Omar Haroon architectural portfolio

Page 1

OMAR HAROON

ARCHITECTURAL PORTFOLIO



I am an architecture student currently in 4th year 8th semester.I have been born and brought up in Delhi.I am seeking an internship to obtain knowledge about the feild at a professional level and expand my horizon of learning.

SKILLS: 1.Sketching and design conceptualisation 2.Microsoft Office 3.Adobe Photoshop 4.Adobe Illustrstor

EDUCATION:

OMAR HAROON

CONTACT ME

ARCHITECTURE STUDENT

omarharoon22@gmail.com +91-8527344500 T-24/FLAT 806 CWG APPARTMENT ,NEAR AKSHARDHAM MANDIR, NEW DELHI

LANGUAGES:

1. Hindi

2014 Higher secondary 9.6 GPA Sanskriti School,New Delhi

5.Adobe Indesign

2016 Senior secondary 90% (commerce) Sanskriti School,New Delhi

6.Sketchup

2020 B.Arch (8th semester) Sushant School of Art and Architecture Gurugram,New Delhi

7.Revit

8.Autocad

PERSONAL SKILLS: 1.Creative

2.Hard-working

2.English

STUDY TRIPS:

INTERESTS

2017 Bhuj,Gujarat Measured drawings Studied Boongha typology 2018 Manglagiri,Telangana contextual study of manglagri Memory based studio

3.Punctual 4.Willingness to learn 5.Observant learner 6.Organised 7.Honest

2019 Dubai,UAE Nakheel builders Hotel and mixed use

PUBLICATION:

EXTRA -CIRCULAR:

2.Shared Spaces and Visually Impaired in the Indian Context

1.Vice student representative,Sanskriti School (2015-16) 2.IPAC 2019 best contextual design,Design charrete (by Ar.Anuradha Chatrjee)

1. Design 5Th semester work published in “Decoding Design” by Rahat Varma(Assistant Professor,SSAA,Ansal University) Sushant School Of Art and Architecture,Ansal University,New Delhi


TABLE OF CONTENTS 1.FUTURE OF HOUSUNG:THE WALK SEMESTER:7TH MENTORS: 1.Gaurav Sanan 2.Amrita Das Gupta 3.Sagar Gupta

2.INSTITUTION:MEDITATIVE ART CENTRE SEMESTER:5TH MENTORS: 1.Abu Talah Farooqi 2.Rahat Varma 3.Ramit Nair

3. MANGLAGIRI OCIS:EXHIBITION AND TEXTILE CENTRE SEMESTER:4TH MENTORS: 1.Amrita Madan 2.Sindhuree 3.Mohd.Anees


4. MIXED USE:THE URBAN WALK SEMESTER:6TH

MENTORS: 1.Meenakshi Dubey 2.Aditya Toggnata 3.Swati Narang

5.WORKING DRAWING:MEDITATIVE ART CENTRE

6.MISCELLANEOUS


1.FUTURE OF HOUSUNG:THE WALK


SITE:DLF phase 3,Gurugram,New Delhi

INTENT: The intent of the project was to cater to the city based theme through a public realm and revitilsation of the moulsari avenue rapid metro station.City based theme here means taking something from the city and giving something back to the city.The same is done through taking into account the master re-development plan of DLF phase-3 and taking into consideration the future upcoming projects within the vicinity.

2


ZONING


4


GROUND FLOOR PLAN

UNIT PLAN

Unit name: Small Unit size :75m2 IN IN

0

+b

*

SIEMENS

4th FLOOR PLAN IN IN

0

+b

*

SIEMENS +b

IN

IN

5

*

Unit name: Medium(M) Unit size :145m2

*

SIEMENS 0


5th FLOOR PLAN

UNIT PLAN

Unit name: Large(L) Unit size :250m2

IN IN

0

+b SIEMENS

*

17th FLOOR PLAN

*

0 IN

IN

SIEMENS +b

Unit name: Extra Large(XL) Unit size :270m2

6


SECTION AND ELEVATION

7


8


ELEVATION

9


CLUSTER PLAN

IN

+b

*

+b

IN IN

SIEMENS

IN

*

IN

IN

0

SIEMENS

0

+b SIEMENS

*

+b SIEMENS

0

*

IN

IN

0

0

0

IN

IN

SIEMENS +b

+b

*

*

IN

IN

IN

IN

0

0

+b

+b SIEMENS

*

*

IN IN

0

*

+b SIEMENS

SIEMENS

IN IN

0

+b SIEMENS

*

*

IN

*

+b IN

*

SIEMENS 0

+b SIEMENS

IN

*

IN

IN

0

+b

IN

+b

+b SIEMENS

SIEMENS 0

IN

IN

IN

0

*

IN

IN

SIEMENS

*

+b

IN

0

IN

IN

SIEMENS

SIEMENS 0

00

*

-600

*

SIEMENS

SIEMENS

+b

+b

IN

0

0

IN

IN

IN

SIEMENS

SIEMENS

+b IN IN

IN

SIEMENS

+b

IN

0

0

*

*

SIEMENS 0

+b IN

IN

*

+b

IN

*

SIEMENS 0

*

IN

SIEMENS 0

+b IN IN

IN

*

+b

IN

*

*

*

*

SIEMENS 0

0

+b

IN

IN

SIEMENS 0

+b IN IN

+900

4TH FLOOR PLAN

5TH FLOOR PLAN

*

GROUND FLOOR PLAN

IN

IN

IN

+b SIEMENS

*

*

IN

0

0

+b SIEMENS

*

IN

IN

0

+b SIEMENS

SIEMENS 0

+b

IN

IN

* *

*

*

17TH FLOOR PLAN

20TH FLOOR PLAN

10


11


2.INSTITUTION:MEDITATIVE ART CENTRE


13


SITE:National Handicrafts and Handlooms Museum,New Delhi

INTENT:

The intent of the proposal of meditative art centre was because of the current problem of footfall ,i.e. due to to lack of sensitisation of art and craft plus thedecorating mental health of citizens in urban area .Thus ideative response was a bigger architectural programme which Wcaters to a larger number of people .Meditative art is a practice which uses different types of arts and crafts as means of meditation and to reflect on there inner selves .The main focus is on the state of mind of the artist rather than the final art piece the artist is creating .

14


GROUND FLOOR PLAN

IDEATIVE SECTIONAL DIGRAMS

Iteration1:meditation centre

Iteration2:meditation centre

Plan of meditative art centre

15


1ST FLOOR PLAN

IDEATIVE SECTIONAL DIGRAMS

workshop and lecture room

Bazaar and eatries

Entrance of meditative art centre

16


IDEATIVE SECTIONAL DIAGRAMS FOR MEDITATION CENTRE

17


SECTIONS:

18


3.MANGLAGIRI OCIS:EXHIBITION AND TEXTILE CENTRE

19


SITE:Manglagiri,Telangana

INTENT:

my intervention is located on the NH16 on the eastern edge . the message i wanted to send was of announcing the identity of mangalgiri for which it stands for and to showcase an evolved new identity keeping in my mind the past . in order to achieve that i evolved a form that catches attention fast and at the same time has depth in it so that it retains in the mind .for engaging and creating curiosity i worked with the scale of openings some big and some small .To maintain the past and present identity i articulated spaces in a manner that they form common spaces which have a use it as well as stops the person and engage with the surroundings .

20


GROUND FLOOR PLAN

21


22


23


24


SECTIONS:

25


26


4.MIXED USE :THE URBAN WALK


SITE:WTC,sector-29,Gurugram,New Delhi

INTENT:

the intent of the intervention was to explore place making and social value of mixed use development in Gurugram .This was done through the lense of walkibility catering to the diverse demographic groups of sector 29 and there different needs.. Enhancing connection with the nearby transit hubs. Will help in promotions of outdoor activities ascreating a connection with the park atmasterplan level and of NMT(non-motorised transit) inside and outside the site. Will result in diversifying and densifying the site as it will help in retaining the old user group.(i.e.of friday prayer goers, people who use the site as a playground.). This approach was also undertaken to provide something back to the city, where there are no boundaries and restrictions on the different demographic groups

28


CONCEPTUALISATION AND ZONING

REASONS FOR THE 3 CRITICAL ENTRY POINTS

• A: Its the most busiest intersection point because all the traffic movement from both the sides of the site converges at this point. coincidentally it has become a self- generated drop -off point as its located at the junction where the entrance of the Westin hotel and RITES building is located. • B:Since this point is connected with the NH8(through an unpaved path which is used by the pedestrians) and its also a self generated bus/shuttle stop. • C:This point has a auto-stand and most of the hawkers and street vendors gather there. Also during the lunch time the people working in RITES ,Power-grid and IFFCO towers gather at this point so as to get Lunch at a cheap rate.Thus densifying that point

29


CONCEPTUALISATION AND ZONING

PRINCIPLES OF WALKABILITY

1.Creating fine grained circulation. 2.Orient buildings to street and open space. 3.Organise uses to support public activity. 4.Placing parking behind or below buildings. 5.Humaninsing the scale of buildings through landscaping. 6.Providing clear and continous pedestrian acess.

30


GROUND FLOOR PLAN

31


SECTIONS:

32


ST-3 DETAIL XXX XXX

4273

XXX

XXX

XXX

XXX

XXX

4397

XXX XXX

XXX

400

4890

3635

W3

1000

1000

W3

1000

W3

XXX

1000

BAL

BAL

W3

XXX

XXX

XXX

XXX

4400

4260

RF

TOWER C

18MM GRANITE STONE

3 LAYERS WHITE WASH+ EMULSION 1 LAYERS WHITE WASH+ PAINT (WHITE COLOR)+WOODEN EMULSION PAINT (WHITE PANELLING COLOR)

1989

RE

19500

23427

14

4904

RD

D1

1000

C2

8000

XXX

RC

RB

8000

C3 10751 500

9400 1625

6500

6200

10900

11200

XXX

4550

400

XXX

XXX

XXX

XXX

XXX

XXX

XXX XXX

1090

XXX

500 500

XXX

XXX

5034

XXX

XXX

950

BAL

400

9702

6648

400 XXX

500

XXX

400

23450 4850

22849

4640

4418

500

XXX

XXX

XXX

XXX

BAL

FHR-1

P-1

8000

BE"

BD"

647

V1

XXX

5044 XXX

6800

XXX

XXX

XXX

XXX

XXX

XXX

BC"

BB"

D2

V1

D2

617

8000

45278

D2

D2

BA"

8149

BAL

BAL

P-1

7701

12MM VETRIFIED TILE

500

9

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

XXX

BAL

D2

D2

4850

XXX

BAL 500

D2

444

D2

W3

D1

1000

12MM VETRIFIED TILE

D1

999

8

XXX

DOWN

1500

D2

2727

+1350

8300

26050

22

6800

150MM 300MM 2000MM

D1

12MM VETRIFIED TILE

4831 BH"

BG"

BF"

E'E" D'4

4793

5000

XXX

KIOSK D'

+1350

1000

9700

20415

D'5

20

5064

500

D1

D1

XXX

500

TERRACOTTA TILE FLOORING 12MM

MUD ROLLS AND RAMMED EARTH TIMBER TRUSS

A1

24000

P-1

43

A2

D2

X

XX

D2

X

10

90

D3

VET

68

57

12M TILE M

WH RIF WA ITE IED PA SH CO INT +E LO (W MU R) HIT LS E ION

94

10

36

46

XX

+1350

3 WA LAYE PA SH RS INT +E WH (GR MU ITE EY LS ) ION

V1

X

A3

XX

43

6

D'E"

42

8300 D'C"

X

7700 24639

D'B"

XX

8300 D'A"

63

D'6

52

17

D2

X 10

22 37

XX

25

2

D2

V1

X

XX

A4

X

XX

20

13 25

3 W LAY PA AS ER C IN H+ S PA OLO T (W EM WH 18 NE R)+ H ULS ITE ST MM LL W ITE IO ON G IN O N 1 E RA G OD LA NIT EN WA YE EM S E R PA ULSH+ S W HIT CO INT IO E LO (W N R) H IT E

40

D2

X

D2

VET

42

61

P-1

00

4

X

XX

X

30

12M TILE M

WH RIF WA ITE IED PA SH CO INT +E LO (W MU R) HIT LS E ION

D2

XX

35 45

XX

X

XX

D3

X

FH R-1

-1 HV

X

35 8

W XX

+1050

50

0

1

68

7

1

X

-1 LS

ET

AIL

11

3

89

77

1

1

15

49

11

LS 0

CO

TY

D

01

+1350

24 25

+1050

26

BA

L

W

AR

20

200

IR

50

ER

95

27 28

DO

0

1

ST

0 200

58 11

36

50

51

15

0

W

1

50

00

W

X

XX

00

W

00

W

29

3

50

W

X

3

34

W

3

04

2

89

4

50

W

1

2

12

65

3

10

79

71

W

3

L

9 00

41

32

10

00

W

99

3

61

W

54 41 24 82 9

86

3

9

X

XX

X

XX W

D1

50

3

0

X

XX

10

BA

00

L

W

00

W

10

3

00

W

74

3

8 BA

L

W

3

W

X

X

X

XX

96

10

3

XX

60

X

"

XX

AG

XX X

"

1

BA

49

10

AF

W

11

X

"

00

XX

AE

18 ST MM ON G E RA LA NIT N E AS YER E M H PA ULS + S W HIT CO INT IO E LO (W N R) HIT 10 E 00

10

X

08

0

XX

"

10

X

AD

3

8

3 W LAY EM AS ER PA ULSH+ S W 12 HIT CO INT IO FLO MM E LO (W N R) H OR WO 1 LA IT IN OD E W Y G EN EM ASH ER PA ULS + S W HIT CO INT IO E LO (W N R) HIT E 48 82

3 W LAY PA AS ER C IN H+ S W PA OLO T (W EM HIT NE R)+ H ULS E LL W ITE IO N 1 IN O G OD W E

XX

62

X

"

22

3

10 XX

AC

3

49

4

XX

19

X

"

10

XX

AB

0

35

W

X

55

XX

"

A

71

3

18 ST MM ON G E RA LA NIT N E AS YER E M H PA ULS + S W HIT CO INT IO E LO (W N R) HIT E

6

51

12

3 W LAY PA AS ER C IN H+ S W PA OLO T (W EM HIT NE R)+ H ULS E LL W ITE IO N 1 IN O G OD W E

521

AA

34

N

13

12

34

AIR

18

17 16

15 14

0

9

CA

W

20

19

SE

9

100

05

LL

339

WE

7 8

10

X

7

TO

-A

UR

521

XX

-1

23

X

ST

RIS TR ER WI EAD 150 DT H 300 MM 200 MM 0M M

UP

X

EN

0

XX

OP

A1

XX

80

-1

40

W XX

ST XX -1 X D

145408

W

X

A9

0

HV A

C-1

30

ES

-1

00

30

27

46

7

00

XX

A8 A7

D2

78

X

A6

48

5

3 WA LAYE PA SH RS INT +E WH (GR MU ITE EY LS ) ION

D2

XX

A5

XX

XXX

4850

23

ST-2

D1

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

5000

2000

RISER TREAD WIDTH

13

15

14

16

20

17

12

21

3300

5542

D2

26650

BAL

7

13

4550

W1

500

18MM GRANITE STONE 3 LAYERS WHITE WASH+ EMULSION 1 LAYERS WHITE WASH+ PAINT (WHITE COLOR)+WOODEN EMULSION PAINT (WHITE PANELLING COLOR)

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

400

UP

18

19

7

6

9

8

27

25

26

24

11

STAIRCASE WELL

BAL

TOWER B

D2

B5

2000

10

5900

XXX

550

XXX

850

XXX

XXX

XXX

500

1900 12078

12MM WOODEN FLOORING

ST-2 DETAIL XXX

6682

W1

1000

ES-1

D1

4927

W2

ST-5 DETAIL XXX

D'3

LS-1

HVAC-1

4850

CG"

3 LAYERS WHITE 1 LAYERS WHITE WASH+ WASH+ EMULSION EMULSION PAINT (WHITE PAINT (WHITE COLOR) COLOR)

HV-1

6800

W1

500

XXX

1900

12MM WOODEN FLOORING

W1

DOWN

8150 E'F"

W1

1000

XXX

W1

500

LS-1

2894

B4

D'2

FHR-1

8000 E'D"

BAL

W3

4828 CF"

8282

W1

ST-5

11

14

13

12

18

15

20

19

10

150MM 300MM 2000MM

16

-1

17

0

3

1

EPOXY

2

4

5

7

6

9

8

8000 E'C"

W3

XXX

6213

11092

6800

XXX

XXX

XXX

1926

3 LAYERS WHITE 1 LAYERS WHITE WASH+ WASH+ EMULSION EMULSION PAINT (WHITE PAINT (WHITE COLOR) COLOR)

W1

RCC GUTTER

2000

7850 E'B"

10

3 LAYERS WHITE 1 LAYERS WHITE WASH+ WASH+ EMULSION EMULSION PAINT (WHITE PAINT (WHITE COLOR) COLOR)

500

7336

RISER TREAD WIDTH

22

8001

W1

1000

UP

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

3300

1000

1000

W3

11

12MM WOODEN FLOORING

W2

D1

7428

BAL

W3

8040 CE"

W1

B3

D'1

STAIRCASE WELL

1000

1000

W3

16397

12

W1

12608 5600

XXX

W1

500 15374

1000

XXX

XXX

KIOSK E'

1000

W3

CD"

CC"

W1

B2

RCC GUTTER

MUD ROLL AND TIMBER TRUSSS

39400

XXX

B1 A'B"

D1

D1

1000

BAL

W3

+1350

8300 A'A"

+1350

1000

W3

7973

LS-1

A'2

+1050 CENTERAL COURTYARD

D1

XXX

7700

LS-1

1000

W3

8163

CB"

12MM TERRAZO FLOORING

KIOSK A'

CA"

+1350

19

FHR-1

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

ES-1

1000

W3

XXX

2500

DOWN

HVAC-1

1000

BAL

W3

XXX

150MM 300MM 2000MM

11

14

13

12

20

3300

19

15

10

TERRACOTTA TILE FLOORING 12MM

HV-1

1000

W3

XXX

ST-4

18

RISER TREAD WIDTH

16

17

STAIRCASE WELL

1000

W3

XXX

UP

3

-1

1

21

MUD ROLLS AND RAMMED EARTH TIMBER TRUSS

2

5

4

6

7

0

9

8

2000

1000

W3

7701

8300

XXX

C4

XXX

1000

A'1

XXX

D1

18MM GRANITE STONE

XXX

ST-4 DETAIL XXX

+1350 D1

15

3 LAYERS WHITE WASH+ EMULSION 1 LAYERS WHITE WASH+ PAINT (WHITE COLOR)+WOODEN EMULSION PAINT (WHITE PANELLING COLOR)

XXX

4133 8450

D2

8000 40000

7400

34500

D2

12MM VETRIFIED TILE

D2

8000

RA

9702

D2

17

D2

12MM VETRIFIED TILE

DOWN

WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

D2

D2

D1

500

J

7700

16

18MM GRANITE STONE 3 LAYERS WHITE WASH+ EMULSION 1 LAYERS WHITE WASH+ PAINT (WHITE COLOR)+WOODEN EMULSION PAINT (WHITE PANELLING COLOR)

FHR-1

UP

8000

E'A"

P-1 5672 6339

D2

1279

D2

18

150MM 300MM 2000MM

4017

6332 WHITE 3 LAYERS WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

ST-3

RISER TREAD WIDTH

11

14

13

12

18

16

10

20

19

15

17

+1350

V1

XXX

P-1 D2

9

8

4

6

5

7

25

21

23

24

3300

ES-1

SLOPE:1:12

22

HVAC-1

RAMP

STAIRCASE WELL

XXX

UP

HV-1

LS-1

8149

V1

LS-1

XXX

C1 DWN


AC"

AB"

5550

3647

2588

AG"

AF"

AE"

AD"

2579

3216

AJ"

AI"

AH"

5684

5812

5279

7907

A9

A10

3097

7913

+14400 TERRACE LVL

5.WORKING DRAWING: MEDITATIVE ART CENTRE

+11600 TERRACE LVL +10718 LINTEL LVL-3

+8568 SECOND FLOOR LVL +7680 LINTEL LVL-2

+5530 FIRST FLOOR LVL +4603 LINTEL LVL-1

+1350 PLINTH LVL +450 SITE LVL +_00 N.G.L

A9

A10 7913

5602

+14400 TERRACE LVL MACHINE ROOM +11600 TERRACE LVL +10718 LINTEL LVL-3

+8568 SECOND FLOOR LVL +7680 LINTEL LVL-2

+5530 FIRST FLOOR LVL +4603 LINTEL LVL-1

+1350 PLINTH LVL +450 SITE LVL +_00

A5

A8 6236

A4 3782


NOTES F

E

H 30000

GUARD ROOM 2000X3000

30000

CATCH CL-(-)300 GL-+450 BASIN 600X600 IL- (-)400

CATCH CL-(-)200 BASIN GL-+450 600X600 IL- (-)300

30000

CATCH CL-(-)400 BASIN GL-+450 600X600 IL- (-)500

30000

CATCH CL-(-)500 GL-+450 BASIN 600X600 IL- (-)600

LS-1

400

4133

59

58

60

2000MM

P-1

FIRE TANK 5000X5000

FIRE YARD (1500X1200) HYDRANT

DOWN

ES-1

8450

P-1

150MM 300MM

41

44

43

42

56

55

54

53

52

57

51

3300

ST-3

STAIRCASE WELL

WIDTH

HVAC-1

45

48

49

46

50

MACHINE+SHAFT ROOM 7500X4400

(1500X1200)

SLOPE:1:12

47

FIRE YARD HYDRANT

RAMP

RISER TREAD

HV-1

DWN

OVERHEAD WATER TANK 5000X5000

LS-1

UP

RECHARGE PIT(FILTRATION CHAMBER 1200X1500)-PIT(DIA 3000)

ST-3 DETAIL XXX

C1

CL-(-)600 GL-+450 IL- (-)700

RECHARGE PIT(FILTRATION CHAMBER 1200X1500)-PIT(DIA 3000)

CATCH CL-(-)100 GL-+450 BASIN 600X600 IL- (-)200

15488 15740

CATCH BASIN 600X600

3408

D

4017

FHR-1

30000

UP

30000

SLOPE-1:300

8000

8000

8000

8000

C2

TOWER C

8000

RC

RB

RD

RE

SLOPE-1:300

4904

40000

RA

RF

1400

21

12MM TERRAZO TILES

C3

N.A.

6800

11113

N.A

A'1

C4 7701

4640

8300

30346 66025

9702

CATCH BASIN 600X600

CA"

7973

8163

8040

CD"

CC"

CB"

4828

CE"

CATCH BASIN 600X600 CL-(-)700 GL-+450 IL- (-)800

CG"

CF"

KIOSK A' +1350

16900

5044

CL- 00 GL-+450 IL- (-)100

B1

A'2

+1050 CENTERAL COURTYARD

8300

A'A"

A'B"

400

30000

3300

23450

DOWN

ES-1

6800

59

60

58

2000MM

150MM 300MM

41

43

42

44

ST-2

55

54

53

52

21

WIDTH

57

TOWER B

SLOPE-1:300

2000

RISER TREAD

56

STAIRCASE WELL 51

4850

UP

45

48

46

49

MACHINE+SHAFT ROOM 5600X7700

50

B3

2000

47

KIOSK E'

HVAC-1

FIRE YARD HYDRANT

SLOPE-1:300

(1500X1200)

LS-1

FIRE TANK 8600X5400

HV-1

XXX

31994

LS-1

XXX

4550

B2

RCC GUTTER

MUD ROLL AND TIMBER TRUSSS

FIRE YARD HYDRANT

ST-2 DETAIL XXX

6648

+1350

12MM TERRACOTTA TILES 1 LAYERS WHITE WASH+ EMULSION PAINT (WHITE COLOR)

N.A

RCC GUTTER

B4

C

RECHARGE PIT(FILTRATION CHAMBER 1200X1500)-PIT(DIA 3000)

4850

XXX

OVERHEAD WATER TANK 8600X5400 P-1

B5

8300

KIOSK D'

7701

8149

P-1

FHR-1

8000

8000

CATCH BASIN 600X600

4831

CL-(-)800 GL-+450 IL- (-)900

45278

BA"

CATCH CL-(+)100 BASIN 600X600 GL-+450 IL- 00

BC"

BE"

BD"

BH"

BG"

BF"

SLOPE-1:300

5000MM

150MM 300MM

ST-4

RISER TREAD WIDTH

+450 SITE LVL

ELECTRICAL

30

0

20

A4

63

KEY PLAN

R-1

S.NO

TYPE WIDTH SILL LINTEL

HV -1

+1050

LS

-1

35

A9

80

HV AC

-1

30

SCHEDULE OF OPENINGS

CATCH BASIN 600X600 CL-(-)900 GL-+450 IL- (-)1000

FH

-1

00

A7

ES

0

30

00

00

A8

30

30

A6

00

35

45

4

P-1

40

A5

P-1

A3

+1350

CATCH BASIN 600X600 CL-(+)200 GL-+450 IL- (+)100

FIRE HYDRANT 159024.2611

37 22 OV W ER TA ATE HE 39 NK R AD 36 00 43 X54 FIR 00 W E TA ATE 39 NK R 00 X54 00

24600

COMPOUND LVL

43

A2

FIRE YARD HYDRANT

DRAINAGE

+1350

A1

30000

00

SL

OP

ST XX -1 DE X TA

E-1

+1350

:30

0

CL-(+)300 GL-+450 IL- (+)200

0

A1

200

0

ST 521 -1 7

RISE TREA R WIDT D

UP

H

TO W

OP

EN

-AI

R

CO

UR TY AR

150M 300M M 2000M M

ER

D

M 41

FI (1500X1200) HY RE DR YA AN RD (1500X1200) T

42 43 44 45 46

0

60

CASE STAIR

WELL

339

47 48 49 50

DO

WN

59 58

A

57 56

30000

M RO ACHI 53 OM NE 00 X5 20 0

80

40

LS

-1

IL

CATCH BASIN 600X600

55

100

54 53

0

52

200

0

51

145408

521

"

30

00

21

6

AA

55

15

N.A

0

AB

"

35

19

ISSUES

22

AC

"

62

AD

"

CATCH BASIN CL-(+)400 600X600 GL-+450 IL- (+)300

12M TE M TIL RR ES AC 1 OT WA LAY TA EM SH ER (W UL + S WH HIT SIO ITE E N CO PA LO INT R)

DATE

29

NOS.

ISSUED TO/REMARKS

08

AE

34

04

"

AF

"

54 41

24 CATCH BASIN 600X600 CL-(-)1000 GL-+450 IL- (-)1100

82

9

AG

"

FIRE YARD HYDRANT

60

(1500X1200)

96

AH

"

30

00

53

38

0

AI" 73

38

AJ

DATE

30000

"

REVISION

REMARKS

REVISIONS

CATCH BASIN 600X600 CL-(+)500 GL-+450 IL- (+)400

PROJECT

+450 SITE LVL

TITLE

24

77

8

LT TRANSFORMER ROOM 5000X5000

TERRACE +SITE SERVICE+EXTERNAL DEVELOPMENT PLAN

CONVERTING HT TO LT

CL-(+)600 GL-+450 IL- (+)500 CATCH BASIN 600X600

4856

RECHARGE PIT(FILTRATION CHAMBER 1200X1500)-PIT(DIA 3000)

+_00 ROAD LVL

CATCH BASIN 600X600

METER ROOM 1500X1500

CL-(-)1100 GL-+450 IL- (-)1200

ARCHITECT OMAR HAROON

GUARD ROOM 2000X3000

HT

SCALE MADE BY

35

DATE

1:200

SIGN

DWG NO.

REV NO.


AC"

AB"

AG"

AF"

AE"

AD"

AH"

AJ"

AI"

NOTES

AK" DETAIL A SCALE-1:10

5550

3647

2588

2579

3216

5684

5812

5279

7907

+13677 MUMPTY LVL

300

+12000 PARAPET LVL

+11141 TERRACE LVL

+9788 LINTEL LVL-3

+8588 SILL LVL-3

+7688 SECOND FLOOR LVL

20MM MORTAR

+6638 LINTEL LVL-2

20MM FLOORING

+5438 SILL LVL-2

+4538 FIRST FLOOR LVL

200

MUD PHASKA

+2250 SILL LVL-1

150

+1350 PLINTH LVL

+450 SITE LVL

RCC

+_00 N.G.L.

SCALE-1:100

100

PCC

+3450 LINTEL LVL-1

SECTION-AA'

A9

A10

A5

A8

A3

A4

A2

KEY PLAN

A1

SCHEDULE OF OPENINGS S.NO

5602

7913

6236

3782

3926

3642

TYPE WIDTH SILL LINTEL HGT.

4353

+14400 TERRACE LVL MACHINE ROOM

A B

+11600 TERRACE LVL +10718 LINTEL LVL-3

D2

XXX

XXX

6

5217

D3

4257

D2

XXX

4363

P-1

A1 12MM VETRIFIED TILE

3 LAYERS WHITE WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

4694

XXX

ISSUES

FHR-1 HVAC-1

12059

XXX

XXX

HV-1

LS-1

XXX

XXX

LS-1

6199

ES-1

1000

W3

1171

W3

869

1000

1000

499

W3

XXX

W3

XXX

1000

500

W3

XXX

1000

W3

500

W3

BAL

W3

748

1000

1000

1000

W3

XXX

W3

XXX

1000

1000

W3

XXX

500

5217

XXX

2000

150MM 300MM

W3

XXX

3580

A' D1

4132

18MM GRANITE STONE

3 LAYERS WHITE 1 LAYERS WHITE WASH+ EMULSION WASH+ PAINT (WHITE PAINT COLOR)+WOODEN EMULSION (WHITE COLOR) PANELLING

W3

BAL

W3

2000MM

DOWN

23 24

0

15

28 7 8 9

RCC STICH SLAB

18 17 16

14

DATE

13

REVISION

REMARKS

12

REVISIONS

5216

B'

5566

MORTAR 30MM

3519 AB"

AA"

BRICKWORK

20 19

15

1000

PAVEMENT 80MM

PCC 100MM

3390

27

2262 2908 AC"

AD"

3404

AE"

AF"

5424 41829 AG"

6096

5338 AH"

PROJECT

7899 AI"

AJ"

SAND 100MM

INDUSTRIAL SAND600MM

607

LIGHT WEIGHT FILLER(REMAINING)

INDUSTRIAL SAND

TITLE

300

SECTIONS AND DETAILS ARCHITECT

RCC 100MM SCREED 32MM

PCC 100MM SCALE-1:10 DETAIL B

DETAIL C SCALE-1:10

WATERPROOFING 12MM

150

300

STAIRCASE WELL

26

10

2000

COPPING (TUCKING WATER PROOFING)

8040

300

20MM MORTAR

7907

25

20MM FLOORING

150

BAL

1 LAYERS WHITE WASH+ EMULSION PAINT (WHITE COLOR)

4882

18MM GRANITE STONE

3 LAYERS WHITE 1 LAYERS WHITE WASH+ EMULSION WASH+ PAINT (WHITE PAINT COLOR)+WOODEN EMULSION (WHITE COLOR) PANELLING

ST-1 RISER TREAD WIDTH

UP

1079

12MM WOODEN FLOORING

3 LAYERS WHITE WASH+ EMULSION PAINT (WHITE COLOR)

3 1

0

35

+1

5136

ST-1 DETAIL XXX

A9

300

0

05

+1

A

ISSUED TO/REMARKS

W1

502

XXX

XXX

XXX

OPEN-AIR COURTYARD

11583

A7

SECTION-BB' SCALE-1:100

894

12653

4 3434

A8

+_00 N.G.L

11771

3000 3000

A6

498

2001

3000

C B

500

NOS.

XXX

XXX

P-1

D3

5095

+1350 PLINTH LVL +450 SITE LVL

W2

W1

5171

XXX

XXX

XXX

D2

W1

XXX

4261

D2

DATE

TOWER A

XXX

XXX

4020

27467

D2

12MM VETRIFIED TILE

XXX

1325

XXX

0

05

+1 D2

4878

5

3 LAYERS WHITE WHITE WASH+EMULSION WASH+EMULSION PAINT (WHITE PAINT(GREY) COLOR)

XXX

3643

XXX XXX

3722

XXX

11153

V1

D2

A5

BAL

687

D2

A4

D

XXX

500

PLAN SCALE-1:200

W1

W1

W1

18MM GRANITE STONE

3 LAYERS WHITE WASH+ EMULSION 1 LAYERS WHITE WASH+ PAINT (WHITE COLOR)+WOODEN EMULSION PAINT (WHITE COLOR) PANELLING

1090 D2

1025

8949

+5530 FIRST FLOOR LVL +4603 LINTEL LVL-1

2

V1

XXX

A3

1068

A2

+8568 SECOND FLOOR LVL +7680 LINTEL LVL-2

OMAR HAROON DETAIL D SCALE-1:10

SCALE

DATE

MADE BY

SIGN

DWG NO.

36


750

2000

750 D"

C"

1000

500

NOTES 50

K

8

30

1000

5

1000

5

2000

B" 1000

38

DOOR FRAME 1

8

8

13

13

45

45

DOOR Rebate- shutter 1 and 2

2100

4 6

SCALE-1:10

SCALE-1:10

INSIDE

789

SCALE-1:10 SECTION-EE"

BOTTOM RAIL

SECTION-II" 1000

4 25

38

2003

1

13 8

50

1200 SECTION-CC"

SECTION-DD"

1200

2100

2100 336

2100

SCALE-1:10

900MM 900MM

2100MM 2100MM 1200MM

900MM

1200MM

5.WINDOWS FIXED-3

900MM

1200MM

500MM

NOS.

ISSUED TO/REMARKS

DATE

H"

REVISION

REMARKS

REVISIONS

H

PROJECT

MEDITATIVE ART CENTRE TITLE

WINDOW FRAME DOOR FRAME-1 15MM THK PLASTER

SCALE-1:5

37

SECTION-BB"

900MM

1000

SCALE-1:10

SECTION-HH"

L"

2000

SCALE-1:10

WINDOW-2 ELEVATION 18

18

BEADING

F

SECTION-GG"

SECTION-JJ" SECTION-KK"

HINGE AND SCREW

DOOR AND WINDOW DETAILS ARCHITECT

OMAR HAROON 50

WOODEN PANEL

GLASS 10MM THK

E

L

18

DETAIL-F

DETAIL-E

875

WOODEN PANEL

SCALE-1:5

INSIDE

SCALE-1:10 SECTION-FF" 500

SCALE-1:10

DETAIL-D

SCALE-1:5

750MM 2000MM

WINDOW -1 ELEVATION

J

13

DETAIL-C

MIDDLE RAIL

OUTSIDE

750

2000

DOOR FRAME-3 WOODEN PANEL

2000MM

3. WINDOWS FIXED-1

4.WINDOWS FIXED-2 1000MM

ISSUES

1200

10MM THK GLASS

D

TYPE WIDTH SILL LINTEL HGT.

1. DOOR-1(HINGED) 2.DOOR-2(HINGED)

G"

OUTSIDE

DETAIL -A

2000

S.NO

DATE

INSIDE OUTSIDE

SCALE-1:5

GLASS 10MM THK

GLASS 10MM THK DETAIL -B DOOR REBATE SCALE-1:5 1 SCALE-1:5

SCHEDULE OF OPENINGS

INSIDE

INSIDE

DOOR FRAME-1

BEADING

INSIDE

HINGE

DOOR FRAME 3

WINDOW-3 ELEVATION K"

D

C

OUTSIDE

SECTION-AA" SCALE-1:10 INSIDE

38

G

1000 B

15MM THK PLASTER HOLDFAST

OUTSIDE

750

4

4 MIDDLE RAIL BOTTOM RAIL

LINTEL

LINTEL

OUTSIDE

1000 A

F"

SCALE-1:10

C

I"

I

J"

LINTEL

2000

OUTSIDE ELEVATION DOOR-2 (TOILET)

OUTSIDE ELEVATION DOOR-2

SCALE-1:10

SCALE-1:10

B

4

4

F

INSIDE ELEVATION DOOR-1

OUTSIDE ELEVATION DOOR-1

A"

SCALE-1:10

A

18

E"

4

E

50

2100

2100

2100

35

SCALE

DATE

MADE BY

SIGN

DWG NO.


DISSERTATION:SHARED SPACES AND VISUALLY IMPAIRED IN THE INDIAN CONTEXT ABSTRACT:

According to WHO there are estimated of 1.3 billion people who are globally living with some sort ofvisual impairment .The root cause of visual impairment globally is uncorrected refractive errors and cataracts .Mostly people affected by it out of the age 50 and above .Visual impairment or vision loss is a decreased ability to see that causes problems which are not fixable by usual means. It isimportant to address this issue as its unfair that the architecture we build is only for certain group ofpeople and not for all due to the biased preconceived notion that architecture can experienced through visual sense only. Thus, leading to Ocular centrism. Visually impaired are not aware of of new environments and take time to get aware it naturally creates confusion, fear and chaos in their minds which leads to increased reaction time of the body and leading to fatal accidents and in somecases loss of life.

Painting by :Omar Haroon(color blind)

The visually impaired are not being treated equally by fellow citizens as they are rather treated as a burden or a forced responsibility in India. The existing guidelines and standards which are there don’t focus on the spatial quality of the shared spaces and lack innovation. Thus, making the designing rigid and mechanical, creating a barrier of discrimination in usability of shared space between the visually impaired and abled. This dissertation paper aims at testing the derived parameters through the various patterns derived by thee the visually impaired individuals from the multisensory environment around and also taking in consideration the existing guidelines and standards. These parameters are tested on shared public spaces to know whether the existing shared spaces are comfortable and barrier free for visually impaired or not. This can be tackled as architecture is a discipline which accommodates all types of users and also considers the multi-sensory environments while designing and planning spaces. Thus, making the space usable, accessible by all and creating an efficient barrier free and social built environment.

38


6.MISCELLANEOUS

39

Splice Acryllic model


CONCEPT:

The idea is of a sculpturecum shoe rack .The inspiration is from a triangle glass frame and a triangular prism shaped dressing table in my house .So as to complment it i got Winspired from the frames language.

MATERIAL USED:

• metal sheet 0.8 mm thickness • square hollow metal rod (thickness 10mm thick

TECHNIQUES USED : • weilding of metal • bending of metal sheet

40


OMAR HAROON omarharoon22@gmail.com +918527344500


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.