PEDROFERREI RA
T HOMPS ONHOT ELT ORONT O L OBBYREDES I GN
THOMPSON HOTEL LOBBY RE-DESIGN
Sheet List Sheet Number
Sheet Name
ID.01 COVER PAGE ID.02 FLOOR PLAN ID.03 FURNITURE PLAN ID.04 SECTION A-A ID.05 SECTION B-B ID.06 REFLECTED CEILING PLAN ID.07 WALL + FINISH FLOOR PLAN ID.08 MILLWORK DETAIL 01 ID.09 MILLWORK DETAIL 02
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
Sheet Issue Date 03/11/14 04/18/14 04/20/14 04/21/14 04/21/14 04/21/14 04/21/14 04/21/14 04/21/14
COVER PAGE Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.01 Scale
6 26' - 7"
26' - 7"
1
2
5' - 2 1/2"
4' - 10"
26' - 7"
3
4
26' - 7"
26' - 7"
26' - 0"
26' - 0"
2
9 10
2 7 11' - 3"
6' - 7 1/2"
8
6' - 7 1/2"
25' - 11"
TRUE NORTH
13' - 7 1/2"
5' - 0" 5' - 0 1/2"
3' - 4" 18' - 9"
6' - 10"
RECEPTION
18' - 9 1/2"
6' - 7"
3
8' - 1"
26' - 7"
5
B
10' - 3" 5' - 10 1/2"
A
26' - 7"
9
8
6' - 11 1/2" 5' - 5 1/2"
0' - 7 1/2"
7
A
COLUMN PANEL (TYP)
2
CAFE BAR
11' - 9"
6
A
EXIST. RESTAURANT
6' - 8"
0' - 5"
LIQUOR BAR
13' - 1 1/2"
0' - 5"
5
DN
1
6' - 0"
1
7' - 5 1/2"
3 11' - 5 1/2"
11' - 4"
2 3
26' - 5 1/2"
4' - 6 1/2"
COAT CHECK
B
11' - 0"
10' - 11"
9' - 10"
21' - 6"
2
4 1
13' - 6 1/2"
92' - 10"
B
13' - 6 1/2"
72' - 11"
FIRST FLOOR 1/16" = 1'-0" Door Schedule Mark
Level
Family
Width
1
Count MULLION
1 2 3 4 5 6 7 8 9 10
FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR FIRST FLOOR
Curtain Wall Door Panel Curtain Wall Door Panel Sliding-Closet Curtain Wall Door Panel Curtain Wall Door Panel Curtain Wall Dbl Glass Single-Flush Single-Flush Single-Flush Single-Flush
13' - 0" 13' - 0" 5' - 8" 13' - 0" 13' - 0" 6' - 2" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
1 1 1 1 1 1 1 1 1 1
2
3
8" CONC. WALL
1/2 GYP. WALL BOARD
1/2 GYP. WALL BOARD
4" METAL STUD 1/2 GYP. WALL BOARD
DOUBLE PLAIN GLAZING
WALL TYPES 1/4" = 1'-0"
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
FLOOR PLAN Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.02 Scale As indicated
3 9' - 7"
RECEPTION BAR (CUST.)
TB2
2' - 4 1/2"
2' - 4 1/2"
SF1 CH2
CH2
SF1
6' - 6 1/2"
TRUE NORTH
SF1
CH2 TB2
TB3
TB3
SF1
TB3
TB3
TB3
11' - 0"
CH2
20' - 11" CH1
CH1
CH1
CH1
CH1
CH1
CH1
CH1
10' - 11"
17' - 11 1/2"
CH3
12' - 1 1/2"
CH3
DN
3' - 3 1/2"
5' - 0" 2' - 4 1/2"
2' - 4 1/2"
11' - 5 1/2"
CAFE BAR (CUST.)
TB1 CH3
2' - 4 1/2"
26' - 5 1/2" CH3
CH3
15' - 8"
LIQUOR BAR (CUST.)
6' - 0"
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
FURNITURE PLAN Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.03 Scale 1/16" = 1'-0"
1 ID.05
T-BAR ANCHOR PLATE PRE-FABRICATE COLUMN PANELS
PRE-FABRICATED CUSTOM WALL/ROOF PANELS PRE-FABRICATED BACKLIT LOGO
T-BAR
LCD ILLUMINATION PANELS (SEE ELECTRICAL DETAILS) CANOPY ANCHOR PLATE SUPPORT 10G SUSP. STEEL CHAIN CUSTOM CANOPY (SEE MILLWORK DETAIL)
0' - 4"
0' - 1 1/2" 2' - 6"
3' - 0"
3' - 0 1/2"
TB1 CUSTOM RECEPTION BAR (SEE MILLWORK DETAIL)
SF1 EXPOSED CONC. FLOORING
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
SECTION A-A Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.04 Scale 1/8" = 1'-0"
TRUE NORTH
1
2
3
4
5
3
A
MAIN ELEC. SWITCH. W. DIMMER ELECTRICAL TERMINAL BOX. @ EACH COLUMN
CANOPY CEILING TILE
B
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
REFLECTED CEILING PLAN Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.06 Scale 1" = 10'-0"
6
7
8
9
TRUE NORTH
2
1
2
3
4
5 CERAMIC TILE
CERAMIC TILE
2 3
2
A 2
B
EXPOSED CONCRETE FLOORING THROUGHOUT
2 1
DN 3
1
1
1
WALL AND FLOOR FINISH PLAN 1/16" = 1'-0"
1 MULLION
2
3
8" CONC. WALL
1/2 GYP. WALL BOARD
1/2 GYP. WALL BOARD
4" METAL STUD 1/2 GYP. WALL BOARD
DOUBLE PLAIN GLAZING
WALL TYPES 1/4" = 1'-0"
THOMPSON HOTEL LOBBY LOUNGE RE-DESIGN
WALL + FINISH FLOOR PLAN Project number Date Drawn by Checked by
2014 - 01 23 April, 2014 P. FERREIRA Humber College
ID.07 Scale As indicated