MIT Nano Building Facts Infographic

Page 1

MIT.nano BUILDING FACTS SQUARE FEET OF INTERIOR WALLS

25,000

27,000

SQUARE FEET OF INTERIOR STONE CLADDING

800,000 POUNDS

35.6 MILES

OF SHEET METAL DUCTWORK

OF PIPING

190 MILES

OF ELECTRICAL WIRING

3,385

AVERAGE PIECES INSTALLED PER DAY

AVERAGE WEIGHT PER PIECE OF POUNDS STRUCTURAL STEEL

TOTAL SQUARE FEET OF EXTERIOR WALL CLADDING

62,000

FEET OF PROCESS PIPING

22

AVERAGE TON PER DAY

22,000

40,000

640,000 CUBIC FEET PER MINUTE OF SUPPLY AND

EXHAUST AIR

TOTAL SQUARE FEET OF METAL WALL AND SOFFIT EXTERIOR WALL CLADDING

2,101

FEET OF FIRE PROTECTION PIPING

FEET OF PLUMBING PIPING

68

PIECES OF STRUCTURAL STEEL

100,000

20,000

60,000

300,000

STRUCTURE

PLUMBING AND WIRING

FEET OF HVAC PIPING

6,000

53,000

OF SITE UTILITY LINEAR PIPING

TOTAL SQUARE FEET OF GLASS CURTAIN EXTERIOR WALL CLADDING

1.4

EQUIVALENT MARATHONS OF PIPING

TOTAL SQUARE FEET OF STONE EXTERIOR WALL CLADDING

LABOR

EXCAVATION AND FOUNDATION

1,500,000 TOTAL PROJECT WORKER ONSITE MAN-HOURS

1,040

530,000 LINEAR FEET OF REBAR

350

TOTAL CUBIC YARDS OF CONCRETE IN THE ENTIRE PROJECT

ON SITE JOBS CREATED

3,000 TRUCKS AVERAGE NUMBER OF WORKERS PER DAY ON-SITE

12,000

530 MAXIMUM NUMBER OF WORKERS PER DAY ON -SITE

REMOVING SOIL

40,000 SQUARE FEET OF SLURRY WALL

9.9 MINUTES PER TRUCK LEAVING SITE ON PEAK DAY

1,400,000 CUBIC FEET OF SOIL REMOVED

550,000 LBS. OF STEEL BRACING TO TEMPORARILY SUPPORT SLURRY WALL DURING EXCAVATION