1 5
2 1 Entrance court 2 Secondary Entrance 3 Patio 4 Concrete ring walkway 5 Park walkways
SITE PLAN
3
4
A 8
6
1
3
7
5
2
GROUND FLOOR PLAN
1
Seating Area Men’s Washroom Women’s Washroom Staff Program Room Staff Room Mechanical Room Janitor Room Entrance Court
0
1 2 3 4 5 6 7 8
4
N
A
0
1
6m
SECTION A-A 1:200
2
1
3
4
5
6 7 8 9
10
11
Detail section Parapet and sill detail
13
9 8
14
12
1 roof construction: 2 ply light grey epdm membrane 12.5mm high strength fibreboard, including base sheet on; 2 layers 63mm polyisocyanurate insulation R30 vapour retarder membrane 2 layers 16mm plywood 286mm Spruce Pine Fir joist 64mm metal furring 12.5mm gypsum 2 4mm aluminium composite material curved to radius, sealed with black silicone 3 parapet construction: 20 gauge stainless steel, #7 mirror finish 25mm x 50mm horizontal aluminum tubing breather membrane 12.5mm marine plywood 51mm Z metal framing polyisocyanurate insulation vapour retarder rim board 4 20 gauge stainless steel, #7 mirror finish flashing 5 steel top plate 6 thermally broken anodized aluminum frame, 7 80mm x 266mm Douglas Fir glulam rim beam 8 19mm counter sunk bolt 9 steel knife plate 10 structural silicone double glazing with mirrored coating on outer lite 11 130mm x 266mm Douglas Fir glulam column 12 150mm concrete slab on grade 13 19mm Douglas Fir sill 14 120mm concrete walkway