FIRST OR SECOND POUR
FIRST OR SECOND POUR
#X x X'-X" CONTINUATION BAR INSERTED INTO PS=Ø COUPLER BEFORE SECOND POUR
BULKHEAD PS=Ø COUPLER @ XX" O.C.
t
SLAB
#X x X'-X" THREADED BAR
CONCRETE SLAB (SEE STRUCTURAL)
NOTES: 1. APPLY BOND-BREAKER BETWEEN FIRST AND SECOND POUR PER MANUFACTURE REQUIREMENTS. 2. THE PS=Ø RELIEF JOINT TO REMAIN OPEN FOR XX DAYS. 3. AFTER THE TIME PERIOD SPECIFIED ABOVE, THE PS=Ø COUPLERS AND JOINT TO BE GROUTED PER MANUFACTURE REQUIREMENTS. 4. SEE PS=Ø MANUFACTURE DATA FOR MORE INFORMATION. 5. WITH SELF-SUPPORTING SLABS ONLY RESHORING IS REQUIRED. 6. COUPLER CAN BE PLACED ON EITHER SIDE OF JOINT.
PS=Ø RELIEF JOINT @ MID-SPAN