Nyakundi Kenani Architecture Portfolio

Page 1

PORTFOLIO

SELECTED WORKS Nyakundi Kenani 2015-2020



PROFESSIONAL WORK

SELECTED WORKS



GITANGA APARTMENTS

Architect: S.F.A | Year: 2019 | Scope: 3D Modelling, 3D Rendering,Detail Drawings




YPASS ERN B 36,000

SOUTH

rock formation

E-03 200

5400

S-02

NYANDIGISI RESIDENCE

A

water fountain

200

C

B

200

1,500 100

200

1,300

4,250

1,600

2,000

4,200

1,800

200

1,200

E

D

17,700

150

2,500

2,700

F G

200

200

4,000

2,100

900

700 750

1,400

H

200

1,900 200 1,050 1,400

1,500

E-01

E-01

C

2,050

2,300

200

200

1,600 200

2,300

2,300

11

200

200

4,850

3,750

2,366

150

200

800

200

2,850

FIRST FLOOR +3900

N

P.V

2,300

2,850

PV

BEDROOM 04 ENSUITE

4

GROUND FLOOR +750

200

3

DSQ F

Scale 1

2

3,750

4,100

E-04

2,300

PV

2,850 150 2,850

200

Elevation 01

1,900

5

800

850

15,200

2,100

4,750 200 2,800

2,850

150 3,300

E

F

G

H

200

E

1,400

F G

200

1

200

200

200

200

20R x 150 19G x 300

2,450

650 150 2,850

6,500

PV

200 2,500

1,050

200

2,425

4,000

H

DSQ E Elevation Scale 02 1

150 1,385

200

Scale 1

8

1,385

1,690

3

2,100 150

1,750

200

2

LOUNGE UP

6,350

5 4

200

150

2,560

DSQ E

9

150mm Reinforced Concrete Slab to S.E D

6

20R x 150 19G x 300

150

7

150mm Reinforced Concrete Slab to S.E D

10

FIRST FLOOR +3900

150

8

1,315

STAIR CASE

10

200

150

200

1,315

2,500

200

2,500

7

LOUNGE

1

8,450

PV

2,100 150

PV 1,750

3,927

9

200

TERRACE LEVEL +6900

200

3,066

GROUND FLOOR +7506

ROOF LEVEL200 +3000 200

Elevation 03

1,500

200

4,250

150

17,800

4,200

200

200

2,500

17,800

C

B P.V

LOUNGE

P.V

2,500

200

200

D

E

Consultant: B

STUDIO FORTE ARCHITECTURE C D P. O. BOX 17351 - 00100, NAIROBI.

1,750

6,150 150 150 1,100

SFA/0893

Job Title:

Client:

N

DSQ FLOOR

GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX

GROUND FLOOR +750

Scale 1:100 Elevation 04

Signature & Date:..............................................

Client:

PROPOSED RESIDENTIAL HOUSE ON F G H PLOT L.R NO 3593/45 KAREN,NAIROBI.

Job No.:

1,500 700

450

200 200

H

Job No.:

E

walkway

FIRST FLOOR +3900

P.V

PLOT L.R NO 3593/45 KAREN,NAIROBI.

Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529

1,900

Job Title: BEDROOM 04 ENSUITE PROPOSED RESIDENTIAL HOUSE ON

Sign.................................. Date:...................

Second Floor Plan

1,500

3,000

200

F G

P.V

A

1 BALCONY

100 100

Reg. Arch. No. A1131; MAAK(A) No. 2529

A

13,500

200

200 200

BEDROOM 02 ENSUITE 100 4,000

STAIRCASE Consultant: GUEST P.V W/C STUDIO FORTE ARCHITECTURE DINING P. O. BOX 17351 - 00100, NAIROBI.

3

IC

Scale 1

P.V

4,600

2

1,200

DSQ S

TERRACE LEVEL +6900

100

MASTER BATHROOM

100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade

Scale 1:100

2

100

MASTER BEDROOM 01 ENSUITE

live hedge

Scale 1:100

H

150 P.V

10,300

Stairs-R.C Cast In-Situ to S.E Details A 900mm High Vanished timber Handrail Bolted to 25mm Steel Balustrade Thread 300mm Riser 150mm Nosing-20mm

900

200 200

STAIRCASE

100

200

200 150mm Reinforced Concrete Slab to S.E Detail 200

5

4 3

SERVICES

TERRACE

2,850

BALCONY

100 100

1

100

1

A

G

1 IC

S-03

water tanks

b

2,100

650

Scale 1:100

F

A

200

GROUND FLOOR +150

4

2,366

200 4,850

2

E

1

A

SECTION 02

D

3

1

4,850

2

SERVICES

6,250

PV

B

4 Structure Roof Stone coated GCI profile tiles on timber trusses to S.E 3 details

PV

13,500

5

Upper C Lobby

2,000 200

200

ENTERTAINMENT TERRACE

200

200

2,850

200

ENTRY PORCH

100 100 400 100

4,100

PV

11

2,500

1

200

200

PV

staircase

100 6,600

200

H 3,605

F G

100

150

200

200 1,750

ROOM

600mm*200 Strip Foundation (Depth determined on site) A

13,500

E-04

1,200

200

2,300 15,000

1,250 700

1,150

550

5

2,500

H

3,023STUDY200

200

6 100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade

kitchen yard 2

200

F G

kitchen garden

2,500

PV

2,850

200 200

700

450 700

2,100

PV

150

PV

E

2,900 200 1,700 200 200

200

Stairs-R.C Cast In-Situ to S.E Details 900mm High Vanished timber Handrail 7 Bolted to 25mm Steel Balustrade Thread 300mm Riser 150mm Nosing-20mm

6

5150 200

E

D

17,800

150mm Reinforced Concrete Slab to S.E Detail

200

4,000

4

17,800 10,300

8 150mm Reinforced Concrete Slab to S.E Detail

3

1,200

+300

200

PV IC 2,100

3

C

600mm*200 Strip Foundation (Depth determined on site)

Ground Floor Plan

2,000

D

150

2,250 200

D

S-02

1,200

8

200 1,250 2,500

underground water storage tank

GSPublisherVersion 0.3.100.100

D

200 1,500 200 1,400 300 200 1,400

2,850

B

2,612

2,850

A

1,800 200 19,100

C

PV

200

2

2,850

1,300

10,300

9

S-01

4

900

PV

200 1,600

PV

4,000

4800

PV

200

+-0 3,600

10

9

4,900

DOBHI SINK PV

F

200

KITCHEN

200

7350

2,300

6,250

200

1,200

200 200 200 450 2,050 200 1,850

200 200 200

BEDROOM 03 ENSUITE

00 3,2

200 2,500 1,300

porch

Scale 1:500 100 1

N

cl

00 1,8 38 3,2

2,500

PV

WINDOW SEAT

3,000

IC

10

IC

1,750

150

TO LANG

DINING

PV

+150

2,500

C

B

200

7

SH

WHB

STORE

LOCATION PLAN 2

WC

2,100

1

entry hall

PV

1,061

200

E-01

200

2,000

4,000 150

5,500

20R x 150 19G x 300

5 4

2

20

200

ATA ROAD

19

3,250

18

6,500

17

200

WHB

6

+750

IC

3

GUEST BD/RM 04

8 7

3

5

4

1,739

3,000 17,700

B

150mm Reinforced Concrete Slab to S.E Detail 200

3250

4,000

10,300

parking

1,300

150

IC PV 250 700 200

1,200

3,800

2,100 PV

200

1,591

UP

DOWN

11,400

16

LOUNGE

T.V WALL

9

15

15,000 6,500

200

WC

10

14

ERN +300 SOUTH

S BYPAS

1,588

Roof Structure A Stone coated GCI profile tiles on timber trusses to S.E details

H

4,000

PV

staircase PV

5,300

200

400

3,400

200 200

PV 250 700 200 2,000 700

450 PV

700

2,100

1,750 1,200

2,300 15,000 200

E-04

1,250 700

1,150

550

200

900 1,200 2,500

200 200

200

F G

200

PV 11

200

+300

13

6

1,700 IC 900 700

2,500

verandah

7

E-02

440

200

12

S-01

2,000

PV

8

7350

1,960

rock formation

2,500

1,750

9

3,600

IC

1,500

5,400

150

E

D

200

200

200 200

2,300

200 1,400 200 200

200

10

10,300

600

1

19,100

entry

GUEST W/C

BALCONY 200

Scale 1:100

fish pond

R=1850

1,500

200

2,850

C

B

SITE BOUNDARY

water feature/koi

GAZEBO

water fountain

900

live hedge

foot bridge

200

1,300 1,500

A

Scale 1:100

H

STAIRCASE BATH

WC

cl

B

SECTION 01 200

LAWN

200

104

150

SITE

A

E-03

live hedge

850

3,300

walkway

150

PV

S-02

Y ROAD

SOAK PIT

DSQ

F G

kitchen garden

P.V

cl

dr

A

200 1

2,900 200 200 1,700 200 200

WHB P.V

DINING

STUDY

P.V

4,000

SH

TERRACE LEVEL +6900

7 6

4,000

200

5150

200

E

D

1

3

kitchen yard 2

SH

P.V

LOUNGE

PV

S-01

BEDROOM 02 ENSUITE

200

SH

H

8

First Floor Plan

S-02

live hedge

ACADEM

2nd gate

PARKING

MAIN HOUSE

200

WC

2,500

G

9

S-02

C

1,200

Site Plan

PV

4,000

PV IC 2,100 4,000

2,250 200

underground water storage tank

Scale 1:200

200

1,750 200

B

1,250 2,500

2,900

E-02

A

1,800 200 19,100

1501,600

600mm*200 Strip Foundation (Depth determined on site)

5

4

200 10,300

2

6

4,900

PV

1,300

8

IC

200

150 1,600

3,800

200 4,000 150 2,100

20R x 150 19G x 300

F

200 6,250

PV

200

+-0 3,600

+300

5,300

15,200

2nd gate

KITCHEN

4800

SOAK PIT

2,300

PV

3,250

100

200 200 200

45,000

S-02 11

5,500

200 6,500 200

1,200

200 200 2,500 1,300

porch IC

1

DOBHI SINK

PV

+150

3

S-01

7

SH

cl

STORE

200

2,500

PV

7350

100

+750

200 200 450 2,050 200 1,850

2,500

WINDOW SEAT

3,000

entry hall IC

3

WC WHB

DINING

10,300

5,000

12750

100

LOUNGE

5

4

2 2,500

2 1

0 80 8 1, 23 3,

100

5 4 3

PV

200 1,400 200 200 200 1,750 200 11,400 15,000 6,500

E-02

PV

1,500

750 200 200 200

S-01

parking

SEPTIC TANK

2,500

3,750

200 400

24,406

16500 200 750 200 200

PV

1,500 3,000

200 200

2,000 200

1,750 6,150 150 150 1,100

1,650 150 6,150 1,500 3,000

F

700

3,000

1,500

450 200

200 200

D

9

P.V

BATH

200WHB

4,200

Upper Lobby

DOWN

200 200

IC

WHB

6

UP

4,250

PV PV JULIET BALCONY 4,000 100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade

10

20

3,000

5,600

8 7

3250

4,000

19

C

150

+300

T.V WALL

GUEST BD/RM 04

18

B

2,450

9

BATH

F

10

SERVICES

STAIRCASE 2,600 WC

MASTER BATHROOM

2,500 150

WHB

17

A

PV WC

10

4,250

E

4,000

P.V

MASTER BEDROOM 01 ENSUITE

16

3

200 200

PV

staircase PV

2 UP

cl

200

5

Stairs-R.C Cast In-Situ to S.E Details 900mm High Vanished timber Handrail Bolted to 25mm Steel Balustrade planter Thread 4 300mm Riser 150mm Nosing-20mm

IC

dr

BEDROOM 02 ENSUITE

1

15

3

IC

walkway

+300

7 6

200 1,200

TERRACE

cl

14

7350

verandah

20

DSQ 02

4,000 2,100 PV

1,500

4 3

PV 00 1,5 00 3,2

COOK

IC

PV

8

2

cl

1,200

200 1,591

BALCONY 200

mini

S-01 150mm Reinforced Concrete Slab to S.E Detail lounge

5

13

9

19

cl

+150

2

10

S-03

1,700 IC 700

900

BALCONY

A

7 6

12

1

200

2,500

18

200

2,500 440

17

200

DSQ 01

2,000

16

3,000 3,375

1,960

15

150

200

200

3,600

14

PV SH

2,300

13

PV WC

10,300

200

S-03

H

19,100

200

12

1,150 1,150 225 700 600 700

D

DOWN

200

1 IC

200

F G

01 ENSUITE

cl

8

20

200

5,600

E

D

W.I.C

D

balcony PV

9

19

C

B

200

C

cl

MASTER

6

10

18

E-03 A

dsq roof line B

cl

17

7

live hedge

150

PV

150mm Reinforced Concrete Slab to S.E Detail BEDROOM

+-0

SITE BOUNDARY

A

staircase PV

DOWN

water feature/koi fish pond

200

Roof Structure Stone coated GCI profile tiles on timber trusses to S.E details planter

16

8

15

9 foot bridge

C

PV

4,750

200

PV

10

14

R=1850

entry

B

13

4500

A

12

GAZEBO

1,600

1,600

3,700

SFA/0893

D

GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX Signature & Date:..............................................

SECTION 01

GSPublisherVersion 0.3.100.100

AD

Scale 1:100

DSQ ELEVAT


200 200

200

200 2,300

4,850 800 2,850

2,800

S-02

2,300 800 200

15,200

200

PV

4,100

850

3,750

4,750

2,450

20R x 150 19G x 300

2,425

200 4,750

6,500

PV

5,300

1,600

2,300

11

200

1,750

Scale 1:100

Elevation 02

Scale 1:100

Elevation 01

Scale 1:100

Elevation 03 Elevation 02

Scale 1:100

4 3

2

150

3,000

B

200

17,700

C

E-01

2,500

2008

PV

4,000

6 5

200

200 1,600

2,300 200

200 200 4,850

200

E

D

F G

2

S-02

2

PV

200

1

10 1 9

200

8

1

7 6

Scale 1:100 Scale 1:100

SERVICES

1

C A

3

H

UP

Upper Lobby

15,200

800

1,400

4

2,500

4

200

200

200 200 200 200

200 1,500 200 1,400 300 200 1,400

3

PV

13,500

2,000

7

200

water tanks

E

D b

Scale 1:100

5

4 3

F G

H

4,850

B

2,300 200

10 2,612 9

ENTERTAINMENT TERRACE

200

PV PV

200

staircase 1,061

1,739

13,500

5,400

A

1,300

5

100 4,000

PV

6,350

1,588

100 100 400 100

cl PV

4,100

2,500 850 200

BEDROOM 03 4,100 ENSUITE

3,750

4,750

dr

E-04

2,850

2,300

H

800

F G

PV

WC

200

PV

200

BATH

8,450

1,500

3,750

200 2,300 200 4,750

20R x 150 19G x 300

2,450

S-02

2,800

SH

E

6

Scale 1:100

900

600

S-01 8

200

200

1,500

WC

SH

D

STUDY

200

9

7

BATH

200 850

C

1

10

6,250

1,500

900

H

WHB

11

1,300

1,400

WHB

PV

104

F G

4,000

2,425

6,500

PV

5,300

2 1

17,800

6,600

13,500

dr

3

20R x 150 19G x 300

200 200 200 2,050 1,750 200 200 2,300 200

11

200

E-02

2,900

200 400

3,400

200 2,500

2,300 200 1,600

200 2,050 200 1,600

200

200

200

1,750

3,750

200 400 200

E-02

2,900

5,300

15,200

200 400

3,400

200 2,500 200

Elevation 01

UP

Upper Lobby

2

staircase

10 9

F G

20R x 150 19G x 300

100

100

100

1 10

9

H 8

7 6 5 4 3 2 1 UP

2,500

200

Consultant:

Job Title:

STUDIO FORTE ARCHITECTURE P. O. BOX 17351 - 00100, NAIROBI. SERVICES Upper Sign.................................. Date:................... Lobby

PV

Scale 1:100

200

E

200

100 100

8

200

ENTERTAINMENT TERRACE

D

4,600 PV

7

Scale 1:100 6 Scale 1:100

PROPOSED RESIDENTIAL HOUSE ON PLOT L.R NO 3593/45 KAREN,NAIROBI. 13,500

PV

Elevation 03 Elevation 02 Plan Second Floor

100

200

6,350

C

B

7

5

Elevation 04 Elevation 03

Client:

GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX

5

SFA/0893

Scale 1:100 Drawing Title: SITE PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN TERRACE FLOOR PLAN ELEVATIONS

Scale:

as indicated

Dwg. No.: Date:

01

AUG 2019

Drawn: Checked:

N.K MAM

Signature & Date:

Notes:

Scale 1:100

1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings

4

3

3

1,200 4,850

1

1

A 2

b

Signature & Date:..............................................

200

4 3

Job No.:

water tanks

4

3 6,250

Reg. Arch. No. A1131; MAAK(A) No. 2529

4,850

4

4,100

PV

8,450

A

PV 2,500

200

200 17,800

6,600

E-04

900 1,200

2,300 200 13,500 15,000 200

200 550 6,250 900 700 200 200 1,150

10,300

6

5

4,900

200

100 PV

17,800

200 200

PV

6

kitchen 2 yard 2

0

2,500

17,800

200

13,500

PV PV 450 6,350 700 1,750 700 8,450 2,100 150

8 7

5

H

+300

S-01

200

100 100 400 100

900

9

10,300

200

11

9

8

17,800

00 3,2

100 400

100

2,300 200 3,750 200 2,300

E-04

15,200

200

1 10

8

1,250

PV PV

F G

PV

E

HEN

PV

STORE water tanks

5 4

200

E BEDROOM 02 ENSUITE

SH

PV

17,800

200

1 10

10 9

1 3250

7

DOBHI SINK

cl

1

cl

6

cl

200

100

PV

200

200

4,000

4800

150

2,100

150

WINDOW SEAT

WC

B

A 2

1,900 200 1,400

balcony 200 1,500 200 1,400 300 200 1,400

PV 4,000

3

5150

6

ERVICES

4

3

2

IC

SH

WHB

PV PV JULIET BALCONY 4,000

Elevation 02 First Floor Plan Elevation 01 5

D

8 7

WHB

1501,600

Scale 1:100

4

9

PV 2,000

PV

2,500

mini lounge

10,300

200 200

2,612

2,600

planter

6

5

1,050

00 3,2

hedge

W.I.C

7

7

6

3

H

WC

200

8

200

H

5

IC

V PV PV C 00 GUEST 2,900 200 200 2,000 200 1,400200 00 2001,500 1,700 BD/RM 300 200 4,000 04 200 1,400 4,000 200 1,400 F G H

F G kitchen garden

8

kitchen yard 2

H +300

EDROOM 200 100 200 03 4,000 200 4,100 00 200 100 400 100 ENSUITE 91 2,100 1,200 PV 100 4,000

E

200 200

PV 250 700 200

H

F G

S-01 S-01

BEDROOM 4,000 03

700 750 1,500 ENSUITE

1,400

cl

4,250

200 100 200 100

F G

9

200

PV

PV

WC

HEN

5

4

BATH

10 1 9

10

1,750

PV

STORE WHB

E

3,800

DOBHI SINK

SH SH

6

BALCONY

PV

2,500 200 staircase 10

cl

200

PV 200 550 200 250 200700 200 2,500 1,200 900 700 1,250 1,200 200 200 4,100 800 2,850 800 200 200 4,900 200 1,150 200 2,300 200 200 200 3,750 200 2,300 200 2,300 200 200 15,000 200 200 15,200 E-04

PV PV

2,600 WINDOW WC SEAT BATH

7

H

cl

MASTER BEDROOM 01 ENSUITE

200

IC

1,750

150

F G

kitchen SH garden

live hedge

WHB cl

8

1

2,900 200 1,700 200 200

C

E-01

PV

100

200

WHB

S-02

H

5150

WC 200

E

D

4,000

3

200

17,700

B

200

13,500

PV

F G 200

PV IC 2,100 4,000

4800

PV

2,100

4,000 200

150

200

10

4

1,061

cl

A

200

PV

4,000

6,250

0

E

DROOM 1,250 2,250 02 2,500 200 NSUITE

2

1 3250

9 kitchen yard 2

3,000

BATH

4,850

150

PV

F

200

5

balcony STORE GUEST 200 2,000 BD/RM 1,500 200 1,400 300 PV porch KITCHEN +300 4,000 04 200 1,400 4,000 200 1,400 PV

2

6

DOBHI SINK

cl

entry hall

7

IC

E-04

200

WINDOW SEAT

+750

PV

DOW

PV

4,000

IC

1,739

PV 00 1,5 00 3,2

1

3

3,800

3 2

UP

150

PV

5

4

3

S-01

PV PV PV PV PV 450 200 550 450 2,500 700 200 1,200 900 700 1,250 250 1,200 1,750 700 700200 200 2,300 200 150 700 4,900 2,000200 1,150 700 200 2,100 200 4,850 200 2001,600 15,000 4,100 E-04 2,100 150 3,800 200 3,750 200 2,300 200 3,750 200

150

4

2,100

20R x 150 19G x 300

6

9

1,300

planter

Scale 1:100

S-01

8

200 EDROOM 4,000 200 1,900 WC 200 03 4,000 200WHB200SH 50 1,500 1,050 1,400 ENSUITE 91 2,100 1,200 5

10

1,588

5,400

A

6

4

3250

H

1,400

2,000

WHB

7

H

200

8

2,000

200 4,000

11

5,500

9

GUEST

BD/RM F G F 04G4,000

PV WC

10

800

IC

1,200

200

1,500

4,850

200

2,100 PV

WC

PV

Estaircase

2,300

H 200

1,591

600

First Floor Plan Elevation 01

5

200

F G

4,000

PV

IC 700

900

200

2,850

SH

BATH 1,700 200

200

1,500

1,500

18

E

D

WHB 2,500 2,500

200

900

17

S-02

SH

45,000

WHB

3

200

1,300

1,050

PV

200 1,200

2,300 15,000 200

E-04

1,250 700

1,600

1,150

550

200

900 200

200

1,200

4,900

2,500 200

200

200 4,850

800

PV

BATH

104

7

6

dr

200

F G

200

6

cl

16

WC

1,050

200 200

PV 250 700 200 2,000

PV

700

150

450 700

2,100

4,000 150

3,800

200

PV PV

PV PV

200

24,406

4800

7

S-01

4,000

200

8

live hedge

2,600

5,300

15,200 45,000

S-02 11

5,500

F

200

S-02

kitchen garden

9

8

1

H

WC

E

2,100 850 900

20

F G

2,500

2,700

19

4,000

S-01

200

1,200

DOWN

PV

5150 2,900 200 1,700 200 200

200

E

10

4,200

1,800

15

200

200

PV IC 2,100 4,000

1

9

150

2,000

14

DROOM 1,250 2,250 02 2,500 200 NSUITED

10

4,250

1,600

13

4,000

3

200

1,300

12

6,250

0 200

4

kitchen yard 2

1,500 100

20

+300

200

19

KITCHEN

200

18

STORE balcony

PV

porch

5

BATH

cl

D

17

1,750

2

6

17,700

DOWN

DOBHI SINK

cl

C

B

SH WHB

E-03

A

SH

STUDY

16

DOW

WINDOW SEAT

+750 entry hall

200

WC

BATH

SH

PV

15

2,100

7

WC

14

150

IC

1501,600

PV PV JULIET BALCONY 4,000

13

20R x 150 19G x 300

8

4,250 planter

9

7

WHB

12

WC 1,900 200WHB SH 1,400

1,050

3

S-01

PV 00 1,5 00 3,2

2

1,500

UP

1,400

9

20

200

200

5 4 3

1

50

10

19

WHB

4

3250

H

18

4,000

8 7 6

GUEST BD/RM

F 04G4,000

2,500

BATH

10

8

4,000

Upper Lobby

WHB

17

9

dr

2,600

DOWN

PV WC

10

4

1

16

PV

Estaircase

5

BEDROOM 02 ENSUITE

cl

mini lounge

5

IC

PV

2

15

200 1,200

1,500

UP

14

4,000 2,100 PV

cl

6

3

13

200 1,591

7

12

1,700 IC 700

900

MASTER BEDROOM 01 ENSUITE

W.I.C

cl

8

20

200

BALCONY

10

19

6

cl

H

1,900 200 1,050 1,400

balcony

PV

18

200

cl

17

200 400

PV

16

3,750

PV planter

DOWN

200 2,500 2,500

S-01

700 750

1,400

200

9

15

H

4,000 900

14

8

F G

2,100

13

E

D

2,700

F G

200

200

staircase

7

3

1,200

2,500

E-04

1,800

200

200

2,000

E

D

17,700 4,200

PV

1,600

150

12

24,406

1,300

4,250

PV

10

9

100

200

1,600

1,600

200

C

B 1,500

3,750

A

200

2,300

S-02

E-03 200

2


OLOITOK-TOK COUNTRY HOUSE


900*450mm Flashing detail

P.V

0.200

4.100

DINING

0.200

4.000

LOUNGE

4.859

4.591

BEDROOM 02

4.217

BEDROOM 01 0.200

5.445

20mm ITS corrugatted Iron Sheets 100mm Purlins 150 mm I-Beam

9.400

100mm Reinforced to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade Foundation Details to S.E drawings

MAIN HOUSE SECTION 01

18.300

0.200 5.000

1.500

1.400 0.200

2.000 1.500

3.142

P.V

0.200 0.200 1.800

3.023

BATH

P.V

2.400

0.200

9.400

BATH

3.451

4.800

2.000

4.600

LOUNGE

50mm Quarry dust blinding

3.000

OFFICE

0.200

6.206

5.100

P.V

clay tiles ff

COVERED PORCH 0.200

1:100 0.900

3.400

4.600

1.100

COVERED COVERED PORCH 0.200 PORCH 3.429

0.200 100mm Reinforced to S.E Detail

4.330

0.200

0.900

5.000

wood parquet blocks ff

MASTER 5.500 BEDROOM P.V 04 (ENSUITE)

3.794

0.200

3.935

2.800 0.200

5.500

4.100 0.500 0.200 3.500 0.200 2.200

DINING

0.200

3.600 3.400 2.000

0.900

0.200

3.300

3.043

0.300

1.800

1.900

4.170

0.200 0.300 2.000 0.100 0.200 1.800 1.600 1.100

1.400

ceramic tiles ff

1.300

1.000

4.000

BEDROOM 02

P.V

8.500

4.006

2.800

1.300

MASTER BEDROOM 04 (ENSUITE) P.V

W.I.C

0.200

4.600

1.978

cl

cl

3.400 1.800

FOYER

3.934

0.200

P.V

ceramic tiles ff

non-slip ceramic tiles ff

2.955

4.800

5.100

4.600

4.800

KITCHEN

3.500

BEDROOM 0.200 01 BATH 3.300

3.500

1.500

0.900 9.400

1.800

ceramic tiles ff

3.000

0.200 18.300

1.500

1.400 0.200

5.000

0.900

4.600

2.200

2.000

3.000

5.000

3.500

4.744

0.200 2.800 4.100

5.500

0.200 8.500

0.500 0.200

0.200 0.300 2.000 0.100 0.200 1.600 1.100

3.500 0.200

0.300

1.000

2.800 3.400

1.800 1.400

108.096

105.926

1.800 0.200

3.000

BEDROOM 03 (ENSUITE) 4.100

0.200

wood parquet blocks ff

1.700

300mm Compacted hardcore on grade

4.476

2.188

1.500

0.200

2.430

1.300

1.500

0.200

0.150 0.150 0.900 0.850

3.300

4.200

0.200

0.850

5.500

0.200

0.200

2.000

0.200

Foundation Details to S.E drawings

0.918

0.918

2.000 4.476

2.188

1.500

0.200

2.430

MAIN HOUSE SECTION 03

16.506

1.300

1.500

0.200

0.150 0.150 0.900 0.850

3.300

4.200

0.200

0.850

5.500

0.200

0.200

96.065

1.100 2.000

5.500

0.200 3.500 0.200 0.450 0.450 1.000 1.000 1.000

clay tiles ff

1.000

6.337

4.600

P.V

2.100

4.800

1.350

wood parquet blocks ff

1.700

1.000

0.200

1.200

108.096

7.350 7.150

cl

LOUNGE

8.700

clay tiles ff

P.V

1.000

TER PANTRY MAS non-slip OOM ceramic tiles ff BEDR 900*450mm Flashing detail 04 KITCHEN )20mm ITS corrugatted Iron Sheets E non-slip IT U 100mm Purlins ceramic tiles ff (ENS ic tiles ff 150 mm I-Beam ceram CLOSET

0.200

COVERED PORCH

1.800 1.000

F

0.785

0.200

1:2000

5.500

1.000

2.600

3.400

0.200 1.078

LOUNGE & DINING

1.800

0.785

LOCATION PLAN

1.800

OFFICE

ic tile ceram

335.106

1.800

1:2000

1.000

wood parquet blocks ff

5.285

CLOSET

DINING

non-slip ceramic tiles ff

4.100

KITCHEN 3.300

0.900

4.170

0.400

5.285

0.400

2.955

0.200

2.000

LAWN

3.400 2.000

5.900 2.878

1.800

COVERED PORCH

GUEST CLOAK non-slip

BnoAnTH slip s ff

cla

6.337

2.000

0.40 Ha

2.130

ceram

MAIN HOUSE SECTION 02

3.600

1.678

0.200

3.400

0.200

ic tile

4.170

5.861 0.200 1.000 0.200

1.412

0.200

2.43 Ha

non-slip 1.900 ceramic tiles ff

2.670

BATH s ff

Foundation Details to S.E drawings slip non

ERED COV H C POR s ff y tile

PANTRY SITE

50mm Quarry dust blinding

AGE STOR

300mm Compacted hardcore on grade

2.100

F

122.445

cla

0.200

0.80 Ha

ic tile

ceramic tiles ff

1.300 MAIN HOUSE

4.900

2.100

ERED COV H C POR s ff y tile

2.100

4.170

PARKING (4 CARS)

0.200

0.2001.000 1.000 3.600 5 0.200 14.58

BEDROOM 02

37.730

ceram

3.700

1.100

4.000

15.361

1.583

0.305 1.000 OOM BEDR OFFICE 03 UITE) P.V (ENSic tiles ff

100mm Reinforced to S.E Detail

2.700

1.300

1.000

1.978

1.300

0.900 1.100 2.700 0.200

FOYER 317.562

cl

cl

ceramic tiles ff

TER MAS 0.40 OOM Ha BEDR 04 UITE) (ENS s ff

ceramic tiles ff

ceramic tiles ff

DSQ

ceram

3.500

BEDROOM 01

5.000

1.200

2.600

ic tile ceram

1.000

0.200

2000

cl

1.000

0.2001.000 1.000 3.600 5 0.200 14.58

MAIN HOUSE

GUEST CLOAK non-slip

4.170

0.200 3.500 0.200 0.450 0.450 1.000 1.000 1.000

clay tiles ff

1.412

BnoAnTH slip s ff

1.000

1.800

1.800 1.000

BATH non-slip

COVERED PORCH

1.350

2.130 0.200

ic tile

0.200 1.078

1.800

1.000

1.800

1.100

ceram

20mm ITS corrugatted Iron Sheets 100mm Purlins 1.500 150 mm I-Beam

5.400

2.200 2.400

0.200

8.700

2.670

BAnTH slip s ff

no 4.170

2.878

1.800

1.200

4.900

2.700

0.900 1.100 2.700 0.200

GE

A STOR

1.678

7.350 7.150

4.100

1.000

2000

ceram

1.000

0.200

0.200 1.300

5.900

2.800

0.305

1.000

1.200

0.200

OOM BEDR 03 UITE) (ENSic tiles ff

3.700

122.445

2.43 Ha

2.800

5.000

1.300

15.361 5.861 0.200 1.583 1.000 0.200

0.200

5.400

1:100

5.200

9300 0.200

0.200

1.500

5.200

9300 0.200

0.200 1.300 2.200 2.400

3.072

37.730

1:100

16.506

1:200 GROUND FLOOR PLAN

GROUND FLOOR PLAN

P.V

P.V P.V

P.V

P.V

P.V

P.V

P.V

P.V

1:200

P.V

P.V

P.V

Con

ELEVATION 1:100 01 ELEVATION 02

1:100

1:100

ELEVATION 02

1:100

S

P N

S

R GSPublisherVersion 0.7.100.100

LAWN

P.V P.V

P.V

P.V

P.V

P.V P.V

P.V

P.V

P.V P.V

P.V P.V

P.V

1:100 ELEVATION 03 ELEVATION 04

Consultant:

37.663

STUDIO FORTE ARCHITECTURE P. O. BOX 17351 - 00100, NAIROBI.

Job Title:

Client:

PROPOSED RESIDENTIAL HOUSE AT OLOITOKTOK

Sign.................................. Date:...................

1:200

Reg. Arch. No. A1131; MAAK(A) No. 2529

Job No.:

ON PLOT L.R. No. ..................................

SFA/0897

ERNEST MOTURI P.O.BOX 15322 NAIROBI Signature & Date:..............................................

1:100

Drawing Title:

Scale:

Consultant:

Dwg. No.: Date:

Drawn:

N.K

Notes:

STUDIO FORTE ARCHITECTURE Checked: P. O. BOX 17351 - 00100, NAIROBI.

Signature & Date: Sign.................................. Date:................... 28 JUN 2019 Reg. Arch. No. A1131; MAAK(A) No. 2529

1:100

Job Title:

PROPOSED RESIDENTIAL HOUSE AT OLOITOKTOK

Job No.:

SFA/0897

P.V

1:100

ELEVATION 04

Client:

1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical andON Plumbing engineering PLOTworks L.R. as No.per.................................. drawings 4. Local authority and landlord approvals to be sought before work commences on site.

P.V

ERNEST MOTURI P.O.BOX 15322 NAIROBI Signature & Date:..............................................

Drawing Title:

Scale:

Drawn:

Dwg. No.:

Checked:

Date:

28 JUN 2019

N.K

Signature & Date:

Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings


A.U.A EXHIBTION BOOTH


6,069

450

1,200

400

1,350

3,048

450

2,400

1,550 2,250

2,400

1,550

450

Consultant:

Job Title:

STUDIO FORTE ARCHITECTURE

Client:

EXIBITION BOOTH FOR GC2020

P. O. BOX 17351 - 00100, NAIROBI.

Scale:

Drawing Title:

ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI

Checked:

Dwg. No.: Date:

Signature & Date:..............................................

Job No.:

Drawn:

as indicated

ELEVATION

2,400

Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529

1,350 1,215 3,048 N.K

MAM

Signature & Date:

AUG 2019

Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

GSPublisherVersion 0.50.100.100

450 Consultant:

Job Title:

STUDIO FORTE ARCHITECTURE

Client:

EXIBITION BOOTH FOR GC2020

P. O. BOX 17351 - 00100, NAIROBI.

ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI

Drawn: Checked:

Dwg. No.:

Signature & Date:..............................................

Job No.:

as indicated

FLOOR PLAN

Date:

Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529

Scale:

Drawing Title:

AUG 2019

Notes:

N.K

1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

MAM

Signature & Date:

2,809

450

2,400

600

2,400

900

600

860

2,250

550 985

1,800

2,100

GSPublisherVersion 0.50.100.100

1,550

450

3,048 6,069 Consultant:

STUDIO FORTE ARCHITECTURE

Job Title:

EXIBITION BOOTH FOR GC2020

P. O. BOX 17351 - 00100, NAIROBI.

Consultant:

STUDIO FORTE ARCHITECTURE

Job Title:

GSPublisherVersion 0.50.100.100

Scale:

ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI

Job No.:

as indicated

ELEVATION

Dwg. No.: Date:

Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529

Drawing Title:

Drawn:

N.K

Notes:

Client:

ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI

Drawing Title:

Scale:

Dwg. No.: Date:

Sign.................................. Date:...................

as indicated

ISOMETRIC

AUG 2019

Drawn: Checked:

N.K

MAM

Signature & Date:

Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings

EXIBITION BOOTH FOR GC2020

P. O. BOX 17351 - 00100, NAIROBI.

Client:

2,250

1,200

900

6,069

450

1,350

Signature & Date:..............................................

AUG 2019

Checked:

MAM

Signature & Date:

Reg. Arch. A1131; MAAK(A) No. 2529 1. All dimensions given are in metres andNo. millimetres. 2. Contractor to check and verify all dimensions on site andGSPublisherVersion immediately any0.50.100.100 discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.

Job No.:

Signature & Date:..............................................



ACADEMIC WORK

SELECTED WORKS



KAREN PAEDIATRIC CENTRE

There is an overwhelming need for paediatric hospitals in the region as to mitigate the current high infant and mortality rate. Located in Karen, this paediatric hospital was designed as a centre of excellence as to exemplify recommendations for child healthcare as a special group resulting from my final year thesis the paediatric care environment. The socio-physical environment of the design plays a major role in the child's healing process. The hospital is designed around a series of multiple courtyards offering a connection to nature. Play rooms across the centre offer children positive distractions as to trigger positive emotional responses.A sense of control is reinforced through clear color coded wayfinding and opportunites for personalization of patient rooms.The patient room showcases social consideration by providing space for parents to stay with thir children.Colourful sunshading elments keep out solar glare while creating a less institutional facade..Environmental considerations infrom the location of patient rooms with the provision of ample daylight,views and access to play gardens.

Thesis Project | Final Year Project-2017 | Supervisor: Prof Magutu


CONCEPT DEVELOPMENT

Analysis of the site highlights the site forces. E-W orientation to avoid solar glare. Programmes branch out of Main spine

Cirulation around the hospital is defined with a separation of public,ambulance,staff and service

Units staggered to break down mass and allow lighting of circulation spine.

Circulation enhanced to reduce travel distances and connect links between departments.

Visual landmarks introduced to aid in wayfinding

Enclosed spaces create interactive courtyards.

Programme distribution across the site with imporant adjacencies considered to allow for a functional process

Landscaping of open ares to provide a connection to nature and create buffer zones for the hospital. Themed gardens offer different experiences for different users.



EXPLODED AXONOMETRIC

Roof

Walls & Sunshading

Structure & Stairs

Floor Slabs

Complete

Public Space (Parking & Gardens)


12

12

GROUND FLOOR PLAN

24 x 0.150 = 3.600

12

9

8

Staff Changing Rooms

7

13 14 15 16 17 18 19 20 21 22 23 24

Staff Changing Rooms

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

3

6

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

9

9

9

9

10

9

9

10

IN-PATIENT (MEDICAL) F

19 x 0.200 = 3.600

10

7

11

6

1

13

4

5 8 11

5 SERVICE YARD

3

11

4

11

14

2

1 23 4 56 7 89 10

RAMP

MORGUE

1 11

MAIN HOSPITAL LOBBY 7 1

4

5

1

8

Main Reception

6 Security Office

2 Waiting Lobby

7

3

Gift Shop

8 Restaurant Kitchen

4

Patient Registration

9 Cold Store

5

Payment and Records

10 Dry Store

11

1

Out Patient Reception

11

2 Waiting Lobby

F

Restaurant Servery

IN-PATIENT (MEDICAL)

24 23 22 21 20 19 18 17 16 15 14 13

1 2 3 4 5 6 7 8 9 10 11

2

3

9

6

1 2 3 4 5 6 7 8 9 10 11

9

24 x 0.150 = 3.600

12

12 12

12

24 x 0.150 = 3.600

24 x 0.150 = 3.600

11

12

F

10

11

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

1

OUT PATIENT DEPARTMET

F

11 10 9 8 7 6 5 4 3 2 1

F

13 14 15 16 17 18 19 20 21 22 23 24

24 23 22 21 20 19 18 17 16 15 14 13

24 x 0.150 = 3.600

9 Exam\Treatment Room

LABORATORIES

9

8

7

6

5

4

2

3

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

2

14

3

Play Room

11 Dirty Utility

4

Nurse's Duty Room

12 Pharmacy Dispensary

5

Medical Records

13 Drug Preparation

12

12

11

10 Clean Utility

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

6

3

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

7

6 Nurse Station

14 Drug Store

7

15 Pharmacy Waiting

Triage

PHYSIOTHERAPY

2

8 Doctor's Room 9 1

2

4

8

5

ACCIDENT AND EMERGENCY DEPARTMET

12

12

10 24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

13

13

6

11 10 9 8 7 6 5 4 3 2 1

1

1

13 14 15 16 17 18 19 20 21 22 23 24

IMAGING DEPARTMET

7

5

4

2

3

8 Doctor's Room

2 Waiting Lobby

9 Exam\Treatment Room

3

Play Room

10 Ressusitation Room

4

Nurse's Duty Room

11 Clean Utility

5

Medical Records

12 Dirty Utility

6 Nurse Station

13 Minor Operating Theatre

7

14 Recovery Ward

12

8

11

Emergency Reception

12

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

2

11 10 9 8 7 6 5 4 3 2 1

7

Triage

8

IMAGING DEPARTMET RESTAURANT

2

SERVICE YARD

6 10

9

9

9

2

1 2 3 4 5 6 7 8 9 10 11

10

24 23 22 21 20 19 18 17 16 15 14 13

Imaging Reception

8 Dirty Utility 9 Ultra Sound

3

Play Room

10 Portable Equipment Store

4

Consultation Room

11 C.T. Scan

5

Radiologist Office

12 M.R.I

13

22 23 24 25 26 27 28 29 30

1

13

20 19 18 17 16 15 14 13 12 11 10

21

12

24 x 0.150 = 3.600

1

2 Waiting Lobby

30 x 0.150 = 4.500

9

8 7 6 5 4 3 2 1

15 1

2

14

2 F

PHARMACY 24 23 22 21 20 19 18 17 16 15 14 13

12

1 2 3 4 5 6 7 8 9 10 11

2

14

3

11

F

F

F

6 Nurse Station

13 X-ray

7

14 Linear Accelerator

Clean Utility

11 12 3

4

5

13

PHYSIOTHERAPY

10

12

24 x 0.150 = 3.600

MAIN HOSPITAL LOBBY

F

F

7

9

9

9

10

9

10

9

9

9

9

9

6

5

4

4

5

6

1 24 23 22 21 20 19 18 17 16 15 14 13

1 2 3 4 5 6 7 8 9 10 11

12

24 x 0.150 = 3.600

3

3

Physio Therapy Reception 6 Nurse Station 7

3

Play Room

8 Hydro-Therapy Pool

4

Consultation Room

9 Clean Utility

5

Physiotherapist Office

10 Dirty Utility

1

Physio Therapy Reception 7

Physio Therapy Gym

LABORATORIES

7

2 Waiting Lobby

8

1 2

EMERGENCY DEPARTMET

1

2 Waiting Lobby

2 OUT-PATIENT DEPARTMET

1 2 3 4 5 6 7 8 9 10 11

24 23 22 21 20 19 18 17 16 15 14 13

Store

8 Clean Utility

3

Play Room

9 Dirty Utility

4

Blood Donor Room

10 Pathology Laboratory

5

Laboratories Officer

6 Blood Bank

11 Haematology Laboratory 12 Bio-Chemistry Laboratory

24 x 0.150 = 3.600 12

8

9

IN-PATIENT (MEDICAL) 1

Inpatient Reception 8

2 Waiting Lobby

7

Clean Utility

8 Dirty Utility

3

Play Room

9 Double Bed Unit

4

Doctor's Room

10 Family Room

5

Treatment Room

11 Single Bed Unit

6 Nurse Station SUPPORT FACILITIES 1

Morgue Reception 8

4

Morgue Cold Room

2 Post Morterm Room

5

Kitchen Cold Store

3

6 Kitchen Dry Store

Morgue Viewing Room


12

12

FIRST FLOOR PLAN

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

3

6

9

9

9

9

9

9

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

IN-PATIENT (SURGICAL) F

19 x 0.200 = 3.600

7 4

1

5

10

8 11

11 (VOID TO GARDEN BELOW)

11 RAMP

11

DOCTOR'S PLAZA 7 1

1

Doctor's Plaza Reception 5

2 Waiting Lobby

Paediatric Opthamologist 7

4

Paediatric Orthopedic

5

ENT Doctor

10

8

6 Paediatric Dentist

3

4

F

(VOID TO GARDEN BELOW)

IN-PATIENT (ONCOLOGY)

Child Development Centre 24 23 22 21 20 19 18 17 16 15 14 13

8 Staff Lounge

1 2 3 4 5 6 7 8 9 10 11

2

3

6

9

1 2 3 4 5 6 7 8 9 10 11

9

24 x 0.150 = 3.600

Doctor's Room

8 Single Bed Unit

3

Play Room

9 Neonatal Care Unit

4

Nurse's Duty Room

10 Clean Utility

5

Medical Records

11 Dirty Utility

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

10 10

11 11

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

1

11 11

INTENSIVE CARE UNIT

(VOID TO GARDEN BELOW)

F

9

8

7

6

5

4

2

3

12

2 Waiting Lobby

13 14 15 16 17 18 19 20 21 22 23 24

12

12

12

24 x 0.150 = 3.600

7

Out Patient Reception

6 Treatment Room

1

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

6

3

12

3

CHEMOTHERAPY TREATMENT

(VOID TO GARDEN BELOW)

8 Single Bed Unit

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

8

F

12 F

Emergency Reception

13 14 15 16 17 18 19 20 21 22 23 24

9

EMERGENCY DAY CARE 1

24 x 0.150 = 3.600

12

2

12

1

24 23 22 21 20 19 18 17 16 15 14 13

24 x 0.150 = 3.600

12

OUT PATIENT DAYCARE

2 Waiting Lobby

9 Four Bed Unit

3

10 Ressusitation Room

4

9 1

Nurse's Duty Room

11 Clean Utility

5

Medical Records

12 Dirty Utility

6 Doctor's Room

13 Minor Operating Theatre

7

14 Recovery Ward

Treatment Room

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

8

5

12

4

7 4

12

5 12

Play Room

24 x 0.150 = 3.600

6

11 10 9 8 7 6 5 4 3 2 1

8 6

11 10 9 8 7 6 5 4 3 2 1

1

7

13 14 15 16 17 18 19 20 21 22 23 24

SURGICAL DEPARTMET

(VOID TO GARDEN BELOW)

F

15

CHEMOTHERAPY DEPARTMET

13

14

Chemotherapy Reception 5

7

11

8

5

4

2

3

F

Doctor's Room

15

12

1

12

24 x 0.150 = 3.600

9

12

13 14 15 16 17 18 19 20 21 22 23 24

13

2 Waiting Lobby

6 Nurse Station

14

11

11 10 9 8 7 6 5 4 3 2 1

EDU-THERAPY

8

F

3

Play Room

7

4

Consultation Room

8 Infusion Bays

Mixing Bay

F

12

9

14

11

10

15

12

15

(VOID TO GARDEN BELOW)

13

STERILE CORRIDOR

7

F

9 Pre Operative Unit 10 Post Operative Room

3

Play Room

11 Utility Room

4

Surgueons Office

12 Anaesthesia Room

5

Consultation Room

13 Operating Room

7

10

22 23 24 25 26 27 28 29 30

1 12

24 23 22 21 20 19 18 17 16 15 14 13

24 x 0.150 = 3.600

12

(TRIPLE VOLUME ATRIUM)

20 19 18 17 16 15 14 13 12 11 10

Surgical Reception

11

21

1

2 Waiting Lobby

1 2 3 4 5 6 7 8 9 10 11

9

13 14

30 x 0.150 = 4.500

12

SURGICAL DEPARTMENT

9

8 7 6 5 4 3 2 1

7 (TRIPLE VOLUME ATRIUM)

1

2 7

6 Nurse Station

11

1 2 3 4 5 6 7 8 9 10 11

2

13

3

11 5 2

10

24 x 0.150 = 3.600

(TRIPLE VOLUME ATRIUM)

3

4

6

10

12

14 Prepartion Room

DOCTOR'S PLAZA F

24 23 22 21 20 19 18 17 16 15 14 13

7

15 Scrub Up Room

Bed Transfer

8

8

8

8

8 Clean Utility INTENSIVE CARE UNIT 9

9

1

Physio Therapy Reception 7

Family Room

2 Waiting Lobby

8 Clean Utility

3

9 Dirty Utility

Play Room

4

Treatment Room

10 Isolation Room

5

Doctor's Office

11 ICU unit

6 Nurse Station

7

8

8

8

8

6

1

5

4

4

5

1

6

7

12 ICU unit 2

IN-PATIENT (MEDICAL)

2 Waiting Lobby

7

Clean Utility

8 Dirty Utility

3

Play Room

9 Double Bed Unit

4

Doctor's Room

10 Family Room

5

Treatment Room

11 Single Bed Unit

6 Nurse Station CENTRAL STERILIZING SERVICES DEPARTMENT 1

Air lock

8

6 Cart Park

2 Clean Holding

7

3

Soiled Holding

8 Issuing Area

4

Washing & Disinfection

9 Control and Packaging

5

Cart Washing

Sterile Store

24 23 22 21 20 19 18 17 16 15 14 13

1 2 3 4 5 6 7 8 9 10 11

24 x 0.150 = 3.600

2 EMERGENCY DAY CARE

3

3

2 OUT-PATIENT DAY CARE

1 2 3 4 5 6 7 8 9 10 11

24 23 22 21 20 19 18 17 16 15 14 13

24 x 0.150 = 3.600 12

Inpatient Reception 8

12

1


12

12

SECOND FLOOR PLAN

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

3

6

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

9

9

9

9

10

9

9

10

IN-PATIENT (CARDIAC) F

19 x 0.200 = 3.600

4

1

7

5

8 11

11 (VOID TO GARDEN BELOW)

11 RAMP

11

ADMINISTRATION 7 4

1

5

1

8 F

(VOID TO GARDEN BELOW)

1 2 3 4 5 6 7 8 9 10 11

2

3

6

9

9

24 x 0.150 = 3.600

7

3

Chief Accountant Office

8 Staff Lounge

4

Accounting pool office

9 ICT Department

5

Board Room

10 Meditation Room

1

Chemotherapy Reception 5

Administration Offices

1 2 3 4 5 6 7 8 9 10 11

24 23 22 21 20 19 18 17 16 15 14 13

12

12

24 x 0.150 = 3.600

12

12

24 x 0.150 = 3.600

24 x 0.150 = 3.600

16

16

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

10

RENAl DIALYSIS DEPARTMET

F

16

F

15

F

11 10 9 8 7 6 5 4 3 2 1

2 Waiting Lobby

IN-PATIENT (ONCOLOGY)

24 23 22 21 20 19 18 17 16 15 14 13

13 14 15 16 17 18 19 20 21 22 23 24

Administration Reception 6 Hospital C.E.O

RESEARCH LABORATORIES

2 Waiting Lobby

F

4

8

12

12

10

24 x 0.150 = 3.600

13 14 15 16 17 18 19 20 21 22 23 24

3

(VOID TO GARDEN BELOW)

3

Play Room

7

4

Consultation Room

8 Infusion Bays

1

Librarian Office

Mixing Bay

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

2

6

3

13 14 15 16 17 18 19 20 21 22 23 24

11 10 9 8 7 6 5 4 3 2 1

8

RENAL DIALYSIS TREATMENT

(VOID TO GARDEN BELOW)

PAEDIATIC RESEARCH DEPARTMET

2 Seminar Room

9 Professor Office 10 Teaching Room

F

F

COMP LAB

6 Nurse Station

12

13

12

14

Radiologist Office

(VOID TO GARDEN BELOW)

13 14 15 16 17 18 19 20 21 22 23 24

7 4

8

5

12

12

1

24 x 0.150 = 3.600

24 x 0.150 = 3.600

11 10 9 8 7 6 5 4 3 2 1

11

8

4

11 10 9 8 7 6 5 4 3 2 1

10

13 14 15 16 17 18 19 20 21 22 23 24

F

(VOID TO GARDEN BELOW)

9

8

9

9

8

7 10 7

1 2 3 4 5 6 7 8 9 10 11

24 23 22 21 20 19 18 17 16 15 14 13

22 23 24 25 26 27 28 29 30

30 x 0.150 = 4.500

9

8 7 6 5 4 3 2 1

12

(TRIPLE VOLUME ATRIUM)

20 19 18 17 16 15 14 13 12 11 10

21

24 x 0.150 = 3.600

7 (TRIPLE VOLUME ATRIUM)

1

2 7

ADMINISTRATION F

24 23 22 21 20 19 18 17 16 15 14 13

1 2 3 4 5 6 7 8 9 10 11

12

24 x 0.150 = 3.600

4

3

2

2

News Paper Reading

13 Clean Utility 14 Dirty Utility

7

15 Store

Book Shelves

(TRIPLE VOLUME ATRIUM)

5 2

3

4

Inpatient Reception 8

2 Waiting Lobby

(VOID TO GARDEN BELOW)

12

1

5

6 Reading Carrels

1

11 10 9 8 7 6 5 4 3 2 1

F

5

12 Researcher's Office

8 Meeting Room

24 x 0.150 = 3.600

RESEARCH LIBRARY

11 Computer Laboratory

Researcher's Lounge

16 Research Laboratory

IN-PATIENT (MEDICAL)

13 14 15 16 17 18 19 20 21 22 23 24

6

Terrace

4

10

12

7

3

6

7

Clean Utility

8 Dirty Utility

3

Play Room

9 Double Bed Unit

4

Doctor's Room

10 Family Room

5

Treatment Room

11 Single Bed Unit

6 Nurse Station





MAMBRUI TOURIST TERMINAL

Mambrui,a small in Malindi has been seeing an increase of tourists as the Kenyan coast boasts some of the most beautiful beaches in the world being a popular tourist destination. A brief was issued calling for the development of a tourist terminal at a beachfront site. The proposed design responds to the extreme climatic conditions of the area with the use of local materials to build thick walls allowing for passive cooling through a high themal mass. The spatial layout of the terminal is based around a central courtyard borrowed from the traditional Swahili house allowing for the cooling of the building through the sea breeze. Screened balconies provide sun shading while allowing breezes through the spaces aiding in regulating temperatures while allowing for visual privacy. The facades reflects historical landmarks from the Malindi area, borrowing the column design from the gazzetted 'House of Columns' one of Malindi's oldest buildings. The exterior is finished in light coloured stucco reflecting away heat from exposed wall surfaces

Cultural Design | 4th Year Project -2015 | Supervisor: Prof Rukwaro GSPublisherVersion 0.0.100.100


GROUND LEVEL PLAN

Outdoor Bomas

KITCHEN

Cold Store

RESTAURANT

RECEPTION

Dry Store

Changing Room(F) Servery

Changing Room(M)

Waiting Area

ACCOMODATIO RECEPTION N

VACCINATION CLINIC 28

4.200

27 28 x 0.150 =

3 4 5

Wet Riser

2

26 25 24

Vaccination Area

Dry Riser

1

Nurse's Office

23 22

6 14

13

12

11

10

9

8

21

20

19

18

17

16

15

7

CHANGING ROOMS (F)

HAIR SALON

AMPHITHEATRE COURTYARD

CHANGING ROOMS (M)

SNACK BAR

FRUIT VENDOR

MUSIC SHOP CRAFTS/ LEATHER GOODS

16

15

14

13

12

CURIO KIOSK 2

11

SPORTS/ SAFARI GOODS

CURIO KIOSK 1

17 10

18

9

19

8

20

6

22

5

23

GENTS

24 25 26 27

4 3 2 1

PHOTOGRAPHY SHOP

27 x 0.150 = 4.050

7

21

LADIES

JEWELRY SHOP

BANK 3

POST OFFICE

RECEPTION

Cashiers

Manager's Office

Strong Room

NEWS STAND

FLORIST Strong Room

Strong Room

Cashiers

Cashiers

Manager's Office

Manager's Office

BANK 1

BANK 2

PEDESTRIAN ACCESS

UTILITIES ROOM

PARKING (16)

EXIT SENTRY POST ENTRY

SERVICE YARD


HOTEL ROOM (8)

HOTEL ROOM (8)

28

28

27

4.200 28 x 0.150 =

1

26

2

25

28 x 0.150 =

4.200

27 5

Wet Riser

4

Dry Riser

3

3

24

4

23

5

22

Wet Riser

2

26

Dry Riser

1

25 24 23 22

6

HOTELS(4) BOAT HIRE (4) 11

11 17

17 10 9

TRANSIT LOUNGE

27 x 0.150 = 4.050

5

24 25 26 27

10 9 8 7

22

6

23

19 21

7

22

18 20

8

21

4 3 2 1

6

23

5 27 x 0.150 = 4.050

GENTS

20

LADIES

19

GENTS

18

LADIES

16

15

14

13

12

16

15

14

13

12

EXECUTIVE OFFICE

24 25 26 27

4 3 2 1

TRANSIT LOUNGE

HELIPORT OFFICE AIRLINE (8)

ROOF GARDEN

VOID BELOW

VOID BELOW

ROOF GARDEN

11

10

9

21

20

EXHIBITION CONCOURSE

AUDIO VISUAL ROOMS (2)

15

19

F

14

18

VOID BELOW F

EXECUTIVE OFFICE

13

17

SWIMMING POOL

VOID BELOW

EXECUTIVE OFFICE

12

16

SECURITY/ CONTROL ROOM

8

9

8

20

19

18

17

16

15

14

13

12

11

7 10

7

21

6

ACCOUNTS OFFICE

TOUR OPRETORS(4

)





NAIROBI ART GALLERY

The city of Nairobi hosts a large number of upcoming artists and collectors and the is a growing need of a variety of functional spaces for them to exhibit their talents. The brief proposed an expansion to the existing Nairobi Art Gallery located off Kenyatta Avenue in order to increase its capacity. The new gallery should provide spaces for presentation, documentation, training and cultural education. The facility is to also create extra revenue generating spaces for artists and collectors a like through cafe's libraries etc. The design of the gallery is informed by an extensive research on spatial and environmental conditions required for the display and exhibition of various arts and crafts, High attention is paid to the lighting conditions of these spaces as some items are sensitive. Most of the galleries are day lit with Harmful solar glare diffused through a dynamic vertical sun shading system designed to mimic the roots of a tree, emphasizing the importance of maintaining a connection to our culture and heritage for national pride. The national flag served as inspiration for the shield designed on the North elevation, a national symbol of Kenya. The columns echo the columns present on the adjacent gallery though with a modern treatment. The white finish represents the blank canvas of an artist.

Architectural Conservation | 4th Year Project -2015 | Supervisor: Prof Rukwaro GSPublisherVersion 0.0.100.100


GROUND FLOOR PLAN

Veranda

Gallery

Gallery

Gallery

Main lobby Gallery

Gallery

Gallery

Veranda Gallery

Sculpture Garden

Gallery

Gallery

19 x 50 = 900

26

25

24

23

22

21

20

19

18

Ramp

17

16 15

PASSAGE

LIFT

14 13 12 11

RECEPTION

10

1

2

4

3

5

6

8

7

9

26 x 150 = 3,900

WAITING AREA

GENTS

SHOP

NYAYO HOUSE

KENYA -TAA AVE

PASSAGE

JANITOR'S CLOSET

LADIES

CAFE

GALLERY CASEMENT

SERVERY

FIRE ESCAPE 26 x 150 = 3,900

26 25 24 23 22

SERVICE LIFT Fire Cabinet 1 2 3 4 5

21

6

20

7

19

8

18

9

17

10

16

11

15

12

13

14


20

19

18

17

16

15

27

26

25

24

23

22

21

20

19 18

17 16 15

PASSAGE

LIFT

14 13

PASSAGE

LIFT

14 13 12

12 11

11

10

10

ARTIFACTS GALLERY

1

3

2

6

5

8

7

9

2

1

4

3

5

7

6

8

9

4

20 x 150 = 3,000

27 x 150 = 3,900

PASSAGE

PASSAGE

VOID

GENTS

GENTS

VOID

GALLERY PAINTINGS

VOID

LADIES

PASSAGE

PASSAGE

JANITOR'S CLOSET

JANITOR'S CLOSET

LADIES

GALLERY SCULPTURE

GALLERY PAINTINGS

24

SERVICE LIFT

FIRE ESCAPE

Fire Cabinet 1

26

2

25

3

24

4

23

22

5

22

23

21

6

21

20

7

20

19

8

19

2 3 4 5 6 7 8

9

18

9

10

17

10

16

11

16

11

15

12

15

12

14

13

13

PASSAGE

20

19

18

17

15

PASSAGE

16

SECOND FLOOR PLAN

20

19

18

17

16

15

1

18

FIRST FLOOR PLAN

12

SERVICE LIFT Fire Cabinet

17

14

11

26 x 150 = 3,900

26 x 150 = 3,900

26 25

13

VOID

PHOTOGRAPHY GALLERY FIRE ESCAPE

14

TEXTILE GALLERY

14 13 12 11

10

10

1

3

2

4

6

5

8

7

9

PASSAGE

PASSAGE GENTS

GENTS

VOID

STUDY COLLECTION

LADIES

VOID

LIBRARY

LADIES

PASSAGE

PASSAGE

JANITOR'S CLOSET

JANITOR'S CLOSET

AUDIO VISUAL

OFFICES

OFFICES

26 x 150 = 3,900

24 23

SERVICE LIFT

FIRE ESCAPE

Fire Cabinet 1

26

2

25

3 4

OFFICES

24 23

22

5

22

21

6

21

20

7

20

SERVICE LIFT Fire Cabinet 1 2 3 4 5 6 7

19

8

19

18

9

18

9

8

17

10

17

10

16

11

16

11

15

12

15

12

14

14

THIRD FLOOR PLAN

13

OFFICES

25

26 x 150 = 3,900

FIRE ESCAPE 26

13

2

20 x 150 = 3,000

LECTURE THEATRE

1

4

3

5

7

6

8

9

20 x 150 = 3,000

FOURTH FLOOR PLAN



FREELANCE WORK

SELECTED WORKS


PHENOM PARK APARTMENTS


Architect: Design Artitude. | Year: 2018 | Scope: 3D Modelling, 3D Rendering




KAPUTEI TOWNHOUSES


Architect: Architectural OMA KE. | Conservation Year: 2016 | Scope: | 4th Year 3D Modelling, Project-2015 3D Rendering, | Supervisor: Interior Prof Rukwaro Design




STANCHART UGANDA


Architect: Dimensions Uganda | Year: 2018 | Scope: 3D Modelling, 3D Rendering


KOINANGE TOWERS


Architect: Martin W. | Year: 2016 | Scope: 3D Modelling, 3D Rendering


MAANZONI HOTEL


Architect: Design Life. | Year: 2019 | Scope: 3D Modelling, 3D Rendering


FOODPLUS OFFICES

Architect: H.I.S | Year: 2018 | Scope: 3D Modelling, 3D Rendering


R.KHAMIS APARTMENTS

Architect:Dimensions Uganda | Year: 2018 | Scope: 3D Modelling, 3D Rendering


KEVIAN FACTORY

Architect: H.I.S & Design Hub | Year: 2020 | Scope: 3D Modelling, 3D Rendering


HEPL STATION

Architect: C.G.M & Design Hub | Year: 2020 | Scope: 3D Modelling, 3D Rendering


EVAN'S RESIDENCE

Architect: C.G.M | Year: 2020 | Scope: 3D Modelling, 3D Rendering


MIRE'S RESIDENCE

Architect: C.G.M & Design Hub | Year: 2020 | Scope: Design, 3D Modelling, 3D Rendering


KAREN RESIDENCE

Architect: C.G.M | Year: 2019 | Scope: 3D Modelling, 3D Rendering


MK-5B RESIDENCE

Architect: C.G.M | Year: 2019 | Scope: 3D Modelling, 3D Rendering


SHINALI RESIDENCE

Architect: Design Life | Year: 2018 | Scope: 3D Modelling, 3D Rendering


WANGWE RESIDENCE

Architect:Design Life | Year: 2018 | Scope: 3D Modelling, 3D Rendering


KAREN RESIDENCE

Architect: Design Life | Year: 2017 | Scope: 3D Modelling, 3D Rendering


OKOTH RESIDENCE

Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering


NJUMBI RD RESIDENCES

Architect:K.S.M | Year: 2018 | Scope: 3D Modelling, 3D Rendering


VIPINGO INTERIORS

Architect: Design Hub | Year: 2018 | Scope: Interior Design 3D Modelling, 3D Rendering


KENTON SCHOOL

Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering


GREEN STEADS SCHOOL

Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering


PRODUCT DESIGN

Designer: Design Hub| Year: 2018 | Scope: Design,3D Modelling, 3D Rendering


GRAPHIC DESIGN

Cover art design for tracks on my music profile.


Nyakundi Kenani Tel: +254 725 589636 Email: nyakundikenani@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.