E-PORTFOLIO
SEE PEI SHAN || 0342437 BA[Honours] in Interior Architecture AUGUST – DECEMBER 2022
PROJECT 1 NARRATIVE PROGRAMMING
The COVID-19 pandemic is a worldwide catastrophe that has affected Malaysia. People's expectations of their workplaces have shifted as a result of working from home during the epidemic, with a better work-life balance being their top goal. Even in a future where work is more mobile, the actual office will still be important, but it will be built to support flexibility and choice. In this project, we were assigned to propose a post pandemic programming of a new working environment, according to the selected SDG as a group of 3. We chosen SDG 12 (responsible consumption and production) ) to extract issues and propose suitable programs that are in line with the selected goal.
THE NARRATIVE ISSUE & PROGRAM BOARD group project
a r r a t i v e a b s t r a c t i o n i s s u e s
a r r a t i v e P r o g r a m
THE OBJECT individual project
PROGRAM DIAGRAM
crit 1 final
PROJECT 2 MODEL
Task 2A : BUILDING/SITE MODEL (GROUP-10%)
We are required to build a physical model of the PAM building at a scale of 1:100 using suitable and sturdy material as a group. The façade must be openable to allow the interior spaces to be appreciated. We use the SketchUp file and scale from PAM centre layout plan provided as our references.
Task 2B : SPATIAL INTERIOR MODEL (INDIVIDUAL-10%)
We are required to produce a spatial model at the same scale (1:100) for the proposed interior areas individually. The model must be able to detach itself and reattach in the Building/Site Model done in groups.
SITE MODEL (GROUP-10%)
FINAL PROJECT WORK-PLAY CENTER
Final project is a continuation of Project 1 & 2, we are required to design an appealing and breathing work space individually at the office level chosen related to the SDGs assigned. Students are to create an engaging workspace that lead to transformation and growth, shift the culture towards engagement and productivity as well as integrating a sense of community will remain important to the future workplace, especially as advancements in technology encourage people to work remotely and become more isolated.
INTERIM CRIT 1
LAYOUT PLAN
INTERIM CRIT 2
AXONOMATRIC & PERSPECTIVES
INTERIM CRIT 2 PERSPECTIVES
INTERIM CRIT 3
SECTIONAL PERSPECTIVE & ELEVATIONS
ECOLOCATOR design statement || introduction
ECOLOCATOR layout plans
ECOLOCATOR axonomatric & elevations
ECOLOCATOR sectional perspective
ECOLOCATOR perspectives - entrance
ECOLOCATOR perspectives - colour codify
ECOLOCATOR
perspectives - digital ticket area
ECOLOCATOR perspectives - cafeteria
ECOLOCATOR
perspectives - digital fashion design
ECOLOCATOR perspectives - co-working area
ECOLOCATOR
perspectives - repupose sewing area
E C O L O C A T O R o v e r a l l p r e s e n t a t i o n b o a r d
REFLECTION
IAD IV was a slow and long process, which required group members to cooperate and brain-storming during the starter of this whole project, continueing with loads of individual work. There are some challenges we encountered during the first project, as we don't have a clear direction on what we are going to develop concept ideas representing the allegory of the issue and interpret on the chosen SDG. However, we manage to overcome the challenges we face. It is a busy and heavy semester for me and I need to improve my time management skills in order to complete all the tasks efficiently.