Construction Alert SR-91 Eastbound Lane Addition Project Release Date: October 1, 2010
Eastbound SR-91 Nighttime Ramp and Lane Closure Week of October 4-8, 2010 WHAT:
As part of the Riverside Freeway (SR-91) Eastbound Lane Addition Project, nighttime work will take place October 4-7, 2010 for crews to continue work in the median. Crews are currently working day and nighttime hours to build the new nearly six-mile lane and shoulder, as well as expand and improve the eastbound SR-91 to northbound SR-71 interchange. SR-91 will remain open to drivers; however, lanes, ramps, and/or connectors will be closed during off-peak/nighttime hours to complete work. Nighttime work on this particular stretch of SR-91, between SR-241 and SR-71, will be ongoing through the end of 2010.
CLOSURES/DETOURS: Location Eastbound HOV Lane between the SR-91/SR-241 Interchange and Green River Road 15-Day Closure Eastbound SR-91/Northbound SR-71 Connector Ramp
Date and Time Mon. 10/4 through Wed. 10/6 from 11 p.m. to 4 a.m.
Suggested Detour No detour necessary as at least one lane will remain open at all times
Sat. 10/9 at 12 a.m. (midnight) through Sat. 10/23 at 12 a.m. (midnight)
Serfas Club Drive, to Westbound SR-91, to Northbound SR-71 Connector Ramp
PROJECT BENEFITS: The new SR-91 Eastbound Lane Addition Project will: · Add a new 12-foot eastbound lane with a 12-foot shoulder to a nearly six-mile stretch of SR-91 · Realign the eastbound SR-91/northbound SR-71 connector to improve operations · Widen five bridges and construct 10 new retaining walls · Reconstruct the on- and off-ramps at Green River Road · Environmental stewardship FOR INFORMATION, QUESTIONS ABOUT THE PROJECT OR TO RECEIVE CONSTRUCTION ALERTS: • Email: Angela Meluski, community liaison, at ameluski@octa.net • Web site: www.octa.net/sr-91.aspx • Transportation Hotline: 800-724-0353 • Twitter: @91fwy