Portfolio Extract Paul MacMahon B.Arch, M.Arch, PfCO 2018
Work Samples August 2018
CPMG Architects 4 Pt.2 Architectural Assistant
RG+P Architects 16 Pt.2 Architectural Assistant
Allan Joyce Architects 28 Pt.2 Architectural Assistant
Nottingham Trent University 42 Research Assistant
SoftLoud House Architects 56 Pt.1 Architectural Assistant
2
3
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present
4
Projects
• EMAT Centre Barn conversion & refurbishment of existing farm house
• Ecclesbourne Sixth Form Refurbishment & new extension to detached dwelling
5
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present
RIBA Plan of Work
Stages 0-4
7
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present
GENERAL NOTES: Drawings are to be read in conjunction with relevant documents, Specifications, Architectural and services drawings, including approved builders work drawings.
Department
CIRCULATION
PLANT
D
D1
D2
2b
D3
E
E1
A
All dimensions are in millimeters unless noted otherwise.
B3B2
C
D D2 2b D3 NBS SPECIFICATION. E E1 All Drawings to be D1 read in conjunction with CPMG
E2
F
WORKSHOPS Calculating... 1
01-008B RISER
A1
STAFF ADMIN B STORAGE TOILETS
1 00-011 TECH / PREP / DELIVERIES
F
00-011A RISER
00-010 ESCAPE STAIR
E2
C
00-013 MECH PLANT
B3B2
B
00-012 ELEC PLANT
A1
Do not scale from the drawings or computer digital data. Contractor to check all dimensions on site.
INFORMAL TEACHING
A
The Contractor should notify CA of any discrepancies between the structural drawings and specifications and other drawings.
CLASSROOMS
01-008 ESCAPE STAIR
2 01-017 VENT RISER
01-009 CLASSROOM
2
01-008A PLANT ACCESS
2a
2a
3
3
01-006A CIRCULATION
K eyan d r.K 1 2 0 D 6 2 C ,M E rG FD vgFo O ed c,Slin (aP B E gM in lSaw e1 f5 0 m o ,C t3 W A LP 6 h u cFx4 D ac0 d To K 1 W .lp rL6 es2 x5 A )i n eh iG rlgo TB )ad C (LK W2 xd er arxtLP (ge1 R n ct1 ireo u vq )O sald 2 0 ar9 A 1 sb u B 4 2 4 E0 3 2 0 5 6 T n gkriu aB WB sb rR (G eko b 2 ch n 0 xtC ireEo u acd n )q 4 W tu ao Lrh 1 yp ks T n gkriu V 2 0 5 8 2 /1 eio n rs
00-009 ENGINEERING (LATHES)
01-010 CLASSROOM
01-007 CAD SUITE
4
4
00-015 LOCKERS
Void
00-014 ELECTRONICS LAB
00-001B VENDING AREA
00-004 ENGINEERING HIGH BAY
01-011 CLASSROOM
5 00-007 STORE
00-008 LIFT
00-006 REPROGRAPHICS
01-005 STORE
00-001A CORRIDOR
00-017 ACC DWC
00-018 ACC SHOWER
01-003 BREAKOUT
00-005 SMT OFFICE
00-019 MALE TOILETS
6
01-004 LIFT
5
01-006 CIRCULATION
00-016 FEMALE TOILETS
00-003 STAFF WORK ROOM AND RECEPTION
00-020 ESCAPE STAIR
01-015 01-014 VWC CLEANERS
01-013 ACC WC
01-012 COMMS
6
01-002 STAFF WORK ROOM
01-001 CIRCULATION / STAIR
7
7
K eyan d 0 2 1 gp C 6 FE,M al0 D ,ec2 (iP EB G Sn rO d vFo g gn rM iD cl3 a0 h P 2 W K e,t1 F.xLA 5 m o C u 4 f6 Sw 5 x.1 l2 rid Lc0 so ae)A TFW K 6 W K egh n io r)B lG (LTa 2 d C xd er sr1 u 0 aB R LargP te(Ex 0 6 1 2 n o 5 verq ictd u )O sal A 0 4 2 Eb 9 C B 5 2 T srkn gb W u aB i R (G rkb o ch o en n ir2 Extacd u eq ) 0 W 4 rksh o 1 p yu tLa T krn giu 8 /1 V o 0 5 2 n ers2 i
00-002 INNOVATION HUB
00-001 LOBBY
Void
8
8
9 Roof overhang outline
9 Roof outline
1
A-SL_25-P-GAPlanL00 1 : 100
8
1
A-SL_25-P-GAPlanL01 1 : 100
RIBA Plan of Work
Stages 1-4
A
A1
B
B3B2
C
03
D
D1
07
D2
2b
D3
E
04
E1
10
E2
02
04
F
F
01
E2
E1
01
05
06
E
D3
2b
D2
D1
07
D
C
B2B3
09
B
06
02
03
A1 A 05
Balustrade and guarding system 25-25-10/110 Balustrade and guarding system 25-25-10/110
Metal profiled sheet cladding system 25-80-68/150
Metal profiled sheet cladding system 25-80-68/150
Masonry external leaf system 25-10-55/150
Drained and back ventilated rainscreen cladding system 25-80-70/120
Drained and back ventilated rainscreen cladding system 25-80-70/120
Stick curtain walling system 25-80-15/175
Masonry external leaf system 25-10-55/150
Industrial doorset system 25-50-20/145 Masonry external leaf system 25-10-55/150
Two sets of elegant curved sliding doors create the stylish and spacious entry that is the Circleslide. This sliding door incorporates self-learning technology to ensure incredibly smooth and quiet operation, while the two sets of door wings provide a small draft lobby that can be used to minimise air loss Sliding doorset system 25-50-20/175
Stick curtain walling system 25-80-15/175
External Double Door Solid Doorset system 25-50-20/120
Doorset system 25-50-20/120
Masonry external leaf system 25-10-55/150
1
SouthElevation
NorthElevation
2
1 : 100
1 : 100
MATERIAL KEY
CPMG-01-EL-DR-A-2020 03
9
8
05
04
7
10
6
01
5
04
4
3
07
2a
2
06
1
2
Balustrade and guarding system 25-25-10/110
Metal profiled sheet cladding system 25-80-68/150
3 CPMG-01-EL-DR-A-2020
4 CPMG-01-EL-DR-A-2020
External Window 1x3 Window system 25-50-95/125
Exterrnal Window 2x3 Window system 25-50-95/125
Stick curtain walling system 25-80-15/175
1 Masonry external leaf system 25-10-55/150
Two sets of elegant curved sliding doors create the stylish and spacious entry that is the Circleslide. This sliding door incorporates self-learning technology to ensure incredibly smooth and quiet operation, while the two sets of door wings provide a small draft lobby that can be used to minimise air loss Sliding doorset system 25-50-20/175
CPMG-01-EL-DR-A-2020
External Double Door Solid Doorset system 25-50-20/120
3
5
Section Location Plan 1 : 500
EastElevation 1 : 100
1
01
2
2a
3
07
4
02
5
6
04
7
04
8
03
9
05
Balustrade and guarding system 25-25-10/110
Metal profiled sheet cladding system 25-80-68/150
Stick curtain walling system 25-80-15/175
GENERAL NOTES:
Drawings are to be read in conjunction with relevant documents, Specifications, Architectural and services drawings, including approved builders work drawings. Masonry external leaf system 25-10-55/150
Drained and back ventilated rainscreen cladding system 25-80-70/120
Stick curtain walling system 25-80-15/175
The Contractor should notify CA of any discrepancies between the structural drawings and specifications and other drawings.
Do not scale from the drawings or computer digital data. Contractor to check all dimensions on site.
All dimensions are in millimeters unless noted otherwise. All Drawings to be read in conjunction with CPMG NBS SPECIFICATION.
4
WestElevation 1 : 100
9
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present F
A
F
A1
A
A1
Aluminium parapet cappngparapet cappng Aluminium set to fall into roof setarea to fall into roof area
B
Aluminium parapet cappngparapet cappng Aluminium set to fall into roof setarea to fall into roof area
Single ply to beSingle dressed ply to be dressed up and over parapet up and over parapet upstand upstand
B
Single ply membrane Single laid ply membrane laid on 150mm ridgid oninsulation 150mm ridgid insulation adhered to metal deck to metal deck adhered
PPC aluminiumPPC eaves aluminium eaves fixed back to steelwork fixed back to steelwork
Steelwork as structural Steelwork as structural engineers design engineers design Acoustic ceilingAcoustic rafts ceiling rafts Refer to drawingRefer to drawing CPMG-01-01-DR-A-3011 CPMG-01-01-DR-A-3011
Single ply membrane Single laid ply membrane laid on 150mm ridgid oninsulation 150mm ridgid insulation adhered to metal deck adhered to metal deck
Acoustic ceilingAcoustic rafts suspended ceiling rafts suspended from roof deck from roof deck Refer to drawingRefer to drawing CPMG-01-01-DR-A-3011 CPMG-01-01-DR-A-3011
High level curtain walllevel curtain wall High Refer to drawingRefer CPMGto drawing CPMG01-EL-DR-A-3220 01-EL-DR-A-3220 Type 02 Type 02
Aluminium frames glazing frames glazing Aluminium as per drawing CPMG-01as per drawing CPMG-0100-DR-A-3322 00-DR-A-3322
Air Tightness line Air Tightness line
150mm SFS; Plasterboard 150mm SFS; Plasterboard taped and jointed internally taped and jointed internally Refer to drawingRefer CPMGto drawing CPMG01-01-DR-A-2511 01-01-DR-A-2511 and and CPMG-01-01-DR-A-3311 CPMG-01-01-DR-A-3311
Painted plasterboard wall Paintedinternal plasterboard internal wall Refer to wall type plantodrawing Refer wall type plan drawing CPMG-01-01-DR-A-2511 CPMG-01-01-DR-A-2511 and and CPMG-01-01-DR-A-3311 CPMG-01-01-DR-A-3311
Floor build up as per build up as per Floor structural engineers structural engineers specification specification
Steelwork as structural Steelwork as structural engineers design engineers design
Steelwork as structural Steelwork as structural engineers design engineers design Aluminium frames glazing frames glazing Aluminium as per drawing CPMG-01as per drawing CPMG-0100-DR-A-3322 00-DR-A-3322
150mm SFS; Plasterboard 150mm SFS; Plasterboard taped and jointed internally. taped and jointed internally. Refer to wall type plantodrawing Refer wall type plan drawing CPMG-01-01-DR-A-2510 CPMG-01-01-DR-A-2510
Air Tightness line Air Tightness line 150mm SFS; Plasterboard 150mm SFS; Plasterboard taped and jointed internally. taped and jointed internally. Refer to wall type plantodrawing Refer wall type plan drawing CPMG-01-01-DR-A-2510 CPMG-01-01-DR-A-2510 and and CPMG-01-01-DR-A-3310 CPMG-01-01-DR-A-3310
Painted blockwork internal wall Painted blockwork internal wall Refer to wall type plantodrawing Refer wall type plan drawing CPMG-01-01-DR-A-2510 CPMG-01-01-DR-A-2510 and and CPMG-01-01-DR-A-3310 CPMG-01-01-DR-A-3310
1
10
150mm ground 150mm bearing ground slab as bearing slab as structural engineers details structural engineers details Separating membrane below slab Separating membrane below slab 50mm insulation50mm to provide required insulation to provide required U-Value U-Value DPM under insulation DPM under insulation 50mm sand blinding 50mm sand blinding Vertical faces ofVertical DPM protected with protected with faces of DPM rigid insualtion board rigid insualtion board
150mm ground 150mm bearing ground slab as bearing slab as structural engineers details structural engineers details Separating membrane below slab Separating membrane below slab 50mm insulation50mm to provide required insulation to provide required U-Value U-Value DPM under insulation DPM under insulation 50mm sand blinding 50mm sand blinding Vertical faces ofVertical DPM protected with protected with faces of DPM rigid insualtion board rigid insualtion board
External groundExternal build upground build up as structural engineers as structural engineers design and details design and details
External groundExternal build upground build up as structural engineers as structural engineers design and details design and details
Foundations asFoundations structural as structural engineers design and engineers design and details details
Foundations asFoundations structural as structural engineers design and engineers design and details details
Detailed Detailed Strip Section Strip A-A Section A-A 1 : 20 1 1 : 20
2
Detailed Detailed Strip Section Strip B-B Section B-B 1 : 20 2 1 : 20
RIBA Plan of Work
Stages 1-4
1
2
2a
3
4
5
6
7
8
9
Balustrade and guarding system 25-25-10/110
Single layer warm roof covering system 20-50-30/170
Masonry external leaf system 25-10-55/150
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110 Stick curtain walling system 25-80-15/175
2
2a
3
4
5
6
7
8
9
7004
1
00-004 ENGINEERING HIGH BAY
Balustrade and guarding system 25-25-10/110
Industrial doorset system 25-50-20/145
Industrial doorset system 25-50-20/145
Two sets of elegant curved sliding doors create the stylish and spacious entry that is the Circleslide. This sliding door incorporates self-learning technology to ensure incredibly smooth and quiet operation, while the two sets of door wings provide a small draft lobby that can be used to minimise air loss Sliding doorset system 25-50-20/175
Single layer warm roof covering system 20-50-30/170
Masonry internal leaf system 25-10-55/160
Masonry internal leaf system 25-10-55/160
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
00-002 INNOVATION HUB
Internal Double Doorset Doorset system 25-50-20/120
Masonry external leaf system 25-10-55/150
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
Stick curtain walling system 25-80-15/175
Section1 7004
1
00-004 ENGINEERING HIGH BAY
1 : 100
Two sets of elegant curved sliding doors create the stylish and spacious entry that is the Circleslide. This sliding door incorporates self-learning technology to ensure incredibly smooth and quiet operation, while the two sets of door wings provide a small draft lobby that can be used to minimise air loss Sliding doorset system 25-50-20/175
Industrial doorset system 25-50-20/145
Industrial doorset system 25-50-20/145
Masonry internal leaf system 25-10-55/160
Masonry internal leaf system 25-10-55/160
Panel partition system 25-05-65/110
Panel partition system 25-05-65/110
00-002 INNOVATION HUB
Internal Double Doorset Doorset system 25-50-20/120
1
Section1 A A1 B
B3
B2
C
D
D1
D2
2b
D3
E
E1
E2
F
1 : 100
Balustrade and guarding system 25-25-10/110
Single layer warm roof covering system 20-50-30/170
Single layer warm roof covering system 20-50-30/170
A A1
B
B3
B2
C
D
D1
D2
2b
D3
E
E1
Suspended Ceiling Tiles Unit (modular) suspended ceiling system 20-10-20/190
E2
Metal profiled sheet cladding system 25-80-68/150
F
01-006 CIRCULATION
01-015 VWC
01-014 CLEANERS
01-013 ACC WC
01-012 COMMS
1
External Window 1x3 Window system 25-50-95/125
CPMG-01-SX-DR-A-2010
Single layer warm roof covering system 20-50-30/170
01-006 CIRCULATION
01-015 VWC
3000
01-003 BREAKOUT
2700
Balustrade and guarding system 25-25-10/110
Single layer warm roof covering system 20-50-30/170
Metal profiled sheet cladding system 25-80-68/150
Stick curtain walling system 25-80-15/175
Floor Finish Floating cementitious levelling screed system 20-55-15/130
Suspended Ceiling Tiles Unit (modular) suspended ceiling system 20-10-20/190
01-003 Panel partition system 25-05-65/110 BREAKOUT
01-012 COMMS
2700
00-004 ENGINEERING HIGH BAY
01-013 ACC WC
2
External Window 1x3 Window system 25-50-95/125
Suspended Ceiling Tiles Unit (modular) suspended ceiling system 20-10-20/190
3000
01-014 CLEANERS
CPMG-01-SXExternal Window 1x3 Window system 25-50-95/125
00-005 SMT OFFICE
00-004 ENGINEERING HIGH BAY
Unit (modular) suspended ceiling system 20-10-20/190
Panel partition system 25-05-65/110
00-005 SMT OFFICE
3800
2 2
Doorset system 25-50-20/120
Industrial doorset system 25-50-20/145
00-019 MALE TOILETS
Floor Finish Floating cementitious levelling screed system 20-55-15/130
Industrial doorset system 25-50-20/145
2500
3800
Doorset system 25-50-20/120
00-001A CORRIDOR Suspended Ceiling Tiles
2710
2692
00-001A CORRIDOR
2710
2692
Stick curtain walling system 25-80-15/175
2500
External Window 1x3 Window system 25-50-95/125
Toilet Cubicle Standard Panel cubicle system 25-05-60/160
2 Masonry external leaf system 25-10-55/150
CPMG-01-SX-DR-A-2010
00-019 MALE TOILETS
Toilet Cubicle Standard Panel cubicle system 25-05-60/160
Masonry external leaf system 25-10-55/150
Section2 1 : 100
Section2 1 : 100
11
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present
3
Proposed Typical Exam Layout Visual
3
Proposed Typical3D Standard Lyout Visual Existing Sixth Form Building 4
Proposed Typical Exam Layout Vis
GENERAL NOTES: Drawings are to be read in conjunction with relevant documents, Specifications, Architectural and services drawings, including approved builders work drawings. The Contractor should notify CA of any discrepancies between the structural drawings and specifications and other drawings. Do not scale from the drawingts or comupter digital data. Contractor to check all dimensions on site. All dimensions are in millimeters unless noted otherwise. All Drawings to be read in conjunction with CPMG OUTLINE SPECIFICATION.
4
12
Proposed Typical Standard Lyout V
DPM under insulation on sand blinding, dressed up slab edge into cavity tray or glazing EPDM, vertical faces of DPM protected with rigid insulation board.
007 for details Skirting as outline specification
L00
57800
D1
D
C
62365
B01
57300
Stages 1-4
Refer to Wall Type Plan 25-003 for details
Roof top plant as M&E design & details PPC Aluminium parapet cappings set to fall into roof area
External ground build up as Structural Engineers design and details
Concrete Foundations as Structural Engineers design and details
B
RIBA Plan of Work
L02
Kitchen Extract Duct to Proposed Flat Roof as per M&E design
Single ply to be dressed up and over parapet upstand (Full horizontal width of external wall build up)
Masonry support shown as indicative. Refer to Structural Engineers drawings for details Steelwork as Structural Engineers design Opening lights with teleflex restricted to 250mm
1
Lighting as M&E design & details
Suspended Acoustic MF Ceiling system: Gyptone Quattro 41 with 50mm acoustic insulation over
Detailed Section 02 1 : 20
High level Timber glazing as drawing 32004
PPC Aluminium Curain Walling System, Refer to External Glazing Elevations 32003 for details 150mm Ground bearing slab as Structural Engineers details. Separating membrane below slab. 120mm Kingspan Styrozone N300R insulation below slab to provie required U-value, DPM under insulation on sand blinding, dressed up slab edge into cavity tray or glazing EPDM, vertical faces of DPM protected with rigid insulation board.
Radiant panels & lighting as M&E design KITCHEN LAYOUT BY OTHERS
00-05
00-06
Circulation
Kitchen / Servery
Refer to Internal drawing 25KEY PLANDoor 007 for details
Refer to wall type plan drawing 25-003 for wall build ups
Plumbing and Electrical items as M&E design & details
Skirting as outline specification
L00
57800
B01
57300
Detailed Section 02
External ground build up as Structural Engineers design and details
1
Concrete Foundations as Structural Engineers design and details
Detailed Section 02
DETAILE
1 : 20
sual
KEY PLAN
GENERA
Drawing documen services drawings The Con between and othe
Detailed Section 02
Do not s data. Co
2
Detailed Section 02 - 3D
All dimen otherwis
All Draw OUTLIN
2
D1
D
Detailed Section 02 - 3D
C
B
Low level single ply membrane warm roof laid to falls as per Proposed GA Roof Plan drawing 24-001 60mm SarnaTherm insulation to achieve 0.14Wm2k
L02
62365
Refer to Wall Type Plan 25-003 for details
Roof top plant as M&E design & details
Visual
PPC Aluminium parapet cappings set to fall into roof area
Provide sump with cross falls to all rainwater to discharge into 2no. RWPs
Kitchen Extract Duct to Proposed Flat Roof as per M&E design
GENERAL NOTES: Drawings are to be read in conjunction with relevant Single ply to be dressed up and over documents, Specifications, Architectural and services parapet upstand (Full horizontal width of drawings, including approved builders work external wall build up) drawings.
PPC Aluminium parapet cappings set to fall into roof area Single ply to be dressed up and over parapet upstand (Full horizontal width of external wall build up)
The Contractor should notify CA of any discrepancies betweenas theindicative. structural drawings and specifications Masonry support shown Refer to and other drawings drawings. for details Structural Engineers
Provide overflow weirs to gutters
Do notas scale from the Engineers drawingts or comupter digital Steelwork Structural data. Contractor to check all dimensions on site. design
Steelwork as Structural Engineers design
All dimensions are in millimeters unless noted Opening lights with teleflex otherwise.
restricted to 250mm All Drawings to be read in conjunction with CPMG OUTLINE SPECIFICATION.
Suspended Acoustic MF Ceiling system: Gyptone Quattro 41 with 50mm acoustic insulation over
KITCHEN LAYOUT BY OTHERS
150mm Ground bearing slab as Structural Engineers details. Separating membrane below Styrozone N300R slab. 120mm Kingspan insulation below slab to provie required U-value, DPM under insulation on sand blinding, dressed up slab edge into cavity tray or glazing EPDM, vertical faces of DPM protected with rigid insulation board.
L00
57800
00-05
00-06
Circulation
Kitchen / Servery
Refer to Internal Door drawing 25007 for details
Parafon Hygien Ceiling Tile System. Refer to drawing 33-001 for details
Radiant panels & lighting as M&E design
High level Timber glazing as drawing 32004
PPC Aluminium Curain Walling System, Refer to External Glazing Elevations 32003 for details
Lighting as M&E design & details
Refer to wall type plan drawing 25-003 for wall build ups
Skirting as outline specification
Plumbing and Electrical items as M&E design & details
Refer to wall type plan drawing 25-003 for wall build ups External PPC single lead door with glazing as External Door drawing 32-002 External door protection rails as outline specification Coved Skirting refer to outline specification & drawing 33-002 External ground build up as Structural Engineers design and details
B01 57300
13
External ground build up as Structural Engineers design and details
Concrete Foundations as Structural Engineers design and details
Concrete Foundations as Structural Engineers design and details
Nottingham, UK CPMG Architects Ltd
Architectural Assistant Pt.2 May 2017 - Present GENERAL NOTES: 7
L02
02
08
6
09
13
5
15
4A
11
08
08
05
62365
4
3A
01
3
08
2
Drawings are to be re documents, Specifica drawings, including ap drawings. The Contractor should between the structura and other drawings.
1
08 05
11
02
Do not scale from the data. Contractor to ch All dimensions are in otherwise.
60600
All Drawings to be rea OUTLINE SPECIFICA
L00
57800
16
16
06
05
03
02
16
06
08
03
EXISTING SIXTH FORM BUILDING
1
08
06
16
03
16
PROPOSED EXTENSION BUILDING
General Arrangement Elevation - North 1 : 50
1
2
3
3A
4
4A
5
6
7
12
L02
62365
60600
L00
57800
16
03
12
02
16
06
03
03
12
02
12
03
16
12
12
16
06
03
PROPOSED EXTENSION BUILDING
2
EXISTING SIXTH FORM BUILDING
General Arrangement Elevation - South 1 : 50
MATERIALS KEY: D1
05
02
09
11
D
C
01
13
B
A
01
10
A1
11
L02
62365
60600
16
L00
57800
16
06
03
16
02
03
EXISTING SIXTH FORM BUILDING
3
16
14
PROPOSED EXTENSION BUILDING
16
03
12
03
General Arrangement Elevation - West 1 : 50
KEY PLAN A1
A
B
C
D
D1
North Elevation L02
62365
01
10
13
60600
West Elevation
East Elevation
L00
16
57800
03
12
EXISTING SIXTH FORM BUILDING
4
General Arrangement Elevation - East 1 : 50
South Elevation
14
RIBA Plan of Work
Stages 1-4
GENERAL NO
Drawings are documents, S drawings, inc drawings. The Contract between the s and other dra
Do not scale data. Contrac
Temporary door during Construction Stage
All dimension otherwise.
All Drawings OUTLINE SP
PROPOSE
Study
Existing grass destroyed by compound to be returfed and made good
PROPOSE
Study
Ex
Provide new concrete edging at junction between new an existing tarmac.
Pr NOTE: Full height
Proposed Door Protection Barrier
Social Area
DEPARTMEN
Office
Kit Exi Pro
8 1
2
3
3A
4
4A
5
6
7
D2
87 27
Proposed Tarmac zone
Proposed Door Protection Barrier
Tea Tot
Sto Tot
2000
2787
D3
6A
D1
Circ Tot
Proposed Door Protection Barriers
Exi
00-07
Store
00-05
D
Shelving
Shelving
00-03
Full height automatic motorised blinds to glazing
Provide black out blinds to rear of door
Store
9.07 m²
2000
Provide black out blinds to rear of door
Circulation
DW
High level glazing as drawing 32-004
Existing counter to be removed, provide new servery counter and low level wall to coordinate/interface with existing Fire Resistant fire shutter to provide a complete 30 minute Fire Resistant compartment. Contractor to confirm that shutter closes on activation of the fire alarm.
00-06
Provide blinds to rear of door leafs
CT
Shelving
Entrance Foyer
Full height automatic motorised blinds to glazing
Existing External wall to be cleaned and made good, Holes to be filled prior to wall finish being applied.
2.24 m²
22.99 m²
Total GEFA Total GIFA
Kitchen / Servery 43.26 m²
NOTE: Ground leve on site.
Proposed F
Existing FFL on site
Store
B
C
B
00-02
00-01
O
100.91 m²
100.89 m²
O
FFL 57.800 [to suit existing FFL Contractor to confirm]
Projector
Store
Fire rated roller shutter to servey
Infill existing aperture from removed kitchen hood extract plant. Infill as Structural Engineers details. Provide new roof finish to existing aperture and fully waterproof to existing roof finish
00-04
External Store 21.10 m²
PV
Provide High level boxing with access panels as drawing 33-001 Provide black out blinds to rear of door
Full height automatic motorised blinds to glazing
Full height automatic motorised blinds to glazing
Provide High level boxing with access panels as drawing 33-001
B
B
Proposed Door Protection Barrier
Modify existing Plant Room louvres to allow for new wall construction
T EX
Provide black out blinds to rear of door
Female WC
DWC
Plant
SE
Male WC
Clnrs Store
FS
Flexible Teaching 02
Flexible Teaching 01 Proposed Door Protection Barrier
Store
Classroom
A
Proposed RWP
Proposed Door Protection Barrier
Proposed RWP
Proposed RWP 1500
Proposed RWP
2288
A1
Existing garage base and tarmac area to be returfed and made good New fence & gate with push pad & antitamper housing in direction of escape, Key override school side
Proposed RWP
Proposed tarmac to be joined with existing tarmac and existing tarmac to proposed external wall to be made good
Proposed Door Protection Barrier
Indicative zone for tower scaffolding to access high level roof
New fence & double leaf gate with push pad & anti-tamper housing in direction of escape, Key override school side
1
Proposed GA Plan 1 : 50
15
Leicester, UK RG+P Architects Ltd
Architectural Assistant Pt.2 Aug 2016 - May 2017
In addition to fulfilling my duties as a Pt.2, I presented a business case to the directors outlining a case for setting up a dedicated drone department. This report was comprised of a breakdown of market research, competitors, overheads and potential for return on investment. After training up an existing company employee in drone applications in architecture, photogrammetry & general aerial surveying skills, I obtained my Civil Aviation Authority Licence to fly drone for commercial purposes. The company now boasts the capability to deliver their existing services with added value, bringing them up to speed with the latest industry technology and providing a unique selling point over other architectural practices.
16
Projects
• Student Accommodation Constrained city centre 7 floor student accommodation with retail units
• Offices at Garden Centre construction of new office and visitor reception space
• Barn Conversions Refurbishment & rennovation of 5 agricultural barns
• Residential Development Multi-house type housing development with landscape design
17
Leicester, UK
ROOMS , AREAS & BATHROOMS SCHEDULE FIRST FLOOR
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
VENT
TYPE D1 TYPE D3
TYPE D1
RG+P Architects Ltd
TYPE
Area / m²
NO. OF ROOMS
TYPE B
23.10 m²
1
TYPE D1
22.10 m²
19
TYPE D2
22.10 m²
1
TYPE D3
22.10 m²
4
BATHROOM - TYPE V3
TYPE E
20.20 m²
1
BATHROOM - TYPE T1
VENT
LIFTS / STAIRS LOBBY
VENT
BATHROOM TYPE BATHROOM - TYPE V3 WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1 WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1 WALKER MODULAR COMPOSITE POD
WALKER MODULAR COMPOSITE POD
WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1
Architectural Assistant Pt.2
TOTAL NO. OF ROOMS
TYPE D3
WALKER MODULAR COMPOSITE POD
26
BATHROOM - TYPE V3
21 5
141
WALKER MODULAR COMPOSITE POD
TYPE D3
Aug 2016 - May 2017 TYPE E
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE B
FIRST FLOOR PLAN
TYPE D2
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
VENT
TYPE D1 TYPE D3
Lifts has beenadded, rooms & bathrooms shedule has been amended, furniture added, second floor plan added
06.12.16 UKD
colours added
09.12.16 UKD
rr gg p
ROOMS , AREAS & BATHROOMS SCHEDULE SECOND FLOOR
CLEANERS STORAGE
TYPE D3
IDEALLIFTS
F
r gp
TYPE D2 CLEANERS STORAGE
TYPE D3
E
TYPE
Area / m²
NO. OF ROOMS
TYPE B
23.10 m²
1
TYPE D1
22.10 m²
19
TYPE D2
22.10 m²
1
TYPE D3
22.10 m²
4
TYPE E
20.20 m²
1
VENT
LIFTS / STAIRS LOBBY
VENT
BATHROOM TYPE BATHROOM - TYPE V3 WALKER MODULAR COMPOSITE POD
WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1 WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE V3 WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1 WALKER MODULAR COMPOSITE POD
BATHROOM - TYPE T1
TOTAL NO. OF ROOMS
TYPE D3
Architects· P· Project Managers· Quantity · QuantitySSurveyors Architects roject Managers urveyors 130New NewWalk Walk 130 Leicester, LE1 Leices ter, LE 1 7J7JA A Tel:0116 0116204 2045800, 5800,Fax: Fax:0116 0116204 2045801 5801 Tel: email:des design@rg-p.co.uk, www.rg-p.co.uk email: ign@rg-p.co.uk, www.rg-p.co.uk
BATHROOM - TYPE T1
WALKER MODULAR COMPOSITE POD
26
BATHROOM - TYPE V3
21
Project: P roject:
Proposed Student Accommodation, Conduit Street, Leicester
5
141
WALKER MODULAR COMPOSITE POD
Client: Client:
Student Urban Living Leicester Ltd TYPE D3
Sheet title: S heet title:
First , Second Floor Plan
Ref: R ef: TYPE E
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
TYPE D1
40697/ 020 F
TYPE D1
Scale: S cale:
TYPE B
1:100 @ A1 Date: Date: 13.10.2016
Drawn: Drawn:
Checked: Checked: UKD
DMcS
dimensions checked site. scale drawing. This drawing is the AllAll dimens ions to to bebe checked onon s ite. DoDo notnot s cale offoff drawing. This drawing is the copyright Architect, and not reproduced without their permission. copyright of of thethe Architect, andnot to to be be reproduced without their permis s ion. Ordnance Survey map information reproduced with permission of HMSO Crown Ordnance S urvey map information reproduced with permis s ion of HMS O C rown Copyright C opyright resreserved. erved. rg+p Ltd. Trading rg+p. rg+p Ltd. Trading as as rg+p.
SECOND FLOOR PLAN
EAST ELEVATION
Revision: R evis ion:
Dimensions shown
Date:Date:
SG
21-03-2017
18
19,800
r g
19,800
2,275
2,275
A
Revision: R evis ion:
A
Date:Date:
Dimensions shown
SG
21-03-2017
r gp rr gg p Architects路 P路 Project Managers路 Quantity 路 QuantitySSurveyors Architects roject Managers urveyors 130New NewWalk Walk 130 Leicester, LE1 Leices ter, LE 1 7J7JA A Tel:0116 0116204 2045800, 5800,Fax: Fax:0116 0116204 2045801 5801 Tel: email:des design@rg-p.co.uk, www.rg-p.co.uk email: ign@rg-p.co.uk, www.rg-p.co.uk
Project: P roject:
Proposed Student Accommodation, Conduit Street, Leicester Client: Client:
Student Urban Living Leicester Ltd Sheet title: S heet title:
North, East Elevation
Ref: R ef:
40697/ 033 A
19
Scale: S cale:
1:100 1:1.10, 1:0.97, 1:100 @ A1 Date: Date: 09.12.2016
View Down Conduit Street
Drawn: Drawn:
Checked: Checked: UKD/GA
DMcS
Leicester, UK RG+P Architects Ltd A
B
C
D
E
Revision:
Date:
A
JH
27.06.16
JH
09.08.16
PMM
05.12.16
F
G
Architectural Assistant Pt.2
Additional material information added for tender
B
Details revised based on client feedback. Including overhaving eave and roof construction C Change of wall structure
Aug 2016 - May 2017
6.00
A
5.99
B
6.01
6.00
C
D
6.00
6.00
E
F
G
Section B-B
A
Detail 04 B Regs Notes 1
G
F E D C B A
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
PRL 001 1,140 by 1,180
Fall
PRL 001 1,140 by 1,180
B
Fall
Detail 02 B Regs Notes 1
B
G F A
E D C B
r gp
A
WALL TYPE CONSTRUCTION DETALS External Wall Construction: U-Value 0.16W/m²K - 21mm FSC Dura Cladding or equivilent - 2x50mm Counter batterns - 0.6mm Tyvek Supro breather membrane ir equivilent - Assume 142mm Kingspan TEK pannel or equivilent - 20mm Kingspan Thermawall TW55 or equivilent - 12.5mm Plasterboard with skim finish Internal Wall Construction - Type A - 12.5mm Plasterboard (min. m/ua 10kg/m2) - 63mm Timber stud with insulation (min. density 10kg/m3) -12.5mm Plasterboard (Moisture resistant in wet areas and all joints well sealed)
KEY SD CD RWP
Smoke Detector Combi Detector (Smoke & Heat) Rainwater Pipe Direct connections
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
Demolition Line
Project: Internal Wall Construction - Type B - 12.5mm Plasterboard (min. m/ua 10kg/m2) -63mm timber stud -12.5mm Plasterboard (Moisture resistant in wet areas and all joints well sealed) Roof Construction: To achieve 0.15W/m2K (min = 0.18W/m2K) - 25mm LinLab Standing seam roofing - HB Polyester sheet or equivilent - 0.6mm Tyvek Supro breather membrane or equivilent - Assume 142mm Kingspan TEK pannel or equivilent - 20mm Kingspan Thermawall TW55 or equivilent - 12.5mm Plasterboard with skim finish
Coles Nurseries, Leicester Client:
Coles Nurseries Sheet title:
Sections GA
Ref:
40541 036B Scale:
1:50 @ A1
Section A-A
Date:
16.05.16 Drawn:
Checked:
JH Detail 03 B Regs Notes 1 All dimensions to be checked on site. Do not scale off drawing. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
20
Revision:
Architects ¡ Project Ma
Tel: 0116 204 email: design@
Project:
Client:
Coles Nurseries - Proposed Internal View Option 1
21
Sheet title:
Ref:
Scale:
Coles Nurs
Coles Nurs
Proposed
40541 003
14
1
13
2
12
3
100
11
4
10
5
W16
570
Sill 625
930 450
6
7
8
105
1,500 2,100
1,503
1,500 2,100
ExDG08
ExDG07
838
B
Insulated lintel over opening
9
2,002
Vestibule
390
F
A
B
2,000 W13
7,525 800 7,075
7,200
W12
2,000
338
250
Cts 820
1,050 920
1,050 920 Sill 0
Sill 0 Insulated lintel over opening
1,222 420
Window Cill - 0.900
r gp
Insulated lintel over opening
925
7,700 4,700 6,800
Lounge
1,975
iDG12
iDG10
50 RWP
iDG09
W19
570
250
iDG13
iDG11
2,475
139
rr gg p
W28
W17
100
100
Kitchen
Cts 900
5,330 500 1,625
1:200 @ A2
Sill 625 Insulated lintel over opening
2,123
Boot / Utility
390
100
650
WR35
930 450
ExDG06
354
1,500 1,000
ExDG05
1,500 1,000
ExDG04
1,220
830
GB
iDG06
roof access hatch
1,175
F ExDG03 105
2,528
900
Architects· P· Project Managers· Quantity · QuantitySSurveyors Architects roject Managers urveyors 130New NewWalk Walk 130 Leicester, LE1 Leices ter, LE 1 7J7JA A Tel:0116 0116204 2045800, 5800,Fax: Fax:0116 0116204 2045801 5801 Tel: email:des design@rg-p.co.uk, www.rg-p.co.uk email: ign@rg-p.co.uk, www.rg-p.co.uk
338
1,050 920
1,050
460 100
925
W20
1,050
Sill 1,180 Insulated lintel over opening
100 2,650
500 1,625
A development at 41 High Street Roxton
1,175
1,000
1,000
1,320 100
133
1,300
1,300
Insulated lintel over opening
900 1,550
Family room Insulated lintel over opening
Resolution Homes
Ground Floor Plan
40680/ 100.02
133
A
B
995
995
900 100
Insulated lintel over opening
Project: P roject:
Client: Client:
Sheet title: S heet title:
HIGH STREET
W21
1,050
1,050
Sill 1,180 Insulated lintel over opening
100207
65 600
Study Insulated lintel over opening
Sill 1,180
450
fence
100 1,084
iDG02 777
100
100
Insulated lintel over opening
Sill 1,180
W09
ExDG03
1,520
footpath
W22
1,050
1,050
Sill 1,180 Insulated lintel over opening
65 3,390
Bed 5
Insulated lintel over opening
Sill 1,180
W08
1,050
Scale:
General Notes
Masonry load bearing external wall.
External Cavity Wall. Refer to Details for specification.
75mm Timber stud partition faced with 12.5mm plasterboard.
75mm Timber stud partition, voids filled with Rockwool RS60 (density 19.5kg/m) to achieve a 40 dB partition. Faced each side with 1 layer 12.5mm plasterboard and skim finish or Knauf Aquapanel or similar tilebacker board within tiled areas.
4,858 995
995
Corridor
900
Insulated lintel over opening
Sill 1,180
100
W28
6,550 1,800
24.53
RWP positions shown indicatively.
1,300
1,300
Insulated lintel over opening
iDG01
Bed 4 Insulated lintel over opening
En suite Insulated lintel over opening
Sill 1,180
W07
1,050
ExDG03 ExDG04 ExDG05
12,300 1,800
13 10 2016
DIMENSIONS STANDARD: Indicated on structural face of masonry walls and structural face of stud walls. Note: Internal partitions are based on using 70mm metal studs (uno), if 63mm Timber studs are used, then site adjustments will be required.
METERS: Final positions to be confirmed
392 1,128
736
Bed 3
Insulated lintel over opening
Sill 1,180
W06
1,050
12,540
North Elevation Section CC
W27 W26
Date:
W18
DMC PMM
W05
4,300 1,800
Ref:
D
1,050
1:50 @ A1
A development at 41 High Street Roxton
FF FFL - 2.625
DMC
Project:
570 1,500
7 6 5 4 3
420 1,080 W15
Window Cill - 3.525
Checked: Checked:
Resolution Homes 45.0 pitch 45.0 pitch
Checked: Drawn:
Ref: R ef:
Scale: S cale:
10 11 2016
Client: 45.0 pitch 45.0 pitch
GARAGE
UKD
RWP
RWP
24.26
Site Plan Sheet title:
GFFL - 0.000
W15 W14
ExDG07 ExDG08
2 gate
WR34
40680/ 002 gate
Date: Date:
Plot 2
W11 W10
1 0 RWP
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk gate
Drawn: Drawn:
RWP
RWP
RWP
23.12
Sill 0 Sill 0
SF FFL - 5.250
dimensions checked site. scale drawing. This drawing is the AllAll dimens ions to to bebe checked onon s ite. DoDo notnot s cale offoff drawing. This drawing is the copyright Architect, and not reproduced without their permission. copyright of of thethe Architect, andnot to to be be reproduced without their permis s ion. Ordnance Survey map information reproduced with permission of HMSO Crown Ordnance S urvey map information reproduced with permis s ion of HMS O C rown Copyright C opyright resreserved. erved. rg+p Ltd. Trading rg+p. rg+p Ltd. Trading as as rg+p.
FL
Sill 1,180
100
100 1,800
10
23.31
W04
4,090 1,050 27,454
9
FL
iDG07
1,500 80 1,500 5,875
WR33
WR32
WR31
WR30
WR29
Insulated lintel over opening Insulated lintel over opening
Window Head - 2.110
step
Sill 1,180
2,150 1,800
8
23.32
Sill 1,180
100 1,050
7
23.49
W03
3,410 1,800
6
BARN
W02
1,050
5
RWP
24.10
South Elevation
r gp RWP
10 9 8 7 6 5 4 3 2
1,800
4
RWP
RWP
RWP
RWP RWP
Plot 3 Plot 4 Plot 5
RWP RWP gate
2,000 100 1,050
3
23.16
Insulated lintel over opening
Sill 1,250
Window Head - 4.735
Plot 1
W01
100 1,800
2
RWP
RWP
23.24 23.56
1 0 24.13
3,905 1,050
1
23.50
EAVE
flowerbed
31.72
W23
gate 23.39
RIDGE
28.13
W11
12,540
450 1,155 500 500 1,155 CHURCH FARM
Sill 475 Sill 475
W19 W18
ExDG04 ExDG05 ExDG06 23.30
2,000
W18 W19
W14
9,350
0
road edge
E 1,050 920
E
W27 W26
2,000 2,100
Date: Revision:
iDG08
100 1,950 1,815 390 500 1,381 910 1,261 390 302
WR35 WR342,100
1,050 920
100 1,000 100 2,150
Insulated lintel over opening
1,050 920
iDG05
300 1,500 2,030
Sill 1,250
1,080 450 1,500 80 1,500 12,300 1,500
1,150 9,350 100
570 1,500
1,050 920
D
iDG04
910 1,950 1,260 910 50 751 1,381 390 450 300 1,200 100 3,250
iDG03
Insulated lintel over opening
1,050 920
4,550 2,140 5,450
North Elevation W10 Section CC 450 23.51
All dimensions to be checked on site. Do not scale off drawing. This drawing is the copyright of the Architect, and not to be reproduced without their permission. ExDG06 Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p. TP
24.08
kerb
24.21 24.07
22
23.29 23.81
C
Aug 2016 - May 2017
450 4,550
C ExDG02 1,050 920
Architectural Assistant Pt.2
1,050 920
1,790 1,050 920
1,200
100 600 100 2,550
RG+P Architects Ltd
Insulated lintel over opening 23.56
hedge 23.73
23.41 23.39 23.66
2,083
N
ExDG01
Leicester, UK
1,050 920
SANITARYWARE SETTING OUT: Bathroom / En-Suite Layouts shown as indicative and are to be confirmed by Client.
5,440
concrete
full height side lights.
full height side lights.
TG
TG
TG
TG
TG
TG
TG
TG
gp
TG
TG
W14
W12
FFFL Level 2728
W13
TG
TG
TG
TG
TG
TG
TG
TG
feather edge timber cladding
ts
W01
W02
brick plith
W11
GFFL Level 0000
ExDG01
ExDG03
ExDG02
East Elevation
ts
Revision: R evis ion:
Date:Date:
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
W25
oof window or similar approved.
rr gg p
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
oof window or similar approved.
WR15
r gp
oof window or similar approved.
WR13
WR16
WR17
WR18
WR15
W22
Architects· P· Project Managers· Quantity · QuantitySSurveyors Architects roject Managers urveyors 130New NewWalk Walk 130 Leicester, LE1 Leices ter, LE 1 7J7JA A Tel:0116 0116204 2045800, 5800,Fax: Fax:0116 0116204 2045801 5801 Tel: email:des design@rg-p.co.uk, www.rg-p.co.uk email: ign@rg-p.co.uk, www.rg-p.co.uk
W24
Project: P roject:
A development at 41 High Street Roxton
FFFL Level 2728
W08
Client: Client:
W09
Resolution Homes
feather edge timber cladding
Sheet title: S heet title: Revision: R evis ion: East & West Elevations
Date:Date:
Ref: R ef:
40680/ 200.07 brick plith
ExDG09
ExDG10
ExDG12
ExDG13
GFFL Level 0000
West Elevation
Scale: S cale:
1:50 @ A1 Date: Date:
Drawn: Drawn:
Checked: Checked:
rr gg p Architects· P· Project Managers· Quantity · QuantitySSurveyors Architects roject Managers urveyors 130New NewWalk Walk 130 Leicester, LE1 Leices ter, LE 1 7J7JA A Tel:0116 0116204 2045800, 5800,Fax: Fax:0116 0116204 2045801 5801 Tel: email:des design@rg-p.co.uk, www.rg-p.co.uk email: ign@rg-p.co.uk, www.rg-p.co.uk
0
1
2
3
4
5
6
7
8
9
10
dimensions checked site. scale drawing. This drawing is the AllAll dimens ions to to bebe checked onon s ite. DoDo notnot s cale offoff drawing. This drawing is the copyright Architect, and not reproduced without their permission. copyright of of thethe Architect, andnot to to be be reproduced without their permis s ion. Ordnance Survey map information reproduced with permission of HMSO Crown Ordnance S urvey map information reproduced with permis s ion of HMS O C rown Copyright C opyright resreserved. erved. rg+p Ltd. Trading as rg+p. rg+p Ltd. Trading as rg+p.
Project: P roject:
A development at 41 High Street Roxton
mments
Resolution Homes
r and full height side lights.
Sheet title: S heet title:
East & West Elevations
Ref: R ef:
40680/ 100.09
r and full height side lights.
r and full height side lights.
Scale: S cale:
1:50 @ A1 Revision: R evis ion: Date: Date:
r and full height side lights.
Date:Date:
10 11 2016
r and full height side lights. Drawn: Drawn:
Checked: Checked:
UKD
DMC
r and full height side lights.
8
9
10
dimensions checked site. scale drawing. This drawing is the AllAll dimens ions to to bebe checked onon s ite. DoDo notnot s cale offoff drawing. This drawing is the copyright Architect, and not reproduced without their permission. copyright of of thethe Architect, andnot to to be be reproduced without their permis s ion. Ordnance Survey map information reproduced with permission of HMSO Crown Ordnance S urvey map information reproduced with permis s ion of HMS O C rown Copyright C opyright resreserved. erved. rg+p Ltd. Trading rg+p. rg+p Ltd. Trading as as rg+p.
r and full height side lights.
r and full height side lights.
r gp
mments
FFFL Level 2728
TG
TG
TG
TG
TG
TG
TG
TG
TG
TG
W14
W12
TG
W13
TG
TG
TG
TG
TG
TG
TG
feather edge timber cladding
W01
W02
brick plith
GFFL Level 0000
W11
East Elevation
ExDG01
ExDG02
ExDG03
r gp
Client: Client:
23
Schedule of Accommodation Type A (130m² 4B) - 9 Type D (90m² 3B) - 5 Type G (84m² 3B) - 10 Type H (45m² 1B) - 2 Type J (64m² 2B) - 9
A
04
01
02 03
03
A
13
05
04
04 05
A
10 09
06 06 07
09
J
07
A
13
218% 1.527 ha 0.368 ha 1.159 ha 105m (approx length) 2188m2(approx area)
28.85 units per hectare (including POS area)
Site coverage equals 11,478 ft2/acre (including POS area)
14 14
J
J
10
09
15
A
32
G
G
33
G
G
G 34
31
23
J*
24
31
J*
30
25
Hx2*
Indicative proposed tree planting
21 - 22
Proposed retaining structure.
D
Public Open Space (POS)
21
24
22
24
General site area, gardens etc.
26
29
D
20
25
25
30
30
20
Existing hedgerow to be retained
20
G*
J*
23
Existing tree to be retained
19
19
G*
35
23
31
18 19
35
Key
18
35
33 32
18
G
34
32
17
17
17
33
16
16
16
34
15
J
15
08
A
Parking Site Area POS Development Area Adoptable HighwayShared Surfaces -
12 11
08 07
35
10
08
A
J
J
G
G
Total Number of Dwellings
Site Density
13
12 11
06
14
12 11
05
Affordable units (*) = 7 Units (20%)
01
02
D
03
A
01
02
27
Soft SUDs features as appropriate.
29 29 28
26
27
28
28
D
27
Proposed woodland planting.
D 26
Street Hierarchy
A
Primary access routes Shared surface routes
24 0
10
20
30
40
50metres
Revision:
Date:
A Housetypes amended to address corner, gardens and parking improved. B Site Plan amended. C Site Plan amended to suit planning comments. D Site Plan amended to suit planning comments. E Access road widened to 5.5m to suit tracking F Mix amended G Amendments to suit landscape comments. H Amendments following internal review
RS.
09.06.15
JH/RS. 25.09.15 RS/DMC13.01.16 Date:
Revision:
RS/DMC02.02.16 DMC
17.02.16
RS RS
13.04.16 15.04.16
SC
20.04.16
Date:
Revision:
Front Elevation
Rear Elevation Front Elevation
r gp
Side Elevation
Side Elevation
Rear Elevation
r gp
Side Elevation
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
Project: Boiler
W
A development at Land off The Green, Donington le Heath
8.32
6 7 8 9 10 11
12
1
2
2
1
8.32
3.89
12
5.39
ST
Sheet title: Bathroom
House Type J
Landing
Ref:
40261/ 015
Living room 2.95
2.11
11
2.49 10 9 8
9
7
8
6
7
5
6
3
4
5
5.39
4
4.69
3 10
F
5
9
Living room
4
8
Landing ST
3
7
9
ST 10
Bathroom
11
8
Wrenbury Properties Ltd ST
WC
6
8
12
2
1:100 @ A2
7
11
1
Scale: Bed 3
Store
W
6
5
3.25
5
12
8 6.9
8 6.9
2.75
Boiler
40261/ 014
Hall
4
4
11
11
Kitchen
Hall
Landing
3
Hall
WC
Ref:
12
12
ST
House Type H
Bed 2 3.52
9
Project:
Bed 1
3
Dining
7
4.25
Bed 1
F
10
Sheet title:
1 2.9
WC
6
4.25
Kitchen
Client: 2.63
5
Dining
F
Bed 1
4
Dining
2.78
Kitchen
Wrenbury Properties Ltd Bathroom
ST
10
Boiler
W 4.25
Client:
2.78
7 2.1
3 3.1
A development at Land off The Green, Donington le Heath 2.83
9 4.6
Living room
2.49
5.3 9
5.3 9
4 4.7
4 4.7
2.83
9 4.6
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
Scale:
3.47
Bed 2
1:100 @ A2
Bed 2
Date:
11.06.15 5.06
Date:
5.06
11.06.15 Drawn:
Checked:
RS Ground Floor Plan
9.55
9.55
1
2
3
4
5
6
7
8
9
10
r gp
0
Side Elevation
Front Elevation
Rear Elevation
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
Proposed Site Layout
Side Elevation
Side Elevation
0.34
5.17
includes plinth
0.34
4.28
6.61
Date:
4.28
Bed 1
40261/ 011
3.11
DW
3.42
3.04
En-Suite
WC11
11
Ref:
10 includes plinth
6
5.93
ST
6.85
3.31
1:100 @ A2
9 8 7
40261/ 007
5
3.07
Scale:
2
11.06.15 8.88
1
2.26
Family Room
Hall
3.23
3.04
Drawn:
Bed 3
Bed 2
1:100 @ A2
Bathroom
Date:
3.46
2.41
Checked:
3.19
3
Date:
3.71
4
Hall
1:500 @ A2
House Type A
12
9 8 7
Sheet title: Bed 4
AC
Living room
12
Scale:
Bed 1
Wrenbury Properties Ltd Landing
W
3.23
Living Kitchen
10
Bathroom
A development at Land off The Green, Donington le Heath Client:
6.63
5.95
Store Living room Bed 2
Project:
2.35
Utility
Ref:
2
Dining
2.80
All dimensions to be checked on site. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
2.65
House Type E
9
9.67
11
8
3
3.04
10
Boiler
10
7
6 5 4
Scale:
Sheet title:
En-Suite
9.89
8 7
1
9
4.24 12
2.87
3.91
9
WC
8
4.24
includes plinth
Bed 3
10
ST
2.10
12
W11
Kitchen
7
Architects · Project Managers · Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
2.94
3.28
3.04
Wrenbury Properties Ltd
DW
6
r gp 4.94
Client:
Landing
40261/ 003 H
5
Project:
W
Utility
4
r gp
Side Elevation
A development at Land off The Green, Donington le Heath
Ref:
3
Rear Elevation
Wrenbury Properties Ltd
F
2
Date:
A development at Land off The Green, Donington le Heath
Boiler
1
Revision:
Front Elevation
Sheet title:
First Floor Plan
All dimensions to be checked on site. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
Revision:
Architects · Project Managers· Quantity Surveyors 130 New Walk Leicester, LE1 7JA Tel: 0116 204 5800, Fax: 0116 204 5801 email: design@rg-p.co.uk, www.rg-p.co.uk
Client:
Checked:
RS Ground Floor Plan 0
Project:
Drawn:
First Floor Plan
11.06.15
RS Ground Floor Plan
First Floor Plan
9.78
Drawn:
9.55
Date:
Drawn:
Ground Floor Plan 0
21.05.2015
SA
1
2
3
4
5
6
7
8
9
10
First Floor Plan
All dimensions to be checked on site. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
0
Checked:
Checked:
RS
includes plinth
1
2
3
4
5
6
7
8
9
10
All dimensions to be checked on site. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
RAW
25 All dimensions to be checked on site. Do not scale off drawing. This drawing is the copyright of the Architect, and not to be reproduced without their permission. Ordnance Survey map information reproduced with permission of HMSO Crown Copyright reserved. rg+p Ltd. Trading as rg+p.
26
27
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 May 2015 - July 2016
28
Projects
• Brook End Farm Barn conversion & refurbishment of existing farm house
• Holmsfield Refurbishment & new extension to detached dwelling
• Halloughton Road Refurbishment & new extension to detached dwelling
• Michael Varnam House Refurbishment, demolition & construction of new series of dwellings & communial Facilaties
• Shelford Road Commercial units & appartments; Demolition of existing dwelling & construction of 2 retail units & 3 appartments
• Limes Avenue Doctors surgery & pharmacy; Extension to GP practice, demolition of existing dwelling & construction of new pharmacy including shared parking
29
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 May 2015 - July 2016
Proposed FFL 42.90
42.75
42.45
42.45
42.35
Existing FFL 42.37
42.24
42.05
41.90
41.77 41.44
Site Section AA
Proposed FFL 42.90
42.75
42.45
42.45
42.35
Existing FFL 42.37
42.24
42.05
41.90
40.53
40.63
40.53
41.77 41.44
Site Section AA
Legend
40.63
Site 4 3.
42
.73
m Tar54 4 2.
62
47
ac
DP
5
E: 47.48
4 2.50.15 E: THL 4 42.55 4 2.
THL 42.81
47
R: 52.55
4 2. 60
.62
DP
THL 42.55
E: 47.48 E: 50.15
THL 42.81 R: 52.55
58 4 2. 65 4 2. 4 2.
42.6
9
c maMH Tar 42.63 UTL 88 (Traffic) 4 2.
77
THL 43.06
MH R: 49.61 42.60 UTL (Traffic) 9 42.6
4 2.
65
7 4 2.
7
42 THL 43.06
m Tar .88
ac
28
48
42.
42
54
MH 42.60 UTL (Traffic)
28
4 2.
4 2.5
87
.45
4
42
4 2.
7
.73
.8
42
55
.89
54
42
4 2.
4 2.
87
42
4 2.
.98
49
Sv
7 2. 3
4
37
42
4
28 4 2.
42.
34
44 4 2. 48 . 2 4 34 42. 2.60
37
MH 42.63 UTL (Traffic)
4
4 2.
4 2. 5
4 2.
4 2.
44
37 R: 49.21
54
55
End 4
m Tar
4 2.
37
58
ac
.9
49
4 2.
Sv
42
ok Bro
42.
26
.01
53
20
4 2.
37
6
43
4
4 2.
4 2.
42.
1
4 2.
0 4 3. 4
.9
4 2. 4 2.
3 4 2.
.89
.9 .01
42
THL 42.61
48.36
E: 45.84
4 2.
DP
THL 42.83
2 2. 4 4Tp
28
42
42 43
41
.98
.04
THL
DP
4 2.
26
11
43
7
42
4 3.
4
42
4 2.
R:
Tarmac
E: 47.00
End
44.78
06
.01
.9
9
.8
4 3. 43 .01
42
.9
41
11
43
42
E:
E: 44.66
42.
5
27
31
4 2.
4 2.
DP
DP
4 2.
30 4 2.
.7
m
ht 1
5
Gy 42.00
I\R
5
.7
4
23
2 4 2.
.17
25 3 4 2. 4 2. 2 37 42. 36 20 4 2. 4 2.
4 2.
4 2.
42.48 k o Bro R: 46.85
THL 42.49
E: 47.65
42.62
45
4 2. 2
20 R: 49.94 4 2.
.20
9
23 4 2.
THL 42.76
Tp
DP
42
4 2. 4
42
THL 42.37
R: 50.06
4 2.
THL 42.43
THL 42.43
CVR
A
R: 46.96 R: 49.21 E: 45.04
DP
Gy 42.35
E: 44.66
5
m ht 1
E: 44.22 (Meter)
Lp
E: 47.65
THL 42.27
22 4 2.
42
THL 42.49
4
25
42.44 R: 46.85
42.43
E: 44.57 7 2.2 DP
Gy E: 47.26 42.00
42.07
4
DP
4 2. 3
DP
4 2.
44.78
THL 42.48
THL 42.61
B1 42.673
4 2.
I\R
6
R: 49.94
THL E: 47.63 42.37
E:
6
45
3 025.2 424.
E: 46.32
E: 44.77
4 2. 6
THL 42.59
4 2.
THL 42.09
6
¯0.225
Lp
2
DP
THL 42.13
THL 42.76
THL 42.83
45
WL 40.87
4 4 2. 2
DP
THL 42.27
4 2. 3
E: 44.56
4 2. 2
5
4 2.
40.72
UTL (Rust/Old)
E: 44.26
THL 42.45 E: 47.63
4 2. 2
CVR 42.13
4 2. 3
DP
R: 46.96
THL 42.77
E: 45.84
Tarmac
E: 45.04
DP
42.62
45
PInv 41.84
R: 45.01
42.13
PInv 40.95
41.96
0 4 2. 2
Gy 42.35
42.43
.48 R: 46.98 E: 44.57 DP 42 9 4 2. 4
A on A Secti Site
5
R: 50.06 DP
E: 46.32
42.44 R: 46.80
DP
Tp
B1 42.673 E: 46.87
4 2.
41.99
.34
MH 42.11 UTL (Traffic)
Wall ht 1.3m
.29
CVR 42.01
UTL (Rust/Old)
42.19
42
9
42
1m
4 0. 6
¯0.225
ht
9
ll Wa
PInv 41.16
flow of water
3 2. 0 4 2. 1 4 E: 47.26
DP
THL 42.09
8 4 2. 4
6
E: 47.00
DP
THL 42.13
E: 44.26
R: 45.01
E: 44.22
42.13 41.90 Wall ht 1.3m
So 40.63 42.09
to measure .62Unable pipe size due to0 40 42.1
4 1. 4
41.30
30
40.56
Wall ht 3m
¯0.225
41.99
3
40.72
40.87
DP
R: 49.15
4 2. 6
THL 42.59
2
4 4 2. 2
DP
UTL (Rust/Old)
6
DP
42
DP
41.96
E: 44.49
42.19
9
9 4 0. 6 41.44
40.6
MH 41.82 B2 IL 39.79 WL 41.939 ¯0.225 PInv 40.95CL
3
UTL (Rust/Old)
41.90
4 1. 4
41.77
41.37
3
A
PInv 41.18
41.90
3
Concrete
CVR 42.01
4 2. 3
A on A Secti Site .33
CVR 42.13
DP
R: 44.94
Unable to measure pipe size due to flow of water
4 2. 1
4 2. 2
THL 42.54
R: 46.98
E: 44.56
0
9
E: 44.77
THL 42.57 THL 42.45
4 2. 2
R: 47.57 E: 44.49
4 2. 4
.7
41.85
41.44
40.6 40.6400.56
41.3040.5 2 3m l ht 1.3 W4al
40.63
THL 42.38
3
1
THL 42.43
THL 42.32
E: 45.29
41.85
40.58
¯0.15
41.90
41.85
MH CL 41.82 IL 39.79
B2 41.939
9 4 2. 2
8
41.84
40.53 A
PInv 41.84
4 1. 8
Concrete
40.58
DP
E: 45.29
41.77
41.74
40.60 40.41
41.32
41.37 41.52
41.82
137smq
0 1. 8
A
42.57
4 2. 3
R: 44.94
THL 42.77
42
41.85
41.84
Proposed Soft Landscaping
4
41.77
41.71
46smq
THL 42.32
4 2. 4
51sqm
Proposed Hard Landscaping
R: 46.80
THL 42.43
THL 42.38
R: 47.57
41.74
41.52
40.41
Proposed Permeable Paving
E: 46.87
R: 49.15
42
137smq 138sqm
8 4 1. 8
41.82
Proposed Soft Landscaping Proposed Demolition
.80
9
THL 42.57
9
46smq
41.77
41.71
Proposed Hard Landscaping Adjoining Site in Same Ownership
41
4 2. 2
48.36
.9
51sqm
1
6
Proposed Permeable Paving Site
4 2. 4
.7
138sqm
42
Proposed Demolition
R:
42
Legend
Tp
THL 42.54
.04
9 4 2. 4
43
42.57
Adjoining Site in Same Ownership
R:
49.61
RIBA Plan of Work
Stages 1-3
North East Elevation
Proposed FFL 42.90 Proposed FFL 42.90
C
08/10/15 Amendments to Plans & Elevations
PMM
B
12/08/15 Flue Added to Barn Elevations
PMM
A
24/07/15 Proposed Barn Elevations Added
PMM
REV. DATE
North West Elevation
DESCRIPTION
Proposed FF
BY
South West Elevation
North West Elevation
Architects, Landscape & Interior Design 16-20 Bath Street, Nottingham NG1 1DF T
0115 841 8418
E
design@allanjoycearchitects.co.uk
F
0115 950 7161
W
www.allanjoycearchitects.co.uk
CLIENT
Martin & Karen Wigglesworth
Landing Bedroom 2
Bedroom 1 Ensuite
PROJECT
Brook End Farm, Brook End, Repton, Derbyshire, DE65 6FW
Bathroom
DRAWING
Proposed Floor Plans & Elevations - Barn
Proposed First Floor Plan
Proposed Roof Plan
South East Elevation
South East Elevation
PROJECT NUMBER
SCALE
DATE
2863
1:100
Jun-15
DRAWING NUMBER
REVISION
STATUS
07
C
Preliminary PMM North East Elevation
BY
This drawing is copyright and remains the property of Allan Joyce Architects Ltd Generally do not scale drawings. All dimensions to be checked on site.
N 0
1
2
3
4
N
5M
0
1
2
3
4
5M
9 42.9
9 42.9
L4 2.7
7
TH
L4 2.7
7
Kitchen
42.48
42.66
42.6
45.0 4
TH
42.4
Dining
2
L4 2.7
4 42.9
E:
4
South West Elevation 5 42.7
42.4
42.66
4 42.9
3
Proposed FFL 42.90
Kitchen
42.48
5 42.7
3
42.4
E:
4 42.6
45.0 4
Dining
2
6
TH
L4 2.7
6
Living Room Living Room E: 4 7.0 0
TH
L4 2.8
Entrance 3Hallway
42.45 42.45
L4 2.6 1
Snug
Sitting Room
4498
TH
L4 2.6
E: 4 7.0 1
0
TH Landing L4 2.8 Entrance 3Hallway
Bedroom 1 Sitting Room
4669
TH
Entrance WC
4 42.9
4498
4 42.9
42.45
42.45
4669
42.4
Utility Room
6 42.7
6 42.7
Utility Room TH
Landing Snug
Bedroom 2 Bedroom 1
Entrance
Ensuite
Bathroom Ensuite
WC 42.44
42.58 42.44
Proposed Ground Floor Plan
Bathr
Proposed First Floor Plan Proposed Ground Floor Plan North East Elevation
42.58
Proposed Roof P Proposed First Floor
31
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 May 2015 - July 2016
Repair existing gutter as R1.136
Flat roof construction as J1.102
Brick up opening as F1.112
Repair existing gutter as Form new opening & supply R1.136 and fix boiler outlet vent
2180
625
880
W 02
W 01 6251250
Brick up opening as F1.112 Footings to new wall as E1.102
Existing North Elevation
Footings to new wall as E1.102 Form new opening & supply and fix tumble dryer vent through external wall
Existing North Elevation
Finish to new Garden Room as H2.108
W 01 900
Tap
Brick plinth to Garden Room as F1.104
2700 New Garden Room
Proposed South Elevation
1595
510 ED 03
510 ED 03 2130 New Garden Room
Proposed West Elevation
900
150
New up-and-over garage door asForm L2.108 replace&existing new toopening supply door and fix tumble dryer vent through external wall
585
Brick plinth to Garden Contractor's choice Room as F1.104 UPVC
600
W 02
445
Finish to new Garden Room as H2.108
Tap
1250
ED 04
2180 Contractor's choice UPVC
800
600
ED 01
Brick F1.112 Supplyup&opening Fit NewasEntrance Door as L2.102. Old English Doors ref 772 New up-and-over garage door New Downpipe to Water as L2.108 to replace existing Butt as R1.102 door
approx. 1960
ED 04 approx. 2350
1595
150
approx. 2100
ED 01
approx. 1960
approx. 2100
approx. 2350
585
Brick up opening as F1.112
880
Supply & Fit New Entrance Form new opening & supply Door as L2.102. Old English and fix boiler outlet vent Doors ref 772 Decorate exteriorto Fascias New Downpipe Water & SofitsasasR1.102 M6.120 Butt
approx. 1820 910
445
800
Decorate exterior Fascias & Sofits as M6.120 Flat roof construction as J1.102
2100
910
2100
approx. 1820
2130
2700
New Garden Room
New Garden Room
Proposed South Elevation
Proposed West Elevation
Legend BRICK INFILL CONSTRUCTION Supply and lay external brick/blockwork infill construction in accordance Legend with SoW clause F1/112 and as follows: - Facing brickwork to match existing. - Full fill cavity insulation as F1/314. Nominal 100mm thickness to be confirmed. BRICK INFILL CONSTRUCTION - 100mm blockwork to internal face tied into existing -Supply Internal as K1. Decorate as M6 infill construction in accordance andlining lay external brick/blockwork with SoW clause F1/112 and as follows: - Facing brickwork to match existing. - Full fill cavity insulation as F1/314. Nominal 100mm thickness to be INSULATED TIMBER FRAME CONSTRUCTION confirmed. - 100mm blockwork to internal face tied into existing andlining install timber wall inside existing brick wall in -Supply Internal as insulated K1. Decorate as framed M6 accordance with SoW clause G2/116 and as follows: - Existing 100mm brickwork to remain - 50mm clear cavity -INSULATED 100mm timber framing as G2/116 with 100mm insulation as M1/346 TIMBER FRAME CONSTRUCTION - Internal lining as K1. Decorate as M6 Supply and install insulated timber framed wall inside existing brick wall in accordance with SoW clause G2/116 and as follows: - Existing 100mm brickwork to remain TIMBER -INTERNAL 50mm clear cavity WALL CONSTRUCTION - 100mm timber framing as G2/116 with 100mm insulation as M1/346 andlining construct interiorastimber-framed walls as follows: -Supply Internal as K1.new Decorate M6 - Timber framing as G2 and to Structural Engineer's information. - Wall linings as K1. Decorate as M6
Existing fence to be replaced as Q1.120. Decorate as M6.122
A WD04
W 02
W 01 A as existing
WD04
Extg MH
ED 03
*T
boiler
to align W 01 GARDEN ROOM
W 02
d
D 10
New Rainwater Butt connected to new Downpipe. Rainwater Butt supplied by Client Existing fence to be replaced as Q1.120. Decorate as M6.122 New Downpipe as R1.102
New DP
to align
New DP
*T
Flat roof set to falls on firlings as G2.108 New floor slab to Garden Room as E1.108
as existing
up ED 03
up
D 11 GARDEN ROOM
d
UTILITY
D 10
SEWING ROOM Flat roof set to falls on firlings as G2.108
w
A WD04
UTILITY
D 11
New DP
New Downpipe as R1.102
w boiler
Extg MH
New DP
New Rainwater Butt connected to new Downpipe. Rainwater Butt supplied by Client
D 09
New floor slab to Garden Room as E1.108 New floor slab as E1.108b to sewing room and wet room to bring floor level up to existing
SEWING ROOM
INTERNAL TIMBER WALL CONSTRUCTION
LIVING
STUDY
A
New floor slab as E1.108b to sewing room and wet room to bring level up to existing Boxingfloor as G2.120
WD04 D 09 WET ROOM
LIVING Extg MH
D 07 Extg SVP
B D 07 HALL D 06
D 08
BATHROOM Supply & Install New Access 30min rated lining to to loft fire as L2.120 compartment wall to garage as Infill old loft hatch and make M1.306 good plaster
D 02 D 03 oven/grill
B
HALL D 01
WD04
D 04
GARAGE
D 02 LOBBY
ED 02
D 01
oven/grill
KITCHEN
DINING
GARAGE
Incoming water main to have solenoid off switch
BED 01 WD04 Future Ramp
ED 04
100 PORCH ED 04
B Incoming water main to have solenoid off switch
Extg DP 100
WD04 Future Ramp
Extg DP
100
DINING
up
100
Extg DP
KITCHEN
Construct insulated timber framing as G2.116 New floor slab to Entry Lobby as E1.108 Block paving to be replaced & regraded as Q1.122 Construct insulated timber framing as G2.116 New stepped paving to porch as Q1.110 New handrail as Block paving be replaced & Provisional SumtoA54 2.2 regraded as Q1.122
Extent of warm roof insulation as J1.120 Warm roof gravel covering over new
membrane as J1.120 New plumbing as R1.110
D 15
Remove door stops & make good lining
D 12 Remove door stops & makeMASTER good lining BEDROOM
DRESSING ROOM
Extg DP
MASTER BEDROOM
DRESSING ROOM
Extg DP
Existing First Floor Plan
0
3
Existing Ground Floor Plan
32
up
Existing brick wall to be replaced as Q1.122
2
New plumbing as R1.110 New rainwater downpipe as R1.102
SVP
New foul water drainage as R1.116 to connect to Existing soil vent pipe retained existing inspection chamber.
4
5M
4
5M
23/05/16
C
13/05/16 23/03/16
A
01/03/16
D
23/05/16
REV. DATE
C
13/05/16
B
23/03/16
A
01/03/16
REV. DATE
Architec
16-20 Bath T
0115 841
F
0115 950
Architec
CLIENT 16-20 Bath
DP
New rainwater downpipe as R1.102 Window Notes:
SVP
All new windows to be as Schedule of Work clauses Existing soil ventand pipedoors retained L1 and L2.
Extg DP
Contractor to provide safety glazing where required to comply Window with ApprovedNotes: Document N.
Extg DP
Trickle required. with PartofF Work of current All new ventilators windows and doorsTo to comply be as Schedule clauses Building Regulations . L1 and L2. Sealants around all new windows as where L1.338required and L1.340. Contractor to provide safety glazing to comply with Approved Document N.
Extg DP
3
1
DP
Extg DP
0 1 Existing First Floor2 Plan
D B
New foul as R1.116 Extent of water warm drainage roof insulation as to connect to existing J1.120 inspection chamber.
LANDING
D 13 D 12
New stepped paving Existing brick wall to to be replaced Q1.122 porch as as Q1.110 New handrail as Provisional Sum A54 2.2
New Lintel as F1. 104
LANDING
D 13
New floor slab to Entry New between Existing Lobbysteps as E1.108 Garage and Proposed Lobby as E1.109
LOBBY ED 01 fridge/freezer
BATHROOM
Infill steps old loft hatch and make New between Existing good plaster Garage and Proposed Lobby as E1.109 Make good old fanlight recess above wardrobe door
PORCH Extg DP
Supply and construct new landscaping wall in front of garage to replace existing in accordance with Q1.122 Warm roof gravel covering over new membrane as J1.120
existing built in furniture to remain D 15
D 14
Make good old fanlight recess Supplywardrobe & Installdoor New Access above to loft as L2.120
D 03 fridge/freezer
BEDROOM
D 14
30min fire rated lining to compartment wallthroughout, to garage as Remove fanlights fill M1.306 in and make good openings
WD04
D 04
D 05
ED 02
STUDY
Boxing as G2.120 WET ROOM
D 05 Extg SVP
LANDSCAPING BRICK WALL CONSTRUCTION New Lintel as F1. 104
existing built in furniture to remain
Remove fanlights throughout, fill in and make good openings
D 08
D 06
Extg MH
Supply and construct new interior timber-framed walls as follows: -LANDSCAPING Timber framingBRICK as G2WALL and toCONSTRUCTION Structural Engineer's information. - Wall linings as K1. Decorate as M6 Supply and construct new landscaping wall in front of garage to replace existing in accordance with Q1.122
BEDROOM
Trickle ventilators required.To comply with Part F of current Window Legend: Building Regulations . SO
Structural Opening Sealants around all new windows as L1.338 and L1.340.
DL
Door Leaf Note: Confirm all dimensions on site prior to Window ordering Legend:
SO
Structural Opening
DL
Door Leaf Note: Confirm all dimensions on site prior to ordering
David & T 0115 841 F
0115 950
PROJECT CLIENT
13 Holm David & DRAWING PROJECT
Proposed 13 Holm
PROJECT NUMB DRAWING
3049 Proposed
DRAWING NUM
WD02 3049 This drawing is c
PROJECT NUMB
Generally doNUM not DRAWING
WD02
This drawing is c
Existing Ground Floor Plan
Generally do not
RIBA Plan of Work
Stages 0-5 Aluminium Flashing as J1.322
Aluminium Edge Trim Flashings as J1.322
Single Ply Polymeric Membrane as J1.310
Proprietary Flashing New Warm Roof construction as J1.102 to achieve UValue of 0.18
Single Ply Polymeric Membrane as J1.310 Facia boards as H2.108
Sofits as H2.108 150x50mm Timber Joists as H2.108
New window W01 as L1.102
D10
D09
New Concrete Floor Slab as E1.108
Brick Piers to Garden Room as F1.104 DPC 150mm Concrete Floor Slab as E1.108 150mm insulation M1.350 DPM
Detail of Post above sill level
Sand Blinding as E1.108 Compacted hardcore as E1.108
New strip footing to support new sun room as E1.102
600mm Strip Foundations as E1.102
Section A-A Scale 1:20
Detail of Post through brick plinth
Gravel covering 50mm deep 240
Proprietary Flashing
Facia boards as H2.108
B
23/03/16
A
01/03/16
REV. DATE
Am
Am
DES
Sofits as H2.108
2330
Architects, L ED01
D01
16-20 Bath Stre
Fall away from threshold at 1:80 New foundation wall stepped 1.2m
T
0115 841 8418
F
0115 950 7161
New Paving Slabs as Q1.110
CLIENT
Tiled Flooring as M4.108
David & Ja
Non deformable suitable Insulated Cavity Closer
PROJECT
13 Holmsf New floor slab as E1.108 DRAWING
Insulation
Sections an
DPM Sand Blinding
PROJECT NUMBER
3049
Assumed existing ground level
DRAWING NUMBER
WD04
Section B-B
This drawing is copyri
Scale 1:20
Generally do not scale
33
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 May 2015 - July 2016 SoW G1.106 New steel support member to struc eng details
Existing Trussed Rafter Roof SoW G2.110 New S/W cut rafter roof as struc eng details
Sow G2.112 New softwood timber framing to support box window. Sizes and grade of timber to struc eng details 152x89xUB16
Existing Beam
A
25mm vent zone
100x100 (c16) Prop
12mm Plywood
06
Render carrier board with polymer modified render on as SoW M1.112 on treated SW battens SoW G2.114 New oak eaves beam as struc eng details
06
06
A SoW G2.114 New Oak ridge as struc eng details
Ext RWP
New padstones for steel
B
Compriband
Proposed Box Window Detailed Plan 1:10 SoW L2.102 New oak front door
SoW G2.114 Oak Posts as struc eng spizes, fixed as struc eng details
T&G Boards 152x89xUB16
Soffit Strip Vent
0
New waterproof membrane to overlap and be fitted beneath existing
SoW E1.104 New pad footings as struc eng detail
5 x1
)
16
(c
50
Form boxed eaves to match existing profile and decorate as SoW M6.110
SoW Q1.102 Mortar bedded concrete pavings set to falls away from front door New ramp to porch
CDM 2015 Notes
Remove existing sofit and facia of hatched areas only and highlight to architect if other areas in poor state of repair
SoW E1.104 New strip footings to support new porch cavity wall construction as struc eng detail
50x150(C16)
EXTG. Beam
Proposed Box Window Section B-B 1:10
ext
Remove existing sofit and facia as above
EB 75x175 C16
50x150(C16)
See ENG Notes Dwg No.1
Remove garage door Existing Trussed Rafters Remove glazing and roof area ready to build new entrance. Retain existing lintels.
Existing South Elevation
152x89xUB16
D01
EXTG. Beam
PMM PMM
DESCRIPTION
REV. DATE
BY
ext
Interior Carry out allArchitects, demolition inLandscape accordance & with ScheduleDesign of Work, clause D2. Temporarily remove interlocking tiles and set aside for re-use, remove existing ceiling and trussed rafters. Provide all temporary propping as required to remaining roof structure
D
Bath Street, Nottingham NG1 1DF to remain during - Protect all16-20 existing structures, surfaces, and fittings demolition. T 0115 841 8418 design@allanjoycearchitects .co.uk - Co-ordinate demolition work with otherE trades as required. - Survey hazards as SoW D2.102 F existing 0115 structures, 950 7161 services, & ground W www.allanjoycearchitects .co.uk
06
RB 75x175 C16
CLIENT
Remove wall to form opening for new window W09 (refer to WD02 for dimensions)
Andy & Paula Dyson LEGEND
ext
150x150 Post C16 Area hatched to be left clear and tiody out of hours to allow clients to park cars in evening
Part Elevation B
Existing West Elevation
PROJECT
50x150(C16) Ext RWP
EB 75x175 C16
See ENG Notes Dwg No.1
existing surface water drainage. MC 65aAsssumed Halloughton Road, Southwell to confirm runs on site prior to excavation NG25 0HL Existing rainwater pipe
DRAWING
Assumed existing foul drainage to be retained. Proposed Bathroom Walk In Wardrobe MC to confirm runs on site prior& to excavation
Temporarily remove interlocking tiles and set aside for re-use, remove existing ceiling and trussed rafters. Provide all temporary propping as required to remaining roof structure
EXTG. Beam
IC01
Existing Inspection chamber
PROJECT NUMBER
DATE
SCALE
MC to seal and protect existing doors as shown
Ext RWP
W06
PMM
Fire Hazard: Fire during work spreading to occupied areas. Person(s) at risk: Site Operatives/owners Minimise Risk: Fire alarm and detection systems to remain operational at all times. Contractor to set up register for all site operatives to sign in and out.
W07
Contractor's Area
Asbestos Hazard: Possible risk of asbestos containing materials disturbed by works. C at 07/01/16 Amendments to notes Person(s) risk: Site Operatives Minimise If any such materials are found during the work, submit B Risk: 27/12/15 Detailing Updated proposals for safe removal by suitably qualified personnel, notify the A 06/11/15 Box Window Added Architect, and alert appropriate authorities.
DEMOLITION NOTES
150x75PFC
Garden
Clients to occupy house during works Hazard: Owners gaining access to the construction site. Person(s) at risk: Owners Minimise Risk: Contractor to provide appropriate hoarding/protection to perimeter of working area, to keep owners informed of proposed work while the house is occupied, and to conduct the work in stages as agreed. At critical periods clients can move into temporary accommodation for short periods if required.
Existing North Elevation
Graveyard
General safe working practices specific to the project are described in the Preliminaries as part of the accompanying Schedule of Work. Access to site Hazard: Access from restricted width highway. Shared Access to Site Person(s) at risk: Site Operatives/General/Public Neighbour Minimise Risk: Site operatives to be made aware of access and plan deliveries / plant movement accordingly.
Remove wall to form opening for new window W11
Proposed Porch Section D-D 1:20
The construction generally is of a standard nature and therefore is well within the generally advisable working methods for building.The project does have a few special hazards which are noted below.
Data
Proposed Porch Detailed Plan 1:20
with polythene tape1:20 and plywood forSep-15 duration of 2934 works as SoW D2
Remove window and widen opening
DRAWING NUMBER
REVISION
STATUS
WD06
C
Contract
BY
Existing door/window to be removed and carted away as SoW D2
Remove door and infill with cavity wall with brick to Proposed Boxed Window Section A-A 1:10 match existing
PMM
Site Boundary
This drawing is copyright and remains the property of Allan Joyce Architects Ltd
Existing East Elevation
Access to Site Generally do not scale drawings. All dimensions to be checked on site.
Part Elevation A Temporarily remove interlocking roof tiles and set aside for re-use, remove existing ceiling and trussed rafters. Provide all temporary propping as required to remaining roof structure
Existing Plan
Proposed area of occupation by client during first phase of construction. Exact phasing and occupation arrangements to be confirmed at Pre-contract meeting
IC01
IC02
Ext RWP
D
27/01/16
Amendments to removal of windows and doors
PMM
C
07/01/16
Amendments to notes
PMM
B
11/12/15
Adjustment to demo of bedroom wall
PMM
A
13/11/15
Extg Elevations Added
PMM
REV. DATE
Living Room
DESCRIPTION
BY
Retain fitted units
Music Room Drive to remain unobstructed by contractors vehicles during the works to allow for access by the client, neighbours and emergency vehicles
Remove and make good all dado rails and coving throughout house. Kitchen coving to be retained. Remove all skirting, architraves & internal doors throughout house.
Ext RWP
Bedroom
Bathroom
Demolish stud wall to existing bedroom
Bedroom
Demolish stud walls and remove all sanitary ware, furnishings , plumbing etc
Bathroom
Ext RWP
IC03
Architects, Landscape & Interior Design
Retain door during first phase to close off areas
16-20 Bath Street, Nottingham NG1 1DF
Hall
Study
Remove wall to form opening for new box window
Bedroom
Ext RWP
Garage
T
0115 841 8418
E
design@allanjoycearchitects .co.uk
F
0115 950 7161
W
www.allanjoycearchitects .co.uk
CLIENT
Andy & Paula Dyson
Ext RWP
Halloughton Road
Contractor Access
Dining Room
Ext RWP
Protect all new kitchen worktops, cupboards , lighting etc during construction work in this area
65a Halloughton Road, Southwell NG25 0HL DRAWING
Kitchen
34
PROJECT
Remove and cart away existing garage door
Ext RWP
Utility
Site Plan Scale: 1:200 A •
B •
Pergola to be demolished and carted away
Site Management Plan and Demolition
Remove glazing and build new entrance porch with pitched roof
PROJECT NUMBER
SCALE
DATE
2934
1:100
Aug-15
DRAWING NUMBER
REVISION
STATUS
WD01
D
Contract
Carefully take up & set aside for reuse the following: - Paving slabs to front door area from existing drive - blue brick pavers - timber sleepers removed from planters - paving to be power washed
BY
PMM
This drawing is copyright and remains the property of Allan Joyce Architects Ltd Generally do not scale drawings. All dimensions to be checked on site.
RIBA Plan of Work Bathroom IC01
Stages 0-5
New IC Wall Tiles as SoW M4.110 Shower Head and Rinser Set as SoW N1.104 Heated Mirror as SoW N1.386 new SVP
W11 Thermostatic Shower Valve as SoW N1.104
Ext RWP Bath Taps & Shower Handset as SoW N1.104
Ext Radiator to be retained
Washbasins as SoW N1.104
180
Bath Tub as SoW N1.104
1045
2000 Back Unit as SoW N1.104
Shower Enclosure as SoW N1.104
Bath as SoW N1.104
WC pan as SoW N1.104
1250 Shower Tray as SoW N1.104 1
Tiled floor as SOW M4.108
4
320
2 3
Bathroom sanitaryware as SoW N1.104
Elevation 1
930
Elevation 2
HM 1
Vanity unit as SoW N1.104
2
4050
3
TR
Shower Enclosure as SoW N1.104 Back Unit as SoW N1.104 Wall Tiles as SoW M4.110
WC pan as SoW N1.104
Shower Head and Rinser Set as SoW N1.104
1200
Towel Rail as SoW T9.102 Shower Tray as SoW N1.104
Bath Taps & Shower Handset as SoW N1.104
900
Shower Enclosure as SoW N1.104
Bath Tub as SoW N1.104
800
Proposed Bathroom
Shower Tray as SoW N1.104
Elevation 3
Proposed walk in wardrobe
Elevation 4
Walk in Wardrobe
A
500
600
1000
1500
500
1500
Client to supply light fittings
780
3382 Data
0115 950 7161
IC02 E
design@allanjoycearchitects .co.uk
W
www.allanjoycearchitects .co.uk
PROJECT
EXTERNAL CAVITY WALL - BRICK FACING
65a Halloughton Road, Southwell NG25 0HL
Supply and lay external brickwork wall construction in accordance with SoW F1.102, to SE information and as follows: - Facing brickwork to match existing. - 100mm cavity fully filled with insulation as SoW F1.344 - 100mm concrete blockwork to internal face as SoW F1.308 - Internal plaster coating as SoW M1.102. Decorate as SoW M6.102
Proposed Bathroom & Walk In Wardrobe
Existing Shower / WC
Proposed Bathroom
TR
Proposed Walk in Wardrobe
HM
P
P
1 D04
PROJECT NUMBER
SCALE
2934
1:20
Sep-15
DRAWING NUMBER
REVISION
DATE
STATUS
WD07
A
Contract
BY
PMM
Construct stud wall partition between This drawing is copyright and remains the property of Allan Joyce Architects Ltd new bathroom and walk in wardrobe
extg D06 boiler
D03
Ext RWP
0115 841 8418
F
Fit new bathroom as DRAWING drawing WD07 Elevation 3
1
Proposed Switch for New Circuit (gangs and poles as shown)
04
1
1
Existing consumer unit to remain. Connect new electrical services to existing capped connection in location shown
T
Andy & Paula Dyson
WD07
Bedroom 2
Loft Hatch to be replaced as SoW G23.110
N.B. All existing sockets, switches, data points, telephone sockets etc to be replaced as SoW V9.102
Ext Radiator
P
Elevation 2
Supply and lay external blockwork wall construction in accordance with SoW F1.104, to SE information and as follows: - External Render as SoW M1.110 - 100mm concrete blockwork SoW F1.308 - 100mm cavity fully filled with insulation as SoW F1.344 - 100mm concrete blockwork to internal face as SoW F1.308 - Internal plaster coating as SoW M1.102. Decorate as SoW M6.102
CLIENT
Ext RWP
Living Room
Elevation 1
W11
New IC New SVP
Ext RWP
145 95
Workshop paint sprayed MDF shelving & frame to Dressing Room units as N1/102
SERVICES LEGEND
Extg SVP
1950
1360 Dressing room vanity unit as Sow N1.102
Note: Confirm all dimensions on site. Do not scale. Check dimensions when setting out and report any discrepancies to Architect
LEGEND
16-20 Bath Street, Nottingham NG1 1DF
1950
Stainless steel hanging rail
Conservatory
BY
Architects, Landscape & Interior Design
IC01
1170
Mirror as SoW N1.102
PMM
Amendments to drawing & annotations
EXTERNAL CAVITY WALL - RENDERED BLOCK FACING
350
210
Client to supply light fitting
08/01/16
Invert levels to newDESCRIPTION IC to meet REV. DATE requirements of Part H of the building regs and work with existing drainage run levels
1040
Generally do not scale drawings. All dimensions to be checked on site.
D07
D05
Construct shelving / built in furniture as Sow N1.102
D09
BOX WINDOW SURROUND Supply and construct timber framed partition wall construction in accordance with SoW G2.112 and as follows: - Render on render carrier board on battens as SoW M1.112 - 12.5mm Plywood Sheething as SoW G2.304 - 150mm Timber Frame construction with fully insulated cavity as SoW G2.112 - 12mm Internal Plasterboard with Skim as SoW M1.102
Data
Proposed Dimmer Switch for New Circuit (gangs and poles as shown)
P
D02 W05
BT
W04
Existing Data/Internet socket outlet. Proposed Data/Internet socket outlet. Link to hub as shown
Data
Hard-wired smoke / heat alarm as SoW V9.320
Recessed ceiling mounted downlight fitting as SoW V9.320
ext
Client to supply light fittings, contractor to fit to existing circuit Exterior soffit mounted downlight fitting with movement and light sensor as SoW V9.320 Exterior wall mounted light fitting with movement and light sensor
PIR
1514 ext
ext
452
Refer to section C on WD05 for details of cut roof construction
RW02
203x102xUB23 with 100 shs post over
New RWP
ext
Ext RWP
Client to supply hanging pendant fitting
1
452
W09 Ext RWP
02
WD06
Garage P Master Bedroom
Electric heating pad behind mirror as SoW N1.306
TR
Heated towel rail as SoW T9.102. Note dual-fuel to cloak room
Dining
ED02 P
WD05
Ext RWP
398
203x102xUB23 with 100 shs post over
D01
ED03 Ext RWP
P
Make good plaster to walls & ceiling where coving and dado rails removed. Prep walls / ceilings fully, remove any existing wall coverings and decorate as SoW M6.102 NB - New skirtings and architraves to all areas as SoW K1.118 Ceramic floor tiling as SoW M4.108. Client to supply additional tiles to extend dining finish out to hall. Contractor to allow for fixing only
Ceramic Floor Tiling as SoW M4.108
Newly Formed Oak Framed Porch & Front Door W01
Relay existing concrete paving slabs and blue brick surrounds set aside from demolition works. Assess amount to ensure sufficient to carry out as per layout shown. Lay in accordance with SoW Q1.102
New foul water drainage . All above ground as SoW R1/104. All new below ground as SoW R1.106.
SVP
FINISHES
W10
Refer to drawing WD06 for details of New Projecting Window
D01
Existing foul water drainage to remain
IC01
New roof window as SoW L1.104
RW01
01
New surface water drainage as SoW R1.102
New IC
New window/external screen as SoW L1.102
RW01
Structural steel as SoW G1.106 (indicative only). Refer to Structural Engineer's information
Mechanical extract as SoW V9.102
New 75Ă˜ rainwater downpipe as SoW R1.102
External door as SoW L2.102
W01
03
Kitchen
New RWP
Internal door as Schedule of Work clause SoW L2.106
ED01
WD06
Movement and light sensor to exterior lights
HM
D01
FS
DS
1152
Existing BT telephone socket
152x89xUB16
Data
P
Bedroom 1
Existing TV distribution
ED01 150x75PFC
2814
Data
EXTG. Beam W06
152x89 UB16
BT
INTERNAL STUD PARTITION CONSTRUCTION Supply and construct timber framed partition wall construction in accordance with SoW G2.118 and as follows: - Timber studs as 100x47 - 100mm Acoustic insulation to En suite walls as shown - Internal plasterboard as SoW M1.102 . Decorate as SoW M6.102
PIR
Proposed Shaver socket outlet TV
EXTG. Beam
P
Existing Socket outlet linked to common 5amp lamp circuit
IC03
D08 W08
194
Data Hub
W07
EXTG. Beam
617 194
Proposed Double switched socket outlet
Cut out area of failed ceiling and reboard this section. Then skim whole ceiling.
1140
Existing Double switched socket outlet
663
Proposed Switch (gangs and poles as shown)
Existing inspection chamber
Proposed Soakaway As SoW R1/110
New inspection chamber as SoW R1.108 Soil & Vent Pipe SoW R1.104
H
05/05/16
Amendments to lighting, doors D01, D04 addition of door D09
G
28/01/16
Codes for Porch door & Garage door adju
F
07/01/16
General Alterations
E
21/12/15
Electric Services Added
D
11/12/15
Alterations to layout
C
19/11/15
Updated labelling, landscaping and layout
B
11/11/15
Existing & proposed opening amended
A
11/09/15
REV. DATE
Alterations to layout DESCRIPTION
Architects, Landscape & Interior Design 16-20 Bath Street, Nottingham NG1 1DF
A
T
0115 841 8418
E
design@allanjoycearch
F
0115 950 7161
W
www.allanjoycearchite
CLIENT
Notes: - All electrical work to be carried out in accordance with Schedule of Work clause V9. - All plumbing and drainage work to be carried out in accordance with Schedule of Work clause R1. - Allow to disconnect and cap redundant services and electrics
B
Proposed Ground Floor General Arrangement Plan Scale: 1:50
35
Andy & Paula Dyson PROJECT
65a Halloughton Road, Southwel NG25 0HL DRAWING
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 South East Elevation May 2015 - July 2016
South East Elevation
20
26
27
20
South West Elevation
27
South East Elevation 26
Legend unit 6 unit 1
n Ke
n gto ourt n i n C
n Ke
unit 2
unit 3
unit 4
unit 18
unit 5
Conversion
n gto ourt n i n C
unit 7
New Build office
unit 17
Renovation unit 16 unit 8
Plant Room unit 9
unit 15
Staff / Admin / Facilities
South East Elevation
unit 10
Bed sit
unit 14
unit 11
Emergency Accommodation unit 13
38
P
P
02/09/15 Elevation Added
PMM
DESCRIPTION
BY
16-20 Bath Street, Nottingham NG1 1DF
n tze rt r O ou C
T
0115 841 8418
F
0115 950 7161
CLIENT
E
design@allanjoycearchitects.co.uk
W
www.allanjoycearchitects.co.uk
1
Framework Housing Association B
2
ST EN OR TZ
2
South West Elevation
1
Accommodation
Architects, Landscape & Interior Design
RE
ET RE ST EN
36
n tze t Or our C
A
REV. DATE
ET
38
OR TZ
38
ORTZEN STREET
unit 12
PROJECT
A
02/09/15 Renovation to Training Cen. Additional Openings added to proposed units 28/08/15 Landscaping & Schedule of Areas added
FHA Michael Varnum House REV. DATE
DESCRIPTION
PMM PMM BY
RIBA Plan of Work
Stages 1-3
5000
Legend unit 6 unit 2
unit 3
unit 4
unit 5
N
6150
unit 1
C
unit 18
R
unit 7
P office
unit 17
S
B
E
unit 16 unit 8
A
Proposed Example Floor Plan 1:50
unit 9
medical room
T
unit 15
in
U U U U U U U U U U U U U U
unit 10 lobby / reception
Training Centre unit 14
wc boiler unit 11
snug kitchen
store store
N
Proposed Floor Plans 1:100 0m
2
4
6
8
unit 13
ORTZEN STREET
unit 12
10m
37
7650
Nottingham, UK 4510
5350
Allan Joyce Architects 462
Architectural Assistant Pt.2 South-West Elevation
Elevation from Shelford Road
North-East Elevation
May 2015 - July 2016
Floor Areas:
EL33.03
Bike Store
27.5m²
Retail 2
24m²
Flat
65m²
House 1
53m²
House 2
53m²
4510
5350
7650
Residents Bin Store
Retail 1
Residents parking area
462
North-West Elevation
Residents courtyard/patio areas
8363
98
12010
RA33.
PA TOP
7260
Radcliffe Methodist Church
113
Elevation from Shelford Road
Proposed North-East Elevation
Bin Store for Retail Units WC WC
N
14.04.16 Additional Parking Space Added
M
08.04.16 Adjustment to Elevations
L
30.03.16 Reduced Scale Proposal
I H G F E D C B A
06.01.16 22.12.15 5.11.15 29.10.15 21.10.15 14.10.15 01.10.15 28.05.15 02.03.15
REV. DATE
17a Shelf
Bin Store ammended Car park dimensions added Drawing updated for planning submission Dimensions added to plan and elevation Development of Design NW Elevation added. Drawings amended Plans & Elevations modified Development of Design Development of Design DESCRIPTION
Existing Hedge and retaining structure retained
New Gate automatically controlled
Architects, Landscape & Interior Design
Removal of self seeded sycamore tree and repairs to retaining wall
16-20 Bath Street, Nottingham NG1 1DF T
0115 841 8418
E
design@allanjoycearch
F
0115 950 7161
W
www.allanjoycearchite
8448
CLIENT
Electrical Solutions EST Ltd
69
P TO
54
SH
F EL
O
RD
AD
RO
EL33.03
Pull in area
Proposed First Floor Plan
PROJECT
17a Shelford Road, NG12 2AE DRAWING
Option 2 Proposed Plans and Ele Bike Store
4 1.7
3 RA PA
Residents Bin Store
Proposed Ground Floor Plan
DATE
PROJECT NUMBER
SCALE
2879
1:100
Feb-15
DRAWING NUMBER
REVISION
STATUS
03
N
Planning
This drawing is copyright and remains the property of Allan Joyce
Generally do not scale drawings. All dimensions to be checked on
Residents parking area Residents courtyard/patio areas
12010
98
33. PARA TOP
7260
8363
Bin Store for Retail Units WC
113 WC
New Gate automatically controlled
Existing Hedge and retaining structure retained
38
1-11 Shelford Road
17a Shelford Road
8448
Removal of self seeded sycamore tree and repairs to retaining wall
Pull in area
R
RIBA Plan of Work
462
4510
5350
7650
Stages 1-3
South-West Elevation
Elevation from Shelford Road
EL33.03
ford Road
North-East Elevatio
21-29 Shelford Road South-West Elevation
North-East Elevation Residents Bin Store
Bike Store
Floor Areas:
Residents parking area Residents courtyard/patio areas
North-East Elevation
12010
98
RA33.
PA TOP
7260
8363
North-West Elevation
Retail 1
27.5m²
Retail 2
24m²
Flat
65m²
House 1
53m²
House 2
53m²
Bin Store for Retail Units WC
113 WC
New Gate automatically controlled
Floor Areas:
8448
Removal of self seeded sycamore tree and repairs to retaining wall
Pull in area
Existing Hedge and retaining structure retained
Retail 1
27.5m²
Retail 2
24m²
Flat
65m²
House 1
53m²
House 2
53m²
North-West Elevation
FO
EL
SH
69
P TO
54
RD
AD
RO
Proposed First Floor Plan
N
14.04.16 Additional Parking Space Added
PMM
M
08.04.16 Adjustment to Elevations
PMM
L
30.03.16 Reduced Scale Proposal
PMM
I H G F E D C B A
06.01.16 22.12.15 5.11.15 29.10.15 21.10.15 14.10.15 01.10.15 28.05.15 02.03.15
Bin Store ammended Car park dimensions added Drawing updated for planning submission Dimensions added to plan and elevation Development of Design NW Elevation added. Drawings amended Plans & Elevations modified Development of Design Development of Design
TA TA TA LJD PMM PMM PMM EPH EPH
DESCRIPTION
BY
REV. DATE
A
21.10.15 Develo
REV. DATE
DESCRI
4 1.7 A3
R PA
West Elevation
Architects, Lan Proposed Ground Floor Plan
14.04.16 Additional Parking Space Added
PMM
M
08.04.16 Adjustment to Elevations
PMM
L
30.03.16 Reduced Scale Proposal
PMM
T
0115 841 8418
E
design@allanjoycearchitects .co.uk
I H G F E D C B A
06.01.16 22.12.15 5.11.15 29.10.15 21.10.15 14.10.15 01.10.15 28.05.15 02.03.15
TA TA TA LJD PMM PMM PMM EPH EPH
F
0115 950 7161
W
www.allanjoycearchitects .co.uk
21-29 Shelford Road AD
RO
Proposed First Floor Plan
Bin Store ammended Car park dimensions added Drawing updated for planning submission Dimensions added to plan and elevation Development of Design NW Elevation added. Drawings amended Plans & Elevations modified Development of Design Development of Design
16-20 Bath Street,
Architects, Landscape & Interior Design
N
16-20 Bath Street, Nottingham NG1 1DF
CLIENT
Electrical Solutions EST Ltd PROJECT
17a Shelford Road, NG12 2AE
T
0115 841 8418
F
0115 950 7161
39 CLIENT Electrical Sol
Nottingham, UK Allan Joyce Architects
Architectural Assistant Pt.2 Single ply roofing construction as J42.104 comprising: - Sarnafil Single Ply Roof Membrane - min. 150mm tapered thermal insulation - Vapour Barrier
May 2015 - July 2016
18mm Plywood deck on: - 50x200mm softwood joists at 600mm centres as G20.108 - Suspended ceiling as K40.10 UValue of 0.18 W/m2k N.B. Roof joists to be doubled up where forming openings for roof windows, AC.etc.
Electronically operated roof windows & blinds with insulated kerb upstands as L10.106
RW1
RW3
RW2
AC Unit TBC
PPC Aluminium Parapet Capping
AC Unit TBC
AC Unit TBC
Joists as G20.108
Suspended Ceiling as M40.10 Ceiling as K10.10
New Consulting Room 2
New Consulting Room 1 Tanking membrane as J40.12 Plasterboard finish as K10.10
New Consulting Room 3
Elec Cupbd
Internal Blockwork as F10.12
Screed & Insulation as M10.126 with upstands to achieve UValue of 0.23 W/m2k Concrete slab as E05.11 IFL 139.28+
Trench fill foundations as E05.10 and Struc Engs info
Proposed Section CC Cut to falls insulation as J42.302
RW2 For steel work see SE drawings
REV. DATE
ED2
New Consulting Room 2
DESCRIPTION
BY
Ceiling as K10.10
W4
Corridor
Architects, Landscape & Interior Design
New Consulting Room 4
16-20 Bath Street, Nottingham NG1 1DF T
0115 841 8418
E
design@allanjoycearchitects.co.uk
F
0115 950 7161
W
www.allanjoycearchitects.co.uk
CLIENT
Manor Pharmacy PROJECT
3 Limes Avenue, Alfreton, DE55 7DW DRAWING
Proposed Surgery Sections PROJECT NUMBER
SCALE
DATE
2855
1:20
Jan-15
DRAWING NUMBER
REVISION
STATUS
WD04
-
Tender
BY
PMM
This drawing is copyright and remains the property of Allan Joyce Architects Ltd Generally do not scale drawings. All dimensions to be checked on site.
Proposed Section BB
Consulting Room
Consulting Room
Shed
Gy
Room not Nurse surveyed
Constulting Room
Gy
Shed
Demolish existing walls to form new corridor as F1013
IL 138.33 CL 138.94 MH
Pit
Pit
Strip out rooms as C2016
Existing West Elevation
Gy
Existing South Elevation
Store Nurse Treatment Room
01
WPD
WD02 Bricking up of metre box as F10.14
Room not Consulting Room surveyed
Consulting Room
Gy
Retain for seperation of escape from building works. Remove fence, gate & hardstand for completion of the external works
Office
Reception
Waiting Room
Existing Dwelling North Elevation
M4
Provide infill fencing to protect from external works
Existing Dwelling East Elevation
Gy
WC
Lobby
Gy Pit
Extent of Demolition
M3
139.02
MH CL 139.05 IL 138.12 100ÂŻ
Gy
6
Kitchen 139.02
DOCTORS ONLY
7
4
3
2
MH CL 138.97 UTL OBSTRUCTED
5
Garage (Not Surveyed)
Shower Room
Dining Room
Manor Pharmacy
Living Room
Existing Dwelling West Elevation
Pantry
8
WC G
W
Existing vehicle access to rear of shops to be maintained throughout works.
Hall Front Room
Proposed Trench for new electrics REV. DATE
1
KEEP
CLEAR
UTL CL 138.93 MH
Existing Dwelling 1st Floor Plan
40 0
1
2
3
4
5M
BY
Architects, Landscape & Interior Design
M2 Bushes / Tree
Gate
DESCRIPTION
Existing Dwelling
Gate
16-20 Bath Street, Nottingham NG1 1DF T
0115 841 8418
E
design@allanjoycearchitects.co.uk
F
0115 950 7161
W
www.allanjoycearchitects.co.uk
CLIENT
Limes Avenue
Manor Pharmacy PROJECT
3 Limes Avenue, Alfreton, DE55 7DW
CDM NOTES Maintainance / cleaning high level glazing Hazard: Falls if using ladders Person(s) at risk: Client maintainance team Minimise Risk: High level windows can be cleaned by using a water fed pole system to eliminate the need
DRAWING
Site Management Plan & Existing
RIBA Plan of Work
Stages 1-4 Junction with new walling as F10.12
KEY:
B
07
RW3
BIG
998
New Consulting Room 1
New Consulting Room 2
Floor Areas
01
Area of Existing Floor Space 444m2
W1
Window Code
ED1
External Door
Area of Proposed Floor Space 114m2
Internal Door C
*
New Floor Space as % of Total 20.4%
New Consulting Room 3
Room Area Det
D1
Total Area of Floor Space 558m2
C
RW2
Elec Cpbd
3927.5
RW1
07
Existing Consulting Room 3
Existing Consulting Room 4
C
D6
1887
15075
07
100dia cut out Soil Vent Pipe
svp
Bins
910
3786
910
910
910
325 ED2
2310
2067.3
300
910
2886.2
Inspection Cham
IC
W4
W1 D4
*
*
D5
External 0.15W/m
*
ED1
New Consulting Room 4
Q10.144 Top soil & planting
New Consulting Room 5
External 0.15W/m 950
BIG
BIG W3
W2
300
Q10.110 Flag Stones
8427.5
900
RG
Render as M 100mm blo 100mm full 100mm blo 12.5mm pla
950
IC01 Q10.144 Top soil & planting
Q10.110 Flag Stones
Facing Brick 100mm full 100mm blo 12.5mm pla
2802
2805
Gy Extg Door
Existing Nurse Treatment Room
6900
300
1272
Nurse
Existing Constulting Room 2
480
RG
D3
1810
1121
move extg 2195 IC
Road Gully
D2
9789.7
D1
*
1810
690
1500
D6
*
Back Inlet Gully
BIG
svp *
900
RG
Internal B 2067.3 0.19W/m
07
15
Existing Consulting Room 1
16
17
18
19
20
B
12.5mm pla 100mm blo 12.5mm pla NB: Wall to of 53RwdB
4800
IC02
Gy Existing Consulting Room 5
NB: Movem provided at up with con poisitions ge agreed with constructio
x White lining to asphalt Q10.144 Top soil & planting
2500 IC03
IC03
Office
Q10.104 Asphalt to car park
Waiting Room
C
19/04/16
Floor Are
B
18/02/16
A
07/01/16
Drainage Area of Amendm
REV. DATE
Reception
2500
DESCRIPT
Architects, Lands
16-20 Bath Street, No
10 WC
11
12
13
14
Lobby
T
0115 841 8418
F
0115 950 7161
CLIENT
Manor Pharm 4800
PROJECT
3 Limes Avenu DRAWING
Proposed Surg Plan
0
1
2
3
4
5M
PROJECT NUMBER
SC
2855
1
DRAWING NUMBER
R
WD02
C
This drawing is copyright an
Generally do not scale drawi
41
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014 Supported the development of research outputs in architectural documentation and heritage management planning of historical and traditional settlements in the Sultanate of Oman. Principle duties included assisting with the basic research on Heritage Documentation and Management Planning in Oman. This involved undertaking and recording the outcome of fieldwork, assisting in the development of questionnaires, conducting surveys and literature / database searches and interviewing inhabitants. Produced visualisations and other 3D drawings of architectural and urban conditions and propositions, both hand-drawn and computer generated. Made significant use of the latest digitall documentation methods, including rapid prototyping and the operation of a microcopter.
42
Projects • Harat as-Suwaufah (Sinaw) Barn conversion & refurbishment of existing farm house
• Harat Al Bu Rashid (Sinaw) Refurbishment & new extension to detached dwelling
• Mudayrib (Al-Qabil) Refurbishment & new extension to detached dwelling
• Harat al-Gila (TIWI) Refurbishment, demolition & construction of new series of dwellings & communial Facilaties
• Misfat al-’Abriyin Commercial units & appartments; Demolition of existing dwelling & construction of 2 retail units & 3 appartments
43
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
The sudden access to fossil fuels in the 1970s has had little sympathy for the traditional omani architecture at both the domestic and urban scale. The centralisation of power and nationalisation of the populace has led to a ‘modernisation’ of living. The promise of guarenteed amenities and less mantainance intensive living has seen entire communities across the country transitioned into new-build housing projects. The Ministry of Heritage and Culture sought ArCHIAM / NTU to document and study a fastly eroding historical record with a view to propose a network of strategic interventions to lure use back into these culturaly significant places.
vernacular architecture | archiving 44
RIBA Plan of Work
Stages 0-2
45
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
46
RIBA Plan of Work
Stages 0-2
47
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
48
RIBA Plan of Work
Stages 0-2
fieldwork | immersion
The initial season of fieldwork took place over a 6 week period which saw us fully document 4 traditional, yet distinctly different, Omani settlements. Living close to site enabled us to learn much from the locals about how the settlements functioned but also the inter-tribal and political dynamics. While spending long hours slowly meandering between the dry and dense walls, a humbling sense of how life must have been like began to develop
49
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
The copters outputs from a few relatively simple but well considered flights informed topographical sections, 3D models, building elevations, assisted in understanding morphology and allowed us to study structures situation from otherwise impossible views ““The observer is neither camera nor eye, but video-dependant.
copter | relativising reality 50
There is a new level of symbiosis between the human being and machines, in which interface plays a key role. The progressive infiltration of electronic means in the world makes us see the world more from within, relativising the idea of reality.” Muller, Willy; the metapolis dictionary of advanced architecture
RIBA Plan of Work
Stages 0-2
Nottingham: Bonnington Gallery
Nottingham / Oman: Settlement Model
51
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
masterplan | research led design
52
RIBA Plan of Work
Stages 0-2
53
UK / OMAN Nottingham Trent University / ArCHIAM
Architectural Research Assistant July 2013 - Dec 2014
After substantial data gathering on site for the ministry of heritage and culture, the work was taken back and turned into a report advocating certain strategic interventions with an aim to enhance and reactivate the now abandoned settlements. The research provides a thurough foundation from which a cohesive design can be developed
54
RIBA Plan of Work
Stages 0-2
55
Vic, Australia Soft Loud House Architects
Architectural Assistant Pt.1 October 2009 - March 2010
Post part 1 placement was spent in Australia working for principle architect Alvyn Williams. Day to day duties included producing planning applications and detailed documentation for dwellings and school buildings Additional work included digital visuals, online blog, production of planning guidelines for local municipality, engagement with planners, engineers & clients.
56
Projects • Steels Creek Underground House
A project which went on to feature on Australian Grand Designs, this was a new build project to replace a previous home destroyed in the bush fires in 2009. Making a fire resilliant building was a priority in the brief as the clients had been lucky to escape the disaster with their lives. Making the home as energy efficient as possible with minimal to no energy bills was another primary objective in the client’s ambitions for this project. I was involved from early briefing stages the planning drawings and the production of tender drawings.
• Melbourne Rudolf Steiner School
An prominant Steiner School in Melbourne was expanding and required and additional building to provide a multipurpose space for all year groups. The primary space was a EUrythmy hall , a large open space flooded with natural light to be used for the practice of This building had been granted planning permission when I received it. I produced the full set of tender drawings drawings.
• Warburton Shops
A set of 5 commercial units with lettable office space above and a carpark to the rear was produced alongside a demolition application to replace an existing dwelling on an economically strategic plot.The site is close to the modest town centre and positionved directly off of the main road running through the town. I produced the full set of planning drawings.
• Shire Planning Guidelines
As part of an iniative to help alieviate the rebuilding costs for home owners following the devistation of the bush fires disaster in 2009, the district council commisioned Soft Loud House Architects to produce a series of planning guideline drawings. These guidelines featured examples of the most common types of planning applications (new home, extension & refurbishment, demolition and commercial), illustrated with full sets of planning drawing examples and annotations.
57
Vic, Australia Soft Loud House Architects
Architectural Assistant Pt.1 October 2009 - March 2010
brockspur farm | bushfire resiliance 58
RIBA Plan of Work
Stages 0-4
photo ben wrigley
59
BUSHFIRE RECONSTRUCTION PROJECT
Brick paving fire door Vic, Australia washing machine fridge sky light Soft Loud House desk trough
+20.750
+20.750
Architects
Architectural Assistant Pt.1 A
A08
October 2009 - March 2010 FGL +20.850
d +20.850
STUDY
Bp
LAP POOL
SPA
ENTRY fd
C
B
FFL +20.900
A08
A08
UTILITY
Bp
10775
BED 1
BED 2
LIVING
KITCHEN
d
Bp
sl
sl shr
Bp
ROBE
Bp
metal door S T O R A G E ladder to mezz
cool air pipes
metal door
gas aga
fr
BATHROOM
Bp
Bp
sl
W/C
fd
Bp sl
wm t
LAU cbd
25400
garden bed
After loosing everything in Black Saturday, Australia’s worst ever natural disaster in recorded history, the Williams’ were determined to not only rebuild, but live in a home resiliant to the threat of bushfires. +20.800 BuiltBpinto a hill, only 1 elevation remains exposed. This elevation is clad in locally sourced Tynong Granite and features a serviced retreat Bp inner most part of the bunker at the dwelling. +21.700 The clever passive design ensures a +22.600 round ambient temperature with year Bp out the need for any heating or cooling systems. This buildings unique story was captured in S2E10 of Australian Grand Designs +23.800 SHELTER FFL +23.950
A
A08
S:\alvyn\alvyn\Soft Loud Drawing Title.jpg
issued: PLANNING nov 2009
57 HARVEY RD STEELS CREEK FARM RECONSTRUCTION FLOOR PLAN
sheet: scale: date: drawn:
A3 OF 8 1:100 NOV 2009 PMM
N
photo celeste faltyn photo ben wrigley
60
Drainage cell Timber ceiling Soil cover Granular fill membrane
RIBA Plan of Work
Stages 0-4
concrete or timber roof to be confirmed Tg
1000
Sc Dpc
Solar hot water panel
2° slope
Bp
FFL +20.9 100Ø drain dpc & termite protection
LAP POOL
Slab & footings Ref engineer
1500
1550
STORAGE
2901
300 KITCHEN
Gf
Tc
3400
SERVICES
Tc
1800
D
1800
Dpc
SECTION B-B
S:\alvyn\alvyn\Soft Loud Drawing Title.jpg
issued: PLANNING nov 2009
57 HARVEY RD STEELS CREEK FARM RECONSTRUCTION SECRTIONS 2
sheet: scale: date: drawn:
A6 OF 8 1:50 NOV 2009 PMM
photo celeste faltyn photo ben wrigley
61
Vic, Australia Soft Loud House Architects
Architectural Assistant Pt.1 October 2009 - March 2010
rudolf steiner school | eurythmy 62
RIBA Plan of Work
Stages 0-4
photo by ben wrigley
63
Vic, Australia Soft Loud House Architects
Architectural Assistant Pt.1 October 2009 - March 2010
64
The Steiner Schools emphasise the role of the imagination & developing thinking that encourages a creative & experiential understanding as much as an analytic approach. The overarching goals of this educational approach are to provide young people the basis on which to develop into free, moral and integrated individuals, and to help every child fulfil his or her unique potential
RIBA Plan of Work
Stages 0-4
eurythmy room
This section and internal photo shows part of the Eurythmy room at the school. Eurythmy is an expressive movement art used for education and in anthroposophic medicine.
65