EPD International
The case for 'home grown' EPDs and how to avoid the pitfalls
July 2012 Anna Braune, Dr. Iris Bauer (PE INTERNATIONAL)
Introduction
Dr. Iris Bauer, Senior Consultant Has developed the EPD toolkit with her experience from many EPD projects
04.07.2012
Sandra Walser, Sales Manager Coordinates Marketing and Sales in the field of Sustainable Building
Anna Braune, Principal Consultant Team Manager in our headquarter and head of PE‘s European expert group ‚Sustainable Building‘
2
Technical Information
Dial-in via phone or headset All participants are muted to ensure a good sound quality You can minimize the menu. Questions and comments can be given via the question/ chat function. We‘ll answer all questions.
04.07.2012
3
1_Importance of Product Information
04.07.2012
2_Environmental Product Declaration - EPD
3_Usage of EPDs
4
Sustainability in Building and Construction At all Life Cycle Stages
Socio-culture / People
Raw materials
04.07.2012
Manufacturing
Construction
Environment / Planet
Operation
Cleaning
Economy / Profit
Repair / Waste Recycling Replacement management
5
Importance of construction materials is growing Example office building
Primary energy demand of a conventional building (2010) after 50 years Use stage (replacements)
Primary energy demand of a "Zero Energy Building" after 50 years
Deposit / recycling Production / materials
Transport to site
Deposit / recycling Use stage (replacements)
Transport to site
EPD Production / materials
Use stage (energy in operation)
04.07.2012
6
Growing network of Green Building Councils Europe
04.07.2012
7
Selected building rating schemes
Rating scheme (origin)
„Green Building“ scheme
„Sustainable Building“ scheme
Product Life Cycle Information required
Complete Building Life Cycle Assessment
BREEAM (UK)
X
Mandatory
Optional
LEED (US)
X
Optional
Optional
Mandatory
Mandatory
Mandatory
Optional
DGNB (DE) HQE (FR)
X X
> 60% of DGNB-criteria are related to information in EPDs! 04.07.2012
8
1_Importance of Product Information
04.07.2012
2_Environmental Product Declaration - EPD
3_Usage of EPDs
9
Environmental Product Declarations EPD
An Environmental Product Declaration EPD describes a product throughout its entire life cycle – all relevant environmental information from cradle to grave EPDs are independently verified and guarantee reliability of manufacturers’ information Rules for EPDs are defined by EPD program holders – for building products the new EN 15804 is introduced as respective standard
EPD program holders worldwide
ECO Platform = European Construction Product Organisation L
Platform for EPD program holders Includes 25 organizations representing 17 countries Aims at creating a common framework for EPDs in Europe
04.07.2012
11
IBU Principles and normative background
04.07.2012
12
Legislative aspects From CPD to CPR
Construction Product Regulation (CPR) = CPD+
• • •
CPR** replaces the Construction Products Directive (CPD)* Clarifies and precises CPD In CPR the former “essential requirements” become “basic work requirements” with some adjustments:
•
•
•
“Hygiene, health and environment” to include construction, demolition and wider environment. Sustainable use of natural resources
CPR contains a link to EPDs in amendments:
“(56) For the assessment of the sustainable use of resources and of the impact of construction works on the environment Environmental Product Declarations should be used when available.”
*CPD was the driver for the development of harmonized standards, which enable CE marking of products. ** Under CPR, where there is a harmonized standard CE marking is mandatory. CPR is effective as of mid-2013,
1_Importance of Product Information
04.07.2012
2_Environmental Product Declaration - EPD
3_Usage of EPDs
14
Usage of EPDs LCA results
European Core EPD Carbon Footprint
Availability in data bases
IBU EPD
LCA Databases
EPD®
Extern „LCA is used“
Transparency Support of certifications BRE Env. Profile
Product LCA
Supply Chain
FDES
Core Indicators Env. Management
e.g. ULE, NSF, ICC
Ecodesign
AENOR
Sustainable optimisation of products and production 04.07.2012
15
Communication of Environmental Indicators of Products
16
Communication of Environmental Indicators of Products
17
Communication of Environmental Indicators of Products
04.07.2012
18
Summary
Environmental Product Declarations‌ are used in some building labelling schemes but with fast uptake in others require explanations for end-users but are reliable documents for environmental communication do not rate products good or bad but support transparency and decision making are standardized but currently mainly in the building products sector are voluntary but provide necessary environmental information for European Construction Product Regulation (CPR)
TRANSPARENCY is key for reliable communication Is basis for differentiation from competitors 04.07.2012
19
1_Schedule of an EPD project
04.07.2012
2_EPD toolkit
3_Benefits
20
Schedule of an EPD project
Decision for EPD Program holder organizes Product Group Forum and public consultation Product specific requirements – Product Category Rule (PCR) – available
Yes
PCR
No
(participate: producers, public, verification board) PCRs include guidelines which must be complied with while setting up an EPD
Calculate LCA, write LCA report and prepare EPD
Verification of EPD through independent verifier appointed by program holder
Background report
EPD
Schedule of an EPD project Standard responsibilities
Project steps
Kick-off meeting Data collection Compilation of a questionnaire Collection of production data Plausibility check Compilation of EPD texts Text template for customers Product description for the EPD document LCA chapter for the EPD Modelling in GaBi Creation/ adaption of the GaBi model Quality check GaBi model Evaluation / Interpretation LCA evaluation Compilation of result diagrams Interpretation of results Documentation Finalisation of the EPD (format, layout) Background report Verification Hand-over for verification Check of EPD document and background report 04.07.2012
Responsibility PE
Customer
X
X
Program holder
X X X X X X Manual Training
X X X X X X X
X
(X)
X X (Pr端fer) 22
Schedule of an EPD project Customers taking over
Project steps
Kick-off meeting Data collection Compilation of a questionnaire Collection of production data Plausibility check Compilation of EPD texts Text template for customers Product description for the EPD document LCA chapter for the EPD Modelling in GaBi Creation/ adaption of the GaBi model Quality check GaBi model Evaluation / Interpretation LCA evaluation Compilation of result diagrams Interpretation of results Documentation Finalisation of the EPD (format, layout) Background report Verification Hand-over for verification Check of EPD document and background report 04.07.2012
Responsibility PE
Customer
X
X
Program holder
X X X X X X X X X X X
GaBi 5 prof Modelling Support
X X
X
(X)
X X (Pr端fer) 23
Schedule of an EPD project Customers taking over
Project steps
Kick-off meeting Data collection Compilation of a questionnaire Collection of production data Plausibility check Compilation of EPD texts Text template for customers Product description for the EPD document LCA chapter for the EPD Modelling in GaBi Creation/ adaption of the GaBi model Quality check GaBi model Evaluation / Interpretation LCA evaluation Compilation of result diagrams Interpretation of results Documentation Finalisation of the EPD (format, layout) Background report Verification Hand-over for verification Check of EPD document and background report 04.07.2012
Responsibility PE
Customer
X
X
Program holder
X X X X X X X X X X X
Interactive EPD
X X
X
(X)
X X (Pr端fer) 24
Schedule of an EPD project Customers taking over
Project steps
Kick-off meeting Data collection Compilation of a questionnaire Collection of production data Plausibility check Compilation of EPD texts Text template for customers Product description for the EPD document LCA chapter for the EPD Modelling in GaBi Creation/ adaption of the GaBi model Quality check GaBi model Evaluation / Interpretation LCA evaluation Compilation of result diagrams Interpretation of results Documentation Finalisation of the EPD (format, layout) Background report Verification Hand-over for verification Check of EPD document and background report 04.07.2012
Responsibility PE
Customer
X
X
Program holder
X X X X X X X X X X X X X
X
(X)
X X (Pr端fer) 25
1_Schedule of an EPD project
04.07.2012
2_EPD toolkit
3_Benefits
26
EPD toolkit
Manual Training
04.07.2012
GaBi 5 prof Modelling Support
Interactive EPD
SOFTWARE SERVICE
27
EPD toolkit Training and Modelling Support
SERVICE – Training and Modelling Support
Basic training for GaBi 5 and LCA methods Training for usage of the interactive EPD 2 to 3 person days Modelling of your product in an cooperative approach OR Adaptation of an existing model to EN 15804 Connection to interactive EPD 5 to 7 person days by PE, X days by customer
04.07.2012
28
Indicators according to EN 15804
Global warming potential (GWP) Depletion potential of the stratospheric ozone layer (ODP) Acidification potential of land and water (AP) Eutrophication potential (EP) Formation potential of tropospheric ozone photochemical oxidants (POCP) Abiotic depletion potential for non fossil resources (ADP elements) Abiotic depletion potential for fossil resources (ADP fossil fuels) Input of renewable primary energy (energy resources) excluding feedstock Input of renewable feedstock Total input of renewable primary energy (resources and feedstock) Input of non renewable primary energy (energy resources), excluding feedstock Input of non renewable feedstock Total input of non renewable primary energy (resources and feedstock)
04.07.2012
Input of secondary material Input of renewable secondary fuels Input of non renewable secondary fuels Input of net fresh water Hazardous waste disposed Non hazardous waste disposed Radioactive waste disposed Components for re-use Materials for recycling Materials for energy recovery Exported energy
29
EPD toolkit LCA model according to EN 15804
04.07.2012
30
EPD toolkit Manual
SOFTWARE – Manual GaBi 5 and interactive EPD
04.07.2012
32
1_Schedule of an EPD project
04.07.2012
2_EPD toolkit
3_Benefits
33
Benefits From EPD to continuous improvement
Communication
Eco-Design (monitoring) Verification
Documentation/ Verification
GaBi Model Bench mark
Core LCA Tool
Company data
04.07.2012
Latest background LCA data Modeling & method acc. to EN 15804
-
EPD toolkit Result presentation in modules (A-D) Formats according to EN 15804 Individual parameters yearly data updates, web or desktop version
Average
Site1
Site 2
…………… ……………
…………… ……………
…………… ……………
Site3 etc. …………… ……………
34
Benefits
Fast results
More EPDs, less cost Usage of LCA indicators in product development/ innovation Controlling during validity of the EPD (also in the framework of an environmental
management system) Individual Support Level Always up-to-date: software, background data and interactive EPD
PE expertise built in
04.07.2012
35
Need more information? Service description FAQ Recording Individual conversations
Thanks for taking part!
04.07.2012