Group
SCHAVENINGEN
live.work.play.learn
D
CONTENT
01
Site introduction & SWOT analysis
02
就是在此添加标题内容文本 Vision, Values & Project timeline 就是在此添加标题内容文本
03
Strategy Projects – policies - outcomes
就是在此添加标题内容文本
Site introduction
Site location : scheveningen harbor, hague, Netherlands Climate : 4 seasons Land use : 1. fishing industry 2. mixed use – residential/commercial/leisure Stakeholders: 1. civil society – local residents - current & future, tourists 2. Private – local business 3. Public – municipality of hague
SWOT analysis
VISION – CONCEPT & VALUES
LOGO
STRATEGY – PROJECT TIMELINE
LOGO
PHASE 1 - PARTICIPATION
LOGO
PHASE 2 – ACCESSIBLITY
LOGO
Projects
Policy
Reinforce civic square
All pedestrian routes require Better visual connectivity tactile material for disabled users An inclusive social space to promote stronger sense of community To create an interesting route to discover the heritage of the place
Tactile pavement with road signs and public furniture
Outcome
civic square INTERVENTIONS FOR THE PUBLIC REALM
PHASE 3 – DUNESCAPE
LOGO
Projects
Policy
Outcome
Stepped dyke/dune with perforations
Dyke requires disabled access (slopes)
Water management – flood control Better connectivity between harbor and beach Leisure area for all
Seasonal activities Eg: ice skating rink Indoor sports stadium
All-year-round public life
Promote all-year-round leisure/economy opportunities in the area
Sea organ, Croatia Benidorm, Barcelona Seasonal activities on the beach - Ice skating rink - Indoor sports
PHASE 4 –
CLEAN ENERGY, WASTE MANAGEMENT & GREENSCAPES
LOGO
Projects
Policy
Outcome
Green roof
50% of individual flat building roofs should have a green area by 2040
Reduction in noise/air pollution Water management Thermal mass
Green Groundscape - Street green - Residential courtyard garden
50% increase in green areas on the Promote ecology streets by 2040 with salt-tolerant Better visual connectivity plants Rainwater management
Renewable energy sources - Wind, solar, biomass (fish byproducts)
25% of total site energy is renewable and locally-sourced (solar, wind, biomass) by 2030
Increase environmental sustainability
Sustainable waste management & energy consumption - Compost - Efficient energy use
Incentives/rewards to companies for every 10% reduction in greenhouse gas emissions & annual energy consumption limits for waste generated
Promote higher awareness of the environmental responsibility
PHASE 5 – FISH CORPORATION
LOGO
Projects
Policy
Outcome
Integrate fishing industry with tourism & commercial activities - Guided tour in fish factories - Learning centre about fish processing & the ocean - Weekend fish market
Sunday fish market in the civic square – roads on harbor closed to traffic
visitors and residents will have more awareness about the local heritage better economic prospect for the industrial, commercial & tourism sectors
PHASE 6 – WATER GATE
LOGO
Projects
Policy
Outcome
Water gate/locks implemented at the mouth of the harbor
Water gate operate on a daily time schedule
Increase resiliency to climate change – flood control Connectivity between the 2 beaches
PHASE 1 PARTICIPATION
PHASE 2 ACCESIBILITY
PHASE 3 DUNESCAPE PHASE 4 CLEAN ENERGY, WASTE MANAGEMENT & GREENSCAPES
PHASE 5 FISH CORPORATION
PHASE 6 WATER GATE