Portfolio Sample, 2017

Page 1

Portfolio Sample 2017

panayiotis hadjisergis


Centro de Cuentapropismo Havana, Cuba (2017)

permanent construction long-term use

An institution for helping and educating micro-entrepreneurs, as well as hosting and temporarily incubating their business startups. Following the recent liberation of micro-entrepreneurship in Cuba, CdC aims to address both resultant short-term problems - lack of commercial space, lack of exposure for startups, and long-standing issues - lack of business education and culture.

temporary construction short-term use

+5 years underside of the building used for temporary commercial units / startup incubators, attached temporarily to the main structure of the building

2


TU Delft academic project | 2017

orientation

relationships school

administration commercial street

coworking auditorium

startups

nt

ion

cat

exhibition

lounge, kitchen

construction

building in use

u ed

seminar rooms

library

start-ups

ane

p

erm

temporary

educational facilities as a physical and metaphorical shelter for new startups

+50 years commercial space is now more available around Havana the underside of the building is stripped down and becomes a sheltered public space

3


Centro de Cuentapropismo | Havana, Cuba

the permanent building raised to reveal and emphasize the lively activity below it

4


TU Delft academic project | 2017

physical model - main floorslabs cast in transparent resin to reveal interior arrangement and relationship between floors

5


Saltaire public factory Saltaire, UK (2014)

The building is focused on the improvement of Saltaire’s public realm without damaging its World Heritage built fabric. It is a digital manufacture factory, prototyping, testing and fabricating bespoke public realm interventions for Saltaire. The pivotal space is the central courtyard, where digitally fabricated proposals for Saltaire’s public space are constructed and tested before being adopted around the city.

6


University of Sheffield academic project | 2014

w on ati ric fab

p

sho

ks or p ho

ing

ch tea

rk wo

tre

ea th re tu

lec n

ub

p er rn co

public courtyard as a theatre set, public activity at the centre stage

students

public

atio istr n i m ad ion ibit h x e

staff

7


Kip Island Auditorium Riga, Latvia (2017)

2

nd

place

BB

student award

Competition entry with Deyan Saev, awarded 2nd place. Design of an extension to the existing facilities of the Riga Exhibition Centre. Primary aim was the creation of an iconic image matching its status as the leading exhibition hall in the Baltic countries. Winning entries would be considered for construction.

the front facade is inspired by lenticular prints, its serrated form provides a dual character based on your viewpoint

8

BB

green award


Competition entry | 2017

current buildings - no coherence, no light

serrated facade for 2 different skewed perspectives

new functions to fill in the gap

mark the entrance

dominant facade - too long

multiple access points

9


Serpentine Columbarium

1

London, UK (2015)

Competition entry, submitted as MSMR Architects (produced in a group of 3), awarded 1st place and published in AJ AJ/RIW ideas competition for an underground structure below a UK landmark. Proposed design is a columbarium carved around the Serpentine lake (Hyde park) as a series of tranquil, private terraces, connected to London’s most iconic green space.

Panopticon VR

conceptual environment (2016) Creation of a virtual reality environment - a panopticon prison, that can accomodate a walkthrough and a short narrative experience. Produced with Autodesk Maya and Unreal Engine, tested on Occulus Rift VR headset.

10

st

place

Hyde Park

the Serpentine lake


‘Helix’ acoustic module

Delft, Netherlands / anywhere (2015) 1

2

3

4

5

6

7

8

Design of an acoustic module, targeting speech and machine noise. The module can be flat-packed for economic transportation, and assembled easily by the user to a configuration that fits the space. Group project with Ioanna Christia Exhibited at Gevel 2016 construction fair in Rotterdam

friction joints built into the geometry

stackable into varied arrangements

11


Salesian Community House Battersea / London, UK (2017)

Community house for the Salesians of Don Bosco, part of the overall redevelopment of buildings for the St John Bosco College in Battersea. The project includes accommodation for members of the religious community, visiting residents and a chapel. Completed in 2016. Received High Commendation at UK Property Awards Shortlisted for RIBA London Awards and Brick Awards Published on ArchDaily

main involvement updated Revit model and main drawings for construction stage (stage 5 - RIBA plan of work) prepared joinery package which included the design and detailing of interior fittings. Communicated with MEP consultants for requirements. attended and recorded on-site construction progress meetings, discussed developments and issues arising. 12

professional work

photos by JZA Photography


New Burlington place Mayfair / London, UK (ongoing)

One off house in Central London. The proposed house includes two bedrooms, kitchen and living space. The design aims to maximize light and spacious accommodation within a limited footprint. The project is currently still at design stage.

main involvement design of facade - materiality and composition. Attended meetings with client and planning consultants to discuss proposal developed several options for interior layout

13



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.