Architecture P o r t fo l i o piedad hoyos garcia
Ciudad Empresarial Luis C. SarmientoBussines centerdepressed roads “The components of the set are designed and built under the guidelines of a comprehensive master plan, which includes aspects of mobility, buildings location and architectural parameters unified. This Plan provides guidance and assurance to the gradual development but also to articulated and harmonious Project.” C.P. SA
artistic impressions - location
location floor
artistic impressions
Position held: Project Architect _____________ Main Responsability: Architect responsible for the design of the areas affected by depressed roads around. Technical coordination. Urban equipment design and adaptation _____________ Employer: Contrucciones Planificadas (Planed Constructions) _____________ Type of business: Construction -private sector _____________ Location: Bogotá - Colombia _____________ Dates: January 2010- September 2010
Ciudad Empresarial Luis C. Sarmiento Business center-depressed roads The design is framed within the parameters and progress of the “bioclimatic architecture�, which means comfort, lower utility costs and contributions to environmental sustainability.
artistic impressions depressed roads The approximate total area of the depressed pathways project is 10 squared kilometers. One of the central objectives of the project was to separate the pedestrian from the automobile. Thus, we created a continuous walking path via sending the traffic through depressed roads and underground connections to the buildings.
urban equipment
artistic impressions
images under construction
The street furniture and fixtures equipment is not disconnected from the urban footpath, each piece resembles a fold of the wooden ground that supports it.
images under constructio
Circasia PorterĂa Position held: Architect Designer _____________ Main Responsability: Design and coordination. _____________ Employer: Contrucciones Planificadas (Planned Constructions) _____________ Type of business: Construction -private sector _____________ Location: Quindio- Colombia _____________ Dates: July 2010- September 2010
images under construction
This is a porter’s lodge designed for a cond located in a rural area in Colombia. The small building seeks to adapt to its context through simple geometry and with colours and materials that do not breat the architec tural language of the area.
elevation
Circasia Porter’s lodge
image
floor plant
image
section
El cubo centro empresarial y recreativo
Position held: Architect _____________ Main Responsability: Coordinar cambios de niveles, y diseños y planos. Adaptación y diseño de mobiliario, _____________ Employer: Contrucciones Planificadas _____________ Type of business: Construction -private sector _____________ Location: Bogotá - Colombia _____________ Dates: July 2010- September 2010
Calling The Cube or “Centro recreativo y empresari colsubsidio” ( Recreation and Business Center) is on of the biggest in its style in an urban area in Colombi with a 32.000 square meters gives to the city an importan equipment that organize it very well. The project was a result of an open competition in tringular lot in a estrategic point of the city, moreov this place was long uninhabitated being the urbanism key part of the project. The project was conceived as a set of 5 independent are (or buildings) to give to de whole project the flexibili to grow with the time as much as possible.
El cubo centro empresarial y recreativo Within this project the main learning was handle lots of different materials, with different features and discover ways to give a continuous language allong the entire project.
first floor pla
informal restaurant
formal restaurant
These pictures show some of the spaces I designed and solved for their construction.
external sta
El cubo centro empresarial y recreativo
second floor plan
Into the things I most enjoyed in the project was to design children’s furniture. The main feature of this furniture is the interaction with the children.
third floor plan
image special furniture for children area
image bowling area
image gym ar
El cubo centro empresarial y recreativo
furniture desig
fifth floor plan
Learning was very wide range in expression techniques, organization and projects coordination .
landscape interventi
section
landscape interventi
Academic work
Position held: Architect designer, contruction _____________ Main Responsability: Design and coordination of entire remodela tionWW _____________ Employer: Juan Guillermo Valenzuela _____________ Type of business: Private remodelation _____________ Location: Bogotรก - Colombia _____________ Dates: August 2006 - October 2006