Omar Ahmed
Omar Ahmed Architecture Portfolio Selected works / 2009-2018
Content • • • • • • • • • • • • • • • • • • • • • • • • • • •
About Timeline experience Projects distribution Opera Grand Tower (UAE) Opera House Downtown Dubai (UAE) Burj Vista Dubai (UAE) Faculty of Islamic Studies (Qatar) Sunway Velocity Mall (Malaysia) Nile Cornice Hotel (Egypt) F-Ring Road (Qatar) Abu Dhabi Airport (UAE) Emiral Towers (Algeria) Credit Agricole Head Office Complex (Egypt) Lusail Multipurpose Hall (Qatar) Al Rayyan Hills Development (Yemen) Abu Dhabi Court House (UAE) Parcel F- Governmental Buildings (Malaysia) Bank for Development and Agricultural Credit” in Cairo and Ismailia branch. Political Awareness centre competition Jerusalem palace (Jerusalem) Saudi Complex Building in Prince Sultan University Engineering Syndicate Design Concept Some of selected designs. Interior Design for Chalet Landscape Design of ELSADAT Academy. Urban planning for new city in Ismailia Fashion shoe design
Categories 004 005 006 008 034 046 048 054 056 060 062 064 066 067 068 070 072 075 076 080 082 088 090 098 101 103 105
• • • • • •
BIM Architecture Design Landscape Urban Planning/Design Interior Design Fashion
7 074 101 103 098 105
ABOUT
Omar Ahmed Othman Egyptian Single 19 May 87 Arabic - English
Name Nationality Status DOB Languages
My interest in Architecture developed from a very young age and has since been a long-standing passion of mine. It is the combination of Architecture, Structure technology, urban design and interior design that makes this profession so appealing. My journey is too long to find my identity and increase my academic studies with personal experiences. New 7D/ FM Project Control
Architecture design
BIM for construction
4D
5D Design Engineering Arch, STR, MEP Fabrication
Interior Design
Fashion/ Industrial design Facade
Landscape
New
Work experience infographic summary 4
TIMELINE EXPERIENCE
2016
BIM PROJECTS COORDINATOR (UAE) Consolidated Contractors Company 2015
2014
BIM LEAD ENGINEER (EGYPT) Consolidated Contractors Company
2013
2012
Beginning Freelance work Design-contracting
2011
ARCHITECT/BIM ENGINEER (EGYPT) Consolidated Contractors Company
2009
2010
Completing pre-master for urban planning Cairo University Engineering Faculty
ARCHITECT AND LANDSCAPE DESIGNER (EGYPT) Inter Consult for architecture Prof. Dr. Ali Raa'fat
Bachelor's Degree in Architecture Cairo University Engineering Faculty
ARCHITECT AND URBAN PLANNER (EGYPT) TAP for Architecture and Urban Planning Prof. Dr. Tarek Abdellatif
5
PROJECTS distribution Pre-Tender Projects 1. Al Rayyan Hills Development (Yemen) 2. Ibn Hani Resort (Syria) 3. Falcon Towers (Egypt) 4. Credit Agricole Head Office Complex (Egypt) 5. Parcel F- Governmental Buildings (Malaysia) 6. Sunway Velocity Mall (Malaysia)
Post-Tender Projects 1. Nile Cornice Hotel (Egypt) 2. Emeril Towers (Algeria) 3. New Doha International Airport, Utility Buildings (Qatar) 4. F-Ring Road (Qatar) 5. Faculty of Islamic Studies (Qatar) 6. Abu Dhabi Airport (UAE) 7. Lusail Multipurpose Hall (Qatar) 8. Abu Dhabi Plaza "Hotel, apartments" (Kazakhstan) 9. Opera House Downtown Dubai (UAE) 10.Burj Vista Dubai (UAE) 11.Opera Grand Tower (UAE)
EnterConsult 1. Design landscapes of ELSADAT Academy.
1. Mustapha Elgammal's farm (Egypt-Suis) 2. Urban design for 12 acre residence compound (Serbia) 3. Mr. Dany's villa (Egypt-kattamya dunes) 4. Abu Dhabi Court House (UAE) 5. Jerusalem palace (Jerusalem) 6. Mr. Ghabbor's Motel (Egypt) 7. Nile city (Egypt- Cairo)
2. Design the façade system and Export executive drawings for “Bank for Development and Agricultural Credit” in Cairo and Ismailia branch.
TAP 1. Youth residential project in 6 Oct. city.
Kazakhstan
Serbia
FREELANCE
OLD WORK
CCC
Syria
Algeria
Jerusalem Egypt
KSA Qatar
UAE
Yemen Malaysia
6
Projects 7
With Employer
1 1
1 17
2
Projects type 1
7
2 3
CCC TAP
5
InterConsult Freelance
High-rise Buildings experience
Emiral Towers (Algeria)
Nile Corniche Towers (Egypt)
Complex building Residential Educational and Cultural Airport Infrastructure, Road
Selected works
Burj Vista Towers (UAE)
Opera Grand Tower (UAE)
Projects Budget
Abu Dhabi Plaza Towers (Kazakhstan)
BIM for Construction Design Interior Design Landscape Urban Planning/Design
budget in US $ Million Abu Dhabi Airport (UAE) Abu Dhabi Plaza "Hotel, apartments" (Kazakhstan) Emeril Towers (Algeria) Nile Cornice Hotel (Egypt) Alrayan Hill Development (Yemen) Lusail Multipurpose Hall (Qatar) Opera House Downtown Dubai (UAE) Ibn Hani Resort (Syria) Burj Vista Towers Dubai (UAE) F-Ring Road (Qatar) Opera Grand Tower (UAE) Faculty of Islamic Studies (Qatar) New Doha International Airport, Utility Buildings (Qatar) 0
500
1000
1500
2000
2500
3000
3500
7
BURJ VISTA TOWER Project
OPERA HOUSE DOWNTOWN DUBAI Project OPERA GRAND TOWER Project
8
DOWNTOWN I am starting to show my selected works with the latest projects in UAE and to show my latest experience in Construction starting from tendering, construction life till handing over stage. In Dubai Downtown district for EMAAR (The client) projects that Own Premium Property in a World-Class Integrated Communities in Dubai. Modern & Contemporary. Superior Amenities. Global Property Developer. Well-connected to Dubai. World-Class Real Estate.
9
OPERA GRAND TOWER
Client Cost Consultant Project Management Technical Consultant Architectural Consultant ID Consultant Main Contractor 10
Opera Grand Project
Category: BIM
Project Information Retail/F&B Units
Land use
Residential Units
Project Built-Up Areas Weight
11% 3% 1%
5%
1% 2%
23% 29%
Tower
podium
Total 12 Units
BIM Scope of work
56%
2 Bedrooms Total 295 3 Bedrooms 4 Bedrooms Units Penthouse (5 bedrooms) Townhouse(5 bedrooms)
Structure Mechanical
95% Residential
Commercial
Tower Podium
Basement Townhouse
Volume of design changes during construction life
th 50
Total 1431 Model file
Architecture Electrical Landscape
73%
Original Deisgn Design changes
One of tallest skyscrapers in Dubai and UAE
Opera Grand
11
Opera Grand Project
Category: BIM
Design Coordination
12
13
Opera Grand Project
Design Coordination
Category: BIM 49
48
47
46
45
44
43
42
41
40
39
38
14
15
Opera Grand Project
Category: BIM
Design Coordination
BIM Project workflow for CSD production 16
17
Opera Grand Project
Category: BIM
Design Coordination
Solving all clashes with all disciplines specially in congested areas. 18
Validate and connect the verticality between all MEP elements in coordinated floors. 19
Opera Grand Project
Category: BIM
Design Coordination
Reflecting all electrical details
Validate and enhance all MEP fittings in the received model. as per consultant requirement. 20
Reflecting all electrical details
Adding missing disciplines and reflecting all detail drawings. 21
Opera Grand Project
Category: BIM
Design Coordination
Reflecting all electrical details
Validate and connect the verticality between all MEP elements in coordinated floors. 22
Adding MEP supports in the congested areas as per the consultant requirement. 23
Opera Grand Project
Category: BIM
Design Coordination
Generate clash reports (more than 80 tests per floor) the target result: ZERO clash per test. 24
Extracting 3D PDF files for each floor (all disciplines) to help other parities in the project 25
Opera Grand Project
Category: BIM
Design Coordination
CSD Production: extracting composite drawings from the fully coordinated BIM model. 26
27
Opera Grand Project
Category: BIM
Design Coordination
3D graphic information to provide more explanation for BIM proposal for clashes solution 28
Opera Grand Project
Category: BIM
BIM Project Control
Study and extract all un-modeled items requested by the procurement, and site engineers 29
Opera Grand Project
Category: BIM
BIM Project Control
BIM backup for monthly payment certificate 30
showing proof of done elements with location in the BIM model for payment certificate for approval by AECOM 31
Opera Grand Project
Category: BIM
BIM Project Control
Reflecting monthly progress on the model as shown in the TAG set including all project control information for each element during construction life
32
Ground floor
Site Progress report 33
Opera Grand Project
Category: BIM
BIM Project Control under engineering process 24%
Submitted to K&A 9%
BIM submissions to the consultant Approved as noted 39%
under SDR modeling by BIM centre Final Approved 10% under coordination 8% 10%
not coordinated 34% Coordinated 56%
Coordinated model under coordination 10%
Tagging
un-tagged model 44% Tagged model 56%
2D extracted model for CSD production 2D non-extracted model 44%
2D extracted model 56%
BIM Submission progress & KPI report 34
Short movie 35
Opera Grand Project
Category: BIM
BIM Integration to FM LOD 500
Implementing Pipe flow directions inside the POCLOD500 model
The Role of FM in Preparing a BIM Strategy to Cover EMAAR’s Information Requirements 36
Access panels
Glass partition LOD 400
Tiling full and cut pcs
LOD 500 Model/Level 04/Unit 2A/Main Bathroom 37
Opera House Downtown Dubai
At the heart of The Opera District is Dubai Opera. It is a truly unique venue and the city’s first purpose built multi-format performing arts theatre situated in the heart of Downtown Dubai. Offering the ultimate flexibility of a proscenium arch theatre, an acoustic concert hall and a 2000 square meters flat floor event space, the configuration allows for approximately 2000 seats for a concert and up to 1000 for a gala dinner. Outside of the main auditorium, the venue has a smaller performance space and rehearsal room and a stunning rooftop restaurant and sky garden with views of Burj Khalifa and The Dubai Fountain.
38
Client
Cost Consultant
Project Management
Consultant
Main Contractor
39
Selected Works Linked to ATLAS Cost BIM Coded BOQ
Updated BOQ
QA/QC Linked to Primavera / Pyramid
QS Detailed Tagged QTO Reports Mirage
EMAAR
Planning
Site Progress Percentages 3D Coordinated model to be checked
Project Director AGCCIC
BKG and Thyssenkrupp
Weekly Site progress reports
Eversendai AGCCIC Arabian Profile
Job Cards For Construction
Alghurair and CPD Shop drawings to be reviewed
Schedules and documents
Specs Approval Shop drawings
Clash Report RFI’s
Engineering
3D Visual presentation
Clash Report / Comments
Site Approval Shop drawings
RFIs Shop drawings to be approved Input Output
RFIs Responses BIM Deliverables and Work Flow Subcontractors BK Gulf: MEP Contractor Construction Phase TyssenKrupp: Elevators and hydraulic systems Contractor Eversendai: Steel structure contractor Arabian Profile: Roofing systems contractor Atkins Alghurair: Façade and glazing systems contractor CPD: Auditorium and FOH finishes contractor
BIM Workflow in construction life
40
Integrated system for design coordination for better understanding of complicated designs
41
Selected Works Dhow curved wall Sky Roof
Foyer
Water features
Integrated system for design coordination for better understanding of complicated designs
42
Auditorium Fly-Tower
Super structure
Water features
Sub-structure (Stage engineering)
Opera Zone Plaza Zone
Retails
Sub-structure (Parking)
43
Optimization location for the tower crane to avoid serious clash with steel structure
ID finishes related to concrete and steel structure works
44
45
Selected Works
46
Integrated system for design coordination for better understanding of complicated designs
47
48
Integrated system for design coordination for better understanding of complicated designs
49
BURJ VISTA TOWERS
50
51
QATAR FACULTY FOR ISLAMIC STUDIES
52
53
Grand mosque 54
55
Fabrication methodology for curved walls and ceiling in the mosque area through BIM
56
57
58
59
60
61
62
63
Road finishes and marking by Khaled Aboulazm
64
Underpass type IC-25
Underpass type IC-26
Road finishes and marking by Eng.Khaled Aboulazm
65
66
67
68
69
CrĂŠdit Agricole Bank NEW CAIRO
70
LUSAIL MULTIPURPOSE HALL QATAR
71
AL RAYAN HILLS YEMEN
72
Visualized by: Mohamed Mazen
Visualized by: Mohamed Mazen
73
ABU DHABI COURT UAE
74
75
Putrajaya Parcel F Malaysia 76
77
Selected works
BIM for Construction Design Working drawings Interior Design Landscape Urban Planning/Design
78
Position: Architect
Organization: InterConsult
Project: Bank for Development and Agricultural Credit - Ismailia branch.
Responsibilities: Design Concept of the façade system and Export executive drawings for “Bank for Development and Agricultural Credit” in Cairo and Ismailia branch.
Position: Architect
Organization: TAP For Architecture and urban planning
Project: Youth residential project (Egypt)
Responsibilities: Design master plan of residential apartments.
79
Freelance
Project: Design and Developing the concept of forms and layouts for Political Awareness Center project associated with Eng. Hammad Ghareeb for Cairo University.
80
81
Jerusalem Palace Conceptual design Freelance
82
83
Freelance
Project: Design and Developing the concept faรงade and the elevations for Complex Building project in KSA associated with Eng. Alaa Elbiali (Prince Sultan University)
84
85
86
87
88
89
Freelance Design and Develop the concept of deconstruction forms of Engineering Syndicate project in Cairo for Cairo University. Associated with Eng. Hammad Ghareeb.
90
91
Sample of my projects Cairo University
92
Sample of my projects Cairo University
93
sample of my projects (Opera Cairo, Ataba) Cairo University
94
(Information ministry) Cairo University
95
Selected works
BIM for Construction Design Interior Design Landscape Urban Planning/Design
Other projects (Freelance)
96
Breakfast area Ocean area Path to the beach
Living
Relaxing Zone
Dinning
Cairo University
Project: Chalet
Project Team • • • • •
Amr Mostafa Abdulla Sado Omar Ahmed Mohamed Tarek Mohamed Tharwat
Sleeping Zone
97
98
Selected works
BIM for Construction Design Interior Design Landscape Urban Planning/Design
99
Organization: InterConsult Project: SADAT ACADEMY-Minya Branch Responsibilities: 1. Design landscape of ELSADAT Academy.
100
Selected works
BIM for Construction Design Interior Design Landscape Urban Planning/Design
Project: Urban planning for new city in Ismailia This alternative was selected in the project as an optimum alternative. Cairo University
101
WHEN ARCHITECTURE MET FOOTWEAR
Selected works
BIM for Construction Design Interior Design Landscape Urban Planning/Design Fashion (new)
Conceptual shoe collection projects, created for COLDA & NOYA . The objective of this project for creating unique designs using architecture background ultimately translated to shoes.
102
Omar Ahmed Contacts: UAE: +971551146937 EGY: +201007387629 Omarothman51@gmail.com
All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher, For permission requests, write to the publisher or the below main sources of work, Š 2018 Omar Ahmed.
BIM Centre