Paul H. Stanley Recent Work-- 2016-2017 St.Petersburg, 2015 Sarasota, 2008-2014 Gainesville
work done at Hayes | Cumming Architects, PA
High School Admin. Center PROGRAM-
New addition and renovation for a growing high school to include offices for all senior administration/ admissions/ guidance/ counseling/ clinic staff
LOCATION-
Tampa, FL
SIZE-
10,000 S.F. addition to an existing 5,000 S.F. brother’s residence
work done at Hayes | Cumming Architects, PA
Music Studio/ Apartments PROGRAM-
Mixed-use building with two apartments/ two music studios and lounge area.
LOCATION-
Warehouse Arts District, St.Pete
SIZE-
4,200 sf
work done at Hayes | Cumming Architects, PA
Trinity Golf + Country Club PROGRAM-
New fitness center/ pro shop/ tensiile-structure covered central gathering area for a community hoping to increase their membership and reinvision their facilities.
LOCATION-
New Port Richey, FL
SIZE-
8,000 S.F. Interior, 60’-0” W x 100’-0” proposed tensile structure
Drawings completed in Revit 2012, Photoshop, Prismacolors, Colored Pencils
work done at Hayes | Cumming Architects, PA
Post-Industrial Art’s Enclave PROGRAM-
Competitively-priced Artist lofts in a converted warehouse as a catalyst for growth while helping avoid the issues of rising rent prices in a upand-coming neighborhood
LOCATION-
Warehouse Arts District, St.Pete
SIZE-
10,000 sf
hayes | cumming architects
GENERAL NOTES 1. STACKED BOND SEAM BEGINS AT CENTERLINE OF BENT AT GRID LINE #
2210 central ave, suite 100 st. petersburg, fl 33712 ph 727.321.0900 fx 727.321.0903 AA26001260 hc-arc.com B3
-
B4
A1
A-202
---
A-202
A-201
hayes | cumming architects
GENERAL LEGEND PROPERTY DATA: PROPERTYIDENTIFICATION:
KEYNOTE LEGEND
Roof 117' - 4"
1
NEW 8" STACKED BOND EXPOSED CMU W/ RAKED JOINTS
2
NEW COMPOSITE SLAB
3
NEW CONCRETE SPREAD FOOTING SEE STRUCTURAL FOR DETAILS
F.C., LOT A & N 16 HIGHLAND CREST & VAC 12, BLK 2 PROPERTY STREET ADDRESS: PARCEL I.D.: ZONING DISTRICT: CURRENT USE: FLOOD HAZARD AREA:
5TH AVENUE SOUTH
andrew m. hayes, aia, leed bd+c
STUDIO 22ND STREET SOUTH
207
members of
SECOND FLOOR 109' - 2 15/16"
PIN
FIRST FLOOR - 1A 100' - 0" FIRST FLOOR - 1B 99' - 1 1/2"
ST LA EL
EXISTING NON-COMFORMING RAMP TO REMAIN
2
NEW ADA ACCESSIBLE RAMP
3
RESTRIPING ONLY
4
COVERED AREA
35’-0” FOR BUILDINGS, 6’-0” FOR OUTDOOR STORAGE ACTUAL BUILDING HEIGHT: 27’-2” BUILDING SETBACKS - MINIMUM ALLOWABLE: ABUTTING NON-INDUSTRIAL LOT/MAJOR STREET : ABUTTING INDUSTRIAL LOT: STREET: 10’-0” 0’-0” INTERIOR YARD: 20’-0” 0’-0”
PARKING REQUIRED BY LAND USE: OFFICE, GENERAL - 1/400 GSF: 4,800 / 400 = 12 SPACES RETAIL, NEIGHBORHOOD SCALE -1/600 GSF : 4916 – 1,200 = 3,716/600 = 7 SPACES (FIRST 1200 GSF IS EXEMPT) STUDIO - 1/500 GSF: 6,482/500 = 13 SPACES WAREHOUSE: 1/2000 GSF 31,043/2000 = 16 SPACES TOTAL REQUIRED PARKING SPACES = 48 SPACES PROVIDED ON SITE: AUTOMOBILE = 52 SPACES MOTORBIKE (20 IN LIEU OF 5 AUTOMOBILE PARKING @ 4/AUTO)= 5 SPACES BICYCLE = 10 SPACES TOTAL PROVIDED PARKING SPACES = 57 SPACES
© Copyright - All Rights Reserved
members of
American Institute of Architects
SITE LEGEND
EXISTING NEIGHBORHOOD RETAIL 4,916
IL RA
andrew m. hayes, aia, leed bd+c
BUILDING ENVELOPE: BUILDING HEIGHT: MAXIMUM BUILDING HEIGHT:
CONSULTANT: PROPERTY LINE NEW CONCRETE SIDEWALK PERVIOUS GRAVEL EXISTING GRADE
EL XX.X
XX .X
107 159SF
1
AA26001260 hc-arc.com
0.75 x 116,357 SQ. FT. = 87,268
ACTUAL F.A.R. = 28,267 + 10,633 + 4,800 SQ. FT. = 43,700 SQ. FT. MAX. IMPERVIOUS SURFACE RATIO (I.S.R.)= 0.95 x 116,357 SQ. FT. = 110,539 SQ. FT. ACTUAL I.S.R.= TBD BY CIVIL= ZZ,ZZZ SQ. FT.
NEW GRADE
EL
American Institute of Architects
SQ. FT.
2210 central ave, suite 100 st. petersburg, fl 33712 ph 727.321.0900 fx 727.321.0903
N/A 2.67 ACRES
MAX. FLOOR AREA RATIO (F.A.R.)=
KEYNOTE LEGEND
STUDIO
515 22ND ST. SOUTH, ST PETERSBURG, FL 33712 23-31-16-83844-000-0010 INDUSTRIAL TRADITIONAL (IT) STORAGE AND ARTIST STUDIOS/SHOPS MAP #: 12103C0218G ZONE X
DEVELOPMENT POTENTIAL: MINIMUM LOT AREA: ACTUAL LAND AREA OF PARCEL:
© Copyright - All Rights Reserved
162SF
SOFT WATER LAUNDRY'S REPLAT NO. 1 UNNUMBERED LOT AND SOFT WATER LAUNDRY'S REPLAT NO. 2 UNNUMBERED LOT AND WEST'S REPLAT, FT OF LOTS 10, 11, 12, BLK 2 OF ALLEY LYING N OF LOTS 9 THRU
CONSULTANT:
ELECTRICAL NEW TRANSFORMER
T
EXISTING WAREHOUSE 5555
EO
ELECTRICAL OVERHEAD SERVICE LINE
FIRE
NEW FIRE LINE PIPING
CLIENT / PROJECT NAME:
ELEC
EXISTING SURFACE MOUNTED ELECTRICAL METER GAS
3
EXISTING SURFACE MOUNTED GAS METER
ALTERATIONS TO
PW
EXISTING WATER METER
C1
CORRIDOR 114 FACING WEST 1/4" = 1'-0"
0'
2'
4'
8'
EA AR
OF
W
G IN IST EX
EXISTING WAREHOUSE 4,236
ORK
AS
T AL PH
PW
EXISTING POTABLE WATER SUPPLY PIPING
SAN
EXISTING SANITARY LINE PIPING
GAS
EXISTING GAS LINE PIPING
C.O.
EXISTING CLEAN OUT
F.H. F.D.C.
ARTS XCHANGE
EXISTING FIRE HYDRANT FIRE DEPARTMENT CONNECTION EXISTING TREE
EXISTING
WAREHOUSE CLIENT / PROJECT NAME:
NEW SHRUB/BUSHES
4,440
-
B5
---
A-202
LANDSCAPE AREA/BERM/GROUND COVER
A3 A-301
EXISTING WAREHOUSE 6,220
B1 A-202
0" G 0' IN 10 3" ILD . = ' BU EV = 51 EL . NG EV ISTI MED EL EX SSU AL A CTU A
IST EX
G IN
AL PH AS
PHASE MAP
EXISTING WAREHOUSE 5,792
ALTERATIONS TO T
EXISTING ARTS XCHANGE WAREHOUSE
Roof 117' - 4"
EXISTING STUDIOS 6,482
) (3
2
DN
1 3
9'
2"
N
- 0"
EXISTING OFFICE 4,800
P. TY
'24
9
AREA OF WORK
1"
PERVIOUS GRAVEL
BUILDING KEY PLAN
AREA MAP
Original drawing is 30"x42". Scale accordingly if reduced.
SHEET TITLE:
6
3
7
SITE PLAN
ONE WAY
PROJECT LOCATION REVISIONS: 15' - 9"
107
S IO UD ST
1" = 100'-0"
STUDIO 3 6
4' - 6"
159SF
W NE S IO
0"
P. TY
6
'26
UD ST
E US O EH AR W
A4 A-001
'18
SECOND FLOOR 109' - 2 15/16"
G IN IST EX
) (2 G IN IST EX
I-C
4
207
) (1
I-A
STUDIO 162SF
I-B
S ASE PH
4,800
ONE WAY
A1 A-201
7
EXISTING ASPHALT
24' - 0"
DEMO EXISTING
9' - 0"
3
EXISTING FIRE TRUCK ACCESS
20' - 0"
EXISTING ASPHALT
FIRST FLOOR - 1A 100' - 0"
TYP.
1/4" = 1'-0"
0'
2'
4'
8'
1/7/2016 11:12:18 AM
B1
CORRIDOR 114 FACING EAST
12' - 0"
TYP.
18' - 0"
PERVIOUS GRAVEL 14
A4 N
SITE PLAN 1" = 20'-0"
0'
10'
20'
40'
5' - 0"
DATE ISSUED: 03/12/2015 PROJECT NO.: 13.0012
H/C Parking Detail 1/4" = 1'-0"
0'
2'
4'
8'
NORTH
NTS
DRAWING NUMBER:
A-001
SHEET:
11
OF
7
work done at Hayes | Cumming Architects, PA
Munitions Depot Renovation PROGRAM-
Gathering space/ cultural + event center along the under-utilized shore of the decomissioned Truman Naval Complex
LOCATION-
Key West
SIZE-
12,500 S.F.
Drawings completed in Revit 2012, Photoshop,
work done at Hayes | Cumming Architects, PA
Contemporary Warehouse Renovation PROGRAM-
Phased renovation of 14 warehouse/industrial units for a local developer including new storefronts, ADA facilities, and new fire-rated partitions.
LOCATION-
Lealman area, St.Petersburg
SIZE-
44,000 S.F.
SHEET KEYNOTES ROOF HEIGHT 4 126' - 0"
ROOF HEIGHT 3 121' - 3"
1
2
PAINTED CMU
2
PAINTED METAL SIDING
3
EXISTING STAIR
2210 cen st. peter ph 727.3 fx 727.3
4
FALSE WINDOWS TINTED ACRYLIC SHEET AND ALUMINUM BAR SURFACE APPLIED TO EXISTING C.M.U. SEE A2/A-501 & B3/A-501
AA26001 hc-arc.c
NOTE: ENTRY DETAIL UNITS ARE TYPICAL THROUGHOUT PROJECT. SEE A1. A2. AND A3/A-201 FOR ARCHETYPES.
PHASE 1 MEZZANINE FLOOR 110' - 10"
3
haye archi
1
EXTERIOR FINISH MATERIALS LEGEND 1.
PAINTED COMPONENTS CEMENT PLASTER STUCCO SHERWIN WILLIAMS, COLOR: NO. ALUMINUM HOLLOW STOREFRONT DOOR SHERWIN WILLIAMS, COLOR: NO. SW 7614 KYNAR FINISH
andrew
© Copyrigh
NORTH ELEVATION
D1
1/8" = 1'-0"
0'
8'
16'
32'
member
ROOF HEIGHT 4 126' - 0"
Americ Institut Archite
3
BOTTOM OF CANOPY - LEVEL 2 111' - 0"
1
CONSUL
LEVEL 2 101' - 0"
C1
WEST ELEVATION 1/8" = 1'-0"
11' - 6" 0'
8'
16'
5' - 8"
32'
3' - 4"
2' - 0"0' - 6"
CLIENT /
1
6' - 0"
ALTE
1' - 0"
420
4200 31st St. Peters 4
AREA OF WORK
B1
NO WORK THIS SIDE
SOUTH ELEVATION OVERALL 1/32" = 1'-0"
0'
8'
16'
B3
32'
14' OVERHEAD DOOR AND STOREFRONT MODULE 1/4" = 1'-0"
0'
8'
16'
32'
Original dr
SHEET TI AREA OF WORK
B3 A-201
NO WORK THIS SIDE
EXTERIO
REVISIO 1
5/19/2016 6:42:15 PM
1
Drawings completed in Revit 2012, Photoshop,
A1
SOUTH ELEVATION 1/8" = 1'-0"
DATE ISSUE PROJECT N 0'
8'
16'
32'
DRAWING
A-20
work done at Clifford M. Scholz Architects, Inc.
Residential + Commercial Work at CMSA WORK-
High-end, luxury homes, estates, country clubs
LOCATION-
Sarasota County, Lee County, Bradenton County 3,000- 20,000 sf
SIZE-
Drawings completed in AutoCAD Architecture Desktop 2014, Photoshop, Prismacolors
work done at Clifford M. Scholz Architects, Inc.
Residential + Commercial Work at CMSA
N.Y.C.
Block-
INVESTIGATING-
Extra-large scale place-making, Propagating private spaces of repose, Re-considering the Smithson’s “Cities in the Sky”, Peripheral public junctions, Accomadating for the transient environment of boarding schools and life-long living.
LOCATION-
block of 29th Street-30th Street between 10th and 11th avenue-- N.Y.C.
SIZE-
800,000 sf
CRITIC(S)-
Alfonso Perez-Mendez, Yann Weymuth of HOK Tampa, Michael Chatham of HHCP Orlando
PARTNER-
Roland A. Faust
Stacked Swathes
New York City’s Meat-Packing District is enjoying a Renaissance due, in part, to the popularity of the High Line. Residential spaces in the area, particularly those with private green spaces, are highly prized. An entire city block between 10th and 11th avenue South of Hudson Yards on 29th street is opened up to welcome an expanse of housing and a boarding school.
Section along the High Line displaying the interplay between private green spaces and public destinations.
Swathe- — (n) a broad strip or area of something, a bandage or wrapping, a strip left clear by the passage of a moving machine
foundational fabric
institutional scale
apartment fabric
carpet housing
system with variety
disruptions and irregularities in the swathes
completed swathes
1- Private Gardens 2- Housing Cluster 3- Dormitory Cluster 4- Shared Gardens
Morphological diagram displaying the transfiguration of a traditional New York tower’s stacked stories paradigm. The core shrinks, working in harmony with a smaller floorplate, offering 270 degree views in the tower residences that each occupy a whole floor.
TRANSITIONAL JUSTICE IN URURAÍ: HOUSING AND MEMORY INVESTIGATING-
A Housing Village for displaced residents and a Material Bank to support its development. An auxillary Headquarters for the Comissão Nacional da Verdade in the East of São Paulo, to archive and address memories of the Dictatorship from 1964-1985
LOCATION-
Jardim Helena, Sao Paulo, Brazil
SIZE-
~20 hectares
CRITIC(S)-
Martha Kohen, Nancy Clark, Milton Braga of MMBB Arquitectos and Alexandre Delijiacov
Unfolded Elevation along Rua Salvador de Medeiro
Between
Surround
Over
Under
Site 1 Choice- Near Itaim: Less historic buildings, residential Opportunities
Site 2 Choice- Jardim Helena: Long Distance to the River, Concrete Jungle
Site 3 Choice- Sao Miguel: Challenging boundaries, excellent historic structure and vibrant street life
Estação São Miguel Paulista
r do
a alv S a ro Ru dei Me
de
Housing Units with advertising/ artwork screens, Hidroanel Canal rejuvenation pond
Banco de Materiais de UruraĂ, using the ancient Indian name for the township. Market stalls on ground oor.
Vessel for sitting
INVESTIGATING-
Working in the full-scale, Promoting Public Interaction/ Comfort,, Constructional Techniques in Wood, Tension, and Wire,
LOCATION-
Plaza of the Americas- - Gainesville, FL
SIZE-
15 sf
CRITIC(S)-
Martin Gundersen, Bradley Walters
Wood and wire were the two materials allowed. Such a restricted palette offers a surprisngly wide array of material possibilities. Cross programming and multivalent nodes of activity were key to creating a versatile bench that would actually be used amidst bustling student life in the Plaza of the Americas. A curved mantle of 1/2� pine, held taught at an angle with wire from the central mast both supported the bench and offered a place of repose on the ground. Once the project served its duty in the Plaza of the Americas as a small vessel for sitting, a simple mantra rang true amidst the graffiti that grew on the bench-“We are the people that willl better our future.�
B O A THOUSE INVESTIGATING-
SIZE-
Compound Buildings, Plenum The Space, Newnan’s Lake History, Sensitivity to site with large-scale buildings Palm Point Park on Newnan’s Lake (Gainesville, FL) ~20,000 sf
CRITIC(S)-
Stephen Bender, Mark McGlothlin
LOCATION-
reflected world is the conquest of calm -Gaston Bachelard
Approaching the Boat House’s sliding openings
A Boathouse for the U.F. crew team on Newnan’s Lake-- In 2001, 110 wood dugout canoes were unearthed from its Northwestern shore, the largest archaeological find of canoes anywhere. The boathouse occupies a sensitive peninsular park 2 miles South. Its towering pine and broad cypress will now support a structure to shelter the sculls, and spirits of a sophisticated rowing team. Diagrammatic sectional and planometric speculations suggested architectonic ways to slide across the landscape towards the water Finding a system of primary spatial sequences and secondary surfaces is important to efficiently choreograph the rowing team’s movements between service areas, training areas, and intermittent social areas.
Sliding and gathering involved in the atrium, split up along an axis emphasizing sight lines to the water.
South Stair for socializing cantilevered over the penninsula
Direct, mechanical sliding in the doors of the boat storage area
Sliding up the interior ramp along points of social interaction
South Stair
SW Elevation
Slits allign for cast light from the cypress canopy above and reflected light from the water below inform the repetitive louvered sliding along the bank of Newnan’s Lake.