KANSAS LIFE TWIN SPOT INSTRUCTIONS Issue 01 29th February 2023
THANK YOU for buying this product. To help ensure it gives complete satisfaction please install it according to these instructions and then pass the instructions to the appropriate person for retention and future reference. SAFETY This is a mains powered product. It is designed to be installed by suitably qualified personnel only and in accordance with the applicable building and electrical regulations. Before installation or maintenance the electrical supply to the product must be isolated. INSTALLATION SUPPORT If installation advice or accessories are required please contact us at the above address. We will do our best to help. When reporting a suspected fault or seeking installation support the problem is likely to be resolved most quickly if you have full product details to-hand, as well as details of when and where it was purchased. LUMINAIRE INSTALLATION 1. Remove the front cover by using a flat blade screw as shown in fig 1. 2. Secure the luminaire in position. 3-off fixing points provided in back face of the base. 3. Drill out the required cable entry point located on either side wall of the base & fit cable gland. 4. Route the power supply cable through the cable gland to the terminal block. Terminate ensuring correct polarity is observed see fig 2. WARNING: THIS LUMINAIRE MUST BE EARTHED 5. Plug the Battery loom onto the PCB connector marked BATT. 6. Rotate & angle the lamp heads to required direction. The bolts/screws on the lamp heads may need to be loosened to do this – ensure they are re-tightened afterwards to hold position. 7. Refit the cover to the body. 8. Reconnect the power supply. The green LED’s on the side face for “Charge/Fault”, “Lamp1 OK” & “Lamp2 OK” should now illuminate. These indicate the battery is charging & the lamps are healthy. If this does not happen, see section “Fault Indicators” below. NOTE! The lamps will not illuminate at this point. Fig 1. 9. The batteries should be allowed to charge for at least 24 hours before carrying out a full discharge test to check batteries are charging correctly & the maintained duration is being achieved.
Fig 2.
FAULT INDICATORS Faults on the product will be indicated visually by the LED indicators on the side of the base: Battery – If there is a battery failure or it is not connected properly, the “Charge/Fault” LED will flash. Lamp – If there is a lamp failure or it is not connected properly, the “Lamp1” or “Lamp2” LED will go out. OPERATION / MAINTENANCE 1. Nominal battery life is 4 years, after which time they should be replaced with a suitable equivalent. 2. This luminaire MUST be disconnected before the circuit it is installed on is subjected to any high voltage or insulation resistance testing, otherwise irreparable damage will occur to luminaire components. 3. Ensure cleanliness of luminaires is maintained so as not to affect performance.
TESTING FOR EMERGENCY LUMINAIRES Recommended routine test procedures in line with BS 5266 & BS EN 50172: Monthly Functional Test Simulate a mains supply failure by isolating the circuit (ensuring if it is safe to do so) or by way of a test key switch if fitted into the circuit. Do this for a period of time sufficient to check that the lamp heads illuminate. Once complete, ensure the normal supply is restored & that the LED charge & lamp indicators illuminate. Log result/comments in the Testing Log Book. Annual Discharge Test Simulate a mains supply failure by isolating the circuit (ensuring if it is safe to do so) or by way of a test key switch if fitted into the circuit. This should be for the full 3-hour rated duration. Check that the lamp heads illuminate & remain illuminated for the full rated duration period. Once complete, ensure the normal supply is restored & that the LED charge & lamp indicators illuminate. Log result/comments in the Testing Log Book. TESTING LOG BOOK Luminaire Type: ……………………………… FIRST YEAR MONTH
Luminaire Location/No.:
SECOND YEAR
THIRD YEAR
………………………………... FORTH YEAR
FIFTH YEAR
TEST Signed
1
FUNCTIONAL
2
FUNCTIONAL
3
FUNCTIONAL
4
FUNCTIONAL
5
FUNCTIONAL
6
FUNCTIONAL
7
FUNCTIONAL
8
FUNCTIONAL
9
FUNCTIONAL
10
FUNCTIONAL
11
FUNCTIONAL
12
DISCHARGE
Installed By: Contact Details
Date
Signed
Date
……………………………… :
Signed
Date
Installed Date:
Signed
Date
Signed
Date
………………………..............
…………………………………………………………………………………………………………..