제니스월드

Page 1

One-Stop Total Solution ZenithWorld Co.,Ltd


One - Stop Total Solution _ ZenithWorld www.zenith21c.com


Message from the CEO

Welcome! We at ZenithWorld would like to extend our sincere thanks to you, our valued customers. Since 2003, we have striven to build our business around a foundation of outstanding customer service and superior quality management. In 2008, taking advantage of the experience we had gained since the establishment of our business, we began developing precision components for use in heaters and related applications. We also started to turn over our business field from precision Cleaning to manufacturing core components for semiconductors, LEDs and LCDs, manufactured through the use of an electrostatic chuck, in 2009, and have successfully achieved market penetration. Now, we are developing our company°Øs capabilities in the areas of spray technology and electroless tungsten plating. We are also focusing on the localization of sourcing of key components in order to maximize cost reductions that we then pass on to you. At ZenithWorld, our objective is to provide a level of customer satisfaction unmatched by any of our competitors. Our aim is not just to be Korea°Øs number one supplier for LCD, and LED manufacturer, but to become a global leader in providing production equipment and core components to industry. We genuinely appreciate your business, now and in the future.

Sincerely, Park, Sang - Been Chief Executive Officer ZenithWorld


One - Stop Total Solution _ ZenithWorld www.zenith21c.com

Company Outline and History

2003 ~ 2005 Founding / Stabilizing

2003.07 Established ZenithWorld Co., Ltd.

2003.09 Completed and moved into a old factory(Juk Hyun-Ri)

2004.08 Registered as business partner of Dong-Bu Electronics

2004.10 Registered as business partner of SEC LCD Business

2004.12 Registered as business partner of Magna Chip

2005.09 ISO 9001/14001 Certification

2006 ~ 2008 Growth Period

2006.12 Established research institute attached to company

2007.01 INNO-BIZ Certification

2007.12 Registered as business partner of LG Display

2008.05 Venture Company Certification

2008.05 Main Biz Certification by SMBA

2008.06 Certification of Promising SME Exporter by SMBA

2008.06 Registered as business Partner 0f Hynix

2008.10 Completed and moved into a new factory at Shin Wal-ri, Ewal-myon

2009 ~ Take-Off Period

2009.04 Capital Increase with Consideration through KDB

2009.09 Registered as business partner of Samsung LED

2009.08 Designated as Quality Excellence Company of Chungbuk Province

2009.10 Designated as Knowledge Economy Minster

2009.12 Started manufacture on ESC

2009.09 Registered as business Partner of LG INNOTEK

2010.10 Registered as business Partner of AMAT


Major Customer

Semiconductor

LCD

ICD

LED/ AMOLED

Solar Cell

Portfolio Manufacture of core Parts

Plasma Spray Coating

Precision Cleaning


One - Stop Total Solution _ ZenithWorld www.zenith21c.com

ESC ESC Electstatic Chuck,

Plate or Wafer is Fixed on lower electrode using static power and, the core of Dry Etch part to keep plate temperature steady.

Plasma Etch System

ESC principle / structure

ESC

It uses MCT equipments and it processes the base metal, coating primary insulation seam, electrode seam, secondary insulation seam using Plasma Spray equipments. It uses the formation plane polishing machine and it polishes it completes Dam and Groove and ESC.

Process Flow Manufacture Complete Reproduction Front Reproduction

Machining

Assembly

1st Insulting Layer

Electrode Layer

2nd Insulting Layer

Dam/Groove Milling

Inspection /Packing


ZW-1 coating Development background and necessity

Hitherto Al2O3, Y2O3 Coating subject matters the within it is excellent compared to shows a plasma quality and in about the coating subject matter ZW-1 Coating subject matter development completions which are an indigenous with demand augmentation.

Technical power and expectation effect

Hitherto Al2O3, Y2O3 Coating subject matters compared to F,a in about plasma reaction gas corrosion resistance and mechanical quality improvement (Hitherto plasma resistance about 2.6 time increases the within Y2O3 coating layer preparing) Particle (contamination) occurrence and size decrement and yield increase Life time increases of parts

Application parts

semiconductor equipment parts, all parts of Y2O3 and Al2O3 coating applications Material: Al, Ceramic, SUS

Quartz disk

Ceramic Dome

Sub electrode

Upper insulator

Focus Ring

DPS Poly upper chamber


One - Stop Total Solution _ ZenithWorld www.zenith21c.com

W-plating Development objective Semiconductor, Hallogen families Gas who are coming to be plentifully used in LCD processes it respects with the ostensible side food defense which is caused by

Strong point

Coating methods of existing and it compares and the corrosion resistance which excels the reduction characteristic atmosphere where the F affiliation or CI affiliation etc. reactions which are classified with Halogen families are strong it shows Halogen Gas it will be able to use specially even about oxide angular chlorine chemical compound etc. the feature where the point is biggest

Application parts

Application possible base metal: SUS, Al, GRAPHITE. The application possible object: HCl, Cl2, HF, BCl3, ClF3, TiCl4, NF3 Application possible temperatur: MAX 800 C째

Center liner

Pendulum

Side liner

Corner

Side liner

Corner


Precision Cleaning Meaning and development necessity

Semiconductor the contamination material removal which occurs from production process of Display, LED and Solar Cell etc. In order decrement remaking after cleaning advancing making, the prime cost charge which is caused by with new parts shift

Field of application

Technical power and expectation effect

In about specialization precise cleaning technical (base metal analyzes power and Co2 Cleaning) retention products lump system setup possibility (cleaning where it is perfect possibility and Parts History managements) Until specialization precision cleaning technique where the multiple competitive enterprise lines up and professional cleaning phase considerable time disturbance The environmental cleaning Chemical (HF substitution) manufacture technical retention which hits LED Wafer De-Cap relation equipment and technical power retention

Before

After

Si Wafer

Wafer Decap Sapphire Wafer

After MOCVD process advancing Decap it does hour fire or a Si Wafer dignity Gan and re-the technical power which is serviceable retention


One - Stop Total Solution _ ZenithWorld www.zenith21c.com

R&D present conditions

To found 2006 December enterprise construction laboratory, currently research worker specialty of 15 people being active research and development From establishment early stage above 5%~10% of every year sale misfortune it comes out every year new product in compliance with research and development costs and project star subjects with the investment for a new major power, It makes an application in intellectual property of etc. of the investment the commonness research which leads a industry and education union and the new high value product development and multiple patent application and utility model, propelling a registration,

Development of ESC for semiconductor 300mm

Development of ESC for semiconductor 300mm

SOFC Development core frame coating

SOFC Development core frame coating

SOFC Development core frame coating Development of ESC for semiconductor 300mm

Development of LED 6 ESC

Ni-mesh Product and coating tech

SOFC Development core frame coating

Development of Plasma Powder Development of W-Coating

Development of W-Coating

TBC coating tech developing

Development of AMOLED Metal ESC

MO-CVD equipment developing

MO-CVD equipment developing


Patent Status

Patent Patent Design

10-0906987 10-0919258 30-2009-0034977

July, 09 Sept, 09 Oct, 10

Cleansing Method for Maintenance of Lower Electrode in etching Chamber The Electrode Cleaning Device Cassette of Storage for substrate

The four case of application for a patent

One - Stop Total Solution _

ZenithWorld


1131, Sinwol-ri, Yiwol-myun, Jincheon-gun, Chungcheongbukdo (Electrical/Electronic Agricultural-industrial Complex) Tel. 82.43.536.6700 Fax. 82.43.536.6788 http://www.zenith21c.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.