N O U R
H A N
M
O
A R C H I T E C T U R E
P
H
O R T F O L IO 2014-2020
A M E D
I S PowerPoint template
M A I L
1
Contents
2
3
About me Biography
Professional projects Alamein towers
Graduation project Medical city
4
5
6
Bim project Arar museum
Dynamo application Tower ,bridge, sun attractor,facade
Working project Mons international congress experience
2
2017-2018
About me I’m a Junior Architect with Bachelor’s degree of architectural engineering from EL Shorouk academy,Enthusiastic about BIM practices and policies and the computational application , I’ve had the opportiunity to be part of BIM team at university to work initiative also gained field experience through construction site visits,Moreover i am very interested in working drawings and architectural planning espicially medical planning.
3
2017-2018
RESUME
EDUCAT ION
EXPERIENCE Technical Office Architect
NOURHAN
MOHAMED
Name Nourhan mohamed ismail Adress 317 Methak Street,Nasr city Cairo,Egypt Phone +20 115 282 5710 Facebook /nourhan.mohamed.52 Email Nourhanmohamed1995.nm@gmail.com Linkedin /nourhan-mohamed95
Software skills
| 10 NOV 2018 - Present Pavillion Architect engineering consultant Technical Office Architect A l A l a m e i n t o we r s - A l a ma i n C i t y Airdefense - New Capital S k ywa l k - 6 O c t o b e r C i t y
BIM PROGRAM TRAINEE
BACHELOR’S DEGREE | 16 Jul 2018 EL Shorouk academy Architectural engineering
Grade : Very good
Graduation project topic : Medical city
Grade : Excellent
GRADUATE | 24 Jun 2018 -10 Sep 2018 ECG - UTW Round 10
|Aug 2013
APE TECHNICAL DIPLOMA
Martyr osama ahmed ismail language school
| 3 Jul 2017 -2 Aug 2017
LANGUAGE SKILLS
ECG - Summer trainning
SITE TRAINEE
Born in Cairo, Egypt learned English as first
| 29 JuL 2016 -1 Aug 2016
language and French as second language
ECG - EL Rehab shopping center Autocad Revit Dynamo Sketchup
TECHNICAL WORKSHOP
100%
80%
40%
Arabic
English
french
| 1 Jun 2015 -15 Jun 2015 EL Shorouk academy - Construction stages
3D MAX Photoshop
Arcmap
References available upon request
4
2017-2018
Al Alamein Towers
5
2017-2018
Airdefense
6
2017-2018
Skywalk
7
2017-2018
Medical city
8
2017-2018
project content: general hospital 500 beds, rehabilitation centers, surgical specialist hospital 150 bed and truma duto the large rate of accidents that occurs at marsa Alam ,research center for the specefic plants spread in this area which used for curing rehamatoid deaseas and bones.
10
2017-2018
General hospital It is provide a complete medical and surgery care for different kind of diseases and injury, And not specialized in certain illness, contest of Emergency department ,surgery unit, delivery unit, Imaging unit, Laboratory,....etc
8
2017-2018
Ground floor plan Emergency department , Labs department. Radiology department , Outpatient department (OPD). Shops and gifts , Administration.
12
2017-2018
First floor plan Maternity department , Neonatal intensive care unit (NICU). Operaton department , Intensive care unit (ICU). Pathology department , Cardiac intensive care unit (CICU)
Oncology department.
13
2017-2018
Second floor plan Inpatient single room. Inpatient double room.
14
2017-2018
Basement floor plan Laundary , kitchen. Pharmacy , Central sterile services department (CSSD). Morgue , Waste , Stores.
Housekeeping.
15
2017-2018
Plans analysis Ground floor plan
Second floor plan
First floor plan
Basement floor plan
16
2017-2018
Scientific evidence indicates that daylight has beneficial
Elevation
effects on patients ,visitors and staff. It has been shown to reduce psychological problems and improve patient outcomes, and increase morale and reduce sickness levels among staff.so we used a large space of curtains to lit in large amout of day light
17
2017-2018
Entrances
Site plan Car path
Near to the city center High accessibility Allow future expansion.
Shape of the site ( rectangular shape )
18
2017-2018
Reception Lobby, Reception Counter Pre & postoperative holding space 7.43 m2/stretcher, General operation & procedure
rm,
Cardiovascular,
orthopedic,
neurological,
special
procedures, Post-anesthetic care units
Radiology department
PACU - 7.43 m2/bed, Staff/Nursing Support Facilities
Reception Lobby, Reception Counter Waiting Area, File Room, Ultrasound room,
Diagnostic
X-ray,
Operation department
Magnetic
resonance imaging - MRI Room, CT Room, Nursing Support Facilities.
19
2017-2018
Reception Lobby, Reception Counter Waiting area, Nurse Station, Nurses Staff Lounge, Medication / Drugs Store Clean Utility, soiled Utility, Storage,
Emergency department
Doctors lounge, Nurishment, Head Of Department, Nurse Head, Janitor
Air Lock, Reception Lobby, Information Counter,
Assessment
Exam/Teatment Exam/Teatment Resuscitation
room,
cubicles cubicles room,
Inpatient ward plan
(male), (Female),
Minor
OR,
Isolation Room, Nursing Support Area
20
2017-2018
Bim project
21
2017-2018
Arar museum Project location : Saudi Arabia Project TBA : culture museum Construction cost : 95,570,091 SAR Project TBA : 20,000 Sqm Project owner : SCTA (Saudi Commission for Tourism and Antiquities Project openning : 2007
Processing B I M
1.Drawing package
Deliverables
3
2.BOQ (5D) - (6D) – (7D) 3.Revit model 4.visualization
Workflow
2
1. Folder Structure.
5. Working drawings.
2.BIM model (300-350)
6.Shop drawings
3.Federation
7. 4D – 5D
4.Clash detection
4. 6D – 7D
1. EIR.
Planning
1
2. Overall Process Map. 3. BXP. 4. Template
23
2017-2018
Employer information requirement (EIR):
BXP Index:
1. Creating 3D Revit Models (LOD 300). 2. Creating a composite model (LOD 350) 3. Creating sheets with full annotation data includes technical details, coordination sections and legend. 4. Creating BOQ& BOM for the all model components according the standard format. 5. Creating a project documentation set extracted from the Revit model includes all drawings in DWG and PDF ( according the naming convention, layers, presentation styles and pen assignment), drawing list, vendor list and technical specifications. 6. Creating a 4D and 5D Model according to project timeline -Primavera/tasks file- and BOQ. 7. Creating a clash matrix for LOD 350 model. 8. Creating a clash report includes hard & soft clashes in the LOD 350 model. 9. Creating presentation files for the project includes rendering for time liner and shots. In addition, animation and walkthrough. 10. Creating FIM Model.
1.EIR, Goals and Uses. 2. Project Information. 3. Organization Chart. 4. Key Contacts. 5. Project Milestone. 6. BIM Uses. 7. Project Information Delivery Manual. .
Planning Overall Process Map
8. Project Workflow. 9. IT Infrastructure 10. Modeling Methodology 11. Naming Convention. 12. Drawing Production. 13. Coordination. 14. Sign-Off Procedures.
Organization Chart
+Project Deliverables Format: RVT, DWG, PDF, EXCEL, NWC, NWF, XML, HTML and others (media format for images and videos)
24
2017-2018
Work flow
warehouse
Starting view
parameters
Families
Template
Activity ID
Export setting
Title block
Parameters
Template
Template
Project info.
Template creation
25
2017-2018
Work flow Folder structure
Folder structure
Folder structure
Dropbox
Bim 360
26
2017-2018
LOD 300
Work flow Level of details
LOD 350
27
2017-2018
Work flow Federated model
Federated
Methodology
Arch-str-mep
links
28
2017-2018
Work flow Clash detection
Methodology
Clash detection
sets
Arch-str-mep
29
2017-2018
Energy analysis 6D
30
2017-2018
Deliverables Drawing package
Incoming DWG Drawing
Deliverable DWG Drawing Package
Incoming DWG Drawing
Deliverable DWG Drawing Package
31
2017-2018
Deliverables Drawing package
32
2017-2018
Deliverables Drawing package
33
2017-2018
Deliverables Drawing package
34
2017-2018
Deliverables Drawing package
35
2017-2018
Deliverables Drawing package
36
2017-2018
Deliverables Drawing package
37
2017-2018
Deliverables Coordination section
38
2017-2018
Deliverables Coordination section
39
2017-2018
Deliverables Visualization Main entrance Interior shot Side elevation
40
2017-2018
Dynamo application
41
2017-2018
Cherkin tower Creation of successive curves with different diameters by using number slider node to keep the ratio of the tower , then the insertion of the adaptive component
42
2017-2018
Dynamo script
43
2017-2018
Adaptive family Cherkin tower panel Using Generic Model Adaptive template
44
2017-2018
Main curves Curves divided points
Dynamo bridge
Side walk Loft for both main curves and side walk Adaptive component insertion
Adaptive component for wires
45
2017-2018
Dynamo script
46
2017-2018
Faรงade Creation of faรงade with different value of extrution of model element
47
2017-2018
Dynamo script
48
2017-2018
Facade
Creation of faรงade with radom color range
49
2017-2018
Sun attractor Panel
rotates
according
to sun
direction.
50
2017-2018
Dynamo script
Morphing panels
51
2017-2018
Working project
52
2017-2018
Drawing package Working drawings
53
2017-2018
Drawing package Working drawings
54
2017-2018
Drawing package Working drawings
55
2017-2018
Drawing package Working drawings
56
2017-2018
Drawing package Working drawings
57
2017-2018
Drawing package Working drawings
58
2017-2018
Drawing package Working drawings
59
2017-2018
Drawing package Working drawings
60
2017-2018
Nourhan Mohamed ismail Nourhanmohamed1995.nm@gmail.com +20 115 282 5710