Pagan | Full Portfolio

Page 1

Jose David Pagan

Cornell University B. Arch ‘15

Architecture Portfolio 2011-2013


Jose David Pagan | Portfolio Cornell University B. Arch ‘15

Ta b l e o f C o n t e n t s

The Inlet

2

Museum of the Unexpected

5

Treetop Walkway Observation Tower

7

Masterplan: Roosevelt Island

9

Japanese Archtiecture

12

Owego Town Hall

15

Traveling Studio Synopsis

20


2

The Inlet, Ithaca, NY | Site Research & Analysis

[re] Habiting The Inlet

D e s i g n S t u d i o Fa l l 2 0 1 2 T h e I n l e t , I t h a c a , N e w Yo r k After careful consideration of the existing spatial and programmatic conditions in the downtown Ithaca area I noted how its main spine and adjacent spaces had been developed and contained the infrastructure for a sustainable existence: dining, retail, leisure, green space, a r t s , i n s t i t u t i o n a l a n d o ffi c e b u i l d i n g s , e t c . I therefore looked at The Inlet, walking distance from the downtown area, as a possible development space with a location in between the dense urban fabric and a more spread out mountaineous condition that exists in Cayuga Lake. The idea was to develop a space and program that made active use of the site in both its adjacency to the downtown area and unique location which provides great views and access to water activities. The Inlet could therefore work as a second and equally important destination to the downtown Ithaca area.

offices

green

2

hotel

retail restaurants theatre

library hotel

offices

river

4

1 3

A

B B

B B


Site Plan | Proposed Development

The proposal for The Inlet consists of two hotels: one short term and one long term. They are placed above a public strip that plays with interior and exterior conditions to provide a space for leisure and entertainment usable all year long. The main spine connects all t h e s p a c e s a n d i s o n l y i n t e r r u p t e d i n t h e c e n t r a l s p a c e o f t h e g r o u n d fl o o r o f t h e l o n g s t a y hotel, where it is partially enclosed by two gardens that mark the location of skylights, and frame views of the lake and the city while at the same time providing access to the building from the boardwalk. The two hotel volumes have the same width. The short stay grows u pw a rd w h i l e t h e l o n g - s t ay e x p a n d s h o r i zo n t a l l y. B o t h b u i l d i n g s h ave vo l u m e s t h a t e x t r u d e f r o m t h e f a c a d e a t s p e c i fi c p o i n t s t o h i g h l i g h t t h e m a s t e r s u i t e s / a c t i v i t y s p a ce s a n d p rov i d e v i e ws o f t h e s u r ro u n d i n g s ce n e r y.

1

1

5 11

2 4

5

5

5

2

3

8

7 8

6

10

6

10

7

5

8

11

1 2 3 4 5 6

Parking Public Entrance Hotel Lobby Hotel Entrance Retail/ Rented Space Retail/Food Carts

7 Interior Green Space 8 Interior Public Space 9 Corridor to Marina 10 Bar/Restaurant 11 Public Plaza

9

3


Building Plan | Short & Long Stay Hotel

4


Museum of the Unexpected D e s i g n S t u d i o Fa l l 2 0 1 1

B i n g h a m p t o n , N e w Yo r k

Concept Model

Entrance

South View

Site Map


Museum of the Unexpected | Building Plan

6

9

2

2 2

7

2 2 2 5

4

3

6

2

1

8

1 2 3 4 5

Foyer | Tickets Exhibition Storage Room Cafe Bathrooms

6 Museum Shop 7 Projection Wall 8 Parking 9 Private Entrance Road 10 Piazza | Boardwalk Entrance

10


Tr e e t o p W a l k w a y O b s e r v a t i o n To w e r Structural Elements & Concepts III

I t h a c a , N e w Yo r k

A-1

A-2

B-1

B-4

A-2

B-3 B-1

A-1 Glulam Bracing A-2 Steel Plate B-1 Beam to Beam Connection B-2

B-2 Foundation B-3 Cross-Bracing B-4 Cross Bracing


For the Structual Elements & Concepts course we were required to work in partners to analyze and replicate the structural system of a structure/building built in the last decade. We choose the treetop walkway observation tower of the Bavaria Forest. After carefully analyzing all the elements and systems that made up the Observation Tower we chose to build it at a 1:50 scale and made a work plan to carry out the project throughout its different phases. All the elements were hand-made: I-beams, wood beams, cross bracing, tension plate, glulam beams, rockite and tree log base, and wood beams.


Roosevelt Island Masterplan | Exploded Axon 12

13

1

2

Layer A

3

Main Buildings

4

5

11

10

Layer C

9

Topography

8

[”Islands”]

7

Layer B

Primary + Supporting Buildings

6

[Density]

K PAR

Layer D

ING

Water

[Isolation] PARKING

ING

K PAR

Layer E

Circulation [Collective Transport]

Design Parameters

Layer F

Sustainability [Embeded]

COLLECTIVE + TRANSPORTATION

WATER STORAGE +

ENERGY GENERATING+ GARDENS

GREEN AREAS and TREES

GRID

SITE CONTEXT

FLOOD LEVELS

VIEWS

DAYLIGHT


10

Roosevelt Island Masterplan Design Studio Spring 2013

R o o s e v e l t I s l a n d , N e w Yo r k , N e w Yo r k


Project Description ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ENTERTAINMENT

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

GR EE N

EN

GR E

GREEN

G HOUSIN

HOUSING

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ACAD EMIC

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

H

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

HOU

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ACADEMIC

S

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

C

SING

SING

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

C

HOU

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

CE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE ESTCODE

GREEN

RV I

SE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ACAD ACADEMIC EMIC

G

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

A CADEMIC

HOU

ESTCODE

ESTCODE

ESTCODE ESTCODE

ESTCODE

C

SING

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

E

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

EN TE RT AI -ME N NT

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

S ERVICES

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

TRANSPORTATION

S

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ACADEMIC

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

E

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

AL

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

CI

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

GREEN

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

C OMM ER

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

G

C

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

MIC

C C

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ENERGY

S

COMMERCIAL

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

DEMIC

ACA DEM -IC

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

CIAL ACADEMIC

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

EN

ER

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ACA

NTERTAINMENT

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

GRE

MM

E

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

AC A D E

C COMM CO

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

GREEN

GREEN

ESTCODE

Shadow Plan

C

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

GREEN S

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ENTER-

ESTCODE

ESTCODE

ESTCODE

ESTCODE

TAINMENT

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

ESTCODE

Roosevelt Island | Plan & Process Diagram 11

A

SERVICES HOUSING +SERVICES

Programmatic Plan

ESTCODE

ESTCODE

ESTCODE

ESTCODE ESTCODE ESTCODE

ESTCODE

ESTCODE

ESTCODE ESTCODE ESTCODE ESTCODE

T h e R o o s e v e l t I s l a n d M a s t e r p l a n h a d a s i t s g o a l t o e s t a b l i s h a c o m p r e h e n s i v e f r a m e w o r k t h a t p r o v i d e d f o r s p e c i fi c p r o g r a m m a t i c a n d s p a t i a l r e q u i r e m e n t s . A t t h e s a m e time, I sought to create a masterplan that incorporated sustainable ideas and provided the infrastructure for energy gardens, public transportation, water storage, and g r e e n a r e a s a n d p a r k s . T h e i d e a w a s t o c r e a t e d i ff e r e n t l a y e r s t h a t w o r k e d a s c o h e r e n t w h o l e : t o p o g r a p h y , c i r c u l a t i o n , m a i n b u i l d i n g s , a n d s u p p o r t i n g b u i l d i n g s . T h e t o p o g r a p h y o r g a n i z e d t h e i s l a n d i n a s e r i e s o f i s l a n d s t h a t w e r e e l e v a t e d o ff t h e g r o u n d a n d h e l p e d t o s e p a r a t e t h e i s l a n d i n t o d i ff e r e n t c l u s t e r s o f s t r u c t u r e s - t h i s a d d r e s s e d c o n c e r n s o f f u t u r e fl o o d s a n d a l s o k e p t i n m i n d t h e i d e a o f a c a m p u s t h a t a l l o w s a n d i n s p i r e s c o l l a b o r a t i o n . E a c h i s l a n d h a d a m a i n b u i l d i n g b a s e d o n t h e m a i n programmatic categories- these buildings were in turn mixed with compatible programs. Housing was mixed with entertainment and leisure programmes while work was m i x e d w i t h a c a d e m i c . M e c h a n i c a l a n d s e r v i c e f a c i l i t i e s w e r e s p r e a d t h r o u g h o u t t h e d i ff e r e n t i s l a n d s t o a d d r e s s t h e s p e c i fi c n e e d s p e r t a i n i n g t o t h e i n d i v i d u a l programmes. Therefore, Roosevelt Island was split into small clusters of islands that had a clear hierarchy of a main building and supporting structures. The island had a m a i n c i rc u l ato r y s p i n e t h at l e d to t h e Lo u i s K a h n m e m o r i a l m o n u m e nt a n d c ro s s e d t h ro u g h t h e m i d d l e o f a l l t h e i s l a n d s. Fu r t h e r m o re, p e d e s t r i a n wa l k ways l i n k e d a l l the islands between themselves as well as to the circulatory spine. ESTCODE

ESTCODE

ESTCODE


Infinite Possibilities | Top View of Model

“ The timeless modernity of this prototype of the Japanese residence is striking… a sequence of interior spaces suggests an unlimited flexibility by sliding walls, and windows, no static spaces, no symmetry, no center focus.” -Walter Gropius

12


Infinite Possibilities

J a p a n e s e A r c h i t e c t u r e Fa l l 2 0 1 1 I t h a c a , N e w Yo r k

II

III

V

VII

I

IV

VI

VIII

Plan

Side Elevation

Modular Japanese House Building Plan

T h e p l a n f o r t h i s h o u s e i s b a s e d o ff t h e ‘ k a k o l ’ t y p e t e a room. After studying Japanese Architecture, I was intere s t e d i n i t s f r e e p l a n a n d fl e x i b l e n a t u r e . U s i n g t h e t a t a m i mat as a modular unit I sough to create the infrastructure f o r a h o u s e o f “ i n fi n i t e p o s s i b i l i t i e s ”. T h i s i m p l i e s t h a t t h e walls can be moved and re-arranged to separate/join spaces, enclose/open them, etc. The same happens with its f a c a d e. Fu r t h e r m o re, e ve n w h e n l e f t a s a n u n d i v i d e d o p e n space the tatami mats can still be used to create private s p a c e s t h e r e f o r e p r o v i d i n g “ i n fi n i t e p o s s i b i l i t i e s ” f o r t h e spatial arrangement of this house.


Infinite Possibilities | Possible Arrangements

14


Terraced Town Hall

Design Studio Spring 2012 O w e g o , N e w Yo r k


Owego Town Hall | Plan & Detailed Section

Substrate Gravel Filter Fabric Drainage Mat Protection Board Waterproofing Membrane Vegetation

Cross-Beam Timber Joists Mullions Double Glazed Windows Radiant Flooring

Sprinklers Interior Sheathing Vapor Barrier Wood Louvred Fins Plumbing

T h e Te r r a c e d To w n H a l l w a s e n v i s i o n e d t o u s e l o c a l r e s o u r c e s a n d establish a relationship between the city and the building and simultaneously between the front and back of the building. In the front is one of the main streets of the town and behind is a riverpath that creates a space for leisure. Through shifting the spaces, a hierarchy is established with a meeting room cantilevering over the riverpath to provide both views of the city and the r i ve r a s we l l a s to p rov i d e s h a d e fo r t h e e x te r i o r s p a ce s b e l ow.

Slatted Decking Drain Waterproof Board Sheathing Insulation Exterior Sheathing Exterior Cladding Interior Sheathing Duct

Glulam Girder Substrate Gravel Filter Fabric Drainage Mat Protection Board Waterproofing Membrane Balcony

Vapor Barrier Mullion Glass Door

Wood Ceiling Fins Lights Concrete Sidewalk Gravel Drain Pipe

SIP Air Cavity Subfloor Flooring Sill Plate

Double Glazing Slatted Decking Drain Waterproof Board Sheathing

Wood Louvred Fins

Cross-Beam Timber Air Cavity

Insulation Footing

Double Glazing

Window Sill Girder Flooring Subfloor Joists Wood Ceiling Fins

Detailed Section

16


Owego Town Hall | Front Elevation

17


Owego Town Hall | Section Perspective & Structure

18


P.O. Box 3340 Guaynabo, PR 00970

   

   

  

   

Phone +39 342 6658321 E-mail jdp249@cornell.edu


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.