O'Reilly Concrete Precast Projects

Page 1

www.oreillyconcrete.com


 Precast Wall Panels

 Pre-stressed Wall Panels

 Columns and Beams

 Precast Stairs

 Hollowcore Flooring

 Precast Lift Shafts

Our extensive design team can provide everything from an initial 3D Model of the building through to full element & connection design. After approval of design, manufacturing of the structure begins offsite in our factory controlled environment. Once manufactured the rapid process of erecting the building on site begins. The O’Reilly Rapid Build Construction is particularly suited to Schools, Apartment Blocks, Hotels, Commercial Offices and general medium-high rise construction.

Weekly Production Capacity

3,500 m² Precast Walls 2,000 m² Pre-stressed Walls 10,000 m² Hollowcore Flooring 150 Columns & Beams 50 Precast Stairs

www.oreillyconcrete.com


 Precast Wall Panels  Columns and Beams  Hollowcore Flooring

 Prestressed Wall Panels  Precast Stairs  Precast Lift Shafts

www.oreillyconcrete.com


 Precast Wall Panels  Columns and Beams  Hollowcore Flooring

 Prestressed Wall Panels  Precast Stairs  Precast Lift Shafts

www.oreillyconcrete.com


Central Park, Dublin • • • •

Design & Build 11 Story Precast Frame 166 no. Residential Units 1352m² Commercial Space & Car Parking Floors - 9,962m2 150Dpp Hollowcore - 713m2 of 100Dpp Solid Slabs - 106m2 of 200Dpp Hollowcore - 550m2 of 300Dpp Hollowcore • Walls - 11650m2 of 200PC Panels • Stairs - 50 Flights over 3 staircases • Precast programme on site – 32 Weeks

www.oreillyconcrete.com


Post Primary School, Hull • • • • •

30,000 sq. ft. Building Precast Walls - 3000 m² Hollowcore Floors – 2000 m² Precast Stairs – 500 4 Week Programme on Site

www.oreillyconcrete.com


Hacton Primary School, London

Walls - 4,000m² Floors - 3,000m² Precast Stairs - 5 7 weeks on site

www.oreillyconcrete.com


Sutton Primary School, London • • • •

Precast Walls - 3,000m² Floors - 2,000m² Precast Stairs - 5 Programme on site - 5 weeks

www.oreillyconcrete.com


Albert Quay, Cork

• • •

200mm Walls - 6,000m² Precast Stairs - 50 no. Flights Programme on site - 6 weeks

www.oreillyconcrete.com


Primary Care Centre, Dublin • • • • • • • •

75,000sq.ft. building Erected in 3 phases 100 tonne Crane used to reduce cost 5,800m2 of Walls 4,750m2 of Floors 20 Flights Stairs Initial programme 9 weeks Completed 2 weeks early within 7 Weeks

www.oreillyconcrete.com


Primary Care Centre, Meath • • • • • • •

4,300 m², 1 to 4 Storey Building incl. basement parking 8 week programme Dense Urban Environment Designed without Structural Screeds Structural load designed directly to basement columns Central Precast Stairs & Lift Shaft Voids provide light & ventilation

www.oreillyconcrete.com


 Installation of 11 storeys of precast + roof  12 days per floor allocated to precast install  Approximately 275 lifts per floor  28 week target install programme Installation Week 10 April 2018

Installation Week 10 April 2018

Hilton Hotel, Heathrow Terminal 2, LONDON • Project: adjacent to T2 Car Park • Main Contractor: Grove Developments • 13,000m2 Hollow Core Floors • 12,500m2 Walls • 13,000m2 Screed • 80 Stairs & Landing

www.oreillyconcrete.com


Post Primary School, Dublin • 2 Story School with PE Hall and SNU • Originally designed as block work – changed to precast to meet clients programme. • SNU unit – we cast in all M&E services. • Largest Post Primary School built in in Ireland in 2016. • PE Hall was designed with Vertical columns cantilevering from finished ground floor. • Building was split into 3 phases. • Converted all insitu area to precast to reduce programme on site. • 4800m2 of 200mm Hollowcore Flooring

www.oreillyconcrete.com


Capital Dock, Dublin

www.oreillyconcrete.com


Siemens, Hull

• • •

£310m Wind Turbine Blade Factory 350mm Insulated Walls - 5000m² Programme on Site 5 Weeks

www.oreillyconcrete.com


Adamstown, Dublin • • •

900 Apartments 200mm Walls – 150,000 m² Programme on site – 18 months

www.oreillyconcrete.com


Siemens, Alexandra Dock, Hull

• Siemens Off-Shore Service Shed • 350mm Insulated Walls • Programme on Site 5 Weeks

www.oreillyconcrete.com


• • • •

Stand-alone Sports Arena The biggest in South East of Ireland Cantilevered Walls – 5,000m² Programme on site – 8 weeks

www.oreillyconcrete.com


ALDI Ireland • • • •

350mm Insulated Walls - 1200m² Floors - 100m² Stairs – 5no. Flights Programme on Site – 2 Weeks

www.oreillyconcrete.com


Manufacturers of Oakstown Precast Concrete Septic Tanks, BAF Sewage Treatment Systems, Rainwater Harvesting & more. O’Reilly Oakstown is part of the O’Reilly Group.

WASTE WATER SOLUTIONS

CONCRETE TANK SOLUTIONS

www.oreillyconcrete.com


Barleystone Paving specialise in the manufacture and supply of concrete block paving, permeable paving & granite paving to the private, commercial, educational, civil and industrial markets. Barleystone Paving is part of the O’Reilly Group.

www.oreillyconcrete.com


• • • •

Precast Walls Columns & Beams Hollowcore Flooring Precast Stairs Tel: +353 (0) 42 969 3500 sales@oreillyconcrete.com www.oreillyconcrete.com

• • • •

Wastewater Treatment Rainwater Harvesting Oil/Water Separators Precast Concrete Tanks Tel: +353 (0) 46 943 1918 info@oreillyoakstown.com www.oreillyoakstown.com

• • • •

Paving Bricks Paving Flags Airtight Blocks Permeable Paving Tel: +353 (0) 42 967 5992 sales@barleystone.com www.barleystone.com

www.oreillyconcrete.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.