WON CONSTRUCTION COMPANY INTRODUCTION
BROAD AND VARIOUS BUSINESS WORLD
Create the Happy World, Open the Happy Future
03_
WON CONSTRUCTION
CONTENTS 04 CEO’s Message 06 History of WON & Organization 08 Management Policy 16 Overseas Works 20 Civil Works 28 Resort 32 Housing Works 40 Architectural Works 48 Construction Supervision 56 Design Works 60 Awards HILDESHEIM 62 General License 66 Brand Information 67 Global Network WON CONSTRUCTION
_04
CEO’s Message
Architecture with Dreams and Philosophy Infinitely Creative Originality and a Challenging Spirit WON Construction, a Leader of Korean Architecture and Construction in the 21st Century
05_
WON CONSTRUCTION
CEO’s Message From the beginning in 1984, WON Construction, with the enterprising challenging spirit and the advanced technology, has utilized the excellent technological capacity and quality to create new ideas and shape the future in various areas of domestic/overseas civil engineering, architecture, residential houses, resorts, etc over the past 25 years in order to make our clients’ dreams come true. On the foundation of consistent management innovation and technical development, WON Construction has carried out several large-scale national policy projects to provide domestic industrial and residential buildings, including the developmental construction of the Bio-Health Science Complex, and the Jecheon Industrial Complex, and various urban development projects. It has received recognition for being an excellent construction company by the KLC (Korea Land Corporation) and its exceptional technical power and know-how has been well-known. WON Construction has also launched a residential housing brand ‘HILDESHEIM’ and has provided about 3,000 of these great quality residential houses annually. It cemented its reputation as the prime housing brand by obtaining the 2007 Grand Prize of Hankyung Residential Culture, and a 2007 Presidential Citation on Residential Housing Construction Day etc. WON Construction made inroads into Libya in 2005 when it undertook the construction of its roads, housing land development, high-quality residential houses, and infrastructure. It has established a bridgehead for its overseas construction markets by constructing branches in Tripoli and Benghazi. At present, it is carrying out a project (with construction costs of about 550 billion KRW) of constructing 2,000 high-quality villas and infrastructure in DERNA. Consequently, WON Construction won the award “Tower of 20 Million Exports” in 2008 and established itself as an excellent construction company. The Architecture embodying its vision and philosophy has prospective values. We promise to develop WON Construction into being a world leading enterprise outside of the Korean domestic market, based on its infinite originality and challenging spirit. We hope you remain loyal and interested in WON Construction’s endeavors, as it becomes a global enterprise. Thank you for your time. CEO_
Min Ho, Kim
WON CONSTRUCTION
_06
Your Dream Partner
WON CONSTRUCTION Co., Ltd.
07_
WON CONSTRUCTION
History of WON 2000s 2007. 12 Obtained “2007 Presidential Citation on Residential Housing Construction Day” 2007. 07 Won the first prize of “Grand Prize of Hankyung Residential Culture” in the townhouse field. 2006. 12 Won the “Grand Award of Integrity Designated by the Citizens” from Cheong-Ju Citizens Coalition for Economic Justice 2006. 06 Completed construction of “Ochang Koaroo Apt” 2005. 12 Registered the construction of fire-fighting buildings. 2005. 12 Registered the construction of landscaping projects. 2005. 12 Established branch at Libya 2005. 09 Registered overseas construction business 2005. 07 Change the company name “WON Construction Co., Ltd.” 2004. 12 Launched the brand of WON Construction’s residential housing projects, “HILDESHEIM” 2003. 12 Registered the business for the design and construction of sewage disposal facilities. 2003. 03 Designated by Korea Land Corporation as “Excellent Construction Company” 2001. 03 Registered agency business for Environmental Effect Evaluation
1900s 1999. 10 Registered the business for electrical projects 1999. 04 Registered the exclusive department for its research and development. 1998. 01 Registered the business of the supervision for fire fighting (mechanical and electrical) facilities. 1997. 12 Registered the license to conduct Civil Engineering Works. 1996. 10 Registered the license to conduct Architectural Construction Projects. 1996. 04 Registered as “the professional architectural supervision company”. 1984. 02 Established “WON Architects’ Office”
Organization CEO
Administration Department
Architecture Department
Civil Department
Housing Department
Overseas Business Dep’t
Construction Supervision
Design Department
R&D Center
Administration
Architectural Technology
Civil Engineering Technology
Development
Business Plan
CS for Architecture
Design 1 Team
Research Plan
Estimation
Estimation
Housing Plan
Sales
CS for Civil Works
Design 2 Team
Housing
Architecture
Total CS
Architecture Research
Marketing
Electric
CS for Electrics Works
Financial Accounting Business Project Management BTL Planning
Construction
Sales
Quality Control
Construction Environmental Support
Project Development
CS for Communication
Civil Eng. Research Technology Development Technology Support
CS for Fire Fighting Facility
WON CONSTRUCTION
_08
Management Policies WON Construction is continuously growing and developing into an international enterprise creating the best value, based on its specialty, advanced technology and active thinking power.
COMPANY VISION
【 Prideful Individual Manpower with at least One Experienced Skill 】 WON Construction carries out each project utilizing exceptional technical skills, taking pride in its responsibility in the Korean construction industry.
【 Positive and Active Way of Thinking 】 WON Construction always fulfills the fundamental tasks first by applying positive and active thought.
【 Realization of the Best Intellectual Enterprise 】 Building on a foundation of the know-how accumulated through various successfully completed projects and consistent researches and developments, WON Construction is realizing itself as a paragon of intellectual enterprise.
Prideful Individual Manpower with at least One Experienced Skill
Positive and Active Way of Thinking
09_
WON CONSTRUCTION
Realization of the Best Intellectual Enterprise
WON CONSTRUCTION
Management Policies
WON Construction maximizes digital applications for more efficient site management and has introduced a digital system initiative in order to create/share/recreate knowledge.
PM
EMS
RFID
INFORMATIONORIENTED MANAGEMENT
IS
P ER
PMS 【 ERP - Enterprise Resource Planning 】 The ERP system was established in the head office and on domestic/overseas sites, and has been operating after the computerization process for the entire works including budget preparation and customer management as well as planning, quotation, design, construction, and repair work. Based on this system, we have made a great effort to reduce working hours and costs by maximizing the flexibility and efficiency of various environmental changes.
EMS
PMS
【 RFID - Radio Frequency Identification 】
RFID
We are able to reduce the projects completion period by using the optimum amount of manpower/resources/equipment necessary for a successful project, and create the best outcome that the customer desires.
IS
【 PMIS - Project Management Information System 】
PM
P ER
The efficiency of personnel management has been maximized through a remote identification system which checks the time site staff and workers start/leave the workplace and their working hours. According to the process plan, we can predict at what time a large number of personnel is needed, and then using the necessary manpower at the most appropriate time, each process of the project can be smoothly executed.
【 PMS - Purchasing Management System 】 We computerize and manage the type, quantity, and input time of the resources necessary for the completion of a project. We exactly know the amount of resources stored and the types and amount of materials changed by a revised project, and then supply them at the most appropriate time.
【 EMS - Equipment Management System 】 We also computerize the type, specification, and quantity of holding equipment and needed equipment which are available for use, by purchasing new equipment and maintaining the existing equipment. We examine the equipment in need of repair and check the purchasing or repairing schedule for the components that are needed, in order to help conduct the process smoothly. WON CONSTRUCTION
_010
Management Policies WON Construction is continuously growing and developing into an international enterprise creating the best value, based on its specialty, advanced technology and active thinking power.
Quality Management
【 ISO 9001 Quality Management System Certificate】 WON Construction obtained the ISO9001 Certification in 1998 in order to raise the customer satisfaction of its superior technology and quality, so its quality has been internationally certified.
【 Management-Innovated Medium/Small Enterprise Certificate 】 WON Construction was chosen as the Management-innovated Medium/Small Enterprise in 2007, and the exceptional quality and thorough process management in technology gained much recognition. What is more, it has been recognized in the management marketing innovation field through systematic organization management and the induction of new brands.
【PERI Skydeck System Form】
PERI Skydeck system form is one type of System Forms produced by PERI. It helps reduce the construction time by shortening the time taken to install and detach the slab forms. It takes only 7 days to complete the framework for an one-story structure (Walls and slab), which halves the length of the construction period for the existing form construction (takes 15 days)
11_
WON CONSTRUCTION
WON CONSTRUCTION
Management Policies
WON Construction is recognized by various licenses and technologies based on many domestic and overseas projects.
PM
EMS
RFID
Technology Management
IS
P ER
PMS 【 Domestic Licenses 】 License
License No.
Date of Registration
2005 - 16
2005. 12. 20
Chung Cheong North Province Office
Chung Buk - 00353
1999. 10. 22
Chung Cheong North Province Office
430054
2008. 04. 29
Chung Cheong North Province Office
12 - 0035
2005. 12. 13
Chung Cheong North Province Office
Chung BukHousing 2006-0010
2006. 06. 01
Korea Housing Builders Association
Civil-Architectural Work12 - 0029
1999. 12. 16
Chung Cheong North Province Office
Fire Fighting Facility Works Electric Works Communication Facility Works Landscaping Housing Works Civil/Architectural Works
Authority
Overseas Construction – Electric Works
455
2005. 09. 21
Ministry of Land, Transport and Maritime Affairs
Overseas Construction – Civil/ Architectural Works
479
2005. 09. 21
Ministry of Land, Transport and Maritime Affairs
Great Socialist People’s Libyan Arab Jamahirya General Committee for Commerce People’s Committee for Tripoli Business
Business Registration Office Certificate of Business
No.: 62925 Company/Industry/Profession/Joint/Partner/Trade
Custody No.: 40 Date: A.D. 2005/12/24 Registration No.: 62925 Receipt No. for the payment of the fee: 9036897 Date: A.D. 2005/12/24 Applicant/Titl e
Kim, Dong Yun / Regional Director
Nationality
Korean (R.O.K)
Name of Corp oration
WON Construction Co., Ltd
Capital
LYD150,000
Types of Busi The business activity is limited by the following. Construction of Road, Dam, Bridge ness . Harbor Construction, Pier Construction, Berth Construction, Dredging Works, Mari time Works. And construction agreed by the authority of improvement and developm ent Date of Establ ishment, Regis tration No.
Based on the resolution 2005. No. 758 about establishment of foreign branches in Li bya resided by the head of the General Committee for Commerce, it is allowed to est ablish the branch for 5 years from 2005.12.6.
Address of the Salahuddir/Company Roads/Near to the GMR Branch Headquarters and Agent
【 International Licenses 】 Country
License
Libya
Construction of Road, Bridge, Dam, Pier, Dock, Structure Related with Maritime Works
1)
In Libya 2) Overseas
Address
License No.
62925
Date of Registration
Authority
2005.12. 24
Chamber of Commerce
Date of Establish ment
Address
Date of Esta blishment
No. of Certificate
Name of Compan y
Title
Date of Reg istration for the Agent an d Duration
Nationalit y
D.O.B
Domicile
Regional Director
Unlimited
Korean ( R.O.K)
1945
Tripoli
Salahuddir/Co mpany Roads/ Near to the G MR Agent and Re presentatives Name/Father’s Name/Title
Kim, Dong Yu n
Date to hand over to the applicant: Libyan calendar 1376/5/22 Applicant paid the fee (tax) and the amount: Tripoli Year: 2008.5.25 Document No.: 1 Issuance: Tripoli (Capital of Libya) Year: Libyan calendar 1376/5/22 Date to be agreed: Year 2008/5/25
WON CONSTRUCTION
_12
Management Policies WON Construction has established its comprehensive management system based on its experience in the projects in connection with ‘Health & Safety, and Environment’ for several years.
Safety Management
【 Health and Safety 】 Through regular fortnightly safety training, we encourage workers to wear safety gear including crash helmets, working clothes and gloves, and safety tools. We also familiarize them with basic work instructions on the use of fire and electrical equipment. All workers must fully know the work instructions in the morning of each working day, in order to prevent potential accidents which may happen during the work. There is one professional safety supervisor on each project site to prevent potential accidents which may happen on site. He/she provides advices on correction of unsafely used equipment/ machinery and improperly processed conditions immediately. We prevent car accidents on site by regulating the speed of vehicles. We have a medical team and emergency car to take immediate care of matters when an accident happens in the site. If any accidents happen, they are reported to the safety manager who takes the appropriate action quickly.
Weekly Safety Training
How to wear safety gear such as crash helmets, safety shoes.
Work Instruction Training
Health, Safety
【 Environment 】 We protect workers against every harmful factor in the project site environment and observe the local environmental protection regulations. We dispose of waste generated on the project site in accordance with the related regulations.
13_
WON CONSTRUCTION
Environment
WON CONSTRUCTION
Management Policies
WON Construction successes to develop and apply the new method and the new technology to the project sites based on active investment in order to develop the state of art technologies with research centers and universities in response of rapid and various changes in domestic and international market.
PM
IS
P ER
EMS
RFID
Research and Development PMS Patent Number
Registration Date Title of the Invention
No. 0383508
Apr. 2003
No. 0419345
Feb. 2004
REMITAR containing ceramics for architectural construction and finishing work. Method of manufacturing the bricks for inner wall use, which are good for humans.
No. 0453480
Oct. 2004
Fuel Saving Heating System
No. 0453482
Oct. 2004
Platform for wallpapering use
No. 0471713
Feb. 2005
Curing Membrane Covering System for the concrete floors of apartment houses.
No. 0484519
Apr. 2005
Safety Inspection System for underground objects within apartment complexes.
No. 10-0562878
Mar. 2006
Hume concrete pipe cutter
No. 10-0593297
Jun. 2006
Structure of Liner Plate for the foundation work (for laying pipes) of a building use.
No. 10-0599245
Jul. 2006
Structure of Liner Plate for the supports used in the foundation work against side earth pressure.
No. 10-0601589
Jul. 2006
Rain Blocking Device on wave-shaped pipes protecting the cables within apartment houses complex.
No. 10-0625326
Sep. 2006
Structure of Hanger supporting the cable within apartment housing complexes.
No. 10-0629900
Sep. 2006
Structure of Cable Tray blocking the electric waves from Distribution Lines for apartment house use.
No. 10-0636879
Oct. 2006
Structure of sunscreen and Insect Net for apartment house use.
No. 10-0637711
Oct. 2006
Easily Adjustable width of prefabricated Liner Plate for construction.
No. 10-0640010
Oct. 2006
Supporting Instrument for the concrete pouring Force Pump Pipe.
No. 10-0642314
Oct. 2006
Drain Cock to prevent back-ward flows from sewage pipe within apartment houses complex.
No. 10-0643007
Oct. 2006
Water Stop Plate for concrete structural elements.
No. 10-0643636
Nov. 2006
Flooring structure of apartment houses and its construction method.
No. 10-0650500
Nov. 2006
Easily constructible external insulation structure for the foundation of apartment houses.
No. 10-0650502
Nov. 2006
Nonskid devices on the floor of underground car parks within apartment houses.
No. 10-0655883
Dec. 2006
Panel Structure of Switchboard System within apartment houses. Electric wire protection ducts installed on the walls of apartments.
No. 10-0660133
Dec. 2006
No. 10-0661301
Dec. 2006
Support Structure to fill concrete inside the Steel Pile Head, and the construction method for concrete foundations using this.
No. 10-064695
Dec. 2006
Lightning Rod Fixing Device for apartment houses use.
No. 10-0667007
Jan. 2007
Protective Panel for underground cables within apartment housing complexes.
No. 10-0672976
Jan. 2007
Leak Prevention Device using water-proofing paint for Cement Pipes
No. 10-0673489
Jan. 2007
Electric Terminal Box Fixing Structure for apartment house use.
No. 10-0685299
Feb. 2007
Safety vests with dust-collecting devices.
No. 10-0686062
Feb. 2007
Crack Remover for concrete creak repair use, its production method and how to repair cracks.
No. 10-0702252
Mar. 2007
Electric Terminal Box on the ceiling of apartments.
No. 10-0715987
May. 2007
WATTMETER making an uninterruptible change available for apartment houses.
No. 10-0786732
Dec. 2007
Guard railing materials for architectural structures.
No. 10-0787107
Dec. 2007
Superstructure for the Stone Coat of the projected entrance.
No. 10-0787541
Dec. 2007
Environment-friendly bricks with carbon absorbent properties and its production method
No. 10-0789844
Dec. 2007
Combined Safety Net and Vertical Net on site.
No. 10-0800031
Jan. 2008
Environment-friendly finishing mortar with carbon absorbent properties and its manufacturing method.
No. 10-0821903
Apr. 2008
Prefabricated File Decoration Structure on the walls of a building. WON CONSTRUCTION
_14
Management Policies WON Construction has the power to change the world. WON Construction proves its exceptional technical skills and competence in Civil Engineering, Construction, Residential House, Resort, Overseas projects, CS and Design etc.
Business Area
【 Civil Engineering 】Residential Land Development, Water Supply & Sewage Facilities, Road, Bridge, Charnel Facility WON Construction with its abundant know-how and technical skills has been continuously contributing to efficient national land development (from basic factors of national development like complex development projects, road, and bridge construction to all types of water treatment facilities)
【 Construction 】General buildings, Office buildings, Educational/Research & Medical Facilities, Cultural/Physical Education Facilities, Factories, BTL We provide the best quality in each architectural area including office buildings, Education and Cultural facilities, Industrial facilities, BTL(Built Transfer Lease) projects, and realize the highest quality architectural culture to satisfy our customers.
【 Residential House 】Apartments, New Project-Townhouse, BTL We try our utmost to provide a dream-like space for our customers through various types of residential housing including elegant townhouses and high quality apartment houses. WON Construction keeps with the changing needs of our customers and creates the top residential culture with a high-grade of self-confidence.
【 Resort 】Golf The resort project is being watched with keen interest as leisure culture becomes more and more popular. WON Construction is constructing an internationalscale golf course under the prime brand ‘HILDESHEIM’, thus opening a new era of resort culture.
【 Overseas 】 Road Project, Residential Development, Infrastructure Construction, and Residential Housing Construction WON Construction established a local corporation in Libya in 2005 in order to unfold its sufficient know-how and technical skills and to receive recognition from world markets to create a better world. It has been contributing to the development of a high-quality architectural culture in various areas there.
【 Construction Supervision 】 We do our best to give our customers the greatest value for money through our know-how, maximized management efficiency and productivity and our effective project management and process management systems.
【 Design 】 WON Construction continuously takes on challenges and spares no effort to provide the best value for our customers through a systematic design system from the beginning of a project, the planning stage.
15_
WON CONSTRUCTION
WON CONSTRUCTION
Management Policies
WON Construction has sound financial structure evaluated as A- in the rating of company credit and is the superior company having the 1st grade in the evaluation of the construction capacity.
PM
RFID
EMS
Company Evaluation Data
IS
P ER
PMS Corporate Credit Rating Certification
A(Unit : KRW million,%)
Classification
2006
2007
2008
Total Assets
37,270
56,080
96,916
Equity Capital
19,628
26,000
33,192
PaidInCapital
5,300
5,300
5,300
Sales
77,967
70,156
139,572
3,717
5,641
1,717
12,700
17,024
27,241
Net Income Total Borrowings
1st Grade
Level of Assessed Construction Competence Annual Sales for the last 3 years Classification
(Unit : KRW million,%)
2006
2007
2008
Civil Engineering
37,336
29,436
96,334
Construction(Architecture)
39,605
30,769
66,712
355
519
711
Landscape Electricity
3,437
1,240
256
Supervision
8,493
11,205
11,781
1,104
1,406
476
Design Engineering Total
472
574
791
90,802
75,149
177,061 WON CONSTRUCTION
_16
COMPANY INTRODUCTION
Overseas Works In pursuit of the world best, We, WON Construction Company are expanding paradigms toward the worldwide field with customers 17_
WON CONSTRUCTION
Overseas Works
In Libya For overseas expansion as the global era has come, we have established two branches in Tripoli and Benghazi in Libya in 2005, running into overseas construction markets WON CONSTRUCTION
_18
Business Career Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
1st Phase, 1,384 Housing Units and Its Associated Infrastructure Project Organization for Development of Administrative Centers ㅣ 2007. 08 ㅣ 4F 1384 Household ㅣ Libya, Derna
2nd Phase, 616 Housing Unit and Its Associated Infrastructure Project Organization for Development of Administrative Centers ㅣ 2009. 04 ㅣ 4F 616 Household ㅣ Libya, Derna
19_
WON CONSTRUCTION
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
In pursuit of the world best, We, WON Construction Company are expanding paradigms toward the worldwide field with customers
In pursuit of the world best For overseas expansion as the global era has come, we have established two branches in Tripoli and Benghazi in Libya in 2005, running into overseas construction markets
Overseas Works List Contract Amount
Period
Facility
Place
1st Phase, 1384 Housing Units and Its Associated Infrastructure Project
230 Million USD
2007. 08 ~ 2010. 05
1,384 Households
Libya, Derna
2nd Phase, 616 Housing Units and Its Associated Infrastructure Project
130 Million USD
2009. 04 ~ 2011. 04
616 Households
Libya, Derna
Project
WON CONSTRUCTION
_20
WON CONSTRUCTION
COMPANY INTRODUCTION 21_
WON CONSTRUCTION
Civil Works
Civil Works
We lead the development of the land in harmony with the nature so that we may create more convenient life places. WON CONSTRUCTION
_22
Business Career Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
Land Development Project for the Osong Bio Science Complex (Incl. Special Structure Works) Cheong Won Gun, Chung Buk ㅣ Korea Land Corporation ㅣ 2003. 07 ㅣ Area 4,653,000㎡
Land Development Project for the Yang Ju New City [Sector 1] [Sector 2] Yang Ju City, Gyeong Gi Do ㅣ Korea Land Corporation ㅣ 2008. 07 ㅣ Area [Sector 1] 2,992,174㎡ [Sector 2] 2,099,221㎡
23_
WON CONSTRUCTION
Land Development Project for Jeon Buk Innovative City [Sector 2] Jeon Ju City, Jeon BukㅣKorea Land Corporationㅣ2009. 05ㅣ Area 1,968,045㎡
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
Land Development Project for a Je Cheon Local Industry Complex Je Cheon City, Chung Buk ㅣ Korea Land Corporation ㅣ 2001. 10 ㅣ Area : 1,195,415㎡
Land Development Project for the HILDESHEIM CC in Je Cheon, Chung Buk Je Cheon City, Chung Buk ㅣ Cheong Poog Development Co., Ltd ㅣ 2007. 12 ㅣ 27 Hole
Sewage Pipe Network Project in Cheong Ju Rehabilitation of a Sewage Pipe Network in Bo Eun Gun Desgin and Built for a Sewage Pipe Network in Jin Cheon-Gun Cheong Ju City, Chung Buk ㅣ Cheong Ju Environmental Friendly Co., Ltdㅣ 2006. 06 ㅣ Water Supply and Drainage 40,738m
Bo Eun Gun, Chung Bukㅣ Bo Eun Water Way Management ㅣ Jincheon Gun, Chung Bukㅣ Jin Cheon Water Business ㅣ 2006. 05 ㅣ 2007. 09 ㅣWater Supply and Drainage 43,277m Water Supply and Drainage 26,942m WON CONSTRUCTION
_26
Business Career Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
Temporary Work for the Jeok Seong Grand Brdige Dan Yang Gun, Chung Buk ㅣ Dan Yang Gun ㅣ 2004. 04 ㅣ Road 0.99m, Bridge 0.418m
Local Road Project (Doekpyeong- Heukseok)
Rehabilitation of a Roundabout for the National Highway No. 38
Goesan Gun, Chung Buk ㅣ Chung Cheong Buk Do ㅣ Jecheon City, Chung Buk ㅣ Jecheon City ㅣ 2000. 06 ㅣ Road 1.24km 2002. 12 ㅣ Road 4.5km
Construction of a Roundabout for the North Principal Road Okcheon Gun, Chung Buk ㅣ Ok Cheon Gun ㅣ 2003. 09 ㅣ Road 0.987km
We lead the development of the land in harmony with the nature so that we may create more convenient life places.
National Capital Region Cemetery Park Project Icheon City, Gyung Gi Do ㅣ Korean Veterans Association ㅣ 2005. 07 ㅣ Area 287,600㎡
27_
WON CONSTRUCTION
Business Career ::
Overseas Works
Civil Works
Resort
Civil Works List
Housing Works
Architectural Works
Construction Supervision
Design
We lead the development of the land in harmony with the nature so that we may create more convenient life places.
Land Development Project
Owner
Location
Land Development Project for Rural Houses in Ochang Science Complex
Korea Land Corporation
Cheong Won Gun, Chung Buk
102,787㎡
2000. 01
Land Development Project for a Je Cheon Local Industry Complex
Korea Land Corporation
Je Cheon City, Chung Buk
1,195,415㎡
2001. 10
Land Development Project for the Osong Bio Science Complex [Incl. Special Structure Works]
Korea Land Corporation
Cheong Won Gun, Chung Buk
4,653,000㎡
2003. 07
Na Ju City
Na Ju City, Jeon Nam
297,600㎡
2006. 01
Land Development Project for the Do Ahn New City in Dae Jeon
Dae Jeon City Development Corporation
Yu Sung Gu, Dae Jeon City
371,217,001㎡
2006. 12
Land Development Project in Yang San Mul Guem District [Sector 3-5]
Korea Land Corporation
Yang San City, Gyeong Nam
1,000,000㎡
2008. 03
Land Development Project for the Yang Ju New City [Sector 1]
Korea Land Corporation
Yang Ju City, Gyeong Gi Do
2,992,174㎡
2008. 07
Land Development for a Industry Complex in the Dae Gu Technopolis [Sector 3]
Korea Land Corporation
Dal Seong Gun, Dae Gu City
1,788,792㎡
2008. 11
Land Development Project for a Yang Ju New City [Sector 2]
Korea Land Corporation
Yang Ju City, Gyeong Gi Do
2,099,221㎡
2008. 12
Land Development Project for Gyeong Buk Innovation City [Sector 2]
Korea Land Corporation
Kim Cheon City, Gyeong Buk
1,705,000㎡
2009. 03
Land Development Project for a Won Ju Innovative City [Sector 3]
Korea Land Corporation
Won Ju City, Gang Won Do
1,509,000㎡
2009. 03
Land Development Project for a Industry Complex in the Dae Gu Technopolis [Sector 2]
Korea Land Corporation
Dal Seong Gun, Dae Gu City
1,977,000㎡
2009. 05
Land Development Project for Jeon Buk Innovative City [Sector 2]
Korea Land Corporation
Jeon Ju City, Jeon Buk
1,968,045㎡
2009. 05
Land Development Project for Multifunctional Administrative City [Sector 1-3]
Korea Land Corporation
Youn Gi Gun, Chung Nam
1,178,000㎡
2009. 07
Land Development Project for Multifunctional Administrative City [Sector 1-1-3]
Korea Land Corporation
Youn Gi Gun, Chung Nam
1,328,000㎡
2009. 07
Owner
Location
Size
Period
Chung Cheong Buk Do
Goesan Gun, Chung Buk
Road 1.24km
2000. 06
Jecheon City
Je Cheon City, Chung Buk
Road 4.5km
2002. 12
Construction of a Roundabout for the North Principal Road
Ok Cheon Gun
Okcheon Gun, Chung Buk
Road 0.987km
2003. 09
Temporary Work for the Jeok Seong Grand Brdige
Dan Yang Gun
Dan Yang Gun, Chung Buk
Road 0.99km Brdige 0.418 km
2004. 04
Korean Veterans Association Cheong Poog Development Co., Ltd
Icheon City, Gyung Gi Do
287,600㎡
2005. 07
Je Cheon City, Chung Buk
27 Holes
2007. 12
Owner
Location
Korea Rural Corporation
Cheong Won Gun, Chung Buk
193ha
2003. 10
Dan Yang Gun
Dan Yang Gun, Chung Buk
5,145m
2004. 08
Jin Cheon Water Business Cheong Ju Environmental Friendly Co., Ltd Bo Eun Water Way Management Eum Seong Lower Reaches of Water
Jincheon Gun, Chung Buk
26,945m
2006. 05
Cheong Ju City, Chung Buk
40,738m
2006. 06
Bo Eun Gun, Chung Buk
43,277m
2007. 09
Eum Sung Gun, Chung Buk
75,210m
2008. 01
City Development Project in Song Wol District and the National Highway No. 13 Project
Area
Period
Road, Bridge, Resort Project Local Road Project (Doekpyeong - Heukseok) Rehabilitation of a Roundabout for the National Highway No. 38
National Capital Region Cemetery Park Project Land Development Project for the HILDESHEIM CC in Je Cheon, Chung Buk
Water Supply and Drainage Project Rehabilitation for Irrigation Facilities in Yong Gok District Rehabilitation of a Sewage Pipe Network in Dan Yang Desgin and Built for a Sewage Pipe Network in Jin Cheon-Gun (BTL) Sewage Pipe Network Project in Cheong Ju (BTL) Rehabilitation of a Sewage Pipe Network in Bo Eun Gun (BTL) Sewage Pipe Network Project in Eum Sung Gun (BTL)
Size
Period
WON CONSTRUCTION
_28
COMPANY INTRODUCTION
29_
WON CONSTRUCTION
Resort Resort
Resort The best partner for you Challenge & Innovation for the future “ WON Construction ” WON CONSTRUCTION
_30
Business Career Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Je Cheon HILDESHEIM CC Je Cheon City, Chung Buk ㅣ 2007.11 ㅣ 1,280,000㎡ ㅣ Membership 18 Holes, Public 9 Holes Landscaping
31_
WON CONSTRUCTION
Construction Supervision
Design
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
The best partner for you Challenge & Innovation for the future “WON Construction”
ㅣ HILDESHEIM Country Club ㅣ
ㅣ 2009. 06 Mountain 2 Holes View ㅣ
ㅣ 2009. 06 Lake Course 5 Holes View ㅣ
WON CONSTRUCTION
_32
COMPANY INTRODUCTION
WON CONSTRUCTION
33_
WON CONSTRUCTION
Housing Works
Housing Works We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value. WON CONSTRUCTION
_34
Business Career Overseas Works
Civil Works
Resort
Housing Works
In Cheon, Cheong Na HILDESHEIM Cheong Na District, Seo Gu, Incheon Cityㅣ 2008. 09 ㅣ 66,327㎡ ㅣ 1,284 household
35_
WON CONSTRUCTION
Architectural Works
Construction Supervision
Design
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value. We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.
O-song HILDESHEIM LakeView Gangoe Myeon, Cheong Won Gun, Chung Buk ㅣ 2007. 11 ㅣ 41,408㎡ ㅣ 402 household
WON CONSTRUCTION
_36
Business Career Overseas Works
Civil Works
Resort
Housing Works
Ochang Koaroo Apartment Cheong Won Gun, Chung Buk ㅣ2004. 04 ㅣ 55,503㎡ ㅣ 948 household
Apartment in Kim Hae / Yul Ha District Kim Hae City, Gyeong Nam ㅣ 2008. 07 ㅣ 97,829㎡ ㅣ 1,290 household
37_
WON CONSTRUCTION
Architectural Works
Construction Supervision
Design
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Architectural Works
Construction Supervision
Design
We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.
Apartment in Pyeong Taek Sosabul C-5 District
Apartment in Pyeong Taek Sosabul B-3 District
Pyeong Taek Sosabul ㅣ Schedule ㅣ43,945㎡ ㅣ 543 household
Pyeong Taek Sosabul ㅣ Schedule ㅣ56,295㎡ ㅣ 826 household
Army Official Residence in Yong In [BTL] Yong In, Gyeong Gi ㅣ 2006. 10 ㅣ 16,837㎡ ㅣ 258 household
WON CONSTRUCTION
_38
Business Career Overseas Works
Civil Works
Resort
Jukjeon HILDESHEIM 1st Yong In City, Gyeong Gi ㅣ 2007. 07ㅣ 10,580㎡ ㅣ 40 household
Jukjeon HILDESHEIM 2ND Yong In City, Gyeong Gi ㅣ Schedule ㅣ 9,700㎡ ㅣ 36 household
39_
WON CONSTRUCTION
Housing Works
Architectural Works
Construction Supervision
Design
Business Career ::
Overseas Works
Civil Works
Resort
Housing Works
Housing Works List Project
Architectural Works
Construction Supervision
Design
We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.
Location
Area
House hold
Supply
Project Period
Ochang Koaroo Apartment
Cheong Won Gun, Chung Buk
55,503
948
86㎡ / 116㎡ / 156㎡
2004. 04
Apartment in Kim Hae/Yul Ha District
Kim Hae City, Gyeong Nam
97,829
1,290
129㎡ ~ 191㎡
2006. 07
Army Official Residence in Yong In (BTL)
Yong In City, Gyeong Gi
16,837
258
Jukjeon HILDESHEIM 1st
Yong In City, Gyeong Gi
10,580
40
261㎡ ~ 280㎡
2007. 07
O-song HILDESHEIM LakeView
Cheong Won Gun, Chung Buk
41,408
402
145㎡ / 166㎡ / 212㎡
2007. 11
Incheon, Cheong Na HILDESHEIM
Seo Gu, Incheon City
66,327
1,284
84㎡ / 85A㎡ / 85B㎡ / 86㎡
2008. 09
Apartment in Pyeong Taek Sosabul District
Apartment C-5BL Pyeong Taek Sosabul
43,945
543
Schedule
Apartment in Pyeong Taek Sosabul District
Apartment B-3BL Pyeong Taek Sosabul
56,295
826
Schedule
Jukjeon HILDESHEIM 2nd
Yong In City, Gyeong Gi
9,700
36
258㎡ ~ 271㎡
Schedule
Juk Jeon HILDESHEIM 3rd
Yong In City, Gyeong Gi
4,733
19
231㎡ / 286㎡
Schedule
Juk Jeon HILDESHEIM 4th
Yong In City, Gyeong Gi
5,370
18
231㎡ / 286㎡
Schedule
Ochang Rural House Complex 253 Block
Cheong Won Gun, Chung Buk
8,700
Ochang Rural House Complex 52 Block
Cheong Won Gun, Chung Buk
11,464
Ochang Rural House Complex 250Block
Cheong Won Gun, Chung Buk
17,150
Ochang Rural House Complex 32~34Block
Cheong Won Gun, Chung Buk
31,867
2006. 10
WON CONSTRUCTION
_40
COMPANY INTRODUCTION
WON CONSTRUCTION
41_
WON CONSTRUCTION
116-166_ Bukmunro2-Ga_ Sangdang-Gu_ Chengju-Si Chungcheongbuk-do Korea http://www.wonenc.co.kr