PA B L O VA Z Q U E Z SELECTED WORKS
2019-2023
PERSONAL WORK Selected works 2018-2023 Pablo Vazquez Self-initiated projects
WORK EXPERIENCE Selected works 2022-2023 Bjarke Ingels Group Professional work made for BIG (Bjarke Ingels Group)
WORK EXPERIENCE Selected works 2021-2023 GLR Architects Professional works made for GLR
01
02
Santa María 129
PA B L O V Á Z Q U E Z
Santiago, N.L, Mx. 67300
pablovzz.design@gmail.com
(81) 14825487
CAREER FOCUS I am a profoundly creative professional who excels in tackling design challenges and elevating each project to the highest level of quality. My fervor for cutting-edge architecture has propelled me to attain exceptional expertise in the entire spectrum of architectural processes, encompassing the conceptualization and design of intricate projects to their precise 3D modeling and construction presentation. Furthermore, I am confident that my proficiency in team collaboration, adaptability, and organizational acumen will render me an invaluable asset.
PUBLICATIONS & AWARDS Architizer - Selected finalist of the 3rd “Annual One Rendering Challenge”
04.2022
Halo Funeral Center finalist in international competition. Recognized as one of the best examples of architectural storytelling among 2022 entries.
VII Student Calli- Honorable mention in the VII Student Calli
10.2021
Halo Funeral Center finalist in architecture bienal of Nuevo León.
Canacero - Second place in national steel competition
08.2021
Halo Funeral Center finalist in national competition.
Amazing Architecture - Digital magazine publication
08.2021
Halo Funeral Center published in a leading world-wide known platform.
PROFESSIONAL EXPERIENCE BIG (Bjarke Ingels Group) -Design Assistant; Copenhaguen, Dk.
12.2022 - To date
Concept design, Schematic design, design developmeent and Interior design for 3 different projects in China and Korea. Worked closely with firm principals on all aspects of architectural projects, plus graphic/communication design, creation of high-end visualizations for client meetings. Developed complex/highly detailed 3D architectural models in Rhino. Project experience: The Hub (CD-SD), Cheng-Du Lake City (CD-SD), Genesis (DD-ID).
GLR Arquitectos - Visualization Specialist; Monterrey Nuevo León, Mx.
07.2021 - 06.2022
Created over 100+ high quality renderings in 3 month period to various stakeholders and clients, each with different representation demands. Defined a rendering process that is consistent, so all team members could collaborate. This increased the work efficiency by 40%. Developed complex/highly detailed 3D architectural models in Sketchup and 3ds Max.
GLR Arquitectos - Junior Designer; Monterrey Nuevo León, Mx.
03.2019 - 06.2021
Managed client timeline and budget expectations. Lead and managed architectural design projects that include assessment of client need, conceptual design, schematic design, design development space planning.
PERSONAL WORK Resume Cv / Selected works Pablo Vazquez 2018-2023
Generated plans, specifications and material selections needed for construction.
EDUCATION Universidad de Monterrey - Nuevo León, Mx.
04.2022
CRGS of arts, architecture and Design - Bachelor in Architecture GPA: 3.8/4.00 Honors: Graduated Outstanding Bachelor's Thesis/Report Award
SKILLS Hard Skills
03
Soft Skills
3ds Max - Advanced
Sketchup - Advanced
Communication
Time management
VRay/ Corona Render - Expert
Blender - Expert
Leadership
Overcoming problems
Revit - Advanced
Illustrator - Advanced
Teamwork
Planning
Rhinoceros - Advanced
Photoshop - Expert
Organization
Enthusiasm and Optimism
Grasshopper - Advanced
Indesign - Advanced
Adaptability
Lumion - Advanced
Enscape - Advanced
Multi-tasking
Autocad 2D - Advanced
Fluent bilingual (English & Spanish
Self-management
04
SELECTED AS ONE OF THE BEST EX AMPLES OF ARCHITECTURAL STORYTELLING OF THE YEAR BY ARCHITIZER . (2022)
H A LO Mexico Funeral Center Design Personal Work Highlight March, 2021
Awards & Publications:
Second Place
Best of category
Inter national Student Competition
Student Architecture
05
Amazing Architecture
ARCHITECTURE HUNTER
Digital Magazine No. 127
Selected Finalist Inter national One Render Competition
06
Site Analysis
The project is located in Nuevo León, Mexico. One of the main main cities of the country.
In the northeast of the country, bordering to the north with the Rio Grande that separates it from the United States.
Form Development
The project is placed between the two main cities of the states.
39 min to Saltillo, 43 min to Monterrey.
2. Avoidance of the main water agglomeration point with an extended geometry.
3. Continuation of the plan.
4. Embedding of the plan in the property.
5. Tilting of the exposed end for elevation healing.
6. Homologation of the volumetry with the natural context.
7. A ramp and a staircase form a coherent cycle from arrival through church and family private room to offices loop and back again.
8. Facade treatment for solar protection on the south facade with louvers and double glazing.
9. Structure of frames and beams with evolutionary spacing at distances according to the overhang.
Environment Analysis
3
2
1
1. Road view
07
2. Pond view
3. Site view
1. Water/rain
Glen
08
Exploded Axonometric Exploded axonometric view emphasising all the layers that make up the building.
Roofing Alucobond panels of trapezoidal geometry placed radially on the upper and lower roof of the building.
Structure Complex steel structure, resolved by means of structural frames in series, reinforced with tensile elements.
Solar Protection Serial vertical elements in radial arrangement whose function is to reduce sun exposure to 1 hour per day per interior space.
Interior Spacing The funeral is designed center is designed as a loop of spaces with great flexibility and various possibilities.
The Gardens The journey through the gardens is an invitation to the wake and a transition to a liberation as we walk though it towards the exit.
09
10
11
12
101. Foyer 102. Mortuory 103. Wake Room 104. Private Family Room 105. Church 106. Vertical Cors 107. Administration Hall 108. Waiting Room 109. Unisex Restrooms 110. Administration 111. Cafe 112. Warehouse/ Site 113. Underground garden 114. Parking 115. Parking lot 116. Hearses parking 117. Registration of bodies 118. Preparation of bodies 119.Staff restroom 120. Personnel dressing room 121. Refrigeration of bodies 122. Cosket storage 123. Materials storage 124. Acuamation Room 125. Access to the caffin lane
Architectural Plan The funeral is designed center is designed as a loop of spaces with great flexibility and various possibilities.
The Gardens
The Hallway
The Temple
The funeral center invites us to experience its gardens of which the loved one will be part by being planted and transformed into a tree.
The curved walls, the sensation given by materials and the views create an intimate atmosphere.
Located precisely at the tallest point of the overhang. The whole concept of the building arises from this space.
13
14
WATCH ME!!
15
Massing Development
PROJECT VIDEO
Digital maquete.
Main concept and design process of the project.
16
THE HUB (CD, SD)
THE L AKE CITY (CD, SD) WORK EXPERIENCE Design Assistant Professional Experience 2022-2023
GENESIS (ID-DD) 17
18
All the renderings of the project were made by me, and due to the quality achieved, it was not necessar y to outsource any renders for this plot!
THE HUB Concept Design | Schematic Design BIG | Bjarke Ingels Group Project lead: Jelena Vucic
Description:
Responsibilities:
March 2023 Strategically situated at a pivotal metro stop, this upcoming architectural marvel is poised to transform into a bustling and dynamic shopping center. As a cornerstone of Lake City's urban landscape, it aims to do much more than provide a diverse shopping experience. This multifaceted development is set to become an iconic landmark, forging a new identity for the city and acting as a vital connector for residents and visitors alike. With a strategic location, diverse retail offerings, and a commitment to enhancing urban connectivity, this structure promises to be a catalyst for growth and community engagement, solidifying its place as an integral part of Lake City's future.
•
Meeting with different departments to understand need. Compiling meeting notes and filtering them into the design.
•
Thoroughly documentin the existing space.
•
Preparing precedents studies and presentations of various design options.
•
Researching materials and products.
•
Preparing drawings for Class C/A costing and strategically implementing cost-cutting measures.
•
Creating diverse physical models for internal meetings and presentations.
• • •
19
Creating compelling visualizations for client presentations. Study various options and possibilities in the different spaces of the building.
20
Form Build-up
M
1. Epic exit from metro station. ᮴ၙװᥰஹኀੀɁᆖ
2. Immersive courtyard experience. ഫජࡿၙ;ᩢ˃᭝
EPIC EXIT FROM METRO STATION
BIG | CLAC - Chengdu Lake City
BIG | CLAC - Chengdu Lake City
IMMERSIVE COURTYARD EXPERIENCE
Presence towards highway ਘңᮃៈၙ˃ᤩ
Entrance plaza ңͩѿࡈࡷ׳
3. Epic corner to highway and welcoming plaza. ᮴ၙᮃៈ ͩѿࡈ̩ၙ׳ᚗࣦ
EPIC CORNER TO HIGHWAY & WELCOMING ENTRANCE PLAZA
BIG | CLAC - Chengdu Lake City
4. View out towards the lake city. ңฬၙرᚌᤨ BIG | CLAC - Chengdu Lake City
ኡȆޣȐᆰ᪶ၙࡴᇢᛵᚢ 6. Connection between roof and facade.
ύ࿈నɛРҙၙޞ፞ኞ 5. Enhanced multilevel connection by step well.
ENHANCED MULTI LEVEL CONNECTION BY STEP WELL
BIG | CLAC - Chengdu Lake City
VIEW OUT TOWARDS LAKE CITY
BIG | CLAC - Chengdu Lake City
CONNECTION BETWEEN ROOF AND FACADE
7. Coherent Envolope. ᡛክȆ᐀ၙڀᣙࣦ࢝ BIG | CLAC - Chengdu Lake City
21
COHERENT ENVELOPE
22
Exploded Axonometric Consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
L3
L2
L1
Up only Down only
Ȧࡠనʾጅ
BIG | CLAC - Chengdu Lake City
LC proposed BIG to provide escalator selection.
ATRIUM ESCALATOR POSITION
2)ࡴᚻ(/-ੱ˨నࠚޜᡴ
OPTION 1A
OPTION 1B
OPTION 1C
OPTION 1D
OPTION 2A
OPTION 2B
OPTION 2C
OPTION 2D
OPTION 2E
23 BIG | CLAC - Chengdu Lake City
șȮѵᬯ Ȧࡠనʾጅ
LC FEEDBACK - ESCALATOR POSITION
24
Շșᆖ௸ࣆᭅϾ϶
BIG | CLAC - Chengdu Lake City 25
RETAIL KEY DRIVERS 26
The original assigment was to make model for internal reference, but since it turned out so well, it was taken to China and the clients decided to keep it!
CLAC_ CHENGDU LAKE CITY HUB NO.5, 2020-80, Shuangliu Distric, Chengdu, China
A
B
C
D
E
F
G
H
I
J
K
И֢ۨୃ١ՅࡶԚ м՚ֲ֪ 噺Ԫ֪о ۨୃࢣֽாऩ
ARCHITECT
T+45 72 21 72 27 big@big.dk
Bjarke Ingels Group
4VOELBK /PSEIBWO ,«CFOIBWO %FONBSL
8200
6200
10800
9700
9700
9700
9700
9000
9000
7200
T +86 028 8633 3800
LOCAL ARCHITECT
brand@jzfz.com.cn
JZFZ Architectural Design Co., Ltd ׂӕސИڏউગઋਁѡ߄ஒҸ՛ 7-15F, Tower A. Crland Plaza. No.8,LiuLi Road , Chengdu, P.R.C И֢ۨୃ١䛋ࣸ૨ ՚Ԣ䃔 ࠡ ڇ'֫ٺ
STRUCTURE
T +86 020 8108 7767
ڏࣿ߭ؠٖٺউৈߣગઋзԇ۱ͧޯପՠѪͨ RM.507-509 Oriental Financial Center, No.140 Dongfeng West Road,
ଂષঀ Plot Boundary
ڎक़ S૭ࣙ 5 meters Setback
1
࣐֩ঀ Site Boundary
֩ଭਇ֟ܰӱ Metro Control Line
gz@gzrbs.com
RBS Structural Engineering Design Associates
Guangzhou, China ٖٺ١Б૨ ՚Бސ壝 ⨝ם
MEP
T +86 020 3718 0088
China-Chengdu-LacadiereLakeCity@wsp.com WSP Global Inc, Guangzhou
ॠ߭峭ٗ३ ߐ܉Ԙч ߄ஒҸ՛ٖٺӣҸ՛ 5/F, Kingold Century No. 62, Jinsui Road, Tianhe District, Guangzhou ٖٺ١מԚ䲞૨ ՚⛑操֢எ壝Иك ڶ
TRAFFIC
T +86 0755 3336 1898
7200
China@mvaasia.com MVA CHINA
㐵ଇсପு߄ஒҸ՛ Room 906, No.98 Fuhua 1st Road, Futian Distric, Shenzhen
2
ࢋⴽ١क़ँԚक़Ԣ▲૨ ՚Ԥ ⨝ם
9000
3
+492.50
+486.50
9000
+480.50
4 יரՖ Outdoor Terrace
9700
SӔ
2.2 m clear height
+498.50
5
ЈࡘڈஓЇॱ Sunken Courtyard Void
9700
101. Foyer
DN
UP
7
יӒࢽ䀿ॱݹݢ Outdoor AI-cooled Heat Pumps Area 157m²
9700
105. Church 106. Vertical Cors
߄Օऀॱ
usable space under sloping roof
יԕ࣒Џऀ۰ Outsourced Property Room 183m²
+474.40
9700
103. Wake Room 104. Private Family Room
DN
+486.50
6
102. Mortuory
ਫߐڋي
Art Corridor
107. Administration Hall
8
5700
7200
112. Warehouse/ Site 113. Underground garden
2000
ऄࠐԶ Elevator Lobby
7200
115. Parking lot
11
116. Hearses parking
UP
+498.50
10
114. Parking
ࢹיߑॱݹݢ Fume Fan Area 116m²
DN DN יரՖ Outdoor Terrace
9
SӔ
2.2 m clear height
߄Օऀॱ
usable space under sloping roof
5700
10800
110. Administration 111. Cafe
+492.50
࣒ЏԄҸ Retail Property Management Office 50m²
ॱલՃߑࢹ۰ AC & Smoking Extraction Room 70m²
ਫߐڋي
Art Corridor
ߑࢹ۰ Oil Fume Exhaust Fan Room 63m²
ॱલЊߑࢹ۰ ١Ӓ⢹֘ߑ۰ B1 Supermarket Ճॱલࡊ䀿۰ AC & Smoking Condenser area Extraction Room 47m² & AC Water Pump Room 63m²
ࢃஅѹࡊঔՃࡊ䀿۰ Head Fire Service
Plant Room +498.50 73m²
ૄࠐ Cargo ࠐؚ ࠐؚ Public Public Elevator Elevator Elevator
2000
108. Waiting Room 109. Unisex Restrooms
117. Registration of bodies KEY PLAN
118. Preparation of bodies 119.Staff restroom 120. Personnel dressing room
FOR PROJECT NOTES, SYMBOLS AND ABBREVIATIONS SEE LEGEND
ாऩપ֣҆ͫޢՃࡨୋबҼҒێબՀৰ֣҆
121. Refrigeration of bodies 122. Cosket storage
Issue
Rev. Date
Description
Init.
FLOOR PLAN L4 - MEP ٵكவ֣ ગكו
123. Materials storage 124. Acuamation Room
Sheet No. / Rev.
A-113
Schematic Design SD
125. Access to the caffin lane
Init. YW
Control YR
Appr. HKL
Project No. 22003
Date 31/08/2023
Format A0
Scale 1:200 Phase SD-25%
ࡀޞ᪶
Architectural Plan
L4
Chengdu Lake City
The Hub is designed as a loop of spaces with great flexibility and various possibilities.
Entrance Plaza
The Metro Gate
Top View
Physical Model
The Hub invites us to experience its shopping mall with green terraces integrated.
The metro gate was designed to create an intimate atmosphere.
Shows the main concept of the green terraces.
Physical model made by me.
27
28
The Lake City Concept Design | Schematic Design BIG | Bjarke Ingels Group Project lead: Jelena Vucic
Description:
Responsibilities:
March 2023 Introducing an extraordinary retail project, inspired by the gentle, rhythmic waves lapping at the shore of a picturesque lake. This innovative architectural marvel is a harmonious fusion of nature and commerce. Its wave-like design captures the fluidity and grace of the water, with undulating lines and organic curves that create a unique and welcoming shopping environment. Each wave represents a distinct shopping zone, seamlessly integrating natural elements, like lush landscaping and panoramic views of the serene lake, into the retail experience. The project is a true celebration of sustainability, employing eco-friendly materials and energy-efficient technologies to minimize its environmental footprint. The innovative retail project by the lakeshore embodies a new era of retail design, where nature and architecture coalesce, creating a space where visitors can shop, relax, and immerse themselves in the tranquil ambiance of the lake's edge. It's an invitation to experience retail in a whole new dimension, one where waves of creativity and commerce meet at the water's edge.
•
Meeting with different departments to understand need. Compiling meeting notes and filtering them into the design.
•
Thoroughly documentin the existing space.
•
Preparing precedents studies and presentations of various design options.
•
Researching materials and products.
•
Preparing drawings for Class C/A costing and strategically implementing cost-cutting measures.
•
Creating diverse physical models for internal meetings and presentations.
• • •
29
Creating compelling visualizations for client presentations. Study various options and possibilities in the different spaces of the building.
30
Form Build-up
31
1. Site.
2. Immersive arrival experience.
3. Building organization and main flow.
4. Program.
5. Addition of canals into the program.
6. Porgram orientation to maximize lake view.
5. Wave canopy providing sun shade and wwater cover.
6. Design overview.
Outsource render by AtChain, but prepared and modeled the entire scene + proposed the camera angle for the space.
32
Studies Consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
33
Outsource render by AtChain, but prepared and modeled the entire scene + proposed the camera angle for the space.
34
Paper physical model handcraf ted by me.
35
36
RENDERS MADE BY ME. PUBLISHED IN SEVERAL MEXICAN ARCHITECTURE MAGAZINES (DOMUS, HABITAT.)AND IN GLR´S NEW BOOK.
WORK EXPERIENCE Visualization Especialist Professional Experience 2021-2022
37
38
RENDERS MADE BY ME. PUBLISHED IN GLR´S NEW BOOK.
39
RENDERS MADE BY ME. PUBLISHED IN GLR´S NEW BOOK.
40
RENDERS MADE BY ME. PUBLISHED IN GLR´S NEW BOOK.
41
RENDERS MADE BY ME. PUBLISHED IN GLR´S NEW BOOK.
42