1 minute read

4.2.3 Implementation - Community framework

SPONGE COLLABORATIVE + WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Advertisement

Figure 73: Graphic showing the stakeholders involved, data-set required, and the necessary allied projects for the successful implementation of mobility layer (Image Credit: Weaving with Water team)

4.2.3 Implementation - Community framework:

Detailed planning and seamless implementation of the community framework require a range of datasets, collaboration across departments, and rigorous stakeholder consultation. The critical datasets that should be investigated are detailed survey of existing neighbourhood-level service infrastructure, land value & real estate analysis, waste movement mapping, and mapping of existing local CSOs, RWAs, and other champions.

For achieving the maximum output, it is recommended to kick-start the allied projects along with a detailed study done using all required data-set.

SPONGE COLLABORATIVE + WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Figure 74 - Mapping of the stakeholders who will be responsible to adopt policies, implement interventions, and maintain them, for projects in the Community Framework (Image Credit: Sponge Collaborative)

This article is from: