PS0 Relieft Joint @ Wall

Page 1

#X HOOK BAR OR FORM-SAVER (BY OTHERS) INSERTED INTO PS=Ø COUPLER @ XX" O.C. BEFORE SECOND POUR (SEE STRUCTURAL)

CONCRETE SLAB (SEE STRUCTURAL)

EQ

CONCRETE WALL (SEE STRUCTURAL)

t

SLAB

EQ

#X x X'-X" THREADED BAR

PS=Ø SLOTTED COUPLER (MID-DEPTH) @ XX" O.C.

NOTES: 1. APPLY BOND-BREAKER BETWEEN SLAB AND WALL POURS PER MANUFACTURES REQUIREMENTS. 2. THE PS=Ø RELIEF JOINT TO REMAIN OPEN FOR XX DAYS. 3. AFTER THE TIME PERIOD SPECIFIED ABOVE, THE PS=Ø COUPLERS AND JOINT TO BE GROUTED PER MANUFACTURES REQUIREMENTS. 4. SEE PS=Ø MANUFACTURE DATA FOR MORE INFORMATION. PS=Ø RELIEF JOINT @ WALL