Playground planning guide pnp

Page 1

Playground Field Guide

WHAT SURFACING IS BEST

A road map for the Playground planning process THE BUDGET Factors to consider: Overall size of the play space Number of children who will use space Type of surfacing you will select Equipment and surfacing installation costs

INSTALLATION Factors to consider: $$$ Professional Installation - FactoryCertified installers manage entire process $$ Supervised installation - Volunteers participate under supervision of FactoryCertified installers $ Customer installation - Volunteers organize and fully participate in installation

THE SITE Factors to consider:

THE CHILDREN Factors to consider:

Topography - Level grade will save time and money

Identify primary users of the play space

Soil and drainage conditions

Plan for age appropriate equipment

Utilities - Identify the location of those seen and unseen

Incorporate a variety of play elements

Circulation - Maximize visibility with the appropriate use zone

Implement inclusive principles in your design

Example of Playground Funding Allocation

28%

Equipment

19% 53%

Surfacing (EWF) Installation The budget percentages listed are for illustrative purposes only and to visually address the main considerations when planning a playground project. Surfacing percentage is based using EWF.

* Playset shown is Martin Point in Playful


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.