OMAR PRECIADO Undergraduate Architecture Portfolio
C
B
2
3
A
6
5
1
4
B
D
CLIMATES
C
A
D
CROSS SECTION CC
B
FLOOR PLAN II
TRANSVERSE SECTION
B
C
C
CROSS SECTION CC
CROSS SECTION EE
1 Chunk Cut
A.4.2
1 1 0 ’ To p o f B l d g .
97’ Seventh Level
84’ Sixth Level
71’ Fifth Level
58’ Four th Level
38’ Third Level
18’ Second Level
18’
2
3
4
APPLIED STUDIES DESIGN DEVELOPMENT 3040 FAll 2012 November 26TH 2014 INSTRUCTOR: SCOTT & Pavo A 2.1
6
6
7
LAMBO
8
C O N S U LTA N T S : s c i -a r c
GFRC Panels
Steel panels
4 8 2 W B r o a d way New York, NY 10012
5
Glass Oculus
Design Development Room 160 ADDRESS
TITLE FRONT ELEVATION
Glass Facade
DRAWING REVISIONS: N O. 1
DESCRIPTION DESIGN DEVELOPMENT
PROJECT NY Concert Hall D R AW N BY Omar Preciado D AT E 11-17-2014
D AT E 4/11/2010
SHEET NUMBER
A .3.1
1
A 2.1
2
To p o f B l d g . 1 1 5 ’
Seventh Level 97’
Sixth Level 84’
Fifth Level 71’
Four th Level 58’
Third Level 38’
Third Level 34’
Second Level 18’
1
A 2.1
2
To p o f B l d g . 1 1 5 ’
Seventh Level 97’
Sixth Level 84’
Fifth Level 71’
Four th Level 58’
Third Level 38’
Third Level 34’
Second Level 18’
2
1
To p o f B l d g .
4
3
110’
Sky Ba Seventh Level
Sixth Level
97’
84’
Cl a s s ro o m Fifth Level
71’
Vi o l i n Cl a s s Four th Level
58’
Pe r fo r m ance S p ace Third Level
Second Level
38’
S e mi - Pu b l i c Rehearsal 18’
M e z z ani ne
E nt r y
Vo u ye r
5
6
7
6
8
APPLIED STUDIES DESIGN DEVELOPMENT FAll 2014 November 26TH 2014 INSTRUCTOR: SCOTT & Pavo
LAMBO C O N S U LTA N T S :
r
4 8 2 W B r o a d way New York, NY 10012
s c i -a r c
Cafe Sp a ce
Prac t ice Sp a ce
Lib rar y
Design Development Room 160 Ti cket B o o th
Tic ket B oot h
ADDRESS
TITLE LONG SECTION
M a i n Per fo r ma n ce Spa ce
DRAWING REVISIONS: N O. 1
DESCRIPTION DESIGN DEVELOPMENT
PROJECT NY Concert Hall D R AW N BY Omar Preciado D AT E 11-17-2014
D AT E 11/2014
SHEET NUMBER
A .3.1
project evolution 1
2
Football Feild Of f i ce Space Retail Shops Elementary School
3
4
Parks Swimming Pools Of f i ce Space Retail
5
6
Tube Spaces Tube Circulation
Tu b e M o r p h o l o g y To p V i e w
Tube M or phology Elevation View
Elevator Clearances
A
Long Section AA
A
Retail Displays + Elevator Clearances
A
A
BALMAIN
Sea Level Rise
+0 Meters
+5 Meters
+10 Meters
+25 Meters
+30 Meters
+35 Meters
+50 Meters
+55 Meters
+60 Meters
+15 Meters
+20 Meters
+40 Meters
+45 Meters
+60 Meters
+60 Meters
Process:Urban Strategies Reservoir City Reservoir
City
is
a
proposal
that
imple-
ments and distributes reservoirs across the western regions of Los Angeles. Upon close inspection, there is a tremendous lack of reservoirs south of the obvious Silverlake and Echo Park. Adding reservoirs to neighborhoods
have
a
huge
impact
on
the
residences surrounding them, regardless of whethere they have a view to them or not.
Silverlake Reservoir: A case study is closely inspected to understand the components of an urban typology.
Water [303,946 Sq. Meters]
Pedestrian Trail Public Green Space [40,117 Sq. Meters]
Residential Zone Vehicular Infrastructure
Lured City Lured
City
is
a
proposal
that
embraces
water invasion into urban metropolis in a controlled
manner
and
fl o o d s
major
portions of Los Angeles. The driving force this scheme suggests that the implementation
of
water
in
the
city
raises
property
value and attracts residential destinations.
Precedents Projects that had massive urban scales were studied on how they impacted society. Le C o r b u s i e r ’s
Plan-Obus
and
S U P E R S T U D I O ’s
Radical Movement were two inspirations.
SYSTEMS
Section Ocean
Dam
Residences
Santa Monica