Schaveningen presentation

Page 1

Group

SCHAVENINGEN

live.work.play.learn

D


CONTENT

01

Site introduction & SWOT analysis

02

就是在此添加标题内容文本 Vision, Values & Project timeline 就是在此添加标题内容文本

03

Strategy Projects – policies - outcomes

就是在此添加标题内容文本


Site introduction

Site location : scheveningen harbor, hague, Netherlands Climate : 4 seasons Land use : 1. fishing industry 2. mixed use – residential/commercial/leisure Stakeholders: 1. civil society – local residents - current & future, tourists 2. Private – local business 3. Public – municipality of hague


SWOT analysis


VISION – CONCEPT & VALUES

LOGO


STRATEGY – PROJECT TIMELINE

LOGO


PHASE 1 - PARTICIPATION

LOGO


PHASE 2 – ACCESSIBLITY

LOGO

Projects

Policy

Reinforce civic square

All pedestrian routes require Better visual connectivity tactile material for disabled users An inclusive social space to promote stronger sense of community To create an interesting route to discover the heritage of the place

Tactile pavement with road signs and public furniture

Outcome

civic square INTERVENTIONS FOR THE PUBLIC REALM


PHASE 3 – DUNESCAPE

LOGO

Projects

Policy

Outcome

Stepped dyke/dune with perforations

Dyke requires disabled access (slopes)

Water management – flood control Better connectivity between harbor and beach Leisure area for all

Seasonal activities Eg: ice skating rink Indoor sports stadium

All-year-round public life

Promote all-year-round leisure/economy opportunities in the area

Sea organ, Croatia Benidorm, Barcelona Seasonal activities on the beach - Ice skating rink - Indoor sports


PHASE 4 –

CLEAN ENERGY, WASTE MANAGEMENT & GREENSCAPES

LOGO

Projects

Policy

Outcome

Green roof

50% of individual flat building roofs should have a green area by 2040

Reduction in noise/air pollution Water management Thermal mass

Green Groundscape - Street green - Residential courtyard garden

50% increase in green areas on the Promote ecology streets by 2040 with salt-tolerant Better visual connectivity plants Rainwater management

Renewable energy sources - Wind, solar, biomass (fish byproducts)

25% of total site energy is renewable and locally-sourced (solar, wind, biomass) by 2030

Increase environmental sustainability

Sustainable waste management & energy consumption - Compost - Efficient energy use

Incentives/rewards to companies for every 10% reduction in greenhouse gas emissions & annual energy consumption limits for waste generated

Promote higher awareness of the environmental responsibility


PHASE 5 – FISH CORPORATION

LOGO

Projects

Policy

Outcome

Integrate fishing industry with tourism & commercial activities - Guided tour in fish factories - Learning centre about fish processing & the ocean - Weekend fish market

Sunday fish market in the civic square – roads on harbor closed to traffic

visitors and residents will have more awareness about the local heritage better economic prospect for the industrial, commercial & tourism sectors


PHASE 6 – WATER GATE

LOGO

Projects

Policy

Outcome

Water gate/locks implemented at the mouth of the harbor

Water gate operate on a daily time schedule

Increase resiliency to climate change – flood control Connectivity between the 2 beaches


PHASE 1 PARTICIPATION

PHASE 2 ACCESIBILITY

PHASE 3 DUNESCAPE PHASE 4 CLEAN ENERGY, WASTE MANAGEMENT & GREENSCAPES

PHASE 5 FISH CORPORATION

PHASE 6 WATER GATE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.