EBLn1 - 546 - 0.067 0 12.1 A B 0.2
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
Synchro 9 Report Page 6
336
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
86.9
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
NWL
NWR
NET NER
SWL SWT
174 174 0 Stop 0 0 0 94 2 185
11 11 0 Stop None 325 94 2 12
960 268 960 268 0 0 Free Free - None 0 0 0 94 94 2 2 1021 285
42 884 42 884 0 0 Free Free - None 250 0 0 94 94 2 2 45 940
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor1 2051 1021 1030 6.42 5.42 5.42 3.518 ~ 61 348 344
1021 6.22 3.318 287 -
~ 57 ~ 57 348 321
287 -
Approach HCM Control Delay, s HCM LOS
NW $ 1095.7 F
Major1 0 -
0 -
NE 0
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NET NERNWLn1NWLn2 SWL SWT 57 287 680 - 3.247 0.041 0.066 $- 1163.8 18.1 10.7 F C B - 19.6 0.1 0.2 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
Major2 1021 4.12 2.218 680 680 -
0 -
SW 0.5
*: All major volume in platoon
Synchro 9 Report Page 1
337
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
04/04/2017
3.1 EBL
EBT EBR
WBL WBT WBR
NBL
67 0 37 67 0 37 0 0 0 Stop Stop Stop - None - 150 0 0 97 97 97 2 2 2 69 0 38
1 0 1 1 0 1 0 0 0 Stop Stop Stop - None 0 0 97 97 97 2 2 2 1 0 1
50 648 0 50 648 0 0 0 0 Free Free Free - Yield 215 0 0 0 97 97 97 2 2 2 52 668 0
Minor2 1207 1206 435 435 435 772 771 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 160 184 621 600 580 392 410 -
Minor1 1206 1206 668 771 771 435 435 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 160 184 458 393 410 600 580 -
154 154 572 373
175 175 580 391
621 -
EB 33.7 D NBL 1125 0.046 8.4 A 0.1
145 145 375 563
175 175 391 580
458 -
WB 21.5 C
Major1 435 4.12 2.218 1125 1125 NB 0.6
NBT NBR EBLn1 EBLn2WBLn1 - 154 621 220 - 0.449 0.061 0.009 - 46.1 11.2 21.5 E B C 2 0.2 0
Ponte Vedra/Palm Valley 09/14/2016 Existing AM Peak
NBT NBR
0 -
0 -
SBL
SBT SBR
0 422 35 0 422 35 0 0 0 Free Free Free - Yield - 125 0 0 97 97 97 2 2 2 0 435 36 Major2 0 0 0 -
-
0 -
SB 0
SBT SBR -
Synchro 9 Report Page 7
338
Signalized Existing PM Reports
339
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
332 332 1900
35 35 1900 6.0 1.00 0.99 0.96 1767 0.96 1767 0.97 36 4 412 NA 4
37 37 1900
18 18 1900
29 29 1900
0.97 19 0 0 Split 8
30 30 1900 6.8 1.00 1.00 0.95 1770 0.58 1086 0.97 31 0 31 pm+pt 1 6 23.9 23.9 0.30 6.8 3.0 344 0.00 0.02 0.09 19.8 1.00 0.1 19.9 B
321 321 1900 6.8 1.00 1.00 1.00 1863 1.00 1863 0.97 331 0 331 NA 6
431 431 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 444 322 122 Perm
41 41 1900 6.8 1.00 1.00 0.95 1770 0.40 751 0.97 42 0 42 pm+pt 5 2 23.9 23.9 0.30 6.8 3.0 251 c0.00 0.05 0.17 20.1 1.00 0.3 20.4 C
207 207 1900 6.8 1.00 0.99 1.00 1851 1.00 1851 0.97 213 1 221 NA 2
9 9 1900
0.97 38 0 0
56 56 1900 5.8 1.00 0.96 0.99 1776 0.99 1776 0.97 58 16 91 NA 8
0.97 342 0 0 Split 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
22.4 22.4 0.28 6.0 3.0 498 c0.23
7.7 7.7 0.10 5.8 3.0 172 c0.05
0.83 26.7 1.00 10.9 37.6 D 37.6 D
0.53 34.1 1.00 2.9 37.0 D 37.0 D 28.7 0.69 79.4 65.7% 15
0.97 30 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
21.9 21.9 0.28 6.8 2.5 513 c0.18 0.65 25.3 1.00 2.5 27.8 C 24.8 C
6 21.9 21.9 0.28 6.8 2.5 436 0.08 0.28 22.6 1.00 0.3 22.8 C
0.97 9 0 0
21.9 21.9 0.28 6.8 2.5 510 0.12 0.43 23.6 1.00 0.4 24.1 C 23.5 C
C 25.4 C
Synchro 9 Report Page 1
340
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
EBL
EBR
NBL
NBT
506 506 1900 6.4 0.97 0.99 0.95 3424 0.95 3424 0.96 527 3 551 Prot 4
26 26 1900
27 27 1900 6.8 1.00 1.00 0.95 1770 0.18 329 0.96 28 0 28 pm+pt 5 2 105.3 105.3 0.70 6.8 3.0 269 0.00 0.07 0.10 9.6 1.00 0.2 9.8 A
833 833 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.96 868 0 868 NA 2
31.5 31.5 0.21 6.4 3.0 719 c0.16 0.77 55.8 1.00 4.9 60.7 E 60.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.96 27 0 0
20.8 0.59 150.0 57.0% 15
105.3 105.3 0.70 6.8 2.5 2484 c0.25 0.35 8.8 1.00 0.4 9.2 A 9.2 A
04/04/2017
SBT
SBR
1111 653 1111 653 1900 1900 6.8 6.4 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.96 0.96 1157 680 0 109 1157 571 NA pm+ov 6 4 6 94.5 126.0 94.5 126.0 0.63 0.84 6.8 6.4 2.5 3.0 2229 1329 c0.33 0.09 0.27 0.52 0.43 15.3 3.0 1.41 0.40 0.6 0.2 22.0 1.3 C A 14.4 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
C 20.0 B
Synchro 9 Report Page 3
341
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
295 295 1900 6.3 1.00 1.00 0.95 1770 0.95 1770 0.97 304 0 304 Prot 4
144 144 1900 6.3 1.00 0.85 1.00 1583 1.00 1583 0.97 148 115 33 Perm
85 85 1900 6.8 1.00 1.00 0.95 1770 0.06 120 0.97 88 0 88 pm+pt 5 2 107.2 107.2 0.71 6.8 3.0 177 0.03 0.33 0.50 21.5 1.36 2.0 31.2 C
1254 1254 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.97 1293 0 1293 NA 2
1620 1620 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.97 1670 0 1670 NA 6
227 227 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 234 31 203 Perm
107.2 107.2 0.71 6.8 2.5 2529 c0.37
92.1 92.1 0.61 6.8 2.5 2172 c0.47
0.51 9.6 1.86 0.7 18.5 B 19.4 B
0.77 21.2 0.77 1.6 17.8 B 17.2 B
29.7 29.7 0.20 6.3 3.0 350 c0.17 0.87 58.3 1.00 19.8 78.0 E 68.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 29.7 29.7 0.20 6.3 3.0 313 0.02 0.10 49.3 1.00 0.1 49.4 D
24.2 0.79 150.0 82.4% 15
6 92.1 92.1 0.61 6.8 2.5 971 0.13 0.21 12.8 0.96 0.3 12.6 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
C 19.9 E
Synchro 9 Report Page 4
342
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
113 113 1900 5.9 1.00 1.00 0.95 1770 0.50 927 0.95 119 0 119 pm+pt 7 4 27.8 27.8 0.19 5.9 3.0 217 0.03 0.07 0.55 53.9 1.00 2.8 56.7 E
34 34 1900 6.6 1.00 0.86 1.00 1610 1.00 1610 0.95 36 169 213 NA 4
329 329 1900
24 24 1900
0.95 346 0 0
0.95 25 0 0 Perm
44 71 44 71 1900 1900 6.6 6.8 1.00 1.00 1.00 0.85 0.98 1.00 1831 1583 0.20 1.00 365 1583 0.95 0.95 46 75 0 64 71 11 NA pm+ov 8 1 8 13.8 22.1 13.8 22.1 0.09 0.15 6.6 6.8 3.0 3.0 33 233 0.00 c0.19 0.00 2.15 0.05 68.1 54.9 1.00 1.00 605.4 0.1 673.5 55.0 F D 355.8 F
247 247 1900 6.8 1.00 1.00 0.95 1770 0.05 97 0.95 260 0 260 pm+pt 5 2 108.8 108.8 0.73 6.8 3.0 322 c0.12 c0.47 0.81 47.6 1.25 12.1 71.7 E
1382 1382 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 1455 0 1455 NA 2
20 20 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
74 74 1900 6.8 1.00 1.00 0.95 1770 0.13 250 0.95 78 0 78 pm+pt 1 6 87.7 87.7 0.58 6.8 3.0 230 0.02 0.18 0.34 15.4 0.64 0.6 10.4 B
1478 1478 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 1556 0 1556 NA 6
67 67 1900 5.9 1.00 0.85 1.00 1583 1.00 1583 0.95 71 67 4 Over 7
79.4 79.4 0.53 6.8 2.5 1873 0.44
8.1 8.1 0.05 5.9 3.0 85 0.00
0.83 29.7 0.51 3.2 18.2 B 19.9 B
0.05 67.3 1.00 0.2 67.4 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 27.8 27.8 0.19 6.6 3.0 298 c0.13 0.71 57.4 1.00 7.8 65.2 E 63.2 E 37.8 0.98 150.0 95.0% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
93.7 93.7 0.62 6.8 2.5 2210 0.41 0.66 17.9 0.62 1.4 12.5 B 21.3 C
2 93.7 93.7 0.62 6.8 2.5 988 0.01 0.01 10.7 1.00 0.0 10.7 B
D 26.1 F
Synchro 9 Report Page 5
343
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
319 319 1900 5.8 1.00 1.00 0.95 1770 0.43 802 0.97 329 0 329 pm+pt 7 4 43.2 43.2 0.29 5.8 3.0 418 c0.15 c0.07 0.79 46.9 1.00 9.4 56.3 E
22 22 1900 6.6 1.00 0.87 1.00 1618 1.00 1618 0.97 23 88 99 NA 4
159 159 1900
28 28 1900
0.97 164 0 0
0.97 29 0 0 Perm
16 42 16 42 1900 1900 6.6 6.9 1.00 1.00 1.00 0.85 0.97 1.00 1805 1583 0.70 1.00 1298 1583 0.97 0.97 16 43 0 39 45 4 NA pm+ov 8 1 8 8.4 14.5 8.4 14.5 0.06 0.10 6.6 6.9 3.0 3.0 72 153 0.00 0.03 0.00 0.62 0.03 69.3 61.4 1.00 1.00 15.7 0.1 85.0 61.4 F E 73.5 E
110 110 1900 6.8 1.00 1.00 0.95 1770 0.07 125 0.97 113 0 113 pm+pt 5 2 88.8 88.8 0.59 6.8 3.0 167 c0.04 0.36 0.68 26.0 1.98 8.2 59.7 E
1414 1414 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.97 1458 0 1458 NA 2
42 42 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.97 43 20 23 Perm
58 58 1900 6.9 1.00 1.00 0.95 1770 0.08 153 0.97 60 0 60 pm+pt 1 6 84.1 84.1 0.56 6.9 3.0 151 0.02 0.21 0.40 22.3 1.11 1.3 26.1 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 43.2 43.2 0.29 6.6 3.0 465 0.06 0.21 40.5 1.00 0.2 40.7 D 50.7 D 33.8 0.81 150.0 88.2% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
80.3 80.3 0.54 6.9 2.5 1894 0.41 0.77 27.5 0.38 2.4 13.0 B 16.3 B
2 80.3 80.3 0.54 6.9 2.5 847 0.01 0.03 16.4 1.00 0.0 16.5 B
SBT
SBR
1432 270 1432 270 1900 1900 6.9 5.8 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1476 278 0 80 1476 198 NA pm+ov 6 7 6 78.0 107.0 78.0 107.0 0.52 0.71 6.9 5.8 2.5 3.0 1840 1129 c0.42 0.03 0.09 0.80 0.18 29.6 7.0 1.30 7.50 3.0 0.1 41.5 52.9 D D 42.7 D
C 26.2 E
Synchro 9 Report Page 6
344
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks DR
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
36 36 1900
0 0 1900 6.6 1.00 0.95 0.97 1711 0.80 1417 0.96 0 60 3 NA 4
24 24 1900
13 13 1900 6.6 1.00 1.00 0.95 1770 0.75 1392 0.96 14 0 14 Perm
1 1 1900 6.6 1.00 0.86 1.00 1597 1.00 1597 0.96 1 18 2 NA 8
18 18 1900
65 65 1900 6.8 1.00 1.00 0.95 1770 0.09 170 0.96 68 0 68 pm+pt 5 2 123.5 123.5 0.82 6.8 3.0 198 c0.01 0.27 0.34 6.7 1.79 0.7 12.8 B
1706 1706 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.96 1777 0 1777 NA 2
30 30 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.96 31 7 24 Perm
50 50 1900 6.8 1.00 1.00 0.95 1770 0.10 186 0.96 52 0 52 pm+pt 1 6 123.9 123.9 0.83 6.8 3.0 213 0.01 0.19 0.24 5.7 0.53 0.4 3.4 A
1767 1767 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.96 1841 0 1841 NA 6
53 53 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.96 55 12 43 Perm
0.96 38 0 0 Perm
0.96 25 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 6.1 6.1 0.04 6.6 3.0 56
6.1 6.1 0.04 6.6 3.0 57 0.00 0.04 69.2 1.00 0.3 69.5 E 69.5 E
c0.01 0.25 69.7 1.00 2.3 72.1 E
5.8 0.63 150.0 75.3% 15
0.96 19 0 0
6.1 6.1 0.04 6.6 3.0 64 0.00 0.03 69.1 1.00 0.2 69.3 E 70.4 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
118.0 118.0 0.79 6.8 2.5 2784 0.50 0.64 6.9 0.68 0.8 5.4 A 5.7 A
2 118.0 118.0 0.79 6.8 2.5 1245 0.02 0.02 3.5 1.00 0.0 3.5 A
118.2 118.2 0.79 6.8 2.5 2788 c0.52 0.66 7.0 0.26 0.9 2.7 A 2.7 A
6 118.2 118.2 0.79 6.8 2.5 1247 0.03 0.03 3.5 0.46 0.0 1.6 A
A 20.2 D
Synchro 9 Report Page 7
345
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900
0 0 1900 6.6 1.00 0.94 0.97 1708 0.73 1290 0.95 0 30 6 NA 4
14 14 1900
146 146 1900
0.95 15 0 0
0.95 154 0 0 Perm
4 4 1900 6.6 1.00 1.00 0.95 1776 0.71 1313 0.95 4 0 158 NA 8
108 108 1900 6.6 1.00 0.85 1.00 1583 1.00 1583 0.95 114 96 18 Perm
17 17 1900 6.9 1.00 1.00 0.95 1770 0.07 138 0.95 18 0 18 pm+pt 5 2 97.8 97.8 0.65 6.9 3.0 130 0.00 0.09 0.14 14.6 0.77 0.4 11.6 B
1629 1629 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 1715 0 1715 NA 2
158 158 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 166 62 104 Perm
121 121 1900 6.9 1.00 1.00 0.95 1770 0.06 115 0.95 127 0 127 pm+pt 1 6 112.9 112.9 0.75 6.9 3.0 217 c0.05 0.39 0.59 27.9 2.15 3.2 63.1 E
1721 1721 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 1812 0 1812 NA 6
12 12 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 13 4 9 Perm
0.95 21 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 23.6 23.6 0.16 6.6 3.0 202
23.6 23.6 0.16 6.6 3.0 206
0.00 0.03 53.5 1.00 0.1 53.5 D 53.5 D
c0.12 0.77 60.6 1.00 15.6 76.2 E 66.9 E 16.9 0.77 150.0 81.2% 15
8 23.6 23.6 0.16 6.6 3.0 249 0.01 0.07 53.9 1.00 0.1 54.0 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
94.1 94.1 0.63 6.9 2.5 2220 c0.48 0.77 20.2 0.52 2.2 12.7 B 12.0 B
2 94.1 94.1 0.63 6.9 2.5 993 0.07 0.10 11.1 0.43 0.2 4.9 A
102.3 102.3 0.68 6.9 2.5 2413 c0.51 0.75 15.5 0.56 1.7 10.5 B 13.9 B
6 102.3 102.3 0.68 6.9 2.5 1079 0.01 0.01 7.6 1.00 0.0 7.6 A
B 20.4 D
Synchro 9 Report Page 8
346
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
18 18 1900 6.2 1.00 1.00 0.95 1770 0.95 1770 0.98 18 0 18 Prot 4
0 0 1900
177 177 1900 6.2 1.00 0.85 1.00 1583 1.00 1583 0.98 181 171 10 Prot 4
0 0 1900
0 0 1900 4.7 1.00 0.86 1.00 1611 1.00 1611 0.98 0 2 0 NA 8
2 2 1900
111 111 1900 6.8 1.00 1.00 0.95 1770 0.09 166 0.98 113 0 113 pm+pt 5 2 122.7 122.7 0.82 6.8 3.0 239 c0.03 0.35 0.47 13.1 2.73 1.0 36.8 D
1500 1500 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 1531 0 1532 NA 2
1 1 1900
3 3 1900 6.8 1.00 1.00 0.95 1770 0.15 274 0.98 3 0 3 pm+pt 1 6 107.3 107.3 0.72 6.8 3.0 206 0.00 0.01 0.01 6.7 0.50 0.0 3.4 A
1652 1652 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 1686 0 1686 NA 6
52 52 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.98 53 15 38 Perm
0.98 0 0 0
0.98 0 0 0
0.98 2 0 0
8 8.4 8.4 0.06 6.2 3.0 99 c0.01
8.4 8.4 0.06 6.2 3.0 88 0.01
1.2 1.2 0.01 4.7 3.0 12 c0.00
0.18 67.5 1.00 0.9 68.4 E
0.12 67.3 1.00 0.6 67.9 E
0.00 73.8 1.00 0.0 73.8 E 73.8 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
67.9 E 11.2 0.63 150.0 76.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
0.98 1 0 0
114.8 114.8 0.77 6.8 4.0 2708 c0.43 0.57 7.3 0.91 0.2 6.8 A 8.9 A
106.2 106.2 0.71 6.8 4.0 2505 c0.48 0.67 12.2 0.49 0.8 6.8 A 6.8 A
6 106.2 106.2 0.71 6.8 4.0 1120 0.02 0.03 6.6 1.00 0.0 6.6 A
B 24.5 D
Synchro 9 Report Page 2
347
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
540 540 1900 6.4 0.97 1.00 0.95 3433 0.95 3433 0.99 545 0 545 Split 8
81 81 1900 6.4 1.00 0.93 1.00 1735 1.00 1735 0.99 82 20 131 NA 8
68 68 1900
85 85 1900
0.99 69 0 0
0.99 86 0 0 Split 7
42 42 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.99 42 0 42 Prot 5
1422 1422 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.99 1436 0 1436 NA 2
56 56 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.99 57 30 27 Perm
136 136 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.99 137 0 137 Prot 1
25.4 25.4 0.17 6.4 3.0 581 c0.16
25.4 25.4 0.17 6.4 3.0 293 0.08
5.8 5.8 0.04 6.8 3.0 68 0.02
70.5 70.5 0.47 6.8 4.0 1663 c0.41
0.94 61.5 1.00 22.9 84.4 F
0.45 56.0 1.00 1.1 57.1 E 78.5 E
67 133 67 133 1900 1900 6.4 6.8 1.00 1.00 1.00 0.85 0.97 1.00 1812 1583 0.97 1.00 1812 1583 0.99 0.99 68 134 0 101 154 33 NA pm+ov 7 1 7 14.6 27.7 14.6 27.7 0.10 0.18 6.4 6.8 3.0 3.0 176 292 c0.08 0.01 0.01 0.88 0.11 66.8 50.9 1.00 1.00 35.0 0.2 101.8 51.1 F D 78.2 E
0.62 71.0 0.73 13.6 65.5 E
0.86 35.5 0.53 5.5 24.3 C 25.4 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
45.7 0.91 150.0 92.8% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
2 70.5 70.5 0.47 6.8 4.0 744 0.02 0.04 21.4 1.00 0.1 21.5 C
13.1 13.1 0.09 6.8 3.0 154 0.08 0.89 67.7 0.82 22.3 78.1 E
SBT
SBR
1554 565 1554 565 1900 1900 6.8 6.4 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.99 0.99 1570 571 0 128 1570 443 NA pm+ov 6 8 6 77.8 103.2 77.8 103.2 0.52 0.69 6.8 6.4 4.0 3.0 1835 1156 c0.44 0.06 0.21 0.86 0.38 31.2 9.9 1.49 2.79 2.4 0.1 48.9 27.8 D C 45.4 D
D 26.4 F
Synchro 9 Report Page 9
348
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
124 124 1900 6.7 1.00 1.00 0.95 1770 0.95 1770 0.98 127 0 127 Prot 4
34 34 1900 6.7 1.00 0.85 1.00 1583 1.00 1583 0.98 35 24 11 Perm
58 58 1900 6.8 1.00 1.00 0.95 1770 0.03 64 0.98 59 0 59 pm+pt 5 2 121.6 121.6 0.81 6.8 3.0 116 0.02 0.39 0.51 38.6 1.36 2.0 54.3 D
2104 2104 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2147 0 2147 NA 2
2338 2338 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2386 0 2386 NA 6
132 132 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.98 135 28 107 Perm
121.6 121.6 0.81 6.8 2.5 2868 c0.61
109.1 109.1 0.73 6.8 2.5 2574 c0.67
0.75 6.8 0.45 1.1 4.2 A 5.5 A
0.93 17.1 1.00 7.3 24.4 C 23.4 C
14.9 14.9 0.10 6.7 3.0 175 c0.07 0.73 65.6 1.00 13.9 79.5 E 75.6 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 14.9 14.9 0.10 6.7 3.0 157 0.01 0.07 61.3 1.00 0.2 61.4 E
17.1 0.92 150.0 82.7% 15
6 109.1 109.1 0.73 6.8 2.5 1151 0.07 0.09 6.0 1.00 0.2 6.1 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
B 20.3 E
Synchro 9 Report Page 10
349
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
71 71 1900 6.0 1.00 1.00 0.95 1770 0.95 1770 0.95 75 0 75 Prot 8
72 72 1900 6.0 1.00 0.85 1.00 1583 1.00 1583 0.95 76 68 8 Perm
75 75 1900 6.4 1.00 1.00 0.95 1770 0.95 1770 0.95 79 0 79 Prot 1
407 407 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 428 0 428 NA 6
647 647 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 681 0 681 NA 2
90 90 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.95 95 33 62 Perm
5.8 5.8 0.09 6.4 3.0 162 0.04
44.1 44.1 0.70 6.4 4.0 1302 c0.23
31.9 31.9 0.51 6.4 4.0 941 c0.37
0.49 27.2 1.00 2.3 29.5 C
0.33 3.7 1.00 0.2 3.9 A 7.9 A
0.72 12.2 1.00 3.0 15.1 B 14.3 B
6.6 6.6 0.10 6.0 3.0 185 c0.04 0.41 26.4 1.00 1.5 27.9 C 26.7 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 6.6 6.6 0.10 6.0 3.0 165 0.01 0.05 25.4 1.00 0.1 25.5 C
13.3 0.65 63.1 63.1% 15
2 31.9 31.9 0.51 6.4 4.0 800 0.04 0.08 8.0 1.00 0.1 8.1 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
B 18.8 B
Synchro 9 Report Page 11
350
Unsignalized Existing PM Reports
351
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
2.6 SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
19 752 54 19 752 54 0 0 0 Free Free Free - None 380 - 380 0 0 95 95 95 2 2 2 20 792 57
32 536 9 32 536 9 0 0 0 Free Free Free - None 425 0 0 95 95 95 2 2 2 34 564 9
37 0 23 37 0 23 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 39 0 24
5 0 6 5 0 6 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 5 0 6
Minor1 1471 1473 792 832 832 639 641 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 105 127 389 363 384 464 469 -
Minor2 1480 1468 569 636 636 844 832 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 104 128 522 466 472 358 384 -
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 574 4.12 2.218 999 -
Approach HCM Control Delay, s HCM LOS
SE 0.2
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
04/04/2017
999 -
0 -
0 -
NELn1 NWL NWT NWR 139 829 0.454 0.041 50.8 9.5 F A 2.1 0.1 -
Major2 792 4.12 2.218 829 -
0 -
829 -
0 -
NW 0.5
SEL 999 0.02 8.7 A 0.1
99 99 356 440 NE 50.8 F
119 119 376 450
389 -
93 93 457 329
120 120 453 376
522 -
SW 27.9 D
SET SERSWLn1 - 169 - 0.069 - 27.9 D 0.2
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
Synchro 9 Report Page 2
352
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
2.8 EBL
EBR
NBL
NBT
SBT SBR
68 68 0 Stop 0 0 0 97 2 70
10 10 0 Stop None 97 2 10
9 597 9 597 0 0 Free Free - None 465 0 0 97 97 2 2 9 615
834 87 834 87 0 0 Free Free - None - 260 0 0 97 97 2 2 860 90
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1494 860 634 6.42 5.42 5.42 3.518 136 414 529
860 6.22 3.318 356 -
Major1 860 4.12 2.218 781 -
134 134 414 523
356 -
781 -
Approach HCM Control Delay, s HCM LOS
EB 56.4 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 781 0.012 9.7 A 0
0 -
NB 0.1
NBT EBLn1 - 146 - 0.551 - 56.4 F 2.8
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
Synchro 9 Report Page 3
353
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
04/04/2017
7.8 EBL
EBT EBR
WBL WBT WBR
NBL
39 4 13 39 4 13 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 41 4 14
27 5 139 27 5 139 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 28 5 145
15 636 30 15 636 30 0 0 0 Free Free Free - None 150 - 150 0 0 96 96 96 2 2 2 16 663 31
Minor2 1523 1852 1158 1158 365 694 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 81 73 208 269 627 442 51 51 204 475
60 60 226 433
432 6.94 3.32 572 572 -
Minor1 1422 1852 694 694 728 1158 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 96 73 399 442 381 269 77 77 391 307
60 60 433 226
331 6.94 3.32 665 -
Major1 865 4.14 2.22 774 -
665 -
774 -
EB 163.7 F
WB 26.3 D
NBL 774 0.02 9.7 A 0.1
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 52 572 74 665 922 - 0.861 0.024 0.45 0.218 0.159 - 209.8 11.4 88.6 11.9 9.6 F B F B A 3.7 0.1 1.8 0.8 0.6
NBT NBR
0 -
NB 0.2
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
0 -
SBL
SBT SBR
141 830 52 141 830 52 0 0 0 Free Free Free - None 230 - 375 0 0 96 96 96 2 2 2 147 865 54 Major2 663 4.14 2.22 922 922 -
0 -
0 -
SB 1.3
SBT SBR -
Synchro 9 Report Page 4
354
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
20.1
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
15 15 0 Stop 0 0 0 95 2 16
25 25 0 Stop None 95 2 26
27 27 0 Free 185 95 2 28
2068 2068 0 Free None 0 0 95 2 2177
2224 30 2224 30 0 0 Free Free - None - 150 0 0 95 95 2 2 2341 32
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 3486 2341 1145 6.84 5.84 5.84 3.52 ~5 58 265
1171 6.94 3.32 186 -
Major1 2341 4.14 2.22 208 -
~4 ~4 58 229
186 -
208 -
Approach HCM Control Delay, s HCM LOS
EB $ 2184.6 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 208 0.137 25 D 0.5
0 -
NB 0.3
NBT EBLn1 10 - 4.211 $- 2184.6 F 6.5
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
355
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.7 EBL
EBR
NBL
NBT
SBT SBR
17 17 0 Stop 0 0 0 90 2 19
13 13 0 Stop None 90 2 14
7 211 7 211 0 0 Free Free - None 0 0 90 90 2 2 8 234
351 26 351 26 0 0 Free Free - None 0 0 90 90 2 2 390 29
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 654 404 250 6.42 5.42 5.42 3.518 431 674 792
404 6.22 3.318 647 -
Major1 419 4.12 2.218 1140 -
428 428 674 786
647 -
1140 -
Approach HCM Control Delay, s HCM LOS
EB 12.7 B
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1140 0.007 8.2 A 0
0 -
NB 0.3
NBT EBLn1 - 502 - 0.066 0 12.7 A B 0.2
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
Synchro 9 Report Page 6
356
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
74
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
NWL
NWR
NET NER
SWL SWT
183 183 0 Stop 0 0 0 92 2 199
19 19 0 Stop None 325 92 2 21
674 151 674 151 0 0 Free Free - None 0 0 0 92 92 2 2 733 164
32 970 32 970 0 0 Free Free - None 250 0 0 92 92 2 2 35 1054
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor1 1857 733 1124 6.42 5.42 5.42 3.518 ~ 81 475 310
733 6.22 3.318 421 -
~ 78 ~ 78 475 298
421 -
Approach HCM Control Delay, s HCM LOS
NW $ 742.2 F
Major1 0 -
0 -
NE 0
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NET NERNWLn1NWLn2 SWL SWT 78 421 872 - 2.55 0.049 0.04 -$ 817.8 14 9.3 F B A 19 0.2 0.1 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
Major2 733 4.12 2.218 872 872 -
0 -
SW 0.3
*: All major volume in platoon
Synchro 9 Report Page 1
357
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
04/04/2017
3.2 EBL
EBT EBR
WBL WBT WBR
NBL
56 0 50 56 0 50 0 0 0 Stop Stop Stop - None - 150 0 0 95 95 95 2 2 2 59 0 53
2 0 5 2 0 5 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 2 0 5
40 450 5 40 450 5 0 0 0 Free Free Free - Yield 215 0 0 0 95 95 95 2 2 2 42 474 5
Minor2 1314 1311 748 753 753 561 558 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 135 159 412 402 417 512 512 -
Minor1 1311 1311 474 558 558 753 753 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 136 159 590 514 512 402 417 -
129 129 382 483
151 151 416 487
412 -
EB 35.9 E NBL 861 0.049 9.4 A 0.2
114 114 489 350
151 151 487 416
590 -
WB 18.8 C
Major1 748 4.12 2.218 861 861 NB 0.8
NBT NBR EBLn1 EBLn2WBLn1 SBL - 129 412 269 1088 - 0.457 0.128 0.027 0.002 - 54.5 15 18.8 8.3 F C C A 2 0.4 0.1 0
Ponte Vedra/Palm Valley 09/14/2016 Existing PM Peak
NBT NBR
0 -
0 -
SBL
SBT SBR
2 711 36 2 711 36 0 0 0 Free Free Free - Yield - 125 0 0 95 95 95 2 2 2 2 748 38 Major2 474 4.12 2.218 1088 1088 -
0 -
0 -
SB 0
SBT SBR -
Synchro 9 Report Page 7
358
Signalized No Build AM Reports
359
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
2100 2100 1900
280 280 1900 7.2 1.00 0.99 0.96 1771 0.96 1771 0.85 329 3 3032 NA 4
200 200 1900
30 30 1900
90 90 1900
0.85 35 0 0 Split 8
30 30 1900 7.7 1.00 1.00 0.95 1770 0.22 406 0.85 35 0 35 pm+pt 1 6 27.8 27.8 0.22 7.7 3.0 117 0.01 0.06 0.30 38.9 1.00 1.4 40.4 D
290 290 1900 7.7 1.00 1.00 1.00 1863 1.00 1863 0.85 341 0 341 NA 6
620 620 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.85 729 552 177 Perm
110 110 1900 7.7 1.00 1.00 0.95 1770 0.21 387 0.85 129 0 129 pm+pt 5 2 31.0 31.0 0.25 7.7 3.0 141 c0.03 c0.20 0.91 45.8 1.00 50.6 96.4 F
280 280 1900 7.7 1.00 0.99 1.00 1836 1.00 1836 0.85 329 3 361 NA 2
30 30 1900
0.85 235 0 0
430 430 1900 7.2 1.00 0.98 1.00 1817 1.00 1817 0.85 506 6 641 NA 8
0.85 2471 0 0 Split 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
42.8 42.8 0.35 7.2 3.0 612 c1.71
21.8 21.8 0.18 7.2 3.0 319 c0.35
4.95 40.5 1.00 1783.4 1823.9 F 1823.9 F
2.01 51.0 1.00 465.5 516.5 F 516.5 F 1129.9 3.02 123.8 219.2% 15
0.85 106 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
25.4 25.4 0.21 7.7 2.5 382 0.18 0.89 47.9 1.00 22.1 70.0 E 52.9 D
6 25.4 25.4 0.21 7.7 2.5 324 0.11 0.55 44.1 1.00 1.5 45.5 D
0.85 35 0 0
27.0 27.0 0.22 7.7 2.5 400 0.20 0.90 47.1 1.00 22.9 70.0 E 76.9 E
F 29.8 H
Synchro 9 Report Page 1
360
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
690 690 1900 7.1 0.97 0.99 0.95 3427 0.95 3427 0.91 758 2 789 Prot 4
30 30 1900
40 40 1900 7.3 1.00 1.00 0.95 1770 0.19 353 0.91 44 0 44 pm+pt 5 2 93.8 93.8 0.63 7.3 3.0 276 0.01 0.09 0.16 13.9 1.00 0.3 14.2 B
1300 1300 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.91 1429 0 1429 NA 2
920 520 920 520 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.91 0.91 1011 571 0 105 1011 466 NA pm+ov 6 4 6 80.6 122.4 80.6 122.4 0.54 0.82 7.3 7.1 2.5 3.0 1901 1291 0.29 0.10 0.19 0.53 0.36 22.5 3.6 0.98 0.00 0.8 0.1 23.0 0.1 C A 14.7 B
41.8 41.8 0.28 7.1 3.0 954 c0.23 0.83 50.7 1.00 6.0 56.7 E 56.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.91 33 0 0
25.0 0.74 150.0 68.6% 15
93.8 93.8 0.63 7.3 2.5 2213 c0.40 0.65 17.7 1.00 1.5 19.1 B 19.0 B
SBR
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
C 21.7 C
Synchro 9 Report Page 3
361
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
200 200 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.89 225 0 225 Prot 4
100 100 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.89 112 95 17 Perm
110 110 1900 7.6 1.00 1.00 0.95 1770 0.11 204 0.89 124 0 124 pm+pt 5 2 112.2 112.2 0.75 7.6 3.0 245 0.03 0.35 0.51 13.8 1.52 1.2 22.2 C
1800 1800 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.89 2022 0 2022 NA 2
1300 1300 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.89 1461 0 1461 NA 6
220 220 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.89 247 34 213 Perm
112.2 112.2 0.75 7.6 2.5 2647 c0.57
95.7 95.7 0.64 7.6 2.5 2257 0.41
0.76 11.1 1.29 1.6 16.0 B 16.3 B
0.65 16.7 1.29 0.5 22.2 C 21.6 C
23.4 23.4 0.16 6.8 3.0 276 c0.13 0.82 61.2 1.00 16.7 77.9 E 70.0 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 23.4 23.4 0.16 6.8 3.0 246 0.01 0.07 54.0 1.00 0.1 54.1 D
22.8 0.82 150.0 72.8% 15
6 95.7 95.7 0.64 7.6 2.5 1009 0.13 0.21 11.4 1.59 0.2 18.2 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
C 22.0 C
Synchro 9 Report Page 4
362
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
130 130 1900 7.5 1.00 1.00 0.95 1770 0.49 913 0.94 138 0 138 pm+pt 7 4 31.9 31.9 0.21 7.5 3.0 240 0.03 0.09 0.57 51.9 1.00 3.3 55.2 E
40 40 1900 7.5 1.00 0.87 1.00 1612 1.00 1612 0.94 43 198 228 NA 4
360 360 1900
40 40 1900
0.94 383 0 0
0.94 43 0 0 Perm
20 80 20 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1802 1583 0.21 1.00 382 1583 0.94 0.94 21 85 0 72 64 13 NA pm+ov 8 1 8 16.3 23.8 16.3 23.8 0.11 0.16 7.5 7.3 3.0 3.0 41 251 0.00 c0.17 0.01 1.56 0.05 66.8 53.5 1.00 1.00 342.5 0.1 409.3 53.6 F D 206.4 F
290 290 1900 7.3 1.00 1.00 0.95 1770 0.05 96 0.94 309 0 309 pm+pt 5 2 103.3 103.3 0.69 7.3 3.0 354 c0.15 0.45 0.87 50.7 1.29 14.1 79.4 E
1700 1700 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.94 1809 0 1809 NA 2
20 20 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.94 21 9 12 Perm
70 70 1900 7.3 1.00 1.00 0.95 1770 0.06 106 0.94 74 0 74 pm+pt 1 6 77.7 77.7 0.52 7.3 3.0 138 0.03 0.25 0.54 26.8 0.98 2.7 28.8 C
1600 1600 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.94 1702 0 1702 NA 6
90 90 1900 7.5 1.00 0.85 1.00 1583 1.00 1583 0.94 96 91 5 Over 7
70.2 70.2 0.47 7.3 2.5 1656 c0.48
8.1 8.1 0.05 7.5 3.0 85 0.00
1.03 39.9 0.86 25.7 59.9 E 59.1 E
0.06 67.3 1.00 0.2 67.5 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 31.9 31.9 0.21 7.5 3.0 342 c0.14 0.67 54.2 1.00 4.9 59.1 E 58.1 E 50.5 1.08 150.0 114.3% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
88.5 88.5 0.59 7.3 2.5 2088 c0.51 0.87 25.8 0.71 3.4 21.8 C 30.0 C
2 88.5 88.5 0.59 7.3 2.5 933 0.01 0.01 12.7 1.00 0.0 12.7 B
D 29.6 H
Synchro 9 Report Page 5
363
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
160 160 1900 8.3 1.00 1.00 0.95 1770 0.39 721 0.95 168 0 168 pm+pt 7 4 29.8 29.8 0.20 8.3 3.0 225 c0.06 c0.09 0.75 54.0 1.00 12.6 66.7 E
10 10 1900 8.3 1.00 0.88 1.00 1631 1.00 1631 0.95 11 42 22 NA 4
50 50 1900
50 50 1900
0.95 53 0 0
0.95 53 0 0 Perm
10 110 10 110 1900 1900 7.0 7.0 1.00 1.00 1.00 0.85 0.96 1.00 1789 1583 0.72 1.00 1339 1583 0.95 0.95 11 116 0 78 64 38 NA pm+ov 8 1 8 11.1 17.8 11.1 17.8 0.07 0.12 7.0 7.0 3.0 3.0 99 261 0.01 0.05 0.02 0.65 0.14 67.5 59.3 1.00 1.00 13.6 0.3 81.1 59.5 F E 67.2 E
80 80 1900 7.0 1.00 1.00 0.95 1770 0.06 110 0.95 84 0 84 pm+pt 5 2 99.8 99.8 0.67 7.0 3.0 168 c0.03 0.30 0.50 22.9 2.37 1.5 55.8 E
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
40 40 1900 7.0 1.00 1.00 0.95 1770 0.04 83 0.95 42 0 42 pm+pt 1 6 96.0 96.0 0.64 7.0 3.0 128 0.01 0.19 0.33 34.7 1.21 1.1 43.0 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 29.8 29.8 0.20 8.3 3.0 324 0.01 0.07 48.8 1.00 0.1 48.9 D 61.8 E 33.4 0.94 150.0 92.7% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
91.2 91.2 0.61 7.0 2.5 2151 c0.59 0.98 28.5 0.60 11.4 28.5 C 29.3 C
2 91.2 91.2 0.61 7.0 2.5 962 0.01 0.01 11.6 1.00 0.0 11.6 B
SBT
SBR
1600 290 1600 290 1900 1900 7.0 8.3 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.95 0.95 1684 305 0 78 1684 227 NA pm+ov 6 7 6 89.3 101.0 89.3 101.0 0.60 0.67 7.0 8.3 2.5 3.0 2106 1065 0.48 0.02 0.13 0.80 0.21 23.4 9.3 1.29 2.55 2.4 0.1 32.7 23.9 C C 31.6 C
C 29.3 F
Synchro 9 Report Page 6
364
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks DR
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
90 90 1900
0 0 1900 8.4 1.00 0.94 0.97 1705 0.78 1366 0.95 0 72 97 NA 4
70 70 1900
30 30 1900 8.4 1.00 1.00 0.95 1770 0.59 1104 0.95 32 0 32 Perm
0 0 1900 8.4 1.00 0.85 1.00 1583 1.00 1583 0.95 0 75 9 NA 8
80 80 1900
20 20 1900 7.0 1.00 1.00 0.95 1770 0.07 137 0.95 21 0 21 pm+pt 5 2 102.8 102.8 0.69 7.0 3.0 134 0.00 0.10 0.16 12.3 0.61 0.2 7.7 A
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 2211 0 2211 NA 2
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 7 14 Perm
130 130 1900 7.0 1.00 1.00 0.95 1770 0.04 70 0.95 137 0 137 pm+pt 1 6 118.8 118.8 0.79 7.0 3.0 199 c0.06 0.48 0.69 51.1 0.90 5.0 51.2 D
1800 1800 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 1895 0 1895 NA 6
30 30 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 32 9 23 Perm
0.95 95 0 0 Perm
0.95 74 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 15.8 15.8 0.11 8.4 3.0 116
15.8 15.8 0.11 8.4 3.0 143 c0.07 0.68 64.7 1.00 12.6 77.2 E 77.2 E
0.03 0.28 61.8 1.00 1.3 63.1 E
20.5 0.90 150.0 99.9% 15
0.95 84 0 0
15.8 15.8 0.11 8.4 3.0 166 0.01 0.05 60.4 1.00 0.1 60.5 E 61.2 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
99.1 99.1 0.66 7.0 2.5 2338 c0.62 0.95 23.0 0.57 4.3 17.5 B 17.3 B
2 99.1 99.1 0.66 7.0 2.5 1045 0.01 0.01 8.7 1.00 0.0 8.7 A
108.1 108.1 0.72 7.0 2.5 2550 c0.54 0.74 12.6 1.10 1.0 14.8 B 17.1 B
6 108.1 108.1 0.72 7.0 2.5 1140 0.01 0.02 5.9 1.00 0.0 6.0 A
C 22.4 F
Synchro 9 Report Page 7
365
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900
10 10 1900 8.3 1.00 0.95 0.98 1729 0.75 1327 0.95 11 16 37 NA 4
20 20 1900
210 210 1900
0.95 21 0 0
0.95 221 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1299 0.95 11 0 232 NA 8
190 190 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 200 101 99 Perm
10 10 1900 6.9 1.00 1.00 0.95 1770 0.05 87 0.95 11 0 11 pm+pt 5 2 87.8 87.8 0.59 6.9 3.0 78 0.00 0.08 0.14 27.9 0.96 0.4 27.1 C
2000 2000 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
200 200 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 211 85 126 Perm
100 100 1900 6.9 1.00 1.00 0.95 1770 0.04 81 0.95 105 0 105 pm+pt 1 6 102.3 102.3 0.68 6.9 3.0 168 c0.04 0.38 0.62 42.7 1.00 7.1 49.8 D
1900 1900 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2000 0 2000 NA 6
10 10 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 11 4 7 Perm
0.95 21 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 32.5 32.5 0.22 8.3 3.0 287
32.5 32.5 0.22 8.3 3.0 281
0.03 0.13 47.3 1.00 0.2 47.5 D 47.5 D
c0.18 0.83 56.0 1.00 17.6 73.7 E 62.5 E 39.0 0.98 150.0 98.1% 15
8 32.5 32.5 0.22 8.3 3.0 342 0.06 0.29 49.1 1.00 0.5 49.6 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
85.3 85.3 0.57 6.9 2.5 2012 c0.59 1.05 32.4 0.48 27.3 43.0 D 39.9 D
2 85.3 85.3 0.57 6.9 2.5 900 0.08 0.14 15.2 0.60 0.1 9.3 A
92.9 92.9 0.62 6.9 2.5 2191 c0.57 0.91 25.0 1.00 7.3 32.3 C 33.0 C
6 92.9 92.9 0.62 6.9 2.5 980 0.00 0.01 10.9 1.00 0.0 10.9 B
D 22.1 F
Synchro 9 Report Page 8
366
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.97 21 0 21 Prot 4
0 0 1900
170 170 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 175 162 13 Prot 4
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.97 0 3 0 NA 8
3 3 1900
90 90 1900 7.0 1.00 1.00 0.95 1770 0.06 118 0.97 93 0 93 pm+pt 5 2 70.7 70.7 0.70 7.0 3.0 211 c0.03 0.27 0.44 22.8 1.00 1.5 24.3 C
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 2062 0 2062 NA 2
0 0 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.07 133 0.97 10 0 10 pm+pt 1 6 57.1 57.1 0.57 7.0 3.0 92 0.00 0.06 0.11 18.7 1.00 0.5 19.3 B
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 2062 0 2062 NA 6
80 80 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 82 36 46 Perm
0.97 0 0 0
0.97 0 0 0
0.97 3 0 0
8 7.4 7.4 0.07 7.0 3.0 130 c0.01
7.4 7.4 0.07 7.0 3.0 116 0.01
1.0 1.0 0.01 7.0 3.0 16 c0.00
0.16 43.5 1.00 0.6 44.1 D
0.11 43.4 1.00 0.4 43.8 D
0.00 49.2 1.00 0.0 49.2 D 49.2 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
43.8 D 38.6 0.91 100.3 88.3% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
0.97 0 0 0
62.9 62.9 0.63 7.0 4.0 2219 c0.58 0.93 16.7 1.00 7.6 24.3 C 24.3 C
56.1 56.1 0.56 7.0 4.0 1979 c0.58 1.04 22.1 1.00 32.1 54.2 D 52.4 D
6 56.1 56.1 0.56 7.0 4.0 885 0.03 0.05 10.0 1.00 0.0 10.1 B
D 28.0 E
Synchro 9 Report Page 2
367
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
760 760 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.97 784 0 784 Split 8
120 120 1900 7.5 1.00 0.93 1.00 1736 1.00 1736 0.97 124 20 207 NA 8
100 100 1900
180 180 1900
0.97 103 0 0
0.97 186 0 0 Split 7
80 80 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 82 0 82 Prot 5
1800 1800 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.97 1856 0 1856 NA 2
70 70 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.97 72 39 33 Perm
110 110 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 113 0 113 Prot 1
24.5 24.5 0.16 7.5 3.0 560 c0.23
24.5 24.5 0.16 7.5 3.0 283 0.12
7.7 7.7 0.05 7.3 3.0 90 0.05
68.6 68.6 0.46 7.3 4.0 1618 c0.52
1.40 62.8 1.00 190.6 253.4 F
0.73 59.6 1.00 9.3 69.0 E 212.0 F
80 330 80 330 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1800 1583 0.97 1.00 1800 1583 0.97 0.97 82 340 0 114 268 226 NA pm+ov 7 1 7 14.5 27.3 14.5 27.3 0.10 0.18 7.5 7.3 3.0 3.0 174 288 c0.15 0.07 0.08 1.54 0.79 67.8 58.6 1.00 1.00 269.7 13.2 337.4 71.7 F E 188.8 F
0.91 70.8 1.00 66.1 136.9 F
1.15 40.7 1.00 74.0 114.7 F 112.3 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
115.8 1.28 150.0 116.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
2 68.6 68.6 0.46 7.3 4.0 723 0.02 0.05 22.6 1.00 0.1 22.7 C
12.8 12.8 0.09 7.3 3.0 151 0.06 0.75 67.0 1.22 8.2 89.7 F
SBT
SBR
1800 510 1800 510 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1856 526 0 97 1856 429 NA pm+ov 6 8 6 73.7 98.2 73.7 98.2 0.49 0.65 7.3 7.5 4.0 3.0 1738 1115 c0.52 0.06 0.21 1.07 0.38 38.1 12.0 0.92 1.78 36.2 0.1 71.5 21.3 E C 61.8 E
F 29.6 H
Synchro 9 Report Page 9
368
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
160 160 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.95 168 0 168 Prot 4
60 60 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.95 63 33 30 Perm
20 20 1900 6.8 1.00 1.00 0.95 1770 0.03 64 0.95 21 0 21 pm+pt 5 2 119.5 119.5 0.80 6.8 3.0 93 0.01 0.17 0.23 45.3 1.62 0.1 73.7 E
2800 2800 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2947 0 2947 NA 2
2400 2400 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2526 0 2526 NA 6
40 40 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 42 8 34 Perm
119.5 119.5 0.80 6.8 2.5 2819 c0.83
109.0 109.0 0.73 6.8 2.5 2571 0.71
1.05 15.2 1.67 21.7 47.1 D 47.3 D
0.98 19.6 1.00 14.1 33.7 C 33.2 C
17.2 17.2 0.11 6.5 3.0 202 c0.09 0.83 65.0 1.00 24.3 89.3 F 81.4 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 17.2 17.2 0.11 6.5 3.0 181 0.02 0.17 59.9 1.00 0.4 60.4 E
42.4 1.07 150.0 97.3% 15
6 109.0 109.0 0.73 6.8 2.5 1150 0.02 0.03 5.7 1.00 0.0 5.8 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
D 20.1 F
Synchro 9 Report Page 10
369
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
250 250 1900 5.6 1.00 1.00 0.95 1805 0.95 1805 0.89 281 0 281 0% Prot 8
220 220 1900 5.6 1.00 0.85 1.00 1583 1.00 1583 0.89 247 197 50 2% Perm
220 220 1900 6.4 1.00 1.00 0.95 1770 0.20 368 0.89 247 0 247 2% pm+pt 1 6 34.4 34.4 0.59 6.4 3.0 410 0.08 0.27 0.60 8.4 1.00 2.5 10.9 B
660 660 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 742 0 742 2% NA 6
460 460 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 517 0 517 2% NA 2
180 180 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.89 202 132 70 2% Perm
34.4 34.4 0.59 6.4 4.0 1103 c0.40
20.0 20.0 0.34 6.4 4.0 641 c0.28
0.67 8.0 1.00 1.8 9.8 A 10.1 B
0.81 17.3 1.00 7.7 25.0 C 21.7 C
11.7 11.7 0.20 5.6 3.0 363 c0.16 0.77 21.9 1.00 9.9 31.8 C 26.0 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 11.7 11.7 0.20 5.6 3.0 318 0.03 0.16 19.1 1.00 0.2 19.4 B
17.6 0.84 58.1 65.6% 15
2 20.0 20.0 0.34 6.4 4.0 544 0.04 0.13 13.1 1.00 0.1 13.2 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
B 18.4 C
Synchro 9 Report Page 11
370
Unsignalized No Build AM Reports
371
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
205.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
10 920 50 10 920 50 0 0 0 Free Free Free - None 380 - 380 0 0 86 86 86 2 2 2 12 1070 58
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 1302 4.12 2.218 532 -
Approach HCM Control Delay, s HCM LOS
SE 0.1
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
SET SER
532 -
0 -
0 -
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
20 20 0 Free 425 86 2 23
100 0 50 100 0 50 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 116 0 58
20 0 30 20 0 30 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 23 0 35
Major2 1070 4.12 2.218 651 -
$: Delay exceeds 300s
0 -
651 NW 0.2
NELn1 NWL NWT NWR SEL 25 651 - 532 6.977 0.036 - 0.022 $ 2997.3 10.7 - 11.9 F B B 21.7 0.1 0.1
Notes ~: Volume exceeds capacity
1100 20 1100 20 0 0 Free Free - None 0 0 86 86 2 2 1279 23
Minor1 2448 1093 1355 7.12 6.12 6.12 3.518 ~ 21 260 184
0 -
~ 17 ~ 17 254 146 NE $ 2997.3 F
2442 1070 1093 1349 6.52 6.22 5.52 5.52 4.018 3.318 31 269 290 219 29 29 283 211
269 -
Minor2 2459 1337 1122 7.12 6.12 6.12 3.518 ~ 21 189 250 ~ 16 ~ 16 185 192
2430 1291 1337 1093 6.52 6.22 5.52 5.52 4.018 3.318 32 199 222 290 30 30 214 283
199 -
SW $ 546.4 F
SET SERSWLn1 36 - 1.615 -$ 546.4 F 6.3
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
*: All major volume in platoon
Synchro 9 Report Page 2
372
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
79.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
90 90 0 Stop 0 0 0 84 2 107
10 10 0 Stop None 84 2 12
40 40 0 Free 465 84 2 48
1300 1300 0 Free None 0 0 84 2 1548
830 140 830 140 0 0 Free Free - None - 260 0 0 84 84 2 2 988 167
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2631 988 1643 6.42 5.42 5.42 3.518 ~ 26 361 173
988 6.22 3.318 300 -
Major1 988 4.12 2.218 699 -
~ 24 ~ 24 361 161
300 -
699 -
Approach HCM Control Delay, s HCM LOS
EB $ 1914.9 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 699 0.068 10.5 B 0.2
0 -
NB 0.3
NBT EBLn1 26 - 4.579 $- 1914.9 F - 14.7
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
*: All major volume in platoon
Synchro 9 Report Page 3
373
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
04/04/2017
1082.9
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
70 10 10 70 10 10 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 81 12 12
40 10 140 40 10 140 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 47 12 163
30 30 0 Free 150 86 2 35
1200 40 1200 40 0 0 Free Free - None - 150 0 0 86 86 2 2 1395 47
150 780 40 150 780 40 0 0 0 Free Free Free - None 230 - 375 0 0 86 86 86 2 2 2 174 907 47
Minor2 2029 2721 1256 1256 773 1465 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 34 20 181 241 358 191 ~2 ~2 173 184
12 12 155 182
453 6.94 3.32 554 554 -
EB $ 21320.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 746 0.047 10.1 B 0.1
Minor1 2273 2721 1465 1465 808 1256 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 22 20 134 191 341 241 ~2 ~2 128 198
12 12 182 155
698 6.94 3.32 383 -
Major1 907 4.14 2.22 746 -
383 -
746 -
WB $ 4248.6 F
0 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 2 554 2 383 486 - 46.512 0.021 29.07 0.425 0.359 $ 23983.9 11.6 $ 16085.3 21.2 16.5 F B F C C - 13.9 0.1 9.3 2.1 1.6
$: Delay exceeds 300s
0 -
Major2 1395 4.14 2.22 486 -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
486 -
SBT SBR
0 -
0 -
SB 2.6
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
374
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
241.5
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
40 40 0 Stop 0 0 0 92 2 43
70 70 0 Stop None 92 2 76
20 20 0 Free 185 92 2 22
2800 2800 0 Free None 0 0 92 2 3043
2400 20 2400 20 0 0 Free Free - None - 150 0 0 92 92 2 2 2609 22
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 4174 2609 1565 6.84 5.84 5.84 3.52 ~2 ~ 41 158
1304 6.94 3.32 151 -
Major1 2609 4.14 2.22 162 -
~2 ~2 ~ 41 137
151 -
162 -
Approach HCM Control Delay, s HCM LOS
EB $ 11739.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 162 0.134 30.6 D 0.5
0 -
NB 0.2
NBT EBLn1 5 - 23.913 $ 11739.3 F 17
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
375
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.9 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 96 2 21
20 20 0 Stop None 96 2 21
20 560 20 560 0 0 Free Free - None 0 0 96 96 2 2 21 583
420 10 420 10 0 0 Free Free - None 0 0 96 96 2 2 438 10
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1068 443 625 7.12 6.12 6.12 3.518 199 594 473
443 6.22 3.318 615 -
Major1 448 4.12 2.218 1112 -
195 195 577 460
615 -
1112 -
Approach HCM Control Delay, s HCM LOS
EB 19.1 C
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1112 0.019 8.3 A 0.1
0 -
NB 0.3
NBT EBLn1 - 296 - 0.141 0 19.1 A C 0.5
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
Synchro 9 Report Page 6
376
HCM 2010 TWSC 4: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
4495.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
NWL
NWR
NET NER
SWL SWT
350 350 0 Stop 0 0 0 94 2 372
20 20 0 Stop None 325 94 2 21
1800 530 1800 530 0 0 Free Free - None 0 0 0 94 94 2 2 1915 564
100 100 0 Free 250 94 2 106
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor1 3936 1915 2021 6.42 5.42 5.42 3.518 ~4 ~ 127 ~ 112
1915 6.22 3.318 84 -
~3 ~3 ~ 127 ~ 74
84 -
Approach HCM Control Delay, s HCM LOS
NW $ 54670 F
Major1 0 -
0 -
NE 0
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NET NERNWLn1NWLn2 SWL SWT 3 84 309 1- 24.113 0.253 0.344 $ 57790.5 61.8 22.6 F F C 49 0.9 1.5 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
Major2 1915 4.12 2.218 309 309 -
1700 1700 0 Free None 0 0 94 2 1809
0 -
SW 1.3
*: All major volume in platoon
Synchro 9 Report Page 1
377
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
04/04/2017
17.2
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
EBL
EBT EBR
WBL WBT WBR
NBL
80 10 60 80 10 60 0 0 0 Stop Stop Stop - None - 150 0 0 97 98 97 0 0 0 82 10 62
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 97 97 97 0 0 0 10 10 10
60 860 10 60 860 10 0 0 0 Free Free Free - Yield 200 0 0 97 97 97 0 0 0 62 887 10
Minor2 1609 1598 588 588 1021 1010 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 85 107 499 499 288 320 ~ 71 ~ 71 469 253
98 98 489 300
567 6.2 3.3 527 527 -
EB 181 F NBL 1015 0.061 8.8 A 0.2
Minor1 1603 1598 1010 1010 593 588 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 86 107 292 320 496 499 66 66 274 420
98 98 300 489
887 6.2 3.3 346 -
Major1 567 4.1 2.2 1015 -
346 -
1015 -
WB 52.4 F
0 -
0 -
SBL
Major2 887 4.1 2.2 772 772 -
0 -
0 -
SB 0.2
SBT SBR -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build AM Peak
SBT SBR
10 550 40 10 550 40 0 0 0 Free Free Free - Yield - 125 0 0 97 97 97 0 0 0 10 567 41
NB 0.6
NBT NBR EBLn1 EBLn2WBLn1 SBL 73 527 106 772 - 1.27 0.117 0.292 0.013 - 293.4 12.7 52.4 9.7 F B F A 7.3 0.4 1.1 0
$: Delay exceeds 300s
NBT NBR
*: All major volume in platoon
Synchro 9 Report Page 7
378
Signalized No Build PM Reports
379
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
1400 1400 1900
150 150 1900 7.2 1.00 0.99 0.96 1768 0.96 1768 0.97 155 4 1749 NA 4
150 150 1900
150 150 1900
240 240 1900
0.97 155 0 0 Split 8
50 50 1900 7.7 1.00 1.00 0.95 1770 0.36 679 0.97 52 0 52 pm+pt 1 6 26.5 26.5 0.27 7.7 3.0 218 0.01 0.06 0.24 27.2 1.00 0.6 27.8 C
520 520 1900 7.7 1.00 1.00 1.00 1863 1.00 1863 0.97 536 0 536 NA 6
700 700 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.97 722 470 252 Perm
60 60 1900 7.7 1.00 1.00 0.95 1770 0.17 318 0.97 62 0 62 pm+pt 5 2 26.5 26.5 0.27 7.7 3.0 131 c0.01 0.11 0.47 29.0 1.00 2.7 31.7 C
300 300 1900 7.7 1.00 1.00 1.00 1854 1.00 1854 0.97 309 2 317 NA 2
10 10 1900
0.97 155 0 0
470 470 1900 7.2 1.00 0.96 0.99 1777 0.99 1777 0.97 485 14 873 NA 8
0.97 1443 0 0 Split 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
23.9 23.9 0.24 7.2 3.0 431 c0.99
17.8 17.8 0.18 7.2 3.0 322 c0.49
4.06 37.0 1.00 1381.9 1418.9 F 1418.9 F
2.71 40.1 1.00 778.9 819.0 F 819.0 F 770.6 2.56 98.0 197.8% 15
0.97 247 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
23.4 23.4 0.24 7.7 2.5 444 c0.29 1.21 37.3 1.00 112.8 150.1 F 83.4 F
6 23.4 23.4 0.24 7.7 2.5 377 0.16 0.67 33.8 1.00 4.0 37.8 D
0.97 10 0 0
23.4 23.4 0.24 7.7 2.5 442 0.17 0.72 34.3 1.00 5.1 39.4 D 38.2 D
F 29.8 H
Synchro 9 Report Page 1
380
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
EBL
EBR
NBL
NBT
570 570 1900 7.1 0.97 0.99 0.95 3424 0.95 3424 0.96 594 3 622 Prot 4
30 30 1900
30 30 1900 7.3 1.00 1.00 0.95 1770 0.12 219 0.96 31 0 31 pm+pt 5 2 100.6 100.6 0.67 7.3 3.0 190 0.00 0.10 0.16 14.1 1.00 0.4 14.5 B
1000 1000 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.96 1042 0 1042 NA 2
35.0 35.0 0.23 7.1 3.0 798 c0.18 0.78 53.9 1.00 4.8 58.7 E 58.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.96 31 0 0
21.8 0.69 150.0 65.1% 15
100.6 100.6 0.67 7.3 2.5 2373 c0.29 0.44 11.5 1.00 0.6 12.1 B 12.2 B
04/04/2017
SBT
SBR
1300 770 1300 770 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.96 0.96 1354 802 0 136 1354 666 NA pm+ov 6 4 6 89.1 124.1 89.1 124.1 0.59 0.83 7.3 7.1 2.5 3.0 2102 1309 c0.38 0.12 0.30 0.64 0.51 20.0 3.9 1.04 1.57 0.7 0.1 21.6 6.2 C A 15.9 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
C 21.7 C
Synchro 9 Report Page 3
381
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
330 330 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.97 340 0 340 Prot 4
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 165 101 64 Perm
100 100 1900 7.6 1.00 1.00 0.95 1770 0.04 78 0.97 103 0 103 pm+pt 5 2 104.5 104.5 0.70 7.6 3.0 154 0.04 0.42 0.67 42.4 1.08 9.3 54.9 D
1500 1500 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.97 1546 0 1546 NA 2
1900 1900 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.97 1959 0 1959 NA 6
270 270 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.97 278 33 245 Perm
104.5 104.5 0.70 7.6 2.5 2465 c0.44
88.0 88.0 0.59 7.6 2.5 2076 c0.55
0.63 12.3 1.39 1.1 18.1 B 20.4 C
0.94 28.7 0.76 1.2 23.1 C 21.8 C
31.1 31.1 0.21 6.8 3.0 366 c0.19 0.93 58.4 1.00 29.3 87.6 F 75.2 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 31.1 31.1 0.21 6.8 3.0 328 0.04 0.20 49.1 1.00 0.3 49.4 D
27.4 0.94 150.0 94.7% 15
6 88.0 88.0 0.59 7.6 2.5 928 0.15 0.26 15.2 0.84 0.1 12.8 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
C 22.0 F
Synchro 9 Report Page 4
382
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
180 180 1900 7.5 1.00 1.00 0.95 1770 0.56 1049 0.95 189 0 189 pm+pt 7 4 44.5 44.5 0.30 7.5 3.0 342 0.02 0.14 0.55 45.2 1.00 1.9 47.1 D
50 50 1900 7.5 1.00 0.86 1.00 1608 1.00 1608 0.95 53 136 475 NA 4
530 530 1900
30 30 1900
0.95 558 0 0
0.95 32 0 0 Perm
50 80 50 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.98 1.00 1828 1583 0.11 1.00 207 1583 0.95 0.95 53 84 0 62 85 22 NA pm+ov 8 1 8 30.5 39.8 30.5 39.8 0.20 0.27 7.5 7.3 3.0 3.0 42 420 0.00 c0.41 0.01 2.02 0.05 59.8 41.1 1.00 1.00 533.8 0.1 593.6 41.1 F D 319.0 F
290 290 1900 7.3 1.00 1.00 0.95 1770 0.06 106 0.95 305 0 305 pm+pt 5 2 90.7 90.7 0.60 7.3 3.0 293 c0.14 0.48 1.04 52.5 1.18 57.2 119.2 F
1600 1600 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.95 1684 0 1684 NA 2
20 20 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.95 21 11 10 Perm
100 100 1900 7.3 1.00 1.00 0.95 1770 0.06 119 0.95 105 0 105 pm+pt 1 6 72.0 72.0 0.48 7.3 3.0 159 0.04 0.28 0.66 32.9 1.24 4.8 45.5 D
2000 2000 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 6
90 90 1900 7.5 1.00 0.85 1.00 1583 1.00 1583 0.95 95 91 4 Over 7
62.7 62.7 0.42 7.3 2.5 1479 c0.59
6.5 6.5 0.04 7.5 3.0 68 0.00
1.42 43.6 0.70 192.4 223.0 F 208.5 F
0.06 68.8 1.00 0.2 69.0 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 44.5 44.5 0.30 7.5 3.0 477 c0.30 1.00 52.7 1.00 40.0 92.7 F 81.9 F 132.9 1.54 150.0 125.1% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
74.1 74.1 0.49 7.3 2.5 1748 c0.48 0.96 36.6 0.73 12.1 38.9 D 50.9 D
2 74.1 74.1 0.49 7.3 2.5 782 0.01 0.01 19.3 1.00 0.0 19.4 B
F 29.6 H
Synchro 9 Report Page 5
383
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
470 470 1900 8.3 1.00 1.00 0.95 1770 0.35 653 0.97 485 0 485 pm+pt 7 4 40.8 40.8 0.27 8.3 3.0 361 c0.22 c0.14 1.34 51.3 1.00 172.1 223.4 F
30 30 1900 8.3 1.00 0.87 1.00 1616 1.00 1616 0.97 31 79 189 NA 4
230 230 1900
30 30 1900
0.97 237 0 0
0.97 31 0 0 Perm
20 50 20 50 1900 1900 8.3 7.0 1.00 1.00 1.00 0.85 0.97 1.00 1809 1583 0.67 1.00 1251 1583 0.97 0.97 21 52 0 47 52 5 NA pm+ov 8 1 8 7.8 15.2 7.8 15.2 0.05 0.10 8.3 7.0 3.0 3.0 65 160 0.00 0.04 0.00 0.80 0.03 70.3 60.8 1.00 1.00 48.8 0.1 119.2 60.9 F E 90.0 F
150 150 1900 7.0 1.00 1.00 0.95 1770 0.05 94 0.97 155 0 155 pm+pt 5 2 89.5 89.5 0.60 7.0 3.0 167 c0.06 0.49 0.93 48.0 1.52 34.0 107.1 F
1900 1900 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 1959 0 1959 NA 2
60 60 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 62 29 33 Perm
70 70 1900 7.0 1.00 1.00 0.95 1770 0.05 97 0.97 72 0 72 pm+pt 1 6 84.3 84.3 0.56 7.0 3.0 137 0.03 0.27 0.53 33.4 1.00 3.6 37.0 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 40.8 40.8 0.27 8.3 3.0 439 0.12 0.43 45.0 1.00 0.7 45.7 D 160.1 F 68.7 1.19 150.0 109.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
79.5 79.5 0.53 7.0 2.5 1875 c0.55 1.04 35.2 0.51 29.1 47.1 D 50.5 D
2 79.5 79.5 0.53 7.0 2.5 838 0.02 0.04 16.9 1.00 0.1 17.0 B
SBT
SBR
1800 330 1800 330 1900 1900 7.0 8.3 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1856 340 0 104 1856 236 NA pm+ov 6 7 6 76.9 101.6 76.9 101.6 0.51 0.68 7.0 8.3 2.5 3.0 1814 1072 0.52 0.04 0.11 1.02 0.22 36.5 9.2 1.00 1.00 27.2 0.1 63.8 9.3 E A 54.7 D
E 30.6 H
Synchro 9 Report Page 6
384
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks DR
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
40 40 1900
0 0 1900 8.4 1.00 0.94 0.97 1707 0.80 1413 0.96 0 69 4 NA 4
30 30 1900
15 15 1900 8.4 1.00 1.00 0.95 1770 0.76 1415 0.96 16 0 16 Perm
10 10 1900 8.4 1.00 0.90 1.00 1673 1.00 1673 0.96 10 20 11 NA 8
20 20 1900
80 80 1900 7.0 1.00 1.00 0.95 1770 0.03 65 0.96 83 0 83 pm+pt 5 2 122.4 122.4 0.81 7.0 3.0 135 c0.03 0.47 0.61 38.5 1.00 8.1 46.6 D
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.96 2188 0 2188 NA 2
40 40 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 42 10 32 Perm
60 60 1900 7.0 1.00 1.00 0.95 1770 0.04 80 0.96 62 0 63 pm+pt 1 6 120.2 120.2 0.79 7.0 3.0 133 0.02 0.35 0.47 20.8 1.00 2.7 23.5 C
2200 2200 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.96 2292 0 2292 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 73 18 55 Perm
0.96 42 0 0 Perm
0.96 31 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 7.7 7.7 0.05 8.4 3.0 71
7.7 7.7 0.05 8.4 3.0 71 0.00 0.05 68.4 1.00 0.3 68.7 E 68.7 E
c0.01 0.23 69.0 1.00 1.6 70.6 E
17.4 0.81 151.4 90.0% 15
0.96 21 0 0
7.7 7.7 0.05 8.4 3.0 85 0.01 0.13 68.7 1.00 0.7 69.3 E 69.8 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
115.0 115.0 0.76 7.0 2.5 2688 0.62 0.81 11.5 1.00 2.8 14.3 B 15.3 B
2 115.0 115.0 0.76 7.0 2.5 1202 0.02 0.03 4.5 1.00 0.0 4.5 A
113.9 113.9 0.75 7.0 2.5 2662 c0.65 0.86 13.2 1.00 3.9 17.1 B 16.9 B
6 113.9 113.9 0.75 7.0 2.5 1190 0.03 0.05 4.8 1.00 0.1 4.9 A
B 22.4 E
Synchro 9 Report Page 7
385
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900
0 0 1900 8.3 1.00 0.95 0.97 1711 0.60 1054 0.95 0 42 11 NA 4
20 20 1900
200 200 1900
0.95 21 0 0
0.95 211 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1300 0.95 11 0 222 NA 8
140 140 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 147 104 43 Perm
20 20 1900 6.9 1.00 1.00 0.95 1770 0.05 90 0.95 21 0 21 pm+pt 5 2 86.8 86.8 0.58 6.9 3.0 95 0.01 0.12 0.22 34.5 1.00 1.2 35.6 D
2000 2000 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
200 200 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 211 86 125 Perm
150 150 1900 6.9 1.00 1.00 0.95 1770 0.04 83 0.95 158 0 158 pm+pt 1 6 103.5 103.5 0.69 6.9 3.0 211 c0.07 0.45 0.75 49.3 1.47 8.2 80.6 F
2200 2200 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2316 0 2316 NA 6
20 20 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
0.95 32 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 31.3 31.3 0.21 8.3 3.0 219
31.3 31.3 0.21 8.3 3.0 271
0.01 0.05 47.5 1.00 0.1 47.6 D 47.6 D
c0.17 0.82 56.6 1.00 17.3 73.9 E 63.8 E 60.0 1.02 150.0 99.6% 15
8 31.3 31.3 0.21 8.3 3.0 330 0.03 0.13 48.3 1.00 0.2 48.5 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
82.9 82.9 0.55 6.9 2.5 1955 0.59 1.08 33.5 1.00 44.5 78.1 E 72.2 E
2 82.9 82.9 0.55 6.9 2.5 874 0.08 0.14 16.3 1.00 0.3 16.6 B
92.7 92.7 0.62 6.9 2.5 2187 c0.65 1.06 28.6 0.46 33.4 46.5 D 48.3 D
6 92.7 92.7 0.62 6.9 2.5 978 0.01 0.01 11.0 1.00 0.0 11.0 B
E 22.1 F
Synchro 9 Report Page 8
386
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.98 20 0 20 Prot 4
0 0 1900
200 200 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 204 176 28 Prot 4
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.98 0 3 0 NA 8
3 3 1900
140 140 1900 7.0 1.00 1.00 0.95 1770 0.04 70 0.98 143 0 143 pm+pt 5 2 119.1 119.1 0.79 7.0 3.0 191 c0.06 0.54 0.75 50.9 1.55 1.5 80.3 F
1900 1900 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.98 1939 0 1940 NA 2
1 1 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.07 131 0.98 10 0 10 pm+pt 1 6 102.5 102.5 0.68 7.0 3.0 115 0.00 0.06 0.09 12.2 0.69 0.0 8.4 A
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.98 2143 0 2143 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 71 24 47 Perm
0.98 0 0 0
0.98 0 0 0
0.98 3 0 0
8 8.7 8.7 0.06 7.0 3.0 102 0.01
8.7 8.7 0.06 7.0 3.0 91 c0.02
1.2 1.2 0.01 7.0 3.0 12 c0.00
0.20 67.3 1.00 0.9 68.3 E
0.31 67.8 1.00 1.9 69.7 E
0.00 73.8 1.00 0.1 73.9 E 73.9 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
69.5 E 18.5 0.85 150.0 92.9% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
0.98 1 0 0
109.7 109.7 0.73 7.0 4.0 2588 c0.55 0.75 12.0 1.15 0.1 13.9 B 18.4 B
100.1 100.1 0.67 7.0 4.0 2361 c0.61 0.91 21.1 0.61 0.7 13.5 B 13.3 B
6 100.1 100.1 0.67 7.0 4.0 1056 0.03 0.04 8.6 1.00 0.0 8.6 A
B 28.0 F
Synchro 9 Report Page 2
387
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
690 690 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.99 697 0 697 Split 8
100 100 1900 7.5 1.00 0.93 1.00 1730 1.00 1730 0.99 101 22 170 NA 8
90 90 1900
150 150 1900
0.99 91 0 0
0.99 152 0 0 Split 7
50 50 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 51 0 51 Prot 5
1800 1800 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.99 1818 0 1818 NA 2
70 70 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.99 71 38 33 Perm
160 160 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 162 0 162 Prot 1
23.5 23.5 0.16 7.5 3.0 537 c0.20
23.5 23.5 0.16 7.5 3.0 271 0.10
5.4 5.4 0.04 7.3 3.0 63 0.03
70.7 70.7 0.47 7.3 4.0 1668 c0.51
1.30 63.2 1.00 147.4 210.6 F
0.63 59.2 1.00 4.5 63.6 E 178.9 F
120 240 120 240 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1812 1583 0.97 1.00 1812 1583 0.99 0.99 121 242 0 115 273 127 NA pm+ov 7 1 7 13.5 26.2 13.5 26.2 0.09 0.17 7.5 7.3 3.0 3.0 163 276 c0.15 0.04 0.04 1.67 0.46 68.2 55.6 1.00 1.00 329.0 1.2 397.2 56.8 F E 237.3 F
0.81 71.8 0.77 40.5 95.5 F
1.09 39.6 0.57 48.4 70.9 E 69.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
97.0 1.23 150.0 117.6% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
2 70.7 70.7 0.47 7.3 4.0 746 0.02 0.04 21.4 1.00 0.1 21.5 C
12.7 12.7 0.08 7.3 3.0 149 0.09 1.09 68.7 0.83 49.9 107.1 F
SBT
SBR
1900 680 1900 680 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.99 0.99 1919 687 0 67 1919 620 NA pm+ov 6 8 6 78.0 101.5 78.0 101.5 0.52 0.68 7.3 7.5 4.0 3.0 1840 1150 c0.54 0.08 0.31 1.04 0.54 36.0 12.3 1.48 1.92 21.3 0.0 74.5 23.7 E C 63.8 E
F 29.6 H
Synchro 9 Report Page 9
388
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
140 140 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.98 143 0 143 Prot 4
40 40 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.98 41 25 16 Perm
70 70 1900 6.8 1.00 1.00 0.95 1770 0.04 65 0.98 71 0 71 pm+pt 5 2 120.9 120.9 0.81 6.8 3.0 133 0.03 0.40 0.53 46.5 1.11 0.4 52.1 D
2600 2600 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2653 0 2653 NA 2
2800 2800 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2857 0 2857 NA 6
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.98 163 29 134 Perm
120.9 120.9 0.81 6.8 2.5 2852 c0.75
107.0 107.0 0.71 6.8 2.5 2524 c0.81
0.93 11.3 0.61 0.7 7.6 A 8.8 A
1.13 21.5 1.00 65.0 86.5 F 82.2 F
15.8 15.8 0.11 6.5 3.0 186 c0.08 0.77 65.3 1.00 17.2 82.6 F 77.7 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 15.8 15.8 0.11 6.5 3.0 166 0.01 0.10 60.6 1.00 0.3 60.9 E
48.3 1.11 150.0 96.2% 15
6 107.0 107.0 0.71 6.8 2.5 1129 0.08 0.12 6.7 1.00 0.2 6.9 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
D 20.1 F
Synchro 9 Report Page 10
389
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
100 100 1900 5.6 1.00 1.00 0.95 1770 0.95 1770 0.95 105 0 105 Prot 8
100 100 1900 5.6 1.00 0.85 1.00 1583 1.00 1583 0.95 105 93 12 Perm
100 100 1900 6.4 1.00 1.00 0.95 1770 0.95 1770 0.95 105 0 105 Prot 1
540 540 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 568 0 568 NA 6
900 900 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 947 0 947 NA 2
120 120 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.95 126 23 103 Perm
11.4 11.4 0.11 6.4 3.0 190 c0.06
81.4 81.4 0.77 6.4 4.0 1434 0.30
63.6 63.6 0.60 6.4 4.0 1120 c0.51
0.55 44.7 1.00 3.5 48.2 D
0.40 4.0 1.00 0.2 4.3 A 11.1 B
0.85 17.1 1.00 6.3 23.3 C 21.7 C
12.3 12.3 0.12 5.6 3.0 205 c0.06 0.51 43.9 1.00 2.2 46.0 D 43.9 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 12.3 12.3 0.12 5.6 3.0 184 0.01 0.07 41.6 1.00 0.2 41.7 D
20.4 0.76 105.7 76.0% 15
2 63.6 63.6 0.60 6.4 4.0 952 0.06 0.11 9.0 1.00 0.1 9.0 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
C 18.4 D
Synchro 9 Report Page 11
390
Unsignalized No Build PM Reports
391
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
25.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
30 30 0 Free 380 95 2 32
1200 90 1200 90 0 0 Free Free - None - 380 0 0 95 95 2 2 1263 95
50 880 10 50 880 10 0 0 0 Free Free Free - None 425 0 0 95 95 95 2 2 2 53 926 11
40 0 30 40 0 30 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 42 0 32
10 0 10 10 0 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 11 0 11
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 937 4.12 2.218 731 -
Approach HCM Control Delay, s HCM LOS
SE 0.2
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
731 -
0 -
0 -
Major2 1263 4.12 2.218 550 550 -
0 -
NW 0.7
NELn1 NWL NWT NWR SEL 34 550 - 731 2.167 0.096 - 0.043 $ 788.5 12.2 - 10.1 F B B 8.3 0.3 0.1 $: Delay exceeds 300s
0 -
Minor1 2368 1326 1042 7.12 6.12 6.12 3.518 ~ 24 192 277 ~ 21 ~ 21 184 242 NE $ 788.5 F
2368 1263 1326 1042 6.52 6.22 5.52 5.52 4.018 3.318 35 207 225 307 30 30 215 277
Minor2 2379 1037 1342 7.12 6.12 6.12 3.518 24 279 188
207 -
18 18 267 152
2363 932 1037 1326 6.52 6.22 5.52 5.52 4.018 3.318 35 323 308 225 30 30 278 215
323 -
SW 217.1 F
SET SERSWLn1 34 - 0.619 - 217.1 F 2.1
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
*: All major volume in platoon
Synchro 9 Report Page 2
392
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
23.3
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
80 80 0 Stop 0 0 0 97 2 82
10 10 0 Stop None 97 2 10
10 980 10 980 0 0 Free Free - None 465 0 0 97 97 2 2 10 1010
1200 120 1200 120 0 0 Free Free - None - 260 0 0 97 97 2 2 1237 124
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2268 1237 1031 6.42 5.42 5.42 3.518 ~ 45 274 344
1237 6.22 3.318 215 -
Major1 1237 4.12 2.218 563 -
~ 44 ~ 44 274 338
215 -
563 -
Approach HCM Control Delay, s HCM LOS
EB $ 620.5 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 563 0.018 11.5 B 0.1
0 -
NB 0.1
NBT EBLn1 48 - 1.933 -$ 620.5 F 9.3
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
*: All major volume in platoon
Synchro 9 Report Page 3
393
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
53.4
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS
04/04/2017
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
SBT SBR
50 10 20 50 10 20 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 52 10 21
30 10 160 30 10 160 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 31 10 167
20 880 40 20 880 40 0 0 0 Free Free Free - None 150 - 150 0 0 96 96 96 2 2 2 21 917 42
170 170 0 Free 230 96 2 177
1000 60 1000 60 0 0 Free Free - None - 375 0 0 96 96 2 2 1042 63
Minor2 1901 2354 1396 1396 505 958 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 42 35 148 206 518 334 ~ 16 ~ 16 143 338
26 26 157 323
521 6.94 3.32 500 500 -
EB $ 1250.7 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 663 0.031 10.6 B 0.1
Minor1 1838 2354 958 958 880 1396 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 47 35 276 334 308 206 ~ 25 ~ 25 267 210
26 26 323 157
458 6.94 3.32 550 -
Major1 1042 4.14 2.22 663 -
550 -
663 -
WB 143.6 F
0 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 17 500 25 550 740 - 3.676 0.042 1.667 0.303 0.239 $- 1663.4 12.5$ 660.2 14.4 11.4 F B F B B 8.5 0.1 5.1 1.3 0.9
$: Delay exceeds 300s
0 -
Major2 917 4.14 2.22 740 -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
740 -
0 -
0 -
SB 1.6
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
394
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
139.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 95 2 21
30 30 0 Stop None 95 2 32
30 30 0 Free 185 95 2 32
2500 2500 0 Free None 0 0 95 2 2632
2700 40 2700 40 0 0 Free Free - None - 150 0 0 95 95 2 2 2842 42
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 4221 2842 1379 6.84 5.84 5.84 3.52 ~1 30 199
1421 6.94 3.32 126 -
Major1 2842 4.14 2.22 131 -
~1 ~1 30 150
126 -
131 -
Approach HCM Control Delay, s HCM LOS
EB $ 14833.2 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 131 0.241 41 E 0.9
0 -
NB 0.5
NBT EBLn1 2 - 26.316 $ 14833.2 F 8.6
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
395
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 90 2 22
20 20 0 Stop None 90 2 22
10 360 10 360 0 0 Free Free - None 0 0 90 90 2 2 11 400
570 590 570 590 0 0 Free Free - None 0 0 90 90 2 2 633 656
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1383 961 422 6.42 5.42 5.42 3.518 158 371 662
961 6.22 3.318 311 -
Major1 1289 4.12 2.218 538 -
154 154 371 645
311 -
538 -
Approach HCM Control Delay, s HCM LOS
EB 27.2 D
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 538 0.021 11.8 B 0.1
0 -
NB 0.3
NBT EBLn1 - 206 - 0.216 0 27.2 A D 0.8
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
Synchro 9 Report Page 6
396
HCM 2010 TWSC 4: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
2045.4
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
NWL
NWR
NET NER
SWL SWT
350 350 0 Stop 0 0 0 92 2 380
30 30 0 Stop None 325 92 2 33
1100 240 1100 240 0 0 Free Free - None 0 0 0 92 92 2 2 1196 261
20 20 0 Free 250 92 2 22
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor1 3413 1196 2217 6.42 5.42 5.42 3.518 ~8 ~ 287 ~ 89
1196 6.22 3.318 227 -
~8 ~8 ~ 287 ~ 86
227 -
Approach HCM Control Delay, s HCM LOS
NW $ 20131 F
Major1 0 -
0 -
NE 0
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NET NERNWLn1NWLn2 SWL SWT 8 227 584 - 47.554 0.144 0.037 $ 21854.5 23.5 11.4 F C B - 49.4 0.5 0.1 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
Major2 1196 4.12 2.218 584 584 -
2000 2000 0 Free None 0 0 92 2 2174
0 -
SW 0.1
*: All major volume in platoon
Synchro 9 Report Page 1
397
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
04/04/2017
20.8
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
EBL
EBT EBR
WBL WBT WBR
NBL
70 10 70 70 10 70 0 0 0 Stop Stop Stop - None - 150 0 0 95 95 95 2 2 2 74 11 74
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 11 11 11
50 590 10 50 590 10 0 0 0 Free Free Free - Yield 200 0 0 95 95 95 2 2 2 53 621 11
Minor2 1748 1737 989 1011 1011 737 726 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 ~ 67 87 299 289 317 410 430 -
Minor1 1742 1737 621 726 726 1016 1011 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 68 87 487 416 430 287 317 -
~ 54 ~ 54 267 361
Approach HCM Control Delay, s HCM LOS
EB 233.8 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 699 0.075 10.6 B 0.2
Notes ~: Volume exceeds capacity
78 78 308 397
299 -
42 42 384 203
78 78 397 308
Major1 989 4.12 2.218 699 -
487 -
699 -
WB 79.5 F
0 -
0 -
SBL
Major2 621 4.12 2.218 960 960 -
0 -
0 -
SB 0.1
SBT SBR -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 No Build PM Peak
SBT SBR
10 940 50 10 940 50 0 0 0 Free Free Free - Yield - 125 0 0 95 95 95 2 2 2 11 989 53
NB 0.8
NBT NBR EBLn1 EBLn2WBLn1 SBL 56 299 78 960 - 1.504 0.246 0.405 0.011 - $ 420 20.9 79.5 8.8 F C F A 7.7 0.9 1.6 0
$: Delay exceeds 300s
NBT NBR
*: All major volume in platoon
Synchro 9 Report Page 7
398
Signalized Short Term AM Reports
399
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
2100 2100 1900 7.2 0.97 1.00 0.95 3433 0.95 3433 0.85 2471 0 2471 Split 4
280 280 1900 7.2 1.00 0.94 1.00 1746 1.00 1746 0.85 329 14 550 NA 4
200 200 1900
30 30 1900
90 90 1900
0.85 35 0 0 Split 8
290 290 1900 7.7 1.00 1.00 1.00 1863 1.00 1863 0.85 341 0 341 NA 6
620 620 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.85 729 604 125 Perm
73.8 73.8 0.43 7.2 3.0 743 0.31
24.8 24.8 0.14 7.2 3.0 259 c0.35
1.69 49.8 1.00 314.1 363.9 F
0.74 41.7 1.00 3.9 45.6 D 304.7 F
2.48 74.3 1.00 678.1 752.4 F 752.4 F
110 110 1900 7.7 1.00 1.00 0.95 1770 0.11 199 0.85 129 0 129 pm+pt 5 2 52.7 52.7 0.30 7.7 3.0 198 c0.06 0.14 0.65 48.8 1.00 7.5 56.3 E
280 280 1900 7.7 1.00 0.99 1.00 1836 1.00 1836 0.85 329 2 362 NA 2
73.8 73.8 0.43 7.2 3.0 1461 c0.72
30 30 1900 7.7 1.00 1.00 0.95 1770 0.29 541 0.85 35 0 35 pm+pt 1 6 33.2 33.2 0.19 7.7 3.0 127 0.01 0.05 0.28 58.4 1.00 1.2 59.6 E
30 30 1900
0.85 235 0 0
430 430 1900 7.2 1.00 0.98 1.00 1817 1.00 1817 0.85 506 4 643 NA 8
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
292.3 1.61 173.4 135.9% 15
0.85 106 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
29.8 29.8 0.17 7.7 2.5 320 c0.18 1.07 71.8 1.00 68.8 140.6 F 88.5 F
6 29.8 29.8 0.17 7.7 2.5 272 0.08 0.46 64.6 1.00 0.9 65.5 E
0.85 35 0 0
41.6 41.6 0.24 7.7 2.5 440 c0.20 0.82 62.4 1.00 11.5 73.9 E 69.3 E
F 29.8 H
Synchro 9 Report Page 2
400
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
690 690 1900 7.1 0.97 0.99 0.95 3427 0.95 3427 0.91 758 2 789 Prot 4
30 30 1900
40 40 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.91 44 0 44 Prot 5
1300 1300 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.91 1429 0 1429 NA 2
40.2 40.2 0.27 7.1 3.0 918 c0.23
8.0 8.0 0.05 7.3 3.0 94 0.02
95.4 95.4 0.64 7.3 3.0 2250 c0.40
0.86 52.2 1.00 8.1 60.3 E 60.3 E
0.47 68.9 1.00 3.7 72.6 E
0.64 16.7 1.00 1.4 18.1 B 19.7 B
920 520 920 520 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.91 0.91 1011 571 0 110 1011 461 NA pm+ov 6 4 6 80.1 120.3 80.1 120.3 0.53 0.80 7.3 7.1 2.5 3.0 1889 1269 0.29 0.10 0.19 0.54 0.36 22.8 4.1 0.74 13.10 0.9 0.1 17.7 54.5 B D 31.0 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.91 33 0 0
32.7 0.74 150.0 68.6% 15
SBR
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
C 21.7 C
Synchro 9 Report Page 4
401
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
200 200 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.89 225 0 225 Prot 4
100 100 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.89 112 95 17 Perm
110 110 1900 7.6 1.00 1.00 0.95 1770 0.11 205 0.89 124 0 124 pm+pt 5 2 112.2 112.2 0.75 7.6 3.0 245 0.03 0.35 0.51 13.8 1.10 1.2 16.3 B
1800 1800 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.89 2022 0 2022 NA 2
1300 1300 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.89 1461 0 1461 NA 6
220 220 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.89 247 35 212 Perm
112.2 112.2 0.75 7.6 2.5 2647 c0.57
95.8 95.8 0.64 7.6 2.5 2260 0.41
0.76 11.1 0.70 1.6 9.4 A 9.8 A
0.65 16.7 1.53 0.9 26.4 C 25.7 C
23.4 23.4 0.16 6.8 3.0 276 c0.13 0.82 61.2 1.00 16.7 77.9 E 70.0 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 23.4 23.4 0.16 6.8 3.0 246 0.01 0.07 54.0 1.00 0.1 54.1 D
21.1 0.82 150.0 72.8% 15
6 95.8 95.8 0.64 7.6 2.5 1011 0.13 0.21 11.3 1.89 0.3 21.6 C
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
C 22.0 C
Synchro 9 Report Page 5
402
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
130 130 1900 7.5 1.00 1.00 0.95 1770 0.44 823 0.94 138 0 138 pm+pt 7 4 30.6 30.6 0.20 7.5 3.0 237 c0.04 c0.08 0.58 51.7 1.00 3.6 55.4 E
40 40 1900 6.5 0.95 0.88 1.00 1557 1.00 1557 0.94 43 99 116 NA 4
360 360 1900 6.5 0.95 0.85 1.00 1504 1.00 1504 0.94 383 119 92 Perm
40 40 1900
20 80 20 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1802 1583 0.67 1.00 1241 1583 0.94 0.94 21 85 0 74 64 11 NA pm+ov 8 1 8 11.1 19.3 11.1 19.3 0.07 0.13 7.5 7.3 3.0 3.0 91 203 0.00 0.05 0.00 0.70 0.05 67.8 57.3 1.00 1.00 21.8 0.1 89.6 57.5 F E 71.3 E
290 290 1900 7.3 0.97 1.00 0.95 3433 0.95 3433 0.94 309 0 309 Prot 5
1700 1700 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.94 1809 0 1809 NA 2
20 20 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.94 21 8 13 Perm
17.7 17.7 0.12 7.3 3.0 405 c0.09
90.1 90.1 0.60 7.3 2.5 2125 c0.51
0.76 64.1 1.10 5.4 75.8 E
0.85 24.5 0.68 2.9 19.6 B 27.6 C
70 70 1900 7.3 1.00 1.00 0.95 1770 0.05 92 0.94 74 0 74 pm+pt 1 6 88.8 88.8 0.59 7.3 3.0 146 0.03 0.27 0.51 25.1 1.54 1.9 40.7 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
30.6 30.6 0.20 6.5 3.0 317 0.07 0.37 51.4 1.00 0.7 52.1 D 52.6 D
0.94 43 0 0 Perm
4 30.6 30.6 0.20 6.5 3.0 306 0.06 0.30 50.6 1.00 0.6 51.2 D
31.9 0.87 150.0 90.8% 15
8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
2 90.1 90.1 0.60 7.3 2.5 950 0.01 0.01 12.1 1.00 0.0 12.1 B
SBT
SBR
1600 90 1600 90 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.94 0.94 1702 96 0 33 1702 63 NA pm+ov 6 7 6 80.6 91.6 80.6 91.6 0.54 0.61 7.3 7.5 2.5 3.0 1901 966 c0.48 0.00 0.03 0.90 0.06 30.9 11.8 0.74 0.66 5.1 0.0 28.0 7.9 C A 27.4 C
C 29.6 E
Synchro 9 Report Page 6
403
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
160 160 1900 8.3 0.97 1.00 0.95 3433 0.95 3433 0.95 168 0 168 Prot 7
10 10 1900 8.3 1.00 1.00 1.00 1863 1.00 1863 0.95 11 0 11 NA 4
50 50 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 53 43 10 Perm
50 50 1900
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
28.4 28.4 0.19 8.3 3.0 352 0.01
0.66 67.6 1.00 6.3 73.9 E
0.03 49.6 1.00 0.0 49.6 D 67.2 E
80 80 1900 7.0 1.00 1.00 0.95 1770 0.07 124 0.95 84 0 84 pm+pt 5 2 99.9 99.9 0.67 7.0 3.0 162 c0.03 0.32 0.52 20.9 1.79 1.9 39.3 D
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
11.1 11.1 0.07 8.3 3.0 254 c0.05
10 110 10 110 1900 1900 8.3 7.0 1.00 1.00 1.00 0.85 0.96 1.00 1789 1583 0.76 1.00 1407 1583 0.95 0.95 11 116 0 80 64 36 NA pm+ov 8 1 8 9.0 15.7 9.0 15.7 0.06 0.10 8.3 7.0 3.0 3.0 84 165 0.01 c0.05 0.01 0.76 0.22 69.4 61.5 1.00 1.00 32.8 0.7 102.2 62.2 F E 76.4 E
40 40 1900 7.0 1.00 1.00 0.95 1770 0.04 81 0.95 42 0 42 pm+pt 1 6 98.7 98.7 0.66 7.0 3.0 128 0.01 0.20 0.33 33.7 1.32 1.1 45.5 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.95 53 0 0 Perm
4 28.4 28.4 0.19 8.3 3.0 299 0.01 0.03 49.6 1.00 0.0 49.6 D
30.2 0.90 150.0 88.4% 15
8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
92.6 92.6 0.62 7.0 2.5 2184 c0.59 0.96 27.1 0.48 9.3 22.3 C 22.9 C
2 92.6 92.6 0.62 7.0 2.5 977 0.01 0.01 11.1 1.00 0.0 11.1 B
SBT
SBR
1600 290 1600 290 1900 1900 7.0 8.3 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.95 0.95 1684 305 0 95 1684 210 NA pm+ov 6 7 6 92.0 103.1 92.0 103.1 0.61 0.69 7.0 8.3 2.5 3.0 2170 1088 0.48 0.01 0.12 0.78 0.19 21.4 8.5 1.21 4.48 2.0 0.1 27.9 37.9 C D 29.8 C
C 30.6 E
Synchro 9 Report Page 7
404
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
90 90 1900
0 0 1900 8.4 1.00 0.94 0.97 1705 0.78 1366 0.95 0 72 97 NA 4
70 70 1900
30 30 1900 8.4 1.00 1.00 0.95 1770 0.59 1104 0.95 32 0 32 Perm
0 0 1900 8.4 1.00 0.85 1.00 1583 1.00 1583 0.95 0 75 9 NA 8
80 80 1900
20 20 1900 7.0 1.00 1.00 0.95 1770 0.07 137 0.95 21 0 21 pm+pt 5 2 102.8 102.8 0.69 7.0 3.0 134 0.00 0.10 0.16 12.3 0.57 0.2 7.3 A
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 2211 0 2211 NA 2
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 7 14 Perm
130 130 1900 7.0 1.00 1.00 0.95 1770 0.04 70 0.95 137 0 137 pm+pt 1 6 118.8 118.8 0.79 7.0 3.0 199 c0.06 0.48 0.69 51.1 0.76 5.1 43.7 D
1800 1800 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.95 1895 0 1895 NA 6
30 30 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 32 9 23 Perm
0.95 95 0 0 Perm
0.95 74 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 15.8 15.8 0.11 8.4 3.0 116
15.8 15.8 0.11 8.4 3.0 143 c0.07 0.68 64.7 1.00 12.6 77.2 E 77.2 E
0.03 0.28 61.8 1.00 1.3 63.1 E
20.3 0.90 150.0 99.9% 15
0.95 84 0 0
15.8 15.8 0.11 8.4 3.0 166 0.01 0.05 60.4 1.00 0.1 60.5 E 61.2 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
99.1 99.1 0.66 7.0 2.5 2338 c0.62 0.95 23.0 0.48 4.7 15.8 B 15.7 B
2 99.1 99.1 0.66 7.0 2.5 1045 0.01 0.01 8.7 1.00 0.0 8.7 A
108.1 108.1 0.72 7.0 2.5 2550 c0.54 0.74 12.6 1.25 1.1 16.8 B 18.5 B
6 108.1 108.1 0.72 7.0 2.5 1140 0.01 0.02 5.9 1.00 0.0 6.0 A
C 22.4 F
Synchro 9 Report Page 8
405
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900
10 10 1900 8.3 1.00 0.95 0.98 1729 0.75 1321 0.95 11 16 37 NA 4
20 20 1900
210 210 1900
0.95 21 0 0
0.95 221 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1299 0.95 11 0 232 NA 8
190 190 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 200 62 138 Perm
10 10 1900 6.9 1.00 1.00 0.95 1770 0.05 88 0.95 11 0 11 pm+pt 5 2 86.8 86.8 0.58 6.9 3.0 73 0.00 0.08 0.15 27.4 0.62 0.4 17.3 B
2000 2000 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
200 200 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 211 92 119 Perm
100 100 1900 6.9 1.00 1.00 0.95 1770 0.04 81 0.95 105 0 105 pm+pt 1 6 102.5 102.5 0.68 6.9 3.0 176 c0.04 0.36 0.60 42.2 1.00 5.3 47.5 D
1900 1900 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2000 0 2000 NA 6
10 10 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 11 4 7 Perm
0.95 21 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 32.3 32.3 0.22 8.3 3.0 284
32.3 32.3 0.22 8.3 3.0 279
0.03 0.13 47.5 1.00 0.2 47.7 D 47.7 D
c0.18 0.83 56.2 1.00 18.6 74.9 E 64.0 E 38.0 0.98 150.0 98.1% 15
8 32.3 32.3 0.22 8.3 3.0 340 0.09 0.41 50.6 1.00 0.8 51.4 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
84.8 84.8 0.57 6.9 2.5 2000 c0.59 1.05 32.6 0.38 29.7 42.1 D 38.5 D
2 84.8 84.8 0.57 6.9 2.5 894 0.08 0.13 15.3 0.22 0.1 3.6 A
93.6 93.6 0.62 6.9 2.5 2208 c0.57 0.91 24.4 1.00 6.8 31.1 C 31.9 C
6 93.6 93.6 0.62 6.9 2.5 987 0.00 0.01 10.6 1.00 0.0 10.7 B
D 22.1 F
Synchro 9 Report Page 9
406
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.97 21 0 21 Prot 4
0 0 1900
170 170 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 175 166 9 Prot 4
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.97 0 3 0 NA 8
3 3 1900
90 90 1900 7.0 1.00 1.00 0.95 1770 0.04 74 0.97 93 0 93 pm+pt 5 2 136.1 136.1 0.82 7.0 3.0 171 c0.04 0.41 0.54 39.6 1.00 3.5 43.2 D
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 2062 0 2062 NA 2
0 0 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.06 111 0.97 10 0 10 pm+pt 1 6 120.6 120.6 0.72 7.0 3.0 104 0.00 0.07 0.10 13.0 1.00 0.4 13.4 B
2000 2000 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 2062 0 2062 NA 6
80 80 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 82 24 58 Perm
0.97 0 0 0
0.97 0 0 0
0.97 3 0 0
8 8.6 8.6 0.05 7.0 3.0 91 c0.01
8.6 8.6 0.05 7.0 3.0 81 0.01
1.2 1.2 0.01 7.0 3.0 11 c0.00
0.23 76.0 1.00 1.3 77.3 E
0.11 75.5 1.00 0.6 76.1 E
0.00 82.3 1.00 0.1 82.3 F 82.3 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
76.2 E 19.7 0.77 166.9 88.3% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
0.97 0 0 0
126.7 126.7 0.76 7.0 4.0 2686 c0.58 0.77 11.6 1.00 1.5 13.1 B 14.4 B
118.2 118.2 0.71 7.0 4.0 2506 c0.58 0.82 17.0 1.00 3.2 20.2 C 19.7 B
6 118.2 118.2 0.71 7.0 4.0 1121 0.04 0.05 7.4 1.00 0.1 7.5 A
B 28.0 E
Synchro 9 Report Page 3
407
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
760 760 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.97 784 0 784 Split 8
120 120 1900 7.5 1.00 0.93 1.00 1736 1.00 1736 0.97 124 20 207 NA 8
100 100 1900
180 180 1900
0.97 103 0 0
0.97 186 0 0 Split 7
80 80 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 82 0 82 Prot 5
1800 1800 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.97 1856 0 1856 NA 2
70 70 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.97 72 40 32 Perm
110 110 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 113 0 113 Prot 1
29.5 29.5 0.20 7.5 3.0 675 c0.23
29.5 29.5 0.20 7.5 3.0 341 0.12
7.7 7.7 0.05 7.3 3.0 90 0.05
66.7 66.7 0.44 7.3 4.0 1573 c0.52
1.16 60.2 1.00 88.4 148.7 F
0.61 55.0 1.00 3.0 58.0 E 128.3 F
80 330 80 330 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1800 1583 0.97 1.00 1800 1583 0.97 0.97 82 340 0 117 268 223 NA pm+ov 7 1 7 16.5 24.2 16.5 24.2 0.11 0.16 7.5 7.3 3.0 3.0 198 255 c0.15 0.04 0.10 1.35 0.88 66.8 61.4 1.00 1.00 188.5 26.7 255.2 88.2 F F 161.8 F
0.91 70.8 1.00 66.1 136.9 F
1.18 41.6 1.00 87.9 129.5 F 126.0 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
119.8 1.25 150.0 116.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
2 66.7 66.7 0.44 7.3 4.0 703 0.02 0.05 23.6 1.00 0.1 23.7 C
7.7 7.7 0.05 7.3 3.0 90 0.06 1.26 71.2 1.11 150.6 229.5 F
SBT
SBR
1800 510 1800 510 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1856 526 0 116 1856 410 NA pm+ov 6 8 6 66.7 96.2 66.7 96.2 0.44 0.64 7.3 7.5 4.0 3.0 1573 1094 c0.52 0.07 0.19 1.18 0.37 41.6 12.7 0.81 0.98 84.4 0.1 118.3 12.5 F B 101.0 F
F 29.6 H
Synchro 9 Report Page 10
408
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
160 160 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.95 168 0 168 Prot 4
60 60 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.95 63 33 30 Perm
20 20 1900 6.8 1.00 1.00 0.95 1770 0.03 62 0.95 21 0 21 pm+pt 5 2 123.2 123.2 0.82 6.8 3.0 78 0.00 0.22 0.27 38.9 2.01 0.2 78.2 E
2800 2800 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2947 0 2947 NA 2
2400 2400 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2526 0 2526 NA 6
40 40 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 42 9 33 Perm
123.2 123.2 0.82 6.8 2.5 2906 c0.83
114.0 114.0 0.76 6.8 2.5 2689 0.71
1.01 13.4 1.39 9.1 27.8 C 28.1 C
0.94 15.1 1.00 8.0 23.1 C 22.8 C
13.5 13.5 0.09 6.5 3.0 159 c0.09 1.06 68.2 1.00 87.2 155.4 F 130.5 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 13.5 13.5 0.09 6.5 3.0 142 0.02 0.21 63.3 1.00 0.8 64.1 E
29.9 1.07 150.0 97.3% 15
6 114.0 114.0 0.76 6.8 2.5 1203 0.02 0.03 4.4 1.00 0.0 4.5 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
C 20.1 F
Synchro 9 Report Page 11
409
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
250 250 1900 5.6 1.00 1.00 0.95 1805 0.95 1805 0.89 281 0 281 0% Prot 8
220 220 1900 5.6 1.00 0.85 1.00 1583 1.00 1583 0.89 247 118 129 2% Perm
220 220 1900 6.4 1.00 1.00 0.95 1770 0.95 1770 0.89 247 0 247 2% Prot 1
660 660 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 742 0 742 2% NA 6
460 460 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 517 0 517 2% NA 2
180 180 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.89 202 107 95 2% Perm
12.7 12.7 0.16 6.4 3.0 284 c0.14
48.4 48.4 0.61 6.4 4.0 1142 0.40
29.3 29.3 0.37 6.4 4.0 691 c0.28
0.87 32.3 1.00 23.5 55.7 E
0.65 9.8 1.00 1.4 11.2 B 22.4 C
0.75 21.6 1.00 4.7 26.3 C 23.6 C
18.5 18.5 0.23 5.6 3.0 423 c0.16 0.66 27.4 1.00 3.9 31.3 C 28.7 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 18.5 18.5 0.23 5.6 3.0 371 0.08 0.35 25.2 1.00 0.6 25.7 C
24.3 0.75 78.9 65.6% 15
2 29.3 29.3 0.37 6.4 4.0 587 0.06 0.16 16.6 1.00 0.2 16.8 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
C 18.4 C
Synchro 9 Report Page 12
410
HCM Signalized Intersection Capacity Analysis 8: Palm Valley Rd & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NEL
NET
NER
SWL
SWT
SWR
50 50 1900
30 30 1900 4.5 1.00 1.00 0.97 1806 0.79 1480 0.88 34 0 91 NA 4
640 640 1900 4.5 0.88 0.85 1.00 2787 1.00 2787 0.88 727 143 584 Perm
20 20 1900
20 20 1900 4.5 1.00 0.97 0.98 1778 0.88 1593 0.88 23 7 50 NA 8
10 10 1900
640 640 1900 4.5 0.97 1.00 0.95 3433 0.17 626 0.88 727 0 727 Perm
1000 1000 1900 4.5 1.00 1.00 1.00 1863 1.00 1863 0.88 1136 0 1136 NA 2
20 20 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.88 23 6 17 Perm
10 10 1900 4.5 1.00 1.00 0.95 1770 0.11 205 0.88 11 0 11 Perm
1150 1150 1900 4.5 0.95 1.00 1.00 3539 1.00 3539 0.88 1307 0 1307 NA 6
90 90 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.88 102 28 74 Perm
2 87.5 87.5 0.73 4.5 3.0 1154
6 87.5 87.5 0.73 4.5 3.0 149
0.01 0.01 4.4 1.00 0.0 4.5 A
0.05 0.07 4.7 1.00 0.2 4.9 A
0.88 57 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
23.5 23.5 0.20 4.5 3.0 289 0.06 0.31 41.4 1.00 0.6 42.0 D 100.0 F
0.88 23 0 0 Perm
4 23.5 23.5 0.20 4.5 3.0 545 c0.21 1.07 48.2 1.00 59.0 107.3 F
77.9 1.48 120.0 77.5% 15
0.88 11 0 0
8 23.5 23.5 0.20 4.5 3.0 311 0.03 0.16 40.1 1.00 0.2 40.3 D 40.3 D
2 87.5 87.5 0.73 4.5 3.0 456 c1.16 1.59 16.2 1.00 277.6 293.9 F
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
87.5 87.5 0.73 4.5 3.0 1358 0.61 0.84 11.3 1.00 4.6 15.9 B 122.9 F
87.5 87.5 0.73 4.5 3.0 2580 0.37 0.51 7.0 1.00 0.2 7.1 A 6.9 A
6 87.5 87.5 0.73 4.5 3.0 1154 0.05 0.06 4.6 1.00 0.0 4.6 A
E 9.0 D
Synchro 9 Report Page 1
411
Unsignalized Short Term AM Reports
412
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
205.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
10 920 50 10 920 50 0 0 0 Free Free Free - None 380 - 380 0 0 86 86 86 2 2 2 12 1070 58
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 1302 4.12 2.218 532 -
Approach HCM Control Delay, s HCM LOS
SE 0.1
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
SET SER
532 -
0 -
0 -
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
20 20 0 Free 425 86 2 23
100 0 50 100 0 50 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 116 0 58
20 0 30 20 0 30 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 23 0 35
Major2 1070 4.12 2.218 651 -
$: Delay exceeds 300s
0 -
651 NW 0.2
NELn1 NWL NWT NWR SEL 25 651 - 532 6.977 0.036 - 0.022 $ 2997.3 10.7 - 11.9 F B B 21.7 0.1 0.1
Notes ~: Volume exceeds capacity
1100 20 1100 20 0 0 Free Free - None 0 0 86 86 2 2 1279 23
Minor1 2448 1093 1355 7.12 6.12 6.12 3.518 ~ 21 260 184
0 -
~ 17 ~ 17 254 146 NE $ 2997.3 F
2442 1070 1093 1349 6.52 6.22 5.52 5.52 4.018 3.318 31 269 290 219 29 29 283 211
269 -
Minor2 2459 1337 1122 7.12 6.12 6.12 3.518 ~ 21 189 250 ~ 16 ~ 16 185 192
2430 1291 1337 1093 6.52 6.22 5.52 5.52 4.018 3.318 32 199 222 290 30 30 214 283
199 -
SW $ 546.4 F
SET SERSWLn1 36 - 1.615 -$ 546.4 F 6.3
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
*: All major volume in platoon
Synchro 9 Report Page 2
413
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
79.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
90 90 0 Stop 0 0 0 84 2 107
10 10 0 Stop None 84 2 12
40 40 0 Free 465 84 2 48
1300 1300 0 Free None 0 0 84 2 1548
830 140 830 140 0 0 Free Free - None - 260 0 0 84 84 2 2 988 167
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2631 988 1643 6.42 5.42 5.42 3.518 ~ 26 361 173
988 6.22 3.318 300 -
Major1 988 4.12 2.218 699 -
~ 24 ~ 24 361 161
300 -
699 -
Approach HCM Control Delay, s HCM LOS
EB $ 1914.9 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 699 0.068 10.5 B 0.2
0 -
NB 0.3
NBT EBLn1 26 - 4.579 $- 1914.9 F - 14.7
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
*: All major volume in platoon
Synchro 9 Report Page 3
414
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
04/04/2017
1082.9
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
70 10 10 70 10 10 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 81 12 12
40 10 140 40 10 140 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 47 12 163
30 30 0 Free 150 86 2 35
1200 40 1200 40 0 0 Free Free - None - 150 0 0 86 86 2 2 1395 47
150 780 40 150 780 40 0 0 0 Free Free Free - None 230 - 375 0 0 86 86 86 2 2 2 174 907 47
Minor2 2029 2721 1256 1256 773 1465 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 34 20 181 241 358 191 ~2 ~2 173 184
12 12 155 182
453 6.94 3.32 554 554 -
EB $ 21320.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 746 0.047 10.1 B 0.1
Minor1 2273 2721 1465 1465 808 1256 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 22 20 134 191 341 241 ~2 ~2 128 198
12 12 182 155
698 6.94 3.32 383 -
Major1 907 4.14 2.22 746 -
383 -
746 -
WB $ 4248.6 F
0 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 2 554 2 383 486 - 46.512 0.021 29.07 0.425 0.359 $ 23983.9 11.6 $ 16085.3 21.2 16.5 F B F C C - 13.9 0.1 9.3 2.1 1.6
$: Delay exceeds 300s
0 -
Major2 1395 4.14 2.22 486 -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
486 -
SBT SBR
0 -
0 -
SB 2.6
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
415
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
241.5
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
40 40 0 Stop 0 0 0 92 2 43
70 70 0 Stop None 92 2 76
20 20 0 Free 185 92 2 22
2800 2800 0 Free None 0 0 92 2 3043
2400 20 2400 20 0 0 Free Free - None - 150 0 0 92 92 2 2 2609 22
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 4174 2609 1565 6.84 5.84 5.84 3.52 ~2 ~ 41 158
1304 6.94 3.32 151 -
Major1 2609 4.14 2.22 162 -
~2 ~2 ~ 41 137
151 -
162 -
Approach HCM Control Delay, s HCM LOS
EB $ 11739.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 162 0.134 30.6 D 0.5
0 -
NB 0.2
NBT EBLn1 5 - 23.913 $ 11739.3 F 17
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
416
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 96 2 21
20 20 0 Stop None 96 2 21
20 560 20 560 0 0 Free Free - None 0 0 96 96 2 2 21 583
420 10 420 10 0 0 Free Free - None 0 0 96 96 2 2 438 10
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1068 443 625 6.42 5.42 5.42 3.518 245 647 534
443 6.22 3.318 615 -
Major1 448 4.12 2.218 1112 -
238 238 647 519
615 -
1112 -
Approach HCM Control Delay, s HCM LOS
EB 16.9 C
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1112 0.019 8.3 A 0.1
0 -
NB 0.3
NBT EBLn1 - 343 - 0.121 0 16.9 A C 0.4
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
Synchro 9 Report Page 6
417
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
492.8
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
0 0 190 0 0 190 0 0 0 Stop Stop Stop - None 0 0 0 92 92 92 2 2 2 0 0 207
190 0 20 190 0 20 0 0 0 Stop Stop Stop - Stop 0 0 94 92 94 2 2 2 202 0 21
0 0 0 Free 92 2 0
4300 4300 0 Free 0 0 94 2 4574
1200 1200 0 Free Free 150 94 2 1277
0 0 0 Free 94 2 0
0 0 0
Major2 0 0 0
-
-
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 0 0 0
Approach HCM Control Delay, s HCM LOS
SE $ 12071.8 F
-
Minor1 8085 4574 3511 7.12 6.12 6.12 3.518 0 ~2 ~9
- 3511 - 6.22 - 3.318 0 ~8 0 0 -
~8 -
- 4574 - 6.22 - 3.318 0 ~2 0 0 -
~2 -
-
~2 -
NW $ 7623.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NETNWLn1 SELn1 SWT 2 8 - 10.638 25.815 $- 7623.3 $ 12071.8 F F 4.3 27.6 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
Major1 0 0 0 -
0 -
NE 0
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
3300 160 3300 160 0 0 Free Free - Free - 125 0 0 94 92 2 2 3511 174
-
0 0 0 0 -
SW 0
*: All major volume in platoon
Synchro 9 Report Page 1
418
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
04/04/2017
17.2
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
EBL
EBT EBR
WBL WBT WBR
NBL
80 10 60 80 10 60 0 0 0 Stop Stop Stop - None - 150 0 0 97 98 97 0 0 0 82 10 62
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 97 97 97 0 0 0 10 10 10
60 860 10 60 860 10 0 0 0 Free Free Free - Yield 200 0 0 97 97 97 0 0 0 62 887 10
Minor2 1609 1598 588 588 1021 1010 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 85 107 499 499 288 320 ~ 71 ~ 71 469 253
98 98 489 300
567 6.2 3.3 527 -
Minor1 1603 1598 1010 1010 593 588 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 86 107 292 320 496 499
527 -
66 66 274 420
EB 181 F NBL 1015 0.061 8.8 A 0.2
98 98 300 489
887 6.2 3.3 346 -
Major1 567 4.1 2.2 1015 -
346 -
1015 -
WB 52.4 F
0 -
0 -
SBL
Major2 887 4.1 2.2 772 772 -
0 -
0 -
SB 0.2
SBT SBR -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term AM Peak
SBT SBR
10 550 40 10 550 40 0 0 0 Free Free Free - Yield - 125 0 0 97 97 97 0 0 0 10 567 41
NB 0.6
NBT NBR EBLn1 EBLn2WBLn1 SBL 73 527 106 772 - 1.27 0.117 0.292 0.013 - 293.4 12.7 52.4 9.7 F B F A 7.3 0.4 1.1 0
$: Delay exceeds 300s
NBT NBR
*: All major volume in platoon
Synchro 9 Report Page 7
419
Signalized Short Term PM Reports
420
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
1400 1400 1900 7.2 0.97 1.00 0.95 3433 0.95 3433 0.97 1443 0 1443 Split 4
150 150 1900 7.2 1.00 0.93 1.00 1723 1.00 1723 0.97 155 23 287 NA 4
150 150 1900
150 150 1900
240 240 1900
0.97 155 0 0 Split 8
520 520 1900 7.7 1.00 1.00 1.00 1863 1.00 1863 0.97 536 0 536 NA 6
700 700 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.97 722 509 213 Perm
57.8 57.8 0.36 7.2 3.0 612 0.17
22.6 22.6 0.14 7.2 3.0 247 c0.49
1.18 52.4 1.00 90.5 142.8 F
0.47 40.5 1.00 0.6 41.1 D 124.8 F
3.56 70.0 1.00 1160.4 1230.3 F 1230.3 F
60 60 1900 7.7 1.00 1.00 0.95 1770 0.08 152 0.97 62 0 62 pm+pt 5 2 53.2 53.2 0.33 7.7 3.0 92 c0.02 0.20 0.67 43.8 1.00 17.7 61.5 E
300 300 1900 7.7 1.00 1.00 1.00 1854 1.00 1854 0.97 309 1 318 NA 2
57.8 57.8 0.36 7.2 3.0 1221 c0.42
50 50 1900 7.7 1.00 1.00 0.95 1770 0.38 707 0.97 52 0 52 pm+pt 1 6 51.4 51.4 0.32 7.7 3.0 245 0.00 0.06 0.21 39.9 1.00 0.4 40.4 D
10 10 1900
0.97 155 0 0
470 470 1900 7.2 1.00 0.96 0.99 1777 0.99 1777 0.97 485 9 878 NA 8
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
326.3 1.49 162.5 143.1% 15
0.97 247 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
48.0 48.0 0.30 7.7 2.5 550 c0.29 0.97 56.6 1.00 31.7 88.3 F 63.7 E
6 48.0 48.0 0.30 7.7 2.5 467 0.13 0.46 46.6 1.00 0.5 47.1 D
0.97 10 0 0
48.9 48.9 0.30 7.7 2.5 557 0.17 0.57 48.0 1.00 1.2 49.1 D 51.1 D
F 29.8 H
Synchro 9 Report Page 2
421
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
EBL
EBR
NBL
NBT
570 570 1900 7.1 0.97 0.99 0.95 3424 0.95 3424 0.96 594 3 622 Prot 4!
30 30 1900
30 30 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.96 31 0 31 Prot 5
1000 1000 1900 4.0 0.95 1.00 1.00 3539 1.00 3539 0.96 1042 0 1042 NA Free!
35.8 35.8 0.24 7.1 3.0 817 c0.18
7.1 7.1 0.05 7.3 3.0 83 0.02
150.0 150.0 1.00
0.76 53.1 1.00 4.2 57.3 E 57.3 E
0.37 69.3 1.00 2.8 72.1 E
0.29 0.0 1.00 0.2 0.2 A 2.3 A
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) ! Phase conflict between lane groups. c Critical Lane Group
0.96 31 0 0
18.6 0.69 150.0 65.1% 15
3539 0.29
04/04/2017
SBT
SBR
1300 770 1300 770 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.96 0.96 1354 802 0 64 1354 738 NA pm+ov 6 4 6 85.4 121.2 85.4 121.2 0.57 0.81 7.3 7.1 2.5 3.0 2014 1279 c0.38 0.14 0.33 0.67 0.58 22.5 5.2 1.02 0.24 0.9 0.3 23.8 1.6 C A 15.5 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
B 21.7 C
Synchro 9 Report Page 4
422
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
330 330 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.97 340 0 340 Prot 4
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.97 165 67 98 Perm
100 100 1900 7.6 1.00 1.00 0.95 1770 0.04 76 0.97 103 0 103 pm+pt 5 2 104.5 104.5 0.70 7.6 3.0 128 0.04 0.52 0.80 43.3 0.84 28.3 64.8 E
1500 1500 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.97 1546 0 1546 NA 2
1900 1900 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.97 1959 0 1959 NA 6
270 270 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.97 278 34 244 Perm
104.5 104.5 0.70 7.6 2.5 2465 c0.44
90.2 90.2 0.60 7.6 2.5 2128 c0.55
0.63 12.3 1.68 1.2 21.7 C 24.4 C
0.92 26.7 0.95 2.6 27.9 C 26.8 C
31.1 31.1 0.21 6.8 3.0 366 c0.19 0.93 58.4 1.00 29.3 87.6 F 75.6 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 31.1 31.1 0.21 6.8 3.0 328 0.06 0.30 50.2 1.00 0.5 50.7 D
31.5 0.93 150.0 94.7% 15
6 90.2 90.2 0.60 7.6 2.5 951 0.15 0.26 14.1 1.32 0.2 18.8 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
C 22.0 F
Synchro 9 Report Page 5
423
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
180 180 1900 7.5 1.00 1.00 0.95 1770 0.42 791 0.95 189 0 189 pm+pt 7 4 29.5 29.5 0.20 7.5 3.0 224 c0.06 c0.11 0.84 56.5 1.00 24.1 80.5 F
50 50 1900 7.5 0.95 0.88 1.00 1550 1.00 1550 0.95 53 109 201 NA 4
530 530 1900 7.5 0.95 0.85 1.00 1504 1.00 1504 0.95 558 109 192 Perm
30 30 1900
50 80 50 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.98 1.00 1828 1583 0.66 1.00 1237 1583 0.95 0.95 53 84 0 72 85 12 NA pm+ov 8 1 8 11.5 20.8 11.5 20.8 0.08 0.14 7.5 7.3 3.0 3.0 94 219 0.00 0.07 0.00 0.90 0.05 68.7 56.1 1.00 1.00 62.2 0.1 130.9 56.2 F E 93.7 F
290 290 1900 7.3 0.97 1.00 0.95 3433 0.95 3433 0.95 305 0 305 Prot 5
1600 1600 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.95 1684 0 1684 NA 2
20 20 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.95 21 9 12 Perm
11.7 11.7 0.08 7.3 3.0 267 c0.09
89.1 89.1 0.59 7.3 2.5 2102 0.48
1.14 69.2 1.07 92.8 166.6 F
0.80 23.6 0.90 2.6 23.9 C 45.5 D
100 100 1900 7.3 1.00 1.00 0.95 1770 0.06 115 0.95 105 0 105 pm+pt 1 6 96.0 96.0 0.64 7.3 3.0 176 0.04 0.34 0.60 23.7 1.34 3.3 35.2 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
29.5 29.5 0.20 7.5 3.0 304 0.13 0.66 55.6 1.00 5.3 60.9 E 65.4 E
0.95 32 0 0 Perm
4 29.5 29.5 0.20 7.5 3.0 295 0.13 0.65 55.5 1.00 4.9 60.4 E
49.1 1.04 150.0 106.7% 15
8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
2 89.1 89.1 0.59 7.3 2.5 940 0.01 0.01 12.5 1.00 0.0 12.5 B
SBT
SBR
2000 90 2000 90 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.95 0.95 2105 95 0 30 2105 65 NA pm+ov 6 7 6 86.7 97.2 86.7 97.2 0.58 0.65 7.3 7.5 2.5 3.0 2045 1025 c0.59 0.00 0.04 1.03 0.06 31.6 9.7 0.68 0.68 23.7 0.0 45.4 6.6 D A 43.3 D
D 29.6 G
Synchro 9 Report Page 6
424
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
470 470 1900 8.3 0.97 1.00 0.95 3433 0.35 1249 0.97 485 0 485 pm+pt 7 4 31.9 31.9 0.21 8.3 3.0 498 c0.10 c0.10 0.97 55.9 1.00 33.4 89.3 F
30 30 1900 8.3 1.00 1.00 1.00 1863 1.00 1863 0.97 31 0 31 NA 4
230 230 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.97 237 82 155 Perm
30 30 1900
20 50 20 50 1900 1900 8.3 7.0 1.00 1.00 1.00 0.85 0.97 1.00 1809 1583 0.80 1.00 1489 1583 0.97 0.97 21 52 0 47 52 5 NA pm+ov 8 1 8 7.6 14.8 7.6 14.8 0.05 0.10 8.3 7.0 3.0 3.0 75 156 0.00 0.03 0.00 0.69 0.03 70.1 61.1 1.00 1.00 24.2 0.1 94.2 61.2 F E 77.7 E
150 150 1900 7.0 1.00 1.00 0.95 1770 0.05 84 0.97 155 0 155 pm+pt 5 2 98.9 98.9 0.66 7.0 3.0 171 c0.06 0.53 0.91 48.8 1.53 33.4 108.2 F
1900 1900 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.97 1959 0 1959 NA 2
60 60 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 62 25 37 Perm
70 70 1900 7.0 1.00 1.00 0.95 1770 0.05 87 0.97 72 0 72 pm+pt 1 6 92.7 92.7 0.62 7.0 3.0 134 0.03 0.30 0.54 31.4 0.99 2.0 33.1 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
31.9 31.9 0.21 8.3 3.0 396 0.02 0.08 47.3 1.00 0.1 47.4 D 76.0 E
0.97 31 0 0 Perm
4 31.9 31.9 0.21 8.3 3.0 336 0.10 0.46 51.6 1.00 1.0 52.6 D
39.4 1.00 150.0 96.7% 15
8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
88.6 88.6 0.59 7.0 2.5 2090 c0.55 0.94 28.2 0.44 7.2 19.4 B 25.6 C
2 88.6 88.6 0.59 7.0 2.5 935 0.02 0.04 12.9 1.00 0.1 12.9 B
SBT
SBR
1800 330 1800 330 1900 1900 7.0 8.3 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.97 0.97 1856 340 0 104 1856 236 NA pm+ov 6 7 6 85.5 101.5 85.5 101.5 0.57 0.68 7.0 8.3 2.5 3.0 2017 1071 0.52 0.02 0.13 0.92 0.22 29.2 9.2 1.19 4.11 4.4 0.1 39.1 38.0 D D 38.7 D
D 30.6 F
Synchro 9 Report Page 7
425
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
40 40 1900
0 0 1900 8.4 1.00 0.94 0.97 1707 0.80 1413 0.96 0 69 4 NA 4
30 30 1900
15 15 1900 8.4 1.00 1.00 0.95 1770 0.76 1422 0.96 16 0 16 Perm
10 10 1900 8.4 1.00 0.90 1.00 1673 1.00 1673 0.96 10 20 11 NA 8
20 20 1900
80 80 1900 7.0 1.00 1.00 0.95 1770 0.04 66 0.96 83 0 83 pm+pt 5 2 122.3 122.3 0.82 7.0 3.0 152 c0.03 0.41 0.55 38.5 1.36 1.5 53.8 D
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.96 2188 0 2188 NA 2
40 40 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 42 10 32 Perm
60 60 1900 7.0 1.00 1.00 0.95 1770 0.04 80 0.96 62 0 63 pm+pt 1 6 117.7 117.7 0.78 7.0 3.0 134 0.02 0.35 0.47 20.5 0.95 0.7 20.2 C
2200 2200 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.96 2292 0 2292 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 73 19 54 Perm
0.96 42 0 0 Perm
0.96 31 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 7.6 7.6 0.05 8.4 3.0 72
7.6 7.6 0.05 8.4 3.0 71 0.00 0.05 67.8 1.00 0.3 68.1 E 68.1 E
c0.01 0.22 68.4 1.00 1.6 69.9 E
14.9 0.81 150.0 90.0% 15
0.96 21 0 0
7.6 7.6 0.05 8.4 3.0 84 0.01 0.13 68.0 1.00 0.7 68.8 E 69.2 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
113.6 113.6 0.76 7.0 2.5 2680 0.62 0.82 11.6 0.47 1.1 6.5 A 8.2 A
2 113.6 113.6 0.76 7.0 2.5 1198 0.02 0.03 4.5 1.00 0.0 4.5 A
111.3 111.3 0.74 7.0 2.5 2625 c0.65 0.87 14.2 1.21 1.2 18.4 B 18.6 B
6 111.3 111.3 0.74 7.0 2.5 1174 0.03 0.05 5.2 4.83 0.0 25.0 C
B 22.4 E
Synchro 9 Report Page 8
426
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900
0 0 1900 8.3 1.00 0.95 0.97 1711 0.60 1051 0.95 0 42 11 NA 4
20 20 1900
200 200 1900
0.95 21 0 0
0.95 211 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1300 0.95 11 0 222 NA 8
140 140 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 147 85 62 Perm
20 20 1900 6.9 1.00 1.00 0.95 1770 0.05 92 0.95 21 0 21 pm+pt 5 2 84.9 84.9 0.57 6.9 3.0 95 0.01 0.12 0.22 34.3 0.78 0.7 27.6 C
2000 2000 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2105 0 2105 NA 2
200 200 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 211 97 114 Perm
150 150 1900 6.9 1.00 1.00 0.95 1770 0.05 85 0.95 158 0 158 pm+pt 1 6 103.6 103.6 0.69 6.9 3.0 235 c0.07 0.39 0.67 47.4 0.86 4.8 45.5 D
2200 2200 1900 6.9 0.95 1.00 1.00 3539 1.00 3539 0.95 2316 0 2316 NA 6
20 20 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
0.95 32 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 31.2 31.2 0.21 8.3 3.0 218
31.2 31.2 0.21 8.3 3.0 270
0.01 0.05 47.5 1.00 0.1 47.6 D 47.6 D
c0.17 0.82 56.8 1.00 17.9 74.7 E 64.6 E 64.9 1.02 150.0 99.6% 15
8 31.2 31.2 0.21 8.3 3.0 329 0.04 0.19 49.0 1.00 0.3 49.3 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
81.0 81.0 0.54 6.9 2.5 1911 c0.59 1.10 34.5 0.63 51.4 73.1 E 66.8 E
2 81.0 81.0 0.54 6.9 2.5 854 0.07 0.13 17.1 0.41 0.2 7.2 A
92.8 92.8 0.62 6.9 2.5 2189 c0.65 1.06 28.6 1.11 33.6 65.3 E 63.6 E
6 92.8 92.8 0.62 6.9 2.5 979 0.01 0.01 11.0 1.00 0.0 11.0 B
E 22.1 F
Synchro 9 Report Page 9
427
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.98 20 0 20 Prot 4
0 0 1900
200 200 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 204 94 110 pm+ov 5 4 17.1 17.1 0.11 7.0 3.0 180 c0.05 0.02 0.61 63.3 1.00 6.0 69.3 E
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.98 0 3 0 NA 8
3 3 1900
140 140 1900 7.0 1.00 1.00 0.95 1770 0.04 67 0.98 143 0 143 pm+pt 5 2 123.0 123.0 0.82 7.0 3.0 194 c0.06 0.54 0.74 50.2 0.66 1.3 34.4 C
1900 1900 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.98 1939 0 1940 NA 2
1 1 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.08 145 0.98 10 0 10 pm+pt 1 6 106.1 106.1 0.71 7.0 3.0 128 0.00 0.05 0.08 9.8 1.32 0.0 12.9 B
2100 2100 1900 7.0 0.95 1.00 1.00 3539 1.00 3539 0.98 2143 0 2143 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 71 22 49 Perm
0.98 0 0 0
4.8 4.8 0.03 7.0 3.0 56 0.01 0.36 71.1 1.00 3.9 75.0 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
69.8 E 26.1 0.85 150.0 92.9% 15
0.98 0 0 0
0.98 3 0 0
8 1.2 1.2 0.01 7.0 3.0 12 c0.00 0.00 73.8 1.00 0.1 73.9 E 73.9 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
0.98 1 0 0
113.6 113.6 0.76 7.0 4.0 2680 c0.55 0.72 9.8 1.94 0.1 19.0 B 20.1 C
103.7 103.7 0.69 7.0 4.0 2446 c0.61 0.88 18.1 1.52 0.5 28.0 C 27.3 C
6 103.7 103.7 0.69 7.0 4.0 1094 0.03 0.04 7.4 1.00 0.0 7.4 A
C 28.0 F
Synchro 9 Report Page 3
428
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
690 690 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.99 697 0 697 Split 8
100 100 1900 7.5 1.00 0.93 1.00 1730 1.00 1730 0.99 101 22 170 NA 8
90 90 1900
150 150 1900
0.99 91 0 0
0.99 152 0 0 Split 7
50 50 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 51 0 51 Prot 5
1800 1800 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.99 1818 0 1818 NA 2
70 70 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.99 71 43 28 Perm
160 160 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 162 0 162 Prot 1
37.3 37.3 0.25 7.5 3.0 853 c0.20
37.3 37.3 0.25 7.5 3.0 430 0.10
5.5 5.5 0.04 7.3 3.0 64 0.03
58.7 58.7 0.39 7.3 4.0 1384 c0.51
0.82 53.1 1.00 6.1 59.2 E
0.40 47.0 1.00 0.6 47.6 D 56.7 E
120 240 120 240 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1812 1583 0.97 1.00 1812 1583 0.99 0.99 121 242 0 116 273 126 NA pm+ov 7 1 7 11.5 24.4 11.5 24.4 0.08 0.16 7.5 7.3 3.0 3.0 138 257 c0.15 0.04 0.04 1.98 0.49 69.2 57.1 1.00 1.00 465.2 1.5 534.4 58.6 F E 310.8 F
0.80 71.7 0.89 39.6 103.8 F
1.31 45.6 0.79 145.2 181.4 F 173.8 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
138.3 1.26 150.0 117.6% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
2 58.7 58.7 0.39 7.3 4.0 619 0.02 0.04 28.3 1.00 0.1 28.4 C
12.9 12.9 0.09 7.3 3.0 152 0.09 1.07 68.5 1.16 41.8 121.2 F
SBT
SBR
1900 680 1900 680 1900 1900 7.3 7.5 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.99 0.99 1919 687 0 45 1919 642 NA pm+ov 6 8 6 66.1 103.4 66.1 103.4 0.44 0.69 7.3 7.5 4.0 3.0 1559 1170 c0.54 0.14 0.27 1.23 0.55 42.0 11.6 0.84 1.19 104.5 0.0 139.8 13.8 F B 107.5 F
F 29.6 H
Synchro 9 Report Page 10
429
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
140 140 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.98 143 0 143 Prot 4
40 40 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.98 41 25 16 Perm
70 70 1900 6.8 1.00 1.00 0.95 1770 0.03 62 0.98 71 0 71 pm+pt 5 2 125.1 125.1 0.83 6.8 3.0 97 0.02 0.59 0.73 52.5 0.97 2.6 53.6 D
2600 2600 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2653 0 2653 NA 2
2800 2800 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2857 0 2857 NA 6
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.98 163 31 132 Perm
125.1 125.1 0.83 6.8 2.5 2951 c0.75
114.3 114.3 0.76 6.8 2.5 2696 c0.81
0.90 8.3 2.19 0.5 18.6 B 19.5 B
1.06 17.9 1.00 35.8 53.6 D 51.0 D
11.6 11.6 0.08 6.5 3.0 136 c0.08 1.05 69.2 1.00 91.6 160.8 F 139.4 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 11.6 11.6 0.08 6.5 3.0 122 0.01 0.13 64.5 1.00 0.5 65.0 E
39.3 1.08 150.0 96.2% 15
6 114.3 114.3 0.76 6.8 2.5 1206 0.08 0.11 4.6 1.00 0.2 4.8 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
D 20.1 F
Synchro 9 Report Page 11
430
HCM Signalized Intersection Capacity Analysis 8: Palm Valley Rd & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NEL
NET
NER
SWL
SWT
SWR
40 40 1900
90 90 1900 4.5 1.00 1.00 0.98 1835 0.86 1610 0.91 99 0 143 NA 4
720 720 1900 4.5 0.88 0.85 1.00 2787 1.00 2787 0.91 791 126 665 Perm
110 110 1900
40 40 1900 4.5 1.00 0.98 0.97 1776 0.60 1105 0.91 44 4 183 NA 8
20 20 1900
450 450 1900 4.5 0.97 1.00 0.95 3433 0.16 571 0.91 495 0 495 Perm
590 590 1900 4.5 1.00 1.00 1.00 1863 1.00 1863 0.91 648 0 648 NA 2
50 50 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.91 55 15 40 Perm
70 70 1900 4.5 1.00 1.00 0.95 1770 0.35 657 0.91 77 0 77 Perm
1250 1250 1900 4.5 0.95 1.00 1.00 3539 1.00 3539 0.91 1374 0 1374 NA 6
60 60 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.91 66 18 48 Perm
2 87.5 87.5 0.73 4.5 3.0 1154
6 87.5 87.5 0.73 4.5 3.0 479
0.03 0.03 4.5 1.00 0.0 4.5 A
0.12 0.16 5.0 1.00 0.2 5.1 A
0.91 44 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
23.5 23.5 0.20 4.5 3.0 315 0.09 0.45 42.6 1.00 1.0 43.6 D 144.7 F
0.91 121 0 0 Perm
4 23.5 23.5 0.20 4.5 3.0 545 c0.24 1.22 48.2 1.00 114.7 162.9 F
58.7 1.20 120.0 80.4% 15
0.91 22 0 0
8 23.5 23.5 0.20 4.5 3.0 216 0.17 0.85 46.5 1.00 25.2 71.7 E 71.7 E
2 87.5 87.5 0.73 4.5 3.0 416 c0.87 1.19 16.2 1.00 107.1 123.3 F
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
87.5 87.5 0.73 4.5 3.0 1358 0.35 0.48 6.7 1.00 0.3 7.0 A 55.0 D
87.5 87.5 0.73 4.5 3.0 2580 0.39 0.53 7.2 1.00 0.2 7.4 A 7.2 A
6 87.5 87.5 0.73 4.5 3.0 1154 0.03 0.04 4.5 1.00 0.0 4.6 A
E 9.0 D
Synchro 9 Report Page 1
431
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
100 100 1900 5.6 1.00 1.00 0.95 1770 0.95 1770 0.95 105 0 105 Prot 8
100 100 1900 5.6 1.00 0.85 1.00 1583 1.00 1583 0.95 105 93 12 Perm
100 100 1900 6.4 1.00 1.00 0.95 1770 0.95 1770 0.95 105 0 105 Prot 1
540 540 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 568 0 568 NA 6
900 900 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.95 947 0 947 NA 2
120 120 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.95 126 23 103 Perm
11.4 11.4 0.11 6.4 3.0 190 c0.06
81.6 81.6 0.77 6.4 4.0 1435 0.30
63.8 63.8 0.60 6.4 4.0 1122 c0.51
0.55 44.8 1.00 3.5 48.3 D
0.40 4.0 1.00 0.2 4.3 A 11.1 B
0.84 17.0 1.00 6.2 23.2 C 21.5 C
12.3 12.3 0.12 5.6 3.0 205 c0.06 0.51 44.0 1.00 2.2 46.1 D 44.0 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 12.3 12.3 0.12 5.6 3.0 183 0.01 0.07 41.7 1.00 0.2 41.8 D
20.4 0.76 105.9 76.0% 15
2 63.8 63.8 0.60 6.4 4.0 953 0.07 0.11 9.0 1.00 0.1 9.0 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
C 18.4 D
Synchro 9 Report Page 12
432
Unsignalized Short Term PM Reports
433
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
25.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
30 30 0 Free 380 95 2 32
1200 90 1200 90 0 0 Free Free - None - 380 0 0 95 95 2 2 1263 95
50 880 10 50 880 10 0 0 0 Free Free Free - None 425 0 0 95 95 95 2 2 2 53 926 11
40 0 30 40 0 30 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 42 0 32
10 0 10 10 0 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 11 0 11
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 937 4.12 2.218 731 -
Approach HCM Control Delay, s HCM LOS
SE 0.2
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
731 -
0 -
0 -
Major2 1263 4.12 2.218 550 550 -
0 -
NW 0.7
NELn1 NWL NWT NWR SEL 34 550 - 731 2.167 0.096 - 0.043 $ 788.5 12.2 - 10.1 F B B 8.3 0.3 0.1 $: Delay exceeds 300s
0 -
Minor1 2368 1326 1042 7.12 6.12 6.12 3.518 ~ 24 192 277 ~ 21 ~ 21 184 242 NE $ 788.5 F
2368 1263 1326 1042 6.52 6.22 5.52 5.52 4.018 3.318 35 207 225 307 30 30 215 277
Minor2 2379 1037 1342 7.12 6.12 6.12 3.518 24 279 188
207 -
18 18 267 152
2363 932 1037 1326 6.52 6.22 5.52 5.52 4.018 3.318 35 323 308 225 30 30 278 215
323 -
SW 217.1 F
SET SERSWLn1 34 - 0.619 - 217.1 F 2.1
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
*: All major volume in platoon
Synchro 9 Report Page 2
434
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
23.3
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
80 80 0 Stop 0 0 0 97 2 82
10 10 0 Stop None 97 2 10
10 980 10 980 0 0 Free Free - None 465 0 0 97 97 2 2 10 1010
1200 120 1200 120 0 0 Free Free - None - 260 0 0 97 97 2 2 1237 124
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2268 1237 1031 6.42 5.42 5.42 3.518 ~ 45 274 344
1237 6.22 3.318 215 -
Major1 1237 4.12 2.218 563 -
~ 44 ~ 44 274 338
215 -
563 -
Approach HCM Control Delay, s HCM LOS
EB $ 620.5 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 563 0.018 11.5 B 0.1
0 -
NB 0.1
NBT EBLn1 48 - 1.933 -$ 620.5 F 9.3
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
*: All major volume in platoon
Synchro 9 Report Page 3
435
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
53.4
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS
04/04/2017
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
SBT SBR
50 10 20 50 10 20 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 52 10 21
30 10 160 30 10 160 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 31 10 167
20 880 40 20 880 40 0 0 0 Free Free Free - None 150 - 150 0 0 96 96 96 2 2 2 21 917 42
170 170 0 Free 230 96 2 177
1000 60 1000 60 0 0 Free Free - None - 375 0 0 96 96 2 2 1042 63
Minor2 1901 2354 1396 1396 505 958 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 42 35 148 206 518 334 ~ 16 ~ 16 143 338
26 26 157 323
521 6.94 3.32 500 -
Minor1 1838 2354 958 958 880 1396 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 47 35 276 334 308 206
500 -
~ 25 ~ 25 267 210
EB $ 1250.7 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 663 0.031 10.6 B 0.1
26 26 323 157
458 6.94 3.32 550 -
Major1 1042 4.14 2.22 663 -
550 -
663 -
WB 143.6 F
0 -
NB 0.2
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL 17 500 25 550 740 - 3.676 0.042 1.667 0.303 0.239 $- 1663.4 12.5$ 660.2 14.4 11.4 F B F B B 8.5 0.1 5.1 1.3 0.9
$: Delay exceeds 300s
0 -
Major2 917 4.14 2.22 740 -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
740 -
0 -
0 -
SB 1.6
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
436
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
139.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 95 2 21
30 30 0 Stop None 95 2 32
30 30 0 Free 185 95 2 32
2500 2500 0 Free None 0 0 95 2 2632
2700 40 2700 40 0 0 Free Free - None - 150 0 0 95 95 2 2 2842 42
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 4221 2842 1379 6.84 5.84 5.84 3.52 ~1 30 199
1421 6.94 3.32 126 -
Major1 2842 4.14 2.22 131 -
~1 ~1 30 150
126 -
131 -
Approach HCM Control Delay, s HCM LOS
EB $ 14833.2 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 131 0.241 41 E 0.9
0 -
NB 0.5
NBT EBLn1 2 - 26.316 $ 14833.2 F 8.6
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
*: All major volume in platoon
Synchro 9 Report Page 5
437
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 90 2 22
20 20 0 Stop None 90 2 22
10 360 10 360 0 0 Free Free - None 0 0 90 90 2 2 11 400
570 590 570 590 0 0 Free Free - None 0 0 90 90 2 2 633 656
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 1383 961 422 6.42 5.42 5.42 3.518 158 371 662
961 6.22 3.318 311 -
Major1 1289 4.12 2.218 538 -
154 154 371 645
311 -
538 -
Approach HCM Control Delay, s HCM LOS
EB 27.2 D
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 538 0.021 11.8 B 0.1
0 -
NB 0.3
NBT EBLn1 - 206 - 0.216 0 27.2 A D 0.8
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
Synchro 9 Report Page 6
438
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
244.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
0 0 350 0 0 350 0 0 0 Stop Stop Stop - None 0 0 0 92 92 92 2 2 2 0 0 380
30 0 20 30 0 20 0 0 0 Stop Stop Stop - Stop 0 0 94 92 94 2 2 2 32 0 21
0 0 0 Free 92 2 0
1100 240 1100 240 0 0 Free Free - Free - 150 0 0 94 94 2 2 1170 255
0 0 0 Free 94 2 0
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 0 0 0
Approach HCM Control Delay, s HCM LOS
SE $ 2396.1 F
-
- 2128 - 6.22 - 3.318 0 ~ 63 0 0 -
Minor1 3298 1170 2128 7.12 6.12 6.12 3.518 ~5 235 65
~ 63 -
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NETNWLn1 SELn1 SWT - 235 63 - 0.091 6.039 - 21.8 $ 2396.1 C F 0.3 43 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
- 1170 - 6.22 - 3.318 0 235 0 0 -
235 -
-
235 -
NW 21.8 C
Major1 0 0 0 -
0 -
0 0 0
Major2 0 0 0
-
-
NE 0
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
2000 20 2000 20 0 0 Free Free - Free - 125 0 0 94 92 2 2 2128 22
-
0 0 0 0 -
SW 0
*: All major volume in platoon
Synchro 9 Report Page 1
439
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
04/04/2017
20.8
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
EBL
EBT EBR
WBL WBT WBR
NBL
70 10 70 70 10 70 0 0 0 Stop Stop Stop - None - 150 0 0 95 95 95 2 2 2 74 11 74
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 11 11 11
50 590 10 50 590 10 0 0 0 Free Free Free - Yield 200 0 0 95 95 95 2 2 2 53 621 11
Minor2 1748 1737 989 1011 1011 737 726 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 ~ 67 87 299 289 317 410 430 -
Minor1 1742 1737 621 726 726 1016 1011 7.12 6.52 6.22 6.12 5.52 6.12 5.52 3.518 4.018 3.318 68 87 487 416 430 287 317 -
~ 54 ~ 54 267 361
Approach HCM Control Delay, s HCM LOS
EB 233.8 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 699 0.075 10.6 B 0.2
Notes ~: Volume exceeds capacity
78 78 308 397
299 -
42 42 384 203
78 78 397 308
Major1 989 4.12 2.218 699 -
487 -
699 -
WB 79.5 F
0 -
0 -
SBL
Major2 621 4.12 2.218 960 960 -
0 -
0 -
SB 0.1
SBT SBR -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 Short Term PM Peak
SBT SBR
10 940 50 10 940 50 0 0 0 Free Free Free - Yield - 125 0 0 95 95 95 2 2 2 11 989 53
NB 0.8
NBT NBR EBLn1 EBLn2WBLn1 SBL 56 299 78 960 - 1.504 0.246 0.405 0.011 - $ 420 20.9 79.5 8.8 F C F A 7.7 0.9 1.6 0
$: Delay exceeds 300s
NBT NBR
*: All major volume in platoon
Synchro 9 Report Page 7
440
Signalized 2040 Build Alternative AM Reports
441
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
2500 2500 1900 7.2 0.97 1.00 0.95 3433 0.95 3433 0.85 2941 0 2941 Split 4
340 340 1900 7.2 1.00 0.94 1.00 1744 1.00 1744 0.85 400 16 678 NA 4
250 250 1900
20 20 1900
50 50 1900
0.85 24 0 0 Split 8
390 390 1900 7.7 0.95 1.00 1.00 3539 1.00 3539 0.85 459 0 459 NA 6
850 850 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.85 1000 671 329 Perm
73.8 73.8 0.45 7.2 3.0 792 0.39
24.8 24.8 0.15 7.2 3.0 276 c0.17
1.89 44.4 1.00 401.4 445.7 F
0.86 39.6 1.00 9.0 48.6 D 369.9 F
1.13 68.8 1.00 95.2 164.0 F 164.0 F
110 110 1900 7.7 1.00 1.00 0.95 1770 0.27 501 0.85 129 0 129 pm+pt 5 2 35.0 35.0 0.22 7.7 3.0 141 c0.02 0.17 0.91 63.2 1.00 50.6 113.8 F
290 290 1900 7.7 1.00 0.99 1.00 1837 1.00 1837 0.85 341 2 374 NA 2
73.8 73.8 0.45 7.2 3.0 1559 c0.86
50 50 1900 7.7 1.00 1.00 0.95 1770 0.13 250 0.85 59 0 59 pm+pt 1 6 33.2 33.2 0.20 7.7 3.0 82 0.01 0.13 0.72 60.4 1.00 25.9 86.2 F
30 30 1900
0.85 294 0 0
200 200 1900 7.2 1.00 0.97 1.00 1809 1.00 1809 0.85 235 5 313 NA 8
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
277.4 1.54 162.5 131.9% 15
0.85 59 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
442
29.8 29.8 0.18 7.7 2.5 648 0.13 0.71 62.3 1.00 3.3 65.6 E 128.7 F
6 29.8 29.8 0.18 7.7 2.5 290 c0.21 1.13 66.3 1.00 93.9 160.2 F
0.85 35 0 0
30.7 30.7 0.19 7.7 2.5 347 0.20 1.08 65.9 1.00 70.2 136.1 F 130.4 F
F 29.8 H
Synchro 9 Report Page 2
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
690 690 1900 7.1 0.97 0.99 0.95 3427 0.95 3427 0.91 758 2 789 Prot 4
30 30 1900
40 40 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.91 44 0 44 Prot 5
1400 1400 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.91 1538 0 1538 NA 2
40.5 40.5 0.27 7.1 3.0 925 c0.23
8.0 8.0 0.05 7.3 3.0 94 0.02
95.1 95.1 0.63 7.3 3.0 2243 c0.43
0.85 51.9 1.00 7.7 59.6 E 59.6 E
0.47 68.9 1.00 3.7 72.6 E
0.69 17.8 1.00 1.7 19.5 B 21.0 C
1000 600 1000 600 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.91 0.91 1099 659 0 110 1099 549 NA pm+ov 6 4 6 79.8 120.3 79.8 120.3 0.53 0.80 7.3 7.1 2.5 3.0 1882 1269 0.31 0.12 0.23 0.58 0.43 23.8 4.5 0.74 5.96 1.2 0.2 18.9 27.0 B C 21.9 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.91 33 0 0
28.8 0.78 150.0 71.3% 15
SBR
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
443
C 21.7 C
Synchro 9 Report Page 4
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
200 200 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.89 225 0 225 Prot 4
100 100 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.89 112 95 17 Perm
130 130 1900 7.6 1.00 1.00 0.95 1770 0.10 179 0.89 146 0 146 pm+pt 5 2 112.2 112.2 0.75 7.6 3.0 235 0.04 0.42 0.62 11.9 1.46 3.6 21.0 C
2000 2000 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.89 2247 0 2247 NA 2
1500 1500 1900 7.6 0.91 1.00 1.00 5085 1.00 5085 0.89 1685 0 1685 NA 6
250 250 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.89 281 51 230 Perm
112.2 112.2 0.75 7.6 2.5 2647 c0.63
95.0 95.0 0.63 7.6 2.5 3220 0.33
0.85 13.0 0.84 2.6 13.6 B 14.0 B
0.52 15.1 1.27 0.5 19.6 B 19.9 B
23.4 23.4 0.16 6.8 3.0 276 c0.13 0.82 61.2 1.00 16.7 77.9 E 70.0 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 23.4 23.4 0.16 6.8 3.0 246 0.01 0.07 54.0 1.00 0.1 54.1 D
20.5 0.89 150.0 78.4% 15
6 95.0 95.0 0.63 7.6 2.5 1002 0.15 0.23 11.8 1.81 0.4 21.7 C
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
444
C 22.0 D
Synchro 9 Report Page 5
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
130 130 1900 7.5 1.00 1.00 0.95 1770 0.44 812 0.94 138 0 138 pm+pt 7 4 32.5 32.5 0.22 7.5 3.0 260 c0.05 0.07 0.53 50.1 1.00 2.1 52.2 D
40 40 1900 7.5 0.95 0.88 1.00 1556 1.00 1556 0.94 43 101 119 NA 4
370 370 1900 7.5 0.95 0.85 1.00 1504 1.00 1504 0.94 394 114 103 Perm
40 40 1900
20 80 20 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1802 1583 0.66 1.00 1236 1583 0.94 0.94 21 85 0 74 64 11 NA pm+ov 8 1 8 11.7 20.1 11.7 20.1 0.08 0.13 7.5 7.3 3.0 3.0 96 212 0.00 c0.05 0.00 0.67 0.05 67.3 56.7 1.00 1.00 16.1 0.1 83.4 56.8 F E 68.2 E
330 330 1900 7.3 0.97 1.00 0.95 3433 0.95 3433 0.94 351 0 351 Prot 5
1900 1900 1900 7.3 0.91 1.00 1.00 5085 1.00 5085 0.94 2021 0 2021 NA 2
20 20 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.94 21 9 12 Perm
23.2 23.2 0.15 7.3 3.0 530 c0.10
87.0 87.0 0.58 7.3 2.5 2949 c0.40
0.66 59.7 1.14 1.6 69.4 E
0.69 22.0 0.70 0.7 16.1 B 23.9 C
70 70 1900 7.3 1.00 1.00 0.95 1770 0.06 120 0.94 74 0 74 pm+pt 1 6 80.6 80.6 0.54 7.3 3.0 156 0.03 0.23 0.47 19.6 2.06 2.0 42.3 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
32.5 32.5 0.22 7.5 3.0 337 0.08 0.35 49.8 1.00 0.6 50.5 D 50.7 D
4 32.5 32.5 0.22 7.5 3.0 325 0.07 0.32 49.4 1.00 0.6 50.0 D
25.9 0.74 150.0 83.6% 15
0.94 43 0 0 Perm 8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
445
2 87.0 87.0 0.58 7.3 2.5 918 0.01 0.01 13.3 1.00 0.0 13.3 B
SBT
SBR
1800 90 1800 90 1900 1900 7.3 7.5 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.94 0.94 1915 96 0 40 1915 56 NA pm+ov 6 7 6 72.2 85.5 72.2 85.5 0.48 0.57 7.3 7.5 2.5 3.0 2447 902 c0.38 0.01 0.03 0.78 0.06 32.4 14.4 0.50 0.05 2.3 0.0 18.3 0.8 B A 18.4 B
C 29.6 E
Synchro 9 Report Page 6
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
160 160 1900 8.3 0.97 1.00 0.95 3433 0.95 3433 0.95 168 0 168 Prot 7
10 10 1900 8.3 1.00 1.00 1.00 1863 1.00 1863 0.95 11 0 11 NA 4
50 50 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 53 43 10 Perm
50 50 1900
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
28.9 28.9 0.19 8.3 3.0 358 0.01
0.65 67.3 1.00 5.4 72.8 E
0.03 49.2 1.00 0.0 49.2 D 66.3 E
80 80 1900 7.0 1.00 1.00 0.95 1770 0.08 157 0.95 84 0 84 pm+pt 5 2 99.3 99.3 0.66 7.0 3.0 182 c0.02 0.28 0.46 12.9 2.01 1.5 27.5 C
2200 2200 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.95 2316 0 2316 NA 2
11.4 11.4 0.08 8.3 3.0 260 c0.05
10 120 10 120 1900 1900 8.3 7.0 1.00 1.00 1.00 0.85 0.96 1.00 1789 1583 0.76 1.00 1407 1583 0.95 0.95 11 126 0 80 64 46 NA pm+ov 8 1 8 9.2 16.0 9.2 16.0 0.06 0.11 8.3 7.0 3.0 3.0 86 168 0.01 c0.05 0.02 0.74 0.28 69.2 61.7 1.00 1.00 29.0 0.9 98.2 62.6 F E 74.6 E
50 50 1900 7.0 1.00 1.00 0.95 1770 0.04 81 0.95 53 0 53 pm+pt 1 6 98.3 98.3 0.66 7.0 3.0 129 0.02 0.25 0.41 19.0 1.39 1.8 28.1 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 28.9 28.9 0.19 8.3 3.0 304 0.01 0.03 49.2 1.00 0.0 49.2 D
23.2 0.72 150.0 75.7% 15
0.95 53 0 0 Perm 8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
446
92.0 92.0 0.61 7.0 2.5 3118 c0.46 0.74 20.6 0.32 1.3 7.9 A 8.6 A
2 92.0 92.0 0.61 7.0 2.5 970 0.01 0.01 11.3 1.00 0.0 11.3 B
SBT
SBR
1700 320 1700 320 1900 1900 7.0 8.3 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.95 0.95 1789 337 0 106 1789 231 NA pm+ov 6 7 6 91.5 102.9 91.5 102.9 0.61 0.69 7.0 8.3 2.5 3.0 3101 1085 0.35 0.02 0.13 0.58 0.21 17.6 8.7 1.53 5.23 0.7 0.1 27.6 45.4 C D 30.3 C
C 30.6 D
Synchro 9 Report Page 7
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
90 90 1900
0 0 1900 8.4 1.00 0.94 0.97 1705 0.78 1366 0.95 0 71 98 NA 4
70 70 1900
30 30 1900 8.4 1.00 1.00 0.95 1770 0.60 1116 0.95 32 0 32 Perm
0 0 1900 8.4 1.00 0.85 1.00 1583 1.00 1583 0.95 0 74 10 NA 8
80 80 1900
20 20 1900 7.0 1.00 1.00 0.95 1770 0.07 131 0.95 21 0 21 pm+pt 5 2 101.4 101.4 0.68 7.0 3.0 128 0.00 0.11 0.16 9.0 0.82 0.4 7.8 A
2300 2300 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.95 2421 0 2421 NA 2
20 20 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 21 7 14 Perm
140 140 1900 7.0 1.00 1.00 0.95 1770 0.04 71 0.95 147 0 147 pm+pt 1 6 117.4 117.4 0.78 7.0 3.0 199 c0.06 c0.51 0.74 45.0 1.22 10.4 65.2 E
2000 2000 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.95 2105 0 2105 NA 6
30 30 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.95 32 9 23 Perm
0.95 95 0 0 Perm
0.95 74 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 17.2 17.2 0.11 8.4 3.0 127
17.2 17.2 0.11 8.4 3.0 156 c0.07 0.63 63.4 1.00 7.7 71.1 E 71.1 E
0.03 0.25 60.5 1.00 1.0 61.6 E
21.7 0.74 150.0 86.8% 15
0.95 84 0 0
17.2 17.2 0.11 8.4 3.0 181 0.01 0.05 59.1 1.00 0.1 59.3 E 59.9 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
447
97.7 97.7 0.65 7.0 2.5 3312 0.48 0.73 17.4 1.46 1.0 26.4 C 26.1 C
2 97.7 97.7 0.65 7.0 2.5 1031 0.01 0.01 9.2 1.00 0.0 9.2 A
106.7 106.7 0.71 7.0 2.5 3617 c0.41 0.58 10.7 0.67 0.5 7.7 A 11.4 B
6 106.7 106.7 0.71 7.0 2.5 1126 0.01 0.02 6.3 1.00 0.0 6.4 A
C 22.4 E
Synchro 9 Report Page 8
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900
10 10 1900 8.3 1.00 0.95 0.98 1729 0.73 1294 0.95 11 15 38 NA 4
20 20 1900
210 210 1900
0.95 21 0 0
0.95 221 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1299 0.95 11 0 232 NA 8
190 190 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 200 73 127 Perm
10 10 1900 6.9 1.00 1.00 0.95 1770 0.06 105 0.95 11 0 11 pm+pt 5 2 90.7 90.7 0.60 6.9 3.0 90 0.00 0.07 0.12 14.9 0.69 0.5 10.7 B
2200 2200 1900 6.9 0.91 1.00 1.00 5085 1.00 5085 0.95 2316 0 2316 NA 2
210 210 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 221 91 130 Perm
100 100 1900 6.9 1.00 1.00 0.95 1770 0.04 79 0.95 105 0 105 pm+pt 1 6 102.1 102.1 0.68 6.9 3.0 145 c0.04 0.45 0.72 36.0 1.00 16.4 52.4 D
2000 2000 1900 6.9 0.91 1.00 1.00 5085 1.00 5085 0.95 2105 0 2105 NA 6
10 10 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 11 4 7 Perm
0.95 21 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 31.5 31.5 0.21 8.3 3.0 271
31.5 31.5 0.21 8.3 3.0 272
0.03 0.14 48.2 1.00 0.2 48.5 D 48.5 D
c0.18 0.85 57.0 1.00 21.9 78.9 E 66.3 E 18.8 0.80 150.0 85.3% 15
8 31.5 31.5 0.21 8.3 3.0 332 0.08 0.38 50.9 1.00 0.7 51.6 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
448
88.3 88.3 0.59 6.9 2.5 2993 c0.46 0.77 23.3 0.32 1.5 8.9 A 8.7 A
2 88.3 88.3 0.59 6.9 2.5 931 0.08 0.14 13.8 0.41 0.2 5.9 A
94.0 94.0 0.63 6.9 2.5 3186 c0.41 0.66 17.8 1.00 1.1 18.9 B 20.5 C
6 94.0 94.0 0.63 6.9 2.5 992 0.00 0.01 10.5 1.00 0.0 10.5 B
B 22.1 E
Synchro 9 Report Page 9
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.97 21 0 21 Prot 4
0 0 1900
170 170 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 175 166 9 Prot 4
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.97 0 3 0 NA 8
3 3 1900
100 100 1900 7.0 1.00 1.00 0.95 1770 0.05 100 0.97 103 0 103 pm+pt 5 2 136.1 136.1 0.82 7.0 3.0 207 c0.04 0.37 0.50 19.3 1.00 1.9 21.2 C
2100 2100 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.97 2165 0 2165 NA 2
0 0 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.07 129 0.97 10 0 10 pm+pt 1 6 118.9 118.9 0.71 7.0 3.0 115 0.00 0.06 0.09 7.6 1.00 0.3 7.9 A
2100 2100 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.97 2165 0 2165 NA 6
90 90 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 93 28 65 Perm
0.97 0 0 0
0.97 0 0 0
0.97 3 0 0
8 8.6 8.6 0.05 7.0 3.0 91 c0.01
8.6 8.6 0.05 7.0 3.0 81 0.01
1.2 1.2 0.01 7.0 3.0 11 c0.00
0.23 76.0 1.00 1.3 77.3 E
0.11 75.5 1.00 0.6 76.1 E
0.00 82.3 1.00 0.1 82.3 F 82.3 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
76.2 E 14.2 0.58 166.9 73.6% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
449
0.97 0 0 0
126.7 126.7 0.76 7.0 4.0 3860 c0.43 0.56 8.4 1.00 0.2 8.7 A 9.2 A
116.5 116.5 0.70 7.0 4.0 3549 c0.43 0.61 13.3 1.00 0.8 14.0 B 13.8 B
6 116.5 116.5 0.70 7.0 4.0 1104 0.04 0.06 7.9 1.00 0.1 8.0 A
B 28.0 D
Synchro 9 Report Page 3
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
740 740 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.97 763 0 763 Split 8
120 120 1900 7.5 1.00 0.93 1.00 1736 1.00 1736 0.97 124 20 207 NA 8
100 100 1900
180 180 1900
0.97 103 0 0
0.97 186 0 0 Split 7
80 80 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 82 0 82 Prot 5
1900 1900 1900 7.3 0.91 1.00 1.00 5085 1.00 5085 0.97 1959 0 1959 NA 2
80 80 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.97 82 46 36 Perm
110 110 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.97 113 0 113 Prot 1
29.5 29.5 0.20 7.5 3.0 675 c0.22
29.5 29.5 0.20 7.5 3.0 341 0.12
8.3 8.3 0.06 7.3 3.0 97 0.05
66.7 66.7 0.44 7.3 4.0 2261 c0.39
1.13 60.2 1.00 76.4 136.7 F
0.61 55.0 1.00 3.0 58.0 E 118.6 F
80 350 80 350 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1800 1583 0.97 1.00 1800 1583 0.97 0.97 82 361 0 117 268 244 NA pm+ov 7 1 7 16.5 24.2 16.5 24.2 0.11 0.16 7.5 7.3 3.0 3.0 198 255 c0.15 0.05 0.11 1.35 0.96 66.8 62.4 1.00 1.00 188.5 44.4 255.2 106.8 F F 170.0 F
0.85 70.2 1.00 45.6 115.8 F
0.87 37.6 1.00 4.8 42.4 D 44.5 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
64.9 1.03 150.0 102.8% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
450
2 66.7 66.7 0.44 7.3 4.0 703 0.02 0.05 23.7 1.00 0.1 23.8 C
7.7 7.7 0.05 7.3 3.0 90 0.06 1.26 71.2 1.10 147.8 226.3 F
SBT
SBR
1800 510 1800 510 1900 1900 7.3 7.5 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.97 0.97 1856 526 0 118 1856 408 NA pm+ov 6 8 6 66.1 95.6 66.1 95.6 0.44 0.64 7.3 7.5 4.0 3.0 2240 1088 c0.36 0.07 0.18 0.83 0.38 37.0 13.0 0.74 0.89 1.6 0.1 29.1 11.7 C B 34.3 C
E 29.6 G
Synchro 9 Report Page 10
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
160 160 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.95 168 0 168 Prot 4
60 60 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.95 63 32 31 Perm
20 20 1900 6.8 1.00 1.00 0.95 1770 0.03 64 0.95 21 0 21 pm+pt 5 2 119.4 119.4 0.80 6.8 3.0 78 0.00 0.21 0.27 45.9 2.04 0.7 94.1 F
2800 2800 1900 6.8 0.91 1.00 1.00 5085 1.00 5085 0.95 2947 0 2947 NA 2
2400 2400 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.95 2526 0 2526 NA 6
40 40 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.95 42 10 32 Perm
119.4 119.4 0.80 6.8 2.5 4047 c0.58
110.2 110.2 0.73 6.8 2.5 2599 c0.71
0.73 7.4 1.31 0.4 10.1 B 10.7 B
0.97 18.5 1.00 12.2 30.7 C 30.2 C
17.3 17.3 0.12 6.5 3.0 204 c0.09 0.82 64.9 1.00 22.8 87.6 F 80.2 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 17.3 17.3 0.12 6.5 3.0 182 0.02 0.17 59.9 1.00 0.4 60.3 E
22.2 0.97 150.0 86.3% 15
6 110.2 110.2 0.73 6.8 2.5 1162 0.02 0.03 5.4 1.00 0.0 5.4 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
451
C 20.1 E
Synchro 9 Report Page 11
HCM Signalized Intersection Capacity Analysis 8: Palm Valley Rd & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NEL
NET
NER
SWL
SWT
SWR
50 50 1900
30 600 30 600 1900 1900 4.5 4.5 1.00 0.88 1.00 0.85 0.97 1.00 1806 2787 0.81 1.00 1500 2787 0.88 0.88 34 682 0 24 91 658 NA pm+ov 4 5 4 12.7 44.6 12.7 44.6 0.11 0.40 4.5 4.5 3.0 3.0 169 1214 c0.15 0.06 0.08 0.54 0.54 47.2 26.2 1.00 1.00 3.3 0.5 50.5 26.7 D C 29.5 C
20 20 1900
20 20 1900 4.5 1.00 0.97 0.98 1778 0.85 1546 0.88 23 6 51 NA 8
10 10 1900
600 600 1900 4.5 0.97 1.00 0.95 3433 0.07 250 0.88 682 0 682 pm+pt 5 2 91.0 91.0 0.81 4.5 3.0 1102 c0.18 0.32 0.62 26.7 1.00 1.0 27.7 C
1000 1000 1900 4.5 0.95 1.00 1.00 3529 1.00 3529 0.88 1136 1 1158 NA 2
20 20 1900
10 10 1900 4.5 1.00 1.00 0.95 1770 0.24 456 0.88 11 0 11 pm+pt 1 6 56.5 56.5 0.50 4.5 3.0 250 0.00 0.02 0.04 14.4 1.00 0.1 14.4 B
1200 1200 1900 4.5 0.95 1.00 1.00 3539 1.00 3539 0.88 1364 0 1364 NA 6
80 80 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.88 91 39 52 Perm
0.88 57 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
21.5 0.73 112.7 71.0% 15
0.88 23 0 0 Perm
0.88 11 0 0
8 12.7 12.7 0.11 4.5 3.0 174 0.03 0.29 45.9 1.00 0.9 46.8 D 46.8 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
452
0.88 23 0 0
84.6 84.6 0.75 4.5 3.0 2649 0.33 0.44 5.2 1.00 0.1 5.3 A 13.6 B
54.6 54.6 0.48 4.5 3.0 1714 c0.39 0.80 24.4 1.00 2.6 27.0 C 26.2 C
6 54.6 54.6 0.48 4.5 3.0 766 0.03 0.07 15.5 1.00 0.0 15.5 B
C 13.5 C
Synchro 9 Report Page 1
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
220 220 1900 5.6 1.00 1.00 0.95 1805 0.95 1805 0.89 247 0 247 0% Prot 8
210 210 1900 5.6 1.00 0.85 1.00 1583 1.00 1583 0.89 236 147 89 2% Perm
210 210 1900 6.4 1.00 1.00 0.95 1770 0.23 430 0.89 236 0 236 2% pm+pt 1 6 39.9 39.9 0.57 6.4 3.0 442 0.08 0.23 0.53 9.8 1.00 1.2 11.0 B
620 620 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 697 0 697 2% NA 6
410 410 1900 6.4 1.00 1.00 1.00 1863 1.00 1863 0.89 461 0 461 2% NA 2
160 160 1900 6.4 1.00 0.85 1.00 1583 1.00 1583 0.89 180 87 93 2% Perm
39.9 39.9 0.57 6.4 3.0 1068 c0.37
23.3 23.3 0.33 6.4 3.0 623 c0.25
0.65 10.1 1.00 1.4 11.6 B 11.4 B
0.74 20.5 1.00 4.6 25.1 C 22.7 C
17.7 17.7 0.25 5.6 3.0 459 c0.14 0.54 22.4 1.00 1.2 23.6 C 22.2 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 17.7 17.7 0.25 5.6 3.0 402 0.06 0.22 20.5 1.00 0.3 20.8 C
17.5 0.70 69.6 60.7% 15
2 23.3 23.3 0.33 6.4 3.0 529 0.06 0.18 16.4 1.00 0.2 16.5 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
453
B 18.4 B
Synchro 9 Report Page 12
Unsignalized 2040 Build Alternative AM Reports
454
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
04/04/2017
268.5
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
20 20 0 Free 380 86 2 23
1300 70 1300 70 0 0 Free Free - None - 380 0 0 86 86 2 2 1512 81
30 30 0 Free 425 86 2 35
100 0 50 100 0 50 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 116 0 58
20 0 30 20 0 30 0 0 0 Stop Stop Stop - None 0 0 86 86 86 2 2 2 23 0 35
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 1884 4.14 2.22 314 -
Approach HCM Control Delay, s HCM LOS
SE 0.3
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
314 -
0 -
0 -
Major2 1512 4.14 2.22 438 -
$: Delay exceeds 300s
0 -
438 NW 0.3
NELn1 NWL NWT NWR SEL 15 438 - 314 11.628 0.08 - 0.074 $ 5277.1 13.9 - 17.4 F B C 22.8 0.3 0.2
Notes ~: Volume exceeds capacity
1600 20 1600 20 0 0 Free Free - None 0 0 86 86 2 2 1860 23
Minor1 2558 3511 1558 1558 1000 1953 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 13 6 118 172 261 109
0 -
~ 10 ~ 10 ~ 109 208 NE $ 5277.1 F
5 5 159 100
756 6.94 3.32 351 -
Minor2 2744 3500 1942 1942 802 1558 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~9 6 67 110 344 172
351 -
~7 ~7 62 266
5 5 101 159
942 6.94 3.32 264 264 -
SW $ 1550.2 F
SET SERSWLn1 17 - 3.42 $- 1550.2 F 7.9
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
455
*: All major volume in platoon
Synchro 9 Report Page 2
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
68.8
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
90 90 0 Stop 0 0 0 84 2 107
10 10 0 Stop None 84 2 12
50 50 0 Free 465 84 2 60
1800 1800 0 Free None 0 0 84 2 2143
1100 180 1100 180 0 0 Free Free - None - 260 0 0 84 84 2 2 1310 214
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2500 1310 1190 6.84 5.84 5.84 3.52 ~ 24 217 251
655 6.94 3.32 409 -
Major1 1310 4.14 2.22 524 -
~ 21 ~ 21 217 222
409 -
524 -
Approach HCM Control Delay, s HCM LOS
EB $ 2218 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 524 0.114 12.7 B 0.4
0 -
NB 0.3
NBT EBLn1 23 - 5.176 - $ 2218 F 15
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
456
*: All major volume in platoon
Synchro 9 Report Page 3
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
04/04/2017
1.7
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS
EBL
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
70 10 10 70 10 10 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 81 12 12
40 10 140 40 10 140 0 0 0 Stop Stop Stop - None 0 0 0 86 86 86 2 2 2 47 12 163
40 40 0 Free 150 86 2 47
1500 50 1500 50 0 0 Free Free - None - 150 0 0 86 86 2 2 1744 58
170 890 50 170 890 50 0 0 0 Free Free Free - None 230 - 375 0 0 86 86 86 2 2 2 198 1035 58
Minor2 2401 3267 1430 1430 971 1837 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 17 ~ 9 141 199 271 125 131 101
~4 ~4 88 116
517 6.94 3.32 503 503 -
Minor1 2756 3267 1837 1837 919 1430 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~9 ~9 78 125 292 199 73 110
EB
WB
-
-
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 667 0.07 10.8 B 0.2
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
~4 ~4 116 88
872 6.94 3.32 294 -
Major1 1035 4.14 2.22 667 -
294 -
667 -
0 -
0 -
Major2 1744 4.14 2.22 356 -
NB 0.3
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL - 503 - 294 356 - 0.023 - 0.554 0.555 - 12.3 - 31.4 27 B D D 0.1 3.1 3.2 +: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
457
356 -
SBT SBR
0 -
0 -
SB 4.1
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
148
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
40 40 0 Stop 0 0 0 92 2 43
70 70 0 Stop None 92 2 76
20 20 0 Free 185 92 2 22
2800 2800 0 Free None 0 0 92 2 3043
2400 20 2400 20 0 0 Free Free - None - 150 0 0 92 92 2 2 2609 22
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 3870 2609 1261 6.44 7.34 6.74 3.82 ~4 ~ 14 161
1304 7.14 3.92 129 -
Major1 2609 5.34 3.12 61 -
~3 ~3 ~9 103
129 -
61 -
Approach HCM Control Delay, s HCM LOS
EB $ 7180.5 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 61 0.356 93.7 F 1.3
0 -
NB 0.7
NBT EBLn1 8 - 14.946 $- 7180.5 F - 16.6
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
458
*: All major volume in platoon
Synchro 9 Report Page 5
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 96 2 21
20 20 0 Stop None 96 2 21
20 490 20 490 0 0 Free Free - None 0 0 96 96 2 2 21 510
370 10 370 10 0 0 Free Free - None 0 0 96 96 2 2 385 10
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 943 391 552 6.42 5.42 5.42 3.518 291 683 577
391 6.22 3.318 658 -
Major1 396 4.12 2.218 1163 -
284 284 683 563
658 -
1163 -
Approach HCM Control Delay, s HCM LOS
EB 15.1 C
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1163 0.018 8.2 A 0.1
0 -
NB 0.3
NBT EBLn1 - 397 - 0.105 0 15.1 A C 0.3
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
459
Synchro 9 Report Page 6
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
20.3
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
0 0 350 0 0 350 0 0 0 Stop Stop Stop - None 0 0 0 92 92 92 2 2 2 0 0 380
0 0 20 0 0 20 0 0 0 Stop Stop Stop - Stop 0 0 94 92 94 2 2 2 0 0 21
0 0 0 Free 92 2 0
1800 530 1800 530 0 0 Free Free - Free - 150 0 0 94 94 2 2 1915 564
0 0 0 Free 94 2 0
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 0 0 0 -
Approach HCM Control Delay, s HCM LOS
SE 218.5 F
- 904 - 6.94 - 3.32 0 ~ 280 0 0 -
Minor1 0 0 0
0 0 0
957 6.94 3.32 258 -
Major1 0 0 0
- ~ 280 -
-
-
258 -
-
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NETNWLn1 SELn1 SWT - 258 280 - 0.082 1.359 - 20.2 218.5 C F 0.3 19.8 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
NW 20.2 C
0 -
0 0 0
Major2 0 0 0
-
-
NE 0
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
460
1700 100 1700 100 0 0 Free Free - Free 0 0 94 92 2 2 1809 109
-
0 0 0 0 -
SW 0
*: All major volume in platoon
Synchro 9 Report Page 1
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
13.2
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
04/04/2017
EBL
EBT EBR
WBL WBT WBR
NBL
80 10 50 80 10 50 0 0 0 Stop Stop Stop - None - 150 0 0 97 97 97 0 0 0 82 10 52
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 97 97 97 0 0 0 10 10 10
60 800 10 60 800 10 0 0 0 Free Free Free - Yield 200 0 0 97 97 97 0 0 0 62 825 10
Minor2 1516 1505 557 557 959 948 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 99 122 518 515 311 342 84 84 487 275
Approach HCM Control Delay, s HCM LOS
EB 138.3 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1042 0.059 8.7 A 0.2
113 113 506 322
536 6.2 3.3 549 549 -
Minor1 1510 1505 948 948 562 557 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 100 122 316 342 515 515 79 79 297 449
113 113 322 506
825 6.2 3.3 376 -
Major1 536 4.1 2.2 1042 -
376 -
1042 -
WB 43.4 E
NB 0.6
NBT NBR EBLn1 EBLn2WBLn1 SBL 86 549 124 814 - 1.079 0.094 0.249 0.013 - 208.3 12.2 43.4 9.5 F B E A 6.3 0.3 0.9 0
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative AM Peak
461
NBT NBR
0 -
0 -
SBL
SBT SBR
10 520 40 10 520 40 0 0 0 Free Free Free - Yield 0 0 97 97 97 0 0 0 10 536 41 Major2 825 4.1 2.2 814 814 -
0 -
0 -
SB 0.2
SBT SBR 0 A -
Synchro 9 Report Page 7
Signalized 2040 Build Alternative PM Reports
462
HCM Signalized Intersection Capacity Analysis 11: SR A1A & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
SEL
SET
SER
NWL
NWT
NWR
1700 1700 1900 7.2 0.97 1.00 0.95 3433 0.95 3433 0.97 1753 0 1753 Split 4
180 180 1900 7.2 1.00 0.92 1.00 1719 1.00 1719 0.97 186 24 358 NA 4
190 190 1900
80 80 1900
130 130 1900
0.97 82 0 0 Split 8
720 720 1900 7.7 0.95 1.00 1.00 3539 1.00 3539 0.97 742 0 742 NA 6
960 960 1900 7.7 1.00 0.85 1.00 1583 1.00 1583 0.97 990 679 311 Perm
73.8 73.8 0.46 7.2 3.0 787 0.21
24.8 24.8 0.15 7.2 3.0 273 c0.26
1.11 43.6 1.00 60.9 104.5 F
0.46 29.8 1.00 0.4 30.3 C 91.2 F
1.66 68.1 1.00 313.6 381.7 F 381.7 F
60 60 1900 7.7 1.00 1.00 0.95 1770 0.14 263 0.97 62 0 62 pm+pt 5 2 32.6 32.6 0.20 7.7 3.0 93 0.02 0.12 0.67 56.5 1.00 16.6 73.1 E
310 310 1900 7.7 1.00 1.00 1.00 1854 1.00 1854 0.97 320 1 329 NA 2
73.8 73.8 0.46 7.2 3.0 1573 c0.51
70 70 1900 7.7 1.00 1.00 0.95 1770 0.14 263 0.97 72 0 72 pm+pt 1 6 32.6 32.6 0.20 7.7 3.0 93 c0.02 0.14 0.77 59.0 1.00 32.2 91.1 F
10 10 1900
0.97 196 0 0
240 240 1900 7.2 1.00 0.96 0.99 1774 0.99 1774 0.97 247 9 454 NA 8
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
146.3 1.22 161.0 121.5% 15
0.97 134 0 0
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
463
28.3 28.3 0.18 7.7 2.5 622 c0.21 1.19 66.3 1.00 102.0 168.4 F 158.4 F
6 28.3 28.3 0.18 7.7 2.5 278 0.20 1.12 66.3 1.00 89.5 155.9 F
0.97 10 0 0
28.3 28.3 0.18 7.7 2.5 325 0.18 1.01 66.3 1.00 53.2 119.6 F 112.2 F
F 29.8 H
Synchro 9 Report Page 2
HCM Signalized Intersection Capacity Analysis 34: SR A1A & Palm Valley Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
EBL
EBR
NBL
NBT
570 570 1900 7.1 0.97 0.99 0.95 3424 0.95 3424 0.96 594 2 623 Prot 4
30 30 1900
40 40 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.96 42 0 42 Prot 5
1200 1200 1900 7.3 0.95 1.00 1.00 3539 1.00 3539 0.96 1250 0 1250 NA 2
34.0 34.0 0.23 7.1 3.0 776 c0.18
6.8 6.8 0.05 7.3 3.0 80 0.02
101.6 101.6 0.68 7.3 3.0 2397 c0.35
0.80 54.8 1.00 6.0 60.8 E 60.8 E
0.53 70.0 1.00 6.1 76.1 E
0.52 12.1 1.00 0.8 12.9 B 14.9 B
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.96 31 0 0
19.6 0.78 150.0 70.7% 15
04/04/2017
SBT
SBR
1500 880 1500 880 1900 1900 7.3 7.1 0.95 1.00 1.00 0.85 1.00 1.00 3539 1583 1.00 1.00 3539 1583 0.96 0.96 1562 917 0 81 1563 836 NA pm+ov 6 4 6 87.5 121.5 87.5 121.5 0.58 0.81 7.3 7.1 2.5 3.0 2064 1282 c0.44 0.15 0.38 0.76 0.65 23.3 5.7 0.54 1.07 1.9 0.9 14.4 7.0 B A 11.7 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
464
B 21.7 C
Synchro 9 Report Page 4
HCM Signalized Intersection Capacity Analysis 35: SR A1A & ATP Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
330 330 1900 6.8 1.00 1.00 0.95 1770 0.95 1770 0.96 344 0 344 Prot 4
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.96 167 52 115 Perm
110 110 1900 7.6 1.00 1.00 0.95 1770 0.04 78 0.96 115 0 115 pm+pt 5 2 102.7 102.7 0.68 7.6 3.0 135 0.04 c0.54 0.85 40.0 1.27 32.3 83.1 F
1700 1700 1900 7.6 0.95 1.00 1.00 3539 1.00 3539 0.96 1771 0 1771 NA 2
2200 2200 1900 7.6 0.91 1.00 1.00 5085 1.00 5085 0.96 2292 0 2292 NA 6
310 310 1900 7.6 1.00 0.85 1.00 1583 1.00 1583 0.96 323 55 268 Perm
102.7 102.7 0.68 7.6 2.5 2423 c0.50
87.8 87.8 0.59 7.6 2.5 2976 0.45
0.73 14.9 1.14 1.6 18.6 B 22.6 C
0.77 23.5 0.83 1.2 20.6 C 20.2 C
32.9 32.9 0.22 6.8 3.0 388 c0.19 0.89 56.7 1.00 20.8 77.6 E 68.5 E
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 32.9 32.9 0.22 6.8 3.0 347 0.07 0.33 49.3 1.00 0.6 49.9 D
26.0 0.90 150.0 85.2% 15
6 87.8 87.8 0.59 7.6 2.5 926 0.17 0.29 15.5 1.07 0.5 17.0 B
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
465
C 22.0 E
Synchro 9 Report Page 5
HCM Signalized Intersection Capacity Analysis 39: SR A1A & PGA Tour Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
190 190 1900 7.5 1.00 1.00 0.95 1770 0.44 815 0.95 200 0 200 pm+pt 7 4 35.5 35.5 0.24 7.5 3.0 292 0.07 c0.09 0.68 49.5 1.00 6.5 56.0 E
60 60 1900 7.5 0.95 0.88 1.00 1556 1.00 1556 0.95 63 99 225 NA 4
550 550 1900 7.5 0.95 0.85 1.00 1504 1.00 1504 0.95 579 108 210 Perm
30 30 1900
50 80 50 80 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.98 1.00 1828 1583 0.73 1.00 1368 1583 0.95 0.95 53 84 0 72 85 12 NA pm+ov 8 1 8 12.4 22.3 12.4 22.3 0.08 0.15 7.5 7.3 3.0 3.0 113 235 0.00 0.06 0.00 0.75 0.05 67.3 54.8 1.00 1.00 24.2 0.1 91.5 54.9 F D 73.3 E
330 330 1900 7.3 0.97 1.00 0.95 3433 0.95 3433 0.95 347 0 347 Prot 5
1900 1900 1900 7.3 0.91 1.00 1.00 5085 1.00 5085 0.95 2000 0 2000 NA 2
30 30 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.95 32 14 18 Perm
15.2 15.2 0.10 7.3 3.0 347 c0.10
82.5 82.5 0.55 7.3 2.5 2796 c0.39
1.00 67.4 1.13 42.0 117.9 F
0.72 25.0 0.54 1.2 14.8 B 29.8 C
110 110 1900 7.3 1.00 1.00 0.95 1770 0.05 99 0.95 116 0 116 pm+pt 1 6 87.1 87.1 0.58 7.3 3.0 167 0.05 0.35 0.69 29.4 1.40 9.6 50.8 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
35.5 35.5 0.24 7.5 3.0 368 c0.14 0.61 51.1 1.00 3.0 54.1 D 54.3 D
4 35.5 35.5 0.24 7.5 3.0 355 0.14 0.59 50.8 1.00 2.6 53.5 D
30.9 0.87 150.0 94.1% 15
0.95 32 0 0 Perm 8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
466
2 82.5 82.5 0.55 7.3 2.5 870 0.01 0.02 15.4 1.00 0.0 15.4 B
SBT
SBR
2100 100 2100 100 1900 1900 7.3 7.5 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.95 0.95 2211 105 0 39 2211 66 NA pm+ov 6 7 6 77.2 92.8 77.2 92.8 0.51 0.62 7.3 7.5 2.5 3.0 2617 979 c0.43 0.01 0.03 0.84 0.07 31.3 11.4 0.55 0.36 2.9 0.0 20.1 4.1 C A 20.9 C
C 29.6 F
Synchro 9 Report Page 6
HCM Signalized Intersection Capacity Analysis 44: SR A1A & Sawgrass Village Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
470 470 1900 8.3 0.97 1.00 0.95 3433 0.95 3433 0.97 485 0 485 Prot 7
30 30 1900 8.3 1.00 1.00 1.00 1863 1.00 1863 0.97 31 0 31 NA 4
230 230 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.97 237 74 163 Perm
30 30 1900
60 60 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.97 62 30 32 Perm
42.9 42.9 0.29 8.3 3.0 532 0.02
0.79 58.7 1.00 6.5 65.3 E
0.06 38.9 1.00 0.0 38.9 D 57.2 E
160 160 1900 7.0 1.00 1.00 0.95 1770 0.05 97 0.97 165 0 165 pm+pt 5 2 87.8 87.8 0.59 7.0 3.0 175 c0.07 c0.49 0.94 44.4 1.73 41.6 118.5 F
2000 2000 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.97 2062 0 2062 NA 2
27.0 27.0 0.18 8.3 3.0 617 c0.14
20 50 20 50 1900 1900 8.3 7.0 1.00 1.00 1.00 0.85 0.97 1.00 1809 1583 0.80 1.00 1489 1583 0.97 0.97 21 52 0 47 52 5 NA pm+ov 8 1 8 7.6 15.2 7.6 15.2 0.05 0.10 8.3 7.0 3.0 3.0 75 160 0.00 c0.03 0.00 0.69 0.03 70.1 60.8 1.00 1.00 24.2 0.1 94.2 60.9 F E 77.6 E
80 80 1900 7.0 1.00 1.00 0.95 1770 0.05 100 0.97 82 0 82 pm+pt 1 6 81.8 81.8 0.55 7.0 3.0 139 0.03 0.29 0.59 25.5 1.07 4.8 32.2 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 42.9 42.9 0.29 8.3 3.0 452 0.10 0.36 42.6 1.00 0.5 43.1 D
33.6 0.91 150.0 84.2% 15
0.97 31 0 0 Perm 8
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
467
77.2 77.2 0.51 7.0 2.5 2617 0.41 0.79 29.7 0.41 1.8 14.0 B 21.6 C
2 77.2 77.2 0.51 7.0 2.5 814 0.02 0.04 18.0 1.00 0.1 18.1 B
SBT
SBR
1900 370 1900 370 1900 1900 7.0 8.3 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.97 0.97 1959 381 0 124 1959 257 NA pm+ov 6 7 6 74.2 101.2 74.2 101.2 0.49 0.67 7.0 8.3 2.5 3.0 2515 1067 0.39 0.04 0.12 0.78 0.24 31.2 9.5 0.94 6.28 1.9 0.1 31.1 59.7 C E 35.6 D
C 30.6 E
Synchro 9 Report Page 7
HCM Signalized Intersection Capacity Analysis 48: SR A1A & Thousand Oaks Dr
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
40 40 1900
0 0 1900 8.4 1.00 0.94 0.97 1707 0.80 1413 0.96 0 69 4 NA 4
30 30 1900
15 15 1900 8.4 1.00 1.00 0.95 1770 0.76 1422 0.96 16 0 16 Perm
10 10 1900 8.4 1.00 0.90 1.00 1673 1.00 1673 0.96 10 20 11 NA 8
20 20 1900
90 90 1900 7.0 1.00 1.00 0.95 1770 0.04 71 0.96 94 0 94 pm+pt 5 2 120.4 120.4 0.80 7.0 3.0 155 c0.04 0.45 0.61 28.3 1.70 4.5 52.5 D
2300 2300 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.96 2396 0 2396 NA 2
40 40 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 42 11 31 Perm
70 70 1900 7.0 1.00 1.00 0.95 1770 0.05 85 0.96 73 0 73 pm+pt 1 6 119.6 119.6 0.80 7.0 3.0 161 0.03 0.34 0.45 11.0 1.03 1.4 12.7 B
2400 2400 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.96 2500 0 2500 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.96 73 19 54 Perm
0.96 42 0 0 Perm
0.96 31 0 0
4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 7.6 7.6 0.05 8.4 3.0 72
7.6 7.6 0.05 8.4 3.0 71 0.00 0.05 67.8 1.00 0.3 68.1 E 68.1 E
c0.01 0.22 68.4 1.00 1.6 69.9 E
10.0 0.63 150.0 80.7% 15
0.96 21 0 0
7.6 7.6 0.05 8.4 3.0 84 0.01 0.13 68.0 1.00 0.7 68.8 E 69.2 E
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
468
111.7 111.7 0.74 7.0 2.5 3786 0.47 0.63 9.2 0.29 0.5 3.2 A 5.1 A
2 111.7 111.7 0.74 7.0 2.5 1178 0.02 0.03 5.0 1.00 0.0 5.0 A
111.3 111.3 0.74 7.0 2.5 3773 c0.49 0.66 9.8 1.14 0.6 11.8 B 12.0 B
6 111.3 111.3 0.74 7.0 2.5 1174 0.03 0.05 5.2 3.29 0.0 17.1 B
A 22.4 D
Synchro 9 Report Page 8
HCM Signalized Intersection Capacity Analysis 53: SR A1A & Corona Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900
0 0 1900 8.3 1.00 0.95 0.97 1711 0.56 986 0.95 0 43 10 NA 4
20 20 1900
190 190 1900
0.95 21 0 0
0.95 200 0 0 Perm
10 10 1900 8.3 1.00 1.00 0.95 1778 0.70 1301 0.95 11 0 211 NA 8
140 140 1900 8.3 1.00 0.85 1.00 1583 1.00 1583 0.95 147 75 72 Perm
20 20 1900 6.9 1.00 1.00 0.95 1770 0.05 85 0.95 21 0 21 pm+pt 5 2 91.6 91.6 0.61 6.9 3.0 94 0.01 0.13 0.22 16.8 0.56 1.0 10.4 B
2200 2200 1900 6.9 0.91 1.00 1.00 5085 1.00 5085 0.95 2316 0 2316 NA 2
210 210 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 221 92 129 Perm
160 160 1900 6.9 1.00 1.00 0.95 1770 0.04 79 0.95 168 0 168 pm+pt 1 6 106.9 106.9 0.71 6.9 3.0 193 c0.07 c0.55 0.87 47.8 1.00 32.0 79.8 E
2300 2300 1900 6.9 0.91 1.00 1.00 5085 1.00 5085 0.95 2421 0 2421 NA 6
20 20 1900 6.9 1.00 0.85 1.00 1583 1.00 1583 0.95 21 8 13 Perm
0.95 32 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 27.9 27.9 0.19 8.3 3.0 183
27.9 27.9 0.19 8.3 3.0 241
0.01 0.05 50.2 1.00 0.1 50.3 D 50.3 D
c0.16 0.88 59.4 1.00 27.8 87.2 F 72.9 E 23.0 0.89 150.0 86.0% 15
8 27.9 27.9 0.19 8.3 3.0 294 0.05 0.25 52.1 1.00 0.4 52.5 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
469
87.8 87.8 0.59 6.9 2.5 2976 0.46 0.78 23.7 0.58 1.7 15.5 B 14.6 B
2 87.8 87.8 0.59 6.9 2.5 926 0.08 0.14 14.0 0.42 0.3 6.1 A
96.2 96.2 0.64 6.9 2.5 3261 c0.48 0.74 18.4 1.00 1.6 20.0 B 23.8 C
6 96.2 96.2 0.64 6.9 2.5 1015 0.01 0.01 9.7 1.00 0.0 9.8 A
C 22.1 E
Synchro 9 Report Page 9
HCM Signalized Intersection Capacity Analysis 24: SR A1A & Library Blvd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20 20 1900 7.0 1.00 1.00 0.95 1770 0.95 1770 0.98 20 0 20 Prot 4
0 0 1900
200 200 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 204 193 11 Prot 4
0 0 1900
0 0 1900 7.0 1.00 0.86 1.00 1611 1.00 1611 0.98 0 3 0 NA 8
3 3 1900
150 150 1900 7.0 1.00 1.00 0.95 1770 0.04 74 0.98 153 0 153 pm+pt 5 2 135.8 135.8 0.81 7.0 3.0 291 c0.07 0.36 0.53 44.2 1.00 1.7 45.9 D
2000 2000 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.98 2041 0 2042 NA 2
1 1 1900
10 10 1900 7.0 1.00 1.00 0.95 1770 0.09 166 0.98 10 0 10 pm+pt 1 6 108.4 108.4 0.65 7.0 3.0 130 0.00 0.05 0.08 10.3 1.00 0.3 10.6 B
2200 2200 1900 7.0 0.91 1.00 1.00 5085 1.00 5085 0.98 2245 0 2245 NA 6
70 70 1900 7.0 1.00 0.85 1.00 1583 1.00 1583 0.98 71 26 45 Perm
0.98 0 0 0
0.98 0 0 0
0.98 3 0 0
8 8.9 8.9 0.05 7.0 3.0 94 c0.01
8.9 8.9 0.05 7.0 3.0 84 0.01
1.2 1.2 0.01 7.0 3.0 11 c0.00
0.21 75.6 1.00 1.1 76.8 E
0.13 75.3 1.00 0.7 76.0 E
0.00 82.3 1.00 0.1 82.3 F 82.3 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
76.1 E 18.9 0.64 166.9 77.4% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
470
0.98 1 0 0
126.4 126.4 0.76 7.0 4.0 3851 c0.40 0.53 8.2 1.00 0.2 8.4 A 11.0 B
106.0 106.0 0.64 7.0 4.0 3229 c0.44 0.70 19.9 1.00 1.3 21.2 C 20.8 C
6 106.0 106.0 0.64 7.0 4.0 1005 0.03 0.04 11.4 1.00 0.1 11.5 B
B 28.0 D
Synchro 9 Report Page 3
HCM Signalized Intersection Capacity Analysis 58: SR A1A & Solana Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
680 680 1900 7.5 0.97 1.00 0.95 3433 0.95 3433 0.99 687 0 687 Split 8
100 100 1900 7.5 1.00 0.93 1.00 1730 1.00 1730 0.99 101 22 170 NA 8
90 90 1900
160 160 1900
0.99 91 0 0
0.99 162 0 0 Split 7
60 60 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 61 0 61 Prot 5
1900 1900 1900 7.3 0.91 1.00 1.00 5085 1.00 5085 0.99 1919 0 1919 NA 2
70 70 1900 7.3 1.00 0.85 1.00 1583 1.00 1583 0.99 71 39 32 Perm
170 170 1900 7.3 1.00 1.00 0.95 1770 0.95 1770 0.99 172 0 172 Prot 1
29.5 29.5 0.20 7.5 3.0 675 c0.20
29.5 29.5 0.20 7.5 3.0 340 0.10
6.2 6.2 0.04 7.3 3.0 73 0.03
66.6 66.6 0.44 7.3 4.0 2257 c0.38
1.02 60.2 1.00 39.2 99.4 F
0.50 53.7 1.00 1.2 54.9 D 89.7 F
130 250 130 250 1900 1900 7.5 7.3 1.00 1.00 1.00 0.85 0.97 1.00 1813 1583 0.97 1.00 1813 1583 0.99 0.99 131 253 0 116 293 137 NA pm+ov 7 1 7 16.6 24.3 16.6 24.3 0.11 0.16 7.5 7.3 3.0 3.0 200 256 c0.16 0.03 0.06 1.47 0.53 66.7 57.6 1.00 1.00 234.5 2.1 301.2 59.8 F E 189.4 F
0.84 71.4 1.00 53.1 124.5 F
0.85 37.2 1.00 4.3 41.5 D 43.4 D
1900 690 1900 690 1900 1900 7.3 7.5 0.91 1.00 1.00 0.85 1.00 1.00 5085 1583 1.00 1.00 5085 1583 0.99 0.99 1919 697 0 80 1919 617 NA pm+ov 6 8 6 68.1 97.6 68.1 97.6 0.45 0.65 7.3 7.5 4.0 3.0 2308 1109 0.38 0.11 0.28 0.83 0.56 35.9 14.3 0.76 0.88 0.3 0.1 27.6 12.7 C B 52.8 D
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
66.8 1.04 150.0 105.9% 15
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
471
2 66.6 66.6 0.44 7.3 4.0 702 0.02 0.04 23.7 1.00 0.1 23.8 C
7.7 7.7 0.05 7.3 3.0 90 c0.10 1.91 71.2 1.16 413.7 495.9 F
SBR
E 29.6 G
Synchro 9 Report Page 10
HCM Signalized Intersection Capacity Analysis 67: SR A1A & Marlin Ave
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
140 140 1900 6.5 1.00 1.00 0.95 1770 0.95 1770 0.98 143 0 143 Prot 4
40 40 1900 6.5 1.00 0.85 1.00 1583 1.00 1583 0.98 41 25 16 Perm
70 70 1900 6.8 1.00 1.00 0.95 1770 0.03 63 0.98 71 0 71 pm+pt 5 2 123.2 123.2 0.82 6.8 3.0 97 0.02 0.58 0.73 51.1 1.09 12.5 68.2 E
2600 2600 1900 6.8 0.91 1.00 1.00 5085 1.00 5085 0.98 2653 0 2653 NA 2
2900 2900 1900 6.8 0.95 1.00 1.00 3539 1.00 3539 0.98 2959 0 2959 NA 6
160 160 1900 6.8 1.00 0.85 1.00 1583 1.00 1583 0.98 163 30 133 Perm
123.2 123.2 0.82 6.8 2.5 4176 c0.52
112.4 112.4 0.75 6.8 2.5 2651 c0.84
0.64 5.0 1.07 0.4 5.7 A 7.4 A
1.12 18.8 1.00 58.1 76.9 E 73.2 E
13.5 13.5 0.09 6.5 3.0 159 c0.08 0.90 67.6 1.00 42.8 110.4 F 99.9 F
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
4 13.5 13.5 0.09 6.5 3.0 142 0.01 0.12 62.8 1.00 0.4 63.1 E
44.3 1.10 150.0 99.0% 15
6 112.4 112.4 0.75 6.8 2.5 1186 0.08 0.11 5.1 1.00 0.2 5.3 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
472
D 20.1 F
Synchro 9 Report Page 11
HCM Signalized Intersection Capacity Analysis 8: Palm Valley Rd & Mickler Rd
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBT
EBR
WBL
WBT
WBR
NEL
NET
NER
SWL
SWT
SWR
40 40 1900
80 80 1900 4.5 1.00 1.00 0.98 1832 0.86 1601 0.88 91 0 136 NA 4
670 670 1900 4.5 0.88 0.85 1.00 2787 1.00 2787 0.88 761 16 745 pt+ov 45
110 110 1900
40 40 1900 4.5 1.00 0.98 0.97 1775 0.67 1234 0.88 45 6 187 NA 8
20 20 1900
420 420 1900 4.5 0.97 1.00 0.95 3433 0.95 3433 0.88 477 0 477 Prot 5
650 650 1900 4.5 0.95 0.99 1.00 3501 1.00 3501 0.88 739 6 790 NA 2
50 50 1900
70 70 1900 4.5 1.00 1.00 0.95 1770 0.95 1770 0.88 80 0 80 Prot 1
1300 1300 1900 4.5 0.95 1.00 1.00 3539 1.00 3539 0.88 1477 0 1477 NA 6
60 60 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.88 68 36 32 Perm
18.1 18.1 0.20 4.5 3.0 327
37.7 37.7 0.43
15.1 15.1 0.17 4.5 3.0 585 c0.14
49.5 49.5 0.56 4.5 3.0 1955 0.23
7.5 7.5 0.08 4.5 3.0 149 0.05
41.9 41.9 0.47 4.5 3.0 1673 c0.42
0.82 35.4 1.00 8.6 44.0 D
0.40 11.1 1.00 0.1 11.3 B 23.5 C
0.54 38.9 1.00 3.7 42.6 D
0.88 21.1 1.00 5.9 27.0 C 27.2 C
0.88 45 0 0 Perm 4
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
0.88 125 0 0 Perm
0.88 23 0 0
0.88 57 0 0
8
0.08 0.42 30.7 1.00 0.9 31.5 C 22.6 C
1185 0.27 0.63 20.0 1.00 1.1 21.0 C
25.8 0.84 88.6 80.0% 15
18.1 18.1 0.20 4.5 3.0 252 c0.15 0.74 33.1 1.00 11.3 44.3 D 44.3 D
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
473
6 41.9 41.9 0.47 4.5 3.0 748 0.02 0.04 12.6 1.00 0.0 12.6 B
C 13.5 D
Synchro 9 Report Page 1
HCM Signalized Intersection Capacity Analysis 80: Palm Valley Rd & Landrum Lane
Movement Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS
04/04/2017
EBL
EBR
NBL
NBT
SBT
SBR
90 90 1900 4.5 1.00 1.00 0.95 1805 0.95 1805 0.95 95 0 95 0% Prot 8
90 90 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.95 95 84 11 2% Perm
90 90 1900 4.5 1.00 1.00 0.95 1770 0.15 285 0.95 95 0 95 2% pm+pt 1 6 46.0 46.0 0.74 4.5 3.0 337 0.02 0.18 0.28 7.1 1.00 0.5 7.6 A
500 500 1900 4.5 1.00 1.00 1.00 1863 1.00 1863 0.95 526 0 526 2% NA 6
800 800 1900 4.5 1.00 1.00 1.00 1863 1.00 1863 0.95 842 0 842 2% NA 2
110 110 1900 4.5 1.00 0.85 1.00 1583 1.00 1583 0.95 116 29 87 2% Perm
46.0 46.0 0.74 4.5 3.0 1377 c0.28
36.2 36.2 0.58 4.5 3.0 1084 c0.45
0.38 2.9 1.00 0.2 3.1 A 3.8 A
0.78 9.9 1.00 3.6 13.5 B 12.5 B
7.2 7.2 0.12 4.5 3.0 208 c0.05 0.46 25.7 1.00 1.6 27.3 C 25.9 C
Intersection Summary HCM 2000 Control Delay HCM 2000 Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group
8 7.2 7.2 0.12 4.5 3.0 183 0.01 0.06 24.5 1.00 0.1 24.6 C
10.9 0.70 62.2 63.3% 15
2 36.2 36.2 0.58 4.5 3.0 921 0.05 0.09 5.7 1.00 0.0 5.8 A
HCM 2000 Level of Service Sum of lost time (s) ICU Level of Service
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
474
B 13.5 B
Synchro 9 Report Page 12
Unsignalized 2040 Build Alternative PM Reports
475
HCM 2010 TWSC 15: Crossroad Lakes Dr & SR A1A
Intersection Int Delay, s/veh
56.1
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
40 40 0 Free 380 95 2 42
1700 120 1700 120 0 0 Free Free - None - 380 0 0 95 95 2 2 1789 126
70 70 0 Free 425 95 2 74
40 0 30 40 0 30 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 42 0 32
10 0 10 10 0 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 2 2 2 11 0 11
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Major1 1284 4.14 2.22 536 -
Approach HCM Control Delay, s HCM LOS
SE 0.3
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
04/04/2017
536 -
0 -
0 -
Major2 1789 4.14 2.22 342 -
$: Delay exceeds 300s
0 -
342 NW 1
NELn1 NWL NWT NWR SEL 14 342 - 536 5.263 0.215 - 0.079 $ 2457.9 18.4 - 12.3 F C B 10.2 0.8 0.3
Notes ~: Volume exceeds capacity
1200 20 1200 20 0 0 Free Free - None 0 0 95 95 2 2 1263 21
Minor1 2653 3306 1874 1874 779 1432 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 11 8 74 120 355 198
0 -
~8 ~8 68 271 NE $ 2457.9 F
6 6 111 155
895 6.94 3.32 284 -
Minor2 2400 3295 1421 1421 979 1874 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 17 8 143 201 268 120
284 -
12 12 132 220
6 6 158 111
642 6.94 3.32 417 417 -
SW $ 397.1 F
SET SERSWLn1 23 - 0.915 -$ 397.1 F 2.7
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
476
*: All major volume in platoon
Synchro 9 Report Page 2
HCM 2010 TWSC 19: SR A1A & Plantation Dr
Intersection Int Delay, s/veh
04/04/2017
27
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
80 80 0 Stop 0 0 0 97 2 82
10 10 0 Stop None 97 2 10
20 20 0 Free 465 97 2 21
1300 1300 0 Free None 0 0 97 2 1340
1500 150 1500 150 0 0 Free Free - None - 260 0 0 97 97 2 2 1546 155
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 2257 1546 711 6.84 5.84 5.84 3.52 ~ 35 162 448
773 6.94 3.32 342 -
Major1 1546 4.14 2.22 425 -
~ 33 ~ 33 162 426
342 -
425 -
Approach HCM Control Delay, s HCM LOS
EB $ 915.7 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 425 0.049 13.9 B 0.2
0 -
NB 0.2
NBT EBLn1 37 - 2.508 -$ 915.7 F - 10.3
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
477
*: All major volume in platoon
Synchro 9 Report Page 3
HCM 2010 TWSC 28: SR A1A & Sawgrass Dr
Intersection Int Delay, s/veh
04/04/2017
1.1
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
EBL
EBT EBR
WBL WBT WBR
NBL
NBT NBR
SBL
SBT SBR
50 10 20 50 10 20 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 52 10 21
30 10 160 30 10 160 0 0 0 Stop Stop Stop - None 0 0 0 96 96 96 2 2 2 31 10 167
30 30 0 Free 150 96 2 31
1100 50 1100 50 0 0 Free Free - None - 150 0 0 96 96 2 2 1146 52
200 200 0 Free 230 96 2 208
1200 70 1200 70 0 0 Free Free - None - 375 0 0 96 96 2 2 1250 73
Minor2 2308 2875 1667 1667 641 1208 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 21 16 100 152 430 254 94 249
~ 10 ~ 10 100 240
625 6.94 3.32 428 428 -
Minor1 2255 2875 1208 1208 1047 1667 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 ~ 23 16 194 254 244 152 183 136
EB
WB
-
-
NBL 553 0.057 11.9 B 0.2
~ 10 ~ 10 240 100
573 6.94 3.32 463 -
Major1 1250 4.14 2.22 553 -
463 -
553 -
0 -
NB 0.3
NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL - 428 - 463 605 - 0.049 - 0.36 0.344 - 13.8 - 17.1 14 B C B 0.2 1.6 1.5
$: Delay exceeds 300s
0 -
Major2 1146 4.14 2.22 605 -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
478
605 -
0 -
0 -
SB 1.9
SBT SBR *: All major volume in platoon
Synchro 9 Report Page 4
HCM 2010 TWSC 64: SR A1A & Dolphin Blvd
Intersection Int Delay, s/veh
04/04/2017
135.6
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 95 2 21
30 30 0 Stop None 95 2 32
30 30 0 Free 185 95 2 32
2600 2600 0 Free None 0 0 95 2 2737
2800 40 2800 40 0 0 Free Free - None - 150 0 0 95 95 2 2 2947 42
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 4105 2947 1158 5.74 6.64 6.04 3.82 ~6 ~ 13 235
1474 7.14 3.92 99 -
Major1 2947 5.34 3.12 40 -
~1 ~1 ~ 13 47
99 -
40 -
Approach HCM Control Delay, s HCM LOS
EB $ 14833.2 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity
NBL 40 0.789 232.6 F 3
0 -
NB 2.7
NBT EBLn1 2 - 26.316 $ 14833.2 F 8.6
Major2 -
0 -
SB 0
SBT SBR -
$: Delay exceeds 300s
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
479
*: All major volume in platoon
Synchro 9 Report Page 5
HCM 2010 TWSC 72: Roscoe Blvd & Solana Rd
Intersection Int Delay, s/veh Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
04/04/2017
0.8 EBL
EBR
NBL
NBT
SBT SBR
20 20 0 Stop 0 0 0 96 2 21
20 20 0 Stop None 96 2 21
10 310 10 310 0 0 Free Free - None 0 0 96 96 2 2 10 323
510 40 510 40 0 0 Free Free - None 0 0 96 96 2 2 531 42
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 896 552 344 6.42 5.42 5.42 3.518 311 577 718
552 6.22 3.318 533 -
Major1 573 4.12 2.218 1000 -
307 307 577 709
533 -
1000 -
Approach HCM Control Delay, s HCM LOS
EB 15.3 C
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 1000 0.01 8.6 A 0
0 -
NB 0.3
NBT EBLn1 - 390 - 0.107 0 15.3 A C 0.4
Major2 -
0 -
SB 0
SBT SBR -
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
480
Synchro 9 Report Page 6
HCM 2010 TWSC 3: Palm Valley Rd & Roscoe Blvd
Intersection Int Delay, s/veh
04/04/2017
39.9
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow
SEL
SET SER
NWL NWT NWR
NEL
NET NER
SWL SWT SWR
0 0 350 0 0 350 0 0 0 Stop Stop Stop - None 0 0 0 92 92 92 2 2 2 0 0 380
0 0 30 0 0 30 0 0 0 Stop Stop Stop - Stop 0 0 94 92 94 2 2 2 0 0 32
0 0 0 Free 92 2 0
1100 240 1100 240 0 0 Free Free - Free - 150 0 0 94 94 2 2 1170 255
0 0 0 Free 94 2 0
Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
Minor2 0 0 0 -
Approach HCM Control Delay, s HCM LOS
SE $ 388.2 F
- 1064 - 6.94 - 3.32 0 ~ 219 0 0 -
Minor1 0 0 0
0 0 0
585 6.94 3.32 454 -
Major1 0 0 0
- ~ 219 -
-
-
454 -
-
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NETNWLn1 SELn1 SWT - 454 219 - 0.07 1.737 - 13.5$ 388.2 B F 0.2 25.7 -
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
NW 13.5 B
0 -
0 0 0
Major2 0 0 0
-
-
NE 0
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
481
2000 20 2000 20 0 0 Free Free - Free 0 0 94 92 2 2 2128 22
-
0 0 0 0 -
SW 0
*: All major volume in platoon
Synchro 9 Report Page 1
HCM 2010 TWSC 76: Palm Valley Rd & Canal Blvd
Intersection Int Delay, s/veh
04/04/2017
14.8
Movement Lane Configurations Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2
EBL
EBT EBR
WBL WBT WBR
NBL
70 10 60 70 10 60 0 0 0 Stop Stop Stop - None - 150 0 0 95 95 95 0 0 0 74 11 63
10 10 10 10 10 10 0 0 0 Stop Stop Stop - None 0 0 95 95 95 0 0 0 11 11 11
50 550 10 50 550 10 0 0 0 Free Free Free - Yield 200 0 0 95 95 95 0 0 0 53 579 11
Minor2 1632 1621 937 937 695 684 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 82 104 320 346 436 452 ~ 68 ~ 68 297 387
94 94 338 420
916 6.2 3.3 333 333 -
Approach HCM Control Delay, s HCM LOS
EB 165 F
Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh)
NBL 753 0.07 10.1 B 0.2
Notes ~: Volume exceeds capacity
$: Delay exceeds 300s
Minor1 1626 1621 684 684 942 937 7.1 6.5 6.1 5.5 6.1 5.5 3.5 4 83 104 442 452 318 346 57 57 411 244
94 94 420 338
579 6.2 3.3 519 -
Major1 916 4.1 2.2 753 -
519 -
753 -
WB 56.8 F
NBT NBR
0 -
0 -
SBL
10 870 50 10 870 50 0 0 0 Free Free Free - Yield 0 0 95 95 95 0 0 0 11 916 53 Major2 579 4.1 2.2 1005 1005 -
NB 0.8
NBT NBR EBLn1 EBLn2WBLn1 SBL 70 333 100 1005 - 1.203 0.19 0.316 0.01 - 275.1 18.3 56.8 8.6 F C F A 6.6 0.7 1.2 0
482
0 -
0 -
SB 0.1
SBT SBR 0 A -
+: Computation Not Defined
Ponte Vedra/Palm Valley 09/14/2016 2040 Build Alternative PM Peak
SBT SBR
*: All major volume in platoon
Synchro 9 Report Page 7
Ponte Vedra/Palm Valley Traffic Study
APPENDIX F: A RTERIAL A NALYSIS
483
Ponte Vedra/Palm Valley Traffic Study Arterial Analysis No Build AM Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Running Time Signal Delay Travel Time (s) Distance (mi) Arterial Speed LOS 152.5 1733 1885.5 1.31 2.5 F 316.9 69.6 386.5 3.43 31.9 B 216.3 29.7 246 2.33 34.1 B 646.1 403.3 1049.4 6.37 21.9 D 668.4 426.2 1094.6 6.36 20.9 D
No Build PM Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 152.5 1359.4 1511.9 1.31 3.1 F 316.9 44.7 361.6 3.43 34.1 B 316.3 23.6 242.6 2.33 34.6 B 646.1 342.3 988.4 6.37 23.2 C 668.4 687.4 1355.8 6.36 16.9 E
Short Term Improvements AM Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 152.5 46.5 199 1.31 23.8 C 313 111.2 424.2 3.47 289.4 B 308.7 114.4 423.1 3.43 29.2 B 544.5 374.4 918.9 6.37 25 C 543.4 452 995.4 6.36 23 C
Short Term Improvements PM Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 152.5 38.2 190.7 1.31 24.8 B 313 122.2 435.2 3.47 28.7 B 308.7 155.3 464 3.43 26.6 C 544.5 409.9 954.4 6.37 24 C 543.4 532.1 1075.5 6.36 21.3 D
AM Build Alternative 1 Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 152.5 48.5 201 1.31 23.6 C 313 126.3 439.3 3.47 28.4 B 308.7 52.6 361.3 3.43 34.2 B 544.5 362.5 907 6.37 25.3 C 543.4 279.8 823.2 6.36 27.8 C
PM Build Alternative 1 Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 152.5 28.6 181.1 1.31 26.1 B 313 118.5 431.5 3.47 28.9 B 308.7 40 348.7 3.43 35.4 A 544.5 308.2 852.7 6.37 26.9 C 543.4 529.7 1073.1 6.36 21.3 D
AM Build Alternative 2 Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 135.2 31.5 166.7 1.31 28.4 B 98.9 13.5 112.4 1.1 35.2 A 254 28.9 282.9 2.33 29.7 B 544.5 280.8 825.3 6.37 27.8 C 543.4 247.3 790.7 6.36 29 B
PM Build Alternative 2 Mickler Road Northbound Palm Valley Road Southbound Palm Valley Road Northbound SR A1A Southbound SR A1A
Travel Time (s) Distance (mi) Arterial Speed LOS Running Time Signal Delay 135.2 30.1 165.3 1.31 28.6 B 313 118.5 431.5 3.47 28.9 B 308.7 40 348.7 3.43 35.4 A 544.5 249.2 793.7 6.37 28.9 B 543.4 397.1 940.5 6.36 24.3 C
484
Ponte Vedra/Palm Valley Traffic Study
APPENDIX G: COST E STIMATE
485
Cost Estimate Location Long‐term Improvements Mickler to ATP Tour Boulevard
ATP Tour Boulevard to Marlin Avenue Marlin Avenue to JTB Intersection Improvements Mickler Road at SR A1A PGA Tour Boulevard Sawgrass Village Drive Solana Road Dolphin Boulevard Palm Valley Road At Roscoe Boulevard Mickler Road at Palm Valley Road GRAND TOTAL
Description
Unit Cost
Total Cost $32.6 million
$2,118,069.36/mile
$6.4 million
$2,486,326.01/mile
$8.2 million
Add eastbound left‐turn lane and far side receiving lane
$ 160,000 each
$18 million $3.4 million $320,000
Widen eastbound to add right‐turn lane and northbound to add left‐turn lane Widen existing eastbound to add a channelized right turn lane Convert La Pasada Circle to right‐in/right‐out entrance Increase eastbound left‐turn storage Pavement markings only Intersection Reconfiguration New signalized intersection
$ 160,000 each $ 160,000 each
$160,000
$50,000
$50,000
$50,000
$50,000 $ 1 million $ 1.5 million $36 MILLION
Widen existing two lane arterial to four lanes undivided ( 3 miles) Add one lane to each side 5 ft paved shoulder Widen existing four lane divided arterial to six lane divided (3.3 miles) Resurface existing 4 lanes 5 ft paved shoulder Widen existing four lane divided arterial to six lane divided
486
$320,000
Updated as of: 08/02/16
Generic Cost Per Mile Models Disclaimer: These models are generic in nature, and not based on actual construction projects. They are for reference purposes only, and are not intended to predict or support future estimates.
Models OTHER
RURAL
Cost Per Mile
Model Details
Two Directional, 12' Shared Use Path
$331,914.18
Rails to Trails project (12' width)
$306,954.53
Sidewalk construction; 5' one side, 4 inch depth
$155,261.80
Composite Report
Mid-Block Crossing
$120,051.93
Composite Report
New Construction Undivided 2 Lane Rural Road with 5' Paved Shoulders
$2,209,534.74
Composite Report
New Construction Undivided 3 Lane Rural Road with 5' Paved Shoulders, Center Turn Lane
$2,685,115.30
Composite Report
New Construction Undivided 4 Lane Rural Road with 5' Paved Shoulders
$3,168,760.05
Composite Report
New Construction, 4 Lane Divided Rural Road with 2' Paved Shoulders Inside and 5' Paved Shoulders Outside
$4,209,661.59
Composite Report
New Construction Divided Rural 4 Lane Interstate with Paved Shoulders 10' Outside and 4' Inside
$5,310,549.93
Composite Report
New Construction Undivided 5 Lane Rural Road with 5' Paved Shoulders, Center Turn Lane
$3,730,060.76
Composite Report
New Construction, 6 Lane Divided Rural Road with 5' Paved Shoulders Inside and Out
$5,161,401.18
Composite Report
New Construction Divided Rural 6 Lane Interstate with 10' Paved Shoulders Inside and Out
$6,310,030.44
Composite Report
New Construction Extra Cost for 1 Single Additional Lane on Rural Arterial
$519,031.31
Composite Report
New Construction Extra Cost for 1 Single Additional Lane on a Rural Interstate
$632,176.16
Composite Report
Milling and Resurfacing 2 Lane Rural Road with 5' Paved Shoulders
$476,404.82
Composite Report
Milling and Resurfacing 3 Lane Rural Road with 5' Paved Shoulders and Center Turn Lane
$661,395.22
Composite Report
Milling and Resurfacing 4 Lane Rural Road with 5' Paved Shoulders
$999,726.69
Composite Report
Mill & Resurface 4 Lane Divided Rural Arterial with 5' Outside Shoulders and 2' Inside
$1,056,368.51
Composite Report
487
Composite Report Composite Report
SUBURBAN
URBAN
Mill & Resurface 4 Lane Divided Rural Interstate with Paved Shoulders 10' Outside and 4' Inside
$1,254,968.46
Composite Report
Milling and Resurfacing 5 Lane Rural Road with 5' Paved Shoulders and Center Turn Lane
$1,203,187.37
Composite Report
Mill & Resurface 6 Lane Divided Rural Arterial with 5' Paved Shoulders Inside and Out
$1,501,080.29
Composite Report
Mill & Resurface 6 Lane Divided Rural Interstate with 10' Paved Shoulders Inside and Out
$1,783,695.04
Composite Report
Mill & Resurface 1 Additional Lane Rural Interstate
$278,546.19
Composite Report
Mill & Resurface 1 Additional Lane Rural Arterial
$228,264.94
Composite Report
Widen Existing 2 Lane Arterial to 4 Lanes Undivided; Add 1 Lane to Each Side; 5' Paved Shoulders
$2,118,069.36
Composite Report
Widen Existing 2 Lane Arterial to 4 Lane Divided; Resurface Existing 2 Lanes; 5' Paved Shoulders Inside & Out
$2,830,080.51
Composite Report
Widen Existing 4 Lane Divided Arterial to 6 Lane Divided; Resurface Existing 4 Lanes; 5' Paved Shoulders Inside & Out
$2,486,326.01
Composite Report
Widen 4 Lane Interstate to 6 Lanes (In Median); Mill & Resurface Existing; 10' Paved Shoulders Inside & Out
$3,675,780.03
Composite Report
Widen 4 Lane Interstate to 6 Lanes (Outside); Mill & Resurface Existing; 10' Shoulders Outside; Widen Existing 4' Inside Shoulders to 10' Widen Existing 6 Lane Divided Arterial to 8 Lane Divided; Resurface Existing 6 Lanes; 5' Paved Shoulders Inside & Out
$3,609,536.54
Composite Report
$2,761,283.03
Composite Report
Widen 6 Lane Interstate to 8 Lanes (in Median); Mill & Resurface Existing; 10' Paved Shoulders Inside and Out
$4,105,807.98
Composite Report
Widen Divided Rural 4-Lane to Allow for Left Turn Lane (300’)
$166,901.44
Composite Report
Widen Divided Rural 4-Lane for Right Turn Lane (300')
$160,914.24
Composite Report
New Construction Suburban 4 Lane with Paved Shoulders Outside and Curb Median
$4,352,397.46
Composite Report
Widen Existing Rural Facility to the Inside with Addition of Closed Drainage System and Median Barrier Wall
$3,196,684.76
Composite Report
Widen 4 Lane Suburban Roadway with 6.5' Paved Shoulder and Convert to C&G Out; Stripe for Bike Lane
$2,607,630.02
Composite Report
Add 2 Lanes with C&G Out to Existing 4 Lane Urban or Suburban Roadway with C&G Out
$2,723,400.43
Composite Report
New Construction 2 Lane Undivided Urban Arterial with 4' Bike Lanes
$4,800,389.18
Composite Report
New Construction 3 Lane Undivided Urban Arterial with Center Lane and 4' Bike Lanes
$4,487,971.04
Composite Report
New Construction Undivided Urban Arterial with 4' Bike Lanes
$4,834,348.49
Composite Report
488
New Construction 4 Lane Urban Road with 22' Median and 4' Bike Lanes
$6,889,753.96
Composite Report
New Construction 4 Lane Divided Urban Interstate, Closed 22' Median with Barrier Wall, 10' Shoulders Inside & Out
$10,495,660.87
Composite Report
New Construction 5 Lane Undivided Urban Arterial with Center Turn Lane and 4' Bike Lanes
$5,543,178.76
Composite Report
New Construction 6 Lane Urban Road with 22' Median and 4' Bike Lanes
$7,714,610.84
Composite Report
New Construction Divided Urban 6 Lane Interstate with 22' Closed Median with Barrier Wall, 10' Shoulders Inside & Out
$11,431,574.16
Composite Report
New Construction Extra Cost for Additional Lane on Urban Arterial
$1,845,604.82
Composite Report
New Construction Extra Cost for Additional Lane on Urban Interstate
$640,776.98
Composite Report
Mill & Resurface 2 Lane Urban Road with 4' Bike Lanes
$517,985.66
Composite Report
Mill & Resurface 3 Lane Urban Road with Center Turn Lane and 4' Bike Lanes
$676,387.74
Composite Report
Mill & Resurface 4 Lane Undivided Urban Roadway with 4' Bike Lanes
$903,701.38
Composite Report
Mill & Resurface 4 Lane Divided Urban Roadway with 4' Bike Lanes
$1,076,052.32
Composite Report
Mill & Resurface 5 Lane Urban Roadway with Center Turn Lane and 4' Bike Lanes
$1,063,828.63
Composite Report
Mill & Resurface 6 Lane Divided Urban Arterial with 4' Bike Lanes
$1,568,019.68
Composite Report
Mill & Resurface 1 Additional Lane Urban Arterial
$252,922.44
Composite Report
Add 2 Lanes to Existing 2 Lane Undivided Arterial (1 Lane Each Side), with 4' Bike Lanes
$4,269,907.62
Composite Report
Widen 2 Lane Urban Arterial to 4 Lane Divided with 22' Median & 4' Bike Lanes
$5,051,909.23
Composite Report
Add 2 Lanes to Existing 3 Lane Undivided Arterial (1 Lane Each Side) with Center Turn Lane and 4' Bike Lanes
$4,423,822.77
Composite Report
Widen 4 Lane Urban Divided Arterial to 6 Lane Urban Divided with 22' Median and 4' Bike Lanes
$4,586,417.42
Composite Report
Widen 4 Lane Urban Interstate with Closed Median to 6 Lanes (Outside); Mill & Resurface Existing; 10' Shoulders Outside
$7,308,635.73
Composite Report
Widen 6 Lane Urban Divided Arterial to 8 Lane Urban Divided with 4' Bike Lanes
$5,283,237.72
Composite Report
Widen 6 Lane Urban Interstate with Closed Median to 8 Lanes (Outside); Mill & Resurface Existing; 10' Shoulders Outside
$7,961,945.81
Composite Report
489