원건설

Page 1

WON CONSTRUCTION COMPANY INTRODUCTION

BROAD AND VARIOUS BUSINESS WORLD


Create the Happy World, Open the Happy Future

03_

WON CONSTRUCTION


CONTENTS 04 CEO’s Message 06 History of WON & Organization 08 Management Policy 16 Overseas Works 20 Civil Works 28 Resort 32 Housing Works 40 Architectural Works 48 Construction Supervision 56 Design Works 60 Awards HILDESHEIM 62 General License 66 Brand Information 67 Global Network WON CONSTRUCTION

_04


CEO’s Message

Architecture with Dreams and Philosophy Infinitely Creative Originality and a Challenging Spirit WON Construction, a Leader of Korean Architecture and Construction in the 21st Century

05_

WON CONSTRUCTION


CEO’s Message From the beginning in 1984, WON Construction, with the enterprising challenging spirit and the advanced technology, has utilized the excellent technological capacity and quality to create new ideas and shape the future in various areas of domestic/overseas civil engineering, architecture, residential houses, resorts, etc over the past 25 years in order to make our clients’ dreams come true. On the foundation of consistent management innovation and technical development, WON Construction has carried out several large-scale national policy projects to provide domestic industrial and residential buildings, including the developmental construction of the Bio-Health Science Complex, and the Jecheon Industrial Complex, and various urban development projects. It has received recognition for being an excellent construction company by the KLC (Korea Land Corporation) and its exceptional technical power and know-how has been well-known. WON Construction has also launched a residential housing brand ‘HILDESHEIM’ and has provided about 3,000 of these great quality residential houses annually. It cemented its reputation as the prime housing brand by obtaining the 2007 Grand Prize of Hankyung Residential Culture, and a 2007 Presidential Citation on Residential Housing Construction Day etc. WON Construction made inroads into Libya in 2005 when it undertook the construction of its roads, housing land development, high-quality residential houses, and infrastructure. It has established a bridgehead for its overseas construction markets by constructing branches in Tripoli and Benghazi. At present, it is carrying out a project (with construction costs of about 550 billion KRW) of constructing 2,000 high-quality villas and infrastructure in DERNA. Consequently, WON Construction won the award “Tower of 20 Million Exports” in 2008 and established itself as an excellent construction company. The Architecture embodying its vision and philosophy has prospective values. We promise to develop WON Construction into being a world leading enterprise outside of the Korean domestic market, based on its infinite originality and challenging spirit. We hope you remain loyal and interested in WON Construction’s endeavors, as it becomes a global enterprise. Thank you for your time. CEO_

Min Ho, Kim

WON CONSTRUCTION

_06


Your Dream Partner

WON CONSTRUCTION Co., Ltd.

07_

WON CONSTRUCTION


History of WON 2000s 2007. 12 Obtained “2007 Presidential Citation on Residential Housing Construction Day” 2007. 07 Won the first prize of “Grand Prize of Hankyung Residential Culture” in the townhouse field. 2006. 12 Won the “Grand Award of Integrity Designated by the Citizens” from Cheong-Ju Citizens Coalition for Economic Justice 2006. 06 Completed construction of “Ochang Koaroo Apt” 2005. 12 Registered the construction of fire-fighting buildings. 2005. 12 Registered the construction of landscaping projects. 2005. 12 Established branch at Libya 2005. 09 Registered overseas construction business 2005. 07 Change the company name “WON Construction Co., Ltd.” 2004. 12 Launched the brand of WON Construction’s residential housing projects, “HILDESHEIM” 2003. 12 Registered the business for the design and construction of sewage disposal facilities. 2003. 03 Designated by Korea Land Corporation as “Excellent Construction Company” 2001. 03 Registered agency business for Environmental Effect Evaluation

1900s 1999. 10 Registered the business for electrical projects 1999. 04 Registered the exclusive department for its research and development. 1998. 01 Registered the business of the supervision for fire fighting (mechanical and electrical) facilities. 1997. 12 Registered the license to conduct Civil Engineering Works. 1996. 10 Registered the license to conduct Architectural Construction Projects. 1996. 04 Registered as “the professional architectural supervision company”. 1984. 02 Established “WON Architects’ Office”

Organization CEO

Administration Department

Architecture Department

Civil Department

Housing Department

Overseas Business Dep’t

Construction Supervision

Design Department

R&D Center

Administration

Architectural Technology

Civil Engineering Technology

Development

Business Plan

CS for Architecture

Design 1 Team

Research Plan

Estimation

Estimation

Housing Plan

Sales

CS for Civil Works

Design 2 Team

Housing

Architecture

Total CS

Architecture Research

Marketing

Electric

CS for Electrics Works

Financial Accounting Business Project Management BTL Planning

Construction

Sales

Quality Control

Construction Environmental Support

Project Development

CS for Communication

Civil Eng. Research Technology Development Technology Support

CS for Fire Fighting Facility

WON CONSTRUCTION

_08


Management Policies WON Construction is continuously growing and developing into an international enterprise creating the best value, based on its specialty, advanced technology and active thinking power.

COMPANY VISION

【 Prideful Individual Manpower with at least One Experienced Skill 】 WON Construction carries out each project utilizing exceptional technical skills, taking pride in its responsibility in the Korean construction industry.

【 Positive and Active Way of Thinking 】 WON Construction always fulfills the fundamental tasks first by applying positive and active thought.

【 Realization of the Best Intellectual Enterprise 】 Building on a foundation of the know-how accumulated through various successfully completed projects and consistent researches and developments, WON Construction is realizing itself as a paragon of intellectual enterprise.

Prideful Individual Manpower with at least One Experienced Skill

Positive and Active Way of Thinking

09_

WON CONSTRUCTION

Realization of the Best Intellectual Enterprise


WON CONSTRUCTION

Management Policies

WON Construction maximizes digital applications for more efficient site management and has introduced a digital system initiative in order to create/share/recreate knowledge.

PM

EMS

RFID

INFORMATIONORIENTED MANAGEMENT

IS

P ER

PMS 【 ERP - Enterprise Resource Planning 】 The ERP system was established in the head office and on domestic/overseas sites, and has been operating after the computerization process for the entire works including budget preparation and customer management as well as planning, quotation, design, construction, and repair work. Based on this system, we have made a great effort to reduce working hours and costs by maximizing the flexibility and efficiency of various environmental changes.

EMS

PMS

【 RFID - Radio Frequency Identification 】

RFID

We are able to reduce the projects completion period by using the optimum amount of manpower/resources/equipment necessary for a successful project, and create the best outcome that the customer desires.

IS

【 PMIS - Project Management Information System 】

PM

P ER

The efficiency of personnel management has been maximized through a remote identification system which checks the time site staff and workers start/leave the workplace and their working hours. According to the process plan, we can predict at what time a large number of personnel is needed, and then using the necessary manpower at the most appropriate time, each process of the project can be smoothly executed.

【 PMS - Purchasing Management System 】 We computerize and manage the type, quantity, and input time of the resources necessary for the completion of a project. We exactly know the amount of resources stored and the types and amount of materials changed by a revised project, and then supply them at the most appropriate time.

【 EMS - Equipment Management System 】 We also computerize the type, specification, and quantity of holding equipment and needed equipment which are available for use, by purchasing new equipment and maintaining the existing equipment. We examine the equipment in need of repair and check the purchasing or repairing schedule for the components that are needed, in order to help conduct the process smoothly. WON CONSTRUCTION

_010


Management Policies WON Construction is continuously growing and developing into an international enterprise creating the best value, based on its specialty, advanced technology and active thinking power.

Quality Management

【 ISO 9001 Quality Management System Certificate】 WON Construction obtained the ISO9001 Certification in 1998 in order to raise the customer satisfaction of its superior technology and quality, so its quality has been internationally certified.

【 Management-Innovated Medium/Small Enterprise Certificate 】 WON Construction was chosen as the Management-innovated Medium/Small Enterprise in 2007, and the exceptional quality and thorough process management in technology gained much recognition. What is more, it has been recognized in the management marketing innovation field through systematic organization management and the induction of new brands.

【PERI Skydeck System Form】

PERI Skydeck system form is one type of System Forms produced by PERI. It helps reduce the construction time by shortening the time taken to install and detach the slab forms. It takes only 7 days to complete the framework for an one-story structure (Walls and slab), which halves the length of the construction period for the existing form construction (takes 15 days)

11_

WON CONSTRUCTION


WON CONSTRUCTION

Management Policies

WON Construction is recognized by various licenses and technologies based on many domestic and overseas projects.

PM

EMS

RFID

Technology Management

IS

P ER

PMS 【 Domestic Licenses 】 License

License No.

Date of Registration

2005 - 16

2005. 12. 20

Chung Cheong North Province Office

Chung Buk - 00353

1999. 10. 22

Chung Cheong North Province Office

430054

2008. 04. 29

Chung Cheong North Province Office

12 - 0035

2005. 12. 13

Chung Cheong North Province Office

Chung BukHousing 2006-0010

2006. 06. 01

Korea Housing Builders Association

Civil-Architectural Work12 - 0029

1999. 12. 16

Chung Cheong North Province Office

Fire Fighting Facility Works Electric Works Communication Facility Works Landscaping Housing Works Civil/Architectural Works

Authority

Overseas Construction – Electric Works

455

2005. 09. 21

Ministry of Land, Transport and Maritime Affairs

Overseas Construction – Civil/ Architectural Works

479

2005. 09. 21

Ministry of Land, Transport and Maritime Affairs

Great Socialist People’s Libyan Arab Jamahirya General Committee for Commerce People’s Committee for Tripoli Business

Business Registration Office Certificate of Business

No.: 62925 Company/Industry/Profession/Joint/Partner/Trade

Custody No.: 40 Date: A.D. 2005/12/24 Registration No.: 62925 Receipt No. for the payment of the fee: 9036897 Date: A.D. 2005/12/24 Applicant/Titl e

Kim, Dong Yun / Regional Director

Nationality

Korean (R.O.K)

Name of Corp oration

WON Construction Co., Ltd

Capital

LYD150,000

Types of Busi The business activity is limited by the following. Construction of Road, Dam, Bridge ness . Harbor Construction, Pier Construction, Berth Construction, Dredging Works, Mari time Works. And construction agreed by the authority of improvement and developm ent Date of Establ ishment, Regis tration No.

Based on the resolution 2005. No. 758 about establishment of foreign branches in Li bya resided by the head of the General Committee for Commerce, it is allowed to est ablish the branch for 5 years from 2005.12.6.

Address of the Salahuddir/Company Roads/Near to the GMR Branch Headquarters and Agent

【 International Licenses 】 Country

License

Libya

Construction of Road, Bridge, Dam, Pier, Dock, Structure Related with Maritime Works

1)

In Libya 2) Overseas

Address

License No.

62925

Date of Registration

Authority

2005.12. 24

Chamber of Commerce

Date of Establish ment

Address

Date of Esta blishment

No. of Certificate

Name of Compan y

Title

Date of Reg istration for the Agent an d Duration

Nationalit y

D.O.B

Domicile

Regional Director

Unlimited

Korean ( R.O.K)

1945

Tripoli

Salahuddir/Co mpany Roads/ Near to the G MR Agent and Re presentatives Name/Father’s Name/Title

Kim, Dong Yu n

Date to hand over to the applicant: Libyan calendar 1376/5/22 Applicant paid the fee (tax) and the amount: Tripoli Year: 2008.5.25 Document No.: 1 Issuance: Tripoli (Capital of Libya) Year: Libyan calendar 1376/5/22 Date to be agreed: Year 2008/5/25

WON CONSTRUCTION

_12


Management Policies WON Construction has established its comprehensive management system based on its experience in the projects in connection with ‘Health & Safety, and Environment’ for several years.

Safety Management

【 Health and Safety 】 Through regular fortnightly safety training, we encourage workers to wear safety gear including crash helmets, working clothes and gloves, and safety tools. We also familiarize them with basic work instructions on the use of fire and electrical equipment. All workers must fully know the work instructions in the morning of each working day, in order to prevent potential accidents which may happen during the work. There is one professional safety supervisor on each project site to prevent potential accidents which may happen on site. He/she provides advices on correction of unsafely used equipment/ machinery and improperly processed conditions immediately. We prevent car accidents on site by regulating the speed of vehicles. We have a medical team and emergency car to take immediate care of matters when an accident happens in the site. If any accidents happen, they are reported to the safety manager who takes the appropriate action quickly.

Weekly Safety Training

How to wear safety gear such as crash helmets, safety shoes.

Work Instruction Training

Health, Safety

【 Environment 】 We protect workers against every harmful factor in the project site environment and observe the local environmental protection regulations. We dispose of waste generated on the project site in accordance with the related regulations.

13_

WON CONSTRUCTION

Environment


WON CONSTRUCTION

Management Policies

WON Construction successes to develop and apply the new method and the new technology to the project sites based on active investment in order to develop the state of art technologies with research centers and universities in response of rapid and various changes in domestic and international market.

PM

IS

P ER

EMS

RFID

Research and Development PMS Patent Number

Registration Date Title of the Invention

No. 0383508

Apr. 2003

No. 0419345

Feb. 2004

REMITAR containing ceramics for architectural construction and finishing work. Method of manufacturing the bricks for inner wall use, which are good for humans.

No. 0453480

Oct. 2004

Fuel Saving Heating System

No. 0453482

Oct. 2004

Platform for wallpapering use

No. 0471713

Feb. 2005

Curing Membrane Covering System for the concrete floors of apartment houses.

No. 0484519

Apr. 2005

Safety Inspection System for underground objects within apartment complexes.

No. 10-0562878

Mar. 2006

Hume concrete pipe cutter

No. 10-0593297

Jun. 2006

Structure of Liner Plate for the foundation work (for laying pipes) of a building use.

No. 10-0599245

Jul. 2006

Structure of Liner Plate for the supports used in the foundation work against side earth pressure.

No. 10-0601589

Jul. 2006

Rain Blocking Device on wave-shaped pipes protecting the cables within apartment houses complex.

No. 10-0625326

Sep. 2006

Structure of Hanger supporting the cable within apartment housing complexes.

No. 10-0629900

Sep. 2006

Structure of Cable Tray blocking the electric waves from Distribution Lines for apartment house use.

No. 10-0636879

Oct. 2006

Structure of sunscreen and Insect Net for apartment house use.

No. 10-0637711

Oct. 2006

Easily Adjustable width of prefabricated Liner Plate for construction.

No. 10-0640010

Oct. 2006

Supporting Instrument for the concrete pouring Force Pump Pipe.

No. 10-0642314

Oct. 2006

Drain Cock to prevent back-ward flows from sewage pipe within apartment houses complex.

No. 10-0643007

Oct. 2006

Water Stop Plate for concrete structural elements.

No. 10-0643636

Nov. 2006

Flooring structure of apartment houses and its construction method.

No. 10-0650500

Nov. 2006

Easily constructible external insulation structure for the foundation of apartment houses.

No. 10-0650502

Nov. 2006

Nonskid devices on the floor of underground car parks within apartment houses.

No. 10-0655883

Dec. 2006

Panel Structure of Switchboard System within apartment houses. Electric wire protection ducts installed on the walls of apartments.

No. 10-0660133

Dec. 2006

No. 10-0661301

Dec. 2006

Support Structure to fill concrete inside the Steel Pile Head, and the construction method for concrete foundations using this.

No. 10-064695

Dec. 2006

Lightning Rod Fixing Device for apartment houses use.

No. 10-0667007

Jan. 2007

Protective Panel for underground cables within apartment housing complexes.

No. 10-0672976

Jan. 2007

Leak Prevention Device using water-proofing paint for Cement Pipes

No. 10-0673489

Jan. 2007

Electric Terminal Box Fixing Structure for apartment house use.

No. 10-0685299

Feb. 2007

Safety vests with dust-collecting devices.

No. 10-0686062

Feb. 2007

Crack Remover for concrete creak repair use, its production method and how to repair cracks.

No. 10-0702252

Mar. 2007

Electric Terminal Box on the ceiling of apartments.

No. 10-0715987

May. 2007

WATTMETER making an uninterruptible change available for apartment houses.

No. 10-0786732

Dec. 2007

Guard railing materials for architectural structures.

No. 10-0787107

Dec. 2007

Superstructure for the Stone Coat of the projected entrance.

No. 10-0787541

Dec. 2007

Environment-friendly bricks with carbon absorbent properties and its production method

No. 10-0789844

Dec. 2007

Combined Safety Net and Vertical Net on site.

No. 10-0800031

Jan. 2008

Environment-friendly finishing mortar with carbon absorbent properties and its manufacturing method.

No. 10-0821903

Apr. 2008

Prefabricated File Decoration Structure on the walls of a building. WON CONSTRUCTION

_14


Management Policies WON Construction has the power to change the world. WON Construction proves its exceptional technical skills and competence in Civil Engineering, Construction, Residential House, Resort, Overseas projects, CS and Design etc.

Business Area

【 Civil Engineering 】Residential Land Development, Water Supply & Sewage Facilities, Road, Bridge, Charnel Facility WON Construction with its abundant know-how and technical skills has been continuously contributing to efficient national land development (from basic factors of national development like complex development projects, road, and bridge construction to all types of water treatment facilities)

【 Construction 】General buildings, Office buildings, Educational/Research & Medical Facilities, Cultural/Physical Education Facilities, Factories, BTL We provide the best quality in each architectural area including office buildings, Education and Cultural facilities, Industrial facilities, BTL(Built Transfer Lease) projects, and realize the highest quality architectural culture to satisfy our customers.

【 Residential House 】Apartments, New Project-Townhouse, BTL We try our utmost to provide a dream-like space for our customers through various types of residential housing including elegant townhouses and high quality apartment houses. WON Construction keeps with the changing needs of our customers and creates the top residential culture with a high-grade of self-confidence.

【 Resort 】Golf The resort project is being watched with keen interest as leisure culture becomes more and more popular. WON Construction is constructing an internationalscale golf course under the prime brand ‘HILDESHEIM’, thus opening a new era of resort culture.

【 Overseas 】 Road Project, Residential Development, Infrastructure Construction, and Residential Housing Construction WON Construction established a local corporation in Libya in 2005 in order to unfold its sufficient know-how and technical skills and to receive recognition from world markets to create a better world. It has been contributing to the development of a high-quality architectural culture in various areas there.

【 Construction Supervision 】 We do our best to give our customers the greatest value for money through our know-how, maximized management efficiency and productivity and our effective project management and process management systems.

【 Design 】 WON Construction continuously takes on challenges and spares no effort to provide the best value for our customers through a systematic design system from the beginning of a project, the planning stage.

15_

WON CONSTRUCTION


WON CONSTRUCTION

Management Policies

WON Construction has sound financial structure evaluated as A- in the rating of company credit and is the superior company having the 1st grade in the evaluation of the construction capacity.

PM

RFID

EMS

Company Evaluation Data

IS

P ER

PMS Corporate Credit Rating Certification

A(Unit : KRW million,%)

Classification

2006

2007

2008

Total Assets

37,270

56,080

96,916

Equity Capital

19,628

26,000

33,192

PaidInCapital

5,300

5,300

5,300

Sales

77,967

70,156

139,572

3,717

5,641

1,717

12,700

17,024

27,241

Net Income Total Borrowings

1st Grade

Level of Assessed Construction Competence Annual Sales for the last 3 years Classification

(Unit : KRW million,%)

2006

2007

2008

Civil Engineering

37,336

29,436

96,334

Construction(Architecture)

39,605

30,769

66,712

355

519

711

Landscape Electricity

3,437

1,240

256

Supervision

8,493

11,205

11,781

1,104

1,406

476

Design Engineering Total

472

574

791

90,802

75,149

177,061 WON CONSTRUCTION

_16


COMPANY INTRODUCTION

Overseas Works In pursuit of the world best, We, WON Construction Company are expanding paradigms toward the worldwide field with customers 17_

WON CONSTRUCTION


Overseas Works

In Libya For overseas expansion as the global era has come, we have established two branches in Tripoli and Benghazi in Libya in 2005, running into overseas construction markets WON CONSTRUCTION

_18


Business Career Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

1st Phase, 1,384 Housing Units and Its Associated Infrastructure Project Organization for Development of Administrative Centers ㅣ 2007. 08 ㅣ 4F 1384 Household ㅣ Libya, Derna

2nd Phase, 616 Housing Unit and Its Associated Infrastructure Project Organization for Development of Administrative Centers ㅣ 2009. 04 ㅣ 4F 616 Household ㅣ Libya, Derna

19_

WON CONSTRUCTION


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

In pursuit of the world best, We, WON Construction Company are expanding paradigms toward the worldwide field with customers

In pursuit of the world best For overseas expansion as the global era has come, we have established two branches in Tripoli and Benghazi in Libya in 2005, running into overseas construction markets

Overseas Works List Contract Amount

Period

Facility

Place

1st Phase, 1384 Housing Units and Its Associated Infrastructure Project

230 Million USD

2007. 08 ~ 2010. 05

1,384 Households

Libya, Derna

2nd Phase, 616 Housing Units and Its Associated Infrastructure Project

130 Million USD

2009. 04 ~ 2011. 04

616 Households

Libya, Derna

Project

WON CONSTRUCTION

_20


WON CONSTRUCTION

COMPANY INTRODUCTION 21_

WON CONSTRUCTION


Civil Works

Civil Works

We lead the development of the land in harmony with the nature so that we may create more convenient life places. WON CONSTRUCTION

_22


Business Career Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

Land Development Project for the Osong Bio Science Complex (Incl. Special Structure Works) Cheong Won Gun, Chung Buk ㅣ Korea Land Corporation ㅣ 2003. 07 ㅣ Area 4,653,000㎡

Land Development Project for the Yang Ju New City [Sector 1] [Sector 2] Yang Ju City, Gyeong Gi Do ㅣ Korea Land Corporation ㅣ 2008. 07 ㅣ Area [Sector 1] 2,992,174㎡ [Sector 2] 2,099,221㎡

23_

WON CONSTRUCTION

Land Development Project for Jeon Buk Innovative City [Sector 2] Jeon Ju City, Jeon BukㅣKorea Land Corporationㅣ2009. 05ㅣ Area 1,968,045㎡


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

Land Development Project for a Je Cheon Local Industry Complex Je Cheon City, Chung Buk ㅣ Korea Land Corporation ㅣ 2001. 10 ㅣ Area : 1,195,415㎡

Land Development Project for the HILDESHEIM CC in Je Cheon, Chung Buk Je Cheon City, Chung Buk ㅣ Cheong Poog Development Co., Ltd ㅣ 2007. 12 ㅣ 27 Hole

Sewage Pipe Network Project in Cheong Ju Rehabilitation of a Sewage Pipe Network in Bo Eun Gun Desgin and Built for a Sewage Pipe Network in Jin Cheon-Gun Cheong Ju City, Chung Buk ㅣ Cheong Ju Environmental Friendly Co., Ltdㅣ 2006. 06 ㅣ Water Supply and Drainage 40,738m

Bo Eun Gun, Chung Bukㅣ Bo Eun Water Way Management ㅣ Jincheon Gun, Chung Bukㅣ Jin Cheon Water Business ㅣ 2006. 05 ㅣ 2007. 09 ㅣWater Supply and Drainage 43,277m Water Supply and Drainage 26,942m WON CONSTRUCTION

_26


Business Career Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

Temporary Work for the Jeok Seong Grand Brdige Dan Yang Gun, Chung Buk ㅣ Dan Yang Gun ㅣ 2004. 04 ㅣ Road 0.99m, Bridge 0.418m

Local Road Project (Doekpyeong- Heukseok)

Rehabilitation of a Roundabout for the National Highway No. 38

Goesan Gun, Chung Buk ㅣ Chung Cheong Buk Do ㅣ Jecheon City, Chung Buk ㅣ Jecheon City ㅣ 2000. 06 ㅣ Road 1.24km 2002. 12 ㅣ Road 4.5km

Construction of a Roundabout for the North Principal Road Okcheon Gun, Chung Buk ㅣ Ok Cheon Gun ㅣ 2003. 09 ㅣ Road 0.987km

We lead the development of the land in harmony with the nature so that we may create more convenient life places.

National Capital Region Cemetery Park Project Icheon City, Gyung Gi Do ㅣ Korean Veterans Association ㅣ 2005. 07 ㅣ Area 287,600㎡

27_

WON CONSTRUCTION


Business Career ::

Overseas Works

Civil Works

Resort

Civil Works List

Housing Works

Architectural Works

Construction Supervision

Design

We lead the development of the land in harmony with the nature so that we may create more convenient life places.

Land Development Project

Owner

Location

Land Development Project for Rural Houses in Ochang Science Complex

Korea Land Corporation

Cheong Won Gun, Chung Buk

102,787㎡

2000. 01

Land Development Project for a Je Cheon Local Industry Complex

Korea Land Corporation

Je Cheon City, Chung Buk

1,195,415㎡

2001. 10

Land Development Project for the Osong Bio Science Complex [Incl. Special Structure Works]

Korea Land Corporation

Cheong Won Gun, Chung Buk

4,653,000㎡

2003. 07

Na Ju City

Na Ju City, Jeon Nam

297,600㎡

2006. 01

Land Development Project for the Do Ahn New City in Dae Jeon

Dae Jeon City Development Corporation

Yu Sung Gu, Dae Jeon City

371,217,001㎡

2006. 12

Land Development Project in Yang San Mul Guem District [Sector 3-5]

Korea Land Corporation

Yang San City, Gyeong Nam

1,000,000㎡

2008. 03

Land Development Project for the Yang Ju New City [Sector 1]

Korea Land Corporation

Yang Ju City, Gyeong Gi Do

2,992,174㎡

2008. 07

Land Development for a Industry Complex in the Dae Gu Technopolis [Sector 3]

Korea Land Corporation

Dal Seong Gun, Dae Gu City

1,788,792㎡

2008. 11

Land Development Project for a Yang Ju New City [Sector 2]

Korea Land Corporation

Yang Ju City, Gyeong Gi Do

2,099,221㎡

2008. 12

Land Development Project for Gyeong Buk Innovation City [Sector 2]

Korea Land Corporation

Kim Cheon City, Gyeong Buk

1,705,000㎡

2009. 03

Land Development Project for a Won Ju Innovative City [Sector 3]

Korea Land Corporation

Won Ju City, Gang Won Do

1,509,000㎡

2009. 03

Land Development Project for a Industry Complex in the Dae Gu Technopolis [Sector 2]

Korea Land Corporation

Dal Seong Gun, Dae Gu City

1,977,000㎡

2009. 05

Land Development Project for Jeon Buk Innovative City [Sector 2]

Korea Land Corporation

Jeon Ju City, Jeon Buk

1,968,045㎡

2009. 05

Land Development Project for Multifunctional Administrative City [Sector 1-3]

Korea Land Corporation

Youn Gi Gun, Chung Nam

1,178,000㎡

2009. 07

Land Development Project for Multifunctional Administrative City [Sector 1-1-3]

Korea Land Corporation

Youn Gi Gun, Chung Nam

1,328,000㎡

2009. 07

Owner

Location

Size

Period

Chung Cheong Buk Do

Goesan Gun, Chung Buk

Road 1.24km

2000. 06

Jecheon City

Je Cheon City, Chung Buk

Road 4.5km

2002. 12

Construction of a Roundabout for the North Principal Road

Ok Cheon Gun

Okcheon Gun, Chung Buk

Road 0.987km

2003. 09

Temporary Work for the Jeok Seong Grand Brdige

Dan Yang Gun

Dan Yang Gun, Chung Buk

Road 0.99km Brdige 0.418 km

2004. 04

Korean Veterans Association Cheong Poog Development Co., Ltd

Icheon City, Gyung Gi Do

287,600㎡

2005. 07

Je Cheon City, Chung Buk

27 Holes

2007. 12

Owner

Location

Korea Rural Corporation

Cheong Won Gun, Chung Buk

193ha

2003. 10

Dan Yang Gun

Dan Yang Gun, Chung Buk

5,145m

2004. 08

Jin Cheon Water Business Cheong Ju Environmental Friendly Co., Ltd Bo Eun Water Way Management Eum Seong Lower Reaches of Water

Jincheon Gun, Chung Buk

26,945m

2006. 05

Cheong Ju City, Chung Buk

40,738m

2006. 06

Bo Eun Gun, Chung Buk

43,277m

2007. 09

Eum Sung Gun, Chung Buk

75,210m

2008. 01

City Development Project in Song Wol District and the National Highway No. 13 Project

Area

Period

Road, Bridge, Resort Project Local Road Project (Doekpyeong - Heukseok) Rehabilitation of a Roundabout for the National Highway No. 38

National Capital Region Cemetery Park Project Land Development Project for the HILDESHEIM CC in Je Cheon, Chung Buk

Water Supply and Drainage Project Rehabilitation for Irrigation Facilities in Yong Gok District Rehabilitation of a Sewage Pipe Network in Dan Yang Desgin and Built for a Sewage Pipe Network in Jin Cheon-Gun (BTL) Sewage Pipe Network Project in Cheong Ju (BTL) Rehabilitation of a Sewage Pipe Network in Bo Eun Gun (BTL) Sewage Pipe Network Project in Eum Sung Gun (BTL)

Size

Period

WON CONSTRUCTION

_28


COMPANY INTRODUCTION

29_

WON CONSTRUCTION


Resort Resort

Resort The best partner for you Challenge & Innovation for the future “ WON Construction ” WON CONSTRUCTION

_30


Business Career Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Je Cheon HILDESHEIM CC Je Cheon City, Chung Buk ㅣ 2007.11 ㅣ 1,280,000㎡ ㅣ Membership 18 Holes, Public 9 Holes Landscaping

31_

WON CONSTRUCTION

Construction Supervision

Design


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

The best partner for you Challenge & Innovation for the future “WON Construction”

ㅣ HILDESHEIM Country Club ㅣ

ㅣ 2009. 06 Mountain 2 Holes View ㅣ

ㅣ 2009. 06 Lake Course 5 Holes View ㅣ

WON CONSTRUCTION

_32


COMPANY INTRODUCTION

WON CONSTRUCTION

33_

WON CONSTRUCTION


Housing Works

Housing Works We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value. WON CONSTRUCTION

_34


Business Career Overseas Works

Civil Works

Resort

Housing Works

In Cheon, Cheong Na HILDESHEIM Cheong Na District, Seo Gu, Incheon Cityㅣ 2008. 09 ㅣ 66,327㎡ ㅣ 1,284 household

35_

WON CONSTRUCTION

Architectural Works

Construction Supervision

Design


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value. We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.

O-song HILDESHEIM LakeView Gangoe Myeon, Cheong Won Gun, Chung Buk ㅣ 2007. 11 ㅣ 41,408㎡ ㅣ 402 household

WON CONSTRUCTION

_36


Business Career Overseas Works

Civil Works

Resort

Housing Works

Ochang Koaroo Apartment Cheong Won Gun, Chung Buk ㅣ2004. 04 ㅣ 55,503㎡ ㅣ 948 household

Apartment in Kim Hae / Yul Ha District Kim Hae City, Gyeong Nam ㅣ 2008. 07 ㅣ 97,829㎡ ㅣ 1,290 household

37_

WON CONSTRUCTION

Architectural Works

Construction Supervision

Design


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Architectural Works

Construction Supervision

Design

We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.

Apartment in Pyeong Taek Sosabul C-5 District

Apartment in Pyeong Taek Sosabul B-3 District

Pyeong Taek Sosabul ㅣ Schedule ㅣ43,945㎡ ㅣ 543 household

Pyeong Taek Sosabul ㅣ Schedule ㅣ56,295㎡ ㅣ 826 household

Army Official Residence in Yong In [BTL] Yong In, Gyeong Gi ㅣ 2006. 10 ㅣ 16,837㎡ ㅣ 258 household

WON CONSTRUCTION

_38


Business Career Overseas Works

Civil Works

Resort

Jukjeon HILDESHEIM 1st Yong In City, Gyeong Gi ㅣ 2007. 07ㅣ 10,580㎡ ㅣ 40 household

Jukjeon HILDESHEIM 2ND Yong In City, Gyeong Gi ㅣ Schedule ㅣ 9,700㎡ ㅣ 36 household

39_

WON CONSTRUCTION

Housing Works

Architectural Works

Construction Supervision

Design


Business Career ::

Overseas Works

Civil Works

Resort

Housing Works

Housing Works List Project

Architectural Works

Construction Supervision

Design

We maximize customers’ convenience by analyzing and predicting their tendency and build the house where the customers get higher value.

Location

Area

House hold

Supply

Project Period

Ochang Koaroo Apartment

Cheong Won Gun, Chung Buk

55,503

948

86㎡ / 116㎡ / 156㎡

2004. 04

Apartment in Kim Hae/Yul Ha District

Kim Hae City, Gyeong Nam

97,829

1,290

129㎡ ~ 191㎡

2006. 07

Army Official Residence in Yong In (BTL)

Yong In City, Gyeong Gi

16,837

258

Jukjeon HILDESHEIM 1st

Yong In City, Gyeong Gi

10,580

40

261㎡ ~ 280㎡

2007. 07

O-song HILDESHEIM LakeView

Cheong Won Gun, Chung Buk

41,408

402

145㎡ / 166㎡ / 212㎡

2007. 11

Incheon, Cheong Na HILDESHEIM

Seo Gu, Incheon City

66,327

1,284

84㎡ / 85A㎡ / 85B㎡ / 86㎡

2008. 09

Apartment in Pyeong Taek Sosabul District

Apartment C-5BL Pyeong Taek Sosabul

43,945

543

Schedule

Apartment in Pyeong Taek Sosabul District

Apartment B-3BL Pyeong Taek Sosabul

56,295

826

Schedule

Jukjeon HILDESHEIM 2nd

Yong In City, Gyeong Gi

9,700

36

258㎡ ~ 271㎡

Schedule

Juk Jeon HILDESHEIM 3rd

Yong In City, Gyeong Gi

4,733

19

231㎡ / 286㎡

Schedule

Juk Jeon HILDESHEIM 4th

Yong In City, Gyeong Gi

5,370

18

231㎡ / 286㎡

Schedule

Ochang Rural House Complex 253 Block

Cheong Won Gun, Chung Buk

8,700

Ochang Rural House Complex 52 Block

Cheong Won Gun, Chung Buk

11,464

Ochang Rural House Complex 250Block

Cheong Won Gun, Chung Buk

17,150

Ochang Rural House Complex 32~34Block

Cheong Won Gun, Chung Buk

31,867

2006. 10

WON CONSTRUCTION

_40


COMPANY INTRODUCTION

WON CONSTRUCTION

41_

WON CONSTRUCTION


116-166_ Bukmunro2-Ga_ Sangdang-Gu_ Chengju-Si Chungcheongbuk-do Korea http://www.wonenc.co.kr


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.