PORTFOLIO
SELECTED WORKS Nyakundi Kenani 2015-2020
PROFESSIONAL WORK
SELECTED WORKS
GITANGA APARTMENTS
Architect: S.F.A | Year: 2019 | Scope: 3D Modelling, 3D Rendering,Detail Drawings
YPASS ERN B 36,000
SOUTH
rock formation
E-03 200
5400
S-02
NYANDIGISI RESIDENCE
A
water fountain
200
C
B
200
1,500 100
200
1,300
4,250
1,600
2,000
4,200
1,800
200
1,200
E
D
17,700
150
2,500
2,700
F G
200
200
4,000
2,100
900
700 750
1,400
H
200
1,900 200 1,050 1,400
1,500
E-01
E-01
C
2,050
2,300
200
200
1,600 200
2,300
2,300
11
200
200
4,850
3,750
2,366
150
200
800
200
2,850
FIRST FLOOR +3900
N
P.V
2,300
2,850
PV
BEDROOM 04 ENSUITE
4
GROUND FLOOR +750
200
3
DSQ F
Scale 1
2
3,750
4,100
E-04
2,300
PV
2,850 150 2,850
200
Elevation 01
1,900
5
800
850
15,200
2,100
4,750 200 2,800
2,850
150 3,300
E
F
G
H
200
E
1,400
F G
200
1
200
200
200
200
20R x 150 19G x 300
2,450
650 150 2,850
6,500
PV
200 2,500
1,050
200
2,425
4,000
H
DSQ E Elevation Scale 02 1
150 1,385
200
Scale 1
8
1,385
1,690
3
2,100 150
1,750
200
2
LOUNGE UP
6,350
5 4
200
150
2,560
DSQ E
9
150mm Reinforced Concrete Slab to S.E D
6
20R x 150 19G x 300
150
7
150mm Reinforced Concrete Slab to S.E D
10
FIRST FLOOR +3900
150
8
1,315
STAIR CASE
10
200
150
200
1,315
2,500
200
2,500
7
LOUNGE
1
8,450
PV
2,100 150
PV 1,750
3,927
9
200
TERRACE LEVEL +6900
200
3,066
GROUND FLOOR +7506
ROOF LEVEL200 +3000 200
Elevation 03
1,500
200
4,250
150
17,800
4,200
200
200
2,500
17,800
C
B P.V
LOUNGE
P.V
2,500
200
200
D
E
Consultant: B
STUDIO FORTE ARCHITECTURE C D P. O. BOX 17351 - 00100, NAIROBI.
1,750
6,150 150 150 1,100
SFA/0893
Job Title:
Client:
N
DSQ FLOOR
GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX
GROUND FLOOR +750
Scale 1:100 Elevation 04
Signature & Date:..............................................
Client:
PROPOSED RESIDENTIAL HOUSE ON F G H PLOT L.R NO 3593/45 KAREN,NAIROBI.
Job No.:
1,500 700
450
200 200
H
Job No.:
E
walkway
FIRST FLOOR +3900
P.V
PLOT L.R NO 3593/45 KAREN,NAIROBI.
Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529
1,900
Job Title: BEDROOM 04 ENSUITE PROPOSED RESIDENTIAL HOUSE ON
Sign.................................. Date:...................
Second Floor Plan
1,500
3,000
200
F G
P.V
A
1 BALCONY
100 100
Reg. Arch. No. A1131; MAAK(A) No. 2529
A
13,500
200
200 200
BEDROOM 02 ENSUITE 100 4,000
STAIRCASE Consultant: GUEST P.V W/C STUDIO FORTE ARCHITECTURE DINING P. O. BOX 17351 - 00100, NAIROBI.
3
IC
Scale 1
P.V
4,600
2
1,200
DSQ S
TERRACE LEVEL +6900
100
MASTER BATHROOM
100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade
Scale 1:100
2
100
MASTER BEDROOM 01 ENSUITE
live hedge
Scale 1:100
H
150 P.V
10,300
Stairs-R.C Cast In-Situ to S.E Details A 900mm High Vanished timber Handrail Bolted to 25mm Steel Balustrade Thread 300mm Riser 150mm Nosing-20mm
900
200 200
STAIRCASE
100
200
200 150mm Reinforced Concrete Slab to S.E Detail 200
5
4 3
SERVICES
TERRACE
2,850
BALCONY
100 100
1
100
1
A
G
1 IC
S-03
water tanks
b
2,100
650
Scale 1:100
F
A
200
GROUND FLOOR +150
4
2,366
200 4,850
2
E
1
A
SECTION 02
D
3
1
4,850
2
SERVICES
6,250
PV
B
4 Structure Roof Stone coated GCI profile tiles on timber trusses to S.E 3 details
PV
13,500
5
Upper C Lobby
2,000 200
200
ENTERTAINMENT TERRACE
200
200
2,850
200
ENTRY PORCH
100 100 400 100
4,100
PV
11
2,500
1
200
200
PV
staircase
100 6,600
200
H 3,605
F G
100
150
200
200 1,750
ROOM
600mm*200 Strip Foundation (Depth determined on site) A
13,500
E-04
1,200
200
2,300 15,000
1,250 700
1,150
550
5
2,500
H
3,023STUDY200
200
6 100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade
kitchen yard 2
200
F G
kitchen garden
2,500
PV
2,850
200 200
700
450 700
2,100
PV
150
PV
E
2,900 200 1,700 200 200
200
Stairs-R.C Cast In-Situ to S.E Details 900mm High Vanished timber Handrail 7 Bolted to 25mm Steel Balustrade Thread 300mm Riser 150mm Nosing-20mm
6
5150 200
E
D
17,800
150mm Reinforced Concrete Slab to S.E Detail
200
4,000
4
17,800 10,300
8 150mm Reinforced Concrete Slab to S.E Detail
3
1,200
+300
200
PV IC 2,100
3
C
600mm*200 Strip Foundation (Depth determined on site)
Ground Floor Plan
2,000
D
150
2,250 200
D
S-02
1,200
8
200 1,250 2,500
underground water storage tank
GSPublisherVersion 0.3.100.100
D
200 1,500 200 1,400 300 200 1,400
2,850
B
2,612
2,850
A
1,800 200 19,100
C
PV
200
2
2,850
1,300
10,300
9
S-01
4
900
PV
200 1,600
PV
4,000
4800
PV
200
+-0 3,600
10
9
4,900
DOBHI SINK PV
F
200
KITCHEN
200
7350
2,300
6,250
200
1,200
200 200 200 450 2,050 200 1,850
200 200 200
BEDROOM 03 ENSUITE
00 3,2
200 2,500 1,300
porch
Scale 1:500 100 1
N
cl
00 1,8 38 3,2
2,500
PV
WINDOW SEAT
3,000
IC
10
IC
1,750
150
TO LANG
DINING
PV
+150
2,500
C
B
200
7
SH
WHB
STORE
LOCATION PLAN 2
WC
2,100
1
entry hall
PV
1,061
200
E-01
200
2,000
4,000 150
5,500
20R x 150 19G x 300
5 4
2
20
200
ATA ROAD
19
3,250
18
6,500
17
200
WHB
6
+750
IC
3
GUEST BD/RM 04
8 7
3
5
4
1,739
3,000 17,700
B
150mm Reinforced Concrete Slab to S.E Detail 200
3250
4,000
10,300
parking
1,300
150
IC PV 250 700 200
1,200
3,800
2,100 PV
200
1,591
UP
DOWN
11,400
16
LOUNGE
T.V WALL
9
15
15,000 6,500
200
WC
10
14
ERN +300 SOUTH
S BYPAS
1,588
Roof Structure A Stone coated GCI profile tiles on timber trusses to S.E details
H
4,000
PV
staircase PV
5,300
200
400
3,400
200 200
PV 250 700 200 2,000 700
450 PV
700
2,100
1,750 1,200
2,300 15,000 200
E-04
1,250 700
1,150
550
200
900 1,200 2,500
200 200
200
F G
200
PV 11
200
+300
13
6
1,700 IC 900 700
2,500
verandah
7
E-02
440
200
12
S-01
2,000
PV
8
7350
1,960
rock formation
2,500
1,750
9
3,600
IC
1,500
5,400
150
E
D
200
200
200 200
2,300
200 1,400 200 200
200
10
10,300
600
1
19,100
entry
GUEST W/C
BALCONY 200
Scale 1:100
fish pond
R=1850
1,500
200
2,850
C
B
SITE BOUNDARY
water feature/koi
GAZEBO
water fountain
900
live hedge
foot bridge
200
1,300 1,500
A
Scale 1:100
H
STAIRCASE BATH
WC
cl
B
SECTION 01 200
LAWN
200
104
150
SITE
A
E-03
live hedge
850
3,300
walkway
150
PV
S-02
Y ROAD
SOAK PIT
DSQ
F G
kitchen garden
P.V
cl
dr
A
200 1
2,900 200 200 1,700 200 200
WHB P.V
DINING
STUDY
P.V
4,000
SH
TERRACE LEVEL +6900
7 6
4,000
200
5150
200
E
D
1
3
kitchen yard 2
SH
P.V
LOUNGE
PV
S-01
BEDROOM 02 ENSUITE
200
SH
H
8
First Floor Plan
S-02
live hedge
ACADEM
2nd gate
PARKING
MAIN HOUSE
200
WC
2,500
G
9
S-02
C
1,200
Site Plan
PV
4,000
PV IC 2,100 4,000
2,250 200
underground water storage tank
Scale 1:200
200
1,750 200
B
1,250 2,500
2,900
E-02
A
1,800 200 19,100
1501,600
600mm*200 Strip Foundation (Depth determined on site)
5
4
200 10,300
2
6
4,900
PV
1,300
8
IC
200
150 1,600
3,800
200 4,000 150 2,100
20R x 150 19G x 300
F
200 6,250
PV
200
+-0 3,600
+300
5,300
15,200
2nd gate
KITCHEN
4800
SOAK PIT
2,300
PV
3,250
100
200 200 200
45,000
S-02 11
5,500
200 6,500 200
1,200
200 200 2,500 1,300
porch IC
1
DOBHI SINK
PV
+150
3
S-01
7
SH
cl
STORE
200
2,500
PV
7350
100
+750
200 200 450 2,050 200 1,850
2,500
WINDOW SEAT
3,000
entry hall IC
3
WC WHB
DINING
10,300
5,000
12750
100
LOUNGE
5
4
2 2,500
2 1
0 80 8 1, 23 3,
100
5 4 3
PV
200 1,400 200 200 200 1,750 200 11,400 15,000 6,500
E-02
PV
1,500
750 200 200 200
S-01
parking
SEPTIC TANK
2,500
3,750
200 400
24,406
16500 200 750 200 200
PV
1,500 3,000
200 200
2,000 200
1,750 6,150 150 150 1,100
1,650 150 6,150 1,500 3,000
F
700
3,000
1,500
450 200
200 200
D
9
P.V
BATH
200WHB
4,200
Upper Lobby
DOWN
200 200
IC
WHB
6
UP
4,250
PV PV JULIET BALCONY 4,000 100mm Reinforced Concrete Slab to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade
10
20
3,000
5,600
8 7
3250
4,000
19
C
150
+300
T.V WALL
GUEST BD/RM 04
18
B
2,450
9
BATH
F
10
SERVICES
STAIRCASE 2,600 WC
MASTER BATHROOM
2,500 150
WHB
17
A
PV WC
10
4,250
E
4,000
P.V
MASTER BEDROOM 01 ENSUITE
16
3
200 200
PV
staircase PV
2 UP
cl
200
5
Stairs-R.C Cast In-Situ to S.E Details 900mm High Vanished timber Handrail Bolted to 25mm Steel Balustrade planter Thread 4 300mm Riser 150mm Nosing-20mm
IC
dr
BEDROOM 02 ENSUITE
1
15
3
IC
walkway
+300
7 6
200 1,200
TERRACE
cl
14
7350
verandah
20
DSQ 02
4,000 2,100 PV
1,500
4 3
PV 00 1,5 00 3,2
COOK
IC
PV
8
2
cl
1,200
200 1,591
BALCONY 200
mini
S-01 150mm Reinforced Concrete Slab to S.E Detail lounge
5
13
9
19
cl
+150
2
10
S-03
1,700 IC 700
900
BALCONY
A
7 6
12
1
200
2,500
18
200
2,500 440
17
200
DSQ 01
2,000
16
3,000 3,375
1,960
15
150
200
200
3,600
14
PV SH
2,300
13
PV WC
10,300
200
S-03
H
19,100
200
12
1,150 1,150 225 700 600 700
D
DOWN
200
1 IC
200
F G
01 ENSUITE
cl
8
20
200
5,600
E
D
W.I.C
D
balcony PV
9
19
C
B
200
C
cl
MASTER
6
10
18
E-03 A
dsq roof line B
cl
17
7
live hedge
150
PV
150mm Reinforced Concrete Slab to S.E Detail BEDROOM
+-0
SITE BOUNDARY
A
staircase PV
DOWN
water feature/koi fish pond
200
Roof Structure Stone coated GCI profile tiles on timber trusses to S.E details planter
16
8
15
9 foot bridge
C
PV
4,750
200
PV
10
14
R=1850
entry
B
13
4500
A
12
GAZEBO
1,600
1,600
3,700
SFA/0893
D
GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX Signature & Date:..............................................
SECTION 01
GSPublisherVersion 0.3.100.100
AD
Scale 1:100
DSQ ELEVAT
200 200
200
200 2,300
4,850 800 2,850
2,800
S-02
2,300 800 200
15,200
200
PV
4,100
850
3,750
4,750
2,450
20R x 150 19G x 300
2,425
200 4,750
6,500
PV
5,300
1,600
2,300
11
200
1,750
Scale 1:100
Elevation 02
Scale 1:100
Elevation 01
Scale 1:100
Elevation 03 Elevation 02
Scale 1:100
4 3
2
150
3,000
B
200
17,700
C
E-01
2,500
2008
PV
4,000
6 5
200
200 1,600
2,300 200
200 200 4,850
200
E
D
F G
2
S-02
2
PV
200
1
10 1 9
200
8
1
7 6
Scale 1:100 Scale 1:100
SERVICES
1
C A
3
H
UP
Upper Lobby
15,200
800
1,400
4
2,500
4
200
200
200 200 200 200
200 1,500 200 1,400 300 200 1,400
3
PV
13,500
2,000
7
200
water tanks
E
D b
Scale 1:100
5
4 3
F G
H
4,850
B
2,300 200
10 2,612 9
ENTERTAINMENT TERRACE
200
PV PV
200
staircase 1,061
1,739
13,500
5,400
A
1,300
5
100 4,000
PV
6,350
1,588
100 100 400 100
cl PV
4,100
2,500 850 200
BEDROOM 03 4,100 ENSUITE
3,750
4,750
dr
E-04
2,850
2,300
H
800
F G
PV
WC
200
PV
200
BATH
8,450
1,500
3,750
200 2,300 200 4,750
20R x 150 19G x 300
2,450
S-02
2,800
SH
E
6
Scale 1:100
900
600
S-01 8
200
200
1,500
WC
SH
D
STUDY
200
9
7
BATH
200 850
C
1
10
6,250
1,500
900
H
WHB
11
1,300
1,400
WHB
PV
104
F G
4,000
2,425
6,500
PV
5,300
2 1
17,800
6,600
13,500
dr
3
20R x 150 19G x 300
200 200 200 2,050 1,750 200 200 2,300 200
11
200
E-02
2,900
200 400
3,400
200 2,500
2,300 200 1,600
200 2,050 200 1,600
200
200
200
1,750
3,750
200 400 200
E-02
2,900
5,300
15,200
200 400
3,400
200 2,500 200
Elevation 01
UP
Upper Lobby
2
staircase
10 9
F G
20R x 150 19G x 300
100
100
100
1 10
9
H 8
7 6 5 4 3 2 1 UP
2,500
200
Consultant:
Job Title:
STUDIO FORTE ARCHITECTURE P. O. BOX 17351 - 00100, NAIROBI. SERVICES Upper Sign.................................. Date:................... Lobby
PV
Scale 1:100
200
E
200
100 100
8
200
ENTERTAINMENT TERRACE
D
4,600 PV
7
Scale 1:100 6 Scale 1:100
PROPOSED RESIDENTIAL HOUSE ON PLOT L.R NO 3593/45 KAREN,NAIROBI. 13,500
PV
Elevation 03 Elevation 02 Plan Second Floor
100
200
6,350
C
B
7
5
Elevation 04 Elevation 03
Client:
GILBERT NYANDIGISI MAOGA & LILIAN KEMUMA MATAGARO P.O BOX
5
SFA/0893
Scale 1:100 Drawing Title: SITE PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN TERRACE FLOOR PLAN ELEVATIONS
Scale:
as indicated
Dwg. No.: Date:
01
AUG 2019
Drawn: Checked:
N.K MAM
Signature & Date:
Notes:
Scale 1:100
1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings
4
3
3
1,200 4,850
1
1
A 2
b
Signature & Date:..............................................
200
4 3
Job No.:
water tanks
4
3 6,250
Reg. Arch. No. A1131; MAAK(A) No. 2529
4,850
4
4,100
PV
8,450
A
PV 2,500
200
200 17,800
6,600
E-04
900 1,200
2,300 200 13,500 15,000 200
200 550 6,250 900 700 200 200 1,150
10,300
6
5
4,900
200
100 PV
17,800
200 200
PV
6
kitchen 2 yard 2
0
2,500
17,800
200
13,500
PV PV 450 6,350 700 1,750 700 8,450 2,100 150
8 7
5
H
+300
S-01
200
100 100 400 100
900
9
10,300
200
11
9
8
17,800
00 3,2
100 400
100
2,300 200 3,750 200 2,300
E-04
15,200
200
1 10
8
1,250
PV PV
F G
PV
E
HEN
PV
STORE water tanks
5 4
200
E BEDROOM 02 ENSUITE
SH
PV
17,800
200
1 10
10 9
1 3250
7
DOBHI SINK
cl
1
cl
6
cl
200
100
PV
200
200
4,000
4800
150
2,100
150
WINDOW SEAT
WC
B
A 2
1,900 200 1,400
balcony 200 1,500 200 1,400 300 200 1,400
PV 4,000
3
5150
6
ERVICES
4
3
2
IC
SH
WHB
PV PV JULIET BALCONY 4,000
Elevation 02 First Floor Plan Elevation 01 5
D
8 7
WHB
1501,600
Scale 1:100
4
9
PV 2,000
PV
2,500
mini lounge
10,300
200 200
2,612
2,600
planter
6
5
1,050
00 3,2
hedge
W.I.C
7
7
6
3
H
WC
200
8
200
H
5
IC
V PV PV C 00 GUEST 2,900 200 200 2,000 200 1,400200 00 2001,500 1,700 BD/RM 300 200 4,000 04 200 1,400 4,000 200 1,400 F G H
F G kitchen garden
8
kitchen yard 2
H +300
EDROOM 200 100 200 03 4,000 200 4,100 00 200 100 400 100 ENSUITE 91 2,100 1,200 PV 100 4,000
E
200 200
PV 250 700 200
H
F G
S-01 S-01
BEDROOM 4,000 03
700 750 1,500 ENSUITE
1,400
cl
4,250
200 100 200 100
F G
9
200
PV
PV
WC
HEN
5
4
BATH
10 1 9
10
1,750
PV
STORE WHB
E
3,800
DOBHI SINK
SH SH
6
BALCONY
PV
2,500 200 staircase 10
cl
200
PV 200 550 200 250 200700 200 2,500 1,200 900 700 1,250 1,200 200 200 4,100 800 2,850 800 200 200 4,900 200 1,150 200 2,300 200 200 200 3,750 200 2,300 200 2,300 200 200 15,000 200 200 15,200 E-04
PV PV
2,600 WINDOW WC SEAT BATH
7
H
cl
MASTER BEDROOM 01 ENSUITE
200
IC
1,750
150
F G
kitchen SH garden
live hedge
WHB cl
8
1
2,900 200 1,700 200 200
C
E-01
PV
100
200
WHB
S-02
H
5150
WC 200
E
D
4,000
3
200
17,700
B
200
13,500
PV
F G 200
PV IC 2,100 4,000
4800
PV
2,100
4,000 200
150
200
10
4
1,061
cl
A
200
PV
4,000
6,250
0
E
DROOM 1,250 2,250 02 2,500 200 NSUITE
2
1 3250
9 kitchen yard 2
3,000
BATH
4,850
150
PV
F
200
5
balcony STORE GUEST 200 2,000 BD/RM 1,500 200 1,400 300 PV porch KITCHEN +300 4,000 04 200 1,400 4,000 200 1,400 PV
2
6
DOBHI SINK
cl
entry hall
7
IC
E-04
200
WINDOW SEAT
+750
PV
DOW
PV
4,000
IC
1,739
PV 00 1,5 00 3,2
1
3
3,800
3 2
UP
150
PV
5
4
3
S-01
PV PV PV PV PV 450 200 550 450 2,500 700 200 1,200 900 700 1,250 250 1,200 1,750 700 700200 200 2,300 200 150 700 4,900 2,000200 1,150 700 200 2,100 200 4,850 200 2001,600 15,000 4,100 E-04 2,100 150 3,800 200 3,750 200 2,300 200 3,750 200
150
4
2,100
20R x 150 19G x 300
6
9
1,300
planter
Scale 1:100
S-01
8
200 EDROOM 4,000 200 1,900 WC 200 03 4,000 200WHB200SH 50 1,500 1,050 1,400 ENSUITE 91 2,100 1,200 5
10
1,588
5,400
A
6
4
3250
H
1,400
2,000
WHB
7
H
200
8
2,000
200 4,000
11
5,500
9
GUEST
BD/RM F G F 04G4,000
PV WC
10
800
IC
1,200
200
1,500
4,850
200
2,100 PV
WC
PV
Estaircase
2,300
H 200
1,591
600
First Floor Plan Elevation 01
5
200
F G
4,000
PV
IC 700
900
200
2,850
SH
BATH 1,700 200
200
1,500
1,500
18
E
D
WHB 2,500 2,500
200
900
17
S-02
SH
45,000
WHB
3
200
1,300
1,050
PV
200 1,200
2,300 15,000 200
E-04
1,250 700
1,600
1,150
550
200
900 200
200
1,200
4,900
2,500 200
200
200 4,850
800
PV
BATH
104
7
6
dr
200
F G
200
6
cl
16
WC
1,050
200 200
PV 250 700 200 2,000
PV
700
150
450 700
2,100
4,000 150
3,800
200
PV PV
PV PV
200
24,406
4800
7
S-01
4,000
200
8
live hedge
2,600
5,300
15,200 45,000
S-02 11
5,500
F
200
S-02
kitchen garden
9
8
1
H
WC
E
2,100 850 900
20
F G
2,500
2,700
19
4,000
S-01
200
1,200
DOWN
PV
5150 2,900 200 1,700 200 200
200
E
10
4,200
1,800
15
200
200
PV IC 2,100 4,000
1
9
150
2,000
14
DROOM 1,250 2,250 02 2,500 200 NSUITED
10
4,250
1,600
13
4,000
3
200
1,300
12
6,250
0 200
4
kitchen yard 2
1,500 100
20
+300
200
19
KITCHEN
200
18
STORE balcony
PV
porch
5
BATH
cl
D
17
1,750
2
6
17,700
DOWN
DOBHI SINK
cl
C
B
SH WHB
E-03
A
SH
STUDY
16
DOW
WINDOW SEAT
+750 entry hall
200
WC
BATH
SH
PV
15
2,100
7
WC
14
150
IC
1501,600
PV PV JULIET BALCONY 4,000
13
20R x 150 19G x 300
8
4,250 planter
9
7
WHB
12
WC 1,900 200WHB SH 1,400
1,050
3
S-01
PV 00 1,5 00 3,2
2
1,500
UP
1,400
9
20
200
200
5 4 3
1
50
10
19
WHB
4
3250
H
18
4,000
8 7 6
GUEST BD/RM
F 04G4,000
2,500
BATH
10
8
4,000
Upper Lobby
WHB
17
9
dr
2,600
DOWN
PV WC
10
4
1
16
PV
Estaircase
5
BEDROOM 02 ENSUITE
cl
mini lounge
5
IC
PV
2
15
200 1,200
1,500
UP
14
4,000 2,100 PV
cl
6
3
13
200 1,591
7
12
1,700 IC 700
900
MASTER BEDROOM 01 ENSUITE
W.I.C
cl
8
20
200
BALCONY
10
19
6
cl
H
1,900 200 1,050 1,400
balcony
PV
18
200
cl
17
200 400
PV
16
3,750
PV planter
DOWN
200 2,500 2,500
S-01
700 750
1,400
200
9
15
H
4,000 900
14
8
F G
2,100
13
E
D
2,700
F G
200
200
staircase
7
3
1,200
2,500
E-04
1,800
200
200
2,000
E
D
17,700 4,200
PV
1,600
150
12
24,406
1,300
4,250
PV
10
9
100
200
1,600
1,600
200
C
B 1,500
3,750
A
200
2,300
S-02
E-03 200
2
OLOITOK-TOK COUNTRY HOUSE
900*450mm Flashing detail
P.V
0.200
4.100
DINING
0.200
4.000
LOUNGE
4.859
4.591
BEDROOM 02
4.217
BEDROOM 01 0.200
5.445
20mm ITS corrugatted Iron Sheets 100mm Purlins 150 mm I-Beam
9.400
100mm Reinforced to S.E Detail 50mm Quarry dust blinding 300mm Compacted hardcore on grade Foundation Details to S.E drawings
MAIN HOUSE SECTION 01
18.300
0.200 5.000
1.500
1.400 0.200
2.000 1.500
3.142
P.V
0.200 0.200 1.800
3.023
BATH
P.V
2.400
0.200
9.400
BATH
3.451
4.800
2.000
4.600
LOUNGE
50mm Quarry dust blinding
3.000
OFFICE
0.200
6.206
5.100
P.V
clay tiles ff
COVERED PORCH 0.200
1:100 0.900
3.400
4.600
1.100
COVERED COVERED PORCH 0.200 PORCH 3.429
0.200 100mm Reinforced to S.E Detail
4.330
0.200
0.900
5.000
wood parquet blocks ff
MASTER 5.500 BEDROOM P.V 04 (ENSUITE)
3.794
0.200
3.935
2.800 0.200
5.500
4.100 0.500 0.200 3.500 0.200 2.200
DINING
0.200
3.600 3.400 2.000
0.900
0.200
3.300
3.043
0.300
1.800
1.900
4.170
0.200 0.300 2.000 0.100 0.200 1.800 1.600 1.100
1.400
ceramic tiles ff
1.300
1.000
4.000
BEDROOM 02
P.V
8.500
4.006
2.800
1.300
MASTER BEDROOM 04 (ENSUITE) P.V
W.I.C
0.200
4.600
1.978
cl
cl
3.400 1.800
FOYER
3.934
0.200
P.V
ceramic tiles ff
non-slip ceramic tiles ff
2.955
4.800
5.100
4.600
4.800
KITCHEN
3.500
BEDROOM 0.200 01 BATH 3.300
3.500
1.500
0.900 9.400
1.800
ceramic tiles ff
3.000
0.200 18.300
1.500
1.400 0.200
5.000
0.900
4.600
2.200
2.000
3.000
5.000
3.500
4.744
0.200 2.800 4.100
5.500
0.200 8.500
0.500 0.200
0.200 0.300 2.000 0.100 0.200 1.600 1.100
3.500 0.200
0.300
1.000
2.800 3.400
1.800 1.400
108.096
105.926
1.800 0.200
3.000
BEDROOM 03 (ENSUITE) 4.100
0.200
wood parquet blocks ff
1.700
300mm Compacted hardcore on grade
4.476
2.188
1.500
0.200
2.430
1.300
1.500
0.200
0.150 0.150 0.900 0.850
3.300
4.200
0.200
0.850
5.500
0.200
0.200
2.000
0.200
Foundation Details to S.E drawings
0.918
0.918
2.000 4.476
2.188
1.500
0.200
2.430
MAIN HOUSE SECTION 03
16.506
1.300
1.500
0.200
0.150 0.150 0.900 0.850
3.300
4.200
0.200
0.850
5.500
0.200
0.200
96.065
1.100 2.000
5.500
0.200 3.500 0.200 0.450 0.450 1.000 1.000 1.000
clay tiles ff
1.000
6.337
4.600
P.V
2.100
4.800
1.350
wood parquet blocks ff
1.700
1.000
0.200
1.200
108.096
7.350 7.150
cl
LOUNGE
8.700
clay tiles ff
P.V
1.000
TER PANTRY MAS non-slip OOM ceramic tiles ff BEDR 900*450mm Flashing detail 04 KITCHEN )20mm ITS corrugatted Iron Sheets E non-slip IT U 100mm Purlins ceramic tiles ff (ENS ic tiles ff 150 mm I-Beam ceram CLOSET
0.200
COVERED PORCH
1.800 1.000
F
0.785
0.200
1:2000
5.500
1.000
2.600
3.400
0.200 1.078
LOUNGE & DINING
1.800
0.785
LOCATION PLAN
1.800
OFFICE
ic tile ceram
335.106
1.800
1:2000
1.000
wood parquet blocks ff
5.285
CLOSET
DINING
non-slip ceramic tiles ff
4.100
KITCHEN 3.300
0.900
4.170
0.400
5.285
0.400
2.955
0.200
2.000
LAWN
3.400 2.000
5.900 2.878
1.800
COVERED PORCH
GUEST CLOAK non-slip
BnoAnTH slip s ff
cla
6.337
2.000
0.40 Ha
2.130
ceram
MAIN HOUSE SECTION 02
3.600
1.678
0.200
3.400
0.200
ic tile
4.170
5.861 0.200 1.000 0.200
1.412
0.200
2.43 Ha
non-slip 1.900 ceramic tiles ff
2.670
BATH s ff
Foundation Details to S.E drawings slip non
ERED COV H C POR s ff y tile
PANTRY SITE
50mm Quarry dust blinding
AGE STOR
300mm Compacted hardcore on grade
2.100
F
122.445
cla
0.200
0.80 Ha
ic tile
ceramic tiles ff
1.300 MAIN HOUSE
4.900
2.100
ERED COV H C POR s ff y tile
2.100
4.170
PARKING (4 CARS)
0.200
0.2001.000 1.000 3.600 5 0.200 14.58
BEDROOM 02
37.730
ceram
3.700
1.100
4.000
15.361
1.583
0.305 1.000 OOM BEDR OFFICE 03 UITE) P.V (ENSic tiles ff
100mm Reinforced to S.E Detail
2.700
1.300
1.000
1.978
1.300
0.900 1.100 2.700 0.200
FOYER 317.562
cl
cl
ceramic tiles ff
TER MAS 0.40 OOM Ha BEDR 04 UITE) (ENS s ff
ceramic tiles ff
ceramic tiles ff
DSQ
ceram
3.500
BEDROOM 01
5.000
1.200
2.600
ic tile ceram
1.000
0.200
2000
cl
1.000
0.2001.000 1.000 3.600 5 0.200 14.58
MAIN HOUSE
GUEST CLOAK non-slip
4.170
0.200 3.500 0.200 0.450 0.450 1.000 1.000 1.000
clay tiles ff
1.412
BnoAnTH slip s ff
1.000
1.800
1.800 1.000
BATH non-slip
COVERED PORCH
1.350
2.130 0.200
ic tile
0.200 1.078
1.800
1.000
1.800
1.100
ceram
20mm ITS corrugatted Iron Sheets 100mm Purlins 1.500 150 mm I-Beam
5.400
2.200 2.400
0.200
8.700
2.670
BAnTH slip s ff
no 4.170
2.878
1.800
1.200
4.900
2.700
0.900 1.100 2.700 0.200
GE
A STOR
1.678
7.350 7.150
4.100
1.000
2000
ceram
1.000
0.200
0.200 1.300
5.900
2.800
0.305
1.000
1.200
0.200
OOM BEDR 03 UITE) (ENSic tiles ff
3.700
122.445
2.43 Ha
2.800
5.000
1.300
15.361 5.861 0.200 1.583 1.000 0.200
0.200
5.400
1:100
5.200
9300 0.200
0.200
1.500
5.200
9300 0.200
0.200 1.300 2.200 2.400
3.072
37.730
1:100
16.506
1:200 GROUND FLOOR PLAN
GROUND FLOOR PLAN
P.V
P.V P.V
P.V
P.V
P.V
P.V
P.V
P.V
1:200
P.V
P.V
P.V
Con
ELEVATION 1:100 01 ELEVATION 02
1:100
1:100
ELEVATION 02
1:100
S
P N
S
R GSPublisherVersion 0.7.100.100
LAWN
P.V P.V
P.V
P.V
P.V
P.V P.V
P.V
P.V
P.V P.V
P.V P.V
P.V
1:100 ELEVATION 03 ELEVATION 04
Consultant:
37.663
STUDIO FORTE ARCHITECTURE P. O. BOX 17351 - 00100, NAIROBI.
Job Title:
Client:
PROPOSED RESIDENTIAL HOUSE AT OLOITOKTOK
Sign.................................. Date:...................
1:200
Reg. Arch. No. A1131; MAAK(A) No. 2529
Job No.:
ON PLOT L.R. No. ..................................
SFA/0897
ERNEST MOTURI P.O.BOX 15322 NAIROBI Signature & Date:..............................................
1:100
Drawing Title:
Scale:
Consultant:
Dwg. No.: Date:
Drawn:
N.K
Notes:
STUDIO FORTE ARCHITECTURE Checked: P. O. BOX 17351 - 00100, NAIROBI.
Signature & Date: Sign.................................. Date:................... 28 JUN 2019 Reg. Arch. No. A1131; MAAK(A) No. 2529
1:100
Job Title:
PROPOSED RESIDENTIAL HOUSE AT OLOITOKTOK
Job No.:
SFA/0897
P.V
1:100
ELEVATION 04
Client:
1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical andON Plumbing engineering PLOTworks L.R. as No.per.................................. drawings 4. Local authority and landlord approvals to be sought before work commences on site.
P.V
ERNEST MOTURI P.O.BOX 15322 NAIROBI Signature & Date:..............................................
Drawing Title:
Scale:
Drawn:
Dwg. No.:
Checked:
Date:
28 JUN 2019
N.K
Signature & Date:
Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings
A.U.A EXHIBTION BOOTH
6,069
450
1,200
400
1,350
3,048
450
2,400
1,550 2,250
2,400
1,550
450
Consultant:
Job Title:
STUDIO FORTE ARCHITECTURE
Client:
EXIBITION BOOTH FOR GC2020
P. O. BOX 17351 - 00100, NAIROBI.
Scale:
Drawing Title:
ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI
Checked:
Dwg. No.: Date:
Signature & Date:..............................................
Job No.:
Drawn:
as indicated
ELEVATION
2,400
Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529
1,350 1,215 3,048 N.K
MAM
Signature & Date:
AUG 2019
Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
GSPublisherVersion 0.50.100.100
450 Consultant:
Job Title:
STUDIO FORTE ARCHITECTURE
Client:
EXIBITION BOOTH FOR GC2020
P. O. BOX 17351 - 00100, NAIROBI.
ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI
Drawn: Checked:
Dwg. No.:
Signature & Date:..............................................
Job No.:
as indicated
FLOOR PLAN
Date:
Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529
Scale:
Drawing Title:
AUG 2019
Notes:
N.K
1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
MAM
Signature & Date:
2,809
450
2,400
600
2,400
900
600
860
2,250
550 985
1,800
2,100
GSPublisherVersion 0.50.100.100
1,550
450
3,048 6,069 Consultant:
STUDIO FORTE ARCHITECTURE
Job Title:
EXIBITION BOOTH FOR GC2020
P. O. BOX 17351 - 00100, NAIROBI.
Consultant:
STUDIO FORTE ARCHITECTURE
Job Title:
GSPublisherVersion 0.50.100.100
Scale:
ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI
Job No.:
as indicated
ELEVATION
Dwg. No.: Date:
Sign.................................. Date:................... Reg. Arch. No. A1131; MAAK(A) No. 2529
Drawing Title:
Drawn:
N.K
Notes:
Client:
ADVENTIST UNIVERSITY OF AFRICA P.O. :PRIVATE BAG MBAGATHI
Drawing Title:
Scale:
Dwg. No.: Date:
Sign.................................. Date:...................
as indicated
ISOMETRIC
AUG 2019
Drawn: Checked:
N.K
MAM
Signature & Date:
Notes: 1. All dimensions given are in metres and millimetres. 2. Contractor to check and verify all dimensions on site and immediately any discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
Architect: S.F.A. | Year: 2019 | Scope: 3D Modelling, 3D Rendering, Council Drawings
EXIBITION BOOTH FOR GC2020
P. O. BOX 17351 - 00100, NAIROBI.
Client:
2,250
1,200
900
6,069
450
1,350
Signature & Date:..............................................
AUG 2019
Checked:
MAM
Signature & Date:
Reg. Arch. A1131; MAAK(A) No. 2529 1. All dimensions given are in metres andNo. millimetres. 2. Contractor to check and verify all dimensions on site andGSPublisherVersion immediately any0.50.100.100 discrepancies to be reported to the Architect 3. Electrical and Plumbing works as per engineering drawings 4. Local authority and landlord approvals to be sought before work commences on site.
Job No.:
Signature & Date:..............................................
ACADEMIC WORK
SELECTED WORKS
KAREN PAEDIATRIC CENTRE
There is an overwhelming need for paediatric hospitals in the region as to mitigate the current high infant and mortality rate. Located in Karen, this paediatric hospital was designed as a centre of excellence as to exemplify recommendations for child healthcare as a special group resulting from my final year thesis the paediatric care environment. The socio-physical environment of the design plays a major role in the child's healing process. The hospital is designed around a series of multiple courtyards offering a connection to nature. Play rooms across the centre offer children positive distractions as to trigger positive emotional responses.A sense of control is reinforced through clear color coded wayfinding and opportunites for personalization of patient rooms.The patient room showcases social consideration by providing space for parents to stay with thir children.Colourful sunshading elments keep out solar glare while creating a less institutional facade..Environmental considerations infrom the location of patient rooms with the provision of ample daylight,views and access to play gardens.
Thesis Project | Final Year Project-2017 | Supervisor: Prof Magutu
CONCEPT DEVELOPMENT
Analysis of the site highlights the site forces. E-W orientation to avoid solar glare. Programmes branch out of Main spine
Cirulation around the hospital is defined with a separation of public,ambulance,staff and service
Units staggered to break down mass and allow lighting of circulation spine.
Circulation enhanced to reduce travel distances and connect links between departments.
Visual landmarks introduced to aid in wayfinding
Enclosed spaces create interactive courtyards.
Programme distribution across the site with imporant adjacencies considered to allow for a functional process
Landscaping of open ares to provide a connection to nature and create buffer zones for the hospital. Themed gardens offer different experiences for different users.
EXPLODED AXONOMETRIC
Roof
Walls & Sunshading
Structure & Stairs
Floor Slabs
Complete
Public Space (Parking & Gardens)
12
12
GROUND FLOOR PLAN
24 x 0.150 = 3.600
12
9
8
Staff Changing Rooms
7
13 14 15 16 17 18 19 20 21 22 23 24
Staff Changing Rooms
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
3
6
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
9
9
9
9
10
9
9
10
IN-PATIENT (MEDICAL) F
19 x 0.200 = 3.600
10
7
11
6
1
13
4
5 8 11
5 SERVICE YARD
3
11
4
11
14
2
1 23 4 56 7 89 10
RAMP
MORGUE
1 11
MAIN HOSPITAL LOBBY 7 1
4
5
1
8
Main Reception
6 Security Office
2 Waiting Lobby
7
3
Gift Shop
8 Restaurant Kitchen
4
Patient Registration
9 Cold Store
5
Payment and Records
10 Dry Store
11
1
Out Patient Reception
11
2 Waiting Lobby
F
Restaurant Servery
IN-PATIENT (MEDICAL)
24 23 22 21 20 19 18 17 16 15 14 13
1 2 3 4 5 6 7 8 9 10 11
2
3
9
6
1 2 3 4 5 6 7 8 9 10 11
9
24 x 0.150 = 3.600
12
12 12
12
24 x 0.150 = 3.600
24 x 0.150 = 3.600
11
12
F
10
11
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
1
OUT PATIENT DEPARTMET
F
11 10 9 8 7 6 5 4 3 2 1
F
13 14 15 16 17 18 19 20 21 22 23 24
24 23 22 21 20 19 18 17 16 15 14 13
24 x 0.150 = 3.600
9 Exam\Treatment Room
LABORATORIES
9
8
7
6
5
4
2
3
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
2
14
3
Play Room
11 Dirty Utility
4
Nurse's Duty Room
12 Pharmacy Dispensary
5
Medical Records
13 Drug Preparation
12
12
11
10 Clean Utility
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
6
3
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
7
6 Nurse Station
14 Drug Store
7
15 Pharmacy Waiting
Triage
PHYSIOTHERAPY
2
8 Doctor's Room 9 1
2
4
8
5
ACCIDENT AND EMERGENCY DEPARTMET
12
12
10 24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
13
13
6
11 10 9 8 7 6 5 4 3 2 1
1
1
13 14 15 16 17 18 19 20 21 22 23 24
IMAGING DEPARTMET
7
5
4
2
3
8 Doctor's Room
2 Waiting Lobby
9 Exam\Treatment Room
3
Play Room
10 Ressusitation Room
4
Nurse's Duty Room
11 Clean Utility
5
Medical Records
12 Dirty Utility
6 Nurse Station
13 Minor Operating Theatre
7
14 Recovery Ward
12
8
11
Emergency Reception
12
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
2
11 10 9 8 7 6 5 4 3 2 1
7
Triage
8
IMAGING DEPARTMET RESTAURANT
2
SERVICE YARD
6 10
9
9
9
2
1 2 3 4 5 6 7 8 9 10 11
10
24 23 22 21 20 19 18 17 16 15 14 13
Imaging Reception
8 Dirty Utility 9 Ultra Sound
3
Play Room
10 Portable Equipment Store
4
Consultation Room
11 C.T. Scan
5
Radiologist Office
12 M.R.I
13
22 23 24 25 26 27 28 29 30
1
13
20 19 18 17 16 15 14 13 12 11 10
21
12
24 x 0.150 = 3.600
1
2 Waiting Lobby
30 x 0.150 = 4.500
9
8 7 6 5 4 3 2 1
15 1
2
14
2 F
PHARMACY 24 23 22 21 20 19 18 17 16 15 14 13
12
1 2 3 4 5 6 7 8 9 10 11
2
14
3
11
F
F
F
6 Nurse Station
13 X-ray
7
14 Linear Accelerator
Clean Utility
11 12 3
4
5
13
PHYSIOTHERAPY
10
12
24 x 0.150 = 3.600
MAIN HOSPITAL LOBBY
F
F
7
9
9
9
10
9
10
9
9
9
9
9
6
5
4
4
5
6
1 24 23 22 21 20 19 18 17 16 15 14 13
1 2 3 4 5 6 7 8 9 10 11
12
24 x 0.150 = 3.600
3
3
Physio Therapy Reception 6 Nurse Station 7
3
Play Room
8 Hydro-Therapy Pool
4
Consultation Room
9 Clean Utility
5
Physiotherapist Office
10 Dirty Utility
1
Physio Therapy Reception 7
Physio Therapy Gym
LABORATORIES
7
2 Waiting Lobby
8
1 2
EMERGENCY DEPARTMET
1
2 Waiting Lobby
2 OUT-PATIENT DEPARTMET
1 2 3 4 5 6 7 8 9 10 11
24 23 22 21 20 19 18 17 16 15 14 13
Store
8 Clean Utility
3
Play Room
9 Dirty Utility
4
Blood Donor Room
10 Pathology Laboratory
5
Laboratories Officer
6 Blood Bank
11 Haematology Laboratory 12 Bio-Chemistry Laboratory
24 x 0.150 = 3.600 12
8
9
IN-PATIENT (MEDICAL) 1
Inpatient Reception 8
2 Waiting Lobby
7
Clean Utility
8 Dirty Utility
3
Play Room
9 Double Bed Unit
4
Doctor's Room
10 Family Room
5
Treatment Room
11 Single Bed Unit
6 Nurse Station SUPPORT FACILITIES 1
Morgue Reception 8
4
Morgue Cold Room
2 Post Morterm Room
5
Kitchen Cold Store
3
6 Kitchen Dry Store
Morgue Viewing Room
12
12
FIRST FLOOR PLAN
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
3
6
9
9
9
9
9
9
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
IN-PATIENT (SURGICAL) F
19 x 0.200 = 3.600
7 4
1
5
10
8 11
11 (VOID TO GARDEN BELOW)
11 RAMP
11
DOCTOR'S PLAZA 7 1
1
Doctor's Plaza Reception 5
2 Waiting Lobby
Paediatric Opthamologist 7
4
Paediatric Orthopedic
5
ENT Doctor
10
8
6 Paediatric Dentist
3
4
F
(VOID TO GARDEN BELOW)
IN-PATIENT (ONCOLOGY)
Child Development Centre 24 23 22 21 20 19 18 17 16 15 14 13
8 Staff Lounge
1 2 3 4 5 6 7 8 9 10 11
2
3
6
9
1 2 3 4 5 6 7 8 9 10 11
9
24 x 0.150 = 3.600
Doctor's Room
8 Single Bed Unit
3
Play Room
9 Neonatal Care Unit
4
Nurse's Duty Room
10 Clean Utility
5
Medical Records
11 Dirty Utility
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
10 10
11 11
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
1
11 11
INTENSIVE CARE UNIT
(VOID TO GARDEN BELOW)
F
9
8
7
6
5
4
2
3
12
2 Waiting Lobby
13 14 15 16 17 18 19 20 21 22 23 24
12
12
12
24 x 0.150 = 3.600
7
Out Patient Reception
6 Treatment Room
1
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
6
3
12
3
CHEMOTHERAPY TREATMENT
(VOID TO GARDEN BELOW)
8 Single Bed Unit
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
8
F
12 F
Emergency Reception
13 14 15 16 17 18 19 20 21 22 23 24
9
EMERGENCY DAY CARE 1
24 x 0.150 = 3.600
12
2
12
1
24 23 22 21 20 19 18 17 16 15 14 13
24 x 0.150 = 3.600
12
OUT PATIENT DAYCARE
2 Waiting Lobby
9 Four Bed Unit
3
10 Ressusitation Room
4
9 1
Nurse's Duty Room
11 Clean Utility
5
Medical Records
12 Dirty Utility
6 Doctor's Room
13 Minor Operating Theatre
7
14 Recovery Ward
Treatment Room
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
8
5
12
4
7 4
12
5 12
Play Room
24 x 0.150 = 3.600
6
11 10 9 8 7 6 5 4 3 2 1
8 6
11 10 9 8 7 6 5 4 3 2 1
1
7
13 14 15 16 17 18 19 20 21 22 23 24
SURGICAL DEPARTMET
(VOID TO GARDEN BELOW)
F
15
CHEMOTHERAPY DEPARTMET
13
14
Chemotherapy Reception 5
7
11
8
5
4
2
3
F
Doctor's Room
15
12
1
12
24 x 0.150 = 3.600
9
12
13 14 15 16 17 18 19 20 21 22 23 24
13
2 Waiting Lobby
6 Nurse Station
14
11
11 10 9 8 7 6 5 4 3 2 1
EDU-THERAPY
8
F
3
Play Room
7
4
Consultation Room
8 Infusion Bays
Mixing Bay
F
12
9
14
11
10
15
12
15
(VOID TO GARDEN BELOW)
13
STERILE CORRIDOR
7
F
9 Pre Operative Unit 10 Post Operative Room
3
Play Room
11 Utility Room
4
Surgueons Office
12 Anaesthesia Room
5
Consultation Room
13 Operating Room
7
10
22 23 24 25 26 27 28 29 30
1 12
24 23 22 21 20 19 18 17 16 15 14 13
24 x 0.150 = 3.600
12
(TRIPLE VOLUME ATRIUM)
20 19 18 17 16 15 14 13 12 11 10
Surgical Reception
11
21
1
2 Waiting Lobby
1 2 3 4 5 6 7 8 9 10 11
9
13 14
30 x 0.150 = 4.500
12
SURGICAL DEPARTMENT
9
8 7 6 5 4 3 2 1
7 (TRIPLE VOLUME ATRIUM)
1
2 7
6 Nurse Station
11
1 2 3 4 5 6 7 8 9 10 11
2
13
3
11 5 2
10
24 x 0.150 = 3.600
(TRIPLE VOLUME ATRIUM)
3
4
6
10
12
14 Prepartion Room
DOCTOR'S PLAZA F
24 23 22 21 20 19 18 17 16 15 14 13
7
15 Scrub Up Room
Bed Transfer
8
8
8
8
8 Clean Utility INTENSIVE CARE UNIT 9
9
1
Physio Therapy Reception 7
Family Room
2 Waiting Lobby
8 Clean Utility
3
9 Dirty Utility
Play Room
4
Treatment Room
10 Isolation Room
5
Doctor's Office
11 ICU unit
6 Nurse Station
7
8
8
8
8
6
1
5
4
4
5
1
6
7
12 ICU unit 2
IN-PATIENT (MEDICAL)
2 Waiting Lobby
7
Clean Utility
8 Dirty Utility
3
Play Room
9 Double Bed Unit
4
Doctor's Room
10 Family Room
5
Treatment Room
11 Single Bed Unit
6 Nurse Station CENTRAL STERILIZING SERVICES DEPARTMENT 1
Air lock
8
6 Cart Park
2 Clean Holding
7
3
Soiled Holding
8 Issuing Area
4
Washing & Disinfection
9 Control and Packaging
5
Cart Washing
Sterile Store
24 23 22 21 20 19 18 17 16 15 14 13
1 2 3 4 5 6 7 8 9 10 11
24 x 0.150 = 3.600
2 EMERGENCY DAY CARE
3
3
2 OUT-PATIENT DAY CARE
1 2 3 4 5 6 7 8 9 10 11
24 23 22 21 20 19 18 17 16 15 14 13
24 x 0.150 = 3.600 12
Inpatient Reception 8
12
1
12
12
SECOND FLOOR PLAN
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
3
6
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
9
9
9
9
10
9
9
10
IN-PATIENT (CARDIAC) F
19 x 0.200 = 3.600
4
1
7
5
8 11
11 (VOID TO GARDEN BELOW)
11 RAMP
11
ADMINISTRATION 7 4
1
5
1
8 F
(VOID TO GARDEN BELOW)
1 2 3 4 5 6 7 8 9 10 11
2
3
6
9
9
24 x 0.150 = 3.600
7
3
Chief Accountant Office
8 Staff Lounge
4
Accounting pool office
9 ICT Department
5
Board Room
10 Meditation Room
1
Chemotherapy Reception 5
Administration Offices
1 2 3 4 5 6 7 8 9 10 11
24 23 22 21 20 19 18 17 16 15 14 13
12
12
24 x 0.150 = 3.600
12
12
24 x 0.150 = 3.600
24 x 0.150 = 3.600
16
16
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
10
RENAl DIALYSIS DEPARTMET
F
16
F
15
F
11 10 9 8 7 6 5 4 3 2 1
2 Waiting Lobby
IN-PATIENT (ONCOLOGY)
24 23 22 21 20 19 18 17 16 15 14 13
13 14 15 16 17 18 19 20 21 22 23 24
Administration Reception 6 Hospital C.E.O
RESEARCH LABORATORIES
2 Waiting Lobby
F
4
8
12
12
10
24 x 0.150 = 3.600
13 14 15 16 17 18 19 20 21 22 23 24
3
(VOID TO GARDEN BELOW)
3
Play Room
7
4
Consultation Room
8 Infusion Bays
1
Librarian Office
Mixing Bay
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
2
6
3
13 14 15 16 17 18 19 20 21 22 23 24
11 10 9 8 7 6 5 4 3 2 1
8
RENAL DIALYSIS TREATMENT
(VOID TO GARDEN BELOW)
PAEDIATIC RESEARCH DEPARTMET
2 Seminar Room
9 Professor Office 10 Teaching Room
F
F
COMP LAB
6 Nurse Station
12
13
12
14
Radiologist Office
(VOID TO GARDEN BELOW)
13 14 15 16 17 18 19 20 21 22 23 24
7 4
8
5
12
12
1
24 x 0.150 = 3.600
24 x 0.150 = 3.600
11 10 9 8 7 6 5 4 3 2 1
11
8
4
11 10 9 8 7 6 5 4 3 2 1
10
13 14 15 16 17 18 19 20 21 22 23 24
F
(VOID TO GARDEN BELOW)
9
8
9
9
8
7 10 7
1 2 3 4 5 6 7 8 9 10 11
24 23 22 21 20 19 18 17 16 15 14 13
22 23 24 25 26 27 28 29 30
30 x 0.150 = 4.500
9
8 7 6 5 4 3 2 1
12
(TRIPLE VOLUME ATRIUM)
20 19 18 17 16 15 14 13 12 11 10
21
24 x 0.150 = 3.600
7 (TRIPLE VOLUME ATRIUM)
1
2 7
ADMINISTRATION F
24 23 22 21 20 19 18 17 16 15 14 13
1 2 3 4 5 6 7 8 9 10 11
12
24 x 0.150 = 3.600
4
3
2
2
News Paper Reading
13 Clean Utility 14 Dirty Utility
7
15 Store
Book Shelves
(TRIPLE VOLUME ATRIUM)
5 2
3
4
Inpatient Reception 8
2 Waiting Lobby
(VOID TO GARDEN BELOW)
12
1
5
6 Reading Carrels
1
11 10 9 8 7 6 5 4 3 2 1
F
5
12 Researcher's Office
8 Meeting Room
24 x 0.150 = 3.600
RESEARCH LIBRARY
11 Computer Laboratory
Researcher's Lounge
16 Research Laboratory
IN-PATIENT (MEDICAL)
13 14 15 16 17 18 19 20 21 22 23 24
6
Terrace
4
10
12
7
3
6
7
Clean Utility
8 Dirty Utility
3
Play Room
9 Double Bed Unit
4
Doctor's Room
10 Family Room
5
Treatment Room
11 Single Bed Unit
6 Nurse Station
MAMBRUI TOURIST TERMINAL
Mambrui,a small in Malindi has been seeing an increase of tourists as the Kenyan coast boasts some of the most beautiful beaches in the world being a popular tourist destination. A brief was issued calling for the development of a tourist terminal at a beachfront site. The proposed design responds to the extreme climatic conditions of the area with the use of local materials to build thick walls allowing for passive cooling through a high themal mass. The spatial layout of the terminal is based around a central courtyard borrowed from the traditional Swahili house allowing for the cooling of the building through the sea breeze. Screened balconies provide sun shading while allowing breezes through the spaces aiding in regulating temperatures while allowing for visual privacy. The facades reflects historical landmarks from the Malindi area, borrowing the column design from the gazzetted 'House of Columns' one of Malindi's oldest buildings. The exterior is finished in light coloured stucco reflecting away heat from exposed wall surfaces
Cultural Design | 4th Year Project -2015 | Supervisor: Prof Rukwaro GSPublisherVersion 0.0.100.100
GROUND LEVEL PLAN
Outdoor Bomas
KITCHEN
Cold Store
RESTAURANT
RECEPTION
Dry Store
Changing Room(F) Servery
Changing Room(M)
Waiting Area
ACCOMODATIO RECEPTION N
VACCINATION CLINIC 28
4.200
27 28 x 0.150 =
3 4 5
Wet Riser
2
26 25 24
Vaccination Area
Dry Riser
1
Nurse's Office
23 22
6 14
13
12
11
10
9
8
21
20
19
18
17
16
15
7
CHANGING ROOMS (F)
HAIR SALON
AMPHITHEATRE COURTYARD
CHANGING ROOMS (M)
SNACK BAR
FRUIT VENDOR
MUSIC SHOP CRAFTS/ LEATHER GOODS
16
15
14
13
12
CURIO KIOSK 2
11
SPORTS/ SAFARI GOODS
CURIO KIOSK 1
17 10
18
9
19
8
20
6
22
5
23
GENTS
24 25 26 27
4 3 2 1
PHOTOGRAPHY SHOP
27 x 0.150 = 4.050
7
21
LADIES
JEWELRY SHOP
BANK 3
POST OFFICE
RECEPTION
Cashiers
Manager's Office
Strong Room
NEWS STAND
FLORIST Strong Room
Strong Room
Cashiers
Cashiers
Manager's Office
Manager's Office
BANK 1
BANK 2
PEDESTRIAN ACCESS
UTILITIES ROOM
PARKING (16)
EXIT SENTRY POST ENTRY
SERVICE YARD
HOTEL ROOM (8)
HOTEL ROOM (8)
28
28
27
4.200 28 x 0.150 =
1
26
2
25
28 x 0.150 =
4.200
27 5
Wet Riser
4
Dry Riser
3
3
24
4
23
5
22
Wet Riser
2
26
Dry Riser
1
25 24 23 22
6
HOTELS(4) BOAT HIRE (4) 11
11 17
17 10 9
TRANSIT LOUNGE
27 x 0.150 = 4.050
5
24 25 26 27
10 9 8 7
22
6
23
19 21
7
22
18 20
8
21
4 3 2 1
6
23
5 27 x 0.150 = 4.050
GENTS
20
LADIES
19
GENTS
18
LADIES
16
15
14
13
12
16
15
14
13
12
EXECUTIVE OFFICE
24 25 26 27
4 3 2 1
TRANSIT LOUNGE
HELIPORT OFFICE AIRLINE (8)
ROOF GARDEN
VOID BELOW
VOID BELOW
ROOF GARDEN
11
10
9
21
20
EXHIBITION CONCOURSE
AUDIO VISUAL ROOMS (2)
15
19
F
14
18
VOID BELOW F
EXECUTIVE OFFICE
13
17
SWIMMING POOL
VOID BELOW
EXECUTIVE OFFICE
12
16
SECURITY/ CONTROL ROOM
8
9
8
20
19
18
17
16
15
14
13
12
11
7 10
7
21
6
ACCOUNTS OFFICE
TOUR OPRETORS(4
)
NAIROBI ART GALLERY
The city of Nairobi hosts a large number of upcoming artists and collectors and the is a growing need of a variety of functional spaces for them to exhibit their talents. The brief proposed an expansion to the existing Nairobi Art Gallery located off Kenyatta Avenue in order to increase its capacity. The new gallery should provide spaces for presentation, documentation, training and cultural education. The facility is to also create extra revenue generating spaces for artists and collectors a like through cafe's libraries etc. The design of the gallery is informed by an extensive research on spatial and environmental conditions required for the display and exhibition of various arts and crafts, High attention is paid to the lighting conditions of these spaces as some items are sensitive. Most of the galleries are day lit with Harmful solar glare diffused through a dynamic vertical sun shading system designed to mimic the roots of a tree, emphasizing the importance of maintaining a connection to our culture and heritage for national pride. The national flag served as inspiration for the shield designed on the North elevation, a national symbol of Kenya. The columns echo the columns present on the adjacent gallery though with a modern treatment. The white finish represents the blank canvas of an artist.
Architectural Conservation | 4th Year Project -2015 | Supervisor: Prof Rukwaro GSPublisherVersion 0.0.100.100
GROUND FLOOR PLAN
Veranda
Gallery
Gallery
Gallery
Main lobby Gallery
Gallery
Gallery
Veranda Gallery
Sculpture Garden
Gallery
Gallery
19 x 50 = 900
26
25
24
23
22
21
20
19
18
Ramp
17
16 15
PASSAGE
LIFT
14 13 12 11
RECEPTION
10
1
2
4
3
5
6
8
7
9
26 x 150 = 3,900
WAITING AREA
GENTS
SHOP
NYAYO HOUSE
KENYA -TAA AVE
PASSAGE
JANITOR'S CLOSET
LADIES
CAFE
GALLERY CASEMENT
SERVERY
FIRE ESCAPE 26 x 150 = 3,900
26 25 24 23 22
SERVICE LIFT Fire Cabinet 1 2 3 4 5
21
6
20
7
19
8
18
9
17
10
16
11
15
12
13
14
20
19
18
17
16
15
27
26
25
24
23
22
21
20
19 18
17 16 15
PASSAGE
LIFT
14 13
PASSAGE
LIFT
14 13 12
12 11
11
10
10
ARTIFACTS GALLERY
1
3
2
6
5
8
7
9
2
1
4
3
5
7
6
8
9
4
20 x 150 = 3,000
27 x 150 = 3,900
PASSAGE
PASSAGE
VOID
GENTS
GENTS
VOID
GALLERY PAINTINGS
VOID
LADIES
PASSAGE
PASSAGE
JANITOR'S CLOSET
JANITOR'S CLOSET
LADIES
GALLERY SCULPTURE
GALLERY PAINTINGS
24
SERVICE LIFT
FIRE ESCAPE
Fire Cabinet 1
26
2
25
3
24
4
23
22
5
22
23
21
6
21
20
7
20
19
8
19
2 3 4 5 6 7 8
9
18
9
10
17
10
16
11
16
11
15
12
15
12
14
13
13
PASSAGE
20
19
18
17
15
PASSAGE
16
SECOND FLOOR PLAN
20
19
18
17
16
15
1
18
FIRST FLOOR PLAN
12
SERVICE LIFT Fire Cabinet
17
14
11
26 x 150 = 3,900
26 x 150 = 3,900
26 25
13
VOID
PHOTOGRAPHY GALLERY FIRE ESCAPE
14
TEXTILE GALLERY
14 13 12 11
10
10
1
3
2
4
6
5
8
7
9
PASSAGE
PASSAGE GENTS
GENTS
VOID
STUDY COLLECTION
LADIES
VOID
LIBRARY
LADIES
PASSAGE
PASSAGE
JANITOR'S CLOSET
JANITOR'S CLOSET
AUDIO VISUAL
OFFICES
OFFICES
26 x 150 = 3,900
24 23
SERVICE LIFT
FIRE ESCAPE
Fire Cabinet 1
26
2
25
3 4
OFFICES
24 23
22
5
22
21
6
21
20
7
20
SERVICE LIFT Fire Cabinet 1 2 3 4 5 6 7
19
8
19
18
9
18
9
8
17
10
17
10
16
11
16
11
15
12
15
12
14
14
THIRD FLOOR PLAN
13
OFFICES
25
26 x 150 = 3,900
FIRE ESCAPE 26
13
2
20 x 150 = 3,000
LECTURE THEATRE
1
4
3
5
7
6
8
9
20 x 150 = 3,000
FOURTH FLOOR PLAN
FREELANCE WORK
SELECTED WORKS
PHENOM PARK APARTMENTS
Architect: Design Artitude. | Year: 2018 | Scope: 3D Modelling, 3D Rendering
KAPUTEI TOWNHOUSES
Architect: Architectural OMA KE. | Conservation Year: 2016 | Scope: | 4th Year 3D Modelling, Project-2015 3D Rendering, | Supervisor: Interior Prof Rukwaro Design
STANCHART UGANDA
Architect: Dimensions Uganda | Year: 2018 | Scope: 3D Modelling, 3D Rendering
KOINANGE TOWERS
Architect: Martin W. | Year: 2016 | Scope: 3D Modelling, 3D Rendering
MAANZONI HOTEL
Architect: Design Life. | Year: 2019 | Scope: 3D Modelling, 3D Rendering
FOODPLUS OFFICES
Architect: H.I.S | Year: 2018 | Scope: 3D Modelling, 3D Rendering
R.KHAMIS APARTMENTS
Architect:Dimensions Uganda | Year: 2018 | Scope: 3D Modelling, 3D Rendering
KEVIAN FACTORY
Architect: H.I.S & Design Hub | Year: 2020 | Scope: 3D Modelling, 3D Rendering
HEPL STATION
Architect: C.G.M & Design Hub | Year: 2020 | Scope: 3D Modelling, 3D Rendering
EVAN'S RESIDENCE
Architect: C.G.M | Year: 2020 | Scope: 3D Modelling, 3D Rendering
MIRE'S RESIDENCE
Architect: C.G.M & Design Hub | Year: 2020 | Scope: Design, 3D Modelling, 3D Rendering
KAREN RESIDENCE
Architect: C.G.M | Year: 2019 | Scope: 3D Modelling, 3D Rendering
MK-5B RESIDENCE
Architect: C.G.M | Year: 2019 | Scope: 3D Modelling, 3D Rendering
SHINALI RESIDENCE
Architect: Design Life | Year: 2018 | Scope: 3D Modelling, 3D Rendering
WANGWE RESIDENCE
Architect:Design Life | Year: 2018 | Scope: 3D Modelling, 3D Rendering
KAREN RESIDENCE
Architect: Design Life | Year: 2017 | Scope: 3D Modelling, 3D Rendering
OKOTH RESIDENCE
Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering
NJUMBI RD RESIDENCES
Architect:K.S.M | Year: 2018 | Scope: 3D Modelling, 3D Rendering
VIPINGO INTERIORS
Architect: Design Hub | Year: 2018 | Scope: Interior Design 3D Modelling, 3D Rendering
KENTON SCHOOL
Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering
GREEN STEADS SCHOOL
Architect:KSM | Year: 2016 | Scope: 3D Modelling, 3D Rendering
PRODUCT DESIGN
Designer: Design Hub| Year: 2018 | Scope: Design,3D Modelling, 3D Rendering
GRAPHIC DESIGN
Cover art design for tracks on my music profile.
Nyakundi Kenani Tel: +254 725 589636 Email: nyakundikenani@gmail.com