Oakland Projects
Bureau of Transportation and Engineering Department of Public Works City of Pittsburgh January 2015
City Of Pittsburgh
Joncaire Step Replacement
In Schenley Park Year Built: 1949 Treads/Landings: 136/ Elevation Change: 86’ Alt Route: +2,000’
City Of Pittsburgh
Joncaire Step Replacement
City Of Pittsburgh
Joncaire Step Replacement
City Of Pittsburgh
Joncaire Step Replacement
City Of Pittsburgh
Joncaire Step Replacement
City Of Pittsburgh
Joncaire Step Replacement
City Of Pittsburgh
Joncaire Step Replacement
Design: $ 30,000 City Construction: $384,000 TAP $ 96,000 Local Duration: 4 to 6 months
City Of Pittsburgh