Academic Portofolio
O livia Eid A P
cademic ortofoilio, Faculty of Engineering ,
Cairo University . Class 2014 2009-2014
Career Principle :
Real architectural is Which changes people lives .
1
Resume
2
Training
Academic
Professional
Table Of Contenets
3
• Resume • Interior Design • Modeling & Rendering • Furniture details
2
• Graduation Project • Residential Complex • School Of Architecture • Working Project. • Urban PLaning Project • Urban Design Project. • HIstory Project • WaterColour works. • Photography..
8-13 14 16 18 20 22 24 25 26
- Dar el Hekma - El Agouza Hospital - The Tomb of Saad Zaghlol - Society Of Egyption Engineers.
4-5 6 7
Academic Portofolio
5
Professional Portofolio
Modeling & Rendering
5 5
Furniture Detials Zinc Sofa Details Detailes not Design
6
Furniture Detials
Mid Century Bedroom furniture moodboard
7
Graduation Project
8
Academic Portofolio
9
Academic Portofolio
Graduation Project Reason to chose cultural hub in slums area : The Financial problems aren’t the slum dwellers main problem .Actually alot of slum dwellers have they own property in countryside , they come to Cairo to raise more money . their huge main problem is the absence of any culture in their lives .
Project Concept:
My Project is a Glimmer Of Light for those who don’t have hope .it’s a Route to a better life , better future for slums dwellers and specially the younger generations .
Project Aims:
-Raise slums dwellers on the cultural side ( help them to have better people ) -Improve workers skills in different fields to earn their trust and allow them to have better jobs. -Give slums children a chance to be treated in a good way . -Allow slums children to have better future than their parents . -Save teenagers form the abuse they get by counseling. - Improve the slum enviroment by its people. -teach slums dwellers to handle their own business and don’t raise their kids as beggars.
Strategy to achieve these aims:
- Having Workshops For teach women, men and kids . - Build an trust between councilors and residents by these workshops . - Having alot of o pen spaces and interactive spaces to
10
GROUND fLOOR pLAN
Academic Portofolio Site Imbaba on Nile River .
First Floor Plan
THird Floor Plan
Second Floor Plan
Forth Floor Plan
To connect the project with the site ,we’ll
move a street market to the site piazza unground and convert an abondened railway to a walking path to encourge people to come .
Project Elements A-thinkers dep.
B-Community DEp. C-Public 1-Commercial Dep. 2-Educational Dep. 3-medical and financial centre D-Community and thinkers.
so overall there are:
Educationaldepartment-workshops-Interactivespacesain levation commercial spaces - fun spaces.
M E
11
Academic Portofolio Elevation materials
al l materials are inspired from slums traditional materials such as 1- wood mullions that cover the big glass screens to reduce the sun heat ( from straw ) 2- red brick which is used in all hoses 3- box section structural system to reduce number of columns and is similar to birds tower that exist on top of most of slum houses , it’s like slums land mark .
form zoning concept :
The aim was to separate each category in their own building to feel intimate and private but also allow them to connect in some places .Also allow thinkers to have their own section to study but also allow people to see them and have connection with them so they won’t feel they’re less than them .
12
Academic Portofolio
13
Academic Portofolio
Residential Commercial Complex Description : Making
the maximum use of
the land for maximum economical benefit with applying the Unified Construction Law .
subject :Design Location :
On Nile ,Giza .
Ind./group : Individual
14
Academic Portofolio
Main ELevation
15
Academic Portofolio
School Of Architecture
( Faculty of engineering , Cairo University )
Location : Faculty eristy.
of engneering ,cairo univ-
Subject : Design The Aim:
• replacing the exsitisting school of architecturewithnewbetteroneallwosmoreinteraction between users .
The Concept :
• Making two seperate building with atrium between them and bridges connecting them in the upper levels to make the experiance of being in the building exciting and fun and encourage interacting between all users .
16
Academic Portofolio
Shot 1
Side Elevation
Layout
Main Elevation
Shots
17
Academic Portofolio
Section Working
(for School Of Architecture ) D8
D7
D6
D5
D3
D4
Cement tiles 2 cm Sand and Mortar 8 cm Rainwater slope O.C 7 cm Thermal insulation 5 cm moisture insulation 2 cm R.C concrete 25 cm
D2
Cement tiles 2 cm Sand and Mortar 8 cm Rainwater slope O.C 7 cm Thermal insulation 5 cm moisture insulation 2 mm R.C concrete 25 cm
920.00
D9
24.90 2090.00
Level 7
2550.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm Hand rail 60 mm
Hand rail 20 mm
Granite cover
Granite cover 21.00
930.00
530.00
600.00
10.00 600.00
Granite cover
3050.00
Granite cover Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
3050.00
700.00
10.00 600.00
24.90
500.00
Level 6
600.00
600.00 10.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Granite cover Hand rail 60 mm
Granite cover
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Granite cover
Granite cover 3050.00
2550.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
3050.00
700.00
10.00 600.00
1450.00
21.00
17.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Granite cover Hand rail 60 mm
3050.00
2550.00
610.00
600.00
Granite cover Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Granite cover
3050.00
700.00
10.00 600.00
1450.00
500.00
530.00
930.00
Hand rail 20 mm
Level 5 17.00
Granite cover
530.00
13.00
600.00
10.00 600.00
Level 4
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Granite cover Hand rail 60 mm
Granite cover
Granite cover
3050.00
Granite cover
3050.00
700.00 2550.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
600.00
26040.00
500.00
13.00
1450.00
26040.00
930.00
Hand rail 20 mm
930.00
9.00
Level 3
500.00
530.00
Hand rail 20 mm
Granite cover Hand rail 60 mm
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm Granite cover
Granite cover 3050.00
Granite cover
3050.00
2490.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
600.00
10.00 600.00
1510.00
9.00
Level 11 6.20
930.00
5.00
Level 2
500.00
530.00
Hand rail 20 mm
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm Hand rail 60 mm
930.00
Hand rail 20 mm
Marble 20 mm
Granite cover 0.45
0.47
870.00
500.00
530.00
600.00
Granite cover Granite cover
3580.00
Granite cover
3580.00
3030.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
600.00
10.00 600.00
1500.00
5.00
Level 1 600.00
600.00
600.00
0.45 Level 0
Granite cover
marble
Marble tiles 2 cm Sand and Mortar 8 cm O.C Concrete 10 cm Moisture insulation 2 m O.C concrete 15 cm
4120.00
Granite cover
3520.00
Marble 20 mm
Marble tiles 2 cm Sand and Mortar 8 cm O.C Concrete 10 cm Moisture insulation 2 m O.C concrete 15 cm
3520.00
0.00
Granite cover -4.00
-4.00
Level -1 -4.00
18
Academic Portofolio
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
D9
www.autodesk.com/revit
24.90
Granite cover Alu bond 15 mm
530.00
3050.00 10.00 600.00
12/20/2013 3:53:36 AM
10.00 600.00 3050.00
steel connec. thick 10 mm
500.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Granite cover
530.00 500.00
870.00
930.00
3580.00
3030.00
Wall sec
Level 1
Granite cover
curtain wall detail 3
detail 1
Olivia eid Shawky
sec 1 bn 32
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
I beam 300 mm Double glazed 10mm each
930.00
530.00
A-013
0.45
600.00
Level 0
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Granite cover
3520.00
Marble 20 mm
Marble tiles 2 cm Sand and Mortar 8 cm O.C Concrete 10 cm Moisture insulation 2 m O.C concrete 15 cm
12/20/2013 3:53:36 AM
0.00
faculty of engineering, cairo university School OF Architecture
Level -1
19
angle
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
250 mm
Wall sec 1:20
sec 1 bn 32
1500.00
5.00
-4.00
I beam Olivia eid Shawky
www.autodesk.com/revit
2490.00
Level 2 School OF Architecture
Drawn by
900.00
3050.00 3050.00
detail 2
10.00 600.00
600.00 3520.00
of engineering, 6.20 cairo university
Drawing
-4.00
10.00 600.00
Drawn by
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Levelfaculty 11
Drawing num.
Level -1
930.00
500.00 700.00 530.00
Drawing
500.00
Level 0
Stone tile 40 mm
A-014
Drawing num.
1510.00
12/20/2013 3:53:36 AM
0.45
Alu bond 15 mm
School OF Architecture
930.00
2550.00
3580.00 880.00
Marble tiles 2 cm
Level 3 9.00
Marble tiles 2 cm Sand and Mortar 8 cm O.C Concrete 10 cm Moisture insulation 2 m O.C concrete 15 cm
faculty of engineering, cairo university
Granite cover
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Level 1
0.00
Alu bond Cab
Alu bond Connec.
500.00 700.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1450.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
Alu bond 15 mm
Granite cover
930.00
2550.00
700.00
10.00 600.00
Level 5 17.00
angle 15 mm
Alu bond 15 mm
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Level 2 5.00
sliding window
aluminum Cab 30 mm
1450.00
21.00
10.00 600.00
21.00
Level 6
Angle 7mm
Alu bond corner Connec.
530.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2550.00
Marble tiles 2 cm Sand and Mortar 8 cm R.C 25 cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Level 6
www.autodesk.com/revit
D6
700.00
10.00 600.00
700.00
24.90
Cement tiles 2 cm Sand and Mortar 8 cm Rainwater slope O.C 7 cm Thermal insulation 5 cm moisture insulation 2 cm R.C concrete 25 cm
D7
2090.00
Level 7
D8
10.00 600.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Drawing Drawn by
curtain wall window detail 4
A-014
Drawing num.
Olivia eid Shawky Wall sec 1:20
sec 1 bn 32
19
Academic Portofolio
UrbanPlaningProject Methodology Group WorkOf ( 5):
did the infrastructure Studies and designed the alternativementioned laterwitha partner. (design and presentation ).
Introduction :
4Th Year ( First term ) Got ( Excellent )
- Suez province. - Urban development strategy for the province of Suez. - Ismailia. - The city of Ismailia.
Aproject to replan ismailia city to
Documenting
Administrative division
3-urban studies (buildings heights - buildings conditionsconstruction - fabric patterns - patterns of housing-DensityConstructivism-occupancy buildings)
- solve current problems - improve the roads ,farmland and reduce urban sprawl on them, and encourage the growth of desert land. - Improve the infrastructure . - Improve roads .
Vision : City of global environmental economic base
Studies Example
Infrastructure Map
1-Population Studies 2-studies of natural Natural - climate - Jiuloggio- Uses Lands
Analyses
1- swot analysis 2- force field analyis
Future Vision: Issues --- Goals --- Vision--- Projects Strategic Plan:
1-strategy 2-proposed projects 3-Budget 4-Alternatives 5-Evaluate alternatives
Detailed Plan :
1-budget studies and outline 2 alternatives planned Alinvesela. 3 Evaluation of alternatives
20
Some Points OF Analaysis:
-The presence of areas suitable for agriculture and the lack of water access to them. (Weakness )
-Lack of utility networks and infrastructure in many areas (such as transit - the land of Hijaz Jaoich)(Weakness) -there’s no waterway transport, although the Suez Canal pass in the government ,But it does not serve the internal traffic between the cities of the channel on a regular basis.( Strength and weakness) -traffic railway line which encourages trading with the regions and other provinces. (Opportunity)
Academic Portofolio
21
Academic Portofolio
Urban Project Group Of 12 4Th Year ( First term ) Got ( Excellent ) MY Participation :
participated in the studies and designed alternative with smaller team of three ,made the 3d sympolic model and rendering .
The Project had 2 phases
1- studing new cairo on the urban sides .
2- creaint an urban space in 6 of october .
Helioplis
DevelopmentStrategyMap
22
Academic Portofolio
Architectural Studies
My team Alternative
23
Academic Portofolio
falling Water (Frank L.Wright )
Simulation Project
Location:ARIZONA -USA -Havasu Waterfall. Subject :History.
Applied principles:
• the space is all about and is the basis of design. • the use of networks design (module). • Using materials From Nature. •Horizontal continuity . •Fireplace in the center of the house and all spaces go around it .
year : 2nd architectural year . Ind./ Team : Team work of three . Role : Participated in
the main design and did the modelling and the rendering .
24
cONCEPTUAL DESIGN
Discription :A project to simulate frand Lyod Wright principles in falling water villa.
Academic Portofolio
Water Color
Watrcolor Course Works
25
Academic Portofolio
Architectural PHotography Training at Tarek Wlay center (Documenting arch.Mostafa fahmy WOrks) (capture and edit )
26
El Agoza Hospital
Dar El Hekma
Academic Portofolio
The Tomb Saad zaghlol
Egyptian Society of Engineers
27