Slides 01
Phase 1 Discovery Your teams must collaborate with critical stakeholders to ensure that the data center ecosystem of your company is covered. Map the hardware, software, databases, or operating systems. Examine the deployment models and security needs Recognize ticket management, upkeep, patching, and licensing Review the security, privacy, and other compliance needs.
Slides 02
Phase 2 Planning The planning phase begins with the validation of the requirements acquired during the discovery stage and concludes with the creation of the migration timeline with future cloud capacity assessments. Complete the architecture for ingesting and exchanging data. Give migration of applications with less data dependencies top priority. Make sure that security protocols and planning SDLC documentation are updated. Test the deployment of infrastructure Slides 03
Phase 3 Execution During the execution phase, the correct parameters are used to migrate all your applications and databases to the cloud across all environments. Verify application access to files sharing, databases, load balancers, etc.. Configure security system rules and networking settings Start keeping an eye on your application's performance and availability. Agile application testing and bug fixing Slides 04
Phase 4 Optimization For better everyday operations and a simpler future cloud migration services, it is crucial to optimize current workloads and demystify data processes as part of the optimization step. Identify possibilities for workflow automation Reduce costs by streamlining resource allocation Analyze the environment of the data center for modifications, violations, etc. Utilize cloud managed services to lessen internal stress. Slides 05
https://nuvento.com/blog/complete-guide-for-cloud-migration/