A Case Study on ACME Products PLC

Page 1

SAMPLE ON PROJECT MANAGEMENT

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


Table of Contents INTRODUCTION TASK 1- UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (a)1.1 Main principles of the project management process (b) 1.2 Success/failure criteria for ACME Project (C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples (d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project appraisal TASK 2 - BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES (a) 2.1 Roles and responsibilities of each of the participants (b) 2.2 Identify the skills and qualities of leader for the ACME Project (c) 2.3 Specifying the human resource requirements for the ACME Project TASK 3 - BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES (a)3.1 Draw up network diagram, determine critical path for the project and final duration of the project (b)3.2 Effect of the delay and the action taken by project manager (c)3.3 Role of Gantt Chart and Resource Histogram in order to improve the management of ACME Project (c)3.4 Crash activities during ACME project in order to complete the project more quickly (d)3.5 Analysis of Cost and Time performance for AMCE project during its project life (e)3.6 Ways to manage any changes which are likely to be required during the life of ACME project (f)3.7 Ways of Project Closer (g)3.8 Evaluation of completed ACME project CONCLUSION References

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


Index of Tables Table 1: Success/failure criteria for ACME Project Table 2: Roles and responsibilities of different ACME project team members

Illustration Index Illustration 1: Network diagram of ACME Project Illustration 2: Network diagram of ACME Project Illustration 3: Project change control procedures for the existing plan

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


INTRODUCTION Project management is a combination of diversified skills, techniques, knowledge and tools which are needed to meet the requirements of a project plan. In other words, it can be said that it includes a careful planning and well organized efforts to complete a project

in a successful manner. There are

different phases which help in managing and implementing the project plan in a right manner

(Kerzner,

2013). The following research is related to project

management and to understand its role in business operation, ACME Products PLC case study has taken into consideration. Company wants to construct a new building for manufacturing of plastic tableware which are used for outdoor dining and picnics. Along with this, organization also wants to arrange a production setup in new facility which will be integrated with other existing factories across the world in near future (Meredith and Mantel, 2011). Objectives covered under the following study are related to understand project management principles, managing human resources, analysing skills and qualities required in project manager as well as identifying success and failure criteria for ACME Project.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


TASK 1 UNDERSTAND PROJECT MANAGEMENT PRINCIPLES (LO1) (a)1.1 Main principles of the project management process There are seven principles of project management process that can be directly link to project life cycle of ACME Project which are as follows. Success: It is hard to measure the success of a project without considering any criteria. It is require to develop some key benchmark that can help in defining the success of project plan. For ACME Project, the success benchmarking for the following project has scope, quality and relevance Kshama, 2012. Commitment: The project manager and its team members should show commitment towards the project. In the case of ACME Project, the project manager and its supportive staff must be committed for achieve goal, scope, quality, time and cost of project plan. Tetrad-Trafe off: This principle state that scope, quality, cots and time must be at balanced state. For ACEM Project, top achieve the objectives, it has required that scope, quality, cots and time has to be at balance stage to accomplish success of project. Primary Communication channels: As per this principle, the project manager of ACME Project should develop a single communication channels so that the require informatics about the project can be easily communicate with team members as well as client (Hamel, 2008). Culture Environment: For achieve the success of project, the management style should be match with type of project plan. Similarly, project manager of ACME Project should develop a suitable culture environment which can support his management style Process: For any type of project, the process, policies and procedures must be clearly define and in documentation format. It should also explain the roles and responsibilities of project manager and its supportive team members. For ACME Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


Project, a document should be prepare which include method, policies and procedures as well as roles and responsibilities of project manager and team members (Cicmil and et.al., 2006). The develop guidelines will work as guide throughout the lifespan for whole project. Life cycle: It includes the four phase of a project which ensure a clear path and determine important milestones in the project (Meredith Belbin, 2011). This principle will help ACME Project to create a clear picture on starting and finishing duration of project plan. (b) 1.2 Success/failure criteria for ACME Project Table 1: Success/failure criteria for ACME Project

Success criteria

Failure criteria

Strong and visible leadership support Poor

leadership

style

of

project

of project manager of ACME project

manager of ACME project

Committed project team members

Lack of different resources such as human, technology, financial etc.

Clear objectives and vision (Forsberg, Undefined and unclear objectives and Mooz and Cotterman, 2005) Effective

distribution

of

vision important Lack of motivation

information Support of top management of ACME Poor support of top management of project

ACME project (Pohl, 2010)

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


(C) 1.3. Explaining concept of time, cost and quality with the help of suitable examples Time plays an important role to manage project operations in the firm. For example, management of ACME can clearly define its objectives in order to design and process their activities. This thing can help to design building for manufacturing of plastic items (Atkinson, Crawford and Ward, 2006). As per the case, cleared objectives contribute effectively to decide time frame for the completion of infrastructure development of building by dividing objectives into specific time frame. This thing also helps ACME to manage quality and cost of its project. Cost aids company to find out estimated expenditure on any type of project. For example: this concept can help management of ACME to identify approximate spending on the infrastructure development of building by analysing the cost of raw materials like cement, wood and labour for constructing building. Further, it monitors quality of materials and proper time frame to analyse appropriate estimated cost because inflation rate, recession and demand of raw material also affect its cost (Megginson, 2006). Proper estimated cost can also give specific idea to manage monetary funds for the infrastructure development of building for the plastic production. Quality also contributes an effective role to improve the efficiency and performance of ACME project. For example: this concept can give better reliability to measure quality of materials by comparing standard performance with the actual performance. It can help firm to improve quality of project by providing proper guidance to make building (Aubry, Hobbs and Thuillier, 2007). Good quality can also aid ACME to complete the project within given time frame and estimated cost.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


(d) 1.4. Explaining ways of terminating Acme Project by including key elements and post-project appraisal There are many ways like extinction, addition, integration as well as starvation for terminating project in the firm. Extinction- ACME has achieved its desired goals. On the other side, it can be stopped because it is unsuccessful to execute the objectives of firm. Addition- If, a project of ACME has achieved its success then it will be end through formal way. Employees worked for project, property and resources will be transferred to new project from the terminated project (Hobbs, Aubry and Thuillier, 2008). Integration- In this part, if, project leads to major success then project outcomes are integrated to the activities of clients. In addition to this, used resources of ACME will be released and it will be given to parent organization. It is the common process to terminate a project. Starvation- When management of ACME determines that project is unsuccessful or obsolete then firm terminates project (Thiry and Deguire, 2007). Organization will take all the resources from that project. Firm will not invest any money on this project. Key elements for assess ACME organization will consider to reduce technical reasons during project execution. Firm will measure that project cost should not higher than the profit. Management of ACME will also want customer support to fulfil its demand. Firm will analyse project completion schedule in order to complete it in an appropriate time frame ( Huemann, Keegan and Turner, 2007). Reducing uncontrollable problems which will lead forcefully termination of the project of ACME. Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


Key Elements involved in post project appraisal There are many key elements which can be covered during post-project appraisal in the organization. Overall Project evaluation Did project fulfil all the goals and objectives which were decided by firm? Was the stakeholder complaints and feedback considered in a positive manner? Was project accomplished within a particular time frame and cost? (Crawford, 2005) Quality of Deliverables ACME will analyse that stakeholder satisfaction on the quality will be appropriate or not. Organization will measure that all the deliverable quality are actual as per the document in order to complete requirements (Pohl, 2010). Key Accomplishment Meeting on the project strength like team work, efficient ways of instrument utilization and other positive accomplishments. Future Consideration Discussion of future activities which will be considered regarding the project (Larson and Gray, 2011) Discussion of any project maintenance process which will need to manage in a proper way. In addition to this, management of ACME can also emphasize on sharing the experience of individuals, opportunities for the improvement and best practices for managing the future projects.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


TASK 2 BE ABLE TO MANAGE A PROJECT’S HUMAN RESOURCES (a) 2.1 Roles and responsibilities of each of the participants There are many personnel involved in ACME Project which are as follows. Table 2: Roles and responsibilities of different ACME project team members Project Role

Responsibilities Managing and directing the project team members of ACME project

Project Manager

Recruiting project employees and

Person is liable for establishing

consultants.

conjunction with the Project

Managing relations with team members for

Sponsor. He assures that project is

the better coordination to continue project

given to client in an agreed time.

work.

He also manages monetary funds

Complete project planning and control

to achieve proper quality standard

(Barry, 2015).

in the project.

Measure project progress and performance. Determining team training needs of team members of ACME project.

Project Team Members

Give functional expertise in management

Staff members play an important

process of ACME project

role to give effective efforts in

Work with co-associates to assure that

ACME project at all the stages.

project has completed its needs or not.

Every individual is responsible to

Measurement of present and future

manage specific work in the firm.

processes regarding ACME project (Javidan and et.al.,, 2006). Analysing information needs of the project

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


Project Sponsor The person who select others

Work as a supporter in ACME project

members to deliver the project.

Project sponsor is accountable for the

They can be a senior member of

outcomes of planned project.

staff in a specific area. Result of

Take core organisational decisions for

project also affect the project

development of ACME project (De Reyck

Spencer. He is responsible from the

and et.al., 2005).

initiation to completion of the

Analysing the availability of essential

project. He supervises that project

resources for staff members.

is actively reviewed or not. Project Board It is a group of management grade employees who are responsible for overseeing the progress and performance of ACME project. They also react on any strategic problems.

Finalization of strategies, execution plan and project scope of ACME project Sort out the project issues. Prioritization of project goals and objectives of ACME project (Elo and Kyngäs, 2008).

(b) 2.2 Identify the skills and qualities of leader for the ACME Project Leader or manager should have appropriate skill and qualities to lead ACME project which are as follows. Communication skills- It is essential for leader to interact with the team members in the firm. This skill also help manager to share the goals and objectives of project with employees in order complete them in specific time frame in the firm. Coordinating skills- This quality also contribute effective role for leader of ACME to share work load with team members to complete in a systematic manner. This skill also helps the firm to increase its efficiency and performance in the market (Kerzner, 2013). Problem solving skills- This ability also aids the leader to solve problem of team members of ACME project. This skill help the ACME to reduce the risk regarding work and it provides appropriate direction to finish the job. Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


(c) 2.3 Specifying the human resource requirements for the ACME Project ACME Organisation needs many human resources like project manager, team members, quality analyst, architect and human resource manager to complete project in optimistic manner.. Work of Project manager is to manage project operations in appropriate way. He analyses the current status of project and report to the top authorities in the ACME (Meredith and Mantel, 2011). Further, team members of firm gives their efforts on the specific work to manage project operations which are assigned by project manager of ACME. Work of quality analyst is to check proper quality standards of raw material, woods and other material which are used in construction of Building. In addition to this, architect of ACME is helps to make layout and design building as per client requirement (Hamel, 2008). He also monitors on construction work in order to check that work is being completed in appropriate manner or not. Further, human resource manager of ACME allocate required human and other resources which are necessary for construction of building.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


TASK 3 BE ABLE TO APPLY PROJECT PROCESSES AND PROCEDURES (a)3.1 Draw up network diagram, determine critical path for the project and final duration of the project

Illustration 1: Network diagram of ACME Project Critical task: Task which are not affecting by any kind of delay S, A, B, D, F, H, K, L. Critical path: Path that connects all critical task → Path SABDFHKL Project

duration:

Sum

of

all

the

duration

of

the

critical

tasks:

S+A+B+D+F+H+K+L = 72 weeks (b)3.2 Effect of the delay and the action taken by project manager As per the given scenario, the construction of the production machinery will take longer than planned by eight weeks. In this situation, its project manager responsibilities to inform about this consequences of delay. The answer of project manager should be the construction of production machinery

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


will start after 23 weeks due to some reason (Cicmil and et.al., 2006). But this activity is not coming under critical path and not affect entire project. So this work can be delay by more eight weeks without any issue. On the other hand, delay in supplying of raw materials is by 6 weeks because of flood. The impact of this delay on entire project is the whole work will delay and take it more time to complete it. But after developing network diagram, it has been found that delay in supply of raw material and construction of the production machinery are not coming under critical path (Meredith Belbin, 2011). Therefore, it will not affect the entire project plan. (c) 3.3 Role of Gantt Chart and Resource Histogram in order to improve the management of ACME Project Gantt Chart: It is a most common technique of project management to define the activities of a project with respect to time. The left side of chart is consisting list of tasks and on top side, a time scale is giving (Nishadha, 2012). In Gantt Chart, each and every activity of a project plan has defined by a bar, the length of bar has showed start and end time as well as duration. In the case of ACME Project, the project manager can use this tool to improve management of project plan in right manner. For example, all the activities of ACME project plan has drawn on Gantt Chart over the time scale. With the help of this, project manager can track movement of every task and compare it with the estimated durationv (Forsberg, Mooz

and Cotterman, 2005). If there is any

delay created in any activity then other tasks can be manage according to it. Resource

Histogram: It is used by project manager to give visual

presentation of utilization of different resources in a chart form with the time scale. It is a bar chart which is used for showing the particular amounts of time that a specific resource is scheduled to be worked for predetermine time period. For example, in ACME Project, the four major human resources have used: project manager, project sponsor, team members and project board (Pohl, 2010). The above figure shows that every member of this project has scheduled to be worked for specific time duration. With the help of this, it can Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


be easy to determine that whether the human resources are over utilized, under utilized or effectively utilized. Therefore, by using Gantt Chart and Resource Histogram, it can be easy to improve management of ACME project. (c) 3.4 Crash activities during ACME project in order to complete the project more quickly

Illustration 2: Network diagram of ACME Project With help of above network diagram of ACME project plan, it can be easily analysed that the activities which are not coming under the critical path will not affect the whole project. The tasks G, C, E, I and J are not coming under critical path and they can be cancel out. For this, the slack time of these activities has required to reduced and bring it out at zero. By doing this, the project will be finished more quickly as compare to the given time duration

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


(d) 3.5 Analysis of Cost and Time performance for AMCE project during its project life For analysing cost and time performance of ACME project during its project life, some methods are as follows. Cost Performance Index (CPI): It helps in analyse the efficiency of the cost used by a project. It is measuring the value of completed work by comparing with actual cost which has spent on project. In the case of ACME project, suppose the project has to completed within 12 months and estimated cost for this is $100000. After six month, $ 60000 has been spent. In the review, it has found that only 50% of the work has been done. From the calculation of CPI, it has determined that value of CPI is 0.67 which is less than one (Atkinson, Crawford and Ward, 2006). It has denote that ACME project is over budget. Therefore, with the help of CPI, cost performance of project can be measure. Time Performance: To measure the performance of ACME project during its entire project life, the project manager can compare it actual time duration with the estimated time span. For example, at time of preparing the requirement statement, the estimated time of this activity is 8 week. After the implementation of plan, it has found that the following task has taken 6 weeks. From the comparison of actual and estimated time, it has found that preparing requirement statement has completed before 2 weeks from scheduled duration. It has defined time performance of project (Megginson, 2006). Therefore, CPI and Time Performance method helps in analyse cost and time performance for ACME project during its project life. (e) 3.6 Ways to manage any changes which are likely to be required during the life of ACME project In ACME project, it is require to manage the changes during project life cycle. In this context, Project Change Control Method is more appropriate which is as follows. Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


First step is monitoring of entire ACME project work and notice the issues which are occurring during implementation of plan. Along with this, the impacts of problems on project plan has also analysed. Second stage is enlisting the changes by creating the change request and send it to Change Control Board (CCB) which has prepared by project manager (Aubry, Hobbs and Thuillier, 2007).

Illustration 3: Project change control procedures for the CCB panel has evaluated the change requests and take the decisions to approve or reject the modifications in ACME Project. It is a integrated change control phase. If the request approved then it will send it to further action otherwise no modifications will be done in project. Next stage is direct and manage execution of changes where the project manager has start to analyse the changes and given instructions to Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


team members about new modifications in existing ACME project plan (Hobbs, Aubry and Thuillier, 2008). Last step is implementation of changes in which project manager has implemented new modifications and that will contain extra cost as well as it will increase budget of ACME project. (f) 3.7 Ways of Project Closer There are three ways of project closer which will be used by project manager of ACME project at different time that are as follows. Addition: When ACME project will complete and consider as a formal part of ACME Product PLC, that time project manager will close the project. It will done after completing entire project and handover it to the client. For closing out the project, the project manager will transfer project team members, equipment’s, property and other resources to new building of ACME Product PLC (Thiry and Deguire, 2007). Integration: When ACME Project will view as integral part of ACME Product PLC then project manager will use integration project closer method. Under this, the resources which has been used during the project, they will be release and distribute in main ACME Product PLC company. Starvation: When the project manager think that the risk factors has increased with time and it will affect entire project very negative manner then he will take decision to close out ACME Project. In this process, first plan will terminate by decrease budget and release all the resources. After this, ACME Product PLC will stop more investment of project plan in future ( Huemann, Keegan and Turner, 2007). Once the project manager of ACME Project has completed its own work the ACME Product PLC can open its new building and start the production of plastic tableware. Company will integrate it new facility with existing plant around the world to manage the production process and other business activities.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


(g) 3.8 Evaluation of completed ACME project The evaluation of completed project is needed to determine the loopholes and check whether the work is able to deliver the expected outcomes or not in right way. In the case of ACME Project, the project manager will require to evaluate the completed project

(Crawford,

2005). For this, the various Key

Performance Indicators will be develop such as outcomes, utilization of resources, time and cost performance etc. For example, by comparing the estimated budget and actual spending over the ACME Project, the evaluation of accomplished project will be done. If project plan will finish within a estimated budget and able to deliver expected outcomes then it cost performance will count as a success criteria otherwise in failure benchmarking (Larson and Gray, 2011). Therefore, by such types of ways, project manager will evaluate the completed project and take decision according to it. On the other hand, there are some methods that will use by project manager to evaluate completed ACME project which are as follows. Budgeted cost for work scheduled: Under this method, project manager will compare estimated budget with spending at each and every step of project plan. Over or under budget spent will help in measuring the performance of ACME Project. Budgeted cost for work performed: It is a budgeted cost of work which has actually completed in carrying out a scheduled task during a give time duration. For ACME Project, the actual time taken to complete each activity of plan will compare with estimated time duration by including spending of budget (Cicmil and et.al., 2006). The outcome of comparison will help in measuring performance of ACME project.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


CONCLUSION From the above research, it has been concluded that there have some criteria for ACME Project which has defined success and failure of aspects of project. Time, cost and quality has some objectives which has used to design project management systems and process for proposed project. Project manager, project board, project sponsor and project team members have different duties and responsibilities while workout on ACME Project. Gantt chart and

Resources

Histogram

has

used

by

project

manager

to

improve

management of proposed project plan. It has important to evaluate the complete project to measure the performance of ACME Project.

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


REFERENCES Books and Journals ● Kerzner, H.R., 2013. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. ● Meredith, J.R. and Mantel Jr, S.J., 2011. Project management: a managerial approach. John Wiley & Sons. ● Hamel, G., 2008. The future of management. Human Resource Management International Digest, 16(6). ● Cicmil, S. and et.al., 2006. Rethinking project management: researching the actuality of projects. International Journal of Project Management. 24(8). pp.675-686. ● Meredith Belbin, R., 2011. Management teams: Why they succeed or fail.Human Resource Management International Digest. ● Forsberg, K., Mooz, H. and Cotterman, H., 2005. Visualizing project management: models and frameworks for mastering complex systems. John Wiley & Sons. ● Pohl, K., 2010. Requirements engineering: fundamentals, principles, and techniques. Springer Publishing Company, Incorporated. Online ● Barry, T., 2015. TOP 10 QUALITIES OF A PROJECT MANAGER. [Online]. Available through:<https://www.projectsmart.co.uk/top-10-qualities-projectmanager.php>. [Accessed on: 28th January, 2016 ]. ● Kshama, 2012. Basic Principles Of Project Management. [Online]. Available through:<http://www.simplilearn.com/project-management-basic-principlesarticle>. [Accessed on: 28th January, 2016 ]. ● Manage

changes

in

your

project,

2012.

[Online].

Available

through:<http://satheespractice.blogspot.in/2012/02/manage-changes-inyour-project.html>. [Accessed on: 28th January, 2016]. Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk


SAMPLE ON PROJECT MANAGEMENT FOR COMPLETE MANAGEMENT DISSERTATION HELP KINDLY CONTACT AT: help@onlinedissertationwriting.co.uk

Toll Free : +44 203 3555 345 Email : help@onlinedissertationwriting.co.uk Website : https://www.onlinedissertationwriting.co.uk