nachovillegas - portfolio

Page 1

architectural visualization agency

arrow-right


www.nachovillegas.com | hola@nachovillegas.com


Who we are nachovillegas is a Seville based architectural cgi agency comprised of architects and industrial designers. We use to get involved in projects not only making cute renderings. We participate at any point of a project from its concept design to its visual selling. Each project is treated with the goal of producing relevant and original work that is valuable and useful to our clients. Most of our visual works in public or private competitions have been awarded and built around the world.

contact +34 954 22 10 51 | +34 676 04 68 78 www.nachovillegas.com | hola@nachovillegas.com Plaza Padre Jerรณnimo de Cรณrdoba 2, 2ยบ C.P. 41.003 Seville, Spain

arrow-right


we are here

Who we work with

www.nachovillegas.com | hola@nachovillegas.com


Selected works 2018

Duty Free Retail shop in MTR Kowloon - Hong Kong. DUFRY (1st prize - built) Pepe Jeans stores in Iran and China. PEPE JEANS (under construction) 4* Hotel in Seville, ÁMBITO ARQUITECTURA (1st prize - under construction) 36 dwellings Aloha Golf in Marbella, Spain. (under construction) UD Las Palmas Training Center in Spain, LPA (under construction) 202 dwellings in Seville, Spain. ÁMBITO ARQUITECTURA (under construction) 21+40+45+61 houses in Andalusia, Spain. METROVACESA (under construction)

2017

Duty Free Retail shops in Al Jazeera International Airport in Kuwait. DUFRY (1st prize - built) Waterpark in Algerie. NGNP Arquitectos (under construction) 202 dwellings in Córdoba, Spain. EDDEA (under construction) Lidl Seville and Dos Hermanas grocery stores. LIDL (case study) Luxury Villas in Marbella, Spain. (built) 56 dwellings in Seville, Spain. EDDEA (under construction) Duty Free Retail shop in Mexico D.F. International Airport. DUFRY (1st prize - built) Ale-Hop Retail shop in Barcelona. ALE-HOP (under construction) Residence in Morocco. UN WOMEN Foundation (under construction)

2016

EMS La Rozavère in Lausanne, Switzerland. Juan Socas Architecte (under construction) Duty Free Retail shop in Raleigh-Durham International Airport. DUFRY (under construction) 6 Luxury Lofts in Seville, Spain. ALINEAL (built) Lidl Chiclana grocery store. LIDL (built) Duty Free Retail shops in Colombo International Airport, Sri Lanka. DUFRY (1st prize - built) Multiple Intelligences Nursery School in Seville, Spain. NGNP Arquitectos (built)

2010 - 2015

Scalpers retail shops in London, Chile, Madrid, Bilbao... SCALPERS (built) High School in Málaga. IDOM (1st prize - built) Sofitec headquarters in Seville, Spain. Donaire Arquitectos (1st prize) Piemontesa Restaurant in Madrid, Málaga. Persevera Producciones (built) Port facilities in Ecuador. Ministerio de Defensa, Gobierno de España (under construction) Tata Pila bistró restaurant in Seville, Spain. Persevera Producciones (built) Jericó Moon City Master Plan. Donaire Arquitectos (1st prize) Public spaces in Córdoba, Spain. Ayuntamiento de Córdoba (built) Bike Center in Sevilla, Spain (1st prize - built) I+D+I Retail shops. RESTALIA (unbuilt) Public Space in Sanlúcar la Mayor, Spain. SVQ Arquitectura (built) Passivehaus in Madrid, Spain. David Marsinyach (built) National Oil Corporation Headquarter in Bengasi, Libia. IDOM (private competition) Bailey’s hotel in London. HA London (built) ACURA Showroom in Kuwait. AGi Architects (built) APICE civic center in Spain. Donaire Arquitectos (1st prize) Mall in Lima, Perú. AITEC Spain (1st prize - built) Conference Hall in Córdoba, Spain. LAP Arquitectos (1st prize - built) Aloha College Sports Hall in Marbella, Spain. IDOM (1st prize - built) Train stations in Seville, Spain. INECO (built) 220 social dwellings in Sevilla, Spain. Estudio Francos 40 (1st prize - built) Social Neighborhood Center in Sevilla, Spain. Estudio Francos 40 (1st prize - built) Theatre restoration in Cádiz, Spain (2nd prize)

arrow-right


Ale-hop retail shop in Barcelona

www.nachovillegas.com | hola@nachovillegas.com


How we work 1

Detailed information and description is provided by the client. The following are the data required for giving a budget of a project (the project is not neccesary to be done at this point) CAD drawing of the building. List of materials and furniture. The environment and the project’s surroundings (location, landscape, streets, etc.) Cameras and define the perspective angles such as man eye’s view, bird eye’s view, etc. Image references of the lighting and mood desired for the final visuals.

2

Preliminary drafts will be sent within 3 days after the deposit. (Large projects and/or missing information will require more time for progress to be sent). The first progress will show the project in clay render (image on the top), that is, everything in white without any materials or textures so the client may approve of the building and environment model. The illumination will be based on daylight lighting and the number of images required will be based on the camera angles defined. The objective of sending the first progress with the parameters mentioned above is that at this point the client usually hasn’t defined clearly what materials and textures to use. If they’re applied at this stage, it’s more likely that the client may want changes, increasing the amount of work and time generating an increase of cost as this risk will surely be included in the previously established quotation. Taking this into consideration, it is preferred to help the client reduce the number of revisions and not affect the budget. The fee structure will also be based on this first stage.

3

After sending the first progress, feedback will be expected. At this stage is where the client may define the textures, furniture, camera angles and lighting moods. Clients may also request camera position changes since the model will still be presented in clay renders.

4

When the first feedback is received, 2-7 days will be required to send the next progress. At this moment, before processing the final renderings in high resolution there are 2 revisions included for every project. It is highly recommended that the client provides the complete data from the beginning and follow points 2 and 3 to make sure the revision of point 4 is maximized. Design changes are not part of the revision. This would imply a price increase since the modelling would have to start from scratch. If this is the case, a new project’s modelling cost will be required. (modelling only without the whole rendering cost). Large projects with many revisions or missing information may require more time. This progress will be based on the revisions and information provided in the beginning. If there is any mistake from our part, it will be corrected without affecting the 2 revisions limit.

5

Upon receiving the final approval of all the images required, final rendering will proceed. This will required 2 – 3 days. (bottom image) Large projects may require more time.

arrow-right


www.nachovillegas.com | hola@nachovillegas.com


Pepe Jeans retail stores in Asia (2018, in progress)

arrow-right


www.nachovillegas.com | hola@nachovillegas.com


Duty Free retail store in MĂŠxico International Airport. DUFRY (2017, built)

arrow-right


Duty Free retail stores

Fixture and product examples

www.nachovillegas.com | hola@nachovillegas.com


Furniture

Product design and custom modelling

arrow-right


www.nachovillegas.com | hola@nachovillegas.com


AlhakĂŠn Villas in CĂłrdoba, Spain metrovacesa (2018, in progress)

arrow-right


202 dwellings in Seville, Spain รกmbito arquitectura (2018, in progress)

www.nachovillegas.com | hola@nachovillegas.com


Aloha Golf in Marbella, Spain The Sixfold (2018, in progress)

arrow-right


6 luxury lofts in Seville, Spain alineal (2016, built)

www.nachovillegas.com | hola@nachovillegas.com


arrow-right


202 dwellings in Cรณrdoba, Spain

eddea (2017, in progress)

www.nachovillegas.com | hola@nachovillegas.com


arrow-right


Prefab houses in Terrasa PrĂŞt Ă porter (2016, in progress)

www.nachovillegas.com | hola@nachovillegas.com


arrow-right


Luxury Villa in Puente Romano, Marbella

Carlos Morales (2017, built)

www.nachovillegas.com | hola@nachovillegas.com


Great Tabriz Gate in Iran

AGi Architects (2015, competition)

arrow-right


High School in Mรกlaga, Spain IDOM (2016, 1st prize - in progress)

www.nachovillegas.com | hola@nachovillegas.com


arrow-right


Health center in Huelva, Spain

LAP Arquitectos (2017, 2nd prize)

www.nachovillegas.com | hola@nachovillegas.com


Multiple Intelligences Nursery School

in Seville, Spain. NGNP Arquitectos (2016, built)

arrow-right


Church Museum in Seville, Spain. Hermandad del Museo (2017, in progress)

www.nachovillegas.com | hola@nachovillegas.com


4* hotel in Seville, Spain

รกmbito arquitectura (2018, in progress)

arrow-right


Tata Pila Bistrรณ Restaurant in Seville, Spain.

Persevera Producciones (2015, built)

www.nachovillegas.com | hola@nachovillegas.com


Exhibition in Bilbao, Spain. acciona APD (2017, built)

arrow-right


51 dwellings in Cรณrdoba, Spain

metrovacesa (2018, in progress)

www.nachovillegas.com | hola@nachovillegas.com


arrow-right


www.nachovillegas.com | hola@nachovillegas.com


Waterpark in Algerie

NGNP Arquitectos (2017, in progress)

arrow-right


contact +34 954 22 10 51 | +34 676 04 68 78 www.nachovillegas.com | hola@nachovillegas.com www.nachovillegas.com | hola@nachovillegas.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.