Residential Damage Assessment SDE WORKSHEET SUPPLEMENT
(SMALL URBAN WATERWAYS W/ SHALLOW DEPTH AND SHORT DURATION FLOODING)
Inspector: ________________________________ Date: ___________________________ Address: _________________________________________________________________ Type of Home/Foundation: ___ Slab ___Crawlspace Flood depth:
___ Basement
Exterior: _____ in f
Basement:_____ in f
First Floor ______ in f
Other: _______ in f
___Split-level
FOUNDATION: U Cracks in walls
U
Bowing of walls/Movement of walls visible
U Portions of wall missing/collapsed SUPERSTRUCTURE: Describe:________________________________________________________________ ROOF: Describe:__________________________________________________________ EXTERIOR FINISH: Includes insulation and the wall covering; stucco, siding, brick, etc. U Insulation must be replaced, approximate height ___________ U Replace siding and trim, estimate quantity _________ INTERIOR FINISH: Includes wall board, plaster, paneling, door trim, base boards, paint and varnish U Baseboard replace
U
Walls replace and paint, height __________
U Trim replace
U
Baseboard/trim refinish only
U Other __________________________________________________ DOORS AND WINDOWS: Largest element in homes overall value, estimate carefully. TAKE PHOTOS, note if wood or metal frames when deciding if replacement. U Windows must be replaced # ____
U Exterior doors must be replaced # _______
U Exterior doors, bottom of doors warped, repair only # ________ U Interior doors, bottom of doors warped, repair only # ________ U Interior doors can’t close –replace # ________ 1
CABINET AND COUNTERTOPS: U Lower Cabinets/Countertops can be cleaned/dried _____Kitchen ______Bathroom________2nd bathroom U Cabinets/Countertops must be replaced _______Kitchen _______Bathroom ________2nd bathroom U Upper Cabinets can be cleaned and dried _______Kitchen ______Bathroom ________2nd bathroom U Upper Cabinets must be replaced _______Kitchen ______Bathroom ________2nd bathroom FLOOR FINISH: Includes subflooring and floor sheathing U Subflooring_________ U Sheathing__________ U Carpet____________ U Tile______________ U Vinyl ______________ U Hardwood__________ U
U
Vinyl ____________
U Other ______________
PLUMBING: Includes water heater, water/wastewater piping, water supply lines, septic, wells, sanitary service. U Water heater must be replaced
U Other ___________________________________
U Other ___________________________________ ELECTRICAL: Includes service lines, panel, outlets, wiring, switches, etc. U Panel Repair U Panel must be replaced
U # of Outlets replaced_________
U Other_______________ UOther______________ UOther__________________ APPLIANCES: Built in appliances, washer and dryer, stove, dish washer, refrigerator, freezer, list below U __________________ U __________________ U __________________ U __________________ U __________________ U __________________ HVAC: Furnace, A/C and ducts U Furnace can be reconditioned/repaired
U
Furnace must be replaced
U A/c can be reconditioned/repaired
U
A/c must be replaced
U Duct can be cleaned
U
Ducts must be replaced
2