Architecture Portfolio

Page 1

N O U R

H A N

M

O

A R C H I T E C T U R E

P

H

O R T F O L IO 2014-2020

A M E D

I S PowerPoint template

M A I L


1

Contents

2

3

About me Biography

Professional projects Alamein towers

Graduation project Medical city

4

5

6

Bim project Arar museum

Dynamo application Tower ,bridge, sun attractor,facade

Working project Mons international congress experience

2

2017-2018


1

Contents

2

3

About me Biography

Professional projects Alamein towers

Graduation project Medical city

4

5

6

Bim project Arar museum

Dynamo application Tower ,bridge, sun attractor,facade

Working project Mons international congress experience

2

2017-2018


About me  I’m a Junior Architect with Bachelor’s degree of architectural engineering from EL Shorouk academy,Enthusiastic about BIM practices and policies and the computational application , I’ve had the opportiunity to be part of BIM team at university to work initiative also gained field experience through construction site visits,Moreover i am very interested in working drawings and architectural planning espicially medical planning.

3

2017-2018


About me  I’m a Junior Architect with Bachelor’s degree of architectural engineering from EL Shorouk academy,Enthusiastic about BIM practices and policies and the computational application , I’ve had the opportiunity to be part of BIM team at university to work initiative also gained field experience through construction site visits,Moreover i am very interested in working drawings and architectural planning espicially medical planning.

3

2017-2018


RESUME

EDUCAT ION

EXPERIENCE Technical Office Architect

NOURHAN

MOHAMED

Name Nourhan mohamed ismail Adress 317 Methak Street,Nasr city Cairo,Egypt Phone +20 115 282 5710 Facebook /nourhan.mohamed.52 Email Nourhanmohamed1995.nm@gmail.com Linkedin /nourhan-mohamed95

Software skills

| 10 NOV 2018 - Present Pavillion Architect engineering consultant Technical Office Architect A l A l a m e i n t o we r s - A l a ma i n C i t y Airdefense - New Capital S k ywa l k - 6 O c t o b e r C i t y

BIM PROGRAM TRAINEE

BACHELOR’S DEGREE | 16 Jul 2018 EL Shorouk academy Architectural engineering

Grade : Very good

Graduation project topic : Medical city

Grade : Excellent

GRADUATE | 24 Jun 2018 -10 Sep 2018 ECG - UTW Round 10

|Aug 2013

APE TECHNICAL DIPLOMA

Martyr osama ahmed ismail language school

| 3 Jul 2017 -2 Aug 2017

LANGUAGE SKILLS

ECG - Summer trainning

SITE TRAINEE

Born in Cairo, Egypt learned English as first

| 29 JuL 2016 -1 Aug 2016

language and French as second language

ECG - EL Rehab shopping center Autocad Revit Dynamo Sketchup

TECHNICAL WORKSHOP

100%

80%

40%

Arabic

English

french

| 1 Jun 2015 -15 Jun 2015 EL Shorouk academy - Construction stages

3D MAX Photoshop

Arcmap

References available upon request

4

2017-2018


RESUME

EDUCAT ION

EXPERIENCE Technical Office Architect

NOURHAN

MOHAMED

Name Nourhan mohamed ismail Adress 317 Methak Street,Nasr city Cairo,Egypt Phone +20 115 282 5710 Facebook /nourhan.mohamed.52 Email Nourhanmohamed1995.nm@gmail.com Linkedin /nourhan-mohamed95

Software skills

| 10 NOV 2018 - Present Pavillion Architect engineering consultant Technical Office Architect A l A l a m e i n t o we r s - A l a ma i n C i t y Airdefense - New Capital S k ywa l k - 6 O c t o b e r C i t y

BIM PROGRAM TRAINEE

BACHELOR’S DEGREE | 16 Jul 2018 EL Shorouk academy Architectural engineering

Grade : Very good

Graduation project topic : Medical city

Grade : Excellent

GRADUATE | 24 Jun 2018 -10 Sep 2018 ECG - UTW Round 10

|Aug 2013

APE TECHNICAL DIPLOMA

Martyr osama ahmed ismail language school

| 3 Jul 2017 -2 Aug 2017

LANGUAGE SKILLS

ECG - Summer trainning

SITE TRAINEE

Born in Cairo, Egypt learned English as first

| 29 JuL 2016 -1 Aug 2016

language and French as second language

ECG - EL Rehab shopping center Autocad Revit Dynamo Sketchup

TECHNICAL WORKSHOP

100%

80%

40%

Arabic

English

french

| 1 Jun 2015 -15 Jun 2015 EL Shorouk academy - Construction stages

3D MAX Photoshop

Arcmap

References available upon request

4

2017-2018


Al Alamein Towers

5

2017-2018


Al Alamein Towers

5

2017-2018


Airdefense

6

2017-2018


Airdefense

6

2017-2018


Skywalk

7

2017-2018


Skywalk

7

2017-2018


Medical city

8

2017-2018


Medical city

8

2017-2018


project content: general hospital 500 beds, rehabilitation centers, surgical specialist hospital 150 bed and truma duto the large rate of accidents that occurs at marsa Alam ,research center for the specefic plants spread in this area which used for curing rehamatoid deaseas and bones.


project content: general hospital 500 beds, rehabilitation centers, surgical specialist hospital 150 bed and truma duto the large rate of accidents that occurs at marsa Alam ,research center for the specefic plants spread in this area which used for curing rehamatoid deaseas and bones.


10

2017-2018


10

2017-2018


General hospital It is provide a complete medical and surgery care for different kind of diseases and injury, And not specialized in certain illness, contest of Emergency department ,surgery unit, delivery unit, Imaging unit, Laboratory,....etc

8

2017-2018


General hospital It is provide a complete medical and surgery care for different kind of diseases and injury, And not specialized in certain illness, contest of Emergency department ,surgery unit, delivery unit, Imaging unit, Laboratory,....etc

8

2017-2018


Ground floor plan Emergency department , Labs department. Radiology department , Outpatient department (OPD). Shops and gifts , Administration.

12

2017-2018


Ground floor plan Emergency department , Labs department. Radiology department , Outpatient department (OPD). Shops and gifts , Administration.

12

2017-2018


First floor plan Maternity department , Neonatal intensive care unit (NICU). Operaton department , Intensive care unit (ICU). Pathology department , Cardiac intensive care unit (CICU)

Oncology department.

13

2017-2018


First floor plan Maternity department , Neonatal intensive care unit (NICU). Operaton department , Intensive care unit (ICU). Pathology department , Cardiac intensive care unit (CICU)

Oncology department.

13

2017-2018


Second floor plan Inpatient single room. Inpatient double room.

14

2017-2018


Second floor plan Inpatient single room. Inpatient double room.

14

2017-2018


Basement floor plan Laundary , kitchen. Pharmacy , Central sterile services department (CSSD). Morgue , Waste , Stores.

Housekeeping.

15

2017-2018


Basement floor plan Laundary , kitchen. Pharmacy , Central sterile services department (CSSD). Morgue , Waste , Stores.

Housekeeping.

15

2017-2018


Plans analysis Ground floor plan

Second floor plan

First floor plan

Basement floor plan

16

2017-2018


Plans analysis Ground floor plan

Second floor plan

First floor plan

Basement floor plan

16

2017-2018


Scientific evidence indicates that daylight has beneficial

Elevation

effects on patients ,visitors and staff. It has been shown to reduce psychological problems and improve patient outcomes, and increase morale and reduce sickness levels among staff.so we used a large space of curtains to lit in large amout of day light

17

2017-2018


Scientific evidence indicates that daylight has beneficial

Elevation

effects on patients ,visitors and staff. It has been shown to reduce psychological problems and improve patient outcomes, and increase morale and reduce sickness levels among staff.so we used a large space of curtains to lit in large amout of day light

17

2017-2018


Entrances

Site plan Car path

Near to the city center High accessibility Allow future expansion.

Shape of the site ( rectangular shape )

18

2017-2018


Entrances

Site plan Car path

Near to the city center High accessibility Allow future expansion.

Shape of the site ( rectangular shape )

18

2017-2018


Reception Lobby, Reception Counter Pre & postoperative holding space 7.43 m2/stretcher, General operation & procedure

rm,

Cardiovascular,

orthopedic,

neurological,

special

procedures, Post-anesthetic care units

Radiology department

PACU - 7.43 m2/bed, Staff/Nursing Support Facilities

Reception Lobby, Reception Counter Waiting Area, File Room, Ultrasound room,

Diagnostic

X-ray,

Operation department

Magnetic

resonance imaging - MRI Room, CT Room, Nursing Support Facilities.

19

2017-2018


Reception Lobby, Reception Counter Pre & postoperative holding space 7.43 m2/stretcher, General operation & procedure

rm,

Cardiovascular,

orthopedic,

neurological,

special

procedures, Post-anesthetic care units

Radiology department

PACU - 7.43 m2/bed, Staff/Nursing Support Facilities

Reception Lobby, Reception Counter Waiting Area, File Room, Ultrasound room,

Diagnostic

X-ray,

Operation department

Magnetic

resonance imaging - MRI Room, CT Room, Nursing Support Facilities.

19

2017-2018


Reception Lobby, Reception Counter Waiting area, Nurse Station, Nurses Staff Lounge, Medication / Drugs Store Clean Utility, soiled Utility, Storage,

Emergency department

Doctors lounge, Nurishment, Head Of Department, Nurse Head, Janitor

Air Lock, Reception Lobby, Information Counter,

Assessment

Exam/Teatment Exam/Teatment Resuscitation

room,

cubicles cubicles room,

Inpatient ward plan

(male), (Female),

Minor

OR,

Isolation Room, Nursing Support Area

20

2017-2018


Reception Lobby, Reception Counter Waiting area, Nurse Station, Nurses Staff Lounge, Medication / Drugs Store Clean Utility, soiled Utility, Storage,

Emergency department

Doctors lounge, Nurishment, Head Of Department, Nurse Head, Janitor

Air Lock, Reception Lobby, Information Counter,

Assessment

Exam/Teatment Exam/Teatment Resuscitation

room,

cubicles cubicles room,

Inpatient ward plan

(male), (Female),

Minor

OR,

Isolation Room, Nursing Support Area

20

2017-2018


Bim project

21

2017-2018


Bim project

21

2017-2018


Arar museum Project location : Saudi Arabia Project TBA : culture museum Construction cost : 95,570,091 SAR Project TBA : 20,000 Sqm Project owner : SCTA (Saudi Commission for Tourism and Antiquities Project openning : 2007


Arar museum Project location : Saudi Arabia Project TBA : culture museum Construction cost : 95,570,091 SAR Project TBA : 20,000 Sqm Project owner : SCTA (Saudi Commission for Tourism and Antiquities Project openning : 2007


Processing B I M

1.Drawing package

Deliverables

3

2.BOQ (5D) - (6D) – (7D) 3.Revit model 4.visualization

Workflow

2

1. Folder Structure.

5. Working drawings.

2.BIM model (300-350)

6.Shop drawings

3.Federation

7. 4D – 5D

4.Clash detection

4. 6D – 7D

1. EIR.

Planning

1

2. Overall Process Map. 3. BXP. 4. Template

23

2017-2018


Processing B I M

1.Drawing package

Deliverables

3

2.BOQ (5D) - (6D) – (7D) 3.Revit model 4.visualization

Workflow

2

1. Folder Structure.

5. Working drawings.

2.BIM model (300-350)

6.Shop drawings

3.Federation

7. 4D – 5D

4.Clash detection

4. 6D – 7D

1. EIR.

Planning

1

2. Overall Process Map. 3. BXP. 4. Template

23

2017-2018


Employer information requirement (EIR):

BXP Index:

1. Creating 3D Revit Models (LOD 300). 2. Creating a composite model (LOD 350) 3. Creating sheets with full annotation data includes technical details, coordination sections and legend. 4. Creating BOQ& BOM for the all model components according the standard format. 5. Creating a project documentation set extracted from the Revit model includes all drawings in DWG and PDF ( according the naming convention, layers, presentation styles and pen assignment), drawing list, vendor list and technical specifications. 6. Creating a 4D and 5D Model according to project timeline -Primavera/tasks file- and BOQ. 7. Creating a clash matrix for LOD 350 model. 8. Creating a clash report includes hard & soft clashes in the LOD 350 model. 9. Creating presentation files for the project includes rendering for time liner and shots. In addition, animation and walkthrough. 10. Creating FIM Model.

1.EIR, Goals and Uses. 2. Project Information. 3. Organization Chart. 4. Key Contacts. 5. Project Milestone. 6. BIM Uses. 7. Project Information Delivery Manual. .

Planning Overall Process Map

8. Project Workflow. 9. IT Infrastructure 10. Modeling Methodology 11. Naming Convention. 12. Drawing Production. 13. Coordination. 14. Sign-Off Procedures.

Organization Chart

+Project Deliverables Format: RVT, DWG, PDF, EXCEL, NWC, NWF, XML, HTML and others (media format for images and videos)

24

2017-2018


Employer information requirement (EIR):

BXP Index:

1. Creating 3D Revit Models (LOD 300). 2. Creating a composite model (LOD 350) 3. Creating sheets with full annotation data includes technical details, coordination sections and legend. 4. Creating BOQ& BOM for the all model components according the standard format. 5. Creating a project documentation set extracted from the Revit model includes all drawings in DWG and PDF ( according the naming convention, layers, presentation styles and pen assignment), drawing list, vendor list and technical specifications. 6. Creating a 4D and 5D Model according to project timeline -Primavera/tasks file- and BOQ. 7. Creating a clash matrix for LOD 350 model. 8. Creating a clash report includes hard & soft clashes in the LOD 350 model. 9. Creating presentation files for the project includes rendering for time liner and shots. In addition, animation and walkthrough. 10. Creating FIM Model.

1.EIR, Goals and Uses. 2. Project Information. 3. Organization Chart. 4. Key Contacts. 5. Project Milestone. 6. BIM Uses. 7. Project Information Delivery Manual. .

Planning Overall Process Map

8. Project Workflow. 9. IT Infrastructure 10. Modeling Methodology 11. Naming Convention. 12. Drawing Production. 13. Coordination. 14. Sign-Off Procedures.

Organization Chart

+Project Deliverables Format: RVT, DWG, PDF, EXCEL, NWC, NWF, XML, HTML and others (media format for images and videos)

24

2017-2018


Work flow

warehouse

Starting view

parameters

Families

Template

Activity ID

Export setting

Title block

Parameters

Template

Template

Project info.

Template creation

25

2017-2018


Work flow

warehouse

Starting view

parameters

Families

Template

Activity ID

Export setting

Title block

Parameters

Template

Template

Project info.

Template creation

25

2017-2018


Work flow Folder structure

Folder structure

Folder structure

Dropbox

Bim 360

26

2017-2018


Work flow Folder structure

Folder structure

Folder structure

Dropbox

Bim 360

26

2017-2018


LOD 300

Work flow Level of details

LOD 350

27

2017-2018


LOD 300

Work flow Level of details

LOD 350

27

2017-2018


Work flow Federated model

Federated

Methodology

Arch-str-mep

links

28

2017-2018


Work flow Federated model

Federated

Methodology

Arch-str-mep

links

28

2017-2018


Work flow Clash detection

Methodology

Clash detection

sets

Arch-str-mep

29

2017-2018


Work flow Clash detection

Methodology

Clash detection

sets

Arch-str-mep

29

2017-2018


Energy analysis 6D

30

2017-2018


Energy analysis 6D

30

2017-2018


Deliverables Drawing package

Incoming DWG Drawing

Deliverable DWG Drawing Package

Incoming DWG Drawing

Deliverable DWG Drawing Package

31

2017-2018


Deliverables Drawing package

Incoming DWG Drawing

Deliverable DWG Drawing Package

Incoming DWG Drawing

Deliverable DWG Drawing Package

31

2017-2018


Deliverables Drawing package

32

2017-2018


Deliverables Drawing package

32

2017-2018


Deliverables Drawing package

33

2017-2018


Deliverables Drawing package

33

2017-2018


Deliverables Drawing package

34

2017-2018


Deliverables Drawing package

34

2017-2018


Deliverables Drawing package

35

2017-2018


Deliverables Drawing package

35

2017-2018


Deliverables Drawing package

36

2017-2018


Deliverables Drawing package

36

2017-2018


Deliverables Drawing package

37

2017-2018


Deliverables Drawing package

37

2017-2018


Deliverables Coordination section

38

2017-2018


Deliverables Coordination section

38

2017-2018


Deliverables Coordination section

39

2017-2018


Deliverables Coordination section

39

2017-2018


Deliverables Visualization Main entrance Interior shot Side elevation

40

2017-2018


Deliverables Visualization Main entrance Interior shot Side elevation

40

2017-2018


Dynamo application

41

2017-2018


Dynamo application

41

2017-2018


Cherkin tower Creation of successive curves with different diameters by using number slider node to keep the ratio of the tower , then the insertion of the adaptive component

42

2017-2018


Cherkin tower Creation of successive curves with different diameters by using number slider node to keep the ratio of the tower , then the insertion of the adaptive component

42

2017-2018


Dynamo script

43

2017-2018


Dynamo script

43

2017-2018


Adaptive family Cherkin tower panel Using Generic Model Adaptive template

44

2017-2018


Adaptive family Cherkin tower panel Using Generic Model Adaptive template

44

2017-2018


Main curves Curves divided points

Dynamo bridge

Side walk Loft for both main curves and side walk Adaptive component insertion

Adaptive component for wires

45

2017-2018


Main curves Curves divided points

Dynamo bridge

Side walk Loft for both main curves and side walk Adaptive component insertion

Adaptive component for wires

45

2017-2018


Dynamo script

46

2017-2018


Dynamo script

46

2017-2018


Faรงade Creation of faรงade with different value of extrution of model element

47

2017-2018


Faรงade Creation of faรงade with different value of extrution of model element

47

2017-2018


Dynamo script

48

2017-2018


Dynamo script

48

2017-2018


Facade

Creation of faรงade with radom color range

49

2017-2018


Facade

Creation of faรงade with radom color range

49

2017-2018


Sun attractor Panel

rotates

according

to sun

direction.

50

2017-2018


Sun attractor Panel

rotates

according

to sun

direction.

50

2017-2018


Dynamo script

Morphing panels

51

2017-2018


Dynamo script

Morphing panels

51

2017-2018


Working project

52

2017-2018


Working project

52

2017-2018


Drawing package Working drawings

53

2017-2018


Drawing package Working drawings

53

2017-2018


Drawing package Working drawings

54

2017-2018


Drawing package Working drawings

54

2017-2018


Drawing package Working drawings

55

2017-2018


Drawing package Working drawings

55

2017-2018


Drawing package Working drawings

56

2017-2018


Drawing package Working drawings

56

2017-2018


Drawing package Working drawings

57

2017-2018


Drawing package Working drawings

57

2017-2018


Drawing package Working drawings

58

2017-2018


Drawing package Working drawings

58

2017-2018


Drawing package Working drawings

59

2017-2018


Drawing package Working drawings

59

2017-2018


Drawing package Working drawings

60

2017-2018


Drawing package Working drawings

60

2017-2018


Nourhan Mohamed ismail  Nourhanmohamed1995.nm@gmail.com  +20 115 282 5710


Nourhan Mohamed ismail  Nourhanmohamed1995.nm@gmail.com  +20 115 282 5710


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.