1_EASTERN PRECINT STUDENT CENTRE
8600 10320 5160
1720
Figure 30. Estimated dimensions of the ERC (Tan 2013)
POTENTIAL CONSTRUCTION CONSTRAINTS
Issue with transport of materials due to steep stairs adjacent to building. Installation of ramp necessary. Close proximity of other buildings reduce working space needed Need to work around existing infrastructure High foot traffic area may restrict construction times
LINKS TO OTHER BUILDING
Links to the ERC library and the Doug McDonnell building
CONSTRUCTION TYPE
Frame construction
STRUCTURAL SYSTEMS
Tensile and compressive structures o Tapered beams o Battens Trusses Skylight