Issue 01 17th October 2024

THANK YOU for buying this product. To help ensure itgives complete satisfaction please install it according to these instructions and then pass theinstructions to the appropriate person for retention and futurereference.

SAFETY This is a mains powered product. Itis designed to be installed by suitably qualified personnel only and in accordance with the applicable building and electrical regulations. Before installation or maintenance the electrical supply to the product must be isolated.

INSTALLATION SUPPORT If installation advice or accessories are required please contact us at the above address. We will do our best to help. When reporting asuspected fault orseeking installation support the problem is likely to be resolved most quickly if you have full product details to-hand, as well as details of when and where it was purchased.

INSTALLATION

1. Find a suitable fixing surfaceand follow the below steps…

sure the IP65 rating is maintained

1. Turn off the Supply
2. Unscrew the lid and Hinge open
3. Use thelidto mark up mounting holes and make ready 4. Drill out the cableentry point
5.Route supply cable 6. Fix the baseto the mounting surface 7. Terminate the supply cableobserve correct polarity
8. Secure the lid ontothebase making

2. This fitting comes with Multi CCT & Power selectable slider & DIP switches,

a. Default settings areCCT=4000K & Power=24W

b. These settingscan be changed as below:

i. CCT Selectable=3000K or 6000K

ii. Power =16Wif required

3. Check for correct operation

Note! It is the installer’s responsibility to ensure the IP65 rating is maintained.

Note! Luminaires fitted withelectronic drivers are exempt from insulation testing as this may cause irreparable damage to the LED driver

PHOTO-CELL VARIANT (…/PEC)

Should the unit be factory fitted with an integralphotocell pleasefollow the above installationinstructions. In addition, please note the following:

1. Extracare shouldbe takenin positioning thefittingsothat thephotocell is not obscuredfrom natural daylight andthat any adjacent lightingwill not causethephotocell to malfunction.

2. When first switchingon theBrooklynfitting it will illuminate irrespective of thetime of day or light level. Afterapproximately 10 minutes, if thelight levelis sufficient thelampwillswitchoff.

3. To test forcorrect operation:

a. Apply power to thefitting and waitfor thefittingtoturn off.

b. Cover the photocell, after approximately 2minutes thefittingshouldswitch on.

c. Uncover the photocelland if inlowlight shine atorch at the photocell. The fitting will switch off afterapproximately 2 minutes.

GENERAL MAINTAINED EMERGENCY LUMINAIRE INSTRUCTIONS

These instructionsshould be followed in conjunction with thestandard luminaire instructions. Please read carefully and passto the end user/responsibleperson for retention and future reference.

INSTALLATION

1. Following theinstallation of theluminaire in accordance with the standard luminaire installationinstructions, aseparate permanent live supplyshould beterminated intheincoming supply terminal block inthe luminaire, inthe connectionmarked ‘L PERM’. The permanentsupply MUST be taken from thesame phase as thecorresponding switchedsupply andMUST be wired at theswitchboard sothat upon instances of tests, it is isolated at the sametime as theswitchedsupply.

2. Oncethe permanent livesupply is connected, connect the battery to the moduleviathe ‘plugand mate’ connector, ensuring correct polarity is observed. Failure to observecorrect battery polarity will result in permanent damageto the emergency module/driver.

3. N.B. toavoidpotential damagetothe battery please ensurethe permanent live is energized as soon as possiblefollowing connection of thebattery to the module.

4. Upon restorationof the powersupply tothe luminaire, check that the indicator LEDfittedwithintheluminaire illuminates green. This indicates that the batteries are charging and that the chargingcircuit is healthy.

5. Allowthe battery tochargefor an uninterrupted period of not less than 24 hours prior to carryingout afull discharge test.

MAINTENANCE

6. The battery pack inthis luminairemust be replaced when it is no longer able tosatisfy its full ratedduration.

7. In emergency mode the light levelof theluminaire willbe at a reduced output. Regular maintenanceand gentlecleaning are recommended so as to ensure that theEmergency Output Factor (E.O.F) remains at specifiedlevels.

8. Isolatethe supply beforeservicing.

9. Pleaseensurethat the emergency flux is not compromisedat any time throughout the designlifeof the luminaire.

10. DO NOT INSULATION TEST

Caution:

The battery packin thisluminaire is aLithium Iron Phosphate (LiFePO4)type which includes adedicated protection circuit. If replacing the battery pack, the specification and chemistrymust beidentical to that detailed on the battery label.

TESTING OF EMERGENCY LUMINAIRES:

Recommended routine test procedures inline with BS 5266-1:2016 & BS EN 50172:2004.