oaknoaugust13

Page 1

PER_NEIGH3 Monday, September 16 2013 Page 1 of 5

Ravenstahl Response Center Detail Report For One Neighborhood For Time Period:

Request ID Composed 342938

08/01/2013 10:46 am

Status Completed

08/01/2013

To

Neighborhood:

08/31/2013

Refer To Dept.

Problem Type

DPW - Refuse/Central ...

ES / Violations

09/03/13 12:27 PM

The foreman, E-12 reported nothing out on 8/31/13 9:15am

08/27/13 12:51 PM

RESOLVED

North Oakland

Location 3877 Bigelow Bl

History Info

342987

08/01/2013 12:50 pm

History Info 343272

08/02/2013 05:16 pm

History Info 343390

09/05/13 08:47 AM

08/07/13 08:22 AM

08/05/2013 11:44 am 08/28/13 08:18 AM

Resolved

DPW - Sts ... & Pks, 3rd Div

Potholes

4627 Baum Bl

Tree - Removal

4205 Bigelow Bl

COMPLETED -- G. MCCAIN 9/4/13 Completed

DPW - Sts ... & Pks, 3rd Div

IT IS THE PROPERTY OWNER'S RESPONSIBILITY TO REPAIR THE SIDEWALK AND THEN THE CITY WILL REIMBURSE FOR CHARGES. CONTACT BUILDING INSPECTION AT 412-255-2175 FOR MORE INFORMATION. Completed

DPW - Transportation ... & Engineering

Miscellaneous

4415 5th Av

This complaint was answered. Please remove it from our record. C. Duray

History Info

Webster Hall has two loading zone areas. One along 5th Ave. that is approximately 100 feet long, and the second along North Dithridge St. Code Chapter 541, Section 541.03 states that loading or unloading shall not consume more than 30 minutes. R. Freyermuth


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
oaknoaugust13 by Oakland Planning and Development Corporation - Issuu