Construction Journal Submission Report Week Three: CASE STUDY SITE VISIT Nicole Tan 641433

1_EASTERN PRECINT STUDENT CENTRE

8600 10320 5160

1720

Figure 30. Estimated dimensions of the ERC (Tan 2013)

POTENTIAL CONSTRUCTION CONSTRAINTS    

Issue with transport of materials due to steep stairs adjacent to building. Installation of ramp necessary. Close proximity of other buildings reduce working space needed Need to work around existing infrastructure High foot traffic area may restrict construction times

LINKS TO OTHER BUILDING 

Links to the ERC library and the Doug McDonnell building

CONSTRUCTION TYPE 

Frame construction

STRUCTURAL SYSTEMS 

 

Tensile and compressive structures o Tapered beams o Battens Trusses Skylight

Nicole Tan | Constructing Environments Journal

Page 1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Site Visit Case Studies Journal by ntannage - Issuu